1

2

3 PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE and ROADWAY IMPROVEMENT PROJECT PERRY AND LEROY TOWNSHIPS, LAKE COUNTY, OHIO (PID 5669/PID 85131) PREPARED BY: MICHAEL BAKER JR., INC EUCLID AVENUE SUITE 1050 CLEVELAND, OHIO (216) FOR: LAKE COUNTY ENGINEER 550 Blackbrook Road Painesville, Ohio Phone: (440) June 27, 2011

4 PURPOSE AND NEED VROOMAN ROAD BRIDGE and ROADWAY IMPROVEMENT PROJECT PERRY AND LEROY TOWNSHIPS, LAKE COUNTY, OHIO PID 5669/PID Prepared by: Michael Baker Jr., Inc. The Halle Building 1228 Euclid Avenue, Suite 1050 Cleveland, Ohio (216) Fax (216) June 27, 2011

5 PURPOSE AND NEED STATEMENT The purpose of this project is to provide a safe and adequate transportation facility that addresses the deficient condition and design of the existing Vrooman Road Bridge (SFN ); eliminates flooding of the existing bridge and approach roadway; addresses deficient design elements of existing Vrooman Road and its intersections; improves the safety of the Study Area; and maintains connectivity. The project has four identified needs outlined below: Deficient Bridge Extensive deterioration, narrow bridge roadway and shoulders, and other design deficiencies have been identified in the existing Vrooman Road Bridge These deficiencies lead to documented problems including increased maintenance costs and increased risk of crashes. The Vrooman Road Bridge is lower than the 100-year flood elevation and is subject to periodic flooding and the associated maintenance. The Vrooman Road Bridge approaches are lower than the 25-year flood elevation and are subject to frequent recurring flooding and the associated maintenance. Current Ohio Department of Transportation s (ODOT) Location and Design (L&D) Manual, Volume 2, Section 1004 criteria require that the highway grade shall normally be set such that the low edge of the pavement will clear the design water surface profile for existing conditions by 3 feet, and bridges (low chord) will generally clear the water surface profile of the design year frequency flood. That is, the lowest component of the replacement bridge must be above the design year flood level, in this case, the 25 year flood level; and that the approach roadway should not flood during this event. Deficient Roadway Vrooman Road including its intersections and bridge approaches is deficient and has inadequate geometrics, steep grades, substandard curves and poor sight distance as compared to current applicable roadway standards. Applicable design criteria/standards are defined in ODOT s L&D Manual Volume 1, and supplemented by the Lake County Standards. Roadway deficiencies also include the existing retaining wall along the south side of Vrooman road in the vicinity of the Vrooman Road / SR-84 intersection which continues to deteriorate with increased maintenance costs. Safety Safety issues are associated with the crash patterns along Vrooman Road within the project area, including roadway and intersections. Crashes along Vrooman Road and SR-84 within the Study Area are located at four major points, three of them are intersections and one is the Vrooman Road Bridge over the Grand River. The historic crash rates for three of the intersections within the Study Area are higher than the state wide average for similar intersections, indicating a traffic safety problem. The crash rate for Vrooman Road within the Study Area is also higher than for other similar roadways in the state. Connectivity Vrooman Road provides connectivity between I-90 and eastern Painesville. The closest interchanges are 7.5 miles to the east (I-90/SR 528) and 4.5 miles to the west (I-90/SR 44). Detour routes are approximately miles and approximately miles, respectively. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 1

6 PROJECT HISTORY Improvements to Vrooman Road have been proposed and studied in various forms since construction of the existing bridge in These studies were conducted to evaluate feasible solutions to address the same, or many of the same, issues faced today; and to utilize the I-90 / Vrooman Road interchange for its originally intended purpose of providing connectivity between Southeast Painesville, Ohio and Interstate 90 (I-90). A summary table of each of these reports is found below. None of the improvements recommended by these reports were completed. Lack of funding postponed the project in 1963 and Because of frequent flooding of Vrooman Road by the Grand River; continued deterioration of the bridge and approach roadway; and increasing numbers of crashes at various intersections and the bridge s approaches, the project was revived in the mid 1980 s by the Lake County Engineer s Office (LCEO). The project advanced with the completion of the 1984 Vrooman Road North Improvement Report (CT Consultants). Following this planning level study, engineering and environmental studies were initiated in the early 1990 s. However, the project was halted in the mid-1990 s pending additional archaeological investigations when Native American burial sites were identified within the project limits. The Vrooman Road Bridge was identified as a structurally deficient and functionally obsolete in bridge inspection reports prepared in 2002 and Concerns over the bridge s safety, crash frequency and recurring flooding resulted in the initiation of another planning study in 2003 to identify transportation system deficiencies along Vrooman Road (County Road 227) between State Route 84 (SR-84) and I-90 and to develop the conceptual solutions to address the identified deficiencies. The 2005 Vrooman Road Planning Study (Transystems 2005, Baker revised 2008) followed ODOT s Planning Study Process (PSP) and Project Development Process (PDP) guidance. Consistent with that process the objectives of the study were to identify deficiencies in the roadway corridor, explore replacement alternatives for the structurally deficient Vrooman Road Bridge, and recommend a Conceptual Solution for further development. The findings of these reports are summarized in Table 1. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 2

7 TABLE 1: SUMMARY OF PREVIOUS VROOMAN ROAD ENGINEERING STUDIES Report Date Issues Recommendations Capitol Engineering Report for the LCEO Ohio Department of Highways, Preliminary Engineering Report CT Consultants, Vrooman Road North Improvement Report Transystems Inc., Vrooman Road Planning Study May 10, 1963 revised October 15, 1963 March 1968 July Revised 2008 by Baker Substandard horizontal & vertical alignments Steep grades on the river valley hillsides Flooding of approaches Slope stability Acute angle of SR 84 Vrooman Rd. intersection with poor sight distances Substandard horizontal & vertical alignments Steep grades on the river valley hillsides Flooding of approaches Slope stability Acute angle of SR 84 Vrooman Rd. intersection with poor sight distances Substandard bridge width Substandard horizontal & vertical alignments Steep grades on the river valley hillsides Flooding of approaches Slope stability Acute angle of SR 84 Vrooman Rd. intersection with poor sight distances Structurally deficient and functionally obsolete bridge Substandard horizontal & vertical alignments Steep grades on the river valley hillsides Flooding of approaches Slope stability Acute angle of SR 84 Vrooman Rd. intersection with poor sight distances Structurally deficient and functionally obsolete bridge Alternative B A 2-lane limited access roadway to SR 84; realignment of Vrooman Rd. to east, low-level bridge crossing, and interchange at SR 84 located between Madison Ave. and Lane Rd. Proposed Preferred Route A 4-lane limited access from SR 86 to SR 2; realignment of Vrooman Rd. to the east utilizing existing I-90 interchange, low-level bridge crossing, and interchange at SR 84 located between Madison Ave. and Lane Rd. Proposed Preferred Alternative A 2-lane high level bridge crossing with an northern connection at Lane Road Connection and southern connection at Vrooman Road near the top of the southern escarpment; a 2-lane roadway with minimal realignment and widening of Vrooman Rd. between I-90 and southern escarpment to address geometric and design deficiencies. Identified the Conceptual Solution as Alternative B- Lane Road. A 2-lane high level bridge crossing with an northern connection at Lane Road and southern connection at Vrooman Road near the top of the southern escarpment; a 2- lane roadway with minimal realignment and widening of Vrooman Rd. between I-90 and southern escarpment to address geometric and design deficiencies. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 3

