1 Edith Wolford Elementary School Site Improvement Committee
2 School Site Improvement Committee Members Bob Wedel Principal Robin Lowery Assistant Principal Toby Williams Building Manager Amalia De Ramon 21C Teacher and BTC Kalee Nappo 2 nd Grade Teacher Colleen Bock Parent Theda Stone Parent Jim Wilkerson Grandparent/Patron
3 4 School Site Improvement Priorities Identified Update Computer Lab Update Classroom Furniture Replace Flooring Update Gym
4 Update Computer Lab CONCERNS: A half wall exists that separates the lab and prevents students from seeing teacher work and/or direction that is projected Fixed counters prevent flexible grouping SOLUTIONS: Remove the half wall Remove all counters Purchase mobile desks BENEFITS: A flexible learning environment would align with our 21C mission benefiting ALL students K 5
5 Current Computer Lab Configuration
6 Current Computer Lab Configuration
7 Update Classroom Furniture CONCERNS: Safety and health concerns: Drawers in desks fall out and can injure students Heavy chairs make it difficult for primary students to lift and move Stacking chairs on the desks prevent nightly disinfecting of desktops Chairs do not stack straight up, preventing proper carpet cleaning Heavy and bulky furniture make it difficult to create flexible learning environments: Rubber bottoms do not allow for smooth movement of chairs on the carpet Cumbersome chairs and desks limit movement for cooperative learning SOLUTIONS: Purchase new, lighter and more safety conscious desks and chairs for classrooms BENEFITS: All students and staff K 5 would benefit with updated furniture
8 Current Classroom Furniture
9 Current Classroom Furniture
10 Replace Flooring CONCERNS: Safety and health concerns with tiles: Tile flooring was originally laid in unfavorable conditions Tiles lift up, causing a tripping hazard Bubbles and lifting tiles have prevented fire doors from closing Constant work orders are submitted to repair and replace tiles Safety and health concerns with carpet: Stains and odors are obvious to students, staff, and community members Sanitary concerns as students sit and utilize the floors in rooms as extended learning environment SOLUTIONS: Replace tiles under favorable conditions with new, safer flooring Replace carpeting in classrooms BENEFITS: Students, staff and community members would all benefit from new flooring
11 Current Classroom Flooring
12 Current Hallway Flooring
13 Update Gym CONCERNS: Plug in Projector Loss of space in gym and time consuming to set up table with projector Safety concerns as cords are draped across the floor Issue in PE classes and all school assemblies, concerts, etc. Gym Walls Over 9 years since last painted Visible scuff marks, wear and tear on the walls that detract from the aesthetics of the gym and doesn t present well when hosting students, families and community SOLUTIONS: Purchase and wire a ceiling mounted projector Purchase a cage protector for the projector Repaint the gym walls BENEFITS: All students use the gym for P.E. instruction, during assemblies, concerts, etc. Teachers, parents and community members use the gym for assemblies, concerts and other community events
14 Current Gym Setup and Condition
15 Current Gym Setup and Condition
16 Other Priorities Possibly Addressed by Other Departments Facilities Build ADA accessible path to turf field Repave and restripe parking lots and basketball courts Repair roofing/gutters over cafeteria HVAC update to allow for consistent heating and cooling throughout the building IT Update school wiring with fiber only school (including School in The Woods) without it
