1 FIXTURE SCHEDULE DESIGNATION MANUFACTURER MODEL # FIXTURE DESCRIPTION P- AMERICAN STANDARD. P-A AMERICAN STANDARD. " HIGH VITREOUS CHINA WATER CLOSET W/ ELONGATED BOWL LOW CONSUMPTION FLUSH TANK (. GPF) SEAT (NO LID) - CHURCH MODEL 900-SSC /" HIGH VITREOUS CHINA WATER CLOSET W/ ELONGATED BOWL (HANDICAP) LOW CONSUMPTION FLUSH TANK (. GPF) SEAT (NO LID) - CHURCH MODEL 900-SSC MOUNT FLUSH CONTROL ON WIDE SIDE OF STALL CONNECTION SCHEDULE WASTE VENT CW HW " " /" -- " " /" -- GENERAL NOTES. IN THE PREPARATION OF THESE PLANS, THE ENGINEER HAS USED CERTAIN ABBREVIATIONS, CONVENTIONS, AND SYMBOLS, THE MEANING OF WHICH ARE ILLUSTRATED AND EXPLAINED WITHIN THE LEGEND.. PLANS ARE DIAGRAMMATIC ONLY. THEY ARE INTENDED TO INDICATE CAPACITY, SIZE, LOCATION, DIRECTION AND GENERAL ARRANGEMENT, BUT NOT EXACT DETAILS OF CONSTRUCTION. THE FACT THAT ONLY CERTAIN FEATURES OF THE INSTALLATION ARE INDICATED MUST NOT BE TAKEN TO MEAN THAT OTHER FEATURES WILL NOT BE REQUIRED.. COORDINATE WITH THE OTHER TRADES TO ENSURE THAT EACH TRADE SHALL HAVE SUFFICIENT SPACE TO INSTALL THEIR EQUIPMENT (DUCTWORK, PIPING, ` ELECTRICAL WORK, ETC.). LEGEND COLD WATER PIPE HOT WATER PIPE SOIL OR WASTE PIPE VENT PIPE TURNED TURNED DOWN TEE, OUTLET DOWN ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. P-B AMERICAN STANDARD "MADERA".000 " HIGH VITREOUS CHINA WATER CLOSET W/ ELONGATED BOWL FLUSH VALVE - SLOAN NO. SEAT (NO LID) - CHURCH MODEL 900-SSC. GPF) " " " --. ONCE THE PIPING HAS ENTERED EACH UNIT FROM BELOW THE FLOOR SLAB, PIPING SHALL BE RUN ABOVE THE CEILING IN EACH UNIT UNLESS NOTED OR INDICATED OTHERWISE.. VERIFY ALL DIMENSIONS FROM ARCHITECTURAL PLANS AND FIELD DIMENSIONS. TP TEE, OUTLET TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING c 0. ALL RISES AND DROPS IN PIPING ARE NOT NECESSARILY SHOWN ED EMERGENCY DRAIN PAN PIPING P-BA AMERICAN STANDARD "MADERA" 0.00 " HIGH VITREOUS CHINA WATER CLOSET W/ ELONGATED BOWL (HANDICAP) FLUSH VALVE - SLOAN NO. SEAT - (NO LID) - CHURCH MODEL 900-SSC LOW WATER CONSUMPTION (. GALLONS PER FLUSH) LOCATE FLUSH CONTROL ON WIDE SIDE OF STALL " " " --. PROVIDE STOP OR ANGLE VALVES ON EACH WATER CONNECTION TO EACH FIXTURE.. PROVIDE ALL STRUCTURAL MEMBERS, SPORT BRACKETS, FLASHING, HARDWARE, ETC. REQUIRED TO INSTALL A COMPLETE SYSTEM. GATE VALVE PRESSURE RELIEF VALVE P-C AMERICAN STANDARD "TRIMBROOK".0 P- AMERICAN STANDARD "AQUALYN" 0.0 WALL- HUNG, VITREOUS CHINA, FLUSH VALVE URINAL FLUSH VALVE - SLOAN NO.-.0 LOW WATER CONSUMPTION (.0 GALLON PER FLUSH) MOUNT TOP OF FRONT RIM AT " A.F.F. PROVIDE SUITABLE FIXTURE CARRIER VITREOUS CHINA COUNTER TOP LAVATORY MIN. FAUCET - CFG L TRAP - /" CAST BRASS WITH C.O. PLUG SPLY - /" ANGLE -TYPE WITH STOPS " " /" -- " /" /" /" 9. PROVIDE CHROME PLATED ESCUTCHEON PLATES AT ALL EXPOSED WALL PENETRATIONS AND CEILING PENETRATIONS. 0. PROVIDE CLEANOUTS ON SANITARY LINES AND CONDENSATE DRAIN LINES AS REQUIRED BY CODE.. PROVIDE ACCESS PANELS FOR ALL SHUT-OFF VALVES LOCATED ABOVE GYPSUM BOARD CEILINGS. COORDINATE WITH GENERAL CONTRACTOR. FIXTURE BALL VALVE FIXTURE DESIGNATION (UNDER LINED) HOT WATER RETURN PIPE EXISTING COLD WATER EXISTING HOT WATER P-A AMERICAN STANDARD "AQUALYN" 0.0 VITREOUS CHINA COUNTER TOP LAVATORY MOUNT AT A.D.A. HEIGHT. FAUCET - CFG L TRAP - /" CAST BRASS WITH C.O. PLUG SPLY - /" ANGLE -TYPE WITH STOPS PROVIDE OFFSET TAIL PIECE. INSULATE TRAP, WATER SPLY TO MEET ADA MIN " /" /" /" ABBREVIATIONS EXISTING HOT WATER RETURN CONNECT TO EXISTING VACUUM P- FLORESTONE 0TS-W P- SPECIALTY PRODUCTS OB-0 P- ELKAY LR- P-A ELKAY LRAD- P-B ELKAY ECTSRADGBG 0x PREFAB FIBERGLASS BARRIER-FREE SHOWER MOUNT AT STANDARD HEIGHT. VALVE/HEAD: CFG 0CGR/ SINGLE LEVER DRAIN: INTEGRAL ICE MAKER BOX W/ WATER HAMMER ARRESTERS. USE MODEL OBFS-00 WHEN IN FIRE RATED WALL DOUBLE-COMPARTMENT, STAINLESS STEEL SINK FAUCET - SPEAKMAN NO. SC--BOCA/FLO C STRAINERS - () ELKAY MODEL LK- SPLY - /" ANGLE-TYPE WITH STOPS TRAP - /" CAST BRASS WITH C.O. PLUG DOUBLE-COMPARTMENT, STAINLESS STEEL SINK (ADA) MOUNT AT A.D.A HEIGHT FAUCET - CFG- B C STRAINERS - () ELKAY MODEL LK- SPLY - /" ANGLE-TYPE WITH STOPS TRAP - /" CAST BRASS WITH C.O. PLUG PROVIDE OFFSET TAIL PIECE. INSULATE TRAP, WATER SPLY TO MEET ADA SINGLE-COMPARTMENT, STAINLESS STEEL SINK (ADA COMPLIANT) FAUCET - SPEAKMAN NO. SC--BOCA/FLO C STRAINERS - () ELKAY MODEL LK- SPLY - /" ANGLE-TYPE WITH STOPS TRAP - /" CAST BRASS WITH C.O. PLUG " /" /" /" /" -- " /" /" /" " /" /" /" " /" /" /" AFF BTU CONN CW ED EX FL FU GC GPM HW IN MIN PC SAN OR S V VTR WTR W/ W/O W HW HWR CO WCO ABOVE FINISHED FLOOR BRITISH THERMAL UNIT CONNECTION COLD WATER EQUIPMENT DRAIN EXISTING FLOOR FIXTURE UNIT GENERAL CONTRACTOR GALLONS PER MINUTE HOT WATER INCHES MINIMUM CONTRACTOR SANITARY VENT VENT TO ROOF WATER WITH WITHOUT WASTE DOWN HOT WATER HOT WATER RETURN CLEANOUT WALL CLEANOUT COMPRESSED AIR NITROUS OXIDE OXYGEN NITROGEN EXISTING SOIL OR WASTE PIPE EXISTING VENT PIPE GENERAL SYMBOLS PLAN OR DETAIL NO. SHEET NUMBER KEYED NOTE NUMBER REVISION NUMBER P- SPECIALTY PRODUCTS OB- WASHING MACHINE BOX W/ WATER HAMMER ARRESTERS. USE MODEL OBFS-00 WHEN IN FIRE RATED WALL " /" /" /" N BUILDING NORTH ARROW /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P-A FLORESTONE -H P- AMERICAN STANDARD 0. P-9 FLORESTONE -W P-0 FIAT MSB EWH- A.O. SMITH ENLB-0 EWH-A A.O. SMITH ENLB-0 EWH- A.O. SMITH DEN-D EWH-A A.O. SMITH DEN-D 9x9 PREFAB ACRYLIC A.D.A. BARRIER-FREE SHOWER FIXTURE: PROVIDE A.D.A. GRAB BARS AND SEAT VALVE/HEAD: CFG 0CG/ SINGLE LEVEL DRAIN: INTEGRAL STANDARD FLOOR MOUNTED "x0" PEDESTAL LAVATORY FAUCET - CFG L TRAP - /" CAST BRASS WITH C.O. PLUG SPLY - /" ANGLE -TYPE WITH STOPS "x" PREFAB FIBERGLASS BARRIER-FREE SHOWER VALVE/HEAD: CFG 0CG/ SINGLE LEVEL DRAIN: INTEGRAL FLOOR-MOUNTED MOLDED STONE MOP BASIN FAUCET- FIAT 0-AA FURNISH WALL- MOUNTED MOP HANGER 0-GALLON ELECTRIC WATER HEATER (LO BOY). KW, 0--0,. AMPS SET WATER TEMP. CONTROL TO 0 F 0-GALLON ELECTRIC WATER HEATER (LO BOY). KW, 0--0 SET WATER TEMP. CONTROL TO 0 F (BLDG A APARTMENTS ONLY) 0-GALLON COMMERCIAL ELECTRIC WATER HEATER 9.0 KW, 0--0 SET WATER TEMP. CONTROL TO 0 F (BLDG C ONLY) 0-GALLON COMMERCIAL ELECTRIC WATER HEATER.0 KW, 0--0 SET WATER TEMP. CONTROL TO 0 F (BLDG A ONLY) " /" /" /" " /" /" /" " /" /" /" " " /" /" /" /" /" /" /" /" /" /" P- J.R. SMITH WALL CLEANOUT - PROVIDE SCREW COVER MATCH SIZE OF PIPE P- J.R. SMITH 0 P- ZURN Z- W/ TYPE "E" STRAINER P- ZURN Z-00 GROUND CLEANOUT - PROVIDE CAST IRON TOP. PROVIDE "x"x" THICK CONCRETE PAD AT GRADE. FLOOR DRAIN W/ " NICKALOY STRAINER TOP W/ FUNNEL PROVIDE WITH "TRAP GUARD" AT PIPING INLET CONNECTION FREEZE-PROOF, ENCASED, ANTI- SIPHON, RECESSED WALL HYDRANT W/ LOCKABLE COVER PROVIDE OPTIONAL WALL CLAMP AND PLAIN BRONZE BOX " " /" -- FIRE HYDRANT WATER FLOW INFORMATION FIRE HYDRANT AT NE CORNER OF TH STREET AND PEGRAM TEST DATE: 9/0/0 STATIC PRESSURE = PSI RESIDUAL PRESSURE = PSI 0 GPM WATER FLOW AT RESIDUAL PRESSURE GPM AT 0 PSI PRESSURE FIRE HYDRANT AT NW CORNER OF TH STREET AND PEGRAM TEST DATE: 9/0/0 STATIC PRESSURE = 0 PSI RESIDUAL PRESSURE = PSI 0 GPM WATER FLOW AT RESIDUAL PRESSURE 9 GPM AT 0 PSI PRESSURE 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 SCHEDULES, NOTES, AND LEGENDS -00 December 0, 0 P00