8 Study Area Vrooman Road (County Road 227) traverses portions of Leroy and Perry Townships, Lake County, Ohio. Vrooman Road is approximately 3.05 miles long extending from its southern terminus at a five-point intersection of State Route 86 (SR-86), County Road 208 (Leroy Center Road) and County Road 210 (Huntoon Road) in Leroy Township; to its northern terminus, State Route 84 (SR-84, aka South Ridge Road and Riverside Drive), in Perry Township. Vrooman Road provides access to and from Perry and Leroy Townships, and southeastern Painesville to Interstate Route 90 (I-90). The Vrooman Road Bridge and Roadway Improvement Project s Study Area is roughly centered along Vrooman Road and is approximately 1.46 miles long, beginning at the I-90 interchange to the south, and ending at SR-84 to the north. The Project Study Area consists of the approximately 0.83 mile long roadway portion (PID 85131, Southern Reach ) extending from the I-90 interchange to the southern escarpment of the Grand River Valley; and the approximately 0.63 mile long bridge portion (PID 5669, Valley Crossing ) extending from the southern escarpment of the Grand River Valley to the intersection with SR-84 at the northern escarpment of the Grand River Valley (Figures 1 through 5). The Grand River, a State designated Wild and Scenic River, is the most prominent physical feature transecting the Study Area. The Grand River flows through a deep, steep-sided valley, and is crossed by Vrooman Road north of Interstate 90, between the Lake Metroparks Indian Point and Mason s Landing Parks located just south of SR-84. The Study Area s limits were established to evaluate and address identified issues within logical geographic boundaries. These boundaries allow the development of a feasible transportation solution that will have independent utility. Specifically, the boundaries were established because: The southern limit, I-90, was chosen because high numbers of crashes and other safety issues were not noted south of I-90 and because the I-90 interchange was originally constructed to provide connectivity between southeast Painesville, Ohio and I-90; The northern limit, SR-84, was chosen because SR-84 is Vrooman Road s current and historic northern terminus. The narrow lateral limits between I-90 and the southern escarpment of the Grand River Valley (the Southern Reach ) were chosen because of the residential property to the west, and county park property to the east; with the intent to minimize possible Right of Way impacts within this area. An additional corridor of land between Riverview Road and SR-84 is included in the Study Area to allow for the possibility of a new connecting roadway between Riverview Road and SR-84. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 4

9 The triangular shaped lateral limits between the southern escarpment of the Grand River Valley and SR-84 (the Valley Crossing ) were chosen to include immediately adjacent existing intersections on SR-84. These intersections included Madison Avenue to the west and Lane Road to the east. No other intersections to the east or west are immediately adjacent to the existing Vrooman Road / SR-84 intersection. Existing Traffic Vrooman Road is classified by ODOT as an urban collector and has a current Average Daily Traffic (ADT) volume of approximately 5500 vehicles per day. Traffic counts were performed by the Lake County Engineer s Office in 2010 at the intersection of Vrooman Road, SR-84 and Madison Avenue. Traffic on Vrooman Road was determined from these traffic counts and is listed below: Current Vrooman Road Traffic (2010) Average Daily Traffic, ADT Average Daily Truck Traffic = 5529 vehicles per day = 166 trucks per day Anticipated future traffic volume on roadway facilities is used to establish design criteria for any proposed improvement project. This volume is normally developed for the anticipated opening and design year for the proposed improvements. ODOT s Office of Technical Service (OTS) provides this information, known as certified traffic data, for federally funded projects. This data projects anticipated traffic volumes based on the studied improvements and site demographics. Certified traffic for the Vrooman Road Bridge and Roadway Improvement Project will be developed once the proposed improvements are identified. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 5

10 TRANSPORTATION NEEDS This project has four identified needs: Deficient condition and design of existing bridge including flooding of existing bridge and approach roadway Deficient design of existing roadway (Vrooman Road) and intersections and retaining wall Safety Connectivity Deficient condition and design of existing bridge The Vrooman Road Bridge is a two-span steel Warren Polygonal pony truss structure built in The bridge has an overall structure length of approximately with each span approximately 88-4 center-to-center of bearings. The trusses are spaced /- centerto-center. The existing superstructure bears on stone abutments dating from the previous bridge crossing built in The bridge s existing two-lane roadway is /- wide with no shoulders. A galvanized steel guardrail has been attached to the interior of the truss verticals, effectively reducing the roadway opening (Photograph 18). This is substantially less than the currently required roadway opening of 32-0 (two 12-0 lanes and two 4-0 shoulders) as stipulated in ODOT L&D Manual Volume 1, Section 300, and as supplemented by Lake County Design Standards. In 1980 the structure underwent a major rehabilitation with the removal and replacement of the original timber deck and steel stringers with a new timber deck and asphalt wearing surface. The condition of bridge structures are evaluated in accordance with state and federal guidelines. Based on inspections, structures are assigned a general appraisal rating on a scale from 1 to 9 where 9 indicates a new condition, 4 indicates deficient/poor condition and 1 indicates near failure. The wearing surfaces and floors of bridges are inspected and given a rating on a scale from 1 to 4 where 1 indicates a new condition, 3 indicates deficient/poor condition and 4 indicates critical condition. The paint is also inspected and given a rating on a scale from 0 to 9 where a 9 indicates a new condition, a 4 indicates deficient/poor condition and 0 indicates failure conditions. Bridges are also given a sufficiency rating. The sufficiency rating is a general representation of the overall condition of the bridge. This rating ranges from 0 to 100 where a rating of 100 is considered excellent and 0 is considered poor. The Vrooman Road Bridge has been identified as a structurally deficient and functionally obsolete bridge in bridge inspection reports prepared in 2002 and The ODOT BR86 Bridge Inspection Form in the 2002 Physical Condition Report Vrooman Road Bridge Over the Grand River, SFN , Leroy Township, Lake County Ohio (HNTB Ohio, Inc.) rated the Vrooman Road Bridge with a General Appraisal of 4 (Appendix A). The ODOT BR86 Bridge Inspection Form in the August 2006, Bridge Inspection Report Vrooman Road Bridge Over Grand River, Perry and Leroy Townships, SFN (Richland Engineering Limited) rated the Vrooman Road Bridge with a General Appraisal of 3. (Appendix A) Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 6