17 Thank you for your time and consideration.
Imagine RBC 2010 The Plan
Imagine RBC 2010 The Plan Creation of New Space The creation of a new Student Center will greatly relieve the demands on existing space. Currently 1,700 students, including both RBC and St. James Grammar
More informationAllisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767
Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be
More informationCAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14
2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher
More informationBURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM
BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM Built in 1992 108, 407 Square Feet 771 Student Population 91 Staff Population 2 Building Supervisors, 3 Custodians 102, 663 Square Feet of
More informationTillamook High School Bond Projects
Tillamook High School Bond Projects School Project Description All Buildings Upgrade fire alarm H&S All Buildings Add door lock capability from inside rooms Security All Buildings Install card lock entry
More informationBethlehem University 2008 Projects Summary
2008 Projects Summary 2008 Projects Summary In Addition to following up daily engineering related issues and supervising the Maintenance and Security Departments the University Engineer is involved in
More informationCustodial- General Cleaning Duties
Custodial- General Cleaning Duties This document is a general list of scheduled custodial routines. All cleaning is scheduled Sunday through Thursday nights with minimal coverage on weekends while classes
More informationMaster Facility Planning Update School Board Meeting May 26, 2016
Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility
More informationSchool Fire Safety. A Guide for Educators. saskatchewan.ca
School Fire Safety A Guide for Educators saskatchewan.ca Table of Contents Fire happens when a source of heat and a material that will burn come together. The amount of flammable and combustible material
More information2014 Bond Project Guide
2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center
More informationCustodial Guide
Custodial Guide 2018-2019 Table of Contents Page Number 1 General Items to Note 2-3 Maintenance for Office Areas 4-5 Maintenance for Classrooms and Hallways 6 Maintenance for Lounge Areas 7 Maintenance
More informationBSES IEQ Walkthrough Summary Spring Room Observations (Responses)
01A. ODOR: Unusual or offensive 55 01B. TEMPERATURE: Uncomfortable Kitchen Bathroom does not smell clean Kitchen was warm but it had not yet been opened for the day. in room, dirty lunch boxes 45 Need
More informationDEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students
DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for
More informationGreenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111
Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical
More informationChariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)
Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers
More informationVOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED
Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological
More informationCCES IEQ Walkthrough Summary Spring Room Observations (Responses)
6/5/2017 10:45:07 6/5/2017 10:50:05 6/5/2017 11:01:09 6/5/2017 11:56:25 6/5/2017 10:44:05 6/5/2017 11:08:12 6/5/2017 11:11:14 6/5/2017 11:15:35 6/5/2017 11:16:11 6/5/2017 11:16:38 6/5/2017 11:33:34 6/5/2017
More informatione. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)
1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed
More informationTRINITY LUTHERAN SCHOOL RENOVATIONS
MASTER PLAN FOR PHASED IMPROVEMENTS AUGUST 26, 2013 WITH DESIGN AND PLANNING GUIDANCE FROM WIGHT & COMPANY` Recognizing the importance of its school facility s general appearance, school officials initiated
More informationdusty. Room shakes and Student restrooms across All vents need cleaning
Timestamp Observation: 01B. TEMPERATURE: Room Number or Location/Name: Comments for this room: ADMINISTRATION CUSTODIAL 6/1/2017 15:08:34 Uncomfortable 01B. TEMPERATURE: 310 Etremely warm 6/1/2017 15:11:42
More informationChabot College: Plan Kickoff and Visioning Session with Student Senate
Facilities Master Plan 2017 Chabot College: Plan Kickoff and Visioning Session with Student Senate February 05, 2018 Key issues, challenges and opportunities: Need more information on the projects that
More information3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert
More informatione. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)
1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed
More informationREPORT CARD TO THE COMMUNITY MAY 15, 2018
REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000
More informationSchool District of Milton 5- Year Capital Maintenance and Improvement Plan
Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom
More informationSJLES IEQ Walkthrough Summary Spring Room Observations (Responses)
01A. ODOR: Unusual or 4/28/2017 9:45:0offensive 19 Musty and dank 29837 5/5/2017 01B. TEMPERATURE: 4/28/2017 10:20: Uncomfortable 31 Etremely hot 03. FOOD: Unsealed, left in room, dirty lunch 4/28/2017
More informationGreen Flag Level Two Survey: Indoor Air Quality Program
Green Flag Level Two Survey: Indoor Air Quality Program You have chosen to work on the Indoor Air Quality (IAQ) program to earn a Green Flag award. Answering these survey questions will take you on a tour
More informationEDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016
EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016 Educational Specifications Page 1 Project Overview:
More informationCustodial. Customer Service. Guide. What We Clean & How Often We Clean It
Custodial Customer Service Guide What We Clean & How Often We Clean It Our Goal Our goal is to provide the students, faculty, staff, and guests of Shawnee State University a clean and healthy environment.
