2 THE QPL UFH EXTENSION KIT The Qual-PEX underfloor heating ytem i perfectly uited to a ingle area extenion up to 40qm in floor area. It i deigned to link into an exiting radiator heating ytem or alternatively it can be run a a eparate ytem providing the benefit of an efficient and cot effective heating ytem. Thi type of heating ytem may be ued in conjunction with any oil or ga fired boiler or even a geo-thermal heat pump ytem. It i not recommended however to run the ytem from a olid fuel heat ource. A typical double loop etup i hown below (fig 1). Pleae note the pipe length mut be of equal length. CUTTING LIST AREA LOOP LENGTH (m 2 ) Loop 1(m) Loop 2(m) Table 1 The Qual-PEX underfloor heating extenion kit comprie: Pre-aembled QPL UFH Control Unit including thermotatic mixing valve, pump and ervice valve. 15mm compreion fitting to connect to exiting pipework A ingle programmable room thermotat (pre wired) White platic cover box 2 x 100m of 15mm red Qual-PEX Barrier Pipe. An optional floor fixing pack i alo available and contain enough rapid rail fixing length and clip to cover an area of up to 40q metre Alternatively wire meh and cable tie may be ued to ecure the pipe. Connection of Qual-PLUMB Puhfit fitting A. Cut the pipe quare and remove any rough edge or burr. B. Puh a pipe inert into platic pipe. C. Puh the pipe firmly into the connector D. Pull on the pipe to enure a ecure joint i made A. B. C. D.

3 INSTALLATION GUIDE LINES The following guideline mut be adhered to when intalling the Qual-PEX Underfloor heating control unit and 15mm Qual-PEX Barrier Pipe. The ite mut firt be prepared thoroughly. Enure that the ub floor i level and dut free throughout. Intall a layer of rigid inulation on the ubfloor. The urface on which the inulation i laid hould be flat and even. Inulation thickne mut meet building regulation, currently 0.15 W/m 2 K reulting in roughly 100mm foil backed polyurethane. Fig 12 A 25mm edge inulation hould be intalled around exterior wall up to the finihed floor level. (fig 12) Lay the rapid rail fixing ytem on the inulation, pacing the rail out approximately 1.5m apart. Ue ome of the rapid rail clip to hold the rapid rail in poition on the inulation. Lay the pipe in a loop pattern imilar to figure 1.by clipping them into the rapid rail. Fig 13 Remember to ue ome rapid rail clip to hold the pipe in place around any bend. The minimum bend radii for Qual-PEX 15mm pipe i 100mm uing pipe clip. (fig 13) The pipe hould be laid at 200mm (8 ) centre in two loop of equal length according to the cutting lit (table 1). A imple up / down pattern i quicket and mot imple format to follow. The notche on the rapid rail are at 1" centre, o clip the pipe into every eight (8th) notch (20 qm). Viually inpect the pipe for any damage before any creed i poured. A normal floor creed (4:1) and and cement i to be ued to cover the pipe. The minimum depth of creed above the inulation i 65mm and the maximum i 100mm.

4 TO SECURE THE UFH CONTROL UNIT TO THE WALL Mark out the location of the UFH unit on the wall. (fig 2) The UFH unit mut be poitioned uch that it i eaily acceible. (fig 3) The unit i to mounted in the upright poition with the pump outlet facing the ground and the backplate fluh againt the wall. (fig 3) 2. It hould be mounted approx 6" - 10" off the ground and ecured to the wall uing the crew upplied. (fig 3) TO CONNECT THE UFH PIPES TO THE UFH CONTROL UNIT 3. Connect both double loop adaptor to the puhfit outlet of the UFH control unit a per intruction encloed with double loop adaptor. Connect the two Qual-PEX 15mm UFH flow pipe to the pump outlet uing the two Qual- PLUMB fitting and pipe inert and ecure. (fig 4) (ee puhfit fitting intruction) Once the pipe are laid in a imilar pattern a hown in figure 1, bring the open end of the coil back to the UFH control unit and connect to the Qual-PLUMB fitting at the return ide. (fig 5) 4. If the pipe are too long carefully cut back the exce pipe until it i the correct length to fit into the puhfit fitting on the cold water ervice valve (fig 5), alway make ure that both loop are the ame length. The underfloor pipe i now connected to the control unit. 5.

5 TO CONNECT THE UFH CONTROL UNIT TO YOUR EXISTING HEATING SYSTEM Drain down the entire heating ytem before commencing connection of UFH control unit to the exiting ytem. (If unure how to carry out thi operation pleae contact a qualified plumbing contractor ) Supply from below : Connect the upply pipework from the boiler / radiator circuit to the 15mm copper tube uing the 15mm compreion fitting. (fig 6) Note: If connecting to 22mm or Irih copper a uitable adaptor will need to be purchaed. Ue the ilver flexi-hoe and connect thi to the top outlet of the cold water ervice valve uing the 15mm compreion fitting. (fig 7) Bend the flexi-hoe down and under the pump and connect to the return pipework from the boiler / radiator circuit uing the 15mm compreion fitting on the hoe end. (fig 8) Supply from above : Connect the return pipework from the boiler / radiator circuit uing the 15mm compreion fitting on the cold water ervice valve. (fig 9) 9 Ue the upplied flexi-hoe and connect thi to the end of the copper tube. (fig 10) Bend the flexi-hoe up and under the pump and connect the upply pipework from the boiler / radiator circuit to the end of thi uing the 15mm compreion fitting. (fig 11) The underfloor control kit i now connected to the exiting heating ytem. Purge fill the entire heating ytem by opening the butterfly valve fully on the hot water ervice valve. (If unure how to carry out thi operation pleae contact a qualified plumbing contractor ) 10 11

6 Sytem Preure Teting. (Mandatory for guarantee to be valid.) The purpoe of ytem teting i to identify any point where leakage occur at a time when they can be repaired a eaily a poible, regardle of their caue. Teting take place immediately after firt fix intallation, and before the pipework i completely covered over. For puh-fit ytem high and low preure teting i mandatory. Low-preure tet = 3 Bar (air or water) for 15 minute. High-preure tet = 6 Bar (air or water), or a preure equal to 1.5 time the preure relief valve etting whichever i the greater for 1 hour. N.B : When teting i complete, the tet preure i dicharged from the ytem, where there i a rik of freezing condition. The drying out time for the creed i approx 2-3 week After thi period of time the heating may be witched on and the temperature lowly increaed until the deired room temperature i achieved. PIPE REPAIR If you have damaged the pipe and need to make a repair to it, follow the tep by tep intruction: Cut out the damaged ection of pipe (approximately 2" at either ide of the damaged pipe) Quality Platic recommend the ue of a pipe cutter pecifically deigned for platic pipe. Puh the Qual-PEX upport inert into the pipe it will ait in re-rounding the pipe after the cutting action. The inert will upport the pipe in the joint. Follow one of the following method: 1. Puh the Qual-PEX pipe into the compreion fitting without removing the capnut and compreion ring until it make firm contact with the pipe top in the body of the fitting. 2. Remove the caput and ring from the fitting, place on Qual-PEX pipe in logical order and inert the pipe fully into the fitting. In both cae, tighten the capnut by hand a far a poible and then a further 1.5 turn with a panner / wrench. Once the pipe ha been repaired back fill around the pipe with fine and up to the top of the pipe and then pour the creed directly over the affected area. Note : Once the joint ha been made a gauze or wrapping may be wrapped around the pipe to enure a tight eal.

