Existing Infrastructure Baseline Data (Task 1.5)

Size: px
Start display at page:

Download "Existing Infrastructure Baseline Data (Task 1.5)"

Transcription

1 Existing Infrastructure Baseline Data (Task 1.5) Hemet, California Downtown Hemet Specific Plan Prepared by John M. Cruikshank, PE July 10, 2015 (Rev. May 24, 2016) John M. Cruikshank Consultants, Inc. 411 N. Harbor Blvd., Ste. 201 San Pedro, CA P: / F

2 This is a project for the City of Hemet with funding provided by the Southern California Association of Governments (SCAG) Sustainability Program. The Sustainability Program is a key SCAG initiative for implementing the Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), combining Compass Blueprint assistance for integrated land use and transportation planning with new Green Region Initiative assistance aimed at local sustainability and Active Transportation assistance for bicycle and pedestrian planning efforts. Sustainability Projects are intended to provide SCAG-member jurisdictions the resources to implement regional policies at the local level, focusing on voluntary efforts that will meet local needs and contribute to implementing the RTP/SCS, reducing greenhouse gas (GHG) emissions, and providing the range of local and regional benefits outlined in the RTP/SCS. The work upon which this publication is based was funded in part through a grant awarded by the Strategic Growth Council under Grant Number The statements and conclusions of this report are those of the Consultant and not necessarily those of the Strategic Growth Council or of the State of California Department of Conservation, or its employees. The contents of this report reflect the views of the author who is responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the views or policies of SCAG. This report does not constitute a standard, specification or regulation. The Strategic Growth Council, the Department of Conservation, and SCAG make no warranties, express or implied, and assume no liability for the information contained in the succeeding text. The Strategic Growth Council, Department of Conservation, and SCAG shall not be responsible for the future use or adaptation of the report.

3 EXISTING INFRASTRUCTURE SUMMARY DOWNTOWN HEMET SPECIFIC PLAN EXECUTIVE SUMMARY As part of Task 1.5, Existing Conditions Data Collection, this Existing Infrastructure Summary is an overview of all the existing utilities / infrastructure within the Downtown Hemet Specific Plan area based on information compiled from existing data researched and retrieved from City of Hemet Public Works Department, Riverside County Flood Control District, various private utility purveyors, as well as observations during site visits. The Specific Plan area is fully built-out with residential and commercial properties, public school, recreational park, church, manufacturing and residential agricultural zones. There is also a BNSF railway track running diagonally across the Specific Plan area from the north boundary to southwest side. Currently there is a network of existing infrastructure utilities serving the Specific Plan area with no major deficiencies. SITE DESCRIPTION Project Location The city of Hemet (pop. 78,657) is a city located in Riverside County. The Downtown Hemet Specific Plan area is generally located in the central portion of the city between Gilbert Street on the west, and Santa Fe Street on the east, (see Figure 1). The southern boundary and northern boundary are Acacia Avenue and Oakland Avenue respectively. The Specific Plan area contains the historic core of the city. There is an existing railroad right-of-way across the area with large portions of vacant lands it due to the diminished concentration of agricultural activities in the valley. 1

4 The following is a summary of the existing utilities within the Downtown Hemet Specific Plan area based on information compiled from existing data supplied by the city of Hemet, Riverside Flood Control District, various utility purveyors, and site visits. The following is a listing of the existing facilities within the limits of the project area boundaries and their respective service providers. (See Exhibit 1 & 2 for utilities distribution maps) WATER SYSTEM City of Hemet Water / Wastewater Department Contact Person: Ron Proze The City of Hemet owns and maintains the water supply network within the City. Water lines are located in almost all streets and alleys within the project area. Almost all the existing water lines are older water pipes made of asbestos cement pipe (ACP), with some relatively new water lines that were installed in recent years made of C pipes and some ductile iron pipes (DIP), steel pipe (ST), and polyvinyl chloride (PVC) pipes. The pipe diameter sizes range from 4-inches to 14-inches. SEWER SYSTEM City of Hemet Water / Wastewater Department Contact Person: Ron Proze The existing sewer system in the city of Hemet is owned and maintained by the city s water/wastewater department. Currently, there is a comprehensive network of sewer lines in the project area. The existing sewer mains in the project are mostly 8 Vitrified Clay Pipe (VCP) with some PVC pipes. The sewer mains follows the general topography of the Specific Plan area and flows from east to west, also from north to south. The pipe diameter sizes range from 6 to 12. STORM DRAIN SYSTEM Riverside County Flood Control District Contact Person: Rudy Tabares, Jr The major back bone / main lines of the storm drain system in the project area are owned and maintained by the Riverside County Flood Control District. Most of the stormwater runoff collected in the Specific Plan area area conveyed to the surface streets and collected by curb and gutter along both sides of the streets. The stormwater will then sheet flows to an existing flood channel west of the Specific Plan area. There are only two underground existing storm drain pipe lines and one open concrete flood channel within the Specific Plan area. 1 C-900 pipe is PVC pipe that conforms to AWWA C900 Specification. 2