2 FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: November 0, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks Units A,AHC, AM, AM, A, AHC, AM,AMHC FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL Bathroom Group, Flush Tank,. GPF Private KS Kitchen Sink, Two Compartment with Disposer Private DW Dishwashing Machine Private IMB Ice Maker Valve Box - (Refrigerator / Ice Maker) Public or Private WMB Washing Machine Box ( lb) Private CALCULATION NOTES REFERENCE THE FIXTURE CALCULATIONS ON THIS SHEET FOR THE DEMAND OF EACH UNIT TYPE. THESE NUMBERS ARE INCLUDED IN THE OVERALL CALCULATIONS FOR EACH BUILDING. THE BUILDINGS SHOW HOW MANY OF EACH UNIT TYPE ARE IN EACH BUILDING AND THAT UNIT NUMBER IS MULTIPLIED BY THE DFU AND WSFU FOR EACH APARTMENT TYPE. ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 TOTALS DFU... WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT.9.0. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES) " /" " INCHES REQ'D.. c 0 FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: November 0, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks Units B, BHC, BM, BHC FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL Bathroom Group, Flush Tank,. GPF Private KS Kitchen Sink, Two Compartment with Disposer Private DW Dishwashing Machine Private IMB Ice Maker Valve Box - (Refrigerator / Ice Maker) Public or Private WMB Washing Machine Box ( lb) Private TOTALS DFU WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES) " /" " INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: November 0, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks Units B, C FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL Bathroom Group, Flush Tank,. GPF Private Toilet, Sink Private KS Kitchen Sink, Two Compartment with Disposer Private DW Dishwashing Machine Private IMB Ice Maker Valve Box - (Refrigerator / Ice Maker) Public or Private WMB Washing Machine Box ( lb) Private TOTALS 9 DFU... WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT.9.. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES) " /" " INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: December, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING A HB Hose Bibb Public or Private WMB Laundry Washing Machine Boxes Public or Private MS Janitor's Mop Sink Private LAV Lavatory Private UR Urinal (flush valve) Private WC Water Closet (flush valve) Private /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt Units A, A-M, A-M, A-M.. Units B, B-M. 9.. TOTALS DFU.. 9. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES) INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING B HB Hose Bibb Public or Private Units B and C TOTALS 9 DFU 99.. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 FIXTURE DEMAND CALCULATIONS -00 December 0, 0 P00

3 FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING B HB Hose Bibb Public or Private Unit B... TOTALS DFU... WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT.. 9. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING B HB Hose Bibb Public or Private CALCULATION NOTES REFERENCE THE FIXTURE CALCULATIONS ON THIS SHEET FOR THE DEMAND OF EACH UNIT TYPE. THESE NUMBERS ARE INCLUDED IN THE OVERALL CALCULATIONS FOR EACH BUILDING. THE BUILDINGS SHOW HOW MANY OF EACH UNIT TYPE ARE IN EACH BUILDING AND THAT UNIT NUMBER IS MULTIPLIED BY THE DFU AND WSFU FOR EACH APARTMENT TYPE. ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 Units B and C TOTALS DFU.. 0. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING B HB Hose Bibb Public or Private FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING D HB Hose Bibb Public or Private Units B and C Units B and C-HC... TOTALS DFU.. 0. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. TOTALS DFU... WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT.. 9. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING C HB Hose Bibb Public or Private WMB Washer Mixing Box Public or Private LAV Lavatory Private WC Water Closet Private.0.0 /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt KS Kitchen Sink, Two Compartments Private Units A, A-M, A-MHC, A-HC 9... TOTALS DFU WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING D HB Hose Bibb Public or Private Unit C-HC 9... Units B and C TOTALS DFU.. 0. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 FIXTURE DEMAND CALCULATIONS -00 December 0, 0 P00

4 UNIT SHUTOFF VALVE TO BE LOCATED IN ACCESSIBLE LOCATION OUTSIDE OF MECHANICAL CLOSET. ROUTE INCOMING WATER SERVICE FOR UNIT TO LAUNDRY ROOM OR NEAREST BATHROOM VANITY. COORDINATE EXACT LOCATION WITH OWNER/ARCHITECT. ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 BATT OR BLOWN INSULATION. BATT INSULATION OVER ALL EXPOSED PIPING. FIRE DAMPER P. WATER METER ASSEMBLY DETAIL NTS WATER METER (PROVIDED BY OWNER) LOCATED IN MECHANICAL CLOSET. COORDINATE LOCATION WITH MC AND OWNER. c 0 P00 INSULATION OVERLAP PIPE INSTALLATION DETAIL NTS JOIST NO INSULATION PIPING W/INSULATED JACKET RUN BELOW BATT INSULATION. NOTE: INSTALL PIPING ON WARM SIDE OF INSULATION -GALLON EXPANSION TANK CW SPLY MIXING VALVE, SET TO 0 MAX. EQUAL TO SYMMONS - SERIES. AHU LOW-BOY WATER HEATER ACCESS PANEL FOR FIRE DAMPER HW SPLY BALL VALVE (TYP.) REFRIGERANT PIPING FLOAT SWITCH ON SECONDARY DRAIN WIRED TO SHUT DOWN UNIT ON ACTIVATION BY WATER IN COND. LINE CONDENSATE DRAIN LINE W/ '' DEEP P-TRAP PROVIDE CORRUGATED STEEL SPLY LINES TO WATER HEATER WITH DIELETRIC NIPPLES TERMINATE /" COND. DRAIN LINE INTO HUB DRAIN WITH " AIR GAP HUB DRAIN CONNECTED TO STORM UNIONS AT INLET AND OUTLET CONNECTIONS (TYPICAL) COLD WATER ''DIP'' TUBE W/ HOLE AT THE TOP. INSULATED HOT WATER LINE HEAT TRAP " EXPANSION TANK EQUAL TO AMTROL WATER HEATER SHUT-OFF VALVE TO BE SAME SIZE AS THE PIPE IT SERVES. COLD WATER LINE. SEE DRAWINGS FOR SIZE AND SPECIFICS A.S.M.E. RATED PRESSURE TEMP. RELIEF VALVE PIPE PT RELIEF VALVE DWV COPPER FULL SIZE TO OUTSIDE OF BUILDING WATER HEATER - SEE FIXTURE SCHEDULE PROVIDE A '' HIGH PLASTIC SAFEPAN FOR ALL WATER HEATERS HUB DRAIN ON FIRST FLOOR ONLY ROUTE TP/PAN DRAIN, AND MECH. CONDENSATE DOWN TO FIRST FLOOR HUB DRAIN. '' SAFEPAN DRAIN, PIPE TO FLOOR DRAIN P00 MECHANICAL CLOSET DETAIL NTS P00 WATER HEATER PIPING DETAIL EWH- NTS CLEANOUT AND ACCESS COVER. TOP OF COVER TO BE FLUSH W/TOP OF FLOOR FLOOR LINE CLEANOUT AND ACCESS SINK COUNTER / BEND FLOOR LINE BALANCE OF PIPING SAME AS CLEANOUT TO GRADE STUDOR FLOOR CLEANOUT (FCO) CLEANOUT NOT TO BE LOCATED IN CARPETED AREA FLOOR LINE / BEND BALANCE OF PIPING SAME AS CLEANOUT TO GRADE P-TRAP /9/0 ::0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt NOTES:. Stancor Model SE-0 submersible effluent pump. HP, volt, 00 RPM, " discharge connection (shown as example).. Check valve (").. Stancor Oil-Minder V, A control system with built-in audible and visual alarm when pump does not run due to oil in pit or high liquid or high amperage condition. Provide silencing button for audible alarm built into panel. Panel shall have two contacts for a remote alarm location (one each for oil and high water or amperage alert). Junction box will be provided with multi-pin connector and cord in lengths as required, ft. standard, optional ft. increments.. Junction box will be provided with multi-pin connector and cord in lengths as required; ft. is standard, optional ft. increments available up to 0 ft.. All buried pump pressure discharge piping shall be protected with tapecoat CT corrosion protection tape.. Pump cable, probe cable, high liquid alarm cable, and pump "on" float cable ( ft. lengths).. High liquid alarm float with clamp device to mount to pump discharge piping.. Pump On float. 9. Power cord and molded ground plug ( ft. length) for V and 0 V single phase only under hp. Items,,,,, and 9 provided by Stancor as a Standard Package. P00 ELEVATOR PIT SUMP PUMP DIAGRAM NTS / TEE CLEANOUT AND ACCESS WASTE STACK/ STORM LEADER CLEANOUT (HORIZONATAL) P00 WASTE STACK/ STORM LEADER CLEANOUT (VERTICAL) / BEND CLEANOUT DETAILS NTS / BEND IF CLEANOUT OCCURS AT END OF LINE CLEANOUT TO GRADE (COTG) BRASS CLEANOUT PLUG W/COUNTER SUNK HEAD FINISHED GRADE '' SQUARE CONCRETE PAD WASTE LINE; LENGTH TO SUIT WASTE LINE TROWEL SMOOTH AND EDGE CONCRETE '' DEEP WITH WWF REINFORCEMENTS P00 FLOOR NOTES: ) THE AIR ADMITTANCE VALVE SHALL BE LOCATED A MINIMUM OF " ABOVE THE HORIZONTAL BRANCH DRAIN OR FIXTURE DRAIN BEING VENTED. ) ACCESS SHALL BE PROVIDED AT ALL AIR ADMITTANCE VALVES. THE VALVE SHALL BE LOCATED WITHIN A VENTILATED SPACE THAT ALLOWS AIR TO ENTER THE VALVE. ) THE AIR ADMITTANCE VALVE SHALL BE RATED IN ACCORDANCE WITH THE STANDARD FOR THE SIZE OF THE VENT TO WHICH THE VALVE IS CONNECTED. SAN. PIPE AIR ADMITTANCE VALVE DETAIL NTS 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 DETAILS -00 December 0, 0 P00

