Progress on implementation of the REDZs and Power Corridors SAPVIA Protea Hotel Balalaika 25 November 2016
|
|
- Brent Harris
- 5 years ago
- Views:
Transcription
1 Progress on implementation of the REDZs and Power Corridors SAPVIA Protea Hotel Balalaika 25 November 2016 Ms D Fischer Integrated Environmental Management Support
2 Background Implementation systems Progress & timeframes for implementation of the REDZs and Power Corridors
3 Bidding window Significant increase in work load for DEA Reporting period Total number of new applications per bid window Number of amendments Prior to 2009 N/A Not recorded to to to to Sub-total to bid window 4: Post to Total: % projects receiving environmental authorisations were constructed EIA done 3 years prior to construction feasibility phase/dea considers aspects of the project on 7 occasions Between increased DEA staff compliment 34% Low success rate time spent reviewing unsuccessful projects Business as usual approach was not appropriate for large strategic projects aimed to promote competitive bidding SEA programme of SEAs - three energy SIPs as a priority
4 Renewable Energy Application Map Version 1 Industry Prioritisation Grid (Developers only) Positive Mapping (pull factors) Negative Mapping (exclusion areas) Study Area Identification (optimal geographical areas) Socio-political study areas refinement (Provincial authorities only) Identify Focus Areas Scoping Assessment in Focus Areas (in progress) Identify Renewable Energy Development Zones (REDZs) Develop Protocol for the REDZs SEA process for wind and solar PV
5 The Corridors (Starting Point) Jan 2014 Phase I (a) (Positive Mapping) Feb-Aug 2014 Phase I (b) (Negative Mapping) Sep- Dec 2014 Phase II (Corridor Refinement) Jan- Feb 2015 Phase III (Environmental Assessment) Mar- Dec 2015 Gazetting Process 2016 Utilisation Corridors W2W Engineering Constraints Map Specialist Studies SEA Outputs Eskom Preliminary Corridors Final Corridors Draft Corridor Environmental Constraints Map Review Final Corridors Final Corridor Environmental Constraints Map W2W Environmental Constraints Map Development Protocol PARTICIPATION: Project Steering Committee, Expert Reference Group, National, Provincial, Local Government, BUSA, Chamber of Mines, Chamber of Commerce, Energy Intensive User Group, SAPVIA, SAWEA, SASTELA, IPP Office, Eskom, Transnet, CEF, Industrial Development Corporation, Civil Aviation Aut hority, Endangered Wildlife Trust, Birdlife South Africa, Cape Nature, Ezemvelo Wildlife, SANBI, and other key stakeholders.
6 Moving from outputs to implementation
7 What was achieved Identify REDZ & PCs Environmental sensitivity screening Locate development using avoidance hierarchy Identified assessment protocols Ensure consistent assessment Simplify the project level assessment Pre-negotiated route for grid Reduce timeframes for the construction Generic EMPR EIA reduced to BA based on preassessment Moved from 8 to 3 years from design to construction through applying for Pre-negotiated route
8 3 Implementation through -National web based screening tool EIA regulations 2014 application accompanied by the report generated by the national web based environmental screening tool Developing online GIS screening tool considers 100 environmental data sets - conditioned Produces a screening report flagging site sensitivities SEA - sensitivities and protocols included
9 3 Orientation Property & development footprint Location map