7 FLOOR COVERINGS Tile: If a tile covering i to be ued then the tiling contractor mut be informed of the floor tructure and intall an indutry approved lip membrane (1000 gauge) in thi application. The tiling contractor hould alo ue a tile adheive which i approved for ue with underfloor heating. Carpet: Carpet and underlay are by deign, thermal inulator, o it i bet to ue a combination of a good quality thin carpet with a good quality underlay. The underlay hould be rubber and free of any oily compound which may leak out and degrade over time. Floating Timber Floor: Pre finihed floating wood floor are an excellent alternative to traditional wood flooring, becaue of the impler floor contruction and eae of intallation. Ue board narrower than 70mm. The narrower the board the le hrinkage that will occur. It i very important to ue an adheive that i uitable for underfloor heating when laying a floating timber floor. COMMISSIONING THE SYSTEM The mixing valve upplied a part of the conervatory heating pack ha a temperature etting range of between 35ºC and 60ºC and hould be et a to enure that the floor urface temperature hould never exceed 29ºc. The creed mut be allowed to dry out fully before the ytem i commiioned *Setting 2 : for creeded application only (TILE) *Setting 3 : for non- creeded application (TIMBER) *Setting 4 : for non-creeded application only (CARPET) SYSTEM CONTROL & WIRING Once the pipe and pump control are intalled mark the poition on the wall to fit the room thermotat. Remove the room thermotat from it box. Make ure it i approx 1.5m from the ground, out of direct unlight and free from any draught. Cut a channel or "chae" the wall to take the room thermotat cable (3m upplied) which i already connected to the terminal box on the control unit. The thermotat may then be et to the deired indoor room temperature, giving independent temperature and time control to the conervatory. The underfloor heating will only operate when the exiting radiator heating i timed on and ha heated up to approx 42ºc, therefore the on / off time of the exiting heating ytem may need to be adjuted. Likewie it will witch off when the central heating time out and the water temperature drop to about 31ºc. The upplied room thermotat allow the underfloor heating to be witched off independently of the radiator circuit once the conervatory ha reached the deired temperature e.g. on a unny day. Set the thermotat to the deired indoor air temperature (approx 19ºc 21ºc). (ee thermotat operating intruction for etup and correct uage) (fig. 14) Thi unit ha 4 uer-adjutable time program and 9 pre-programmed time program' built in. Thee are the running time of the unit and at the end of each time cycle the thermotat will witch off the pump and the unit will witch off until the next ON period in the time cycle. The 9 pre-program are : Prog 1 : 7 am-9 am and 5pm-11pm. Prog 2 : 7am-9am, 12pm-2pm, 6pm-11pm. Prog 3 : 12am-6am and 11pm-12pm. Prog 4 : 3pm-11pm. Prog 5 : 6am-8am and ON 9pm-11pm. Prog 6 : 6am-8am and ON 2pm-9pm. Prog 7 : 7am-7pm. Prog 8 : 8am-7pm. Prog 9 : 12am-7am. 14 The platic cover box may now be placed over the control pack and ecured to the wall uing fixing crew. To operate the ytem imply plug the unit into an electrical ocket and enjoy the full benefit of underfloor heating. (fig 15) 15

8 FEATURES OF QUAL-PEX UNDERFLOOR HEATING SYSTEM CONTROL UNIT Comfortable even temperature throughout Efficient on fuel due to lower operating temperature Healthier environment with le dut being circulated Safer - no hot panel or dangerou hard edge No retriction on interior deign layout Low maintenance Maximum uable floor pace Excellent value for money Independent temperature control for conervatory Qual-PEX 15mm Barrier Pipe i BSI Kitemark approved for ue under the ervice condition lited in BS 7291 : Part 1 : 1990 Cla S. 12 bar at 20C - 4 bar at 82ºC - 3 bar at 92ºC and hort term overload temperature of 114ºC and i guaranteed for 50 year Pipelife UK 13 Saxon Way Eat, Oakley Hay Indutrial Etate, Corby, Northant, NN18 9EY, Great Britain, info@pipelife.co.uk Phone : , Fax : QUALITY PLASTICS LTD P.O. Box 29,White Cro, Cork, Ireland, qpl@qpl.ie Phone : , Fax :

Installation, Operation and Maintenance Manual

Installation, Operation and Maintenance Manual PRODUCT MANUAL TR200009.r1 Stainle Steel Range SSB, SSI and SST Serie Intallation, Operation and Maintenance Manual P R A C T I C A L, E F F I C I E N T & S U S TA I N A B L E BUILDING SERVICES SOLUTIONS

More information

Stainless Steel Range

Stainless Steel Range PRODUCT MANUAL TR200009.r2 Stainle Steel Range SSB, SSI, and SST Intallation, Operation, and Maintenance Manual PRACTICAL, EFFICIENT & SUSTAINABLE BUILDING SERVICES SOLUTIONS Warning Thi manual hould be

More information

F890. Relcom Installation Instructions. 8 Segment Redundant Fieldbus Power Supply for use with non-proprietary cabled systems

F890. Relcom   Installation Instructions. 8 Segment Redundant Fieldbus Power Supply for use with non-proprietary cabled systems F890 8 egment Redundant Fieldbu Power upply for ue with nonproprietary cabled ytem F890P Intallation Intruction Relcom www.mtlfieldbu.com CONTENT PAGE 1 OVERVIEW 1 2 DECRIPTION 1 3 COMPONENT AND ACCEORIE

More information

F892. Relcom Installation Instructions. 8 Segment Redundant Fieldbus Power Supply for use with non-proprietary cabled systems

