TECHNICAL COMMITTEE ON MULTIPLE BURNER BOILERS NFPA 85 Pre-Draft Meeting Agenda March 16, :00 AM - 5:00 PM EDT NFPA Headquarters, Quincy, MA

Size: px
Start display at page:

Download "TECHNICAL COMMITTEE ON MULTIPLE BURNER BOILERS NFPA 85 Pre-Draft Meeting Agenda March 16, :00 AM - 5:00 PM EDT NFPA Headquarters, Quincy, MA"

Transcription

1 TECHNICAL COMMITTEE ON MULTIPLE BURNER BOILERS NFPA 85 Pre-Draft Meeting Agenda March 16, :00 AM - 5:00 PM EDT NFPA Headquarters, Quincy, MA Note: Continental breakfast will be served at 7:30AM. Lunch will be provided starting at 12:00PM. 1. Call to Order. Michael Walz, Chair 2. Introductions. 3. Staff Updates. Laura Montville, NFPA Staff 4. Approval of Meeting Minutes from January 14-15, 2014, Tempe, AZ. (Attachment 1) 5. Review draft definitions and guidelines developed by the Correlating Committee and Fundamentals Committee (Attachment 2). Develop input for the next revision cycle as necessary. 6. Task Group Reports. Design Pressures. B. Smith (chair), D. Evely, J. Frazier, K. Gamble, D. King, J. Lehman, H. Wong, and A. Zadiraka o Formed to review structural requirements for duct work; determine if the 35 in. limitation needs to be reviewed to reflect current designs and practices; determine if the fan requirement, based on cold, dense air, is realistic or should be based on typical ambient conditions; determine if requirements should be added to address positive pressure units that may be subjected to negative pressure when fuel valves close quickly on an MFT; and review the use of test block capability and design pressure for consistency. Plasma Arc Igniters. S. Yates (chair), B. Smith, K. Gamble, S. Matz, E. Lightbourn, M. Kinoshita, J. Eibl, and M. Polagye o Formed to review igniter requirements in chapters 4 and 6 to determine what revisions, if any, would need to be made to recognize the application of plasma arc igniters and to provide guidance in classifying plasma arc ignitors. Valve Leak Testing. J. Gilman (chair), S. Matz, P. Cannon, C. Schmidt, and F. Switzer NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 1 of 42

2 o Formed to review the tightness test and the leak test requirements for oil and gas systems to identify the purpose of each test and determine if both are appropriate and applicable to current practices. Boiler Enclosure Definition/Purge Times. J. Franks (chair), G. Gilman, D. King, J. O Rourke, J. Parker, and A. Zadiraka. o 7. New Business. 8. Next Meeting. 9. Adjourn. Formed to review and create recommendations concerning the length of purge times and purge rates relative to the size of the unit. NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 2 of 42

3 Attachment 1 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 3 of 42

4 MINUTES OF MEETING Technical Committee on Multiple Burner Boilers January 14-15, 2014 PERA Club Tempe, AZ I. Attendance: Principal Members/Staff: Mike Walz, Technical Committee Chair, Burns & McDonnell Engineering Co., MO Denise Beach, NFPA, MA Frank Bennett, GenOn Energy, Inc., MD John Bollinger, Babcock & Wilcox Company, OH Dale Dressel, Solutia Incorporated, MO John Eibl, The DuPont Company, Inc., TN Dale Evely, Southern Company Services, AL Kris Gamble, Black & Veatch Corporation, KS David King, American Electric Power Service, OH Daniel Lee, ABB Incorporated, OH W. Scott Matz, Invensys Process Systems, TX (via teleconference) Michael Polagye, FM Global, MA Thomas Russell, Honeywell, Inc., TX Jimmie Schexnayder, Entergy Corporation, LA Celso Schmidt, UTC, TX Bill Smith, Exothermic Engineering LLC, MO Franklin Switzer, S-afe, Inc., IN Joseph Vavrek, Sargent & Lundy, LLC, IL Henry Wong, URS Corporation E&C, NJ Harold (Skip) Yates, HRY, Inc. Boiler Systems Consulting, MI Allan Zadiraka, OH (via teleconference) Alternates : Joseph Bittinger, American Electric Power Corporation, OH James Franks, XL Global Asset Protection Services, TN Jack Lehman, Exothermic Engineering LLC, NE Daniel May, Burns & McDonnell Engineering Company, MO Jeff Parker, Salt River Project, AZ John Stevens, HF Controls Corporation, TX Guests : D. Paul Cannon, Hurst Technologies Joseph Fehr, Sega, Inc. Frank Fowler, SmartBurn LLC Jerry Gilman, SIS-Tech Ted Jablkowski, Fives North American Combustion Sinming Kwong, Emerson Process Management (via teleconference) Edward Lightbourn, SmartBurn LLC Tony Niu, Guodian Longyuan Technology Austin Pool, Hurst Technologies Donald Zissa, SIS-Tech NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 4 of 42

5 II. Minutes of Meeting: 1. Call to order. The meeting was called to order at 8:30 am MST on Jan 14, Chairman Walz welcomed committee members and guests and thanked them for their participation. 2. Introduction. The Committee members and guests introduced themselves and identified their affiliation. 3. Minutes Approval. The minutes from the February 2013 meeting were approved as written. 4. NFPA Staff Report. The NFPA staff liaison reviewed the new document revision process and tools, including the new terminology, the revision cycle timeline, and the online public input submittal process. (Attachment A) NFPA staff reported that the NFPA Board of Directors approved a formal anti-trust policy at their November 2013 meeting (Attachment B). 5. Old Business. A. Referenced Documents in Fundamentals Chapters. Mr. Switzer reported that the reference to NFPA 54 is applicable and appropriate. B. Design Pressures Task Group. The task group scope has been expanded to include the following issues: i. Current applications have fan capabilities up to 80 in., but the duct work is addressed only in the annex as a consideration. Is it time to establish structural requirements for the duct work? ii. Does the committee need to review 35 in. limitation to reflect current designs/practices? or should the code reflect typical ambient conditions. iv. Should requirements be added to address positive pressure units that may be subjected to negative pressure when fuel valves close quickly on an MFT? v. NFPA 85 refers to test block capability and design pressure inconsistently. Review each section for appropriateness. The task group will continue to discuss these new questions for further consideration in the next revision cycle. The deadline for the task group report is the first quarter of 2015, or at least 8 weeks prior to the next scheduled meeting. The task group members are B. Smith (chair); D. Evely; J. Frazier; K. Gamble; D. King; J. Lehman; H. Wong; and A. Zadiraka. C. Annexes B and C (Supervised Manual Systems). A task group was established to discuss this issue further. The task group members are: D. Dressel (chair); J. Eibl ; S. Yates; and A. Zadiraka. The task group recommended that Annex C be removed from the document in the 2015 edition, and that Annex B be retained until the 2019 edition. In addition, committee members and NFPA staff will reach out to chemical and petroleum industry groups to advise them of the upcoming change. These groups include the American Chemistry Council, the Center for Chemical Process Safety, and the American Petroleum Institute. Committee members are encouraged to contact NFPA staff if they identify any other interest groups. The task group was discharged with thanks. NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 5 of 42