5 ELECTRICAL SYSTEM Southern California Edison Contact Person: Kim Gurule The Southern California Edison Company is the electrical purveyor for the city of Hemet the existing electrical facilities are an overhead/aerial electrical system with mostly low voltage conduits sharing poles with telecommunication and cable TV facilities. GAS SYSTEM Southern California Gas Company Contact Person: Steven Vargas The natural gas purveyor for the city of Hemet is the Southern California Gas Company. The entire Specific area has an extensive natural gas facility network with good comprehensive coverage. Almost every parcel within the project area has access to natural gas. The existing pressured gas lines within the project area ranges in size from 2 to 8. TELECOMMUNICATIONS SYSTEM Verizon Contact Person: Desiree Serano As mentioned earlier in the Electrical system section, existing telecommunications conduits within the project area are mainly aerial/overhead facilities sharing poles with the overhead electrical conduits; therefore, the location of the telecommunications systems have the identical alignment and coverage as the electrical system. CABLE TV SYSTEM Time Warner Cable Contact Person: Keith Klump Time Warner Cable (TWC) is the cable television (TV) service provider for the city of Hemet. Similar to telecommunication systems, the cable TV systems are mostly aerial facilities that share the joint poles with the electrical system along with a few underground conduits within the subarea. 3

6 W. OAKLAND AVENUE E. OAKLAND AVENUE 14" VCP 14" VCP 6" VCP SANTA FE STREET E. DATE STREET 14" ST LEGEND: (PIPE SIZE & MATERIAL) (PIPE SIZE & MATERIAL) (PIPE SIZE & MATERIAL) EXISTING WATER MAIN EXISTING SEWER MAIN EXISTING STORM DRAIN MAIN EXISTING OPEN CONCRETE STORM DRAIN CHANNEL SPECIFIC PLAN BOUNDARY RAILROAD EXISTING WATER WELL 14" PVC 14" PVC 14" VCP 14" PVC 14" PVC S. GILBERT STREET N. GILBERT STREET 10" PVC 10" PVC 10" PVC 10" PVC 10" PVC 10" PVC 10"PVC N. RAMONA STREET N. ALESSANDRO STREET 8"SEWER S. RAMONA STREET S. ALESSANDRO STREET W. LATHAM AVENUE 10" PVC 10" PVC 10" PVC W. DEVONSHIRE AVENUE E. DEVONSHIRE AVENUE N. INEZ STREET 60" RCP S. INEZ STREET 6" VCP S. STATE STREET S. HAVARD STREET N. STATE STREET N. HAVARD STREET N. CARMALITA STREET N. JUANITA STREET 54" RCP 54" RCP 48" RCP 48" RCP 12" ACP 12" ACP 12" ACP 12" ACP S. CARMALITA STREET S. JUANITA STREET S. BUENA VISTA STREET N. BUENA VISTA STREET 2" ST CALHOUN PLACE N. FRANKLIN STREET S. FRANKLIN STREET N. THOMPSON STREET S. THOMPSON STREET E. LATHAM AVENUE N. TAYLOR STREET ST JOHN PLACE 14" ST 14" ST 14" ST 14" ST S. TAYLOR STREET 12" ACP 12" ACP 10" VCP 10" AC W. KIMBALL AVENUE 6"PVC E. KIMBALL AVENUE 10" VCP (E) WELL 66" RCP 8" CONC. 8"CONC. 6" VCP 6" VCP ACACIA AVENUE 66" RCP 8" CONC. 8" CONC. 12" ACP ACACIA AVENUE EXHIBIT 1 DOWNTOWN SPECIFIC PLAN AREA WET UTILTIES PLAN

