WORCESTER/WYZERSDRIFT UPGRADE OF 20.7KM OF MAIN ROAD 298 BASIC ASSESSMENT (REF: 16/3/1/1/B2/32/1090/12) COMMENTS ON THE BID, ADVERT AND REGISTRATION

Size: px
Start display at page:

Download "WORCESTER/WYZERSDRIFT UPGRADE OF 20.7KM OF MAIN ROAD 298 BASIC ASSESSMENT (REF: 16/3/1/1/B2/32/1090/12) COMMENTS ON THE BID, ADVERT AND REGISTRATION"

Transcription

1 WORCESTER/WYZERSDRIFT UPGRADE OF 20.7KM OF MAIN ROAD 298 BASIC ASSESSMENT (REF: 16/3/1/1/B2/32/1090/12) ON THE BID, ADVERT AND REGISTRATION (CRR January & February 2013) Comments have been received from the following stakeholders: No Name Organisation 1 Mrs. Anthea Du Preez Rawsonville Bottle Store 2 Mr Andres de Wet Lorraine Private Cellar and 34 Degrees Design 3 Ms Anine du Toit Private capacity and business FUEL ARCHITECTURE & INTERIORS 4 PJ Hamman Elranet One Stop 1

2 1 04/09/2012, Mrs Anthea Du Comment Preez, Sheet Rawsonville Bottlestore 2 06/02/2013, Andres de Wet, Lorraine Private Cellar and 34 Degrees Design Direct Business- Ingeval van reen, kan stormwater nie vining genoeg weg loop nie, gevalglik oorstroom, Drankwinkel (Poor stormwater drainage which leads to flooding) Direct Interest- I presented the initial unsolicited design for Van Riebeek Street (Rawsonville) to province in late 2009 and have seen many elements thereof included in AureconGroup s proposed design scheme. As stated in the unsolicited Integrated Transport Plan of December 2009: Rawsonville s main thoroughfare should not be viewed as a provincial road in a small urban setting, but rather as an economic catalytic project. Rawsonville and Breedekloof Wine Valley s main stumbling block to development is the acute lack of a core region. Rawsonville fails to develop due to its poor urban environment, due in part to crumbling infrastructure and pedestrianunfriendly urbanism. Poor urban zoning and building-use is also a contributing factor. This infrastructural upgrade can address the former. The infrastructure upgrade must go hand-in-hand with urban and pedestrian improvements. The town cannot remain hostage to the limitations of utility servitudes, owing to poor planning in the past. If utilities must be moved to extricate the town from this economic trap, they should be moved. These costs should be undertaken with the aid of Dankie vir u kommentaar. Die stormwater probleem word aangespreek met die opgradering van die pad. (Thank you for your comment. Your comment is noted. The storm water concern will be addressed with the new road design). Your comments are noted and your input is appreciated. The rehabilitation of the road is well supported in the development planning for the region and is expected to serve as a platform to improve the economic situation in the area as well as improve the aesthetics of the town. Zoning and building use considerations fall outside the scope of this project. A sidewalk will be constructed from the school and pedestrian safety will be considered in the design of the intersections and the pedestrian crossings. DRAFT BASIC ASSESSMENT REPORT: AND REPORT 2

3 BVM, CWDM and if necessary, consultation with Min. Alan Winde's department as province. These costs should be incurred concurrently with the massive rehabilitation of the road, as to minimise disruption and cost. Urban landscaping must also be done by informed companies/individuals, and not left to BVM s departments. Their botanical knowledge and grasp of Winelands aesthetics is lacking. Rawsonville is trying to position itself firmly in the Cape Winelands and not the Karoo. Soft landscaping, using heritage Winelands species, is of paramount importance to inject heritage, identity and seasonal-variance (reflecting the deciduous nature of viticulture) into the town. Urban lighting is unsightly. More details/designs on request. The incorporation of specialist input will be discussed with the Client. 3 25/02/2013 Anine du Toit FUEL ARCHITECTURE & INTERIORS And private capacity I am a property owner in Rawsonville and the set rehabilitation and beautification of the Main Rd including Van Riebeeck street is adjacent to my property erf 172 Rawsonville, 40 van Riebeeck Street. Thank you for your inputs, your comments is noted. Concerns / suggestions or potential impacts that should be investigated during the BA 1. The current pavement encroaches on my property and I have been corresponding with The Breede Valley Municipality for many years now regarding this without any success. The The road is currently designed to be upgraded on its existing location. Although the sidewalk falls within the municipal jurisdiction it will possibly be reconstructed with new block paving to improve the town s aesthetics and address other issues. After discussions between yourself and the Engineering DRAFT BASIC ASSESSMENT REPORT: AND REPORT 3

