1 Roads Plan

2 Background Road conditions have been a problem for Painesville City over the past decade. Between 2009 and 2013, the city was only able to dedicate $1.9 million in total road repairs or an average of $393,000 per year. Because of this low investment, road infrastructure became weak and many roads fell into disrepair. In 2013, the residents of Painesville passed a 5-year levy to contribute $3 million of dedicated funding for the roads. Through grants and a strong five-year plan, the city will complete $8.2 million in road projects over that five-year period, a 316 percent increase in road investment. Roads that have been repaired in the last four years ( ) include Belmont Drive, Courtland Street, East Prospect Street, Elm Street, Erie Street, Fern Drive, Gillett Street, Hillside Drive, Hine Avenue, Levan Drive, Lexington Avenue, Lusard Street, Marion Avenue, Rockwood Drive, North State Street, Parmly Place, Stage Avenue, West Walnut Street, West Washington Street, Williams Street and Wood Street. The largest project for 2018 is the waterline replacement and resurfacing of Richmond Street costing an estimated $2.1 million and paid for by the Water Construction Fund, grants and the road levy. The waterline construction is expected to be completed in June, with ODOT running the resurfacing that is scheduled for completion in the fall. The final phase of Walnut Avenue, from Levan Drive to Mentor Avenue, will be completed in 2018 with a total budget of $606,000. Pearl Street, which received a new waterline in 2017, and Transit Street are budgeted at $185,000 and the design work for resurfacing West Jackson Street is budgeted at $112,000. The Next 5 Years In November 2017, the residents of Painesville approved a continuation of the Road Levy for another 5-year term ( ). To honor transparency, Painesville City is releasing our roads plan for these funds. *It should be noted that this document is a plan and that several variables, mostly tied to funding, can impact the implementation of this plan. The following is not a guarantee and all dates are tentative. Data Collection Painesville City started with data collection to determine the status of all city roads. Each street was inspected and ranked using ODOT standards. Once a list of roads ranked from worst to best condition was produced, the other infrastructures were evaluated. Water: The water infrastructure was elevated through an engineering study along with water main break records. The city ranked water main replacements starting with the

3 most important, best impact projects. These improvements are paid for through the Water Bills and grants. Sewer: There is no formal engineering study on the sanitary sewer collection system. It is in Painesville s operating plan to hire a third-party engineer to inspect and write a report on the sanitary sewer collection needs. Known issues with our sewer system were discussed. We set aside money each year of the plan for potential issues tied to construction projects. These improvements will be paid for through the Sewer Bill. Storm Water: There has been extensive research and development on the storm sewer needs in Painesville. The most impactful projects are included in this 5-year plan. These projects are paid for through the Level 2 Storm Sewer fees. Funding The city evaluated available funding through local sources (the Road Levy, General Capital Fund, Water Capital Fund, Sewer Capital Fund and Level 2 Storm Sewer Fees) as well as regional, state and federal grant and loan opportunities. The current City Council prefers to pay cash for all projects; therefore, loans are only used on the Storm Sewer projects and where it is advantageous for a grant application. The city paired grant funding opportunities to the projects that were most likely to receive funding in order to create the most fiscally responsible plan for the improvements. The Roads Plan ( ) The following pages hold the plan for the Road Levy funding cycle. The first three years of the plan are likely to occur as written. The fourth and fifth years reflect our best educated guess on where we will be as a community. As stated above, this is just a plan and the success falls solely on our ability to fund the whole project. Each year is broken down into the street, water, storm sewer, and sanitary sewer projects along with pertinent infrastructure improvements for the community.

4 2019 Highlights $4,378,000 West Jackson Button Avenue Pinehill Waterline Mentor Ave/ Jackson St. Storm Ardmore-Belmont Sewer Sidewalk Program Bank Street Retaining Wall

5 2019 Infrastructure Improvement Plan Road Resurfacing Project(s): 1. West Jackson Resurfacing Project $1,531,000 i. Road Levy $612,400 ii. Grant Funding $918,600 i. Road Resurfacing The project consists of pavement planing and asphalt resurfacing of 2.03 miles of West Jackson Street from the west corporation line of the City of Painesville to Richmond Street. The construction of ADA compliant curb ramps will be added at all required locations. This project will also include signage and pavement markings to incorporate a shared bicycle lane in both directions. 2. Button Avenue Waterline and Resurfacing Project- $595,000 i. Road Levy $22,600 ii. General Fund Capital $137,400 iii. Water Capital $150,000 iv. Sanitary Sewer $35,000 v. Grant Funding $250,000 i. Replacement of the water main The Button Avenue transmission waterline project is a vital health and safety project for Painesville, Grand River, Painesville Twp and Concord Twp. Historical data has shown an increase of water main breaks in Grand River and Painesville Twp. north of a bottleneck, at the intersection of the City s two largest transmission mains on Button Avenue. The existing 24 inch main connects to these lines through a 24 x12 wet tap connection which is currently restricting water flow and pressures to the Chestnut Pumping Station which serves Concord Twp. This waterline improvement would allow the water plant to reach its maximum capacity of 7.5 MGD, reduce water pressure and increase flow to distribution systems south of Button Ave. This would also help to minimize the amount of main breaks, allow for redundancy during a transmission waterline break on Button Ave. and reduce energy consumption. ii. Improvements on the Sanitary Sewer Replace 50 feet of 8 inch clay pipe with new 8 inch PVC. Existing clay pipe has belly in line that collects solids and plugs. iii. Road Resurfacing This project consists of the asphalt resurfacing of 0.35 miles of Button Avenue from Newell Street to Stage Avenue. The project will also include pavement repairs, casting adjustments, pavement markings, and the improvement of driveway aprons, as needed.