7 8" GAS 8" GAS LEGEND: EXISTING COMBINATION OF EXISTING ELECTRICAL, TELECOMMUNICATION AND CABLE TV AERIAL FACILITIES EXISTING ELECTRICAL AERIAL FACILITIES (PIPE SIZE) EXISTING GAS EXISTING CABLE TV AERIAL FACILITIES EXISTING CABLE TV UNDERGROUND FACILITIES SPECIFIC PLAN BOUNDARY RAILROAD S. GILBERT STREET N. GILBERT STREET W. DEVONSHIRE AVENUE W. LATHAM AVENUE N. RAMONA STREET N. ALESSANDRO STREET N. INEZ STREET N. STATE STREET (E) POWER PLANT S. RAMONA STREET S. ALESSANDRO STREET S. INEZ STREET S. STATE STREET W. KIMBALL AVENUE N. CARMALITA STREET S. HAVARD STREET N. HAVARD STREET S. CARMALITA STREET S. JUANITA STREET N. JUANITA STREET S. BUENA VISTA STREET N. BUENA VISTA STREET E. DEVONSHIRE AVENUE N. FRANKLIN STREET 2"GAS 2"GAS 2"GAS 2"GAS 2"GAS S. FRANKLIN STREET N. THOMPSON STREET N. TAYLOR STREET S. THOMPSON STREET S. TAYLOR STREET 2"GAS 2"GAS E. LATHAM AVENUE E. KIMBALL AVENUE EXISTING POWER PLANT EXHIBIT 2 DOWNTOWN SPECIFIC PLAN AREA DRY UTILTIES PLAN ACACIA AVENUE ACACIA AVENUE 0 250' 500' 750' 1000'

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION 3.0 PROJECT DESCRIPTION 3.1 BACKGROUND Under California law (Government Code Section 65300 et seq.), every city and county is required to have a general plan. The general plan is to be comprehensive and

More information

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

5-Year Street Reconstruction Plan ( )

5-Year Street Reconstruction Plan ( ) 5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek

More information

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP PROJECT DESCRIPTION ENVIRONMENTAL SETTING Project Site Location The proposed project site is located within the City of Camarillo in Ventura County. As shown in Figure 1, the City of Camarillo is located

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

1 INTRODUCTION. A. Purpose of this General Plan

1 INTRODUCTION. A. Purpose of this General Plan 1 How will Chino become a healthier place to live, work, and play? The City has established community health as a focus of this General Plan. Health touches all aspects of a community, from where residents

More information

SPECIFIC PLAN Requirements

SPECIFIC PLAN Requirements CITY OF LANCASTER PLANNING DEPARTMENT 44933 Fern Avenue, Lancaster, California 93534 (661) 723-6100 SPECIFIC PLAN Requirements Purpose The purpose of a specific plan is to provide for the logical development

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting Rosecrans/Marquardt Grade Separation Project Community Open House Meeting October 17, 2017 Rosecrans/Marquardt Presentation Agenda 1. Welcome Remarks & Introductions 2. Community Outreach 3. Project Goals

More information

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION 2. INTRODUCTION 2.1 AUTHORITY The City of Gardena initiated and prepared the Artesia Corridor Specific Plan pursuant to the provisions of California Government Code, Title 7, Division 1, Chapter 3, Article

More information

9IMPLEMENTATION AND PHASING

9IMPLEMENTATION AND PHASING 9IMPLEMENTATION AND PHASING Purpose A key objective of the Railyard Master Plan is the integration of the public and private realm to provide a network of places that connect to and complement Commercial

More information

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY INTRODUCTION Through the joint efforts of the City of Tulsa planning staff and the Land Services division of Indian Nations Council of Governments (INCOG), the Berryhill Land

More information

THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS

THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS ABSTRACT THE LAUREL STREET GRADE SEPARATION PROJECT IN COLTON, CA: DRAINAGE CHALLENGES AND SOLUTIONS Joseph Sawtelle, PE Project Engineer TranSystems 6 Hutton Centre, Suite 1250 Santa Ana, CA 92707 714-708-6881