4 current pavement encroaches about 1,45m onto my property. I see no mention of this in the report. Supporting documents (Land surveyors cards etc, title deed was provided to the Breede Valley Municipality stating these claims and they have not disputed that it is my property. The same scenario happens down the road from me where the Doctor s rooms are, and the road was narrowed there (without parking spaces both sides of the road) to accommodate this. I would appreciate it if consideration is given to do the same with my property, as it is one of the older houses in town and a narrowing in the road here would cause traffic to slow down, which is quite necessary as we have the school hostel and school opposite the road from me. My intention would be to use this area (1.45m ) as a green area in front of the house to minimise noise levels. At this stage my house s windows vibrate each time a heavy vehicle passes which is clearly not good for an old building. (build in 1943). Please confirm the way ahead here. 2. Rawsonville is a country side town and we pay rates and taxes for this luxury however the amount of vehicles especially heavy vehicles using this main road as a detour has a serious impact on noise levels and traffic. Speeding is a major problem in this road consultants your case was discussed with the Provincial Government. Whether the sidewalk in this location falls within the proclaimed road reserve is still to be resolved. Comment noted. As discussed above. Speed mitigation measures are being considered with the final design. DRAFT BASIC ASSESSMENT REPORT: AND REPORT 4

5 and though a few stops were introduced in the past years it is not a successful means of regulating speeding. As a community we have requested council on numerous accounts to investigate the introduction of speed bumps in Van Riebeeck Street and crossings in front of the school. We love our children yet many were killed in the same road over the decades, and nothing seems to get done regarding this. The amount of heavy vehicles/weight should be regulated. Using of air breaks in the street should be prohibited due to the fact that it is mix of residential and business properties in Van Riebeeck street. There are not enough crossings to accommodate the pedestrians in town in order to cross this road safely. 3. Another concern is the lack of trees / green areas in the main road. The main road is currently an sore-eye compared to the rest of town, and compared to places similar in size. Introducing trees / green areas will reduce noise levels and beautify the road, which is much needed in Van Riebeeck Street. 4. Current proposal does not make any provision for disabled / people in wheelchairs. We would like to see this included in the report as it regulation that special needs be catered for i.e. ramps This will be considered in the speed mitigation measures of the design. There are also measures to reduce noise during construction included in the Environmental Management Programme (EMP). Please note that construction vehicles will adhere to speeds of 60 km/h or the speed limit (whichever is lower). Comment noted and will be addressed within the final design. This will be addressed with new sidewalk areas and crossing areas that consider universal access. DRAFT BASIC ASSESSMENT REPORT: AND REPORT 5

6 at sufficient gradients for wheelchair and less able pedestrians. The uneven surfaces of pavements are a huge obstacle that should be rectified during the upgrade phase. 5. Entrances to Rawsonville are badly lit and the road shoulders for pedestrians and cyclists are not sufficient. It would be appreciated it consideration could be given for a stretch of raised pavements to protect them from being knocked over. Again we are a small town and we have enormous pedestrian traffic on weekends, as this is most people s only way of getting to / from town. We appreciate your time and input. Should you have any queries, please do not hesitate to contact me. Kind regards, Your comment is noted. The issue of a cycle lane has been discussed with the Road department who is currently not in favour of this. 4 25/02/2013 Comment sheet PJ Hamman Elranet One Stop Anine du Toit 1. Hoe sal toegang tot my besighede verkry word. (How will I/clients gain access to my business) Dankie vir u kommentaar. Daar sal stop-ry beheer toegepas word en konstruksie voor u besighede sal so gou moontlik voltooi word. (Thank you for your comments. There will be stop-go measures implemented and construction outside businesses will be completed as quickly as possible). 2. Die werk aan van Riebeeck str sal n tydelike negatiewe invloed op my besighede he. Die meerderheid is voetgangers en hulle sal nog steeds toegang kan verkry tot u besigheid. Die konstruksie reg voor besighede sal so spoedig moontlik afgehandel word. (The construction of Riebeeck street will have a negative influence on my business) (The bulk of traffic is pedestrian and they will still be able to access your business. Construction periods directly outside of businesses will be kept as short as possible). DRAFT BASIC ASSESSMENT REPORT: AND REPORT 6