11 Flooding of current bridge and roadway The Vrooman Road Bridge (roadway elevation and approach elevations 631.0/632.0) is below the 25-year flood elevation of and the 100-year flood elevation of Because of its elevation, the bridge and approach roadway is subject to recurring flooding and associated maintenance (i.e. enacting emergency closures, inspections, repair of degrading bridge members, and post-flood removal of debris and mud from Vrooman Road, the approaches, and the bridge structure). Refer to Figures 7A and 7B. Zone A areas in these figures have a 1% annual chance of flooding and a 26% chance of flooding over a 30-year period. Zone C areas in these figures are above the 500-year flood level and have minimal chances of experiencing flood hazard other than ponding and local drainage problems The Vrooman Road Bridge and approach roadway have been closed 2 to 3 times annually on average over the last 5 years in the spring and/or fall; with the typical closure lasting 1 to 2 days. The Vrooman Road Bridge was closed for 5 months from July, 2006 to December, 2006 due to severe damage to the approach roadway and possible scour damage to the substructure resulting from an extreme flood event. When the Vrooman Road Bridge is closed, the nearest alternative crossings of the Grand River (local road detours) are Blair Road, located approximately 2 miles to the east; and SR-84 located approximately 4 miles to the west. The estimated detour length is approximately 8.5 to 13.0 miles depending on route and roadway restrictions on allowable vehicles. For interstate/state highway traffic, the closest interchanges are 7.5 miles to the east (I-90/SR 528) and 4.5 miles to the west (I-90/SR 44). Detour routes are approximately miles and approximately miles, respectively. Current ODOT s L&D Manual Volume 2, Section 1004, criteria require that the lowest component of the replacement bridge must be above the design year flood level, in this case, the 25 year flood level; and that the approach roadway should not flood during this event. Therefore, any new bridge s lowest point of structure elevation and any new approaches would need to be at or above an elevation of Deficient design of existing roadway (Vrooman Road) and intersections and retaining wall The U.S. DOT s Federal Highway Administration (FHWA) classifies our Nation s urban and rural roadways by road function. Each functional classification is based on the type of service the road provides to the motoring public, and the designation is used for data and planning purposes. Design standards (requirements) are tied to these functional classifications. Each classification has a range of allowable lane widths, shoulder widths, curve sharpness (radii), steepness of roadway (grade), etc. Vrooman Road, Madison Avenue north of SR 84 and SR 84 within the Study Area are classified as Urban Collectors. Urban Collectors: a. Serve both land access and traffic circulation in residential, and commercial/industrial areas; b. Penetrate residential neighborhoods; and c. Distribute and channel trips between local streets and arterials. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 7

12 Lane Road north of SR 84 is classified as an Urban Principal Arterial. Urban Principal Arterials: a. Serve major activity centers, highest volume corridors, and longest trip demands; b. Carry high proportion of total urban travel on minimum of mileage; c. Interconnect and provide continuity for major rural corridors to accommodate trips entering and leaving urban area and movements through the urban area; and d. Serve demand for intra-area travel as between the central business district and outlying residential areas. The existing posted speed limit on Vrooman Road is 40 mph from I-90 north to the southern escarpment of the Grand River Valley and 25 mph from that point north to SR 84. Therefore, the project must provide a bridge and approach roadways that meet the design requirements for an Urban Collector and/or Principal Arterial roadway; and for the appropriate design speed. ODOT s Location and Design Manual Volume I and LCEO standards document applicable design criteria for Vrooman Road. Vrooman Road does not meet the current design standards for any of these functional classifications. A comparison of the current condition (e.g., steepness, or grade of the roadway; sharpness of curves; width of pavement and shoulders: etc.) with current design standards is presented in Table 2 below. Presently, Vrooman Road has a 12% grade on the south side of the Grand River Valley and a 15% grade on the north side. These steep grades make it difficult for motorists with standard transmission vehicles to operate the vehicle safely and properly on the hills, especially at the intersection with SR-84. All vehicle types are affected in poor weather conditions. Vehicles have slid backwards when forced to stop while climbing the grade north of the river in snowy or icy conditions. The steep grade also lends itself to problems concerning sight distance to the bridge. A driver approaching the Vrooman Road Bridge is unable to see it until they are almost upon it, making a dangerous approach for motorists traveling southbound from SR-84. This becomes a problem if the bridge or roadway is too icy, if there is an accident, or any other obstruction on the bridge or roadway. Further, during the summer months when the Indian Point s and Mason s Landing Parks have the most visitors, issues with poor sight distance pose a danger for pedestrians and bicyclists utilizing the road. The sight distance from Vrooman Road at the intersection of Vrooman Road and SR-84 is extremely limited due to the angular approach of Vrooman Road up the Grand River Valley. The extreme grade on the approach makes mathematical calculations of site distance difficult to perform, but estimates of the existing sight distance were developed based upon field observations. If traffic were to stop at the stop bar, sight distance to the right would be an estimated 50', as the driver must look up and over their right shoulder through guiderail to see oncoming traffic. This is further limited if vegetation has grown up near the guiderail. Pulling up beyond the stop bar to be at SR-84 is dangerous because the vehicle would then be in traffic, but the driver would only be able to see approximately 150'. To the left, the driver can see only about 130' along eastbound SR-84, but that would be limited by vegetative growth as well. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 8