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

N Watt Avenue Corridor Plan. STOREFRONT WORKSHOP May 15-17, 2007

N Watt Avenue Corridor Plan. STOREFRONT WORKSHOP May 15-17, 2007 N Watt Avenue Corridor Plan STOREFRONT WORKSHOP May 15-17, 2007 Workshop Overview May 15 12 & 2 pm General Overview/3D Modeling 4 pm Special Topic: Market Study 6 pm Special Topic: McClellan May 16 12

More information

South Bismarck Watershed Model Update and Stormwater Improvement Project

South Bismarck Watershed Model Update and Stormwater Improvement Project Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of

More information

Roads Plan

Roads Plan Roads Plan 2019-2023 Background Road conditions have been a problem for Painesville City over the past decade. Between 2009 and 2013, the city was only able to dedicate $1.9 million in total road repairs

More information

Getting Started On Your Green Infrastructure (GI) Plan

Getting Started On Your Green Infrastructure (GI) Plan Getting Started On Your Green Infrastructure (GI) Plan Peter Schultze-Allen EOA Inc. Annual SCVURPPP C3 Workshop June 16, 2015 Presentation Outline MRP 2.0 C.3.j (GI) requirements GI Framework elements

More information

The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016

The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016 The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016 Connie Goldade Community Design + Architecture Green Infrastructure (GI) Requirements Develop a Green

More information

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

Tyvola & Archdale Transit Station Area Plan. May 15, 2008 Tyvola & Archdale Transit Station Area Plan First Public Meeting May 15, 2008 Presentation Outline 1. Purpose and Process 2. Station Area Overview 3. Plan Recommendations Vision Land Use Transportation

More information

A Blueprint for Reuse of Distressed Parcels

A Blueprint for Reuse of Distressed Parcels Barthman Parsons Integrated Solutions A Blueprint for Reuse of Distressed Parcels Steven D. Thompson, P.E. (AECOM) C. Timothy Fallara, P.E. (City of Columbus, Sewerage & Drainage) Presentation Agenda Introduction

More information

Staybridge Suites. Aerial Site Map CCR POL. 1 inch = 17,493 feet. 1 inch = 250 feet. Vicinity Map. Zoning Map RL.

Staybridge Suites. Aerial Site Map CCR POL. 1 inch = 17,493 feet. 1 inch = 250 feet. Vicinity Map. Zoning Map RL. Staybridge Suites Aerial Site Map 1 «2nd St 1st St 14 Vine Mulberry _ ^ U V Drake Lemay Prospect Shields Mountain Vista Buckingham Park Taft Hill Douglas Horsetooth Timberline 3rd St Vicinity Map E Lincoln

More information

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No )

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No ) AGENDA REPORT Meeting of the San Marcos City Council MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No. 88165) Recommendation Staff recommends the City Council adopt

More information

Project Narrative For Fruita RV Resort Conditional Use Permit

Project Narrative For Fruita RV Resort Conditional Use Permit Project Narrative For Fruita RV Resort Conditional Use Permit Date: November 18, 2016 Prepared by: Robert W. Jones, II, P.E. Vortex Engineering & Architecture, Inc. 2394 Patterson Rd., Ste. 201 Grand Junction,

More information

4.1 LAND USE AND HOUSING

4.1 LAND USE AND HOUSING 4.1 This section provides a project-level analysis of potential impacts to land use, Shorelines of the State (shorelines), and housing. The study area for the land use and housing analysis in the Final

More information

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT   PLACERVILLE OFFICE: COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT http://www.edcgov.us/devservices/ PLACERVILLE OFFICE: LAKE TAHOE OFFICE: 2850 Fair Lane Court, Placerville, CA 95667 924 B Emerald Bay Rd.

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

Figure 1 Cypress Street Study Area Location Map

Figure 1 Cypress Street Study Area Location Map July 20, 2016 TO: FROM: Jim Massarelli Director of Engineering Jeff Julkowski, PE Michael Burke, PE SUBJECT: Cypress Street Study Area Stormwater Analysis (CBBEL Project No. 16-0058) At the request of

More information

W E A V E R C R O S S I N G Concept Plan

W E A V E R C R O S S I N G Concept Plan W E A V E R C R O S S I N G Concept Plan February 19, 2014 APPLICANT: Contact: Scott Murray 2522139501 EUBANKS ROAD RAMP NC 86 MLK JR. BLVD. INTERSTATE 40 Vicinity Map DEVELOPER: Mangement Co. Inc. Contact:

More information

Public Meeting May 20, 2014

Public Meeting May 20, 2014 Public Meeting May 20, 2014 Overview Study Purpose Study Area Overview Strategies Potential Opportunities Implementation and Discussion Skeo Solutions Raleigh Walkable Watershed Pilot 2 Purpose Develop

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

Bus Rapid Transit Route Planning Project

Bus Rapid Transit Route Planning Project Bus Rapid Transit Route Planning Project Executive Summary JUNE 2010 IBI Group with The Planning Center a Disclaimer This is a project for the Western Riverside Council of Governments (WRCOG), Bus Rapid

More information

McLean Main Street Public Forum Exchange of Ideas

McLean Main Street Public Forum Exchange of Ideas McLean Main Street Public Forum Exchange of Ideas Sponsored & Hosted by McLean Planning Committee John W. Foust, Dranesville District Supervisor Fairfax County Office of Community Revitalization and Reinvestment

More information

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT TO: SUBJECT: Interested Parties Notice of Preparation of a Draft Environmental Impact Report for the Marywood Residential Development project.

More information

FONTANA URBAN GREENING

FONTANA URBAN GREENING FONTANA URBAN GREENING MASTER PLAN COMMUNITY WORKSHOP #1 DECEMBER 17th, 2018 GOALS Fontana Forward Comprehensive Plan Urban Greening Master Plan State/Local Landscape Regulations Fontana Active Transportation

More information

Advance Engineering & Surveying PLLC

Advance Engineering & Surveying PLLC Advance Engineering & Surveying, PLLC Consulting in: Civil & Environmental Engineering Land Surveying Land Development 11 Herbert Drive Phone: (518) 698-3772 Latham, N.Y. 12110 Email:ncostape@gmail.com

More information

ANTEC SUSTAINABILITY OF PVC (VINYL) PIPE: A COMPREHENSIVE ENVIRONMENTAL REVIEW. May 9, 2017

ANTEC SUSTAINABILITY OF PVC (VINYL) PIPE: A COMPREHENSIVE ENVIRONMENTAL REVIEW. May 9, 2017 SUSTAINABILITY OF PVC (VINYL) PIPE: A COMPREHENSIVE ENVIRONMENTAL REVIEW ANTEC May 9, 2017 PRESENTED BY: Randel Dobbs, P.E., R.P.L.S. Regional Engineer SPE ANTEC Anaheim 2017 / 2556 THE PURPOSE OF THE

More information

1.0 Circulation Element

1.0 Circulation Element 5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and

More information

Section 3.0 Project Description

Section 3.0 Project Description Section 3.0 Project Description 3.0 PROJECT DESCRIPTION 3.1 PROJECT LOCATION AND SETTING PROJECT LOCATION Regionally, the Old Town Yucca Valley Specific Plan Area (SPA) is located near the western end

More information

Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR

Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR Submitted CONTENTS 1. PLAN SUMMARY II. INTRODUCTION IX. SPECIFIC PLAN RELATIONSHIPS X. XI. List of Figures 1. Regional Location 2. Point Richmond Area 3. Planning

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose

More information

Community Meeting #1: Project Kick Off

Community Meeting #1: Project Kick Off Community Meeting #1: Project Kick Off November 17, 2015 What are 3 things you like about Downtown Gilroy that you want to hold onto in the future? Please write them down and share with us! Tonight s Meeting

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements Coco Palms Community Development District Engineer s Report Infrastructure Improvements Prepared for Coco Palms Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

PLANNING COMMISSION. Submitted

PLANNING COMMISSION. Submitted PLANNING COMMISSION City Hall 1275 Main Street El Centro, CA 92243 Submitted PLANNING COMMISSION ACTION ITEM (1844) Meeting: 05/10/16 12:00 AM Department: Community Development Category: Public Hearing

More information

CITY OF VALPARAISO STORMWATER MASTER PLAN

CITY OF VALPARAISO STORMWATER MASTER PLAN CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August

More information

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan Date: August 17, 2016 To: From: Subject: Management Committee Dan Cloak, Consultant Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan Recommendation: Receive the

More information

SCVURPPP Green Infrastructure Handbook. Kristin Kerr, P.E. EOA, Inc. April 19, 2017