10 3 Orientation Sensitivity theme Category Sub category Sens feature VERY HIGH MEDIUM LOW HIGH Agriculture Land capability High High potential X X X X potential agricultural land agricultural land Terrestrial Species Bats Confirmed bat X X X biodiversity roosts Terrestrial Species Birds Artificial vulture X X biodiversity feeding sites Infrastructure Civil aviation Aerodromes Major aerodromes X Infrastructure Defence Airspace Restricted airspace X Flicker X X X X Heritage Cultural X X Heritage Other heritage sites Cultural Cultural landscape X X landscapes Geology Mining areas Mining areas X Noise X X X X SKA Infrastructure Telecommunications Obstacles SACAA obstacles X Conservation Protected areas Nature Nature reserve X X X reserve Weather services
11 3 Agriculture sensitivity
12 3 Online application system- CIPs EIA regulations 2014 application accompanied by the report generated by the national web based environmental screening tool
13 Systems to pass information between them CIPs passes personal and project information to screening Screening passes erf, footprint and classification data to CIPs spatial data CIPs passes application status to screening screening displays visually Upload ability for audit reports to either CIPs or Screening work in progress Allows for a visual representation of all applications including status and final decision
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59 Progress and timeframes Gazetting of REDZs & PC for comment 1 st quarter 2017 (April/June) EIA/BA Review timeframes reduced to Pre-negotiated route submission Screening tool and CIPs 1 st quarter 2017 Assessment protocols gazetting 2 nd quarter 2017 for comment REDZs implementation 3 rd quarter 2017 Assessment protocols 4 th quarter 2017
60
REDZ & POWER CORRIDOR GAZETTING. 25 July Environmental Advisory Services
REDZ & POWER CORRIDOR GAZETTING 25 July 2017 Environmental Advisory Services PURPOSE To provide general progress on the REDZs and Power corridor gazetting process To provide a range of comments received
More informationCape Environmental Assessment Practitioners(Pty)
BACKGROUND INFORMATION DOCUMENT (BID) Introduction Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 First Floor, Eagles View Building Facsimile: (044)
More informationPURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE
ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE DRAFT BASIC ASSESSMENT REPORT PUBLIC REVIEW LANDOWNERS MEETING FICKSBURG 23 JULY 2013 T his project is being conducted on behalf of Eskom PRESENTATION
More information!"#"$%&'"()*%+*,*-.%/"0.%(,$*&$,(*+%/*)1"* 2"314314("*!.2)/.5)* 0/%-$"/2!,$*+./"*2),).%(*-%,/!/%%'6*78*',/51*9:7;*
!"#"$%&'"()*%+*,*-.%/"0.%(,$*&$,(*+%/*)1"* 2"314314("*!.2)/.5)* 0/%-$"/2!,$*+./"*2),).%(*-%,/!/%%'6*78*',/51*9:7;* Meeting Agenda Item Discussion Item Presenter 1. Opening and Welcome 2. Introductions
More informationThe Jigsaw: Legal Instruments for Biodiversity Planning in South Africa
The Jigsaw: Legal Instruments for Biodiversity Planning in South Africa Annual Conference, Environmental Law Association AUGUST 2012 Dr. Marie Parramon-Gurney Head of Programmes: Sustainability and Development
More informationENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE SARATOGA VEGETATION CLEARING SECTION 24G ON PORTION 4 OF THE FARM KLAAS VOOGDS RIVIER NO. 40, ROBERTSON, WESTERN
More informationM07/11 CURRICULUM VITAE Kelly Tucker
Present Appointment Environmental Scientist Date of Birth 17 th April 1980 ID Number 8004170084085 Nationality South African Education Northcliff High School (1993 1997), Rand Afrikaans University (1998-2002):
More information4/8/2015 Item #10D Page 1
MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE
More informationBACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE
To: Interested and Affected Parties 2 October 2017 NOTIFICATION OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED DEVELOPMENT OF RESIDENTIAL HOUSING ON PORTION 56 OF THE FARM CHELSEA NO. 25,
More informationEnvironmental Impact Assessment
Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.