More informationClassroom Safety Checklist
Classroom Safety Checklist Classroom safety Is the area at the front of the classroom safe? Is there anything on the ground which could trip someone up? Are there any of these items on the floor that someone
More informationTIFT COUNTY SCHOOLS E-SPLOST HISTORY
TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,
More informationIEQ SCHOOL DATA BASE
LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ ASSIGNED COMPLETION 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, gym Too cold on walk through day 15171 12/21/16
More information2014 Bond District-wide Facility Repairs
Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls
More informationFood needs to be in sealed containers 03. FOOD: Unsealed, left in
01A. ODOR: Unusual or 6/14/2017 14:15offensive Boys room Urine smell 01A. ODOR: Unusual or 6/14/2017 15:16offensive Office Odor and poor air flow x 01B. TEMPERATURE: 6/14/2017 13:42Uncomfortable 202 Warm
More informationWILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly
WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly Collect & properly dispose of recycling as needed Dust, or wipe all
More informationTo describe the process for training new hire custodians (and substitute custodians) and establishing cleaning expectations
Title: Custodial Training System: Operations Sub-System: Custodial Services Process: Training Issue Date: 12/8/08 Issue Number: 3 Approved by: Mike Casey Document author: Christopher Bullinger Summary
More informationNAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX
NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA 18064 610-759-1367 FAX 610-759-7028 TO: FROM: Dr. Riker, Superintendent of Schools Board of School Directors Lewis F.
More informationTALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017
TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017 AGENDA INTRODUCTIONS RECAP OF CONSTITUENT INPUT WHAT WE HEARD SITE PLAN PRECEDENT IDEAS WHERE WE ARE 06.23.17
More informationIf there are emergency situations they should be reported to Maintenance Department immediately.
To: From: Re: Mercer County Schools Principals Mercer County Schools Safety Committee Required Safety Reports Date: October 30, 2010 In order to work toward safer schools, two reports are required to be
More informationDesign Presentation. Chief Operations Officer Willie Burroughs
Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community
More information5 Year Capital Improvement Plan Update
5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John
More informationIEQ SCHOOL DATA BASE
LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ ASSIGNED COMPLETION 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort 15-21 - 8-2 -
More informationCLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN
CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN 04.13.2017 1 MONTICELLO INTERIOR FINISHES PAINT MOULDING WALLS ACCENT DOORS DOOR TRIM/STAIRS
More informationHigh Five for Saving Energy!
High Five for Saving Energy! 1. Heat offices and classrooms to 68 F Turing the heat down by 1 F will save 3% of the energy needed to heat that space. 2. Keep doors and windows closed Every hour a window
More informationRiverview West Side Elementary 160 Isabel Avenue East
160 Isabel Avenue East Project Summary: At the center of Hispanic culture in St. Paul is Riverview Elementary - and it s truly the center of the West Side community. Our newly renovated location offers
More informationSpecial attention should be given to new students, to students with special needs and to students enrolled in visiting classes.