13 TABLE 2: GEOMETRIC DESIGN DEFICIENCIES Design Criteria Existing Minimum Acceptable ODOT L&D Vol. 1 Ref. # Urban Collector Urban Principal Arterial (Lane Rd.) Urban Collector (Vrooman Rd., Madison Ave. and SR 84) Is it Acceptable? Yes or No Bridge Lane Width No Minimum Bridge Shoulder Width No Roadway Lane Width & No Shoulder 301-2, - Width 3, No Minimum Curve Radius 202-2E No Maximum Grade 203-2E 12% and 15% 7% 10% No Intersection Sight Distance 201-5E No to Left* Intersection Sight Distance to Right* 201-5E No * At the existing Vrooman Road / SR-84 intersection The north approach to the Vrooman Road Bridge is supported by a retaining wall on the south side of the road running up the hill to the SR-84 intersection. This wall was constructed in or around 1972, and is approximately 250 long and 25 high. The wall exhibits some signs of movement. LCEO has repaired the retaining wall twice since 2005 at a total cost of approximately $10,000. Repairs have included installing additional bracing. The wall is a critical structure supporting Vrooman Road out of the river valley. Failure of this retaining wall could possibly result in the closure of both SR-84 and Vrooman Road. Existing conditions are shown in Photographs 1 through 3. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 9

14 In addition to the bridge and roadway deficiencies cited in Table 2 above, seven of the nine existing Vrooman Road curves within the Study Area are below the minimum acceptable radius (i.e., they are too sharp ). Figure 6 shows the locations of the curves. Details regarding the existing Vrooman Road curves are presented in Table 3. TABLE 3: EXISTING HORIZONTAL CURVES Curve Number D c Existing Minimum Acceptable Check Radius (Feet) D c Radius (Feet) Yes/No EHC / / Yes* EHC /- 1,432 +/ Yes EHC / / No EHC / / No EHC / / No EHC /- 70 +/ No EHC / / No EHC / / No EHC / / No * Curve requires super elevation (i.e., banked curves). Finally, the LCEO estimates that the section of Vrooman Road within the Study Area requires approximately $75,000 more in annual maintenance costs than similar lengths of non-deficient roadway. Additional costs can be attributed to: increased salting and plowing because of steep grades; special pavement and drainage treatments because of steep grades; repair costs resulting from flooding; guide rail maintenance costs resulting from the high number of crashes; and costs associated with closing, cleaning and reopening the road during the frequent flood events. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 10

15 Safety Five years of crash data ( ) for the Study Area was obtained from the Ohio Department of Public Safety. The data was then analyzed to identify any accident patterns during this period. There were a total of 76 recorded accidents in the study area during this period. TABLE 4: VROOMAN ROAD CRASH DATA ( ) Year Number of Crashes Accidents within the Study Area are concentrated at five locations. Three of the locations are at existing intersections; one is the I-90 / Vrooman Road interchange and one is at the Vrooman Road Bridge over the Grand River. These locations account for 61 of the 76 accidents in the study area. The remaining 15 accidents occurred at various locations along Vrooman Road from I-90 to SR-84. The accidents were located as follows: Vrooman, Madison, and State Route 84 intersection Lane, River, and State Route 84 intersection Vrooman and Seeley intersection Vrooman / I-90 Interchange Vrooman Road Bridge Vrooman Road I-90 to SR total accidents 13 total accidents 11 total accidents 18 total accidents 4 total accidents 15 total accidents Table 5 shows that historic accident rates for intersections in the Study Area are higher than the state wide average, indicating a traffic safety problem. This table also indicates a higher than average accident rate along Vrooman Road Bridge in the Study Area. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 11

16 Location TABLE 5: VROOMAN ROAD CRASH RATES ( ) Number of Crashes Vrooman Road Vrooman Road Crash Rate Statewide Average Above or Below Average? Yes or No Vrooman, Madison, and SR Above intersection 1 Lane, River, and SR Above intersection 1 Vrooman and Seeley intersection Above Vrooman and I-90 interchange 18 NA 3 NA NA Vrooman Road I-90 to Above SR Crash Rate is measured in number of crashes per million vehicles entering an intersection. Tabulated rates were taken from statewide statistics for Current statistics are unavailable. 2 - Crash Rate is measured in number of crashes per million miles traveled. Tabulated rates were taken from statewide statistics for This is the most recent information available. 3 - Crash data did not differentiate between accidents on I-90 and Vrooman Road. 4 - Includes 4 crashes at Vrooman Road Bridge Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 12

17 Connectivity Vrooman Road provides connectivity between I-90 and the eastern portion of Painesville. The I-90/SR 528 interchange is the next interchange to the east and is approximately 7.5 miles away. The interchange is farther away from Painesville and is used as a detour route (approximately miles) when the Vrooman Road Bridge is closed. The I-90/SR 44 interchange is the next interchange to the west and is approximately 4.5 miles away. This interchange is southwest of Painesville and is used as a detour route (approximately miles) when the Vrooman Road Bridge is closed. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 13

18 CONCLUSION Vrooman Road is an important local thoroughfare. Functional deficiencies exist with Vrooman Road within the study area. Structural and functional deficiencies exist with the Vrooman Road Bridge over the Grand River. These deficiencies indicate that an improvement to the structure and roadway are warranted to meet the current and future needs. These include: Deficient condition and design of existing bridge and retaining wall Flooding of existing bridge and approach roadway Deficient design of existing roadway (Vrooman Road) and intersections Safety LOGICAL TERMINI AND INDEPENDENT UTILITY Logical Termini Selection The logical termini for the project were determined based on the existing structurally-deficient and functionally-obsolete Vrooman Road Bridge (SFN ) over the Grand River, and the existing roadway geometric deficiencies along Vrooman Road between Interstate 90 and State Route 84. The termini for the project were established at the Interstate 90 westbound on/off ramps because high numbers of crashes and other safety issues were not noted on Vrooman Road south of I-90 and because the I-90 interchange was originally constructed to provide connectivity between Southeast Painesville, Ohio and I-90. State Route 84 was chosen because it is Vrooman Road s current and historic northern terminus. These termini allow for possible transportation facility improvements to the existing bridge and Vrooman Road. The narrow lateral limits between I-90 and the southern escarpment of the Grand River Valley were chosen because of the residential property to the west, and county park property to the east; with the intent to minimize possible Right of Way impacts within this area. The triangular shaped lateral limits between the southern escarpment of the Grand River Valley and SR-84 were chosen to include immediately adjacent existing intersections on SR-84. These intersections included Madison Avenue to the west and Lane Road to the east. No other intersections to the east or west are immediately adjacent to the existing Vrooman Road / SR- 84 intersection. An additional corridor of land between Riverview Road and SR-84 is included in the Study Area to allow for the possibility of a new connecting roadway between Riverview Road and SR-84. Independent Utility Improvements to Vrooman Road and replacement of the existing bridge will have a value independent of the completion of any other transportation projects in the area. Replacement of the bridge and correction of roadway and intersection deficiencies will enhance safety for drivers traveling within or through the area regardless of other improvement projects. Improvements will also eliminate flooding of the bridge and roadway allowing uninterrupted use of this facility. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 14