More informationTOWN OF BEDFORD CONSERVATION COMMISSION
PUBLIC NOTICE DRAFT Work Plan The is in the process of forming a subcommittee that will be studying the of Exceptional Value and their importance to the Town of Bedford. This document will serve as the
More informationBoulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017
Boulder County Comprehensive Drilling Plan Surface Owner Meeting Thursday, Nov. 2, 2017 Contact Crestone Crestone Peak Resources Quick Facts www.crestonepeakresources.com cdpboulder@crestonepr.com (720)
More informationA New Plan For The Calgary Region June calgary.ca call 3-1-1
A New Plan For The Calgary Region June 2009 calgary.ca call 3-1-1 Introduction Since January 2006, The City of Calgary has been actively participating with the member municipalities of the Calgary Regional
More informationMASTER PLAN KICK-OFF Open House #1A, April 28, 2015
"The beginning is the most important part of the work." Plato, The Republic MASTER PLAN KICK-OFF Open House #1A, April 28, 2015 YOUR CAMPUS PLANNING TEAM Campus Planners Landscape Architects Urban Designers
More informationPRESENTATION TO THE CITY COUNCIL, CITY OF GLEN COVE
PRESENTATION TO THE CITY COUNCIL, CITY OF GLEN COVE Step III BOA Implementation Strategy for the Orchard Neighborhood and Sea Cliff Avenue Corridor November 13, 2018 This presentation and the materials
More informationSoutheast Extension to RidgeGate Parkway Scoping Booklet
Southeast Extension to RidgeGate Parkway Scoping Booklet PUBLIC SCOPING MEETING SCHEDULE Public Scoping Meeting Wednesday, November 2, 2011 6:00pm to 7:30pm City of Lone Tree Recreation Center Willow Room
More informationBASIC ASSESSMENT PROCESS
BASIC ASSESSMENT PROCESS NOTICE OF A BASIC ASSESSMENT PROCESS FOR THE PROPOSED MIXED USE DEVELOPMENT ON THE REMAINDER OF PORTION 2, REMAINDER OF PORTION 7, PORTION 7, REMAINDER OF PORTION 9, REMAINDER
More informationSpatial / Land Use Planning System in Slovakia
SEA and spatial planning in Slovakia: Current practices and lessons for practical application of the EC Directive Szentendre, April 14-16, 2004 Spatial / Land Use Planning System in Slovakia Spatial planning
More informationBoulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017
Boulder County Comprehensive Drilling Plan Surface Owner Meeting Thursday, Oct. 19, 2017 Contact Crestone Crestone Peak Resources Quick Facts www.crestonepeakresources.com cdpboulder@crestonepr.com (720)
More informationPresented by: Remy Norbert DUHUZE Director/ER&PC REMA
Presented by: Remy Norbert DUHUZE Director/ER&PC REMA 1 Presentation Outline What is Environment, Social and Economic Impact Assessment? Objectives and Principles of EIA EIA background & regulations Stakeholders
More informationBlue/Green Infrastructure Study Accomack County, VA
Blue/Green Infrastructure Study Accomack County, VA Draft Asset Maps March 8-9, 2010 Green Infrastructure Center, Inc. 2 Overview What is Green and Blue Infrastructure Project Timeline & Tasks Literature
More informationPerth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager
Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West
More informationENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED HAASENDAL DEVELOPMENT AND KUILS RIVER GOLF COURSE RE-DEVELOPMENT ON ERF 23580, ERF 23579, ERF 23582, ERF
More informationCONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM
CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto
More informationTSHWANE STRENGTHENING PROJECT PHASE 1, GAUTENG PROVINCE: Draft Scoping Report: Apollo - Verwoerdburg July 2009
APPROACH TO UNDERTAKING THE ENVIRONMENTAL SCOPING STUDY CHAPTER 3 An Environmental Impact Assessment (EIA) process refers to that process (as per the EIA Regulations) which involves the identification
More informationBASIC ASSESSMENT REPORT. Background Information Document
BASIC ASSESSMENT REPORT Background Information Document BASIC ASSESSMENT FOR THE PROPOSED LUIPERDSHOEK 33 KV POWER LINE PROJECT TO BE LOCATED NORTH OF THE TOWN OF POFADDER IN THE NORTHERN CAPE (DEA Ref