6 6. New Business A. Create Second Revision of Chapter 6. The committee reviewed the public comments and other requests and created Second Revisions in chapter 6 and related annex text. The committee actions will be available in the Second Draft Report, which will be published no later than July 18, B. Valve Leak Testing Task Group. In discussion on the Second Revisions, the committee recognized that there are two valve leakage tests: the tightness test performed annually and the leak test performed prior to every startup. A task group was established to review these requirements for oil and gas systems to identify the purpose of each test and determine if both are appropriate and applicable to current practices. The task group members are: J. Parker (chair); P. Cannon; J. Gilman; S. Matz; C. Schmidt; F. Switzer. C. Review BCS-FUN actions. The committee briefly discussed Fundamentals actions of interest. D. Boiler Enclosure Definition/Purge Times. It has been reported that some boilers are being purged for much longer than 5 minutes because of the volume calculation and the requirement for 5 air changes. A task group was established to review and create recommendations concerning the length of purge times and purge rates relative to the size of the unit. The members of the task group are: J. Franks (chair); G. Gilman; D. King; J.. The task group can consider developing a code fund project involving CFD modeling of basic furnace designs. The task group may also seek loss data from insurers, the National Board, and EPRI. 7. Plasma Arc Igniter. Edward Lightbourn and Frank Fowler of SmartBurn LLC presented information on plasma arc igniters (Attachment C). The committee discussed extensively the new technology. A task group was established to review igniter requirements in chapters 4 and 6 to determine what revisions, if any, would need to be made to recognize the application of plasma arc igniters. The task group members are: S. Yates (Chair); J. Eibl; K. Gamble; E. Lightbourn; S. Matz; M. Polagye; and B. Smith. The task group deadline is to provide recommendations at the proposed off-cycle meeting. 8. Other Items. The committee briefly discussed a recent application of a pressurized unit being converted from coal to gas. Preliminary modeling indicates that the pressure may go significantly negative when fuel valves close quickly on an MFT. Currently, pressurized ction. This issue was referred to the design pressures task group. 9. Next Meeting. The committee tentatively scheduled an off-cycle meeting in the second quarter of 2015 in conjunction with a planned meeting of the BCS-SBB committee. Details will be provided as they become available. 10. Adjournment. The meeting adjourned at 11:25 am MST on Jan. 15, NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 6 of 42

7 Attachment A: NFPA Staff Presentation NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 7 of 42

8 1/ 29/ 2014 NFPA Second Draft Meeting Welcome TC on Multiple Burner Boilers NFPA Second Draft Meeting At this and all NFPA committee meetings we are concerned with your safety. If the fire alarm sounds, please proceed to an exit. January 14-15, 2014 PERA Club Tempe, AZ NFPA Second Draft Meeting Members, please verify/update your contact information Use of tape recorders or other means capable of reproducing verbatim transcriptions of this or any NFPA meeting is not permitted NFPA Second Draft Meeting Guests All guests are required to sign in and identify their affiliation. Participation is limited to TC members or those individuals who have previously requested time to address the committee. Other participation is granted at the discretion of the Chair. Guest chairs are located around the room as a courtesy. 1 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 8 of 42

9 1/ 29/ 2014 NFPA Second Draft Meeting Members categorized in ANY interest category who have been retained to represent the interests of ANOTHER interest category (with respect to a specific issue or issues that are to be addressed by a TC/CC) shall declare those interests to the committee and refrain from voting on any Public Input, Comment, or other matter relating to those issues throughout the process. NFPA Second Draft Meeting General Procedures Follow Robert s Rules of Order. Discussion requires a motion. NFPA Second Draft Meeting Motions for Ending Debate Previous Question or Call the Question Not in order when another has the floor Requires a second This motion is not debatable and DOES NOT automatically stop debate A 2/3 affirmative vote will immediately close debate and return to the original motion on the floor. Less then 2/3 will allow debate to continue. NFPA Second Draft Meeting Committee member actions: Member addresses the chair. Receives recognition from the chair. Introduces the motion. Another member seconds the motion. 2 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 9 of 42

10 1/ 29/ 2014 NFPA Second Draft Meeting Committee chair actions: States the motion. Calls for discussion. Ensures all issues have been heard. Takes the vote. Announces the result of the vote. NFPA Second Draft Meeting New Process What s New? New Term Input Stage Public Input First Draft Meeting Committee Input Committee Statement (CS) First Revision (FR) First Draft Report First Draft Changes in Terms: Old Term ROP Stage Proposal ROP Meeting Trial Balloon (or later, FR that fails ballot) Committee Statement Committee Proposal or Accepted Public Proposal ROP ROP Draft NFPA Second Draft Meeting New Process What s New? New Term Comment Stage Public Comment Second Draft Meeting Committee Comment Second Revision Second Draft Report Second Draft Changes in Terms: Old Term ROC Stage Public Comment ROC Meeting Comment that Failed Ballot (Second Revision that failed ballot) Committee Comment or Accepted Public Comment ROC ROC Draft NFPA Second Draft Meeting Technical Committee Actions: Resolving Public Comments Committee Action and Committee Statement Creating Second Revisions 3 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 10 of 42