5 SCHEDULES OF HILTI THROUGH PENETRATION FIRESTOP SYSTEMS CONCRETE FLOORS CONCRETE OR BLOCK WALLS WOOD FLOORS GYPSUM WALLBOARD ASSEMBLIES TYPE OF PENETRANT CIRCULAR BLANK OPENINGS SINGLE METAL PIPES OR CONDUIT F-RATING (HR) UL-CLASSIFIED SYSTEM F-A-000, C-AJ-00, C-AJ-000 F-A-000, C-AJ-00, C-AJ-000 F-A-000, C-AJ-00 C-AJ-, F-A0 C-AJ-, F-A0 C-AJ-, F-A0 C-BJ-0, C-BJ-0 TYPE OF PENETRANT CIRCULAR BLANK OPENINGS SINGLE METAL PIPES OR CONDUIT F-RATING (HR) UL-CLASSIFIED SYSTEM C-AJ-00, C-AJ-000 C-AJ-00, C-AJ-000 C-AJ-00 C-AJ-, W-J-0 C-AJ-, W-J-0 C-AJ-, C-AJ-0, W-J-0 C-BJ-0, C-BJ-0 W-J-0, W-J-0 TYPE OF PENETRANT METAL PIPES OR CONDUIT NON-METALLIC PIPE OR CONDUIT F-RATING (HR) UL-CLASSIFIED SYSTEM F-C-009, F-C-09 F-C-009, F-C-09 F-C-0, F-C-00, F-C-0 F-C-0, F-C-09, F-C- TYPE OF PENETRANT METAL PIPES OR CONDUIT NON-METALLIC PIPE OR CONDUIT F-RATING (HR) UL-CLASSIFIED SYSTEM W-L-0, W-L-0, W-L- W-L-0, W-L-0, W-L- W-L-0, W-L- W-L-0, W-L-0, W-L- W-L-0, W-L-0, W-L- W-L- ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 SINGLE NON-METALLIC PIPE OR COUNDUIT (I.E. PVC, CPVC, ABS, FRP, ENT) F-A-0, F-A-0, C-AJ-09 C-AJ-09, C-AJ-, C-AJ- C-BJ-0 F-A-0, F-A-0, C-AJ-09 C-AJ-09, C-AJ-, C-AJ- C-BJ-0 SINGLE NON-METALLIC PIPE OR COUNDUIT (I.E. PVC, CPVC, ABS, FRP, ENT) C-AJ-09, C-AJ-09, C-AJ- C-AJ-09, C-AJ-09, C-AJ- C-AJ-09, C-AJ-09 SINGLE OR BUNDLED CABLES F-C-0, F-C-0 F-C-0 SINGLE OR BUNDLED CABLES W-L-0, W-L-, W-L- W-L-0, W-L-, W-L- W-L-9 SINGLE OR BUNDLED CABLES CABLE TRAY SINGLE INSULATED PIPES C-AJ-09, C-AJ-09 F-A-00, C-AJ-09, C-AJ-09 F-A-00, C-AJ-09, C-AJ-09 F-A-00, C-AJ-09, C-AJ-09 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 F-A-0, F-A-0, C-AJ-090, C-AJ-09, C-AJ-09 F-A-0, F-A-0, C-AJ-090, C-AJ-09, C-AJ-09 F-A-0, C-AJ-090 C-BJ-00 SINGLE OR BUNDLED CABLES CABLE TRAY SINGLE INSULATED PIPES W-J-0 C-AJ-0, C-AJ-09, C-AJ-09 C-AJ-0, C-AJ-09, C-AJ-09 C-AJ-09, C-AJ-09 W-J-00 W-J-0, C-AJ-0, C-AJ-0 W-J-0, C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 W-J-00 C-AJ-090, C-AJ-09, C-AJ-0 C-AJ-090, C-AJ-09, C-AJ-0 C-AJ-090, C-AJ-0 C-BJ-00, W-J-0 INSULATED PIPES NON-INSULATED MECHANICAL DUCTWORK WITHOUT DAMPERS MIXED PENETRANTS F-C-00, F-C-0, F-C-0 F-C-00, F-C-0, F-C-0 F-C-0 F-C-009, F-C-0 CABLE TRAY INSULATED PIPES NON-INSULATED MECHANICAL DUCTWORK WITHOUT DAMPERS MIXED PENETRANTS W-L-0, W-L-09 W-L-0, W-L-09 W-L-0 W-L-0, W-L-09, W-L-0 W-L-0, W-L-09, W-L-0 W-L-0 W-L-0, W-L-00, W-L-0 W-L-00, W-L-0 W-L-09, W-L-0 W-L-09, W-L-0 W-L-0 ELECTRICAL BUSWAY /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt NON-INSULATED MECHANICAL DUCTWORK WITHOUT DAMPERS MIXED PENETRANTS C-AJ-00, C-AJ-0 C-AJ-00, C-AJ-0 C-AJ-00, C-AJ-0 C-AJ-00, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-BJ-00 ELECTRICAL BUSWAY NON-INSULATED MECHANICAL DUCTWORK WITHOUT DAMPERS MIXED PENETRANTS C-AJ-00, C-AJ-0 C-AJ-00, C-AJ-0 C-AJ-0, C-AJ-0, W-J-0, W-J-0 C-AJ-0, C-AJ-0, W-J-0, W-J-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0, W-J-00 C-AJ-0, C-AJ-0, W-J-00 C-AJ-0, C-AJ-0, W-J-00 C-BJ-00, W-J-00 NOTES:. JOBSITE CONDITIONS OF EACH THROUGH-PENETRATION FIRESTOP SYSTEM MUST MEET ALL DETAILS OF THE UL-CLASSIFIED SYSTEM SELECTED.. IF JOBSITE CONDITIONS DO NOT MATCH ANY UL-CLASSIFIED SYSTEMS IN THE SCHEDULES ABOVE, CONTACT HILTI FOR ALTERNATIVE SYSTEMS OR ENGINEER JUDGEMENT DRAWINGS WHERE MORE THAN ONE APPLICABLE UL-CLASSIFIED SYSTEM IS LISTED IN THE SCHEDULES, CHOOSE THE UL SYSTEM WHICH IS MOST ECONOMICAL FOR EACH THROUGH-PENETRATION FIRESTOP SYSTEM.. COORDINATE WORK WITH OTHER TRADES TO ASSURE THE PENETRATION OPENING SIZES ARE APPROPRIATE FOR PENETRANT LOCATIONS, AND VICE VERSA.. FOR -HOUR RATED GYPSUM WALLS, CONTACT HILTI FOR A UL-CLASSIFIED SYSTEM OR ENGINEER JUDGEMENT DRAWING R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: License No.: DETAILS -00 December 0, 0 P00