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016
Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest
More informationAssessing the impact of smallscale wind energy proposals on the natural heritage
Scottish Natural Heritage Assessing the impact of smallscale wind energy proposals on the natural heritage Guidance March 2016 Version 3 1 Contents 1. Introduction. 3 2. Encouraging a spatial approach
More informationDGE 2 EUROPEAN UNION. Brussels, 20 September 2017 (OR. en) 2016/0287 (COD) PE-CONS 28/17 TELECOM 158 FC 54 CODEC 1008
EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 20 September 2017 (OR. en) 2016/0287 (COD) PE-CONS 28/17 TELECOM 158 FC 54 CODEC 1008 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: REGULATION
More informationSIBAYA WATERLINE BASIC ASSESSMENT PROCESS. PRE-APPLICATION MEETING WITH EDTEA March 2016
SIBAYA WATERLINE BASIC ASSESSMENT PROCESS PRE-APPLICATION MEETING WITH EDTEA March 2016 Agenda Item No. Topic 1. Welcome & Introduction 2. Purpose of the Meeting 3. Presentation 4. Queries / Discussion
More informationPROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM
PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM PUBLIC CONSULTATION YOUR VIEW MATTERS TO US LOCATION PLAN Thank you for taking the time to read this information leaflet regarding a proposed residential
More informationTown of Cobourg Heritage Master Plan. Statutory Public Meeting
Town of Cobourg Heritage Master Plan Statutory Public Meeting April 25 th 2016 Presentation Overview 1. Introduction 2. Project background and schedule overview 3. Review of strategic direction content
More informationWLAC Facilities Committee Meeting. September 18, 2017
Campus Program Report WLAC Facilities Committee Meeting September 18, 2017 Page 1 DSA approved the plans on May 15, 2017. Notice to Proceed was issued June 8, 2017 and the project remains on schedule for
More informationAnalogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement
Analogue to Digital Telecare Technical Advisory Board 21 st June 2017 Work Stream 3 Procurement Euan Kidd Senior Procurement Specialist Euan.kidd@scotland-excel.org.uk 1 Purpose of Work stream 3 - procurement
More informationIntegrated urban policies and land management The URBACT Experience Didier Vancutsem
Integrated urban policies and land management The URBACT Experience Didier Vancutsem Didier Vancutsem URBACT Expert Prof Urban Planner ISOCARP Contents Integrated urban policies and land management: a
More informationTOWN OF NEW CASTLE - Master Plan Update
Our Presentation Today (1) Recap the Master Planning Process To Date (2) Present the Outline of the Master Planning Work Plan (3) Present the Calendar for the Master Plan (4) Outline the scope of a Downtown
More informationStrategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017
Strategic Environmental Assessment Screening Report Dublin Port Masterplan Review 2017 Table of Contents 1 Introduction... 1 2 Purpose of the Masterplan... 2 3 Task 1.1 Pre-Screening Check... 5 4 Task
More informationUnified Development Code (UDC) Revision
Unified Development Code (UDC) Revision Update Brief George Haggerty Acting Land Use General Manager Department of Land Use NCC Council Land Use Workshop Briefing January 5, 2016 Summary Background (Outreach
More informationedmonton.ca/ribbonofgreen #ribbonofgreen
WHAT IS THE RIBBON OF GREEN? The Ribbon of Green is Edmonton s entire river valley and ravine system. The Ribbon of Green (2018) Project will provide strategic guidance for the southwest and northeast
More informationMEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)
MINUTES OF THE PRE-APPLICATION MEETING IN RESPECT OF THE APPLICATION FOR ENVIRONMENTAL AUTHORISATION OF THE PROPOSED BEACHWOOD RESORT AND ESTATE DEVELOPEMENT MEETING HELD AT THE EDTEA OFFICES (ethekwini)
More informationDigital Terrestrial Television Infrastructure Rollout. Environmental Impact Assessment - Corridor -