11 1/ 29/ 2014 NFPA Second Draft Meeting Resolving Public Comments (See Regs ) Committee develops a Committee Action Accept Reject but see Reject Reject but Hold NFPA Second Draft Meeting Committee Statements Committee must clearly indicate reasons for not accepting the recommendation and/or point to a relevant Second Revision All Public Comments Actions must have a Committee Statement Must include a valid technical reason No vague references to intent Explain how the submitter s substantiation is inadequate Neither PC Action nor Committee Statements get balloted NFPA Second Draft Meeting Create a Second Revision (SR) Committee wants to make a change (to add, delete or modify) the First Draft. Committee develops a Committee Statement (CS) substantiating the change. Each SR gets balloted NFPA Second Draft Meeting No new material after the Public Input Stage since it hasn t had the benefit of public review. What constitutes new material is decided by the TC or Correlating Committee. Adding new material at this Comments stage could successfully be challenged through appeal to the NFPA Standards Council 4 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 11 of 42

12 1/ 29/ 2014 NFPA Second Draft Meeting Formal voting Voting during meeting is used to establish a sense of agreement (simple majority) Secured by letter ballot (2/3 agreement) Only the results of the formal ballot determine the official position of the committee on the Second Draft NFPA Second Draft Meeting Ballots are on the Second Revisions (SR) ONLY Public Comments and Committee Statements not balloted Reference materials are available - Second Draft, Public Comments, First Draft Report Ballot form allows you to vote: Affirmative on all SR Affirmative on all SR with exceptions specifically noted Ballot form provides a column for affirmative with comment Note: This box only needs to be checked if there is an accompanying comment. Reject or abstain requires a reason. NFPA Second Draft Meeting Initial ballot Circulation of negatives and comments Members may change votes during circulation Second Revision that fails letter ballot shall be designated as a Committee Comment (in the 2 nd Draft Report), marked as Reject and deleted from the Second Draft. Electronic Balloting Ballots will be an online format Alternates are strongly encouraged to return ballots Ballot session will time out after 90 minutes Use submit to save your work 5 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 12 of 42

13 1/ 29/ 2014 Electronic Balloting Click link on the ballot received Sign in with N FPA.org Commit t ee Login and Passwor d Electronic Balloting Select either Affirmative on All or Affirmative with Exception(s) Electronic Balloting Choosing AFFIRMATIVE ON ALL Use See FR/SR - # link to review all First/Second Revisions Use Edit election to change individual votes or to modify vote after submitting ballot. Electronic Balloting Choosing AFFIRMATIVE W ITH EXCEPTION (S) Make selection: Affirmative with Comment, Negative, or Abstain No selection made-defaults to affirmative Must include comment on each vote. 6 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 13 of 42

14 1/ 29/ 2014 Electronic Balloting To complete ballot click Participant Consent and Submit Return and edit any votes before ballot due date. TC Struggles with an Issue Code Fund Lends a Hand Research Project Carried Out g/codefund Legal Patent: Disclosures of essential patent claims should be made by the patent holder, but others may also notify NFPA if they believe that a proposed or existing NFPA standard includes an essential patent claim. Antitrust: the single most important provision-federal law prohibits contracts, combinations, or conspiracies which unreasonably restrain trade or commerce. Section 1 of the Sherman Act Legal Activities Disapproved by the Courts Packing meetings Hiding commercial interest throwing the committees out of balance Hiding scientific or technical information from committees No final decision-making authority to unbalanced Task Groups; include all interested parties. 7 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 14 of 42

15 1/ 29/ 2014 Doc Info Pages NFPA Second Draft Meeting Document Information Next Edition Technical Committee Any questions? 8 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 15 of 42

16 Attachment B: NFPA Anti-Trust Policy NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 16 of 42

17 NFPA Antitrust Policy The NFPA is a not for profit organization with a mission of promoting the science and improving the methods of fire protection and prevention and electrical safety. The primary way in which the NFPA fulfills this mission is by developing and disseminating safety standards intended to minimize the possibility and effects of fire and other risks. The standards development process depends on volunteer participation by a diverse range of individuals on behalf of numerous stakeholders including participants representing business and industry. As a result, antitrust concerns can arise in connection with standards development activity. It is the policy of the NFPA to strictly comply with state and federal antitrust laws, and the NFPA expects all participants in NFPA standards development activities to conduct themselves in strict accordance with these laws. NFPA minimizes the risk of antitrust problems by providing a forum for standards activities that is based on the principles of openness, honesty, fairness and balance and that is conducted in accordance with published rules and regulations. Each participant in the standards development process has the obligation to adhere to all rules, regulations, and policies of the NFPA including, without limitation, the Regulations Governing the Development of NFPA Standards. In addition, participants can draw valuable guidance on how to conduct hemselves by consuling NFPA s Guide for Conduct of Participants in the NFPA Standards Development Process. While compliance wih NFPA s sanars evelopmens rules an regulaions is essenial, ialone is no sufficient to avoid conduct that may violate the antitrust laws. Participants must also avoid any conduct, conversations or agreements that would constitute an unreasonable restraint of trade or be otherwise illegal uner he aniruslaws. Alhough i s nopossible o ienify every siuaion hacoul be foun o be anticompetitive or a violation of antitrust laws, the following topics should NOT be addressed or discussed, even informally, by or among competitors or other individuals in the course of their NFPA involvement: - Profits, profit margins or cost data; - Prices, rates, and fees; - Selection, termination, division or allocation of customers, sales territories, or markets; or - Refusal to deal with a specific business entity. Participants in NFPA activities may receive antitrust training or advice from their employers or other organizations or entities they represent. This NFPA antitrust policy, as well as other information or presentations that NFPA may provide concerning the antitrust laws and standards development, are not intended to take the place of such training or advice; nor are they intended to constitute legal advice to participants. In addition to consulting with their legal counsel, however, participants can assist NFPA and their fellow participants by refusing to engage in inappropriate discussions and by speaking up if they have questions or concerns about any matter or discussion that occurs in the course of NFPA standards development activities. Participants should bring matters of concern to the attention of NFPA staff. Any participant may also raise quesions regaring his policy o he NFPA s General Counsel. NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 17 of 42