Fire Prevention Administrative Procedure 8.90 Board Governance Policy Cross Reference: 1, 2, 3, 4, 12, 13, 16, 17 Legal Reference: E10-468R, Section 36, Manitoba Fire Code Date Adopted: January, 1983 Date
More informationIEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ
LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ DATE ASSIGNED COMPLETION DATE 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort 316,
More informationbold/italic items are revisions to the previous program notes
bold/italic items are revisions to the previous program notes Future Meetings: - Dr. Caldwell - Students - Industry Partners (Mike Betts? Sam Geil? Kevin Harmon? TBD by SCCCD) A. Specific Room Requirements
More informationNew High School Concept
Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide
More informationBriar Crest Elementary
Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary
More informationG W C C GREENMOUNT WEST COMMUNITY CENTER GWCA - COMMUNITY CENTER. design recommendations
G W C C GREENMOUNT WEST COMMUNITY CENTER design recommendations GWCA - COMMUNITY CENTER PROGRAM SIDEWALK 1... ENTRANCE/EXIT A... MECHANICAL 2... LOBBY B... ELECTRICAL 1 3... RECEPTION C... MEN S TOILET
More informationHawthorn Building. Penn State Altoona Campus Altoona, PA. Walter Nichols. Lighting/Electrical Option Faculty Advisor: Dr.
Hawthorn Building Penn State Altoona Campus Altoona, PA Walter Nichols Lighting/Electrical Option Faculty Advisor: Dr. Richard Mistrick 58,800 sq.ft. 2 Stories above grade Steel frame with curtain wall
More informationH107 Video Conference Room
Capacity: 20 persons White Board (1) Document Camera (1) Door (1) Network connections possible Layout: Seminar style with chairs and tables (moveable) Podium (1) Media Cart (1) Windows (4) Meets all ADA
More informationFacilities Management Services
Facilities Management Services Operating Budget Facilities Management (FM) receives an Operating Budget each year predicated on funding the routine, predictable costs of cleaning, maintaining,, and repairing,
More informationHOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District
HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the
More information30% Design Community Meeting
Monday, September 17, 2018 30% Design Community Meeting Site 85-E-W-4 Please sign in on your mobile device: http//communitymeeting.ocps.net/ Site 85-E-W-4 Meeting Agenda September 17, 2018, 6:45PM Welcome
More informationCENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE
MANAGEMENT SUPPORT SERVICES Utilities Management Introduction In support of Central Kitsap School District (CKSD) Utilities Conservation Policy, the following procedure is set forth to establish operating
More informationB115/B116, B117, B118, B132, B205, B206,
Space Overview: District Downstairs, the B1 and B2 levels of District House offers over 40,000 square feet of student space to GW. The space is comprised of large common areas, dining options, and 9 reservable
More informationSafety In the Science Lab
Lab Safety: Everyone Is Responsible! Safety In the Science Lab Rules and Symbols Millbrook Middle Junior High Safety First Safety is my #1 priority in the science lab. Science is a hands-on laboratory
More informationCleaning Service Levels
Restrooms Empty waste receptacles and change liner, as needed. Restock dispensers: soap, paper towel and toilet tissue. Clean mirrors; clean and disinfect urinals, toilets, and sinks. Polish stainless
More informationBedroom Cleaning Standards: Sunrise Village
Bedroom Cleaning Standards: Sunrise Village Tools/Cleaners: Plain white vinegar (poured into a spray bottle), rubbing alcohol (poured into a spray bottle), glass cleaner, disinfecting cleaner, multi-purpose
More information2014 Bond District-wide Facility Repairs
Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls
More informationMechanical Inspection Plumbing
0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,
More informationCUSTODIAL SERVICES CUSTOMER SERVICE GUIDE
CUSTODIAL SERVICES CUSTOMER SERVICE GUIDE WHAT WE CLEAN AND HOW OFTEN WE CLEAN IT As part of an ongoing effort to improve custodial customer service, we developed the Custodial Services Customer Service
More informationOffice Safety: Housekeeping
Office Safety: Housekeeping March 2017 Housekeeping Safety Simple changes in basic housekeeping practices can go a long way towards keeping our office safe. Use our tips on the following topics to keep
More informationKenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2
Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2 Adams Field Kenmore East High School Kenmore West High School Crosby Field Charles Lindbergh Elementary Thomas