7 3. Sal verkies dat die werk voor my besighede voor my seisoentyd d.w.s desember klaar sal wees. (Prefer that construction in front of my business is completed before the peak season in December) Die konstruksie word opgebreek in fases oor n tydperk van 2 jaar en daar sal sover moontlik probeer word om die ongerief so min as moontlik te hou vir al die betrokke partye. (Construction will be phased over a two year period and best efforts will be put forward in terms of minimal disruption to all affected parties). Hierdie kommentaar is van kardinale belang vir al die besighede in die dorp en sal effektief moontlik aangespreek word om te verseker dat die impak minimaal is. (The concern raised here is of extreme importance to all business through town and will be addressed as effectively as possible to ensure the impact is kept to a minimum). DRAFT BASIC ASSESSMENT REPORT: AND REPORT 7

WORCESTER/WYZERSDRIFT UPGRADE OF 20.7KM OF MAIN ROAD 298 BASIC ASSESSMENT (REF: 16/3/1/1/B2/32/1090/12) COMMENTS ON THE BID, ADVERT AND REGISTRATION

WORCESTER/WYZERSDRIFT UPGRADE OF 20.7KM OF MAIN ROAD 298 BASIC ASSESSMENT (REF: 16/3/1/1/B2/32/1090/12) COMMENTS ON THE BID, ADVERT AND REGISTRATION WORCESTER/WYZERSDRIFT UPGRADE OF 20.7KM OF MAIN ROAD 298 BASIC ASSESSMENT (REF: 16/3/1/1/B2/32/1090/12) ON THE BID, ADVERT AND REGISTRATION (CRR January to August 2013) Comments have been received from

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED HAASENDAL DEVELOPMENT AND KUILS RIVER GOLF COURSE RE-DEVELOPMENT ON ERF 23580, ERF 23579, ERF 23582, ERF

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT PROPOSED UPGRADING OF THE N2 NATIONAL ROAD FROM KRAAIBOSCH TO DIE VLEIE BASIC ENVIRONMENTAL IMPACT ASSESSMENT The South African National Roads Agency Society Limited (SANRAL)

More information

BASIC ASSESSMENT PROCESS

BASIC ASSESSMENT PROCESS BASIC ASSESSMENT PROCESS NOTICE OF A BASIC ASSESSMENT PROCESS FOR THE PROPOSED MIXED USE DEVELOPMENT ON THE REMAINDER OF PORTION 2, REMAINDER OF PORTION 7, PORTION 7, REMAINDER OF PORTION 9, REMAINDER

More information

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study Reconstruction of Regional Road 45 (Creek Road) Between Regional Road 27 (River Road) and Regional Road 63 (Canborough Road) in the Township of Wainfleet Municipal Class EA Study Public Information Centre

More information

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

Welcome. to the 95th Street Terminal Improvement Project Public Hearing Welcome to the 95th Street Terminal Improvement Project Public Hearing The purpose of this Public Hearing is to solicit comments from the community about the Environmental Assessment prepared for the 95th

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF APPLICATION FOR AMENDMENT OF AN ENVIRONMENTAL AUTHORISATION FOR THE HAASENDAL DEVELOPMENT ON PORTIONS 1, 11, 26, 30, 34, 58, AND 87 OF FARM HAASENDAL NO. 222,