18 Attachment C: SmartBurn LLC Presentation NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 18 of 42

19 Plasma Ignition & Combustion Stabilizing (PICS) Technology PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 19 of 42

20 Plasma Ignition Introduction System Benefits History of Adoption Plasma Ignition Basics Ignition Process NFPA Classification Next Steps Appendix PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 20 of 42

21 Objectives Introduce PICS to the NFPA MBB Technical Committee PICS is widely adopted in China YTLY is the leading manufacturer with over 90% market share Developed to achieve national goal to eliminate use of oil fuel for boiler startup/shutdowns PICS is of interest to U.S. utilities because of compelling benefits Discuss applicable NFPA Code Plasma ignition has been on the MBB Technical Committee agenda since at least 2012 Discuss next steps PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 21 of 42

22 Plasma Ignition Benefits to Coal Fired Generators Payback a combination of: Reduced use of igniter fuel typically oil for startup/shutdowns Better low-load performance from combustion stabilization Avoided generation cost during off-peak periods New build units can save oil systems, payback during commissioning PICS can supplement existing igniters w/o full replacement PM emissions lower & collection systems function better during startup Mitigates issues with loss of startup/shutdown exemption, if ESP Reduces PM collection system maintenance issues PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 22 of 42

23 Benefits to Coal EGUs- Oil Savings US EGUs spend up to $1B yearly in support fuel (EIA 2011 Data) Turndown savings may exceed startup cost savings PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 23 of 42

24 PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 24 of 42

25 Oil vs. PICS Warm-up Flame PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 25 of 42

26 PICS Application Milestones Yantai Longyuan began developing plasma ignition technology First oil-free startup using PICS in a 50 MWe unit First T-Fired application of PICS in a 600 MWe unit First Wall-Fired application of PICS in a 600 MWe unit First ultra-supercritical application of PICS in a 1000 MWe unit PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 26 of 42

27 Applications Outside of China NO Country Name Unit Capacity Retrofit / New Furnace Configuration Coal 1 S. Korea Samchonpo 560MW Retrofit T-firing Bituminous 2 S. Korea Yonghung 870MW New T-firing Bituminous 3 S. Korea Hadong 2 x 500MW New T-firing Bituminous 4 Russia Khabarovsk 3 rd 180MW Retrofit Side Wall opposed fired Bituminous 5 S. Korea Hadong 500MW New T-firing Bituminous 6 Indonesia Suralaya 600MW Retrofit Wall fired Subbituminous 7 Turkey Eren 2 x 600MW Retrofit Wall fired Bituminous 8 S. Korea Yonghung 2 x 870MW New T-firing Bituminous Over 650 Units and 275 GW Installed within China to date PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 27 of 42

28 Plasma Ignition Basics Plasma generates ionized gas produced by air flow through electric arc High temperature gas is used to directly ignite a portion of burner coal flow PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 28 of 42

29 Principle of PlCS--Plasma Burner Plasma L ance Stage Support Structure Coal Concentration Features Typical features of current burner shown diversity of physical designs from YTLY and others Coal abrasion & low NOx features retained Bur ner Stages PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 29 of 42

30 Plasma Ignition Basics Temperature (F) Side View Ignition Zone Coal Flame Igniter Zone Intermediate Zone Coal Flame Burner Zone Pulverized coal passes through the plasma arc with high temperature chemically active ions. Coal particles are rapidly gasified, releasing volatile matter which is ignited by the flame. PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 30 of 42

31 Plasma vs Conventional Ignition Conventional Coal Igniters Coal is not ignited until just outside the burner tip Coal devolatilization and pyrolysis occurs slowly as coal particles heat up Electromechanical device Max flame temperature (adiabatic, equivalence ratio ideal) 2100 C (oil) & 1960 C (natural gas) Plasma Igniter Portion of coal is lit downstream of the elbow. Initial ignition propagates through successive stages inside the burner. Flame moves to furnace when igniter turned off Concentrated 5000 C (typ) plasma arc quickly shatters & devolatilizes coal (low heating/drying time) Solid state device and control systems Plasma energy input of 1% of rated burner heat input sufficient to ensure combustion Coal is the igniter fuel, so heat input = fuel burned in burners w/ PICS > 10% of boiler heat input PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 31 of 42

32 Safety Considerations Combustion process is engineered ignition occurs in a controlled space (burner rings) rather than at front of burner in furnace cavity as with an oil/gas igniter PA velocity > coal flame propagation speed prevents flame from propagating backward same as conventional igniters Much higher flame temperature rather than oil/gas flame High degree of Plasma lit discrimination (high voltage & current condition) PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 32 of 42

33 Safety Considerations Plasma generator power supply => solid state reliability Multiple instruments verify PICS in service & burner flame: Current flow to PICS Visual camera Redundant main burner flame scanners on main burner (vs one on igniter & one on burner for oil) Performance to be verified by test under Typical problems of oil / gas igniters avoided No atomizer tip clogging No liquid flow control devices PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 33 of 42

34 Primary Air Requirements Primary Air characteristics can have a strong impact on performance of all igniters Since PICS works by first igniting the coal volatiles in primary air, an incorrect PA to coal ratio or PA flow rate will impair ability of PICS to complete ignition including char particles PICS PA requirements are similar to those of a standard PC boiler/mills Property PA Velocity (m/s) PA/Coal Ratio PICS ideal range PICS required range B&W mills required range* *Steam: its generation and use, ed. 41, pg PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 34 of 42

35 Classification Discussion PICS can accomplish all functions of a Class I Igniter, including ignition and combustion support Staged ignition of coal allows PICS to achieve stable coal ignition despite relatively low heat input Plasma temperature is sufficient to ignite coal under all credible combinations of fuel and air Testing under section will be performed for each installation rather than rely on general guidelines which are typically not tested A Many factors affect the classification of the igniters, including the characteristics of the main fuel, the combustion chamber and the burner design, and the igniter capacity and location relative to the main burner 10% Guideline result of intrinsic oil and gas flame characteristics Relatively low oil flame temperature, and exposed position in furnace, requires more energy input to ignite coal volatiles PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 35 of 42