6 2019 Infrastructure Improvement Plan Road Project Design: 1. Skinner Avenue Design for 2020 project $150,000 i. General Fund Capital $100,000 ii. Water Capital $50,000 b. Apply for Grant to help cover Construction Water Line Project(s): 1. Watson Waterline $60,000 i. Water Capital $60,000 : i. The waterline is being replaced a year in advance of road improvements to Watson Street. The existing waterline is a 4 inch cast iron pipe which was built in The plan is to replace the existing waterline with a new 8 inch PVC pipe that will connect from W. Erie to W. Jackson. 2. Pinehill Waterline $473,000 i. Water Capital - $236,600 ii. Loan Funding - $50,000 iii. Grant Funding - $186,400 : i. This project is located along Pinehill Road from the northern top of bank of Ellison Creek to the cul-de-sac near S.R. 44 in Concord Twp, Ohio. Replace the failing/corroding 8 water main on Pinehill Road, constructed in 1984 with new 8-inch PVC water main. The estimated length of pipe replacement is 1620 feet. The condition of the existing 34 year old ductile iron main is certainly unstable. As corrosive soils have deteriorated the pipline causing 28 waterline breaks over the past 9 years. This break rate is over 50 times the AWWA national average. The fire department was not able to perform fire flow testing on Pinehill Road because of the threat of causing another main break.

7 2019 Infrastructure Improvement Plan Storm Sewer Project(s): 1. Mentor Avenue/ Jackson St. Storm Sewer Improvements $1,174,000 i. 20 year Bond for $1,174,000 : i. The Mentor Avenue (US 20) and Jackson Street Storm Sewer Improvements Project was created by combining recommendations made for each street as outlined in the 2008 Tiber Creek Drainage Study. The project consists of installing approximately 1,000 LF of 18 and 24 diameter storm sewer along Jackson Street and approximately 800 LF of 24 diameter storm sewer along Mentor Avenue. The installation of the storm sewer improvements for both areas is necessary due to existing undersized infrastructure that results in flooded roadways during frequent storm events. The proposed improvements are sized to convey a 10-Year (10% probability) storm event. Sanitary Sewer Project(s): 1. Ardmore-Belmont Sewer Repair $25,000 i. Sanitary Sewer Capital $25,000 : i. Replace 25 feet of 8 inch clay pipe and replace with 8 inch PVC. Root intrusion has deteriorated the integrity of the pipe. 2) Sanitary Sewer Improvements $40,000 i. Sanitary Sewer Capital $40,000 Other Infrastructure Project(s): 1. Bank Street Retaining Wall $300,000 i. General Fund Capital $300,000 2) Sidewalk Program $30,000 i. General Fund Capital $30,000

8 2020 Highlights $2,794,000 Skinner Avenue Riverside Drive Watson Street Cedarbrook Drive Sanford Street Micro-Surfacing Bank Street Retaining Wall

9 2020 Infrastructure Improvement Plan Road Resurfacing Project(s): 1. Skinner Avenue Resurfacing Project $1,500,000 i. Road Levy $500,000 ii. Water Capital $500,000 iii. Grant Funding $500,000 : i. Waterline replacement Skinner Avenue waterline project is coinciding with a road improvement. The waterline is a 6 inch cast iron pipe that was constructed in The water distribution department has assigned the lowest condition rating to this waterline. There have been eleven main breaks since 2011 on this waterline. The plan is to replace the existing pipe with a new 8 inch PVC waterline pipe. ii. Road Resurfacing The project consists of pavement planing and asphalt resurfacing of 0.70 miles of Skinner Avenue from Richmond Street to North St. Clair Street. This project will also include the installation of underdrains along the existing curb line, pavement repairs, casting adjustments and pavement markings. 2. Riverside Drive (in conjunction with the County) $130,000 i. Road Levy $130,000 b. Infrastructure i. Road Resurfacing The project consists of the pavement planing and asphalt resurfacing of Riverside Drive. The portion of Riverside Drive within the City limits is approximately 0.23 miles long between the Norfolk Southern railroad tracks and Nelmar Drive. This project will also include pavement repairs, the installation of Glas Pave 25 fabric, and pavement markings. 3. Watson Street $75,000 i. Road Levy $5,000 ii. General Fund Capital $70,000 : i. Road resurfacing The project consists of the pavement planing and asphalt resurfacing of Watson Street between Mentor Avenue and Jackson Street. This project will also include pavement repairs, curb replacement as needed, casting adjustments, and pavement markings.