Digital Terrestrial Television Infrastructure Rollout Environmental Impact Assessment - Corridor - 1 1 ENVIRONMENTAL IMPACT ASSESSMENT (EIA): CORRIDOR 1.1 INTRODUCTION Corridor is a small farming community
More informationThe UK-MAB Urban Forum
The UK-MAB Forum www.ukmaburbanforum.org.uk (Provisional) Work Programme 2008/09 Nigel Lawson Secretary to the Forum c/o Geography, School of Environment and Development University of Manchester Manchester
More informationINTERNATIONAL SEMINAR
UNDER THE DISTINGUISHED PATRONAGE OF THE Ministry of Environment, Nature Protection and Sustainable Development (MINEPDED) INTERNATIONAL SEMINAR THEME "Evolution of Environmental Assessment systems in
More informationINDEPENDENCE BOULEVARD AREA PLAN. June 24, 2008
INDEPENDENCE BOULEVARD AREA PLAN Public Meeting #1 June 24, 2008 Tonight s Agenda Introduction Welcome and Ground Rules Overview Presentation Purpose of the Plan What Brings Us Here? A Tour of the Corridor
More information~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1
~!VAUGHAN NOV Z 5 2016 November 21, 2016 Mr. Denis Kelly, Regional Clerk The Regional Municipality of York 17250 Yonge Street Newmarket, ON L3Y 6Z1 Dear Mr. Kelly: RE: NEW KIRBY GO STATION IN BLOCK 27
More informationFingal Development Plan & Green Infrastructure. Nicholas O Kane Senior Executive Planner Fingal County Council
Fingal Development Plan 2011-2017 & Green Infrastructure Nicholas O Kane Senior Executive Planner Fingal County Council 2011 Fingal Development Plan Must be in compliance with National Spatial Strategy
More informationOur Constitutional imperative
PARLIAMENT: PUBLIC HEARINGS EFFICACY OF SOUTH AFRICA'S ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REGIME Henri Fortuin Cape Town 29July 2013 Our Constitutional imperative Section 24 of our Constitution gives
More informationTri-County Transportation & Land Use Study. Steering Committee Meeting May 14, 2009
Tri-County Transportation & Land Use Study Steering Committee Meeting May 14, 2009 Agenda Recap of Study Goals and Objectives Update on CV Land Use Model: Business as Usual (BAU) Growth Scenario Pros vs
More informationRapid Transit Implementation Working Group September 14, 2017
Rapid Transit Implementation Working Group September 14, 2017 BACKGROUND Council approved the Rapid Transit Master Plan and Updated Business Case on July 25, 2017. Approval of the RTMP confirmed the BRT
More informationSOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom - Happiness
THE MINISTRY OF SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION Independence - Freedom - Happiness -------- ---------- No. 07/2008/TT-BXD Hanoi, April 7, 2008 CIRCULAR GUIDING THE ELABORATION, EVALUATION,
More informationDUBLIN DOCKLANDS MASTER PLAN AND RELATIONSHIP WITH OTHER PLANS
.1 National Policy and Programmes.1.1 Sustainable Development A Strategy for Ireland, 1997.1.2 National Climate Change Strategy, 2007-2012.1. National Development Plan 2007-201.1.4 National Spatial Strategy,
More informationCHAPTER 4: CONTEXTUALISING THE PROPOSED PROJECT ENVIRONMENT WITHIN THE NATIONAL AND LOCAL
: CONTEXTUALISING THE PROPOSED PROJECT WITHIN THE NATIONAL AND LOCAL ENVIRONMENT CONTENTS 4. CONTEXTUALISING THE PROPOSED PROJECT WITHIN THE NATIONAL AND LOCAL ENVIRONMENT 4-1 4.1 Introduction to the Coega
More informationPresentation August 20, 2013
Presentation August 20, 2013 St. Vital Transmission Complex Stakeholder Workshop WELCOME! Manitoba Hydro 9:00am to 1:50pm Purpose of Workshop Share current project information Including outcomes of the
More informationCall for Proposals. Heritage, natural capital and ecosystem services: case studies. Project No: Date of Issue: Tuesday 14 th November 2017
Call for Proposals Heritage, natural capital and ecosystem services: case studies Project No: 7705 Date of Issue: Tuesday 14 th November 2017 Summary Historic England is seeking expressions of interest
More informationScope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan
Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016