More informationWorkplace Safety Observation Tour Notes
Workplace Safety Observation Tour Notes The following summary report highlights key observation findings noted during the 2012 COR Safety Audit. The intent of this document is to share the 2012 observation
More informationJANITORIAL SPECIFICATIONS
JANITORIAL SPECIFICATIONS A. Office Areas 1. Empty and wipe outside wastebaskets, replacing liners, if necessary. Remove to appropriate receptacle for disposal. All bins will be returned to their original
More informationAppendix B JPPSS Emergency Management Plan Template for Schools (Please type all information)
Appendix B JPPSS Emergency Management Plan Template for Schools (Please type all information) Directions for the Site Administrator/Principal This Emergency Management Plan must be completed at the beginning
More informatione. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)
1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed
More informationB115/B116, B117, B118, B132, B205, B206,
Space Overview: District Downstairs, the B1 and B2 levels of District House offers over 40,000 square feet of student space to GW. The space is comprised of large common areas, dining options, and 9 reservable
More informationDOUGLAS INTEREMDIATE / ELEMENTARY SCHOOL MASSACHUSETTS SCHOOL BUILDING AUTHORITY FINAL DESIGN PROGRAM / ADVANCED SCHEMATIC DESIGN SUBMISSION
DOUGLAS INTEREMDIATE / ELEMENTARY SCHOOL MASSACHUSETTS SCHOOL BUILDING AUTHORITY FINAL DESIGN PROGRAM / ADVANCED SCHEMATIC DESIGN SUBMISSION SECTION SIX: PROGRAM DESIGN Security and Visual Access Requirements
More informationSagebrush Elementary School East Temple Place Aurora, Colorado 80015
Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical
More informationWe are one of the leading manufacturers, exporters and suppliers of Modular Office and Home Furniture. Apart from this, we are also engaged in
We are one of the leading manufacturers, exporters and suppliers of Modular Office and Home Furniture. Apart from this, we are also engaged in providing Corporate Interiors and Integrated Design Services
More informationMeadow Point Elementary School East Grand Avenue Aurora, Colorado 80015
Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,
More informationDesign Review of Facility Improvement Projects
Design Review of Facility Improvement Projects Agenda Board Meeting Schedule Scope of Work Summary Overall Building Plans and Scope Summary Update on Areas of Design Development Programming and Space planning
More informationMAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents;
Housekeeping/Laundry/Maintenance Each licensed facility shall: MAINE Downloaded 01.15.11 g. Maintain an effective pest control program so that the facility is free of pests and rodents; 20.J.2. Soiled
More informationILLINOIS INSTITUTE OF TECHNOLOGY SAFETY POLICY COMMITTEE OFFICE SAFETY POLICY
ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY POLICY COMMITTEE OFFICE SAFETY POLICY Approved: October 10, 2013 Reviewed and Modified: April 27, 2015 Reviewed: April 23, 2018 TABLE OF CONTENTS 1.0 INTRODUCTION...1
More informationAlbany Senior Center Remodel
Albany Senior Center Remodel Todd Jersey Architecture June 13, 2011 Todd Jersey Architecture Albany Senior Center Project Overview The main focus of the Albany Senior Center renovation is in the Lobby,
More informationATLANTA-FULTON PUBLIC LIBRARY SYSTEM CENTRAL LIBRARY RENOVATION
ATLANTA-FULTON PUBLIC LIBRARY SYSTEM CENTRAL LIBRARY RENOVATION APRIL 11, 2018 VINES ARCHITECTURE AGENDA: CONCEPT DEVELOPMENT EXTERIOR PLAZA STRATEGY PLAN DISTRIBUTION CONCEPT DEVELOPMENT EMERGING PRINCIPLES
More informationBASIC OFFICE CLEANING GUIDE FOR GENERAL
BASIC OFFICE CLEANING GUIDE FOR GENERAL OFFICE CLEANING After many years in the office cleaning business, I realized that most people do not know the best way to clean an office. Many are unable to mop
More informationMUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY
ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross
More informationMUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY
MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation
More informationBoard of Directors Meeting Minutes October 1, 7:00 p.m. in the Lobby Hallway
Board of Directors Meeting Minutes October 1, 2018 @ 7:00 p.m. in the Lobby Hallway The meeting was called to order by George Herrera at 7:00PM. Board Members Present: Bob Bellantoni (President via phone),
More information3. Franchisee has successfully completed the STRATUS training program and carries all required certifications and insurance.