6 P0 TYPICAL DOMESTIC WATER RISER SCALE: NTS "CW TO APT. "CW TO APT. "CW TO APT. "CW TO APT. i"cw r"cw r"cw r"cw r"cw "CW i"cw NOTE: INSTALL SHUTOFF VALVE FOR DOMESTIC WATER IN ACCESSIBLE LOCATION. P0 "S "VTR TYPICAL WASHING MACHINE SANITARY VENT RISER SCALE: NTS WCB WCB WCB WCB "V "S "S "S WCO P0 "VTR TYPICAL KITCHEN SINK (WITHOUT AAV) SANITARY VENT RISER SCALE: NTS UNDER COUNTER UNDER COUNTER KIT SINK KIT SINK KIT SINK KIT SINK "S "V "S "S "S WCO NOTE: PROVIDE EXPANSION JOINTS EQUAL TO FERNCO "XJ" ON VERTICAL STACKS BETWEEN FLOORS / P0 "S "VTR TYPICAL FLOOR DRAIN SANITARY VENT RISER SCALE: NTS HUB DRAIN HUB DRAIN HUB DRAIN HUB DRAIN "V "S "S "S WCO LAV TUB/SHOWER "S LAV TUB/SHOWER "S LAV TUB/SHOWER "S LAV TUB/SHOWER "S "V LAV WC "S "V LAV WC "S "V LAV WC "S "V LAV WC "S "V "S "VTR "S "S "S WCO "S "S "V "V "V ADDITIONAL SINK ON SELECT UNITS SEE ENLARGED PLANS ADDITIONAL SINK ON SELECT UNITS SEE ENLARGED PLANS ADDITIONAL SINK ON SELECT UNITS SEE ENLARGED PLANS ADDITIONAL SINK ON SELECT UNITS SEE ENLARGED PLANS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 "VTR "VTR "VTR NOTE: WASTE STACK VENTS SHALL NOT HAVE AN OFFSET BETWEEN FLOORS. A VENT IS REQUIRED FOR ANY OFFSETS IN A WASTE STACK PER NCPC 90. P0 TYPICAL BATHROOM SANITARY VENT RISER SCALE: NTS "VTR "VTR /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt 9 P0 HUB DRAIN WCB KIT. SINK HUB DRAIN WCB KIT. SINK HUB DRAIN WCB KIT. SINK NOTE: WASTE STACK VENTS SHALL NOT HAVE AN OFFSET BETWEEN FLOORS. A VENT IS REQUIRED FOR ANY OFFSETS IN A WASTE STACK PER NCPC 90. OFFSET KITCHEN SINK, HUB DRAIN WASHING MACHINE SANITARY VENT RISER SCALE: NTS "V "V "V "S "V CO "V HUB DRAIN WCB KIT. SINK "S "V "S WCO HUB DRAIN WCB KIT. SINK "V "S CO HUB DRAIN WCB KIT. SINK HUB DRAIN WCB KIT. SINK "S "V "V HUB DRAIN WCB KIT. SINK "S "V "V "V "V "S WCO HUB DRAIN WCB CO KIT. SINK HUB DRAIN WCB KIT. SINK HUB DRAIN WCB KIT. SINK "S "V "S "V "V "S "S WCO HUB DRAIN WCB KIT. SINK "V "S "V "V "V CO "V LAV WC TUB/SHOWER "S "S "V LAV WC TUB/SHOWER "S "S "V LAV WC TUB/SHOWER "S "S LAV TUB/SHOWER "S "S "S "S "VTR "S "V "V "V CO "V WC "S "S "V "S WCO "S "S "V P0 LAV TUB/SHOWER "S OFFSET STACK-UNITS SANITARY VENT RISER SCALE: NTS LAV TUB/SHOWER "S TUB/SHOWER "S "V "S WC LAV TUB/SHOWER LAV "S "V "S "S WC "V "S WC CO "V "S "S "V WC "S "S "S "S "V "V "S "S "V "V "S WCO "V CO TUB/SHOWER "S TUB/SHOWER "S TUB/SHOWER LAV LAV LAV "S LAV TUB/SHOWER "S "V "S "V "S "V "S WC WC WC "S "V "S WC "S "S WCO "S "S "S "S "V "V "V "S "S "V "V "V CO P0 "VTR TYPICAL KITCHEN SINK (WITH AAV) SANITARY VENT RISER SCALE: NTS AAV KIT SINK BELOW FLOOR AAV KIT SINK BELOW FLOOR AAV KIT SINK BELOW FLOOR AAV KIT SINK BELOW FLOOR "S "V "S "S "S WCO 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: License No.: DETAILS -00 December 0, 0 P00

7 P- "CW TO STRUCTURE PROVIDE SHUTOFF VALVE AT "AFF ARCHITECTURE PLANNING INTERIORS INDOOR SITTING AREA P-B AAV STAIR A 0 " S /" CW " S /" CW " S /" CW " CW FCO " S " S " S " CW " S ELEC HUB DRAIN " V /" CW " CW MECH. MULTI-PURPOSE ROOM A RISER /" CW " CW P- "FD KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. PROVIDE AN OIL MINDER CONTROL AND PUMP SYSTEM FOR ELEVATOR SUMP. STANCOR MODEL #OM0SR-ELV OR EQUAL. V//0, /HP, 0 FEET OF HEAD. SEE DETAIL ON DETAIL SHEET. ROUTE DRAIN TO EXTERIOR AND DISCHARGE " ABOVE GRADE. PROVIDE SPLASH BLOCK. PROVIDE /" HW CONNECTION AND PIPING TO DISHWASHER. PROVIDE TEE ON SINK DRAIN TAILPIECE FOR DISHWASHER DISCHARGE. 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /" CW P- /" CW " S MULTI-PURPOSE ROOM B /" HW " S " S " S " CW " S " S STO. 0 STO. LOUNGE " CW P-BA MEETING " V " S CORR 0 " S " CW ENTRY 00 P-B WOMEN 0 " S P- " V " S " S " S LEASING HUB DRAIN0 /" CW WAITING 0 /" CW " S /" HW EWH-A /" HW /" HW /" CW P- HVAC 0A MEN " S " CW " V P-C " V " S P-BA " S " S " S " V /" CW PROP. MGR 0 P- HUB DRAIN " S FCO " CW " S " S " S /9/0 ::9 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0a HVAC 9 TENANT STO. " S " CW " S /" CW " S P- ELEV 90 " S " CW " CW " S " S /" CW " S " S FCO /" CW BUILDING A. - FIRST FLOOR PLAN - AREA A - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - FIRST FLOOR PLAN - AREA A - December 0, 0 P0a -00

8 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. PROVIDE AN OIL MINDER CONTROL AND PUMP SYSTEM FOR ELEVATOR SUMP. STANCOR MODEL #OM0SR-ELV OR EQUAL. V//0, /HP, 0 FEET OF HEAD. SEE DETAIL ON DETAIL SHEET. ROUTE DRAIN TO EXTERIOR AND DISCHARGE " ABOVE GRADE. PROVIDE SPLASH BLOCK. PROVIDE /" HW CONNECTION AND PIPING TO DISHWASHER. PROVIDE TEE ON SINK DRAIN TAILPIECE FOR DISHWASHER DISCHARGE.. c 0 P- P- /" CW /" CW FCO " S " S /" CW /" CW /" CW " S /" CW " S " S /" CW " S " S /" CW " S " S /" CW " S " S /" CW " S " S " S " S " S " CW " S " CW " S " S " CW " S FCO " S " CW " S " S " CW " S /" CW " S " S /" CW " S " S /" CW " S /" CW " S " S /" CW " S " S /" CW /9/0 :9:0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0b BUILDING A. - FIRST FLOOR PLAN - AREA B - SCALE: /" = '-0" /" CW P- 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - FIRST FLOOR PLAN - AREA B - December 0, 0 P0b -00

9 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN P- CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. PROVIDE AN OIL MINDER CONTROL AND PUMP SYSTEM FOR ELEVATOR SUMP. STANCOR MODEL #OM0SR-ELV OR EQUAL. V//0, /HP, 0 FEET OF HEAD. SEE DETAIL ON DETAIL SHEET. ROUTE DRAIN TO EXTERIOR AND DISCHARGE " ABOVE GRADE. PROVIDE SPLASH BLOCK. PROVIDE /" HW CONNECTION AND PIPING TO DISHWASHER. PROVIDE TEE ON SINK DRAIN TAILPIECE FOR DISHWASHER DISCHARGE. " S HUB DRAIN EWH-A /" CW /" HW " S /" CW HUB DRAIN " CW /" HW P- FCO /" V " S " S " S " CW " S /" CW " S /" CW /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0c /" CW BUILDING A. - FIRST FLOOR PLAN - AREA C - SCALE: /" = '-0" " S " S P- /" CW /" CW " S 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - FIRST FLOOR PLAN - AREA C - December 0, 0 P0c -00

10 KEY NOTES TO PLAN ARCHITECTURE PLANNING INTERIORS CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0.. c 0 /" HW, /" CW /" HW, /" CW P-0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0a BUILDING A. - SECOND FLOOR PLAN - AREA A - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - SECOND FLOOR PLAN - AREA A - December 0, 0 P0a -00

11 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0b BUILDING A. - SECOND FLOOR PLAN - AREA B - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - SECOND FLOOR PLAN - AREA B - December 0, 0 P0b -00

12 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. EWH-A HUB DRAIN /" CW /" HW /" CW P- /" CW " CW /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0c BUILDING A. - SECOND FLOOR PLAN - AREA C - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - SECOND FLOOR PLAN - AREA C - December 0, 0 P0c -00

13 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. c 0 " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. /" HW, /" CW FROM FLOOR BELOW P-0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0a BUILDING A. - THIRD FLOOR PLAN - AREA A - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - THIRD FLOOR PLAN - AREA A - December 0, 0 P0a -00

14 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. P- /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0b BUILDING A. - THIRD FLOOR PLAN - AREA B - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - THIRD FLOOR PLAN - AREA B - December 0, 0 P0b -00

15 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. EWH-A /" HW /" CW /" HW P- /" CW /9/0 :9:0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0c BUILDING A. - THIRD FLOOR PLAN - AREA C - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - THIRD FLOOR PLAN - AREA A - December 0, 0 P0c -00

16 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0a BUILDING A. - ROOF PLAN - AREA A - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - ROOF PLAN - AREA A - December 0, 0 P0a -00

17 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0b BUILDING A. - ROOF PLAN - AREA B - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - ROOF PLAN - AREA B - December 0, 0 P0b -00

18 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0c BUILDING A. - ROOF PLAN - AREA C - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - ROOF PLAN - AREA C - December 0, 0 P0c -00