SCVURPPP Green Infrastructure Handbook. Kristin Kerr, P.E. EOA, Inc. April 19, 2017 SCVURPPP Green Infrastructure Handbook Kristin Kerr, P.E. EOA, Inc. April 19, 2017 Outline of Presentation Overview Handbook Contents Schedule Overview MRP requires GI Plans to include general guidelines,

More information

Route 66 Business Corridor

Route 66 Business Corridor Route 66 Business Corridor DOWNTOWN BUSINESS AND CULTURAL DISTRICT SPECIFIC PLAN Draft April 2016 Acknowledgments Text Acknowledgments here etc... LIST NAE Table of Contents 1. Introduction... 1 2. Existing

More information

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville URBAN DESIGN BRIEF 181 Burloak Drive, Oakville February 2017 Our File: 1730B 230-7050 WESTON ROAD / WOODBRIDGE / ONTARIO / L4L 8G7 / T: 905 761 5588/ F: 905 761 5589/WWW.MHBCPLAN.COM TABLE OF CONTENTS

More information

Agenda Item # 1. Meeting Date September 21, Prepared By. Approved By

Agenda Item # 1. Meeting Date September 21, Prepared By. Approved By Agenda Item # 1 Work Session Meeting Date September 21, 2015 Prepared By Approved By Erkin Ozberk, Senior Planner Suzanne R. Ludlow City Manager Discussion Item Background Discussion of Site Plan Application

More information

4. SPECIFIC PLAN CONCEPTS

4. SPECIFIC PLAN CONCEPTS 4. SPECIFIC PLAN CONCEPTS 4.1 SPECIFIC PLAN OBJECTIVES The overall purpose of this Specific Plan is to generate momentum and provide comprehensive direction for the improvement of the Artesia Corridor

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 & PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL

More information

USF System Campus Master Plan Updates Goals, Objectives and Policies

USF System Campus Master Plan Updates Goals, Objectives and Policies 2015-2025 USF System Campus Master Plan Updates Goals, Objectives and Policies Tampa Goals, Objectives, and Policies Table of Contents Executive Summary 2015 2025 USF Campus Master Plan Update Introduction

More information

CHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA

CHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA CHAPTER 2 SUMMARY This is an Initial Study format used to determine, pursuant to CEQA Guidelines Section 15177, whether a project 1) is within the scope of a Master EIR (MEIR), 2) may result in additional

More information

E x E C U T I v E S U M M A R y / P L A N N I N G C O N T E x T 14 //

E x E C U T I v E S U M M A R y / P L A N N I N G C O N T E x T 14 // 14 // executive summary / planning context COMMUNITY GREENING PLAN PLANNING CONTEXT Capital Region Water has entered into a partial consent decree with the United States Department of Justice to address

More information

Staff Report and Recommendation

Staff Report and Recommendation Community Planning and Development Planning Services 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 p: 720.865.2915 f: 720.865.3052 www.denvergov.org/cpd TO: City Council Neighborhoods and Planning Committee

More information

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA HIGH-SPEED RAIL PROGRAM UPDATE Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA OVERVIEW Introductions High-Speed Rail Project Update Overview

More information

II. SUMMARY WEBB A. PROJECT SUMMARY 1. PROJECT LOCATION

II. SUMMARY WEBB A. PROJECT SUMMARY 1. PROJECT LOCATION Section II Summary II. SUMMARY A. PROJECT SUMMARY 1. PROJECT LOCATION The MAJESTIC FREEWAY BUSINESS CENTER SPECIFIC PLAN (SP 341) project site is located on approximately 325 gross acres, within the Mead

More information

PHASE III DRAINAGE REPORT

PHASE III DRAINAGE REPORT PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village

More information

... the real city lives on... Character Area 5: LOWER WASHINGTON

... the real city lives on... Character Area 5: LOWER WASHINGTON ... the real city lives on... Character Area 5: LOWER WASHINGTON 89 Boundaries This area is bordered by the extension of Fair Way to the north, the Napa River to the south, Gerard Street/Fire Station parking

More information

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT PRELIMINARY STORM DRAIN CALCULATIONS ASSOCIATED WITH BRISBANE BAYLANDS REDEVELOPMENT BRISBANE, CALIFORNIA Prepared by BKF Engineers

More information

Existing Conditions Summary (Draft for Review)

Existing Conditions Summary (Draft for Review) Existing Conditions Summary (Draft for Review) Prepared by March 16, 2015 Bird s-eye-view of Norwalk in 1899 (Cropped) Existing Conditions Summary (Draft for Review) March 16, 2015 Table of Contents 1.