36 Classification Discussion Class 1 Igniter. An igniter that is applied to ignite the fuel input through the burner and to support ignition under any burner light-off or operating conditions. Its location and capacity are such that it will provide sufficient ignition energy, generally in excess of 10 percent of full load burner input, at its associated burner to raise any credible combination of burner inputs of both fuel and air above the minimum ignition temperature. PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 36 of 42

37 Credible Combinations of Fuel and Air Credible Range - Cold Furnace Credible Range - Hot Furnace Propose defining credible combinations in terms of percent of the maximum primary air and coal flow for Cold and Hot furnaces For MPS 89 Mill propose +/- 3% Coal Flow and +/- 10% air flow uncertainty PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 37 of 42

38 Closing Remarks Plasma ignition offers opportunities to: Safely improve economic competiveness of coal fired generators Reduce emissions YTLY is discussing PICS with interested parties: NFPA Committee Prospective Clients (opportunistically) Demonstration projects to prove system value to EGU s and safety Carry out testing to demonstrate ignition under all credible combinations of air & fuel Insurers, AHJs & other YTLY and SmartBurn are seeking guidance from the committee on the next steps to commercialize the technology in the US. Does the MBB Technical Committee believe the current code is adequate? Discuss next steps PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 38 of 42

39 Contact Information SmartBurn, LLC Frank Fowler, V.P. Of Business Development , Edward Lightbourn, Engineering Manager , Guodian Longyuan Tech. USA Tony Niu, President , PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 39 of 42

40 PICS Introduction NFPA MBB Jan NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 40 of 42

41 Attachment 2 NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 41 of 42

42 Draft Definitions and Guidelines developed by the NFPA 85 Correlating Committee and Fundamentals Committee Draft definitions for interlock, permissive, and trip. Interlock: A function which prevents, limits, stops, or initiates the operation of equipment or a subsequent function. o Annex language: An interlock can consist of a sensing function, a control function, and an output or a final control element. The interlock can be accomplished with the use of any combination of electrical devices, mechanical devices, or logic. Permissive: An interlock that functions only to allow initiation of the operation of equipment or a subsequent function Trip: An interlock that shuts down equipment when a predefined set of conditions exists. It was decided that permissive and trip should be subdefinitions under interlock, but they should also appear in alphabetical order with a reference back to the interlock section, similar to what is done for coal in Recommendations for other Chapters. The following recommendations have been developed for the use of interlock and related terms throughout the code: Safety device, protective device, interlock device and safety interlock device appear to be synonymous. The Fundamentals Committee suggests using "interlocks" or "interlocks and associated devices" as appropriate. Safety function is similar to the new definition of an interlock. The Fundamentals Committee suggests using the term interlock. Master fuel trip device is not defined in Chapter 3, and is only used in Chapter 7 and its Annex. If this is intentionally different from a master fuel trip relay, it should be defined in Chapter 3. Otherwise, it should be replaced with master fuel trip relay. Safety shutdown is only used in Chapters 3, 4, and 5, and the Annex to Chapters 5 and 7. For consistency throughout the document, the Fundamentals Committee recommends replacement with trip or master fuel trip, as appropriate. The Fundamentals Committee will be removing the term from Chapters 3 and 4. Emergency shutdown is used in Chapters 4, 6, 7, 8, and 10, and the Annex to Chapters 4, 6, and 7, as well as Annex B. This appears to be the same as a safety shutdown, so the Committee recommends replacement with trip or master fuel trip as in the comment above. The Fundamentals Committee will be removing the term from Chapter 4. Abnormal shutdown is only used twice, both times in Chapter 6. This appears to be synonymous with trip and for consistency, that term should be substituted. NFPA 85 Multiple Burner Boilers Pre-First Draft Meeting Agenda March 16, 2016 Quincy, MA Page 42 of 42

MINUTES OF MEETING. Technical Committee on Multiple Burner Boilers

MINUTES OF MEETING. Technical Committee on Multiple Burner Boilers MINUTES OF MEETING Technical Committee on Multiple Burner Boilers January 14-15, 2014 PERA Club Tempe, AZ I. Attendance: Principal Members/Staff: Mike Walz, Technical Committee Chair, Burns & McDonnell

More information

Technical Committee on Multiple Burner Boilers

Technical Committee on Multiple Burner Boilers Technical Committee on Multiple Burner Boilers AGENDA Salt River Project PERA Club 1 Continential Drive Tempe, AZ January 14-15, 2014 1. Chair s welcome, call to order, and opening remarks at 8:00 a.m.

More information

MINUTES OF MEETING. Technical Committee on Fundamentals of Combustion Systems Hazards

MINUTES OF MEETING. Technical Committee on Fundamentals of Combustion Systems Hazards MINUTES OF MEETING Technical Committee on Fundamentals of Combustion Systems Hazards January 29-30, 2013 GE Corporate Headquarters Houston, TX I. Attendance: Principal Members/Staff: Dale Evely, Technical

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

Attendees Principal Members/Staff: Joseph Fehr, Chair, Sega, Inc., KS Laura Montville, NFPA Staff, MA

Attendees Principal Members/Staff: Joseph Fehr, Chair, Sega, Inc., KS Laura Montville, NFPA Staff, MA TECHNICAL COMMITTEE ON FUNDAMENTALS OF COMBUSTION SYSTEMS HAZARDS NFPA 85 Pre-Draft Meeting Minutes September 30, 2015 8:00 AM - 5:00 PM EDT NFPA Headquarters, Quincy, MA Attendees Principal Members/Staff:

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on This list represents the membership at the time the Committee was balloted on the text of this edition. Since that time, changes

More information

3. Approval of Meeting Minutes from February 7-8, (Attachment A)

3. Approval of Meeting Minutes from February 7-8, (Attachment A) TECHNICAL COMMITTEE ON MULTIPLE BURNER BOILERS NFPA 85 Second Draft Meeting Agenda January 24, 2018 8:00 AM 5:00 PM CT Entergy Corporation, 639 Loyola Avenue, New Orleans, LA 1. Call to Order. Michael

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

ANSI/NETA Standards Update

ANSI/NETA Standards Update Specifications and Standards Activity ANSI/NETA Standards Update NOW AVAILABALE!!!! NETA Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems The NETA Acceptance Testing

More information

3. Approval of Meeting Minutes from January 21, 2014 (Attachment A). Fall 2018 revision cycle schedule. (Attachment C)

3. Approval of Meeting Minutes from January 21, 2014 (Attachment A). Fall 2018 revision cycle schedule. (Attachment C) TECHNICAL COMMITTEE ON FLUIDIZED BED BOILERS NFPA 85 First Draft Meeting Agenda February 16, 2017 9:30 AM 4:30 PM Eastern Time Web Meeting/Teleconference 1. Call to Order. James Walawender, Chair 2. Introductions.