19 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 " CW P- " CW " CW " CW " CW BUILDING KEY NOTES THIS PLAN EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME SANITARY SEWER PIPING TO SITE UTILITIES. COORDINATE PIPING TIE-IN CONNECTION POINT WITH CIVIL. PROVIDE GRADE LEVEL CLEANOUT ON UNDERGROUND SAINTARY SEWER PIPING OUTSIDE OF BUILDING.. c 0 EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME DOMESTIC WATER PIPING TO SITE UTILITIES. COORDINATE PIPING CONNECTION POINT WITH CIVIL. PROVIDE PIPING MAIN SHUT-OFF VALVE AT CLOSEST ACCESSIBLE POINT IN BUILDING. P- UNIT B UNIT B UNIT B UNIT C THE P.C. SHALL NOTE THAT BUILDING B, B, B, AND B HAS THE DOMESTIC WATER AND SANITARY SEWER PIPING ENTERING THE TOWNHOME UNITS ON OPPOSITE ENDS OF THE TOWNHOME. BUILDINGS D AND D WILL HAVE THE DOMESTIC WATER AND SANITARY SEWER ENTERING THE TOWNHOME ON THE SAME SIDE OF THE TOWNHOME. THE P.C SHALL COORDINATE THE SANITARY SEWER FLOW DIRECTION TO MATCH HOW AND WHERE THE SANITARY SEWER PIPING MAIN ENTERS THE TOWNHOME. EWH- P- P- UNIT C P- P- FIRE RISER ROOM P BUILDING B. - FIRST FLOOR PLAN - SCALE: /" = '-0" /9/0 :0:0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P " S UNIT C FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" UNIT B UNIT B UNIT B " S " S " S " S UNIT C 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - FIRST FLOOR PLAN December 0, 0 P

20 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 UNIT C UNIT B UNIT B UNIT B UNIT C BUILDING B. - SECOND FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0:09 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P UNIT C BUILDING B. - SECOND FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" UNIT B UNIT B UNIT B UNIT C 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - SECOND FLOOR PLAN December 0, 0 P

21 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 BUILDING B. - ROOF PLAN - P SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - ROOF PLAN December 0, 0 P

22 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 BUILDING KEY NOTES THIS PLAN. " CW " CW " CW EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME SANITARY SEWER PIPING TO SITE UTILITIES. COORDINATE PIPING TIE-IN CONNECTION POINT WITH CIVIL. PROVIDE GRADE LEVEL CLEANOUT ON UNDERGROUND SAINTARY SEWER PIPING OUTSIDE OF BUILDING. c 0 UNIT B UNIT B UNIT C EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME DOMESTIC WATER PIPING TO SITE UTILITIES. COORDINATE PIPING CONNECTION POINT WITH CIVIL. PROVIDE PIPING MAIN SHUT-OFF VALVE AT CLOSEST ACCESSIBLE POINT IN BUILDING. THE P.C. SHALL NOTE THAT BUILDING B, B, B, AND B HAS THE DOMESTIC WATER AND SANITARY SEWER PIPING ENTERING THE TOWNHOME UNITS ON OPPOSITE ENDS OF THE TOWNHOME. BUILDINGS D AND D WILL HAVE THE DOMESTIC WATER AND SANITARY SEWER ENTERING THE TOWNHOME ON THE SAME SIDE OF THE TOWNHOME. THE P.C SHALL COORDINATE THE SANITARY SEWER FLOW DIRECTION TO MATCH HOW AND WHERE THE SANITARY SEWER PIPING MAIN ENTERS THE TOWNHOME. FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0:9 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P " S UNIT B UNIT B UNIT C " S FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" " S 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - FIRST FLOOR PLAN December 0, 0 P

23 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 UNIT B UNIT B UNIT C BUILDING B. - SECOND FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P UNIT B UNIT B UNIT C BUILDING B. - SECOND FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - SECOND FLOOR PLAN December 0, 0 P

24 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BUILDING B. - ROOF PLAN - P SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - ROOF PLAN December 0, 0 P

25 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 BUILDING KEY NOTES THIS PLAN EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME SANITARY SEWER PIPING TO SITE UTILITIES. COORDINATE PIPING TIE-IN CONNECTION POINT WITH CIVIL. PROVIDE GRADE LEVEL CLEANOUT ON UNDERGROUND SAINTARY SEWER PIPING OUTSIDE OF BUILDING.. c 0 UNIT C " CW " CW " CW " CW " CW " CW UNIT B UNIT B UNIT B UNIT B UNIT C EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME DOMESTIC WATER PIPING TO SITE UTILITIES. COORDINATE PIPING CONNECTION POINT WITH CIVIL. PROVIDE PIPING MAIN SHUT-OFF VALVE AT CLOSEST ACCESSIBLE POINT IN BUILDING. THE P.C. SHALL NOTE THAT BUILDING B, B, B, AND B HAS THE DOMESTIC WATER AND SANITARY SEWER PIPING ENTERING THE TOWNHOME UNITS ON OPPOSITE ENDS OF THE TOWNHOME. BUILDINGS D AND D WILL HAVE THE DOMESTIC WATER AND SANITARY SEWER ENTERING THE TOWNHOME ON THE SAME SIDE OF THE TOWNHOME. THE P.C SHALL COORDINATE THE SANITARY SEWER FLOW DIRECTION TO MATCH HOW AND WHERE THE SANITARY SEWER PIPING MAIN ENTERS THE TOWNHOME. FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P " S UNIT C UNIT B UNIT B UNIT B UNIT B UNIT C FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" " S " S " S " S " S 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - FIRST FLOOR PLAN December 0, 0 P

26 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 UNIT B UNIT B UNIT B UNIT B UNIT C UNIT C BUILDING B. - SECOND FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P UNIT C BUILDING B. - SECOND FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" UNIT B UNIT B UNIT B UNIT B UNIT C 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - SECOND FLOOR PLAN December 0, 0 P

27 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BUILDING B. - ROOF PLAN - P SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - ROOF PLAN December 0, 0 P

28 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 UNIT C " CW " CW " CW " CW " CW " CW UNIT B UNIT B UNIT B UNIT B UNIT C BUILDING KEY NOTES THIS PLAN EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME SANITARY SEWER PIPING TO SITE UTILITIES. COORDINATE PIPING TIE-IN CONNECTION POINT WITH CIVIL. PROVIDE GRADE LEVEL CLEANOUT ON UNDERGROUND SAINTARY SEWER PIPING OUTSIDE OF BUILDING. EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME DOMESTIC WATER PIPING TO SITE UTILITIES. COORDINATE PIPING CONNECTION POINT WITH CIVIL. PROVIDE PIPING MAIN SHUT-OFF VALVE AT CLOSEST ACCESSIBLE POINT IN BUILDING. THE P.C. SHALL NOTE THAT BUILDING B, B, B, AND B HAS THE DOMESTIC WATER AND SANITARY SEWER PIPING ENTERING THE TOWNHOME UNITS ON OPPOSITE ENDS OF THE TOWNHOME. BUILDINGS D AND D WILL HAVE THE DOMESTIC WATER AND SANITARY SEWER ENTERING THE TOWNHOME ON THE SAME SIDE OF THE TOWNHOME. THE P.C SHALL COORDINATE THE SANITARY SEWER FLOW DIRECTION TO MATCH HOW AND WHERE THE SANITARY SEWER PIPING MAIN ENTERS THE TOWNHOME.. c 0 FIRE RISER ROOM P BUILDING B. - FIRST FLOOR PLAN - SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P " S UNIT C FIRE RISER ROOM " S UNIT B UNIT B UNIT B UNIT B UNIT C " S BUILDING B. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" " S " S " S 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - FIRST FLOOR PLAN December 0, 0 P

29 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 UNIT C UNIT B UNIT B UNIT B UNIT B UNIT C P BUILDING B. - SECOND FLOOR PLAN - SCALE: /" = '-0" UNIT C UNIT B UNIT B UNIT B UNIT B UNIT C /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P BUILDING B. - SECOND FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - SECOND FLOOR PLAN December 0, 0 P

30 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 ::0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BUILDING B. - ROOF PLAN - P SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - ROOF PLAN December 0, 0 P

31 "CW U/G LINE TO ON-SITE DOMESTIC MAIN SEE SITE PLAN FOR CONTINUATION ARCHITECTURE PLANNING INTERIORS P- 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 /" CW " CW " VALVE /" CW UNIT A UNIT A HC UNIT A HC /" CW " CW KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN.. c 0 P- EWH-A P-A P-A /" HW /" CW /" HW /" CW /" CW /" CW " CW " CW "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. P-A P-0 /" HW P- P- P- /" CW /" CW /" CW "CW RISER UNIT A UNIT A UNIT A HC UNIT A HC P- P- P BUILDING C. - FIRST FLOOR PLAN - SCALE: /" = '-0" " U/G SANITARY SEWER LINE TO ON-SITE SANITARY SEWER MAIN SEE SITE PLAN FOR CONTINUATION " S STOR 0 /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BATHROOM 00 P-A P-A " V " S MULTI-PURPOSE ROOM 00 P-0 MAINT " S 00 UNIT A P-A " V " S " S " S "S STACK P- LAUNDRY 00 P- " V " S " S P- P " S " S " S FCO " S " S " S " S UNIT A " S UNIT A " S " S " S UNIT A HC UNIT A HC UNIT A HC " S " S " S " S " S " S " S " S " S BUILDING C. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" " S HUB DRAIN FIRST FLOOR ONLY " S HUB DRAIN FIRST FLOOR ONLY " S HUB DRAIN FIRST FLOOR ONLY " S " S UNIT A HC HUB DRAIN FIRST FLOOR ONLY FCO FCO 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING C. - FIRST FLOOR PLAN December 0, 0 P

32 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. UNIT A UNIT A UNIT A UNIT A KEY NOTES TO PLAN c 0 CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. UNIT A UNIT A UNIT A UNIT A P BUILDING C. - SECOND FLOOR PLAN - SCALE: /" = '-0" /9/0 ::9 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING C. - SECOND FLOOR PLAN December 0, 0 P

33 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 UNIT A UNIT A UNIT A UNIT A KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT.. c 0 " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. UNIT A UNIT A UNIT A UNIT A P BUILDING C. - THIRD FLOOR PLAN - SCALE: /" = '-0" /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING C. - THIRD FLOOR PLAN December 0, 0 P

34 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 -/" CW RISER INSTALL ALL COLD WATER PIPING LOW IN ATTIC SPACE ON THE WARM SIDE (APARTMENT SIDE) OF THE ATTIC INSULATION. -/" CW RISER " CW RISER FROM BELOW -/" CW. TO RD FLOOR WATER HEATER CLOSET (TYPICAL OF RISERS) /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BUILDING C. - ROOF PLAN - P SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING C. - ROOF PLAN December 0, 0 P