More information

TRANSPORT STAMENT LA PETITE FERME DEVELOPMENT ON FARM 30/1108 FRANSCHOEK

TRANSPORT STAMENT LA PETITE FERME DEVELOPMENT ON FARM 30/1108 FRANSCHOEK Western Cape Government Department of Transport and Public Works 9 Dorp Street, Cape Town, 8001 email: malcolm.watters@westerncape.gov.za Date: 21 February 2018 Our Ref: ITS 3934 Le Petite Ferme Attention:

More information

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London Bostwick Road Municipal Class Environmental Assessment Public Information Centre #2 June 14, 2017 Welcome! Welcome to the 2 nd Public Information Centre for the. Representatives from the and the consulting

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE SARATOGA VEGETATION CLEARING SECTION 24G ON PORTION 4 OF THE FARM KLAAS VOOGDS RIVIER NO. 40, ROBERTSON, WESTERN

More information

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION NOTICE OF PUBLIC PARTICIPATION PERIOD OF A RIVER MAINTENANCE MAANGEMENT PLAN (RMMP) FOR THE PROPOSED MAINTENANCE OF THE KM 8.920 CULVERT, WAARBURGH ROAD, PAARL,

More information

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION February 2016 NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION 1. INTRODUCTION This Environmental Impact Assessment Report (EIR) has been compiled as part of an

More information

BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012

BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012 BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012 WHAT DOES THIS DOCUMENT TELL YOU? This document aims to

More information

Performance of Rootstock Cultivars in the Avocado Phase II Evaluation Programme: 1997

Performance of Rootstock Cultivars in the Avocado Phase II Evaluation Programme: 1997 South African Avocado Growers Association Yearbook 1998. 21:13-18 Performance of Rootstock Cultivars in the Avocado Phase II Evaluation Programme: 1997 A.D. Sippel, C.W. Matsha & Z. Bijzet ARC-lnstitute

More information

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015 CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide

More information

BASIC ASSESSMENT REPORT. Background Information Document

BASIC ASSESSMENT REPORT. Background Information Document BASIC ASSESSMENT REPORT Background Information Document BASIC ASSESSMENT FOR THE PROPOSED LUIPERDSHOEK 33 KV POWER LINE PROJECT TO BE LOCATED NORTH OF THE TOWN OF POFADDER IN THE NORTHERN CAPE (DEA Ref

More information

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell: 11 July 2016 Organisation: Department of Environmental Affairs and Development Planning Attention: Mr. Shafeeq Mallick NOTICE OF FIRST PUBLIC PARTICIPATION PERIOD: 12 July 2016 15 August 2016 GNEC Code:

More information

St. Clair Avenue West Area Transportation Master Plan

St. Clair Avenue West Area Transportation Master Plan 1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present

More information

Christine Toner, Consultation Leader

Christine Toner, Consultation Leader 9. FAIRVIEW STREET FOOTBRIDGE REBUILD General Manager responsible: General Manager, City Environment Group, DDI 941-8608 Officer responsible: Unit Manager, Transport and Greenspace Author: Christine Toner,

More information

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass; WELCOME The intent of today s Open House is to: Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass; Review highway crossing locations, future access closures

More information

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project

More information

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES CHAPTER 1 GENERAL DESIGN GUIDELINES 1.0 INTRODUCTION This Publication has been developed to provide current, uniform procedures and guidelines for the application and design of safe, convenient, efficient

More information

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016 FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for

More information

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE DRAFT BASIC ASSESSMENT REPORT PUBLIC REVIEW LANDOWNERS MEETING FICKSBURG 23 JULY 2013 T his project is being conducted on behalf of Eskom PRESENTATION

More information

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street Welcome City of Cornwall Municipal Class Environmental Assessment Proposed Improvement and Extension of Lemay Street Redevelopment and Design of the Municipal Works Yard Public Information Centre #1 Thursday,

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island

More information

Implementing sustainable water strategy through development industry engagement

Implementing sustainable water strategy through development industry engagement Implementing sustainable water strategy through development industry engagement Ian Director, Organica Engineering, Melbourne, Australia E-mail: iadams@organicaeng.com.au Edward Cotter Sustainability Leader,