19 APPENDICES Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 15

20 Figures Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 16

21 Figure 1: Map of the state of Ohio, showing the Study Area in relation to drainage areas and county boundaries (ODNR 2004). Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) Purpose and Need 17 June27, 2011

22 Figure 2: Map of Lake County, Ohio, showing the project s Study Area (ODOT 2004). Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 18

23 Figure 3: Location of the project s Study Area in Lake County, Ohio, from the USGS 1960 (photo revised 1985) Painesville, Ohio quadrangle. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 19

24 Figure 4: Location of Lake Metropark s parks in relation to the project s Study Area in Lake County, Ohio (Lake Metroparks Park Guide 2009 Map- Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 20

25 Figure 5: Identified environmental constraints within and adjacent to the Study Area. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) Purpose and Need 21 June27, 2011

26 Figure 6: Map of Existing Horizontal Curve Locations Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 22

27 FIGURE 7A: FLOOD PLAIN MAP Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 23

28 FIGURE 7B: FLOOD PLAIN MAP Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 24

29 Photographs Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 25

30 Photograph 1 - The base of the Vrooman Road retaining wall, looking west. Photograph 2 - The base of the Vrooman Road retaining wall, looking east. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 26

31 Photograph 3 - The base of the Vrooman Road retaining wall, looking down from the top. Photograph 4 - Vrooman Road south of the existing bridge at EHC6, looking south west. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 27

32 Photograph 5 - Vrooman Road Bridge and the southern approach at EHC6, looking north. Photograph 6 - Vrooman Road south of the existing bridge, looking southeast. Seeley Road is on the left side of Vrooman Road. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 28

33 Photograph 7 - Vrooman Road at the intersection of Seeley Road, looking south at EHC5. The intersection is at the curve at the bottom of the hillside. Photograph 8 - Vrooman Road at the southern hillside and EHC5, looking southwest. Approaches to Vrooman Road Bridge are characterized by steep grades and curving alignment. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 29

34 Photograph 9 - Vrooman Road at the top of the southern hillside and EHC4, looking south. Photograph 10 - Vrooman Road Bridge at the northern approach andehc7, looking northwest. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 30

35 Photograph 11 - Vrooman Road north of the Vrooman Road Bridge, looking northwest at EHC8. This section of Vrooman Road includes the entrance to Mason s Landing Park on the left and the bottom of the northern hillside, from SR-84 in the background. Photograph 12 - Vrooman Road at the bottom of the northern hillside at EHC8 looking southeast. Vrooman Road Bridge is in the background and Mason s Landing Park entrance on the right. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 31

36 Photograph 13 - Vrooman Road at the base of the northern hillside and EHC8, looking northwest. This curve in the road is at the bottom of a steep grade. Photograph 14 - Vrooman Road at the bottom of the northern hillside and EHC8, looking west. The retaining wall is on the left side of the roadway. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 32

37 Photograph 15 - The intersection of SR-84, Vrooman Road, and Madison Avenue at the top of the northern hillside, looking northeast. Note poor intersection geometry. Photograph 16 - The intersection of SR-84, Vrooman Road, and Madison Avenue at the top of the northern hillside, looking west along Madison Avenue. Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 33

38 Photograph 17 - The intersection of SR-84, Vrooman Road, and Madison Avenue at the top of the northern hillside, looking south west along SR-84. Photograph 18 - The southern approach roadway to the bridge at EHC6, looking north along Vrooman Road Vrooman Road Bridge and Roadway Improvement Project (PID 5669 and PID 85131) 34

PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE REPLACEMENT PROJECT

PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE REPLACEMENT PROJECT PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE REPLACEMENT PROJECT PERRY AND LEROY TOWNSHIPS, LAKE COUNTY, OHIO (PID 5669) PREPARED BY: MICHAEL BAKER JR., INC. 1228 EUCLID AVENUE SUITE 1050 CLEVELAND, OHIO

More information

Existing Transportation System 5-1

Existing Transportation System 5-1 5-1 The Jackson County transportation system is served by several modes of transportation including streets and highways, multi-modal, non-motorized, rail, and aviation. While the focus of the transportation

More information

Project Purpose. Project Need

Project Purpose. Project Need Project Purpose The purpose of the project is to implement a bridge improvement solution that corrects the existing safety problem at the Strasburg Pike Bridge. The project will provide a structurally

More information

APPENDIX G LAKE METROPARKS COORDINATION

APPENDIX G LAKE METROPARKS COORDINATION APPENDIX G LAKE METROPARKS COORDINATION Location Central Lake County, Ohio Leroy and Perry Townships Vrooman Road over Grand River between SR-84 and IR-90 SR-44 to west and SR-528 to east Location Issues

More information

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study Reconstruction of Regional Road 45 (Creek Road) Between Regional Road 27 (River Road) and Regional Road 63 (Canborough Road) in the Township of Wainfleet Municipal Class EA Study Public Information Centre

More information

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) Preliminary Design Report February 2015 Prepared For: City of Inver Grove Heights Dakota County Prepared By: Kimley-Horn and Associates,

More information

Concord, BRF-X-5099 (021), Draft Alternative Analysis

Concord, BRF-X-5099 (021), Draft Alternative Analysis THE CITY OF CONCORD in conjunction with the STATE OF NEW HAMPSHIRE, DEPARTMENT OF TRANSPORTATION BUREAU OF ENVIRONMENT and the FEDERAL HIGHWAY ADMINISTRATION Concord, BRF-X-5099 (021), 12004 Draft Alternative

More information

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary Executive Summary Background As congestion continues to affect mobility in the region, the Ozarks Transportation Organization (OTO) is particularly concerned with traffic movement. The North-South Corridor

More information

REHABILITATION FEASIBILITY STUDY ER#

REHABILITATION FEASIBILITY STUDY ER# REHABILITATION FEASIBILITY STUDY MILLER FARM ROAD BRIDGE PROJECT VENANGO COUNTY BRIDGE NO. 34 CARRYING S.R. 7212, SECTION L00 OVER OIL CREEK OIL CREEK AND CHERRYTREE TOWNSHIPS VENANGO COUNTY, PENNSYLVANIA

