1 Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio SR 46 (Niles Cortland Road) and SR 82 Proposed Improvements Howland Township, Trumbull County, Ohio Wednesday, September 5, :00pm to 7:00pm ODOT Project: TRU ; PID Informational Handout Ohio Department of Transportation 2088 South Arlington Road Akron, Ohio Phone: (330)
2 Purpose of this Public Involvement Meeting The purpose of this public involvement meeting is to present information and solicit public comment on the results and recommendations included in the TRU Safety Study. This meeting will be an open house format. The project team will be available to answer any questions you may have anytime between 5:00 pm and 7:00 pm. The meeting format will also include a brief project overview presentation at 5:45 pm. Following the presentation, interested individuals will have the opportunity to speak during an open microphone public comment period. Throughout the public meeting, the safety study and exhibits illustrating the recommended improvement alternatives under consideration will be displayed and representatives of ODOT, including the safety study consultant, Mott MacDonald, will be available to address questions. Project Description A Safety Study was completed to evaluate the roadway safety and traffic operations at several locations all within Howland Township in Trumbull County, Ohio. These locations include: the interchange of State Route (SR) 46 (Niles Cortland Road) and SR 82 the signalized intersection of SR 82 and Howland-Wilson Road the signalized intersection of SR 46 and County Road 329 (Warren-Sharon Road), the section of SR 46 between SR 82 and Warren-Sharon Road the unsignalized intersection of SR 46 and Howland Springs Road Recommendations See attached exhibits. The study recommendations are as follows: SR 46 and SR 82 interchange convert interchange to a Diverging Diamond Interchange (DDI) SR 82 and Howland-Wilson Road extend median on SR 82 cul-de-sac both legs of Howland-Wilson Road only allow right turn movements from SR 82 to Howland-Wilson Road SR 46 and Warren-Sharon Road extend existing northbound, southbound, and westbound left turn lanes construct right turn lanes for the northbound and southbound approaches of SR 46 SR 46 section between SR 82 and Warren-Sharon Road convert to a three-lane section with center two-way left-turn lane (TWLTL) with sidewalk, curb, and enclose drainage ditches SR 46 and Howland-Springs Road realign Howland-Springs Road with Kenyon Drive
3 Environmental Considerations Ecological Resources (including wetlands, rivers/streams, aquatic and terrestrial habitats, and threatened and endangered species) A review of the various environmental databases conducted by ODOT, District 4 Environmental Section personnel on July 3, 2018, indicated several streams, wetlands and terrestrial habitats exist within the project study area(s) and will need to be evaluated for potential impacts. Additionally, a review of the Ohio Department of Natural Resources (ODNR) Natural Heritage Database did not identify any endangered, threatened, or potentially threatened species records for any animal species located within 1 mile of the project and any plant species records within 0.5 mile of the project(s). However, there does appear to be suitable wooded habitat (SWH) for the Indiana Bat (Myotis sodalis) and Northern Long Eared Bat (Myotis septentrionalis) within the project study area(s). Therefore, an Ecological Survey Report (ESR) will be completed for the proposed project(s) to address any impacts that will occur to these resources. Cultural Resources (including historic sites, archeological sites and historic architecture) An electronic records check conducted by ODOT, District 4 Environmental Section personnel on July 3, 2018, was completed for the project to determine if previously recorded cultural resources are located within the vicinity of the project(s). Based on a review of the Ohio State Historic Preservation Office (SHPO) Mapper, multiple previously identified historic structures, including the E.N. Brown House (TRU ), are located within the project study area(s) and will need to be evaluated for potential impacts. In compliance with Section 106 of the National Historic Preservation Act of 1966, as amended (codified as 36 CFR 800) ODOT requests information regarding the presence of any known cultural resources in the vicinity of the recommended safety improvement alternatives. Cultural resources include prehistoric and historic archaeological sites, historic bridges, historic buildings, sites and districts. The proposed countermeasures at the SR 46/82 interchange have the potential to impact the E.N. Brown Residence [877 SR 46 (Niles Cortland Road)] determined to be eligible for inclusion on the National Register of Historic Places (NRHP). Section 106 of the National Historic Preservation Act of 1966 requires agency officials to consider the effects of their actions on historic properties. The Section 106 process seeks to incorporate historic values into project planning through consultation among agencies, and other parties, with an interest in the effects of the undertaking on historic properties. Individuals or organizations with a demonstrated interest in the effects of the undertaking on historic properties can become a Section 106 consulting party. The various consulting parties work together to discuss options, provide multiple viewpoints, and strive to seek common agreement on the incorporation of historic preservation values into the project. If you are interested in becoming a Section 106 consulting party please contact Sean Carpenter, Environmental Specialist at or by at sean.carpenter@dot.ohio.gov.