10 2020 Infrastructure Improvement Plan 4. Cedarbrook Drive (Southington Blvd. to Monroe Blvd.) $175,000 i. General Fund Capital $175,000 : i. Road resurfacing The project consists of the pavement planing and asphalt resurfacing of Cedarbrook Drive between Southington Boulevard and Monroe Boulevard. This project will also include pavement repairs, casting adjustments, and pavement markings. Road Reconstruction Project(s): 1. Sanford Street (Richmond to Skinner) $265,000 i. General Fund Capital $265,000 i. Road Reconstruction Reconstruction of approximately 0.11 miles of Sanford Street from Richmond Street to Skinner Avenue. The work will include the cement stabilization of the road base; the installation of concrete curbs, underdrains, and storm sewer upgrades; and the placement of 6¼ of asphalt concrete pavement. Driveway aprons along the roadway will be replaced and all castings within the roadway will be adjusted or replaced as necessary. Water Line Project(s): 1) Shamrock Second Feed Loop Design $30,000 i. Water Capital $30,000 Storm Sewer Project Design: 1. Gingerbread Storm Water Project Design $64,000 i. General Fund Capital $64,000 : i. The Gingerbread Apartments Storm Sewer Improvements were recommended as outlined in the 2008 Tiber Creek Drainage Study. The project consists of installing approximately 225 LF of 36 diameter storm sewer and approximately 225 LF of 48 diameter storm sewer on the Gingerbread Apartments property. The installation of the storm sewer improvements is necessary due to existing undersized infrastructure that results in parking lot flooding during frequent storm events. The proposed improvements are sized to convey a 10-Year (10% probability) storm event.

11 2020 Infrastructure Improvement Plan Sanitary Sewer Project(s): 1) Sanitary Sewer Improvements $100,000 i. Sanitary Sewer Capital $100,000 Other Infrastructure Project(s): 1. Bank Street Retaining Wall $400,000 i. Stormwater Fund $400, Microsurfacing- Liberty Greens $55,000 i. General Fund Capital $55,000

12 2021 Highlights $2,590,600 East Washington Street South St. Clair Street Newell Street North State Street Shamrock Waterline Project Gingerbread Storm Sewer Project

13 2021 Infrastructure Improvement Plan Road Resurfacing Project(s): 1. East Washington Street (Liberty to State) $200,000 i. Road Levy $200,000 i. Road Resurfacing The project consists of the pavement planing and asphalt resurfacing of East Washington Street between Liberty Street and South State Street. This project will also include pavement repairs, casting adjustments, and pavement markings. 2. South St. Clair Street (High Street to Washington Street) $115,000 i. Road Levy $65,000 ii. Water Capital $50,000 i. Water Valve replacement The South St. Clair water valve replacement project will require 2-3 new valves to permit the possible abandonment of an existing 6 inch waterline that travels parallel to a 12 inch waterline. ii. Road Resurfacing The project consists of the asphalt resurfacing of South St. Clair Street between East Washington Street and East High Street. This project will include pavement planing of the existing asphalt near East Washington Street, pavement repairs, casting adjustments, and pavement markings 3. Newell Street (Jackson to Railroad Tracks) ( conjunction with County) $370,000 i. Road Levy $185,000 ii. Grant Funding $185,000 (Lake County) i. Road Resurfacing The project consists of the pavement planing, roadway widening, and asphalt resurfacing of Newell Street from Jackson Street to Richmond Road. This project will also include pavement repairs, the installation of CG 100 fabric, casting adjustments, and pavement markings.

14 2021 Infrastructure Improvement Plan 4. North State Street Resurfacing $680,000 i. Road Levy $185,000 ii. General Fund Capital $495,000 i. Road Resurfacing The project consists of pavement planing and asphalt resurfacing of 0.95 miles of North State Street from Chester Street to Skinner Avenue. This project will also include the installation of underdrains along the existing curb line, pavement repairs, casting adjustments and pavement markings. ADA compliant curb ramps shall be installed at all required locations Road Project Design: 1. Reed Avenue Design $75,000 i. General Capital Fund $75, Latimore/Mill Street Design $65,000 i. General Fund $50,000 ii. Water Fund $15,000 Water Line Project(s): 1. Shamrock Second Feed $270,000 i. Water Capital $135,000 ii. Grant Funding $135,000 i. Water users in the Shamrock development are currently served by Aqua Ohio through a temporary service agreement with the City of Painesville. The proposed waterline project planned would extend the existing 12 inch waterline on Renaissance Parkway under Rt. 44 to Shamrock Blvd. Water Project Design: 1. Magnolia Street Engineering $15,000 i. Water Capital $15,000 Storm Sewer Project(s): 1. Gingerbread Storm Water Project Construction- $640,000 i. Level 2, 8 Year Note, $640,000 2) Nelson Street Storm Water Project Design- $60,600 i. General Capital Fund $60,600