GENERAL PLUMBING NOTES

GENERAL PLUMBING NOTES GENERAL SYMBOLS GENERAL PLUMBING NOTES PLUMBING LEGEND ABBREVIATIONS N PLAN OR DETAIL NO SHEET NUMBER KEYED NOTE TO PLAN REVISION NUMBER NORTH ARROW. IN THE PREPARATION OF THESE PLANS, THE ENGINEER HAS

More information

HWC NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

HWC NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS. ELECTRIC WATER HEATER SCHEDULE DESIGNATION MODEL MANUFACTURER STORAGE RECOVERY TEMPERATURE LEAVING ELECTRICAL CHARACTERISTICS REMARKS/SPECIAL INSTRUCTIONS NUMBER GALLONS RATE RISE WATER K.W. VOLTAGE PHASE

More information

LAV FCO WCO NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

LAV FCO WCO NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS. ELECTRIC WATER HEATER SCHEDULE DESIGNATION MODEL MANUFACTURER STORAGE RECOVERY TEMPERATURE LEAVING ELECTRICAL CHARACTERISTICS REMARKS/SPECIAL INSTRUCTIONS NUMBER GALLONS RATE RISE WATER K.W. VOLTAGE PHASE

More information

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type. PART 1 - GENERAL 1.1 Toilet rooms and utility rooms to have floor drains at lowest point. 1.2 Utilize Exposed Flushometers. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

More information

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point. PART 1 - GENERAL 1.01 Toilet rooms and utility rooms to have floor drains at lowest point. 1.02 Utilize Exposed Flushometers. 1.03 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

More information

SECTION PLUMBING

SECTION PLUMBING SECTION 22 10 00 PLUMBING PART 1 GENERAL 1.1 WORK INCLUDED A. Furnish all labor, material and equipment necessary for the complete installation of the sanitary sewer system (including soil and vent piping),

More information

MATERIALS Traps TRAPS. No. IPC IRC Description

MATERIALS Traps TRAPS. No. IPC IRC Description MATERIALS Traps TRAPS MAX " MAX 0" No. IPC IRC Description 00. P0.6 00. P0.6 00. P0. 00. () P0.6 Exc. Vertical distance from fixture to the trap weir can not exceed ". Horizontal distance from the fixture

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 22 40 00 Plumbing Fixtures 1. General A. Definitions 1. Section includes a. Water closets and urinals b. Lavatories, sinks, and service sinks c. Electric water coolers, drinking fountains, d. Showers

More information

DOMESTIC WATER PACKAGED BOOSTER PUMPS

DOMESTIC WATER PACKAGED BOOSTER PUMPS DIVISION 22 PLUMBING 22 11 16 DOMESTIC WATER PIPING 22 11 19 DOMESTIC WATER PIPING SPECIALTIES 1. To facilitate landscape and other maintenance operations, exterior hose bibs shall be provided at 150 foot

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Plumbing Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Plumbing Standards Date Description of Change Pages / Sections Modified ID 8/5/17 Entire document - mgl PART 1 - INTRODUCTION 1.1 This section applies to Plumbing for campus institutional facilities. A. Purpose: Yale University

More information

GENERAL PLUMBING REQUIREMENTS

GENERAL PLUMBING REQUIREMENTS 22 00 00 GENERAL PLUMBING REQUIRMENTS i. 00 00 07 Design Professional Design Process Requirements ii. 00 00 08 Design Professional Documentation Requirements and Deliverables iii. 01 81 00 Facility Performance

More information

DRAWING SCHEDULE TAB REQUIREMENTS BY EQUIPMENT TYPE TYPE OF EQUIPMENT DESCRIPTION COMPONENT TAB REQUIREMENTS

DRAWING SCHEDULE TAB REQUIREMENTS BY EQUIPMENT TYPE TYPE OF EQUIPMENT DESCRIPTION COMPONENT TAB REQUIREMENTS DRAWING SCHEDULE NUMBER TITLE M0-1 MECHANICAL NOTES AND LEGEND M1-0 MECHANICAL FLOOR PLAN M4-0 MECHANICAL SCHEDULES M4-1 MECHANICAL LOAD CALCULATIONS M5-0 MECHANICAL DETAILS M8-0 TCS BASYS CONTROLS DRAWINGS

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 22 40 00 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Faucets for lavatories, bathtubs, bathtub/showers, showers and sinks. 2. Flushometers. 3. Toilet

More information

SHOE PALACE HUNTINGTON PARK M.200

SHOE PALACE HUNTINGTON PARK M.200 M.200 SPLIT SYSTEM CONDENSING UNIT SCHEDULE MARK SERVICE MODEL NO. COOLING DIMENSIONS ELECTRICAL REMARKS CAPACITY AMBIENT DB REFRIGERANT LENGTH WIDTH HEIGHT WEIGHT VOLT/PHASE MCA MOP (MBH) (DEG F) (IN)

More information

A. Section Joint Sealants: Seal fixtures to walls and floors.

A. Section Joint Sealants: Seal fixtures to walls and floors. SECTION 224000 - PLUMBING FIXTURES PART 1 GENERAL 1.1 SECTION INCLUDES A. Water closets. B. Urinals. C. Lavatories. D. Sinks. E. Service sinks. F. Showers. G. Wash fountains. H. Eye wash fountains. 1.2

More information

University of Rochester October 17, 2008 Brooks Landing Business Center

University of Rochester October 17, 2008 Brooks Landing Business Center SECTION 224200 COMMERCIAL PLUMBING FIXTURES PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, equipment and services to perform operations required for the complete installation and related

More information

Level I Chapter 1 Worksheet

Level I Chapter 1 Worksheet Chapter 1 Worksheet 1. For applicability requirements of the Plumbing Code, refer to: a. Building Code b. Administration and Enforcement Code c. Plumbing Code d. Residential Code 2. The provisions of the

More information

B E ROUTE DUCT BEHIND BOOKSHELF. GRILLE MOUNTED ON TOP OF BENCH. BOOK CASE WALL 12x8 8x5 I 8"Ø 7"Ø 125 CFM I D M FLOOR SIDE WALL VENT 6x5 160 CFM 6"Ø 6"Ø 8x10 J C G 1 Section M-1 NOT TO SCALE Project No

More information

Sanitary Drainage Systems

Sanitary Drainage Systems 11.1 MATERIALS See Section 3.1. Sanitary Drainage Systems 11.2 BUILDING SEWERS AND BUILDING DRAINS 11.2.1 Sewer or Drain in Filled Ground Chapter 11 Building sewers or building drains that are installed

More information

JAMES P. KISSANE, ARCHITECT

JAMES P. KISSANE, ARCHITECT UNISEX RESTROOM 6" X 9" UNISEX H.C. RESTROOM SIGN; BLUE NOTE: THE FASTENING HARDWARE FOR THE WALL BRACKETS FOR THE AND THE URINAL AND GRAB BARS MUST BE ABLE TO SUPPORT A 300 LB. WEIGHT. CONTRACTOR IS REQUIRED

More information

SECTION PLUMBING FIXTURES

SECTION PLUMBING FIXTURES CSUEB Pioneer Heights Phase r 15410 Page 1 SECTION 15410 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

PLUMBING DESIGN GUIDELINES SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

PLUMBING DESIGN GUIDELINES SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS The Design Guidelines, which follow, are intended to supplement the Educational Specifications and State Requirements for Educational Facilities (SREF). Note: All fittings shall be installed by no less

More information

A. All fixtures shall meet the requirements of ANSI A117.1, ANSI Z124.2 and the State of Texas Accessibility Standards (TAS).

A. All fixtures shall meet the requirements of ANSI A117.1, ANSI Z124.2 and the State of Texas Accessibility Standards (TAS). PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer. ICP Plumbing Exam Name: Date: Score: Carefully read each question and then circle the letter of the best answer. 1. A 1 inch diameter faucet, where the inside edge of the spout opening is 2.5 inches away

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

GENERAL PLUMBING REQUIREMENTS

GENERAL PLUMBING REQUIREMENTS 22 00 00 GENERAL PLUMBING REQUIRMENTS 1. GENERAL A. Related sections: i. 00 00 07 Design Professional Design Process Requirements ii. 00 00 08 Design Professional Documentation Requirements and Deliverables

More information

PLUMBING CURRICULA OUTLINE

PLUMBING CURRICULA OUTLINE PLUMBING CURRICULA OUTLINE CORE CURRICULUM 2015 Basic Safety (Construction Site Safety Orientation) (12.5 Hours) (Module ID 00101-15) Presents basic jobsite safety information to prepare workers for the

More information

B. Shop Drawings: Include diagrams for power, signal, and control wiring.

B. Shop Drawings: Include diagrams for power, signal, and control wiring. SECTION224213.13 -COMMERCIAL WATERCLOSETS PART 1- GENERAL 1.1 SUMMARY Section Includes: 1. Water closets. 2. Flushometer valves. 3. Toilet seats. 1.2 ACTION SUBMITTALS Product Data: For each type of product.

More information

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point. PART 1 - GENERAL 1.01 Toilet rooms and utility rooms to have floor drains at lowest point. 1.02 Utilize Exposed Flushometers. 1.03 Utilize wall hung toilet room fixtures. Urinals for handicapped may be

More information

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer. IPC Plumbing Exam Name: Date: Score: Carefully read each question and then circle the letter of the best answer. 1. A vent stack handling 25 dfu s with a developed length of 35 feet shall be inches minimum

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

CHAPTER VI BUILDING PLUMBING

CHAPTER VI BUILDING PLUMBING CHAPTER VI BUILDING PLUMBING 6.1. INTRODUCTION The chapter covers questions related to water demand, distribution and drainage. The basic principles for planning and installing common plumbing systems

More information

PLUMBING INSTALLATIONS

PLUMBING INSTALLATIONS PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT PLUMBING INSTALLATIONS A homeowner guide to plumbing requirements for single-family dwellings November 2017 contents Permit Requirements... 3 Inspection Requirements...