Item 5, Report No. 26, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the City of Vaughan on June 7, 2016. 5 MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
More informationOur approach to the design and routeing of new electricity transmission lines
Our approach to the design and routeing of new electricity transmission lines 2012 National Grid s job is to connect people to the energy they use to warm and light their homes, to connect factories and
More informationStock-Taking on Integrated Coastal Zone Management (ICZM) in the Black Sea IMPLEMENTATION AUDIT QUESTIONNAIRE 2010
Stock-Taking on Integrated Coastal Zone Management (ICZM) in the Black Sea IMPLEMENTATION AUDIT QUESTIONNAIRE 2010 PURPOSE The purposes of this questionnaire are: (a) to perform the policy, legal and institutional
More information1.0 Purpose of a Secondary Plan for the Masonville Transit Village
Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village
More informationCALL TO ORDER Chair Tom Vance called the meeting of Sammamish Planning Commission to order at 6:00 p.m.
PLANNING COMMISSION MEETING SUMMARY Thursday Sep 3, 2009 City of Sammamish Council Chambers COMMISSIONERS PRESENT Jan Klier Erica Tiliacos Dick Amidei Tom Vance Stan Bump Mahbubul Islam Scott Hamilton
More informationEIA process in Malaysia. Approaches and Strategies. Way Forward
PUBLIC PARTICIPATION APPROACHES AND STRATEGIES UNDER THE EIA PROCESS IN MALAYSIA By Norhayati Mohamad Yusof Principal Assistant Director Department of Environment Malaysia AECEN REGIONAL WORKSHOP Strengthening
More informationSolar Plant Performance Monitoring
Solar Plant Performance Monitoring Firstgreen Workshop Series : 25 th June 2014 Firstgreen Consulting Pvt Ltd. U 28A/3 FF DLF PH III Gurgaon India - 122002 +91-124-4063031 +919899295854 www.firstgreen.co
More informationIUCN World Heritage Advice Note Environmental Assessment & World Heritage
FINAL DRAFT, 07 June 2013 1 IUCN World Heritage Advice Note Environmental Assessment & World Heritage This Advice Note is intended to provide States Parties and other stakeholders with guidance on integrating
More informationBUSINESS PLAN. CEN/TC 336 BITUMINOUS BINDERS Version 2018 EXECUTIVE SUMMARY
Page: 1 BUSINESS PLAN CEN/TC 336 BITUMINOUS BINDERS Version 2018 EXECUTIVE SUMMARY BUSINESS ENVIRONMENT The parties interested in the bituminous binder market are the following industries: - the bituminous
More informationCentral Lake Ontario Conservation Conservation Lands Master Plan
Conservation Lands Master Plan Top 13 Frequently Asked Questions 1. What are conservation lands? Where are these conservation lands located in the Central Lake Ontario Conservation watershed? Conservation
More informationLOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013
LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES MS4 Statewide Stormwater Summit June 18, 2013 Powerpoint Templates Evan Canfield, Ph.D, P.E. Pima County Regional Flood Control Outline
More informationAMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON
AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON Subject: Boyne Survey Secondary Plan and Related Official Plan Amendments The following text and schedules constitute Amendment No. 30 to the
More informationTown of Oakville Streetscape Strategy
Town of Oakville Streetscape Strategy Endorsed by PDC on February 10, 2014 (PD-011-14) Town of Oakville Streetscape Strategy [endorsed by PDC February 10, 2014] 0 Town of Oakville Streetscape Strategy
More informationTERMS OF REFERENCE MALASPINA COMPLEX COASTAL PLAN
TERMS OF REFERENCE MALASPINA COMPLEX COASTAL PLAN A. RATIONALE Land and Water BC, resource user groups and the Powell River Regional District have requested that the Ministry of Sustainable Resource Management
More informationStandardization Programme ( ) Building & Construction Standards Committee
Standardization Programme (2012-2013) Building & Construction Standards Committee Projects Title 2012 2013 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1 EN 12811: 2 EN 197-1:2011