15 2021 Infrastructure Improvement Plan Sanitary Sewer Project(s): 1) Sanitary Sewer Improvements $100,000 i. Sanitary Sewer Capital $100,000

16 2022 Highlights $3,036,000 Stonehaven Drive Oak Street Hayer Drive Chestnut Street Latimore/ Mill Street Reed Avenue Magnolia Drive Nelson Storm Sewer Washington Complete Street Mirco-Surfacing

17 2022 Infrastructure Improvement Plan Road Resurfacing Project(s): 1. Stonehaven Drive Resurfacing $45,000 i. Road Levy $45,000 i. Road Resurfacing The project consists of the asphalt resurfacing of Stonehaven Drive from South State Street to the cul-de-sac. This project will include pavement repairs, driveway aprons, casting adjustments, and pavement markings. 2. Oak Street Paving (Elm, East 1,200 )- Needs to review Storm Sewer $100,000 i. Road Levy $45,000 ii. General Fund Capital $55,000 i. Road Resurfacing The project consists of the asphalt resurfacing of Oak Street from Elm Street to a point approximately 1200 east. This project will include pavement repairs, driveway aprons, casting adjustments, and pavement markings 3. Hayer Drive $150,000 i. General Fund Capital $150,000 i. Road Resurfacing The project consists of the pavement planing and asphalt resurfacing of Hayer Drive between Newell Street and Jackson Street. This project will also include pavement repairs, casting adjustments, and pavement markings 4. Chestnut Street $370,000 i. General Fund Capital $175,000 ii. Water Capital $20,000 iii. Grant Funding $175,000 i. Water Valve Replacement New valves will be installed on the waterline main connections, to improve service to the area. ii. Road Resurfacing The project consists of the pavement planing and asphalt resurfacing of Chestnut Street between the South Corp line and Mentor Avenue. This project will also include pavement repairs, casting adjustments, and pavement markings.

18 2022 Infrastructure Improvement Plan Road Reconstruction Project(s): 1. Latimore Street/ Mill Street Reconstruction $565,000 i. Road Levy $210,000 ii. Water Capital $75,000 iii. Grant Funding $280,000 i. Water Line replacement Latimore waterline project is the replacement of an existing 6 inch cast iron pipe that was installed in Water distribution staff assigned the lowest rating to the condition of the pipe and has had extensive maintenance repairs. The new pipe will be PVC material and will be increased in size to 8 inches. ii. Road Reconstruction Reconstruction of approximately 0.32 miles of Latimore Street and Mill Street from North State Street to East Main Street. The work will include the cement stabilization of the road base; the installation of concrete curbs, underdrains, and storm sewer upgrades; and the placement of 6¼ of asphalt concrete pavement. Driveway aprons along the roadway will be replaced as needed and all castings within the roadway will be adjusted or replaced as necessary. 2. Reed Avenue (does not include sanitary or water lines) $350,000 i. Road Levy $175,000 ii. Grant Funding $175,000 i. Road Reconstruction Reconstruction of approximately 0.19 miles of Reed Avenue from Newell Street to Lexington Avenue. The work will include the cement stabilization of the road base; the installation of concrete curbs, underdrains, and storm sewer upgrades; and the placement of 6¼ of asphalt concrete pavement. Driveway aprons along the roadway will be replaced as needed and all castings within the roadway will be adjusted or replaced as necessary. 3. Magnolia Drive Reconstruction $275,000 i. Road Levy $160,000 ii. Water Fund $115,000 Magnolia Drive existing waterline is a 4 inch cast iron pipe that was installed in Water distribution staff assigned the lowest rating to the condition of the pipe and has low flow concerns. The new pipe planned for installation will be an 8 inch PVC waterline that will

19 2022 Infrastructure Improvement Plan include a new fire hydrant. The waterline project will coincide with new pavement construction. i. Road Reconstruction Reconstruction of approximately 0.07 miles of Magnolia Drive from West Walnut Avenue to the cul-de-sac. The work will include the removal of the existing concrete curb and pavement; cement stabilization of the road base; the installation of new concrete curbs, underdrains, and storm sewer upgrades; and the placement of 6¼ of asphalt concrete pavement. Driveway aprons along the roadway will be replaced as needed and all castings within the roadway will be adjusted or replaced as necessary. Road Project Design: 1. West Eagle Street Design $125,000 i. General Capital Fund $75,000 ii. Water Fund $50,000 Storm Sewer Project(s): 1) Nelson Street Storm Water Project $606,000 i. Level 2, 8 Year Note, $606,000 b. Improvements: i. The Nelson Street Storm Sewer Improvements were recommended as outlined in the 2008 Tiber Creek Drainage Study. The project consists of installing approximately 450 LF of 42 diameter storm sewer in order to enclose the open channel between Nelson Street and Carroll Street. The installation of the storm sewer improvements is necessary to alleviate the flow restriction that results in manholes overtopping their rims along Nelson Street. The proposed improvements are sized to convey a 10-Year (10% probability) storm event Sanitary Sewer Project(s): 1) Sanitary Sewer Improvements $100,000 i. Sanitary Sewer Capital $100,000