More information

Land at Fiddington Hill Nursery, Market Lavington

Land at Fiddington Hill Nursery, Market Lavington Land at Fiddington Hill Nursery, Market Lavington Briefing Report for Market Lavington Parish Council Persimmon Homes (Wessex) April 2016 Background This brief report has been prepared following the Market

More information

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House). Welcome Thank you for coming. We want to hear your views on proposed improvements to the between junction 65 (Birtley) and junction 67 (Coal House). This is your opportunity to provide comments on our

More information

Olde Towne Vision Plan

Olde Towne Vision Plan Olde Towne Vision Plan Introduction In 2016, the City of Bellevue will complete its move of City offices from Olde Towne Bellevue to its new municipal complex on Wall Street. The City intends to sell its

More information

OPEN SPACE MANAGEMENT WORKSHOP. Johannesburg Botanical Gardens 22 May 2009 TOWN PLANNING SCHEME REQUIREMENTS

OPEN SPACE MANAGEMENT WORKSHOP. Johannesburg Botanical Gardens 22 May 2009 TOWN PLANNING SCHEME REQUIREMENTS 1 OPEN SPACE MANAGEMENT WORKSHOP Johannesburg Botanical Gardens 22 May 2009 TOWN PLANNING SCHEME REQUIREMENTS INTRODUCTION What is the purpose and function of a Town Planning Scheme? 3 To manage the use

More information

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC) Update JANUARY 2010 Neighbourhood Advisory Committee (NAC) ARTS AND CULTURE Gas Station Theatre BUSINESS Osborne Village BIZ Downtown BIZ COMMERCIAL PROPERTY OWNER Great-West Life COMMUNITY ORGANIZATIONS

More information

2017 Canadian Consulting Engineering Awards

2017 Canadian Consulting Engineering Awards 2017 Canadian Consulting Engineering Awards Northeast Anthony Henday Drive DBFO Edmonton, Alberta Four years of detours, traffic snarls, varying speed limits, and stop-and-start driving has come to an

More information

REDZ & POWER CORRIDOR GAZETTING. 25 July Environmental Advisory Services

REDZ & POWER CORRIDOR GAZETTING. 25 July Environmental Advisory Services REDZ & POWER CORRIDOR GAZETTING 25 July 2017 Environmental Advisory Services PURPOSE To provide general progress on the REDZs and Power corridor gazetting process To provide a range of comments received

More information

Public Information Centre. Welcome

Public Information Centre. Welcome Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff

More information

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE Prepared for BOLAND ENVIRO Att: Mr Nik Wullschleger PO Box 250 Worcester 6849 Fax: (023) 347 0336 By

More information

Smart Growth Development Checklist

Smart Growth Development Checklist 2004 Smart Growth Development Checklist Smart Growth Development Checklist Corporation of the City of New Westminster Guide and manage growth in a manner which is consistent with the principles of sustainable

More information

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM C H A P T E R 1 M O D E L P O L I C I E S F O R I M P L

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

Portage Parkway Environmental Assessment Public Information Centre No. 1

Portage Parkway Environmental Assessment Public Information Centre No. 1 City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces

More information

PROPOSED GARDEN CITY NEW TOWN DEVELOPMENT, KRAAIFONTEIN DRAFT ENVIRONMENTAL IMPACT REPORT Summary Document

PROPOSED GARDEN CITY NEW TOWN DEVELOPMENT, KRAAIFONTEIN DRAFT ENVIRONMENTAL IMPACT REPORT Summary Document 1 PROPOSED GARDEN CITY NEW TOWN DEVELOPMENT, KRAAIFONTEIN DRAFT ENVIRONMENTAL IMPACT REPORT Summary Document What is an Environmental Impact Assessment? Garden Cities Incorporated Association Not For Gain

More information

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013 Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN

More information

Victoria Bridge Municipal Class EA Civic Works Committee

Victoria Bridge Municipal Class EA Civic Works Committee Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction

More information

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA 1 1 Purpose of Public Information Centre #2 To provide interested and/or potentially affected stakeholders with an opportunity to participate in the planning and decision-making process for this Municipal

More information

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project PennDOT Public Meeting S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project Mt Lebanon Township, Allegheny County Mt Lebanon Township Municipal Building November 6, 2014 1 Project