4 Regulated Materials (including Superfund, Resource Conservation and Recovery Act (RCRA), solid waste facilities, spills, Ohio Voluntary Action Program (VAP) and Bureau of Underground Storage Tank (BUSTR) site) A review of the ODOT, Office of Environmental Services (OES) Environmental Site Assessment Website conducted by ODOT, District 4 Environmental Section personnel on July 3, 2018, indicated several regulated material sites exist within the project study area(s) and will need to be evaluated for potential impacts. Noise Analysis (studies to identify potential noise impacts) The project will be evaluated to ensure compliance with NEPA, the FHWA Highway Act of 1970 and the USEPA Noise Control Act. Social and Economic/Community Impacts (including businesses, residences, emergency services, travel patterns, schools, recreational activities, etc.) The project will not adversely impact the local community or the local economy. Access shall be maintained to adjacent residences/businesses. No substantial impacts to health and education facilities, recreational activities/facilities, religious institutions, public transportation or pedestrian and bicycle facilities are anticipated. Temporary, short-term, minor impacts will occur to police, fire and emergency medical services with increased response times anticipated during construction. Additionally, minor short-term, temporary impacts to school and public bus services are also anticipated. Underserved Populations (defined by ODOT as minorities, low-income, older adults, individuals with disabilities and individuals with limited English proficiency) ODOT has developed guidance which provides information how to properly identify and engage Underserved Populations as part of the environmental process with the intention to avoid, minimize or mitigate disproportionately high and adverse human health and environmental effects, including social and economic effects, on Underserved Populations. The proposed project is not expected to disproportionately impact underserved populations based upon the analysis of demographic indicators in the Transportation Information Mapping System (TIMS). Individuals will be encouraged to comment throughout project planning on the project(s) potential to impact minorities, low-income, older adults, individuals with disabilities and individuals with limited English proficiency.
5 Public Comments and Project Information Your comments are an important part of the planning process for this project. Comments may be spoken or submitted in writing during the public meeting or may be ed / mailed after the public meeting to: Project Contact: David E. Griffith, P.E. Highway Safety Program Manager Ohio Department of Transportation, District david.griffith@dot.ohio.gov Media Contact: Brent Kovacs Public Information Officer Ohio Department of Transportation, District D04.PIO@dot.ohio.gov Please submit written comments by October 5, 2018 See attached public comment sheet. Project information, including this meeting handout and the meeting exhibits, will be available on the ODOT District 4 website home page: (scroll down, and select Public Meetings / Public Involvement from the list in the left margin) A summary of public comments received during the public comment period and responses to comments will be prepared and will be posted on the ODOT District 4 website within 30 days of the end of the comment period. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated June 6, 2018, and executed by FHWA and ODOT.