F892. Relcom  Installation Instructions. 8 Segment Redundant Fieldbus Power Supply for use with non-proprietary cabled systems F892 8 egment Redundant Fieldbu Power upply for ue with nonproprietary cabled ytem F892P Intallation Intruction Relcom www.mtlfieldbu.com CONTENT PAGE 1 OVERVIEW 1 2 DECRIPTION 1 3 COMPONENT AND ACCEORIE

More information

FREE & FORCED CONVECTION HEAT TRANSFER

FREE & FORCED CONVECTION HEAT TRANSFER FREE & FORCED CONVECION HEA RANSFER Objective he objective of thi experiment are: (1) o demontrate the relationhip between power input and urface temperature in free convection (2) o demontrate the relationhip

More information

Bulk Handling of Paraplex and Plasthall Plasticizers

Bulk Handling of Paraplex and Plasthall Plasticizers Bulk Handling of Paraplex and Plathall Platicizer Buying and handling platicizer in bulk i attractive becaue the reulting cot per pound i alway lower than the cot in drum quantitie. Other advantage include

More information

1/2" [15mm] HANGER ROD SECURED TO STRUCTURE ABOVE (TYP) BOSS FOR HANGER ROD WELDED. [1200mm] CC SPACING (TYP)

1/2 [15mm] HANGER ROD SECURED TO STRUCTURE ABOVE (TYP) BOSS FOR HANGER ROD WELDED. [1200mm] CC SPACING (TYP) 1/2" [15mm] HANGER ROD ECURED TO TRUCTURE ABOVE (TYP) TURNBUCKLE (TYP) PREFAB. CEILING PANEL A PECIFIED BO FOR HANGER ROD WELDED TO CHANNEL. MAX. 4'-0" [1200mm] CC PACING (TYP) 3" [75mm] 5 U CHANNEL LOCATED

More information

Sinumerik 808D Service Guide

Sinumerik 808D Service Guide Training manual Sinumerik 808D Service Guide Verion 2013-01 Note Service guide 808D Lit For Service cae of hardware Go to page 7 Service cae of For Go to page 23 PLC alarm For Service cae of NC program

More information

Vista Underground Distribution Switchgear Outdoor Distribution. Pull Box Specifications for UnderCover Style

Vista Underground Distribution Switchgear Outdoor Distribution. Pull Box Specifications for UnderCover Style Vita Underground Ditribution Outdoor Ditribution Pull Box Specification I. GENERAL 1.1 The pull box for the witchgear hall be deigned, detailed, and fabricated in accordance with the requirement of thi

More information

PANIC EXIT HARDWARE DX-200 Serie

PANIC EXIT HARDWARE DX-200 Serie PANIC EXIT HARDWARE DX-200 Serie Explanation of European tandard The tandard EN 1125 and EN 179 were created at the European level with the acceptance and cooperation of the Dutch tandard committee. The

More information

CATERING SPARES. T: W:

CATERING SPARES. T: W: CATERING SPARES T: 0845 688 7122 W: www.undercontrol.co.uk At Under Control Intrument we are upplier of catering equipment and pare. We are upplier to many catering equipment manufacture, re-eller and

More information

25iSA. United States Patent (19) 4,614,303. Sep. 30, Moseley, Jr. et al.

25iSA. United States Patent (19) 4,614,303. Sep. 30, Moseley, Jr. et al. United State Patent (19) Moeley, Jr. et al. (54) 76) 21 22 (51) 52) (58) (56) WATERSAVING SHOWER HEAD Inventor: Charle D. Moeley, Jr., P.O. Box 449, Lynchburg, Va. 2; Charle D. Waring, 3952 Boworth Dr.

More information

RTU 02 S x14. 16x16. 18x20 RTU x20. 10x14 S-1. MAU 01 12x12

RTU 02 S x14. 16x16. 18x20 RTU x20. 10x14 S-1. MAU 01 12x12 YMBOL & ABBREV. T D Ø DL UC M E ME A/UP RA/RET EA/EH CD/R RR/RG ER/EG FC MVD FD (L) FLE T-TAT T-TAT D DIA. DL UC UPPLY AIR (RIE/DROP) RETURN AIR DUCT (RIE/DROP) EHAUT AIR DUCT (RIE/DROP) CEILING DIFFUER/UPPLY

More information

(12) United States Patent (10) Patent No.: US 8,181,474 B2

(12) United States Patent (10) Patent No.: US 8,181,474 B2 US008181474B2 (12) United State Patent (10) Patent No.: US 8,181,474 B2 Chen (45) Date of Patent: May 22, 2012 (54) SOLAR-POWERED AIR CONDITIONER RE34,542 E * 2/1994 Rockenfeller... 165,104.12 USING AMIXTURE

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Unit 1 79 Friar Street Worcester WR1 2NT Tel: 01905 616 928 Fax:01905 611 240 E-mail: info@underfloorheatingsystems.co.uk Website: www.underfloorheatingsystems.co.uk ngsystems.co.uk

More information

INT 69 YF Diagnose. Application. Functional description

INT 69 YF Diagnose. Application. Functional description INT 69 YF Diagnoe Application The motor protector INT69 YF Diagnoe i a univeral and veratile protection unit. For the monitoring of electrical component, variou input for temperature, voltage, leakage/reitance

More information

REMKO ATK 25. Automatic oil heater with built-in oil burner, tank and exhaust gas connection. Operation Technology Spare Parts.

REMKO ATK 25. Automatic oil heater with built-in oil burner, tank and exhaust gas connection. Operation Technology Spare Parts. REMKO ATK 25 Automatic oil heater with built-in oil burner, tank and exhaut ga connection Operation Technology Spare Part Edition GB-D05 Content Safety Notice 4 Environmental Protection and Recycling

More information

INSTALLATION GUIDE XR150/XR550 SERIES CANADIAN CONTROL PANEL

INSTALLATION GUIDE XR150/XR550 SERIES CANADIAN CONTROL PANEL INSTALLATION GUIDE XR150/XR550 SERIES CANADIAN CONTROL PANEL MODEL XR150CAN/XR550CAN Serie CANADIAN INSTALLATION GUIDE INDUSTRY CANADA NOTICE Thi Cla A digital apparatu complie with Canadian ICES-003.