More information

SECTION PLUMBING FIXTURES AND TRIM. A. Types of plumbing fixtures required for the project include the following:

SECTION PLUMBING FIXTURES AND TRIM. A. Types of plumbing fixtures required for the project include the following: SECTION 15440 PART I - GENERAL 1.01 WORK INCLUDED A. Types of plumbing fixtures required for the project include the following: 1. Water Closets 2. Urinals 3. Lavatories 4. Mop Sink 5. Sinks 6. Electric

More information

Pro Vent TM. Provent Systems Inc Capital Circle Lawrenceville Georgia

Pro Vent TM. Provent Systems Inc Capital Circle Lawrenceville Georgia Pro Vent TM Guide to Design and Usage Provent Single System Handling Installation Corrosion Ease Simplicity Resistance IPMO Copyright (c) 2014, Pro Vent Systems Inc., plus *2016 Revisions ll Rights Reserved

More information

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line ± 4' ± 13' ± 72' Lease Line ± 6' ± 7' Plot # R019A ± 18' Lease Line Site N o : Site N ame: Lo catio n: Submitted B y: D rawn by D ate: 991 Santee Trolley Square Santee, CA ID Plans 11/10/2016 This drawing

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.

More information

APPENDIX J ILLUSTRATIONS

APPENDIX J ILLUSTRATIONS The following figures have been included in the 1994 edition of the Standard Plumbing Code to aid in interpreting this code. The figures are not to be construed as superseding the written text, but merely

More information

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016 Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016 Ohio Administrative Code Rule Number OPC Section IPC origin Reason for proposed 4101:3-2-01 Alternate on-site 2015 Added definition

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#58619/Page 1/November 1, 2017 PLUMBING Executive Summary: Presently, the Plumbing Systems serving the building are cold water, hot water, sanitary, waste and vent system, storm drain piping, and natural

More information

TRUMAN STATE UNIVERSITY PRESIDENT S RESIDENCE RENOVATION

TRUMAN STATE UNIVERSITY PRESIDENT S RESIDENCE RENOVATION SECTION 224100 - RESIDENTIAL PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

APPENDIX A. A 3.2 Determine the elevation of the highest. A 3.3 Subtract the sum of loss in static pressure

APPENDIX A. A 3.2 Determine the elevation of the highest. A 3.3 Subtract the sum of loss in static pressure APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM Because of the variable conditions encountered, it is impractical to lay down definite detailed rules of procedure for determining the sizes

More information

SECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD

SECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Codes and Standards: A. Plumbing Code Compliance: Comply with applicable portions of National Standard Plumbing Code pertaining to selection and installation of Plumbing materials

More information

An Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010

An Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010 An Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010 Putnam County Planning & Development Services Building & Zoning Division Compliance Section PO Box 1486 Palatka, FL 32178 1486 Office

More information

Read Only Document Not For Distribution

Read Only Document Not For Distribution Chapter 9 Indirect Waste Piping and Special Wastes 9.1 INDIRECT WASTES 9.1.1 General Drains from fixtures, fixture compartments, equipment, appliances, appurtenances, and other devices requiring protection

More information

PLUMBING FIXTURES CHAPTER 27

PLUMBING FIXTURES CHAPTER 27 CHAPTER 27 PLUMBING FIXTURES SECTION P2701 FIXTURES, FAUCETS AND FIXTURE FITTINGS P2701.1 Quality of fixtures. Plumbing fixtures, faucets and fixture fittings shall be constructed of approved materials,

More information

2016 Plumbing Supplemental Plan Review List

2016 Plumbing Supplemental Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Plumbing Supplemental Plan Review List POTABLE WATER SYSTEM P1. Specify which fixtures are for private use and which are for

More information

APPENDIX L ALTERNATE PLUMBING SYSTEMS

APPENDIX L ALTERNATE PLUMBING SYSTEMS ALTERNATE PLUMBING SYSTEMS L 1.0 General. L 1.1 Applicability. The intent of this appendix is to provide clarification of procedures for the design and approval of engineered plumbing systems, alternate

More information

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18 NAVFAC PTS-D20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-D20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION D20 PLUMBING 02/18 NOTE: This section

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

SPRINGS AT HAMMOCK COVE

SPRINGS AT HAMMOCK COVE PLUMBING SPECIFICATIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY FITTINGS AS REQUIRED BY ALL APPLICABLE CODES AND GOVERNING AUTHORITIES. WORK COVERED BY THIS DOCUMENT INCLUDES LABOR,

More information

Mechanical/Plumbing Specification

Mechanical/Plumbing Specification Mechanical/Plumbing Specification Contents WC-1 Toilet 3 WC-1 Fixtures - Toilet Seat & Toilet Supply 4 UR-1 Urinal 5 UR-1 Fixtures - Metering Valve & Vacuum Breaker 7 - Wall Cleanout & Urinal Carrier 9

More information

GENERAL PLUMBING REQUIREMENTS

GENERAL PLUMBING REQUIREMENTS 22 00 00 GENERAL PLUMBING REQUIRMENTS i. 00 00 07 Design Professional Design Process Requirements ii. 00 00 08 Design Professional Documentation Requirements and Deliverables iii. 00 00 13 Designing Learning

More information

Project General Notes DESCRIPTION ABBREVIATIONS AIR CONDITIONER ABOVE FINISHED FLOOR BALANCING DAMPER

Project General Notes DESCRIPTION ABBREVIATIONS AIR CONDITIONER ABOVE FINISHED FLOOR BALANCING DAMPER G T D-X 000/000 DOMESTIC COLD WATER PIPE DOMESTIC HOT WATER PIPE DOMESTIC HOT WATER RETURN PIPE NATURAL GAS PIPE SANITARY VENT PIPE SANITARY PIPE DUCT SMOKE DETECTOR RELAY COIL THERMOSTAT TEMPERATURE SENSOR

More information

Ventilation Requirements Schedule SCHEDULE BASED ON IMC 2009

Ventilation Requirements Schedule SCHEDULE BASED ON IMC 2009 Ventilation Requirements Schedule SCHEDULE BASED ON IMC 2009 occupancy Gross OccupantsOccupancy Minimum O/A Effectiveness Table 403.3. Single Zone System plumb Minimum Exhaust Actual unit operating conditions

More information

1 Exam Prep Plumber s Handbook Tabs and Highlights

1 Exam Prep Plumber s Handbook Tabs and Highlights 1 Exam Prep Plumber s Handbook Tabs and Highlights These 1 Exam Prep Tabs are based on the Plumber s Handbook Revised 2006. Each Tabs sheet has five rows of tabs. Start with the first tab at the first

More information

G101 SCHOOL AIR CONDITIONING UPGRADE - PROJECT #3 SUNSET ELEMENTARY COOLING UPGRADE 2014 NORTH 250 WEST SUNSET, UTAH 84015

G101 SCHOOL AIR CONDITIONING UPGRADE - PROJECT #3 SUNSET ELEMENTARY COOLING UPGRADE 2014 NORTH 250 WEST SUNSET, UTAH 84015 DRAWING INDEX GENERAL G0 PLUMBING P00 P0A P0B P0C P0A P0A P0B COVER SHEET PLUMBING LEGEND AND GENERAL NOTES PLUMBING PLAN PLUMBING PLAN PLUMBING PLAN PLUMBING ROOF DEMOLITION PLAN PLUMBING ROOF REMODEL

More information

CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE APPENDIX A - RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM 1 2 1/AC AC SS SS/CC

CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE APPENDIX A - RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM 1 2 1/AC AC SS SS/CC CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE APPENDIX A - RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM Adopting Agency BSC SFM HCD DSA OSHPD CSA DPH AGR DWR CA 1 2 1/AC AC SS SS/CC 1 2 3 4 Adopt

More information

WARRANTY POLICY & RECOMMENDED MAINTENANCE

WARRANTY POLICY & RECOMMENDED MAINTENANCE WARRANTY POLICY & RECOMMENDED MAINTENANCE WARRANTY POLICY The following information will explain the plumbing components and warranty coverage for the plumbing systems and fixtures in your new home. It

More information

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc Inspection Report 1 Inspection Way Orlando, FL 32825 Prepared for: Wanda Figueroa Prepared by: Page 1 of 25 Needs Service Summary This summary is not the entire report. The complete report may include

More information

Read Only Document Not For Distribution

Read Only Document Not For Distribution Chapter 5 Traps, Cleanouts and Backwater Valves 5.1 SEPARATE TRAPS FOR EACH FIXTURE a. Plumbing fixtures shall be separately trapped by a water seal trap placed as close as possible to the fixture outlet.

More information

ABV AD AFF CO CODP COTG COWP CW DN EWC FD HB HW

ABV AD AFF CO CODP COTG COWP CW DN EWC FD HB HW TA WASTE VENT WALL MOUNTED WATER CLOSET WITH WC ELONATED BOWL AT ADA HEIHT " " " UR LAV SK SH TMV MSB WMB WASHIN MACHINE SUPPLY " /" /" /" AND DRAIN FIXTURE NOTES: WALL HUN, WALL OUTLET, VITREOUS CHINA

More information

TUBS & SURROUNDS FIBERGLASS TUB STANDARD FIBERGLASS GARDEN TUB

TUBS & SURROUNDS FIBERGLASS TUB STANDARD FIBERGLASS GARDEN TUB TUBS & SURROUNDS FIBERGLASS TUB STANDARD One-piece design for a clean, simple design; left, right, or center drain. 309525 54 x 28 Center White 309530 54 x 28 Center Bone 309535 54 x 28 LH Bone 309540

More information

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18 NAVFAC PTS-D20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-D20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION D20 PLUMBING 02/18 NOTE: This section

More information

Building Utilities 1 Plumbing and Sanitary Systems

Building Utilities 1 Plumbing and Sanitary Systems Building Utilities 1 Plumbing and Sanitary Systems Taken from UST Architecture exams by Arch. Rafael Alli Recommended review material for UST Preboard Exam Prepared by: arkireviewph.multiply.com Types

More information

PLUMBING REQUIREMENTS

PLUMBING REQUIREMENTS PLUMBING REQUIREMENTS This handout is a compilation of the standard requirements based on the State Plumbing Code and City Ordinance for projects of this type. This information sheet does not contain all

More information

2). Crane Co. 4). Kohler Co. 5). Universal-Rundle Corp. Revised September 29, 2017 Commercial Plumbing Fixtures

2). Crane Co. 4). Kohler Co. 5). Universal-Rundle Corp. Revised September 29, 2017 Commercial Plumbing Fixtures PART 1: GENERAL A. This Section provides design standards for plumbing fixtures and trim. Certification of compliance with specified ANSI, UL, and ASHRAE Standards will be required, as appropriate, for

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

CHAPTER 31. VENTS Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 425R

CHAPTER 31. VENTS Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 425R CHAPTER 31 VENTS Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 425R This page left intentionally blank. 426R 2003 INTERNATIONAL RESIDENTIAL CODE For SI: PIPE SIZE (inches) TABLE P3107.3 COMMON VENT SIZES

More information

SECTION DOMESTIC WATER PIPING SPECIALTIES

SECTION DOMESTIC WATER PIPING SPECIALTIES SECTION 22 11 19 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

2. All necessary storm and sanitary pumps shall be tied into emergency power, and sump levels shall be monitored electronically through the B.A.S.