20 2022 Infrastructure Improvement Plan Other Infrastructure Project(s): 1) Microsurfacing- Heisley Park $100,000 i. General Fund Capital $100,000 2) Washington Street Complete Street Project $250,000 i. General Fund Capital $100,000 ii. Grant Funding $150,000 i. This project will be the implementation of the transportation plan formulated in the 2018 with the TLCI feasibility grant.

21 2023 Highlights $3,250,000 Roosevelt Drive West Eagle Sanford Street Traffic Signals

22 2023 Infrastructure Improvement Plan Road Resurfacing Project(s): 1. Roosevelt Drive $100,000 i. General Fund Capital $100,000 : i. Road Resurfacing The project consists of the pavement planing and asphalt resurfacing of Roosevelt Drive between Mentor Avenue and Forest Drive. This project will also include pavement repairs, casting adjustments, and pavement markings Road Reconstruction Project(s): 1. West Eagle Reconstruction $1,540,000 i. Road Levy $210,000 ii. Water Capital $500,000 iii. Storm Sewer Fund $350,000 iv. Grant Funding $480,000 : i. Water Line Replacement The West Eagle waterline project is planned to replace the existing 8 inch cast iron pipe, built in 1939, with a new 8 inch PVC pipe material. The waterline has been assigned the lowest rating by the Water Distribution staff due to excessive maintenance repairs and main breaks ii. Road Reconstruction The project includes the reconstruction of 2150 feet of West Eagle Street, between the intersections with Newell Street and Jackson Street. The work shall will consist of the installation of storm sewers and the full reconstruction of the roadway, including chemical stabilization of the road base, and the placement of 6.25" of asphalt concrete pavement. Driveway aprons along the roadway will be replaced and all castings within the roadway will be adjusted or replaced as necessary. 2. Sanford Street (Taylor to St. Clair) $665,000 i. Road Levy $425,000 ii. General Fund Capital $240,000 b. Infrastructure i. Road Reconstruction The project includes the reconstruction of 1900 feet of Sanford Street, between the intersections with Taylor Place and North St. Clair St. The work will consist of the installation of storm sewers and the full reconstruction of the roadway, including chemical stabilization of the road base, and the placement of 6.25" of asphalt

23 2023 Infrastructure Improvement Plan concrete pavement. Driveway aprons along the roadway will be replaced and all castings within the roadway will be adjusted or replaced as necessary Sanitary Sewer Project(s): 1) Sanitary Sewer Improvements $100,000 i. Sanitary Sewer Capital $100,000 Other Infrastructure Project(s): 1. Traffic Signal Upgrade $845,000 i. CMAQ $367,500 ii. Electric $238,750 iii. General Fund Capital $238,750 : i. The proposed project will replace traffic signal controllers and vehicle detection at 14 intersections along the City s busiest two corridors, Richmond Street (SR 283) and Mentor Avenue (US 20). The vehicle detection upgrade will replace the existing inductive loops with signal pole mounted radar detector units. Fiber optic interconnect will be installed along the corridors and routed to the City Engineer s office where it will be connected to a new Central System, such as Centracs.

24 Conclusion This document shares the City s plan for road infrastructure improvements between the years of The Road Levy will contribute $3.175 million into our Roads. The current City Council plans to match that with $3.111 million from the General Capital Fund. The City also plans on apply for and receive $3.803 million in Grant Funding over the same period. The sources of funding stated above, along with water, sanitary sewer, storm sewer and electric funds, will allow us to invest $16 million in our complete street infrastructure from

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

5-Year Street Reconstruction Plan ( )

5-Year Street Reconstruction Plan ( ) 5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek

More information

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012 David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012 The City of Indianapolis is undergoing the completion of RebuildIndy projects. Through Mayor Ballard s RebuildIndy initiative, investments

More information

CITY OF VALPARAISO STORMWATER MASTER PLAN

CITY OF VALPARAISO STORMWATER MASTER PLAN CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August

More information

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project PennDOT Public Meeting S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project Mt Lebanon Township, Allegheny County Mt Lebanon Township Municipal Building November 6, 2014 1 Project

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

City of Richmond. Engineering Design Specifications

City of Richmond. Engineering Design Specifications City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Project will Replace: Utilities Curb Pavement Lighting. City of Madison Project will Replace: Utilities Curb Pavement Lighting Replace sanitary sewer main & laterals Winnebago: Existing 8 main, 1905 Linden: Existing 6 main, 1915, upsize to 8 main Atwood: Existing 12 main,

More information

University Park Subdivision Street Assessment Report

University Park Subdivision Street Assessment Report University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:...