More informationAlternative Routes Determined
Alternative Routes Determined Preferred Route Selection Preferred Route Selection Expert judgment is used to determine the Final Preferred Route Takes into account feedback from Round One engagement and
More informationCommunicate the results of the EIA for the proposed development;
1 INTRODUCTION Burgan Cape Terminals (Proprietary) Limited hereafter referred to as Burgan Oil, appointed Environmental Resources Management Southern Africa (Pty) Ltd, hereafter referred to as ERM, as
More informationScarborough Waterfront Project
Scarborough Waterfront Project Public Information Centre #1 Environmental Assessment Terms of Reference September 10, 2014 Agenda Open House Presentation 7:00 to 7:30 pm Presentation 7:30 to 8:15 pm History
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF DECEMBER 10, 2013
Item 1, Report No. 55, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the City of Vaughan on December 10, 2013. Regional Councillor Di Biase declared
More informationInfrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation
Staff Report To Service Area Committee of the Whole Infrastructure, Development and Enterprise Services Date Monday, March 6, 2017 Subject Natural Heritage Action Plan (NHAP) Project Initiation Report
More informationRIVER MAINTENANCE MANAGEMENT PLAN APPLICATION
RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION NOTICE OF PUBLIC PARTICIPATION PERIOD OF A RIVER MAINTENANCE MAANGEMENT PLAN (RMMP) FOR THE PROPOSED MAINTENANCE OF THE KM 8.920 CULVERT, WAARBURGH ROAD, PAARL,
More informationROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document
ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL
More informationLiving with World Heritage in Africa
INTERNATIONAL CONFERENCE Living with World Heritage in Africa [26 26-29 September 2012] South Africa BACKGROUND DOCUMENT The Government of the Republic of South Africa, in collaboration with the African
More informationSAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW
SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW Steering Committee Presentation February 14, 2018 Purpose of General Plan Guide land use and development decisions Coordinate transportation, infrastructure,
More informationPDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016
Page 1 REPORT TO: Planning and Development Committee MEETING DATE: Wednesday, June 01, 2016 SUBJECT: ROPA 12: Project Initiation Report Regional Official Plan Amendment (ROPA # 12) Watercourse Policies
More information2014 South Atlantic LCC
2014 South Atlantic LCC Annual Report 1 Allie Stewart, U.S. FWS The South Atlantic LCC s 2014 Annual Report this year of progress and accomplishments is dedicated to South Atlantic LCC Coordinator, Ken
More informationSUBJECT: Revised proposed new official plan recommended for adoption
Page 1 of Report PB-04-18 SUBJECT: Revised proposed new official plan recommended for adoption TO: FROM: Planning and Development Committee Department of City Building Report Number: PB-04-18 Wards Affected:
More informationSINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR
7 PROJECT: SINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR Basic Environmental Assessment for Lodge expansion and Refurbishment of the Singita Sweni Lodge, within the Singita Private Concession in
More informationDigital Terrestrial Television Infrastructure Rollout. Site-specific Environmental Management Plan - Omega -
Digital Terrestrial Television Infrastructure Rollout Site-specific Environmental Management Plan - Omega - 2 1 ENVIRONMENTAL IMPACT ASSESSMENT: OMEGA 1.1 RATIONALE FOR THE SITE Omega is situated in the
More informationNational Conservation Council AGENDA
2017-05-03 NCC GM Agenda v1 National Conservation Council Special General Meeting (National Trust Meeting Room Dart Park, Wednesday 3 rd May 3:30pm- 5pm) AGENDA 1. Call to Order a. Attendees, Apologies,
More informationKick-off Meeting,: September 11, 2014