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

Technical Committee on Fundamentals of Combustion Systems Hazards

Technical Committee on Fundamentals of Combustion Systems Hazards Technical Committee on Fundamentals of Combustion Systems Hazards AGENDA Dec 4-6, 2013 Georgia Power Company Headquarters Banquet Room 241 Ralph McGill Blvd Atlanta, GA 1. Chair s welcome, call to order,

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Board and Care Facilities

More information

NFPA 550 ROP Meeting Minutes

NFPA 550 ROP Meeting Minutes NFPA 550 ROP Meeting Minutes NFPA Technical Committee on Fire Risk Assessment Methods (FIR-AAA) June 24, 2010 Microsoft Live Meeting 1. Call to order. The meeting was called to order at 1:00 PM on Monday,

More information

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169 7471 Phone: 617 770 3000 Fax: 617 770 0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Furnishings

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Code (FCC-AAA) Gregory

More information

M E M O R A N D U M. The Technical Correlating Committee on Boiler and Combustion Systems Hazards

M E M O R A N D U M. The Technical Correlating Committee on Boiler and Combustion Systems Hazards M E M O R A N D U M TO: FROM: The Technical Correlating Committee on Boiler and Combustion Systems Hazards Jeanne Moreau DATE: June 22, 2010 SUBJECT: NFPA 85 TCC Report on Comments Letter Ballot (F10)

More information

NFPA s Standards Development Process

NFPA s Standards Development Process NFPA s Standards Development Process Revision Cycle 104 weeks or 141 weeks Guiding Principles Due process Openness Lack of dominance Seek society s balance between: Acceptable risk Commitment of resources

More information

Standards and Safety Update

Standards and Safety Update Standards and Safety Update Presented By: Michael J. Johnston Executive Director Standards and Safety, NECA Update Objectives Update on NFPA 70E and NECA Safety products Update on NECA S National Electrical

More information

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems San Antonio, TX October 12-14, 2016 The following are the meeting minutes from the third meeting of the Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems held in San Antonio,

More information

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached) TECHNICAL COMMITTEE ON WATER-COOLING TOWERS NFPA 214 (F2015) Second Draft Meeting Agenda February 17, 2014 10:00 AM - 1:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Mercantile and Business Occupancies

More information

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation.

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation. NFPA Technical Committee On Fire Hose NFPA 1961 Minutes Task Group Update Underwriters Laboratory November 15 th - 16 th 2016 Tuesday, November 15 th, 2016 Meeting called to order at 8:07 AM by Chairman

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

Why AC800M High Integrity is used in Burner Management System Applications?

Why AC800M High Integrity is used in Burner Management System Applications? Why AC800M High Integrity is used in Burner Management System Applications? Prepared by: Luis Duran Product Marketing Manager Safety Systems ABB Process Automation/Control Technologies TÜV Functional Safety

More information

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Wood and Cellulosic

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

Technical Committee on Electrical Equipment Evaluation. ROC Meeting Agenda September 28-29, 2010 Providence, RI

Technical Committee on Electrical Equipment Evaluation. ROC Meeting Agenda September 28-29, 2010 Providence, RI Technical Committee on Electrical Equipment Evaluation ROC Meeting Agenda September 28-29, 2010 Providence, RI Item 10-09-1 Call to Order Item 10-09-2 Introductions Item 10-09-3 Staff Remarks Item 10-09-4

More information

Circulation Report for SIG-TMS Comments Document # 72

Circulation Report for SIG-TMS Comments Document # 72 1 72-12 Eligible To Vote:28 Affirmative: 24 : 0 Abstain: 0 : 4 3.3.x Deficiency (New) (Log # 209 ) 72-13 Eligible To Vote:28 Affirmative: 24 : 0 Abstain: 0 : 4 3.3.x Deficiency (New) (Log # 234 ) 72-15

More information

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Tuesday, March 10; All Day Wednesday, March 11; All Day DRURY PLAZA HOTEL San Antonio Riverwalk 0. Administrative. A. Meeting Schedule.

More information

At its meeting of August 7-9, 2012, the Standards Council considered the above referenced matter.

At its meeting of August 7-9, 2012, the Standards Council considered the above referenced matter. SC #12-8-56 D#12-15 Amy Beasley Cronin Secretary, Standards Council 30 August 2012 To: Interested Parties Subject: Standards Council Decision (Final): D#12-15 Standards Council Agenda Item: SC#12-8-56

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

Call to Order Chair Jack Poole called the meeting to order at 8:00 AM on Monday, July 17, 2017.

Call to Order Chair Jack Poole called the meeting to order at 8:00 AM on Monday, July 17, 2017. NFPA 72 SIG-PRO Meeting Minutes NFPA Technical Committee on Protected Premises Fire Alarm Systems (SIG-PRO) Second Draft Meeting, July 17 19, 2017 Charlotte, North Carolina 17-7-1 Call to Order Chair Jack

More information

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda])

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda]) FINAL MINUTES Healthcare Interpretations Task Force Tuesday, June 15, 2016 Mandalay Bay Convention Center South Convention Center, Level 2 Room Surf F Las Vegas, NV 1. Call to Order. The meeting was called

More information

Correlating Committee on Automatic Sprinkler Systems

Correlating Committee on Automatic Sprinkler Systems Correlating Committee on Automatic Sprinkler Systems M E M O R A N D U M DATE: May 14, 2014 TO: FROM: Principal and Alternate Members of the Correlating Committee on Automatic Sprinkler Systems Matt Klaus,