More information

New Stanton Project Update July 3, 2012

New Stanton Project Update July 3, 2012 New Stanton Project Update July 3, 2012 The Needs BACKGROUND INFO I-70 Geometric Concerns Substandard Horizontal & Vertical Clearance at Center Ave. Bridge (The Center Avenue Bridge is Replaced in all

More information

National Register of Historic Places Continuation Sheet

National Register of Historic Places Continuation Sheet NPS Form 10-900-a (Rev. 8/2002) OMB No. 1024-0018 (Expires 5-31-2012) United States Department of the Interior National Park Service National Register of Historic Places Continuation Sheet Bridge No. 5721

More information

Victoria Bridge Municipal Class EA Civic Works Committee

Victoria Bridge Municipal Class EA Civic Works Committee Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction

More information

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3 Table of Contents Programmatic Section 4(f) Evaluation for use of a Historic Bridge Replacement of Route 30/130 Bridge over the Cooper River Structure No. 0405-153 City of Camden, Borough of Collingswood,

More information

CENTERTON ROAD BRIDGE REPLACEMENT

CENTERTON ROAD BRIDGE REPLACEMENT CENTERTON ROAD BRIDGE REPLACEMENT FEASIBILITY STUDY BURLINGTON COUNTY BRIDGE C4.4 OVER RANCOCAS CREEK TOWNSHIPS OF MOUNT LAUREL, WESTAMPTON & WILLINGBORO 1 prepared for: BOARD OF CHOSEN FREEHOLDERS BURLINGTON

More information

I-84 HARTFORD PROJECT HARTFORD, CONNECTICUT DRAFT PURPOSE AND NEED STATEMENT

I-84 HARTFORD PROJECT HARTFORD, CONNECTICUT DRAFT PURPOSE AND NEED STATEMENT I-84 HARTFORD PROJECT HARTFORD, CONNECTICUT DRAFT PURPOSE AND NEED STATEMENT October 2016 I. PROJECT BACKGROUND AND HISTORY The City of Hartford is the capital of Connecticut, and the largest employment

More information

Lake Hazel/Gowen Relocation Alignment Study Report

Lake Hazel/Gowen Relocation Alignment Study Report Lake Hazel/Gowen Relocation Prepared for 3775 Adams Street Garden City, Idaho 83714 And City of Boise 150 North Capitol Blvd. Boise, Idaho 83702 Prepared by Parametrix 7761 W. Riverside Dr. Suite 201 Boise,

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

Town of Weston Guardrail Overview Report

Town of Weston Guardrail Overview Report Town of Weston Guardrail Overview Report July 28, 2016 Prepared for: Town of Weston Weston, MA 02493 Submitted by: Nitsch Engineering 2 Center Plaza, Suite 430 Boston, MA 02108 Nitsch Engineering Project

More information

PROPOSED IMPROVEMENTS

PROPOSED IMPROVEMENTS IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways

More information

7.5 Impacts on the Section 4(f) Properties

7.5 Impacts on the Section 4(f) Properties constructive use, such as noise, air quality and visual impacts were also assessed. It was determined that this project would not introduce changes of an external nature that would affect the recreational

More information

M-11 (Wilson Avenue) Access Management Plan

M-11 (Wilson Avenue) Access Management Plan M-11 (Wilson Avenue) Access Management Plan Acknowledgements M-11 (Wilson Avenue) Corridor Advisory Committee: City of Walker Michigan Department of Transportation (MDOT) Grand Valley Metropolitan Council

More information

Transportation Research Center

Transportation Research Center Increasing Design Flexibility in the AASHTO Green Book Your Department Name Presentation to AASHTO Subcommittee on Design Doug Harwood, MRIGlobal July 2017 Transportation Research Center Resolution of

More information

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES CHAPTER 1 GENERAL DESIGN GUIDELINES 1.0 INTRODUCTION This Publication has been developed to provide current, uniform procedures and guidelines for the application and design of safe, convenient, efficient

More information

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

Bypass #16 - Bend Parkway (new alignment for US 97) (MP ) Bypass #16 - Bend Parkway (new alignment for US 97) (MP 134.76-141.83) Description: The Parkway is on new alignment for US 97 through Bend. US 97 is a Statewide Highway on the National Highway System that

More information

Berkshire Regional Planning Commission Clearinghouse Review Report

Berkshire Regional Planning Commission Clearinghouse Review Report August 19, 2013 SUBJECT: Reconstruction of Housatonic Street, Dalton, MA EOEA#: 15083 LOCATION: Dalton ESTIMATED COST: $8.1 million REVIEW TYPE: ENF PROPONENT: MassDOT and Town of Dalton COMMENTS DUE:

More information

Page. I. Introduction 1. II. Project Purpose and Need 1. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) Property 3

Page. I. Introduction 1. II. Project Purpose and Need 1. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) Property 3 TABLE OF CONTENTS Programmatic Section 4(f) Evaluation for Use of a Public Park Replacement of Route 30/130 Bridge over the Cooper River Structure No. 0405-153 City of Camden, Township of Pennsauken Camden

More information

Pennsy Greenway Trail

Pennsy Greenway Trail Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

Alta Vista Transportation Corridor Environmental Study Report November 2005

Alta Vista Transportation Corridor Environmental Study Report November 2005 Alta Vista Transportation Corridor Environmental Study Report November 2005 6.0 ALTERNATIVE DESIGNS The Preferred Solution to providing additional transportation system capacity through the AVTC study

More information

510 Highways, Streets & Roads Comprehensive Plan Section 510

510 Highways, Streets & Roads Comprehensive Plan Section 510 511 510 Comprehensive Plan Section 510 Highways, streets, and roads provide for the movement of people and goods from one place to another. These public ways form a network that defines the relationship

More information

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the

More information

Transportation Systems and Utility Infrastructure

Transportation Systems and Utility Infrastructure 77 Audience Local and regional units of government, Landowners and developers, Community and citizen organizations, and Transportation/utility planners and engineers. Overview Transportation systems and

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on

More information

Introduction to the Project

Introduction to the Project Chapter 1 Introduction to the Project 1.1 Project Introduction The New Hampshire Department of Transportation (NHDOT) and the Federal Highway Administration (FHWA) have prepared this Environmental Assessment/Draft

More information

WELCOME TO THE PUBLIC INFORMATION CENTRE. Please Sign In

WELCOME TO THE PUBLIC INFORMATION CENTRE. Please Sign In WELCOME TO THE PUBLIC INFORMATION CENTRE Replacement of Oxtongue Lake Narrows Bridge & Oxtongue River Bridge, Highway 60 (G.W.P. 93-89-00 & G.W.P. 5550-04-00) Class Environmental Assessment (Group B) Please

More information

Visitor's Guide to Historic Bridge Park

Visitor's Guide to Historic Bridge Park Visitor's Guide to Historic Bridge Park Located in Calhoun County, Michigan, southeast of Battle Creek, the park is open year-round from 8:00 AM to 8:00 PM. Entry to the park is free of charge. Guide produced

More information

Access Management: An Overview

Access Management: An Overview Figures 1-5 Below Evolution of development along a highway. In the early stages, land along the road is used for farming with little traffic generated. As time passes, the highway corridor becomes a de

More information

3. Additional driveways may be permitted where determined by the Planning Commission to adequately accommodate traffic or ensure public safety.