More information

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01] This document is scheduled to be published in the Federal Register on 12/18/2017 and available online at https://federalregister.gov/d/2017-27194, and on FDsys.gov Billing Code: 4210-67 DEPARTMENT OF HOUSING

More information

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015 Rt. 29 Solutions Project Delivery Advisory Panel December 3, 2015 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Nov

More information

North Somerset Council Local Development Framework

North Somerset Council Local Development Framework North Somerset Council Local Development Framework Sites and Policies Development Plan Document Evidence Paper Re-opening Portishead Railway Line and Options for the Location of Portishead Railway Station

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

SQUAMISH 2010 AND BEYOND COMMUNITY VISION

SQUAMISH 2010 AND BEYOND COMMUNITY VISION Our plan has been imagined and created to be both pragmatic and visionary. At the core of the strategy is a consideration of the highway s role and its impact on the community. First and foremost in creating

More information

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I SBCAG STAFF REPORT SUBJECT: Cabrillo-UPRR Bridge Project MEETING DATE: March 17, 2016 AGENDA ITEM: 5I STAFF CONTACT: Fred Luna RECOMMENDATION: Authorize the chair to sign a Memorandum of Understanding

More information

The purpose of tonight s PIC is to:

The purpose of tonight s PIC is to: The purpose of tonight s PIC is to: Provide an overview of the work completed to date and a summary of the Class EA process being followed; Provide a summary of public input received so far, including

More information

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m. Focus Group First Meeting Belfountain Community Centre 7:00 p.m. to 9:00 p.m. Mississauga Road/Old Main Street and Bush Street, from Olde Base Line Road to Winston Churchill Boulevard Environmental Assessment

More information

20 & 30 Frank Nighbor Place

20 & 30 Frank Nighbor Place Engineering Land / Site Development Municipal Infrastructure Environmental / Water Resources Traffic / Transportation Structural Recreational Planning Land / Site Development Planning Application Management

More information

Cape Environmental Assessment Practitioners(Pty)

Cape Environmental Assessment Practitioners(Pty) BACKGROUND INFORMATION DOCUMENT (BID) Introduction Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 First Floor, Eagles View Building Facsimile: (044)

More information

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208) MEMORANDUM Archuleta County Development Services Planning Department 1122 HWY 84 P. O. Box 1507 Pagosa Springs, Colorado 81147 970-264-1390 Fax 970-264-3338 TO: Archuleta County Planning Commission FROM:

More information

APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH

APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH February 25, 2010 INSTRUCTIONS APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH Please complete each section of this application from and submit it with all required application material

More information

Irmé van Zyl Privaat Posbus 567, Upington Jangroentjieweg 4, Keidebees, Upington

Irmé van Zyl Privaat Posbus 567, Upington Jangroentjieweg 4, Keidebees, Upington Irmé van Zyl Privaat Posbus 567, Upington 8800 Jangroentjieweg 4, Keidebees, Upington 8801 ibvanzyl@telkomsa.net 072 222 6194 086 624 0306 Afrikaans Ek is geïnterreseerd in die projek Ja, die visuele impak

More information

CHAPTER 5: GUIDING PRINCIPLES

CHAPTER 5: GUIDING PRINCIPLES CHAPTER 5: GUIDING PRINCIPLES The following 10 principles were developed based on public consultation, planning policy and the background analysis conducted during Phase 1. The Guiding Principles significantly

More information

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Board 1: Welcome Welcome to the Wilson Transfer Station Project Public Hearing. The purpose

More information

THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI

THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI DATE: Monday, 26 th November 2012 VENUE: John Jacobs Room, City of Cape Town offices, Constantia TIME: 17h30 19h00 FACILITATOR:

More information

PLANNING JUSTIFICATION REPORT

PLANNING JUSTIFICATION REPORT PLANNING JUSTIFICATION REPORT 55 DELHI STREET CITY OF GUELPH PREPARED FOR: VESTERRA PROPERTY MANAGEMENT PREPARED BY: LABRECHE PATTERSON & ASSOCIATES INC. SCOTT PATTERSON, BA, CPT, MCIP, RPP PRINCIPAL,