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

Toronto Complete Streets Guidelines

Toronto Complete Streets Guidelines Toronto Complete Streets Guidelines 108 110 7.1 Green Infrastructure Design Principles 112 7.2 Context-Sensitive Green Streets 114 7.3 Key Green Street Elements Green infrastructure refers to natural and

More information

1. POPLAR LANDING + MUNI EVERS PARK

1. POPLAR LANDING + MUNI EVERS PARK . POPLAR LANDING + MUNI EVERS PARK WHAT S HAPPENING? PROJECT DESCRIPTION PROJECT TIMELINE Poplar Landing and the future Muni Evers Park site (located at 00 Quayside Drive) is jointly owned by the City

More information

Riverside County Flood Control and Water Conservation District LAKELAND VILLAGE MDP LINE H, STAGE 1

Riverside County Flood Control and Water Conservation District LAKELAND VILLAGE MDP LINE H, STAGE 1 Riverside Flood Control and Water Conservation District Riverside, California LAKELAND VILLAGE MDP LINE H, STAGE 1 CEQA ADDENDUM TO THE FINAL PROGRAM ENVIRONMENTAL IMPACT REPORT FOR THE LAKELAND VILLAGE

More information

Appendix I-A3 DENAIR COMMUNITY PLAN

Appendix I-A3 DENAIR COMMUNITY PLAN Appendix I-A3 DENAIR COMMUNITY PLAN Adopted by the Stanislaus County Board of Supervisors DECEMBER 15, 1998* *A technical update removing reference to the former Stanislaus County Redevelopment Agency

More information

Camden SMART Initiative Stormwater Management and Resource Training

Camden SMART Initiative Stormwater Management and Resource Training Camden SMART Initiative Stormwater Management and Resource Training www.camdensmart.com Camden s Struggle with Stormwater 1 The City of Camden is served by a combined sewer system, which uses the same

More information

Southern Pines. Downtown Neighborhood Development Plan

Southern Pines. Downtown Neighborhood Development Plan Southern Pines Downtown Neighborhood Development Plan Public Review Draft: March 28, 2013 Table of Contents Overview... 1 Purpose of the Downtown Neighborhood Development Plan... 1 How the Plan was Developed...

More information

C ity of Grande Prairie Development Services Department

C ity of Grande Prairie Development Services Department C ity of Grande Prairie Development Services Department FAIRWAY DEVELOPMENT OUTLINE PLAN OP 08 09 Approved April 6, 2009 Prepared by: Focus Corporation Table of Contents 1.0. Introduction 2 3 1.1. Plan

More information

Stormwater Utility and Connection Fees

Stormwater Utility and Connection Fees Stormwater Utility and Connection Fees Environmentally conscious We will make decisions that preserve and protect the environment to the highest feasible degree Outline (click question to be directed to

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC

11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC 11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC REQUEST: Conditional Use Permit for Religious use STAFF PLANNER: Karen

More information

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011 Santa Cruz River Master Plan Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011 Introduction Who is FICO? 2 Project Team Kimley-Horn and Associates, Inc. River

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING 1 PRESENTATION OUTLINE History of the Burton Station SGA Plan Changes since the Plan Adoption City Infrastructure Projects

More information

Comprehensive Plan. Village of Downers Grove. Adopted October 4, 2011 Updated 2015 Updated 2017 LAKE MICHIGAN

Comprehensive Plan. Village of Downers Grove. Adopted October 4, 2011 Updated 2015 Updated 2017 LAKE MICHIGAN Village of Downers Grove Comprehensive Plan 294 Barrington Hills LAKE MICHIGAN Arlington Heights 94 90 Elgin Schaumburg 53 47 90 294 20 355 KANE 290 Elmhurst Downers Grove LaGrange 88 Aurora Naperville

More information

XSW11, Plumstead Portal worksites, Interim Statement for NLBH. 1 Introduction Site Methodology and fieldwork objectives...4

XSW11, Plumstead Portal worksites, Interim Statement for NLBH. 1 Introduction Site Methodology and fieldwork objectives...4 Contents 1 Introduction...4 2 Site Methodology and fieldwork objectives...4 2.1 NLBH Methodology... 4 2.2 NLBH Fieldwork Objectives... 5 3 Provisional Results...6 3.1 NLBH various features... 6 3.2 Shelter