6 Comment Sheet SR 46 (Niles Cortland Road) and SR 82 Proposed Improvements Howland Township, Trumbull County, Ohio -Please Print- Name: Mailing Address: Phone/ Proposed Improvement Key: Your comments are requested on each colored individual proposed improvement Comments are due October 5, 2018
7 Comments: SR 46 at SR 82 Interchange (Convert to Diverging Diamond Interchange) Comments are due October 5, 2018
8 SR 46 at Warren-Sharon Road (Add NB & SB right turn lanes, extend NB, SB, & WB left turn lanes) Comments: SR 82 at Howland-Wilson Road (Extend median, remove traffic signal & left turn lanes, cul-de-sac Howland-Wilson Road, only allow right turns onto Howland-Wilson Road) Comments: Comments are due October 5, 2018
9 Comments: SR 46 Section (SR 82 to Warren-Sharon Road) (convert to a 3-lane section with center two-way left-turn lane (TWLTL), sidewalk, curb, and enclose drainage ditches) Comments: SR 46 at Howland-Springs Road (Realign Howland-Springs Road with Kenyon Drive) Comments are due October 5, 2018
10
Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement
Ohio Department of Transportation District 2 317 East Poe Rd. Bowling Green, Ohio 43402 (419) 353-8131 John R. Kasich, Governor Jerry Wray, Director Todd Audet, P.E., District Deputy Director Project Description
More informationUS-69 McAlester. Anthony Echelle, P.E. ODOT Division II Engineer
US-69 McAlester US-69 from the US-270 junction south approximately 2 miles to Fourteenth Street, including the Village Road (Kinkead Road) interchange and adjacent frontage roads. Anthony Echelle, P.E.
More informationNorth Carolina Department of Transportation Project Development and Environmental Analysis Branch
North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,
More informationSTATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION
STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION Suite 900 - James K. Polk Building 505 Deaderick Street Nashville, Tennessee 37243-0334 MEMORANDUM TO: FROM: Files Joe W. Matlock,
More informationPUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204
DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making
More informationPublic Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.
Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)
More informationFinal Environmental Impact Statement / Record of Decision
Final Environmental Impact Statement / Record of Decision APRIL 2014 (this page intentionally left blank) (this page intentionally left blank) the CLEVELAND OPPORTUNITY CORRIDOR Project RECORD OF DECISION
More informationThe Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass
The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn
More informationProject Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationPrincess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting
Citizens Information Meeting Princess Anne Road Phase VII (CIP 2-195) Wednesday, May 5, 2004 4:30 PM to 7:00 PM Red Mill Elementary School 1860 Sandbridge Road Virginia Beach, VA Welcome to the Citizens
More informationPROJECT BACKGROUND. Preliminary Design Scope and Tasks
PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of
More informationFANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016
FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for
More informationProject Overview. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More information7.5 Impacts on the Section 4(f) Properties
constructive use, such as noise, air quality and visual impacts were also assessed. It was determined that this project would not introduce changes of an external nature that would affect the recreational
More informationDRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina
DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina 1.0 INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 U.S.C. 303, requires that prior to
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar
More informationITS Concept Development Activity Descriptions
ITS Concept Development Activity Descriptions October 2015 Procedures are subject to change without notice. Check the NJDOT website to ensure this is the current version. Table of Contents Concept Development
More informationSECTION 4(f) DE MINIMIS DOCUMENTATION
SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationPublic Information Meeting
Public Information Meeting Corridor Study / Environmental Analysis for County Road 600 West from County Road 300 North to County Road 1000 North (96 th Street) Study Limits it County Road 600 West from
More informationPUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region
National Capital Region DRAFT Environmental Impact Statement PUBLIC HEARING Matthews Memorial Baptist Church Washington, DC October 18, 2007 Introduction Welcome and team introduction Hearing procedures
More informationENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F)
ENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F) Oklahoma Association of County Engineers November 8, 2016 Law and Regulatory Requirements: Section 106 National Historic
More informationSUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.