More information

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs. WELCOME Welcome! MILLENNIUM LINE BROADWAY EXTENSION Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs. The Broadway Corridor is home to the second largest

More information

Glen Road Pedestrian Bridge Environmental Assessment

Glen Road Pedestrian Bridge Environmental Assessment Glen Road Pedestrian Bridge Environmental Assessment Presentation to Design Review Panel July 18, 2017 Glen Road Pedestrian Bridge Class Environmental Assessment STUDY AREA Bloor Street East Streetscape

More information

BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE

BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE To: Interested and Affected Parties 2 October 2017 NOTIFICATION OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED DEVELOPMENT OF RESIDENTIAL HOUSING ON PORTION 56 OF THE FARM CHELSEA NO. 25,

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Veterans Way (previously Powerline Road) and Klondike Park Road Wasaga Beach Welcome Please sign in Take a comment

More information

NEIGHBORHOOD MEETING SUMMARY. Avago Technologies Expansion Major Amendment

NEIGHBORHOOD MEETING SUMMARY. Avago Technologies Expansion Major Amendment NEIGHBORHOOD MEETING SUMMARY PROJECT: Avago Technologies Expansion Major Amendment DATE: March 25, 2013 APPLICANT: CONSULTANTS: CITY PLANNER: Avago Technologies c/0 of Mr. Pat Balliew, Facility Manager

More information

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Heritage Road Improvements from Steeles Avenue to Rivermont Road The Corporation of the City of Brampton Heritage Road Improvements from Steeles Avenue to Rivermont Road Class Environmental Assessment Study (Schedule C) September 19, 2013 The Corporation of the City

More information

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges 222221 2.0 DRIVE-THROUGH FACILITIES Background In recent years, drive-through facilities have grown significantly in popularity with drive-through restaurants, in particular, being established on numerous

More information

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network. Better Cycling Dedicated bike facilities will be constructed along BRT corridors where space is available. Nearby bike routes will also be upgraded to ensure a complete network is available for cyclists.

More information

TRANSPORTATION: Roads and Highways Services

TRANSPORTATION: Roads and Highways Services TRANSPORTATION: Roads and Highways Services Profile Our background GIBB is a leading multi-disciplinary engineering consulting firm based in South Africa with 67% Black ownership. The firm has a strong

More information

Goals and Objectives Survey December 4, 2013

Goals and Objectives Survey December 4, 2013 Goals and Objectives Survey December 4, 2013 Process The 2006 Master Plan was based upon a set of 12 goals with various objectives tied to each goal. Goals = High level aspirations that provide general

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments SUMMARY This Advice Note provides

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

Executive Summary. The goals of the Plan are to:

Executive Summary. The goals of the Plan are to: Executive Summary The Wiscasset Bath Road Master Plan (Plan) seeks to maximize development opportunities along Bath Road through the strategic coordination of traffic infrastructure improvements, land

More information

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report Date: March 11, 2014 To: From: Wards: Reference Number:

More information

Purpose of the Act. Learning Objectives. Latest with DOJ. Latest with DOJ. Texas Registered Accessibility Specialists Association

Purpose of the Act. Learning Objectives. Latest with DOJ. Latest with DOJ. Texas Registered Accessibility Specialists Association Texas Registered Accessibility Specialists Association Mission Statement To enhance accessibility in the built environment throughout Texas To raise the level of service provided by our members by presenting

More information

CITY OF ZEELAND PLANNING COMMISSION

CITY OF ZEELAND PLANNING COMMISSION APPLICATION FOR SITE PLAN REVIEW AND SPECIAL LAND USE Date City Official App. Filing Fee Rec'd ($350) NOTE TO APPLICANT: Please submit this application for Site Plan Review along with twenty (20) copies

More information

HS2 Interchange Station Design

HS2 Interchange Station Design Working on behalf of HS2 Interchange Station Design October 2018 www.hs2.org.uk 1 Interchange Station, Solihull Introduction In February 2018, HS2 Ltd appointed Arup to take forward the design of Interchange

More information

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 12/20/2016 ITEM NO: 12 DATE: TO: FROM: SUBJECT: MAYOR AND TOWN COUNCIL LAUREL PREVETTI, TOWN MANAGER RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II

More information

2. What is required if I want to put some patio/bistro tables and chairs on the sidewalk and remove them at the end of each day?