More information

Outflow to Saw Mill Run

Outflow to Saw Mill Run Dormont Stormwater Fee Frequently Asked Questions What is stormwater, and why is it a problem in Dormont? Stormwater is runoff from rain or snow that falls and flows to Little Saw Mill Run or McNeilly

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

Engineering Department

Engineering Department Engineering Department Department Mission It is the mission of the Engineering Department to protect and enhance the public health, safety and welfare by reviewing, inspecting and maintaining documentation

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015 AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department

More information

A G E N D A Council Update Training Room September 26, :45 p.m.

A G E N D A Council Update Training Room September 26, :45 p.m. CITY OF THORNTON CITY MANAGER S OFFICE A G E N D A Council Update Training Room September 26, 2017 5:45 p.m. A. Boards and Committees Reports (Estimated 20 Minutes) 1. Rangeview Library District Meeting

More information

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals Purpose: The Midlothian Road entrance to Mundelein Park & Recreation District s (MPRD s) Keith Mione (Community) Park would

More information

JOB CREATION PROJECTS

JOB CREATION PROJECTS SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

PROJECTS UNDER CONSTRUCTION

PROJECTS UNDER CONSTRUCTION Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction

More information

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination

2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination 2014 PSPE Philadelphia Chapter Outstanding Engineering Achievement Award Nomination Route 29 Roadway Improvement Project SR 0029, Section AL2 Charlestown Township, Chester County, PA Nomination Form Route

More information

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C Exposition Light Rail Transit Project Project Status Update Meeting West End Corridor Segment C Culver City Senior Center November 18, 2010 Phase 1 Project Description Phase 1 from Downtown Los Angeles

More information

Construction Projects Report

Construction Projects Report Construction Projects Report Week of November 26 December 2, 2018 For general inquiries and questions, please contact the Project Management Office at (940) 349 7227 Street/Intersection From To CURRENT

More information

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010 City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville

More information

Cottage Grove Road Reconstruction. City of Madison Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs

More information

PROPOSED IMPROVEMENTS

PROPOSED IMPROVEMENTS IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways

More information

2017 Capital Improvements Report

2017 Capital Improvements Report 2017 Capital Improvements Report March 20, 2017 Board of County Commissioners Butler County Government Services Center 315 High Street Hamilton, Ohio 45011-2759 RE: 2017 Capital Improvements Report Board

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change* 12/6/2017 3012115-03 Northwood Dr NE, Glass to s/o Brookland $980,000.00 J. 4/16/2018 12/13/2017 3012121-02 O Ave NW, 16th to Ellis $4,065,000.00 Tippe; Lee J. 3/19/2018 Collins Rd NE from E of Northland

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name Project # PROJECT NAME PAGE 2134 2119 PR-1109 Clayton Road (Market Street to Oakland Avenue) Sidewalk Repair 911 System Replacement and Dispatch Room Remodel ADA Barrier

More information

2018 Capital Improvements Report

2018 Capital Improvements Report 2018 Capital Improvements Report March 19, 2018 Board of County Commissioners Butler County Government Services Center 315 High Street Hamilton, Ohio 45011-2759 RE: 2018 Capital Improvements Report Board

More information

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS 2010 EDITION CITY OF OZARK, MISSOURI REVISIONS TO THE 2009 EDITION The following revisions have been made to the 2009 edition of the city

More information

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES ROAD CONSTRUCTION 36 June 2014 ROADS&BRIDGES Young is full of life Recent expansion completes continuous, multilane arterial By Donald Hammack, P.E. Contributing Author The Florida Department of Transportation

More information

Building Great Neighbourhoods LAURIER HEIGHTS

Building Great Neighbourhoods LAURIER HEIGHTS Building Great Neighbourhoods LAURIER HEIGHTS Building Great Neighbourhoods Building Great Neighbourhoods (BGN) is a longterm framework that coordinates and integrates the efforts of three City of Edmonton

More information

Const. ROADS - Description

Const. ROADS - Description Road Projects make up the bulk of the capital expenditures for the township. For the term of this CIP, road projects total $9,843,000 or 72.0% of the total capital expenditures for all capital projects

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and

More information

4.500 Preston Road Overlay District

4.500 Preston Road Overlay District Section 4.500 Preston Road Overlay District 2004 Zoning Ordinance 4.500 Preston Road Overlay District (ZC 98-29; Ordinance No. 98-9-12) 4.501 Purpose To provide appropriate design standards for the use

More information

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Public Meeting US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Mark Leiferman Chief Road Design Engineer April 28, 2014 Why

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name 2062 1701 & 1711 Concord Avenue Purchase and Demolition of Structures 85 1279 1024 UF-802 UF-803 Affordable Housing 77 Annual CIP/TIP Management Program 105 Arnold Industrial