3. Additional driveways may be permitted where determined by the Planning Commission to adequately accommodate traffic or ensure public safety. ARTICLE 10 ACCESS MANAGEMENT Section 10.01 Purpose. The purpose of this Article is to protect the substantial public investment in the City s street system by preserving the traffic capacity of existing

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY SEPTEMBER 2016 Introduction The Platteview Road Corridor Study was led by the Metropolitan Area Planning Agency (MAPA) with assistance from

More information

Commissioners Road West Realignment Environmental Assessment

Commissioners Road West Realignment Environmental Assessment City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 1 March 30, 2017 Welcome to the Public Information Centre This first Public Information Centre

More information

BRIDGE REHABILITATION ANALYSIS AND FEASIBILITY REPORT

BRIDGE REHABILITATION ANALYSIS AND FEASIBILITY REPORT BRIDGE REHABILITATION ANALYSIS AND FEASIBILITY REPORT SR 0016-037 Main Street Bridge Project Memorial Bridge over the West Branch of Little Antietam Creek in Waynesboro Borough and Washington Township

More information

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT) MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 (HUTCHINSON SEGMENT) COMPREHENSIVE PLAN AMENDMENT INTRODUCTION. The purpose of this plan is to provide consistent access management in the Trunk

More information

4-Town Comprehensive Plan DRAFT 7/30/07

4-Town Comprehensive Plan DRAFT 7/30/07 4-Town Comprehensive Plan DRAFT 7/30/07 Acknowledgements ning Committee Town of Harrisburg Norman Roof Randy Nicol Town of Martinsburg Terry Thisse Paul Kelly Town of Montague Jan Bagdanowicz Wendy Perry

More information

MEMORANDUM. Jim Tomberlin, Mountain Valley Properties

MEMORANDUM. Jim Tomberlin, Mountain Valley Properties MEMORANDUM TO: CC: Jim Tomberlin, Mountain Valley Properties GR Fielding, Pitkin County Engineer Brian Pettit, Pitkin County Public Works Director Dan Cokley, SGM FROM: Lee Barger, SGM DATE: June 16, 2016

More information

INDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES

INDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES INDEX EXECUTIVE SUMMARY...1 INTRODUCTION...2 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS... 4-5 EXISTING UTILITIES... 6-7 MEDIAN BREAKS AND TURN LANE STORAGE REQUIREMENTS...8 PRELIMINARY DESIGN

More information

Great Lakes North Central South Central FAX: (718) CONTACT PERSON: ADDRESS: Daniel Hom, PE, Engineer-in-Charge

Great Lakes North Central South Central FAX: (718) CONTACT PERSON:  ADDRESS: Daniel Hom, PE, Engineer-in-Charge AMERICAN SOCIETY OF HIGHWAY ENGINEERS National Project of the Year Award OFFICIAL ENTRY FORM AWARD CATEGORY (Check One): Under $20 Million Over $20 Million SPONSORING REGION (Check One): Northeast Mid-Atlantic

More information

Appendix E Preliminary Location Hydraulic Study

Appendix E Preliminary Location Hydraulic Study Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally

More information

Issues Requiring Future Study

Issues Requiring Future Study Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem

More information

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM Identification Historic Name Nicollet Avenue Bridge Current Name Nicollet Avenue Bridge Field # Address Nicollet Avenue over Minnehaha Creek City/Twp Minneapolis SHPO Inventory Number Review and Compliance

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,

More information

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 Sponsored by: The Ohio Department of Transportation and The City of Defiance Project

More information

Moving The Metro. A special construction update for the metro Omaha area.

Moving The Metro. A special construction update for the metro Omaha area. Moving The Metro A special construction update for the metro Omaha area. ebraska Department of Roads Spring/Summer 2017 I-80 / I-480 / US-75 Interchange The improvements on this project consist of bridge

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive. 5.0 ACCESS CONTROL PLAN This section presents the Access Control Plan Update which has been formulated through the considerable input of the governing agencies, business owners, organized homeowner groups,

More information

NORTH BETHANY ELEMENTARY SCHOOL SITE ASSESSMENT

NORTH BETHANY ELEMENTARY SCHOOL SITE ASSESSMENT NORTH BETHANY ELEMENTARY SCHOOL SITE ASSESSMENT Prepared for: Prepared by: October 10, 2014 Page 2 Introduction and Purpose This report provides an assessment of two potential sites for a new elementary

More information

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility. SUMMARY THE I-69 LOCATION STUDY The proposed I-69 Location Study from El Dorado to McGehee, Arkansas, represents one section (Section of Independent Utility No. 13) of the nationally designated I-69 Corridor

More information

Visual and Aesthetics

Visual and Aesthetics Such a connection could accommodate timed transfers and improve connections between local transit service and Presidio Shuttle service. Level of Service The results of the analysis are provided on a route-by-route

More information

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative

More information

Project Study Report Equivalent The Old Road Widening SIX FLAGS MAGIC MOUNTAIN. On Street The Old Road Between Magic Mountain Pkwy And Turnberry Lane

Project Study Report Equivalent The Old Road Widening SIX FLAGS MAGIC MOUNTAIN. On Street The Old Road Between Magic Mountain Pkwy And Turnberry Lane Project Study Report Equivalent The Old Road Widening SIX FLAGS MAGIC MOUNTAIN On Street The Old Road Between Magic Mountain Pkwy And Turnberry Lane On Street Henry Mayo Drive Between The Old Road And