More information

INSTALLATION INSTRUCTIONS ONE LARGE ZONE

INSTALLATION INSTRUCTIONS ONE LARGE ZONE INSTALLATION INSTRUCTIONS ONE LARGE ZONE Unit 1 79 Friar Street Worcester WR1 2NT Tel: 01905 354 791 Fax: 01905 352 100 E-mail: info@underfloorheatingsystems.co.uk Website: www.underfloorheatingsystems.co.uk

More information

United States Patent (19)

United States Patent (19) United State Patent (19) Hopkin (11 Patent Number: () Date of Patent: Aug. 23, 1988 54 MICROWAVE HIGHWAY PAINT DRYING APPARATUS 76 Inventor: Harry C. Hopkin, Rte. 5, Box 883, Williamton, N.C. 27892 (21)

More information

(12) Patent Application Publication (10) Pub. No.: US 2009/ A1

(12) Patent Application Publication (10) Pub. No.: US 2009/ A1 (19) United State US 20090266567A1 (12) Patent Application Publication (10) Pub. No.: US 2009/0266567 A1 Muer, JR. (43) Pub. Date: Oct. 29, 2009 (54) FIRE SUPPRESSION DEVICE (76) Inventor: John E. Muer,

More information

United States Patent (19)

United States Patent (19) United State Patent (19) Thompon (54) Two STAGE COOLING TOWER 75 Inventor: Tommy L. Thompon, Tucon, Ariz. 73 Aignee: Planetary Deign Corporation, Tucon, Ariz. (21) Appl. No.: 505,767 (22 Filed: Apr. 6,

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS ISTALLATIO ISTRUCTIOS Unit 1 79 Friar Street Worcester WR1 2T Tel: 01905 616 928 Fax:01905 611 240 E-mail: info@underfloorheatingsystems.co.uk Website: www.underfloorheatingsystems.co.uk 1. Installation

More information

Tenney Seri LRE.com

Tenney Seri LRE.com 800-574-2748 LRE.com Tenney Seri 1111 -------,------- The Tenney Serie Chamber employ leading edge technology to upply our cutomer with the mot efficient and environmentally friendly tet equipment poible.

More information

Gas burner controls. Building Technologies HVAC Products

Gas burner controls. Building Technologies HVAC Products 7 106 Ga burner control LME39... Ga burner control for the uperviion of 1- or 2-tage ga burner of mall to medium capacity (typically up to 350 kw), in intermittent operation. The LME39 and thi Data Sheet

More information

PRAIRIE VIEW A&M UNIVERSITY AUSTIN GREAUX ENGINEERING BUILDING CHANCELLOR'S RESEARCH INITIATIVE RENOVATION PRAIRIE VIEW, TEXAS 77445

PRAIRIE VIEW A&M UNIVERSITY AUSTIN GREAUX ENGINEERING BUILDING CHANCELLOR'S RESEARCH INITIATIVE RENOVATION PRAIRIE VIEW, TEXAS 77445 C C C PRAIRIE VIEW A&M UNIVERITY GENERAL NOTE: THE INTENT I TO HAVE NO EXPOED WIRING, CONDUIT OR CABLE ON WALL OR IN OPEN CEILING. ARCHITECT I URRING OUT WALL WHERE VERTICAL CONDUIT RUN ARE NEEDED. I THERE

More information

DUCT INSTALLATION 2. INSTALL DUCTS ACCORDING TO SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE" UNLESS OTHERWISE INDICATED.

DUCT INSTALLATION 2. INSTALL DUCTS ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE UNLESS OTHERWISE INDICATED. CU, HP- CU, HP- EF- DUCTWORK - AIR TERMINAL " IDEW GRILLE TAP WITH MANUAL VOLUME DAMPER, RND DUCTWORK - EQUIPMENT M BDD D EDH- FIRE DAMPER NOTE: RUNOUT IZE TO ROUND NECK DIFFUER I THE AME IZE A THE DIFFUER

More information

A HOLLOW FIBER MEMBRANE-BASED LIQUID DESICCANT AIR DEHUMIDIFICATION SYSTEM FOR SOLAR ENERGY RECLAMATION

A HOLLOW FIBER MEMBRANE-BASED LIQUID DESICCANT AIR DEHUMIDIFICATION SYSTEM FOR SOLAR ENERGY RECLAMATION SASEC01 Third Southern African Solar Energy Conference 11 13 May 01 Kruger National Park, South Africa A HOLLOW FIBER MEMBRANE-BASED LIQUID DESICCANT AIR DEHUMIDIFICATION SYSTEM FOR SOLAR ENERGY RECLAMATION

More information

INSTALLATION INSTRUCTIONS SINGLE CIRCUIT

INSTALLATION INSTRUCTIONS SINGLE CIRCUIT INSTALLATION INSTRUCTIONS SINGLE CIRCUIT Unit 1 79 Friar Street Worcester WR1 2NT Tel: 01905 616 928 Fax:01905 611 240 E-mail: info@underfloorheatingsystems.co.uk Website: www.underfloorheatingsystems.co.uk

More information

Measuring & Order Guide

Measuring & Order Guide Meauring & Order Guide SIMPLE STEPS TO A BRAND NEW VIEW Our meauring guide will take you through the tep you need to meaure your window. Jut a few imple meaurement are all you ll need and if you d like

More information

Gas burner controls. Building Technologies

Gas burner controls. Building Technologies 7 106 Ga burner control LME39... Burner control for the uperviion of 1- or 2-tage ga or ga burner of mall to medium capacity, with or without fan in intermittent operation. The LME39 and thi Data Sheet

More information

(12) Patent Application Publication (10) Pub. No.: US 2004/ A1

(12) Patent Application Publication (10) Pub. No.: US 2004/ A1 (19) United State US 2004O144124A1 (12) Patent Application Publication (10) Pub. No.: US 2004/0144124 A1 Bottom (43) Pub. Date: Jul. 29, 2004 (54) RETAIL BANANA STORAGE UNIT (76) Inventor: Kenneth H. Bottom,

More information

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes WARM WATER UNDERFLOOR HEATING SYSTEMS Guidance Notes 02 WARM WATER UNDERFLOOR HEATING SYSTEMS Introduction Underfloor heating systems consist of a series of pipes which are integrated into the floor structure

More information

Method Statement. General Site preparation by others: Preparation for screed system by others: Preparation for plate system by others:

Method Statement. General Site preparation by others: Preparation for screed system by others: Preparation for plate system by others: Method Statement. The One Stop Solution for Underfloor Heating. General Site preparation by others: Work areas to receive UFH must be watertight, dry, clean and clear of any debris or moveable obstructions.