More information

Project Descriptions for FY 15

Project Descriptions for FY 15 Department of Transportation and Stormwater Services Stormwater Engineering and Design Division Project Descriptions for FY 15 43 rd Street Outfall PH II Pond Regional Drainage Improvement Flooding Relief

More information

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL The following is a list of conditions requiring completion to the City s Satisfaction prior to Site Plan Approval being granted

More information

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION

More information

CHAPTER 8 INFRASTRUCTURE

CHAPTER 8 INFRASTRUCTURE CHAPTER 8 INFRASTRUCTURE CHAPTER 8 SECTIONS 801 Introduction 802 Public Services/Facilities 803 Sewer System 804 Storm-Drain Facilities 805 Water-Distribution System 806 Street Network 801. INTRODUCTION

More information

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION LITTLE ELM 2009-2014 CAPTIAL IMPROVEMENT BOND STREET PRESENTATION Denton Frisco Little Elm Lewisville Legacy Southlake Grapevine Addison DENTON COUNTY & LEWISVILLE LAKE MATCHING FUNDS DENTON COUNTY BOND

More information

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements Coco Palms Community Development District Engineer s Report Infrastructure Improvements Prepared for Coco Palms Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS

More information

City of Ketchum P.O. Box East Ave. N. Ketchum, ID 83340

City of Ketchum P.O. Box East Ave. N. Ketchum, ID 83340 City of Ketchum P.O. Box 2315 480 East Ave. N. Ketchum, ID 83340 June 10, 2015 Mayor Jonas and City Councilors City of Ketchum Ketchum, Idaho Mayor Jonas and City Councilors: Sidewalk Discussion Introduction/History

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 TABLE OF CONTENTS Sheet Number Title Revision Date I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 STREETS ST-1 LOCAL STREETS 03/17/08 ST-1A LOCAL STREETS, 2015 GENERAL PLAN 11/15/04 ST-2 COLLECTOR AND ARTERIAL

More information

Highway 15 Project - Hutchinson

Highway 15 Project - Hutchinson Highway 15 Project - Hutchinson Agenda What are we going to talk about today? Goals and benefits of the project Details about the proposed work Project schedule and costs Any questions you may have about

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -

More information

Pennsy Greenway Trail

Pennsy Greenway Trail Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad

More information

John Portman Boulevard Corridor

John Portman Boulevard Corridor Corridor Multi-use Path + Streetscape Improvements February 8, 13 SOUTH SIDE BLOCK IMPROVEMENT NOTES: Consolidation of Utility/Sign Locations Remove Existing Trees Centennial Olympic Park Drive Planter

More information

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land. BYLAW NO. 3549/2015 Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land. 1 WHEREAS pursuant to provisions of Section 648 of the Municipal

More information

Town of Vershire Road Erosion Inventory Report

Town of Vershire Road Erosion Inventory Report Town of Vershire Road Erosion Inventory Report Taylor Valley Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation

More information

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By: S WOLFE ST N CASTLE ST N WASHINGTON ST S WASHINGTON ST S CHAPEL ST S DURHAM ST S DUNCAN ST N MADEIRA ST N MONTFORD AVE Butchers Hill Greening Feasibility N DUNCAN ST MULLIKIN ST N PORT ST N WOLFE ST E

More information

Location. Served. Category. Units Start Year. Previous Appropriations

Location. Served. Category. Units Start Year. Previous Appropriations 20142018 CAPITAL IMPROVEMENT PLAN ($ Thouss) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: TC Jester: Washington to I 10 N100002 Paving Drainage Project Description Project provides for the design

More information

2016 WORKSHOP LVR Field Trip

2016 WORKSHOP LVR Field Trip 2016 WORKSHOP LVR Field Trip ***Note*** Many of the sites on this tour were NOT related to, or funded by, the DGLVR program. They are being shown to encourage discussion about the kinds of projects that

More information

STANDARD DETAILS QUICK REFERENCE

STANDARD DETAILS QUICK REFERENCE STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B

More information

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 2, 2015 # 9 SUBJECT: ELECTION DISTRICT: Identification of Funds for the Traffic Signal at the Intersection of Northstar Boulevard

More information

Abbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK

Abbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK Municipality of Anchorage Community Council Survey ABBOTT LOOP COMMUNITY PARK This state funding request would be used to implement the remaining elements of the Community Park Master Plan Vision including

More information

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP #8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP STAFF REPORT To: Planning Commission Meeting Date: June 14, 2017 Item: T-1409 Prepared By: Robert Eastman GENERAL INFORMATION: Applicant: Property Owner(s): Requested

More information

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects 2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects Preservation / Structural Improvement Projects in 2018 Ravine

More information

BEST LOCAL LAND USE PRACTICES

BEST LOCAL LAND USE PRACTICES Ohio Balanced Growth Program BEST LOCAL LAND USE PRACTICES BIOSWALES AND BIORETENTION IN THE RIGHT-OF-WAY The Ohio Balanced Growth Program, and its Best Local Land Use Practices component, continue to