SUMMARY THE I-69 LOCATION STUDY The proposed I-69 Location Study from El Dorado to McGehee, Arkansas, represents one section (Section of Independent Utility No. 13) of the nationally designated I-69 Corridor
More informationRapid Transit Implementation Working Group
Rapid Transit Implementation Working Group October 12, 2017 1 Agenda 1. Consultation Update 2. Technical Work Update 3. LTC Rapid Transit Integration 4. Next Steps 2 Consultation Update 3 Consultation
More informationCATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY)
December 11, 2012 CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY) Project Number: Kansas Department of Transportation (KDOT) Project No. 435-46 KA-1002-03 Route:
More informationPublic Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B
Public Meeting US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Mark Leiferman Chief Road Design Engineer April 28, 2014 Why
More informationSection 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004)
11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363 4210 Fax: (916) 363 4230 M e m o r a n d u m To: Julie Myrah, Branch Chief Date: May 5, 2017 California Department of Transportation
More informationARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)
ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) Preliminary Design Report February 2015 Prepared For: City of Inver Grove Heights Dakota County Prepared By: Kimley-Horn and Associates,
More informationKING GEORGE COUNTY BOARD OF SUPERVISORS. Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018
KING GEORGE COUNTY BOARD OF SUPERVISORS Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018 Tonight s Goals Project Design and Schedule Update Noise Analysis Results Determine
More informationALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).
III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the
More informationFairfax County Parkway (Route 286) Widening Project
Fairfax County Parkway (Route 286) Widening Project Route 29 (Lee Highway) to Route 123 (Ox Road) State Project No. 0286-029-259, P101; UPC 107937 Fairfax Station HOA Meeting January 30, 2018 7:00 to 9:00
More informationPROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.
PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH
More informationAppendix E Memorandum of Agreement between FHWA and the SHPO
Appendix E between FHWA and the SHPO MEMORANDUM OF AGREEMENT BETWEEN THE FEDERAL HIGHWAY ADMINISTRATION AND THE FLORIDA STATE HISTORIC PRESERVATION OFFICER PURSUANT TO 36 CFR PART 800 REGARDING THE WEKIVA
More informationBostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London
Bostwick Road Municipal Class Environmental Assessment Public Information Centre #2 June 14, 2017 Welcome! Welcome to the 2 nd Public Information Centre for the. Representatives from the and the consulting
More informationAGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:
AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 7, 2016 AGENDA ITEM: Consideration of approval of a resolution approving Engineering Services Amendment No. 1 with
More informationCreating Complete Roadway Corridors:
Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee
More informationResponse: The public school use, including the SWM facility, is within the R-1 District.
Loudoun County School Board Dulles North Elementary School (ES-31) CMPT 2017-0006 and SPMI 2017-0015 First Response to Referral Comments Zoning Administration Comments dated October 2, 2017 Comment 1:
More informationCategorical Exclusion (CE) Determination Project Narrative
Categorical Exclusion (CE) Determination Project Narrative Project Information Project Name: SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET
More information2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental
REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Affected Environment, Environmental 2.1.8 Cultural Resources This section evaluates the potential for historical and archaeological resources within the proposed
More informationI. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...
PROJECT COMMITMENTS SUMMARY... S-1 1. Type of Action... S-1 2. Description of Action... S-1 3. Summary of Purpose and Need... S-1 4. Alternatives Considered... S-2 5. NCDOT Alternatives Carried Forward...
More informationBus Rapid Transit Environmental Assessment and Section 4(f) Evaluation Summary
Bus Rapid Transit Environmental Assessment and Section 4(f) Evaluation Summary S.0 SUMMARY August 25, 2000 As a grantee of the Federal Transit Administration (FTA), the Greater Cleveland Regional Transit
More informationEast River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement
East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement October 12, 2006 CEQR No.: TO COME ULURP Nos.: TO COME Lead Agency: Lower Manhattan Development Corporation
More informationLITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013
LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013 Environmental Assessment (EA) Availability Completed in Compliance with the National Environmental Policy Act (NEPA)
More informationMeeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.
Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Board 1: Welcome Welcome to the Wilson Transfer Station Project Public Hearing. The purpose
More informationDecision Notice. Proposed Action
Decision Notice Paving Weld County Road 105 USDA Forest Service Arapaho and Roosevelt National Forest and Pawnee National Grassland Pawnee National Grassland Ranger District Weld County, Colorado November
More informationPennsy Greenway Trail
Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad
More informationAshland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development
Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development Overview The Chicago Transit Authority (CTA), in partnership with the Chicago Department
More informationBeltLine Corridor Environmental Study
BeltLine Corridor Environmental Study Joint TAC and SAC Meeting December 8, 2008 What We Will Discuss Today Outreach and Agency Coordination Scoping Results Existing Conditions Historical and Archeological
More informationPURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationBurloak Drive Grade Separation
Burloak Drive Grade Separation Transit Project Assessment Process Public Meeting #1 March 30, 2017 GO Lakeshore West Service Plan Weekday Rush Hour 15-minute, two-way service between Aldershot* and Union
More informationWURZBACH PARKWAY WURZBACH PARKWAY
WURZBACH PARKWAY WURZBACH PARKWAY From Lockhill-Selma Rd to NW Military Hwy Open NW Military HouseHwy/Lockhill-Selma Open House Barshop Jewish Community Center December Barshop Jewish 14, 2017 Community
More informationAPPENDIX I PUBLIC MEETING AT PROJECT INCEPTION
APPENDIX I PUBLIC MEETING AT PROJECT INCEPTION OKLAHOMA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY 10 ENVIRONMENTAL ASSESSMENT (MIAMI, OKLAHOMA) OPEN HOUSE SEPTEMBER 7, 2006 PROJECT OVERVIEW The Oklahoma
More informationGoal 1 To establish and follow land use patterns for the long-range development of the campus.
ELEMENT 4 FUTURE LAND USE Goal 1 To establish and follow land use patterns for the long-range development of the campus. Objective 1A Correct existing incompatible campus land uses. Policy 1A-1 Reduce
More informationNew Stanton Project Update July 3, 2012
New Stanton Project Update July 3, 2012 The Needs BACKGROUND INFO I-70 Geometric Concerns Substandard Horizontal & Vertical Clearance at Center Ave. Bridge (The Center Avenue Bridge is Replaced in all
More informationAGENDA ACTION ITEMS INFORMATION ITEMS
NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION
More informationRt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016
Rt. 29 Solutions Project Delivery Advisory Panel January 7, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Dec
More informationTechnical Memorandum 5
Technical Memorandum 5 Environmental Resources August 2015 PREPARED BY AECOM Table of Contents Introduction... 3 Natural Features... 6 Watersheds... 6 Rivers, Lakes, Creeks... 6 Wetlands... 8 Floodplains...
More informationEnvironmental Critical Issues Report
Environmental Critical Issues Report May 25, 2018 DRAFT Deliverable Task 9.1 Prepared for: Prepared by: Historical Research Associates, Inc. Blank Page Pacific Avenue SR 7 Corridor HCT Feasibility Study
More informationMeeting Purpose: Date and Time: Location: Attendance: Handouts:
Meeting Purpose: Date and Time: Location: Attendance: Handouts: PA Turnpike / I-95 Interchange Project Design Advisory Committee (DAC)/Public Officials Meeting #8 April 12, 2012 at 1:30 p.m. Project Office,
More informationMavis Road Class Environmental Assessment
Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in
More informationOverall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.