More information

Herringbone Linked Flue System

Herringbone Linked Flue System Herringbone Linked Flue ystem INTALLATION, ERVICING AND OPERATING INTRUCTION CBU09//5-HB, RU(ERU)5-HB, RU30/35/40/45-HB RL09//5-HB,RL5-HB, RL30/35/40/45-HB Gas Fired Products (UK) Ltd. Chapel Lane, Claydon,

More information

Building Technologies Division Infrastructure & Cities Sector

Building Technologies Division Infrastructure & Cities Sector Ditribuitor: FLAE POWER SRL 021-3121727 ; 0744-340566 contact@arzatoare.ro ; www.arzatoare.ro 7 106 Burner control LE39... Burner control for the uperviion of 1- or 2-tage ga or ga / oil burner of mall

More information

OneZone. Underfloor heating range. For existing properties & new build extensions. Extensions Conservatories Single rooms HEAT PUMPS

OneZone. Underfloor heating range. For existing properties & new build extensions. Extensions Conservatories Single rooms HEAT PUMPS Extensions Conservatories Single rooms OneZone Underfloor heating range For existing properties & new build extensions UNDERFLOOR HEATING HEAT PUMPS SOLAR THERMAL Contents Warm water underfloor heating

More information

Gas Burner Controls. Building Technologies HVAC Products

Gas Burner Controls. Building Technologies HVAC Products 7 106 Ga Burner Control LME39... Ga burner control for the uperviion of 1- or 2-tage ga burner of mall to medium capacity (typically up to 350 kw), in intermittent operation. The LME39 and thi Data Sheet

More information

Building Technologies Division

Building Technologies Division 7 154 Burner control LMO39... Burner control for the uperviion of 1- or 2-tage oil burner of mall to medium capacity, with or without fan in intermittent operation. The LMO39 and thi Data Sheet are intended

More information

Cycle Analysis and Turbo Compressor Sizing With Ketone C6F as Working Fluid for Water-Cooled Chiller Applications

Cycle Analysis and Turbo Compressor Sizing With Ketone C6F as Working Fluid for Water-Cooled Chiller Applications Purdue Univerity Purdue e-pub International Compreor Engineering Conference School of Mechanical Engineering 4 Cycle Analyi and Turbo Compreor Sizing With Ketone a Working Fluid for Water-Cooled Chiller

More information

Water Underfloor Heating Kit

Water Underfloor Heating Kit Water Underfloor Heating Kit INSTALLATION MANUAL For multiple rooms 50 year pipe warranty CE approved Easy to install MULTIPLE ROOM SYSTEM INSTALLATION MANUAL Manufactured in Europe! MULTI ROOM SYSTEM

More information

UPONOR Ltd. Specification for UPONOR Q&E PEX Shrinkfit Plumbing Systems

UPONOR Ltd. Specification for UPONOR Q&E PEX Shrinkfit Plumbing Systems UPONOR Ltd Specification for UPONOR Q&E PEX Shrinkfit Plumbing Systems Reference Page(s) UPONOR Q&E PEX 2 Operating Conditions 2 Pipe Properties 2 Fittings Range 3 Radiator Heating Systems 3 H&C Water

More information

Experimental Assessment on Performance of a Heat Pump Cycle Using R32/R1234yf and R744/ R32/R1234yf

Experimental Assessment on Performance of a Heat Pump Cycle Using R32/R1234yf and R744/ R32/R1234yf Purdue Univerity Purdue e-pub International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2016 Experimental Aement on Performance of a Heat Pump Cycle Uing R32/R1234yf

More information

Temperature Control by Heat Exchanger Incorporating with Vibration Type Coiled-tube

Temperature Control by Heat Exchanger Incorporating with Vibration Type Coiled-tube emperature Control by Heat Exchanger Incorporating with Vibration ype Coiled-tube A. haikua a, P. Kittiupakorn a*, S. anthadiloke a Abtract - In a hard chrome electroplating proce, a heat exchanger i employed

More information

NODIA AND COMPANY. Model Test Paper - I GATE Refrigeration and Air Conditioning. Copyright By Publishers

NODIA AND COMPANY. Model Test Paper - I GATE Refrigeration and Air Conditioning. Copyright By Publishers No part of thi publication may be reproduced or ditributed in any form or any mean, electronic, mechanical, photocopying, or otherwie without the prior permiion of the author. Model Tet Paper - I GATE

More information

Gas fired, Low Intensity Infrared Unitary Infrared Heating Systems Installation, Operating, Maintenance and Parts Manual

Gas fired, Low Intensity Infrared Unitary Infrared Heating Systems Installation, Operating, Maintenance and Parts Manual COMBUTION REEARCH CORPORATION FOR YOUR AFTEY If you smell gas:. Open windows 2. DO T try to light any appliance 3. DO T use electrical switches 4. DO T use any telephone in your building 5. Leave the Building

More information

HD video and audio camera (720p) Unlimited viewing / recording of live HD video and audio streaming - anytime, anywhere

HD video and audio camera (720p) Unlimited viewing / recording of live HD video and audio streaming - anytime, anywhere Paradox Inight i the firt and only integrated olution of HD video/audio monitoring with uperior ecurity capabilitie that allow uer to ee and hear what i going on and protect their home or buine anytime,

More information

Simple. Smart. Solutions. ROOM PACK Z2105/239/0812. Step by Step Installation Guide

Simple. Smart. Solutions. ROOM PACK Z2105/239/0812. Step by Step Installation Guide Simple. Smart. Solutions. ROOM PACK Z2105/239/0812 Step by Step Installation Guide 1. Room Pack Overview 2. Temperature Settings 3. Operation 4. Wiring 5. Installing Your Room Pack Before you get started

More information

Water Underfloor Heating Kit

Water Underfloor Heating Kit Water Underfloor Heating Kit INSTALLATION MANUAL For small & large rooms 50 year pipe warranty CE approved Easy to install SINGLE ROOM SYSTEM INSTALLATION MANUAL Manufactured in Europe! SINGLE ROOM SYSTEM

More information

Installation Instructions

Installation Instructions Electric Heater Kit For use with GB, GP and GT eries Geothermal Heat Pumps KWAEH0101N05 KWAEH0101N10 KWAEH0101F15 KWAEH0101F20 Installation Instructions NOTE: Read the entire instruction manual before

More information

General. Mode of operation and application. Input

General. Mode of operation and application. Input Dataheet for SITRANS P DSIII / P410 GAUGE PRESSURE SITRANS P DS III / P410, HART,4-20 ma tranmitter for preure 7MF40331BA101NC6 General Manufacturer Supplier Product deignation Brand name Type deignation

More information

KEY PLAN NOTE: SHADED AREAS INCLUDED IN SET RAMP LEVEL NORTH SOUTH PUMP ROOM PUMP ROOM KEY PLAN NOTE: SHADED AREAS INCLUDED IN SET ARRIVALS LEVEL