More information

2016 Annual Revision Cycle Consent Document NFPA 75

2016 Annual Revision Cycle Consent Document NFPA 75 2016 Annual Revision Cycle Consent Document NFPA 75 The Committee on Electronic Computer Systems produced a Technical Committee Report that received at least one Notice of Intent to Make a Motion (NITMAM)

More information

Australian Standard. Degrees of protection provided by enclosures (IP Code) AS IEC Ed 2.1:2001 AS 60529

Australian Standard. Degrees of protection provided by enclosures (IP Code) AS IEC Ed 2.1:2001 AS 60529 AS 60529 2004 IEC 60529 Ed 2.1:2001 AS 60529 Australian Standard Degrees of protection provided by enclosures (IP Code) This Australian Standard was prepared by Committee EL-026, Protective Enclosures

More information

NFPA Technical Committee on Fire Tests

NFPA Technical Committee on Fire Tests National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Tests Tracy

More information

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Notification Appliances for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Notification Appliances for

More information

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m.

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m. 1. Call to Order: NFPA Technical Committee on Building Systems NFPA 900 First Draft Teleconference/Web Meeting AGENDA Thursday, February 13, 2014 11:00 a.m. Noon EDT Online meeting link: http://nfpa.adobeconnect.com/r366m2eaxx6/

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

Home Depot complies with all legal and regulatory requirements in its political activities and interactions with public officials.

Home Depot complies with all legal and regulatory requirements in its political activities and interactions with public officials. The Home Depot, Inc. Political Activity and Government Relations Policy Last Revised February 2015 Introduction The Home Depot, Inc. ( Home Depot, or the Company ) recognizes that the actions of public

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

Proposed Changes to NFPA

Proposed Changes to NFPA 2017 NFPA Conference & Expo Proposed Changes to NFPA 72-2019 Presented by: Manuelita David (SIG-FUN), Jensen Hughes Warren Olsen (SIG-SSS), Fire Safety Consultants, Inc. Merton Bunker (SIG-AAC), EYP Architecture

More information

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Testing and Maintenance

More information

Technical Committee on Liquefied Natural Gas

Technical Committee on Liquefied Natural Gas Technical Committee on Liquefied Natural Gas MEMORANDUM TO: FROM: Technical Committee on Liquefied Natural Gas Denise Beach, Senior Engineer/Staff Liaison DATE: March 16, 2011 RE: NFPA 59A LNG-AAA ROP

More information

Compatibility between Smoke Alarms and Arc-Fault Circuit Interrupters

Compatibility between Smoke Alarms and Arc-Fault Circuit Interrupters Page 2 A NEMA Low Voltage Distribution Equipment Section Document ABP 11-2016 Compatibility between Smoke Alarms and Arc-Fault Circuit Interrupters Published by National Electrical Manufacturers Association

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Hot Work Operations

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Correlating Committee on Combustible Dusts Susan

More information

The North American Electric Reliability Corporation ( NERC ) hereby submits

The North American Electric Reliability Corporation ( NERC ) hereby submits December 8, 2009 VIA ELECTRONIC FILING Neil Thomson SaskPower, Law, Land Regulatory Affairs 2025 Victoria Ave. Regina, Saskatchewan S4P 0S1 Re: North American Electric Reliability Corporation Dear Mr.

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Portable Fire Extinguishers

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fundamentals of Combustion Systems Hazards Jeanne Moreau DATE: April 23, 2010 SUBJECT: NFPA 85 F10 ROC Letter Ballot The ROC

More information

DIRECTIVE NO: D-B

DIRECTIVE NO: D-B DIRECTIVE NO: D-B6 100604 1 LOW PRESSURE THERMAL FLUID PLANT AUTOMATED CONTROL SYSTEMS Date of Issue: June 4, 2010 General Details This directive is being issued to owners, licensed contractors, consulting

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting. October 10 12, 2011 Baltimore, MD

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting. October 10 12, 2011 Baltimore, MD National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting October 10 12, 2011 Baltimore, MD Chairman Glenn Benarick called the meeting to order

More information

home smoke candles alarms electrical burns smoking medical oxygen cooking FIREFIGHTING MATCHES & LIGHTERS SPRINKLERS

home smoke candles alarms electrical burns smoking medical oxygen cooking FIREFIGHTING MATCHES & LIGHTERS SPRINKLERS FIREFIGHTING home smoke alarms REGULATIONS GOVERNING THE NFPA EDUCATIONAL MESSAGES DESK REFERENCE FOR THE FIRE SERVICE AND FIRE AND LIFE SAFETY EDUCATORS MATCHES & LIGHTERS medical oxygen cooking FIRE

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ

MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ MEETING MINUTES NFPA Technical Correlating Committee on Safety to Life January 6, 2011 ROC Meeting The Wyndham Phoenix, Phoenix, AZ 1. Call to Order. The meeting was called to order by Chair William Koffel

More information

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES 1.

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

National Fire Protection Association

National Fire Protection Association National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M (AMENDMENT) TO: FROM: Technical Committee on Mercantile

More information

NATIONAL FIRE PROTECTION ASSOCIATION The leading information and knowledge resource on fire, electrical and related hazards NFPA STANDARDS DIRECTORY

NATIONAL FIRE PROTECTION ASSOCIATION The leading information and knowledge resource on fire, electrical and related hazards NFPA STANDARDS DIRECTORY NATIONAL FIRE PROTECTION ASSOCIATION The leading information and knowledge resource on fire, electrical and related hazards NFPA STANDARDS DIRECTORY 2017 2017 NFPA Standards Directory The content in the

More information

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333 Paul Cabot Administrator National Fuel Gas Ms. Gabriella Davis Recording Secretary, IAPMO Standards Council International Association of Plumbing and Mechanical Officials (IAPMO) IAPMO Group World Headquarters

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Residential Occupancies Kelly

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 2918:2001 AS/NZS 2918 Australian/New Zealand Standard Domestic solid fuel burning appliances Installation Building Code of Australia Primary referenced Standard AS/NZS 2918:2001 This Joint Australian/New