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010 Action Items 1. Storm water* a. Retrofit drainage in remaining areas of Miami River starting with Pinehurst neighborhoods This project included drainage work that consist of French drains, solid piping,

More information

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1 Illustration of Eastlake Farmer s Cooperative Grain Elevator Chapter 5: implementation 5-1 chapter 5: implementation Introduction The Eastlake Subarea Plan includes a wide range of recommendations intended

More information

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details CITY OF LATHROP Department of Public Works DESIGN & CONSTRUCTION Standard Details January 2014 General G-1A Signature Blocks G-1B Signature Blocks G-2 Drafting Standards G-3 Drafting Standards G-4 Drafting

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on

More information

City of Elyria. Frequently Asked Questions

City of Elyria. Frequently Asked Questions City of Elyria Stormwater Utility Program Prepared by: April 2014 (version 1) Page 1 City of Elyria Stormwater Utility Program Stormwater Utility Program Q. What is a Stormwater Utility? A. A stormwater

More information

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017 Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background

More information

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No )

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No ) AGENDA REPORT Meeting of the San Marcos City Council MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No. 88165) Recommendation Staff recommends the City Council adopt

More information

PORT CLINTON DOWNTOWN REVITALIZATION PLAN

PORT CLINTON DOWNTOWN REVITALIZATION PLAN The City has been awarded a $2.34 million Ohio Department of Transportation (ODOT), Small Cities Grant for the complete reconstruction of Madison Street AWARD WINNING PROJECT Best of Lake Erie Award Lake

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects 69th Street Bridge 02311 02311 A grade separation at 69th Street would eliminate the current at-grade crossing which causes frequent automobile delays due to long freight trains moving through this area.

More information

ions nts July 1, 2019 The utility answers to some increase: Q: A: rainwater Q: A: areas any the total by

ions nts July 1, 2019 The utility answers to some increase: Q: A: rainwater Q: A: areas any the total by Frequently Asked Quest ions Stormwater Rate Adjustmen nts The Fort Wayne Board of Stormwater Management and Fort Wayne City Council have approved an increasee stormwaterr utility fees to address neighborhood

More information

The Benefits and Challenges Associated with Green Infrastructure Practices

The Benefits and Challenges Associated with Green Infrastructure Practices The Benefits and Challenges Associated with Green Infrastructure Practices Thomas M. Evans ASLA, LEED AP Regional Green Infrastructure Design Services Director OWEA Technical Conference, June 20, 2013

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

North Street Reconstruction & Integrated Stormwater Management System

North Street Reconstruction & Integrated Stormwater Management System OWEA Watershed Workshop-October 30 th, 2014 North Street Reconstruction & Integrated Stormwater Management System Ted Blahnik, PE Principal-Williams Creek Consulting North Street: A Case Study for Integrated

More information

FEASIBILITY REPORT EVERGREEN PARK AREA STREET, UTILITY AND TRAIL IMPROVEMENTS

FEASIBILITY REPORT EVERGREEN PARK AREA STREET, UTILITY AND TRAIL IMPROVEMENTS Public Works Dept Engineering Division Phone: 763-569-3340 FAX: 763-569-3440 FEASIBILITY REPORT FOR EVERGREEN PARK AREA STREET, UTILITY AND TRAIL IMPROVEMENTS IMPROVEMENT PROJECT NOS. 2017-01, 02, 03,

More information

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Audit & Finance Standing Committee November 28, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Audit & Finance Standing Committee November 28, 2018 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 12.4.1 Audit & Finance Standing Committee November 28, 2018 TO: SUBMITTED BY: Chair and Members of the Audit & Finance Standing Committee Original

More information

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013 Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN

More information

Dundas Place Flexible Street Public Information Centre

Dundas Place Flexible Street Public Information Centre WELCOME TO THE DUNDAS PLACE DESIGN REVEAL Dundas Place Flexible Street Public Information Centre November 8, 2017 This project is funded by the City of London with support from the Government of Canada

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the

More information

Village of Forest Park. July 27, Sewer Separation Evaluation

Village of Forest Park. July 27, Sewer Separation Evaluation Village of Forest Park July 27, 2015 Sewer Separation Evaluation Presentation Overview Study Background Historic Nature of Forest Park Drainage Scale of Flooding Problem Forest Park Sewer System Background

More information

Designing for Sustainability: A Consultant s Perspective

Designing for Sustainability: A Consultant s Perspective Session 462 Asphalt Pavement Sustainability Designing for Sustainability: A Consultant s Perspective Timothy A. Bevan, P.E. / CH2M HILL Transportation Research Board 87th Annual Meeting January 13-17,

More information

APPENDIX F: DETAIL DRAWINGS

APPENDIX F: DETAIL DRAWINGS APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Route 18, South of Texas Road to Rues Lane, Pavement Project ID Numbers: 11408 / 114080 Initiated from the Pavement Management System, this project will rehabilitate pavement within the project limits.,