2. What is required if I want to put some patio/bistro tables and chairs on the sidewalk and remove them at the end of each day? DOWNTOWN SEASONAL PATIOS The establishment and use of seasonal patios in downtown Cranbrook will be regulated by City of Cranbrook Downtown Seasonal Patio Bylaw No. 3860, 2016. This bylaw provides regulations

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

California Environmental Quality Act (CEQA) Environmental Review Process

California Environmental Quality Act (CEQA) Environmental Review Process California Environmental Quality Act (CEQA) Environmental Review Process Los Angeles Union Station Forecourt and Esplanade Improvements constitute a Project Los Angeles County Metropolitan Transportation

More information

DAVENPORT VILLAGE SECONDARY PLAN

DAVENPORT VILLAGE SECONDARY PLAN 27 DAVENPORT VILLAGE SECONDARY PLAN 27. DAVENPORT VILLAGE SECONDARY PLAN 1. VISION FOR THE DAVENPORT VILLAGE SECONDARY PLAN Davenport Village, municipally known as 830, 940, 980 and 1100 Lansdowne Avenue,

More information

Need for better accessibility on Karl Johans gate (street) Project Levende Oslo (Oslo Alive)

Need for better accessibility on Karl Johans gate (street) Project Levende Oslo (Oslo Alive) Need for better accessibility on Karl Johans gate (street) Project Levende Oslo (Oslo Alive) Map of the city centre of Oslo, Karl Johans gate marked. International Conference on Universal Design (UD 2014)

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

B2B Project Team Responses to Nga Potiki Draft Addendum

B2B Project Team Responses to Nga Potiki Draft Addendum B2B Project Team s to Nga Potiki Draft Addendum Nga Potiki were introduced into the project in December 2012 and formally meet through the Hapū Advisory Group (Nga Potiki, Ngai Tukairangi and Ngati Tapu)

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

Visual Specialist Opinion on Preferred Layout Alternative 4 September 2014 (Megan Anderson of MALA)

Visual Specialist Opinion on Preferred Layout Alternative 4 September 2014 (Megan Anderson of MALA) Visual Specialist Opinion on Preferred Layout Alternative 4 September 2014 (Megan Anderson of MALA) Sillito Environmental Consulting Suite 105, Block B2 Tokai Village Centre Vans Road Tokai 7966 29 September

More information

Kaufland supermarket and complementary uses, part 1550 Pascoe Vale Road, Coolaroo Incorporated Document (Insert date) 2019

Kaufland supermarket and complementary uses, part 1550 Pascoe Vale Road, Coolaroo Incorporated Document (Insert date) 2019 Kaufland supermarket and complementary uses, part 1550 Pascoe Vale Road, Coolaroo Incorporated Document (Insert date) 2019 Page 1 of 7 Incorporated document pursuant to section 6(2)(j) of the Planning

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose

More information

University Park Subdivision Street Assessment Report

University Park Subdivision Street Assessment Report University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:...

More information

QUESTIONNAIRE. Public Participation General Plan

QUESTIONNAIRE. Public Participation General Plan QUESTIONNAIRE Public Participation General Plan As you know, a General Plan is the instrument that analyses the current planning of a municipality and marks its future development, specifying, among other

More information

5.1 Commercial and Industrial Development. (Effective April 1, 2006)

5.1 Commercial and Industrial Development. (Effective April 1, 2006) 5.1 Commercial and Industrial Development. (Effective April 1, 2006) A. Applicability: The requirements of this section (5.10) shall apply to all uses within the LB Local Business; HB Highway Business;

More information

Project Consulting Team:

Project Consulting Team: THE DOWNTOWN CHERRYVILLE LAND USE + STREETSCAPE MASTER PLAN WAS FUNDED THROUGH THE GENEROUS DONATIONS OF THE FOLLOWING: The Community Foundation of Gaston County ElectriCities of North Carolina The Cherryville

More information