More information

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE TABLE OF CONTENTS SECTION TITLE PAGE 1 INTRODUCTION AND OVERVIEW 1-1 1.1 Purpose and Need 1-1 1.2 Goals and Objectives 1-3 1.3 Overview of the Planning Process 1-5 1.4 Federal and State Requirements and

More information

Carolina North Individual Permit Application September 2010 Draft

Carolina North Individual Permit Application September 2010 Draft Carolina North Individual Permit Application September 2010 Draft Appendix C Jurisdictional Streams, Wetlands, and Buffer Impacts Figures (C- 1 through C-17) C-1 Sheet Index: Impacts within and Outside

More information

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time. AGENDA ITEM H-7 continued from 4/18 Public Works STAFF REPORT City Council Meeting Date: 4/18/2017 Staff Report Number: 17-081-CC Informational Item: Update on the Bayfront Canal Bypass Project Recommendation

More information

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551 Master Plan Architect School Name Moreno Valley College District Riverside Community College District Architecture and Urban Design 5898 Blackwelder Street Ground Floor Culver City, CA 90232 T: 310.559.5720

More information

OP Council Resolution June 16, Planning and Development Services

OP Council Resolution June 16, Planning and Development Services OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership

More information

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018 Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3. September 18, 2018 Agenda Welcome Introductions Rules of the Ad-Hoc Presentation Background Vulnerability Assessment Results Non-Agenda

More information

Preliminary Subdivision Plan

Preliminary Subdivision Plan Preliminary Subdivision Plan 704-525-8000 Suite 1200 Executive Summary the east huntersville area development plan provides a series of development initiatives and public improvements for land east of

More information

Request for Proposals

Request for Proposals Request for Proposals Charlestown Navy Yard Infrastructure Assessment Engineering Services The Boston Redevelopment Authority ( BRA )/Economic Development Industrial Corporation ( EDIC ) is issuing a Request

More information

Assembly Amendments to Anchorage 2040 Land Use Plan Adopted on September 26, 2017

Assembly Amendments to Anchorage 2040 Land Use Plan Adopted on September 26, 2017 Assembly Amendments to Anchorage 2040 Land Use Plan Adopted on September 26, 2017 Contents: Constant Amendment 1 Constant Amendment 2 Constant Amendment 3 Constant Amendment 4 Constant Amendment 5 Constant

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX City of Reedley SPECIAL PERMIT Submittal Requirements Conditional Use Permit (CUP), Site Plan Review (SPR) & Variance (VAR) Please use this information sheet as a checklist to assemble materials required

More information

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY JACKSON HIGHWAY & GRANT LINE EAST S A C R A M E N T O C O U N T Y P L A N N I N G D E P A R T M E N T SUMMARY AND WORKBOOK November 19, 2008 History of the Visioning Study Sacramento County has two growth

More information

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW Steering Committee Presentation February 14, 2018 Purpose of General Plan Guide land use and development decisions Coordinate transportation, infrastructure,

More information

CONCEPT PLAN APPLICATION

CONCEPT PLAN APPLICATION CONCEPT PLAN APPLICATION TOWN OF CHAPEL HILL Planning Department 405 Martin Luther King Jr. Blvd phone (919) 968-2728 fa (919) 969-2014 www.townofchapelhill.org Parcel Identifier Number (PIN): 9880267455

More information

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK SMART CONSERVATION THROUGH SMART GROWTH NJ LAND CONSERVATION RALLY March 22, 2014 Laurette Kratina, PP, AICP, Supervising Planner Somerset County Planning

More information

Historic Resources. San Mateo has a Historic Building Survey that identified roughly 200 historically significant

Historic Resources. San Mateo has a Historic Building Survey that identified roughly 200 historically significant Historic Resources City of San Mateo Planning Division Community Development Department 330 West 20 th Avenue www.cityofsanmateo.org San Mateo, CA 94403 planning @cityofsanmateo.org Updated: March 20,

More information

ENVIRONMENTAL SETTING

ENVIRONMENTAL SETTING II. ENVIRONMENTAL SETTING EXISTING CONDITIONS The 208.87-acre Project site is located in the western portion of the City (refer to Figures II-1 and II-2). The Project site comprises Assessor s Parcel Number

More information