KEY PLAN NOTE: SHADED AREAS INCLUDED IN SET RAMP LEVEL NORTH SOUTH PUMP ROOM PUMP ROOM KEY PLAN NOTE: SHADED AREAS INCLUDED IN SET ARRIVALS LEVEL A2 B2 D A TERMINAL B TERMINAL A D2 C2 E2 DALLA FORT WORTH INTERNATIONAL AIRPORT E KEY PLAN NOTE: HADED AREA INCLUDED IN ET RAMP LEVEL CONTRACT NO. : 956 PERMIT NO. : A7-37B IUED FOR BID: OCTOBER, 27 PUMP

More information

Product and installation manual. Underfloor Heating

Product and installation manual. Underfloor Heating Product and installation manual Contents Introduction 2-3 Why Choose? 2 Why Hep 2 O UFH? 2 Choosing a System The Three Essential Elements 3 Floor Products 4-5 Staples System 4 System Plates 4 Dry Construction

More information

IMAGINATION SOLAR LTD. Installation Guide B1. Planning the Plumbing and Wiring

IMAGINATION SOLAR LTD. Installation Guide B1. Planning the Plumbing and Wiring Page 1 of 8 IMAGINATION SOLAR LTD Installation Guide B1 Planning the Plumbing and Wiring Unit 4 Montpelier Central, Station Road Bristol BS6 5EE t: 0117 942 6668 f: 0117 942 8998 e: enquiries@imaginationsolar.com

More information

~,~. June 10, ,838,077 A VG.. 2. AOy A. COOAA4. Filed Oct. 20, 1954 R. L. COOFPER. 9 Sheets-Sheet DISPENSING MACHINE FOR BEWERAGES

~,~. June 10, ,838,077 A VG.. 2. AOy A. COOAA4. Filed Oct. 20, 1954 R. L. COOFPER. 9 Sheets-Sheet DISPENSING MACHINE FOR BEWERAGES June 10, 1958 Filed Oct. 20, 1954 R. L. COOFPER DISPENSING MACHINE FOR BEWERAGES 2,838,077 9 Sheet-Sheet D --------- ~,~. N A VG.. 2 AOy A. COOAA4 INVENTOR June 10, 1958 R. L. COOPER 2,838,077 DISPENSING

More information

F-T, FT-P, F-L AND F-P SERIES

F-T, FT-P, F-L AND F-P SERIES F-T, FT-P, F-L AND F-P ERIE 2/3 JACKETED DIRECT TEAM TILTING & TATIONARY KETTLE INTALLATION - OPERATION - MAINTENANCE TILTING TRI-LEG TILTING PEDETAL TATIONARY TRI-LEG TATIONARY PEDETAL FT-L FT-30L FT-40L

More information

EEE. eff 4S5. see-tail 17, ESS SY. 1,33,779. Patented Aug. 19, 1919, QO \SYU. O (at J, E, BELL, FURNA CE, APPLICATION FLED AUG, 7, 1915, N Es NE N

EEE. eff 4S5. see-tail 17, ESS SY. 1,33,779. Patented Aug. 19, 1919, QO \SYU. O (at J, E, BELL, FURNA CE, APPLICATION FLED AUG, 7, 1915, N Es NE N J, E, BELL, FURNA CE, APPLICATION FLED AUG, 7, 1915, 1,33,779. Patented Aug. 19, 1919, HEE-HEET N E NE N Y. it i ae A i n N. 1 EEE. Y - 17, E eff 45 ee-tail () A er & it - it QO \YU. O (at 784%&é2eeze-

More information

REINFORCED FLEXIBLE PAVEMENT DESIGN OVER EXPANSIVE CLAY SUBGRADE

REINFORCED FLEXIBLE PAVEMENT DESIGN OVER EXPANSIVE CLAY SUBGRADE Indian Geotechnical Journal, 41(2), 2011, 86-94 REINFORCED FLEXIBLE PAVEMENT DESIGN OVER EXPANSIVE CLAY SUBGRADE C.N.V. Satyanarayana Reddy 1 and K. Chinnapa Reddy 2 Key word Geotextile, reinforcement,

More information

Technical Checklist - Plumbing and Heating Fittings - UK Sizes

Technical Checklist - Plumbing and Heating Fittings - UK Sizes Technical Checklist - Plumbing and Heating Fittings - UK Sizes July 2008 NOTE: This checklist refers exclusively to fittings and accessories from our range of push-fit products for Plumbing and Heating

More information

Installation Guide. Maximum Area 20m 2

Installation Guide. Maximum Area 20m 2 Installation Guide Maximum Area 20m 2 i PLEASE READ THIS INSTALLATION GUIDE CAREFULLY BEFORE BEGINNING ANY WORK TO ENSURE A SAFE & TROUBLE FREE INSTALLATION. Parts provided with pack 4 Parts provided with

More information

Boiler Manual. Installation Instructions Commissioning Instructions Maintenance Instructions Commissioning Certificate Service Record

Boiler Manual. Installation Instructions Commissioning Instructions Maintenance Instructions Commissioning Certificate Service Record Boiler Manual Incorporating: User Instructions Installation Instructions Commissioning Instructions Maintenance Instructions Commissioning Certificate ervice Record High Efficiency Condensing Gas Boilers

More information

SI 3080 / SI 3100 / SI 3200

SI 3080 / SI 3100 / SI 3200 SI 3080 / SI 3100 / SI 3200 Mini pump for air conditioner up to 10 kw (SI 3080 & SI 3100) and up to 20 kw (SI 3200) SILENCIEUSES SILENT o Integral quick / connector plug Anti-vibration mount SI 3080 SI

More information

DCP-FRCME - FAST RESPONSE CONTACT MODULE

DCP-FRCME - FAST RESPONSE CONTACT MODULE DCPFRCME FAT REPONE CONTACT MODULE TANDARD FEATURE ingle input contact monitor Fast, reliable contact monitoring utilizing the Hochiki DCP (Digital Communications Protocol) Two different mounting configurations

More information

Instruction Manual RK 25 - RKR 25. for models. Premix condensing boiler CE Installation, operating, commissioning and maintenance instructions.

Instruction Manual RK 25 - RKR 25. for models. Premix condensing boiler CE Installation, operating, commissioning and maintenance instructions. Instruction Manual for models RK 25 - RKR 25 Premix condensing boiler EDBUK BAND A GA COUNCIL NUMBER: RK 25: 41-651-15 RKR 25: 41-651-14 Installation, operating, commissioning and maintenance instructions.