More information

MEMORANDUM. Subject: NFPA 1124 Proposed Tentative Interim Amendment (TIA) No. 1094

MEMORANDUM. Subject: NFPA 1124 Proposed Tentative Interim Amendment (TIA) No. 1094 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Pyrotechnics Elena Carroll,

More information

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Correlating Committee on Signaling Systems for

More information

Center for Life Safety Education

Center for Life Safety Education Center for Life Safety Education Fire Sprinklers 101 Introduction, Building Codes, and Water Supplies Reprinted with permission from NFPA 13, Installation of Sprinkler Systems, Copyright 2007, National

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60335-2-90 Edition 4.0 2015-08 Household and similar electrical appliances Safety Part 2-90: Particular requirements for commercial microwave ovens INTERNATIONAL ELECTROTECHNICAL

More information

SC # /16/17/18/19/23/24 D#03-24

SC # /16/17/18/19/23/24 D#03-24 SC #03-7-15/16/17/18/19/23/24 D#03-24 Casey C. Grant, P.E. Secretary, Standards Council 26 July 2003 To: Interested Parties Subject: Standards Council Decision (Final): D#03-24 Standards Council Agenda

More information

OPERATING AND MAINTENANCE MANUAL

OPERATING AND MAINTENANCE MANUAL OPERATING AND MAINTENANCE MANUAL NVPOM-0104 TABLE OF CONTENTS Section Page 1 SPECIFICATIONS...1 1.1 Nova Plus Specifications...1-1 1.2 Warranty...1-2 2 GENERAL BURNER DESCRIPTION...2 2.1 Burner...2-1 2.2

More information

Arc Flash and Selective Coordination

Arc Flash and Selective Coordination PowerHour webinar series for consulting engineers Experts you trust. Excellence you count on. Arc Flash and Selective Coordination Wednesday June 8 1:00 CDT / 2:00 EDT (1PDH issued by Cummins) Welcome!

More information

MEMORANDUM. Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems

MEMORANDUM. Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Initiating Devices for Fire

More information

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P-01-05 THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS October, 2005 Society of Fire Protection Engineers - 1 - Position Statement

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

MEETING AGENDA High Rise Building Safety Advisory Committee

MEETING AGENDA High Rise Building Safety Advisory Committee MEETING AGENDA High Rise Building Safety Advisory Committee Renaissance Blackstone Chicago 636 South Michigan Avenue, Chicago, IL 60605 May 13-14, 2014 Chicago, IL 1. Call to Order. Call the meeting to

More information

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Nonvoting Industrial and Medical Gases Michael W. St. Clair, Chair Ostrander, OH [U] Rep. NFPA Industrial Fire Protection Section

More information

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases Committee on 51A M E M O R A N D U M To: From: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant Date: June 14, 2010 Subject: NFPA 51A ROC Letter Ballot Circulation

More information

NEMA Standards Publication Enclosures for Electrical Equipment (1000 Volts Maximum)

NEMA Standards Publication Enclosures for Electrical Equipment (1000 Volts Maximum) NEMA Standards Publication 250-2008 Enclosures for Electrical Equipment (1000 Volts Maximum) Published by National Electrical Manufacturers Association 1300 N. 17th Street, Suite 1752 Rosslyn, VA 22209

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: NEC Code-Making Panel 2 FROM: Kimberly Shea, Administrator,

More information

MINUTES OF TOWN BOARD MEETING HELD ON OCTOBER 18, 2017 AT 7:00 PM AT TOWN HALL, ONE OVEROCKER ROAD POUGHKEEPSIE, NEW YORK

MINUTES OF TOWN BOARD MEETING HELD ON OCTOBER 18, 2017 AT 7:00 PM AT TOWN HALL, ONE OVEROCKER ROAD POUGHKEEPSIE, NEW YORK CALL TO ORDER SALUTE TO THE FLAG ROLL CALL OF TOWN BOARD: MINUTES OF TOWN BOARD MEETING HELD ON OCTOBER 18, 2017 AT 7:00 PM AT TOWN HALL, ONE OVEROCKER ROAD POUGHKEEPSIE, NEW YORK PRESENT: Supervisor Baisley

More information

GIS Data Exchange Committee. and the NFPA Standards Making System

GIS Data Exchange Committee. and the NFPA Standards Making System GIS Data Exchange Committee and the NFPA Standards Making System This briefing... NFPA Technical Committees New GIS Data Exchange Committee Background of the NFPA Standards Making Process Status of the

More information

Securities Dealing Policy

Securities Dealing Policy Securities Dealing Policy INTRODUCTION PURPOSE AND OBJECTIVES As a public company, CSL is bound by laws governing the conduct for buying, selling and otherwise dealing in securities. This document sets

More information

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

M EM O RA N D UM. NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018) M EM O RA N D UM TO: FROM: DATE: SUBJECT: Correlating Committee on Combustible Dusts Yiu Lee, Project Administrator January 27, 2017 NFPA 652 First Draft Correlating Committee FINAL Ballot Results (A2018)

More information

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12.

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12. 2/18/2016 National Fire Protection Association Report Committee Input No. 70 NFPA 54 2015 [ Section No. 12.5 ] This was a First Revision that failed ballot. 12.5 Type of Venting System to Be Used. 12.5.1

More information

Electrical Safety Policy

Electrical Safety Policy Electrical Safety Policy By acting with a business head and social heart, together we achieve our mission to enhance life chances by helping people to fulfil their potential and live better, more independent

More information

White Paper. Integrated Safety for a Single BMS Evaluation Based on Siemens Simatic PCS7 System

White Paper. Integrated Safety for a Single BMS Evaluation Based on Siemens Simatic PCS7 System White Paper Project: Integrated Safety for a Single BMS Evaluation Based on Siemens Simatic PCS7 System Version 1, Revision 2, August 4, 2016 Jim Jenkins, William Goble The document was prepared using

More information

2015 National Fuel Gas Code Summary List of Revisions Updated: 04/24/14

2015 National Fuel Gas Code Summary List of Revisions Updated: 04/24/14 The following list contains a summary of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. PIPING Various Brass REVISED

More information

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX 1. Call to Order. The meeting of the Technical Committee on Fire Tests

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information