More information

Evaluation of Strobe Lights in Red Lens of Traffic Signals

Evaluation of Strobe Lights in Red Lens of Traffic Signals 36 TRANSPORTATION RESEARCH RECORD 1495 Evaluation of Strobe Lights in Red Lens of Traffic Signals BENJAMIN H. COTTRELL, JR. Strobe lights are used as a supplement to the red lens to draw the attention

More information

SR 483 Clyde Morris Boulevard FDOT District 5

SR 483 Clyde Morris Boulevard FDOT District 5 This project occurs on a 3.0 mile section of SR 483 (Clyde Morris Blvd.) south of Beville Road (SR 400) to north of International Speedway Boulevard (SR 600). Ghyabi is providing project management and

More information

ARTICLE VI: SITE PLAN REVIEW

ARTICLE VI: SITE PLAN REVIEW Section 6.01 - Site Plan Review (All Districts) ARTICLE VI: SITE PLAN REVIEW Site plans give the Planning commission an opportunity to review development proposals in a concise and consistent manner. The

More information

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION AASHTO SUBCOMMITTEE ON DESIGN June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION CENTRAL FLORIDA INTERSTATE 4 FACTS Trucks and Others 12% Tourist

More information

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH 112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG060310124909PGH C ontents Introduction 1 Project Overview 1 Public Involvement and Technical Coordination 4 Description

More information

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT 2. AGENCY COORDINATION AND PUBLIC INVOLVMENT This chapter discusses the process carried out for conducting agency coordination and public involvement activities. TECHNICAL ADVISORY COMMITTEE A Technical

More information

Population and Demographics Alternatives Development Design Criteria Stormwater Management Guidelines Alternative 1: No Build

Population and Demographics Alternatives Development Design Criteria Stormwater Management Guidelines Alternative 1: No Build Table of Contents Executive Summary... 1 Introduction... 1 Purpose and Need... 1 Alternatives Development... 2 Impacts and Costs... 2 Next Steps... 3 Findings Report... 5 Purpose and Need... 5 Introduction...

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

4.11 TRAFFIC Existing Conditions Existing Project Site. Existing Street System

4.11 TRAFFIC Existing Conditions Existing Project Site. Existing Street System 4.11 TRAFFIC This traffic and circulation section is based on a Traffic Impact Study conducted by Linscott Law & Greenspan Engineers, which is provided in full in Appendix F. This traffic analysis has

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

Green Book 7 th Edition Summary of Changes. Jim Rosenow NCITE Geometric Design Committee August 30, 2018

Green Book 7 th Edition Summary of Changes. Jim Rosenow NCITE Geometric Design Committee August 30, 2018 Green Book 7 th Edition Summary of Changes Jim Rosenow NCITE Geometric Design Committee August 30, 2018 Outline 1. The drama 2. Chapter 1 rewrite 3. The rest of the book 2 Outline 1. The drama 2. Chapter

More information

K-96 Location Study From Southeast of Nickerson to North of Sterling, Kansas

K-96 Location Study From Southeast of Nickerson to North of Sterling, Kansas K-96 Location Study From Southeast of Nickerson to North of Sterling, Kansas Project No. 96-106-KA-1007-01 Rice and Reno Counties December 2010 Prepared for: By: K-96 Location Study From Southeast of Nickerson

More information

Chapter V-Transportation

Chapter V-Transportation Town of Vernon 2026 Smart Growth Plan Chapter V-Transportation DEVELOPMENT OBJECTIVES Transportation System Objective - To provide an integrated transportation system which, through its location, capacity,

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project 1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA 1.1.1 Project Description The Trunk Highway (TH) 14 West Corridor is a two-lane roadway approximately 22 miles in length. Located in Nicollet County, the corridor

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar

More information

University Parkway Corridor Plan. Public Workshop Sept. 18, 2017

University Parkway Corridor Plan. Public Workshop Sept. 18, 2017 University Parkway Corridor Plan Public Workshop Sept. 18, 2017 AGENDA 1. Overview of Process 2. Study Area 3. Components of the Plan 4. What We Know 5. What We Have Heard 6. Tonight s Input 7. Next Steps

More information

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment Bostwick Road Municipal Class Environmental Assessment October 13, 2016 Welcome! Welcome to the first Public Information Centre for the Bostwick Road Municipal Class Environmental Assessment. Representatives

More information

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement DOWNTOWN REDMOND LINK EXTENSION 2018 SEPA Addendum to the East Link Project Final Environmental Impact Statement AUGUST 2018 Downtown Redmond Link Extension SEPA Addendum to the 2011 East Link Project

More information

RZC Public View Corridors and Gateways

RZC Public View Corridors and Gateways RZC 21.42 Public View Corridors and Gateways 21.42.010 Purpose 21.42.020 Scope and Authority 21.42.030 Administration 21.42.040 Gateways Design 21.42.050 Unidentified Public Views 21.42.060 Identification

More information

Highway Alignment and Route Location Survey

Highway Alignment and Route Location Survey CHAPTER 2 Highway Route Surveys and Location Introduction To determine the geometric features of road design, the following surveys must be conducted after the necessity of the road is decided. Type of

More information

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories: Lakeside Business District Lakeside Business District Land Use Categories: Campus Commercial Campus Commercial means a mixture of uses which includes corporate offices, office parks, hotels, commercial,

More information

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP. (10/27/14) PennDOT Section 106 Field Assessments and Finding Combined Early tification/finding? Yes Concurrence required or requested: Yes MPMS: 51507 ER# (if consultation with PHMC required) ): County:

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

4. INITIAL CONCEPT DEVELOPMENT AND SCREENING

4. INITIAL CONCEPT DEVELOPMENT AND SCREENING 4. INITIAL CONCEPT DEVELOPMENT AND SCREENING A coordinated effort by the project team and members of the three oversight committees (Citizen Advisory, Technical Advisory, and Steering) led to 17 initial

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES 7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an

More information

foi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7

foi#'.w County Road Needs Report i*-is;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7 FLOOD PLAIN SERVICES County Road Needs Report County udges' Association of Arkansas 20L7 Annual Winter Meeting Thomas F. Black, P.E., CFM shsl201-7 i*"-i"s;a,i=?;;,#'1 tta le0isrtnet foi"#'.w Flood Plain

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the

More information

I-90 Mississippi River Bridge & Interchange Project

I-90 Mississippi River Bridge & Interchange Project I-90 Mississippi River Bridge & Interchange Project Presentation Outline I. Background: Context & Need for Project II. Preferred Alternative Overview III. Project Development IV. Project Management Tools

More information