More information

Central Station Air Handling Unit multicent Type TW. Product Data. Our product line. Central Air Handling Unit. Hygienic Compact Unit

Central Station Air Handling Unit multicent Type TW. Product Data. Our product line. Central Air Handling Unit. Hygienic Compact Unit Product Data Central Station Air Handling Unit multicent Type TW AHU n 09.07.439 Range : MULTICENT TW&TW(H) Our product line Central Air Handling Unit Hygienic Compact Unit Hopital Equipment Foodtuff Equipment

More information

tep by step Installation Guide Install a complete underfloor heating system, up to 112m 2, using one simple pack.

tep by step Installation Guide Install a complete underfloor heating system, up to 112m 2, using one simple pack. H E AT I N G S O LU T I O N S tep by step T E C H N I C A L I N F O R M AT I O N A p r i l 2 0 0 8 Installation Guide Install a complete underfloor heating system, up to 112m 2, using one simple pack.

More information

MD-200, TA-200, RA-200 & MR-200

MD-200, TA-200, RA-200 & MR-200 MD-200, TA-200, RA-200 & MR-200 ES Mando a ditancia, Termotato de ambiente y Módulo repetidor para cuadro de control electrónico CCE Intruccione de Funcionamiento, Limpieza y Mantenimiento para el USUARIO

More information

NEW NEW. Qual-PEX Crimp System. Plumbing and Heating Installation Manual SAFE. Over 45 ye ars serving the Irish Plumbing Industry.

NEW NEW. Qual-PEX Crimp System. Plumbing and Heating Installation Manual SAFE. Over 45 ye ars serving the Irish Plumbing Industry. Qual-PEX Crimp System 50 YEAR WARRANTY Plumbing and Heating Installation Manual NEW NEW Over 45 ye ars serving the Irish Plumbing Industry Sleek, Affordable, Fast, Efficient SAFE www.pipelife.com Contents

More information

Underfloor Heating Installation Guide

Underfloor Heating Installation Guide Underfloor Heating Installation Guide Beneath Heat Ltd Unit 3, Dunne s Farm, Laindon Road, Horndon On The Hill, Essex. SS17 8QB. Tel: 01268 543475 Fax: 01233 221616 Email: info@beneathheat.co.uk www.beneathheat.co.uk

More information

CoziMat. 1. Introduction and Brief Description COZIMAT INSTALLATION INSTRUCTIONS & SAFETY REQUIREMENTS

CoziMat. 1. Introduction and Brief Description COZIMAT INSTALLATION INSTRUCTIONS & SAFETY REQUIREMENTS CoziMat 1. Introduction and Brief Description The CoziMat underfloor heating mat is designed for underfloor heating of rooms where the floor thickness needs to be kept to a minimum. CoziMat underfloor

More information

General System Layout Sketch

General System Layout Sketch General System Layout Sketch EZ-37 Solar Panels PV panel Glycol Fill Valve Expansion Tank ` 1 Introduction This document describes how to install a Heliatos GH type solar water heating system. These systems

More information

General System Layout Sketch

General System Layout Sketch General System Layout Sketch EZ-37 Solar Panels PV panel Can use Standard Copper, CPVC or PEX Pipes Pump Existing Water Heater Bottom Feed Connector 1 Introduction This document describes how to install

More information

INSTALLATION, USE AND MAINTENANCE MANUAL MPE

INSTALLATION, USE AND MAINTENANCE MANUAL MPE GB INTALLATION, UE AND MAINTENANCE MANUAL MPE 4 kw - 76 kw MPE 1 THE MPE ERIE... 5 1.1 Field of application... 5 1.2 Models and versions... 5 1.3 Components lay-out... 6 1.4 Water circuits... 13 2 INPECTION,

More information

FTM-L SERIES SINGLE OR TWIN DIRECT STEAM MIXER KETTLE COMPLETE WITH HYDRAULIC POWER TILT BRIDGE INSTALLATION - OPERATION - MAINTENANCE

FTM-L SERIES SINGLE OR TWIN DIRECT STEAM MIXER KETTLE COMPLETE WITH HYDRAULIC POWER TILT BRIDGE INSTALLATION - OPERATION - MAINTENANCE FTM-L ERIE INGLE OR TWIN DIRECT TEAM MIXER KETTLE COMPLETE WITH HYDRAULIC POWER TILT BRIDGE INTALLATION - OPERATION - MAINTENANCE INGLE MODEL FTM-40L FTM-60L FTM-80L FTM-100L TWIN MODEL FTM-(2)40L FTM-(2)60L

More information

Nu-Heat. SPECIFYING NU-HEAT LoPro Max. A Best Practice Guide for professional installers

Nu-Heat. SPECIFYING NU-HEAT LoPro Max. A Best Practice Guide for professional installers Nu-Heat UNDERFLOOR & RENEWABLES SPECIFYING NU-HEAT LoPro Max A Best Practice Guide for professional installers UNDERFLOOR HEATING GROUND SOURCE HEAT PUMPS AIR SOURCE HEAT PUMPS SOLAR THERMAL V1 WWW.NU-HEAT.CO.UK

More information

Simulation Model of an Automatic Commercial Ice Machine

Simulation Model of an Automatic Commercial Ice Machine Purdue Univerity Purdue e-pub International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2016 Simulation Model of an Automatic Commercial Ice Machine Haithem Murgham Univerity

More information

Maincor Underfloor Heating UNDERFLOOR HEATING SYSTEMS. Introduction. Overview. Tel: Web: Why use Underfloor Heating?

Maincor Underfloor Heating UNDERFLOOR HEATING SYSTEMS. Introduction. Overview. Tel: Web:  Why use Underfloor Heating? UNDERFLOOR HEATING SYSTEMS Introduction Underfloor heating (UFH) is not a new concept; it was brought to Britain about 2,000 years ago by the Romans. Their heating technique was to allow hot gasses from

More information

ADDENDUM No. 1. OPSB Central Office Relocation & Renovation

ADDENDUM No. 1. OPSB Central Office Relocation & Renovation Addendum No. ADDENDUM No. Date August 7, 208 Project: OPB Central Office Relocation & Renovation NOTICE TO CONTRACTOR GENERAL: The following does hereby become a part of the Contract Documents and all

More information

TP970 and TP9600 Series Pneumatic Thermostats

TP970 and TP9600 Series Pneumatic Thermostats TP970 and TP9600 eries Pneumatic Thermostats ENGINEERING DATA Contents Introduction... 2 Fundamentals of Thermostat Operation... 2 General... 2 Flapper-Nozzle Operation... 2 Valve Unit Operation... 2 TP973A,

More information

Product Data INDUSTRY LEADING FEATURES / BENEFITS

Product Data INDUSTRY LEADING FEATURES / BENEFITS 40MBFQ Floor Console Ductless ystem izes 09 to 12 Product Data INDUTRY LEADING FEATURE / BENEFIT A PERFECT BALANCE BETWEEN BUDGET LIMIT, ENERGY AVING AND COMFORT. The 40MBFQ series ductless system are

More information

Pamphlet M AIR & DRAIN TRAPS. JA JAHR Series / G8 TATSU2 SS1VG / JAHRG Series

Pamphlet M AIR & DRAIN TRAPS. JA JAHR Series / G8 TATSU2 SS1VG / JAHRG Series Pamphlet M00- AIR & DRAIN TRAP JA JAHR eries / G8 TATU VG / JAHRG eries ree Technology AIR TRAP or Air In today's world of automatation, compressed air is used in many different industries including high-precision

More information

Ensure nut and olive are in place before inserting pipe insert.