2. All necessary storm and sanitary pumps shall be tied into emergency power, and sump levels shall be monitored electronically through the B.A.S. DIVISION 22 00 00 22 30 00 EQUIPMENT Page 1 of 10 22 30 00 EQUIPMENT 22 01 01 GENERAL REQUIREMENTS General 1. All plumbing shall comply with the B.C. Plumbing Code. 1. Avoid the use of storm pumps and

More information

2015 UPC Chapter 8 Indirect Wastes RV

2015 UPC Chapter 8 Indirect Wastes RV PLEASE DO NOT BOOKMARK ANY ANYTIMECE WEBPAGES! Our system will remember the last page you viewed when logging out and back in but please DO NOT exit out when taking a test. Your place will NOT be saved.

More information

c. Direct or indirect?

c. Direct or indirect? ~ \ 1.) GENERAL a. Definitions: Chapter B Code References (1) Air-break Comm 81.01 (5) (2) Air-gap, drain system Comm 81.01 (6) (3) Flood level rim Comm 81.01(102) (4) sink Comm 81.01(105) (5) Indirect

More information

ASME STANDARDS IN MODEL CODES

ASME STANDARDS IN MODEL CODES STANDARDS IN MODEL CODES ASME Name Model Code With Year of Referenced IPC IRC UPC 2009 NSPC A112.1.2 Air Gaps in Plumbing 2004 2004 2004 2004 A112.1.3 Air Gap Fittings For Use With Plumbing, Appliances

More information

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet Perkins Statewide Articulation Agreement Documentation item: Secondary Task List Coversheet The Secondary School agrees to: A. Implement the approved PDE Program(s) of Study. B. Provide assessment of student

More information

SECTION PLUMBING SPECIALTIES

SECTION PLUMBING SPECIALTIES DIVISION 22 PART 1 GENERAL 1.01 SCOPE SECTION 22 0430 PLUMBING SPECIALTIES A. Domestic water, sewer, roof drainage and condensate drains, including piping, equipment and all necessary accessories as designated

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

1 Exam Prep Plumbing State Contractors Practice Exam 2

1 Exam Prep Plumbing State Contractors Practice Exam 2 1 Exam Prep Plumbing State Contractors Practice Exam 2 1 According to Chapter 64E-6, when sizing a grease interceptor used in a restaurant, the correct formula is. A. (S) x (EW 12) x (LF) B. (S) x (GS)

More information

Plumbing. September 8, 2018 Prices and product availability are subject to change without notice. 32" Curved Shower Pan with Round Front - Parchment

Plumbing. September 8, 2018 Prices and product availability are subject to change without notice. 32 Curved Shower Pan with Round Front - Parchment Page 1 of 19 Plumbing 32" Shower Surround with Wainscot Design - 32" Curved Shower Pan with Round Front - $128.00 (df-323244891) Dual Lever Pull Out Spout Kitchen Faucet - Venetian Bronze $108.74 (725110-VB)

More information

PRICE BOOK CONTENTS 010 PIPE

PRICE BOOK CONTENTS 010 PIPE 010 PIPE 010 Buttweld Pipe 020 ERW 2-24 Pipe 030 Domestic Seamless Pipe 2-12 040 Domestic OD Seamless 14-24 Pipe 050 Pressure Pipe A106 060 Fusion Bond Pipe 080 Cut To Order Pipe 020 STAINLESS STEEL PIPE

More information

FEATURES. Other Fed-Flush Arrangements

FEATURES. Other Fed-Flush Arrangements Brochure # 0710 TYPE TYPE... VSAF SEWAGE EJECTOR SYSTEM Flows to 600 gpm, Heads to 120, 1 thru 40 HP. Discharge size 4, 1750 and 1150 RPM, strainer in discharge pipe. HIGHLIGHTS Installations where rags

More information

PLUMBING FIXTURES Reserved

PLUMBING FIXTURES Reserved CHAPTER 27 PLUMBING FIXTURES Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 395R This page left intentionally blank. 396R 2003 INTERNATIONAL RESIDENTIAL CODE SECTION P2708 SHOWERS P2708.1 General. Shower

More information

DeCA DESIGN CRITERIA HANDBOOK PLUMBING SYSTEMS

DeCA DESIGN CRITERIA HANDBOOK PLUMBING SYSTEMS GENERAL 1.01 Summary A. The plumbing system shall include sanitary drainage, waste, and vent piping; roof drains and interior downspouts; domestic cold water, hot water, and hot water recirculating piping;

More information

8 Kitchen Gooseneck. 4 Lavatory/Shower. 8 Shower. Adjustable Garden Tub. Diverter Spring & Spool Diverter Knob Plastic Aerator Speedy Locknut

8 Kitchen Gooseneck. 4 Lavatory/Shower. 8 Shower. Adjustable Garden Tub. Diverter Spring & Spool Diverter Knob Plastic Aerator Speedy Locknut 8 Kitchen 8 Kitchen Gooseneck 4 Kitchen 10979 Chrome 10991 Chrome 10991W White 10987 Chrome 4 Lavatory 4 Lavatory/Shower 8 Tub/Shower 10983 Chrome 10983W White 10988 Chrome 10981 Chrome 4 Tub/Shower 8

More information

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18 NAVFAC PTS-D20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-D20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION D20 PLUMBING 02/18 NOTE: This section

More information

Willoughby Industries - Security Products

Willoughby Industries - Security Products TOILET WASTE LOCATION (ECW)- WALL OUTLET (ECF)- FLOOR OUTLET TOILET ORIENTATION (L)- ANGLED LEFT (L)- OFFSET LEFT (R)- ANGLED RIGHT (R)- OFFSET RIGHT (C)- CENTER FIXTURE MOUNTING (OF)- OFF FLOOR (ON)-

More information

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS City of Redwood City Community Development Department Building and Inspection Department 1017 Middlefield Road Redwood City, CA 94063 Phone (650) 780-7350 2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY

More information

GRILLE, REGISTER AND DIFFUSER SCHEDULE

GRILLE, REGISTER AND DIFFUSER SCHEDULE ROOFTOP UNIT SCHEDULE (NATURAL GAS HEAT) MARK MANUFACTURER MODEL SUPPLY FAN COOLING COIL HEAT EXCHANGER MIN. MIN. MCA MOCP V/PH WEIGHT NOTES FAN CFM MIN ESP REFR. TH SH EAT LAT MIN. OUTPUT MIN. EFF. NOM.

More information

STACKS AND STACK VENTS

STACKS AND STACK VENTS CHAPTER 9 VENTS SECTION 901 GENERAL 901.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of vent systems. 901.2 Trap seal protection. The plumbing

More information

CHAPTER 9 VENTS. run undiminished in size and as directly as possible from the building drain through to the open air above the roof.

CHAPTER 9 VENTS. run undiminished in size and as directly as possible from the building drain through to the open air above the roof. CHAPTER 9 VENTS SECTION 90 GENERAL run undiminished in size and as directly as possible from the building drain through to the open air above the roof. 90. Scope. The provisions of this chapter shall govern

More information

Yale University Design Standards

Yale University Design Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 3/26/13 Add text encouraging discussion of innovation in 2 15410, A (Summary) SO newly available products. 3/26/13

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

Work Order Number PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20

Work Order Number PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 NAVFAC PTS-D20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-D20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION D20 PLUMBING 02/18 NOTE: This section

More information

PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE Dry Vacuum System Part Numbers V3, V5, V7, 2V3, 2V3CT, 2V5, 2V5CT, 2V7, 3V5 and 4V5 PRE-INSTALLATION GUIDE All pumps comply with NFPA 99C level 3 requirements. All installations must conform to local codes.

More information

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12" 12" 24"

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12 12 24 SOUTH TEJON ST., SUITE 00 COLORADO SPRINGS, CO. 00 TELE.: FAX: WALL ESCUTCHEON PACK ANNULAR SPACE WITH MINERAL WOOL GENERAL NOTES. THIS PROJECT INCLUDES THE DESIGN AND PROVISION OF A NEW WET SPRINKLER

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

1. Division 22 Section "Emergency Plumbing Fixtures." 2. Division 22 Section "Drinking Fountains and Water Coolers."

1. Division 22 Section Emergency Plumbing Fixtures. 2. Division 22 Section Drinking Fountains and Water Coolers. Page 224000-1 SECTION 224000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Plumbing and Drainage

Plumbing and Drainage Dufferin-Peel Catholic District School Board STANDARD TEXT FOR Plumbing and Drainage for ELEMENTARY AND SECONDARY SCHOOLS Prepared by the Plant Department Formatted by the Design Department THE INFORMATION

More information

AIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015

AIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015 1.1 GOALS The goal of this section is to provide guidance in the design of Plumbing and Fire Protection systems to LAWA standards. The LAWA Plumbing Design Standards are a compilation of general design

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information