This Agreement, dated June 29, 2018 is made between Stratus Building Solutions ( STRATUS ) and Explore Community School ( CLIENT ). Both STRATUS and CLIENT agree that STRATUS will begin service on July
More informationHELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013
HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT May 2013 HPS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT PURPOSE During the week of May 20th, 2013 BRUCO INC.
More informationIchabod Crane Central School District 2018 Capital Project Preliminary Estimate
Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED
More informationWorkplace Safety. Workplace Safety. Developed by The University of Texas at Dallas Department of Environmental Health & Safety and Risk Management
Workplace Safety Workplace Safety Developed by The University of Texas at Dallas Department of Environmental Health & Safety and Risk Management Campus Health and Safety UT Dallas places the highest priority
More informationCUSTODIAL CUSTOMER SERVICE GUIDE
CUSTODIAL CUSTOMER SERVICE GUIDE INSIDE what we clean & how often we clean it 2. Classrooms & Teaching Labs 3. Research Labs & Halls & Lobbies 4. Offices & Restrooms 5. Stairwells & Conference Rooms 6.
More informationRADON PLAN. Eugene School District 4J Facilities Management 715 West Fourth Avenue Eugene, OR
RADON PLAN The 2015 Legislature passed House Bill (HB) 2931 so that if elevated radon levels in Oregon schools existed they would be known. House Bill 2931 later became Oregon Revised Statute (ORS) 332.166-167.
More informationIEQ SCHOOL DATA BASE
LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ ASSIGNED COMPLETION 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort C26, C09, B11
More informationSafety In the Science Lab
Safety In the Science Lab Rules and Symbols Purwanti Widhy H Safety First Science is a hands-on laboratory class. You will be doing many laboratory activities, which require the use of hazardous chemicals
More informationSample Safety Inspection Checklist for Schools
INSPECTION Health and CHECKLIST Safety Committees 1 Sample Safety for Schools School: Date: Inspected By: Each No answer may indicate a problem. Floors and Walkways Are walkways and stairways kept clear
More informationNYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS
NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the
More informationRockwell/Johnson School Renovations Project. Existing Conditions September, 2016
Rockwell/Johnson School Renovations Project Existing Conditions September, 2016 Rockwell School Conditions RS - Custodial Closet Shared w/ Book Room. RS - Aging Telephone Switch Gear/No Growth for Additional
More informationGENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS
University of Iowa FSG - Design & Construction Services Design Reference Manual 2 Design Standards 2.02 Classroom Design Standards Classroom Design Standards GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS
More informationUniversity of Wisconsin - Whitewater Universal Design Guidelines
University of Wisconsin - Whitewater Universal Design Guidelines The purpose of these guidelines is to foster good design and discussion that fully encompasses the principals of Universal Design (UD) into
More informationPortfolio. Portfolio. Interior Design. By Kinjal Ahalpara
Portfolio Interior Design Portfolio By Kinjal Ahalpara 0 Table of Contents 1 Restaurant Design project 2 2 Sales office design project for Westerfield retirement community apartments 3 Commercial Retail
More informationTHE UNIVERSITY OF THE WEST INDIES Mona Campus Human Resource Management Division (HRMD) SECTION I GENERAL SAFETY
EOHS 01-004 Office and Classroom Safety Introduction Though offices and classrooms are thought of as relatively safe working environments, they can present potential risks that are often overlooked. Blocked
More informationStanfield School District Cleaning Standards
Stanfield School District Cleaning Standards Universal Precautions Always wear protective gloves. Do not use gloves that have holes or tears. Treat all body fluid spills as if they were contaminated. Items
More information