Overall Map Summit Chicago Bloomington-Normal Lincoln New Station Planned New Station Planned Dwight Pontiac Joliet Pedestrian overpass and second platform planned Higher speed service began in this section
More informationPublic Information/Cultural Resources Committee Workshop August 15, Florida Department of Transportation District One
Public Information/Cultural Resources Committee Workshop August 15, 2012 Florida Department of Transportation District One SR 542 from 1 st Street to E. of Buckeye Loop Road Winter Haven, Polk County FPID#
More informationAppendix E Section 4(f) Evaluation
Appendix E Section 4(f) Evaluation Appendix E Draft Section 4(f) Evaluation E.1 Introduction This appendix addresses a federal regulation known as Section 4(f), which protects parks, recreation areas,
More informationProject Purpose. Project Need
Project Purpose The purpose of the project is to implement a bridge improvement solution that corrects the existing safety problem at the Strasburg Pike Bridge. The project will provide a structurally
More informationBlackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014
Blackfriars Bridge Municipal Class Environmental Assessment Public Information Centre #1 November 19 th, 2014 Why are you here tonight? To determine the future requirements of the river crossing at Blackfriars
More informationRight-of-Way Acquisitions and Relocations Technical Memorandum
Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional
More informationALIGNMENT SEGMENTS & OPERATIONALLY INDEPENDENT SECTIONS
ALIGNMENT SEGMENTS & OPERATIONALLY INDEPENDENT SECTIONS During the Draft SEIS it was anticipated that the Preferred Alternative would be constructed in stages or operationally independent sections (OIS).
More informationBostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment
Bostwick Road Municipal Class Environmental Assessment October 13, 2016 Welcome! Welcome to the first Public Information Centre for the Bostwick Road Municipal Class Environmental Assessment. Representatives
More informationBOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers
BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, 2017 5:00 PM City Hall - Council Chambers I. CALL TO ORDER II. WORK SESSION ITEMS 1. Interim Changes (10 mins) Presenter: Brent Davis, Finance and
More informationS SUMMARY S.1 PREFACE S.2 PURPOSE AND NEED S.3 PROJECT BACKGROUND
S SUMMARY S.1 PREFACE The Federal Highway Administration (FHWA) and the District Department of Transportation (DDOT), in cooperation with the National Park Service (NPS), are proposing the rehabilitation
More informationSTAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION
APPLICATION SUMMARY Case Number: S17-02 Request: STAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION SUP application in order to develop a convenience food store. Applicant: Property Owner(s): Cindee
More informationPine Flat Lake Master Plan Update FACT SHEET September 2014
Pine Flat Lake Master Plan Update FACT SHEET September 2014 PURPOSE AND OBJECTIVE The U.S. Army Corps of Engineers Sacramento District is revising the 1976 Pine Flat Lake Master Plan and is seeking public
More informationHeritage Road Improvements from Steeles Avenue to Rivermont Road
The Corporation of the City of Brampton Heritage Road Improvements from Steeles Avenue to Rivermont Road Class Environmental Assessment Study (Schedule C) September 19, 2013 The Corporation of the City
More information7.0 DRAFT SECTION 4(f) EVALUATION
7. DRAFT SECTION 4(f) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects on parks, recreation areas, wildlife and waterfowl
More informationAsbury Chapel Subdivision Sketch Plan
Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential
More informationPublic Information Centre #1
and Highway 401 Interchange Improvements WELCOME Public Information Centre #1 Veterans Memorial Parkway Extension and Highway 401 Interchange Improvements Study May 23, 2012 4 p.m. to 7 p.m. Brief Overview
More informationThe Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the
The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the first Public Meeting for the proposed interchange improvement
More informationSAWYER RANCH ROAD Pedestrian and Bicycle Improvements
SAWYER RANCH ROAD Pedestrian and Bicycle Improvements RM 150: From West of Kyle to I-35 Oct. 25, 2018 Thank you for your interest in the RM 150 project. The purpose of this meeting is to share project
More informationSummary of Other State Archeological Guidelines
Summary of Other State Archeological Guidelines This is a summary all guidelines for archeology from 17 other states. This information was gathered in order to see what type of guidelines other states
More informationPennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.