Town of Midland Downtown Master Plan Study Kick-off Meeting,: September 11, 2014 PRESENTATION OVERVIEW 1. Trip Agenda 2. Introduction 3. Work Program & Schedule Consultation Strategy Project Phases and
More informationReport to: Development Services Committee Report Date: September 11, 2017
~RKHAM Report to: Development Services Committee Report Date: September 11, 2017 SUBJECT: PREPARED BY: Conceptual Master Plan for the Future Urban Area - Community Structure Plan and Key Policy Direction
More informationDr. Riccardo Mesiano Sustainable Development and Productivity Division May 2 nd, 2012
Rio+20, National Policy Making and Sustainable Development Policies in Conflict-Afflicted Courtiers: The case of Lebanon Rio+20 Conference and the Zero Draft: Concepts and Opportunities Dr. Riccardo Mesiano
More informationbuilding with nature - a new benchmark for green infrastructure
building with nature - a new benchmark for green infrastructure Danielle Sinnett, Gemma Jerome, Sarah Burgess, Nick Smith and Roger Mortlock outline the aims, development and proposed operation of Building
More informationDowntown Development Specialist 2017 Year in Review
Downtown Development Specialist 2017 Year in Review Downtown Development Specialist 3 Year Plan as Proposed (Autumn 2016): Year 1: Imagine Change (Organizationally Driven) Inspiring the local community
More informationAlternative Routes. St. Vital to La Verendrye Station - Southern Loop Transmission Corridor. 20 different segments 4 segments common to all routes
Alternative Routes St. Vital to La Verendrye Station - Southern Loop Transmission Corridor In a fixed right-of-way St. Vital to Letellier Station 20 different segments 4 segments common to all routes Goal
More informationInterim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents
Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives
More informationBRE Strategic Ecological Framework LI Technical Information Note 03/2016
BRE Strategic Ecological Framework Technical Information Note 03/2016 September 2016 Contents 1. Introduction 2. Aims of BRE s Strategic Ecological Framework 3. How SEF is different from previous approaches
More informationUniversity of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT
University of Saskatchewan CAMPUS MASTER PLAN Senate Meeting Preliminary Presentation April 21, 2018 DIALOG ECS DA WATT project process presentation agenda Stakeholder Engagement Project Control phase1
More informationNorthern Territory Compact Urban Growth Policy
Northern Territory Compact Urban Growth Policy A Reference Policy Document to clause 2.7 (Reference to Policy) of the NT Planning Scheme May 2015 Table of Contents 1 Policy Setting... 3 1.1 Context for
More informationRandle Siddeley associates landscape architecture environment urban design
Summer Palace Private Garden, Syria Landscape Consultancy Fee Proposal Date: 11 th November 2010 Doc. No. RS/FP CONTENTS 1.0 Site Visit & Project Development 2.0 Concept Design 3.0 Design Development 4.0
More informationReg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web:
C ape E nvironmental A ssessment P ractitioners (Pty) Ltd Reg. No. 2008/004627/07 VAT No 4720248386 Telephone: (044) 4) 874 0365 1 Floor Eagles View Building Facsimile: (044) 874 0432 5 Progress Street,
More informationInternational Blvd. TOD Plan Public Workshop #1
International Blvd. TOD Plan Public Workshop #1 Add photos or project images September 21 and 22, 2010 Workshop Purpose Introduce the public to the Project Review and discuss the existing conditions analysis
More informationCITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA
CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James
More informationPART 1. Background to the Study. Avenue Study. The Danforth
The Danforth 1.1/ Study Purpose & Key Municipal Goals 1.2/ The Local Advisory Committee 1.3/ The Project Team 1.4/ Study Process/Summary of Method 1.5/ Summary of Consultation 1.1 Study Purpose and Key
More information