(10/27/14) PennDOT Section 106 Field Assessments and Finding Combined Early tification/finding? Yes Concurrence required or requested: Yes MPMS: 51507 ER# (if consultation with PHMC required) ): County:
More informationJOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana
JOINT PUBLIC NOTICE 26 June 2017 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services 7400
More informationPREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY
PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY SEPTEMBER 2016 Introduction The Platteview Road Corridor Study was led by the Metropolitan Area Planning Agency (MAPA) with assistance from
More informationPRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS
This checklist must accompany your submittal as the cover page. CONDITIONAL USE Application Submittal Checklist for PRELIMINARY AND FINAL APPROVAL Per Winter Park Land Development Code Sec. 58-90 PRELIMINARY
More information2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac
PLAN AMENDMENT 2013-I-B1: SEVEN CORNERS SPECIAL STUDY Summary of Pre-staffing Comments Planner: Bernard Suchicital bsuchi@fairfaxcounty.gov (703) 324-1254 Background On October 29, 2013, the Board of Supervisors
More informationPD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222
PD&E STUDY SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # 435808-1-22-02 ETDM 14222 WELCOME TO THE KICK-OFF MEETING May 24, 2016 1 1 2 3 4 5 6 PLANNING PROJECT DEVELOPMENT AND ENVIRONMENT
More informationWELCOME TO OPEN HOUSE TWO November 28, 2018
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting
More informationDevelopment of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site
Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality
More informationPreserving Green Streetscape Character on Hillside Drive
STAFF REPORT ACTION REQUIRED Preserving Green Streetscape Character on Hillside Drive Date: February 19, 2014 To: From: Toronto and East York Community Council Deputy City Manager, Cluster B Wards: Toronto-Danforth,
More informationPublic input has been an important part of the plan development process.
Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the
More informationPROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES
CITY OF LARKSPUR PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES PRESENTED BY Julian Skinner Larkspur Public Works Director DATE July 13, 2016 Bon Air Bridge
More informationPittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015
Public Notice U.S. Army Corps In Reply Refer to US Army Corps of Engineers, Pittsburgh District of Engineers Notice No. below 1000 Liberty Avenue Pittsburgh District Pittsburgh, PA 15222-4186 Application
More informationCity of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street
Welcome City of Cornwall Municipal Class Environmental Assessment Proposed Improvement and Extension of Lemay Street Redevelopment and Design of the Municipal Works Yard Public Information Centre #1 Thursday,
More informationCalifornia Environmental Quality Act (CEQA) Environmental Review Process
California Environmental Quality Act (CEQA) Environmental Review Process Los Angeles Union Station Forecourt and Esplanade Improvements constitute a Project Los Angeles County Metropolitan Transportation
More informationRezoning Transportation Analysis Petition Number: General Location Identifier: , ,
From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Rick Grochoske, PE rgrochoske@charlottenc.gov 704-432-1556 CDOT s review of this rezoning petition is intended to
More informationUS 95 Phase 2B/5 Open House
US 95 Phase 2B/5 Open House www.us95nw.com Wednesday, Mountain Crest Community Center 4701 N Durango Drive Las Vegas, NV 89129 Brian Sandoval Governor Rudy Malfabon Director Nevada Department of Transportation
More informationDRAFT MAP AMENDMENT FLU 04-4
DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,
More informationOverview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)
Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Presented to Pennsylvania Agency Coordination Meeting May 27, 2015 Doug Smith & Ryan Gordon 1 Southwestern
More informationB. DESCRIPTION OF THE PROPOSED ACTION
Executive Summary A. INTRODUCTION Metro-North Commuter Railroad Company ( Metro-North or the Project Sponsor ) is proposing the construction of a new, expanded parking garage at 50 Haarlem Avenue (formerly
More informationDESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED
DESIGN PUBLIC HEARING MAY 10, 2018 AT GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Reconstruction of Granby Road/West State Street (Route
More informationChapter Three. Recommendations
Chapter Three Recommendations Recommended Approach Based on the market analysis and further market research, three retail development strategies have been formulated that could be pursued to expand the
More information