Ensure nut and olive are in place before inserting pipe insert. SYSTEM CONNECTIONS Connection to compression fitting When using compression fittings with Speedfit pipe, a Standard Pipe Insert (prefix TSM) must be used to withstand the compressive pressure of the olive.

More information

Always make sure to check the heating film before, during, and after installation of the floor covering.

Always make sure to check the heating film before, during, and after installation of the floor covering. Installation of floor heating film for ceramic tiles, granite and other stone or composite flooring Read through this entire manual before starting installation. All electrical connections must be made

More information

M07. Wunda Premium Manifold. Before you start: Check the contents THE BRAND YOU CAN TRUST

M07. Wunda Premium Manifold. Before you start:  Check the contents THE BRAND YOU CAN TRUST Before you start: Check the manifold box contents against the list below. Check the contents 1. 2 x Manifold end blanks 2. 2 x Manual air vent & drain cocks 3. 2x Adjustable mounting brackets 4. Manifold

More information

NS1100 / NS2200 Installation Guide & Owner s Manual

NS1100 / NS2200 Installation Guide & Owner s Manual NS1100 / NS2200 Installation Guide & Owner s Manual Installation Tips Contents 1 Control Panel 1 Spool of Signal Wire 2 Mounting Screws & Drywall Inserts 2 Wire Clips 3 Wire Ties Tools you will need Phillips

More information

Temperature and humidity ranges. Operating the GC within the recommended ranges insures optimum instrument performance and lifetime.

Temperature and humidity ranges. Operating the GC within the recommended ranges insures optimum instrument performance and lifetime. Temperature and humidity range Operating the GC within the recommended range inure optimum intrument performance and lifetime. Recommended temperature range 20 to 27 C 5 to 40 C Temperature range Recommended

More information

landscape design Homes

landscape design Homes landcape deign Exterior At entrance level, the houe appear to be ingle torey, and ha a decked eating area, heltered beneath the overailing roof. (The rear reveal a different view, with a lower ground floor

More information

Simple. Smart. Solutions.

Simple. Smart. Solutions. Simple. Smart. Solutions. Your guide to underfloor heating A smarter way to heat a home Whether you are building a new home, renovating existing space or adding a new extension, Speedfit Underfloor Heating

More information

LIFETIME. INSTALLATION MANUAL emat Pro 100w/150w/200w WARRANTY

LIFETIME. INSTALLATION MANUAL emat Pro 100w/150w/200w WARRANTY INSTALLATION MANUAL emat Pro 100w/150w/200w LIFETIME WARRANTY Before you begin installing, read through these instructions carefully and check that you have all the components required. 01473 276677 www.elementsunderfloorheating.co.uk

More information

SUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)

SUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV) SUBCOURSE EDITION EN5113 5 US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV) US ARMY PLUMBER MOS 51K SKILL LEVELS 1 AND 2 COURSE PLUMBING FIXTURES (PLUMBING IV) SUBCOURSE NO. EN5113 US Army Engineer

More information

Instruction Manual for model

Instruction Manual for model Instruction Manual for model RKA 100 Premix condensing boiler with storage cylinder EDBUK BAND A GA COUNCIL NUMBER: 47-651-22 Installation, operating, commissioning and maintenance instructions. CE 0694

More information

INVERTER SPLIT - TYPE

INVERTER SPLIT - TYPE INVERTER SPLIT - TYPE ISSUE No 2 DATE 04/09/08 P/No 2020323A2868 CONTENTS SAFETY PRECAUTIONS Warning 2 Operating temperature 2 BEFORE INSTALLATION Tools needed for installation 3 Items required for installing

More information

W. DAYTON ST. L-001 LANDSCAPE PLAN LAYOUT 30" 15" " 24" MADISON, W I. GENERAL NOTES:

W. DAYTON ST. L-001 LANDSCAPE PLAN LAYOUT 30 15  24 MADISON, W I. GENERAL NOTES: R.R. TRACK LANDCAPE PLAN LAYOUT unny lope Road Brookfield, Wisconsin 00 GENERAL NOTE:. LANDCAPE CONTRACTOR HALL CONTACT CITY FORETRY AT LEAT HOUR IOR TO PLANTING TO VERIFY PLANTING ITE, INPECT NURURY TOCK,

More information

Installation And User Instructions GB/IRE. Devimat Warm Floor System Installation Instructions User Guide Trouble Shooter

Installation And User Instructions GB/IRE. Devimat Warm Floor System Installation Instructions User Guide Trouble Shooter GB/IRE Installation And User Instructions Devimat Warm Floor System Installation Instructions User Guide Trouble Shooter Please retain this booklet for homeowners future reference. For Devireg 55 setup

More information

INSTRUCTIONS FOR MODEL

INSTRUCTIONS FOR MODEL Marco Beverage Systems Ltd. INSTRUCTIONS FOR MODEL Font Uber Style Marco Beverage Systems Limited. 63d Heather Road, Sandyford Industrial Estate, Dublin 18. Ireland Tel: +353 (0)1 295 2674 Ireland Fax:

More information

how To order or enquire about Price/delivery

how To order or enquire about Price/delivery PiPes for life Trade Brochure 2018 over 45 years serving The uk PlumBing industry PiPes for life company Profile Pipelife is one of europe s leading producers of plastic pipe systems. employing in excess

More information

Uponor. THE NATIONAL ENERGY FOUNDATION Ground Source Heat Pump Seminar 12 th May Who Are We???????? Radiator

Uponor. THE NATIONAL ENERGY FOUNDATION Ground Source Heat Pump Seminar 12 th May Who Are We???????? Radiator 1 Heat Pumps And Underfloor Heating A Match Made In Heaven? Introduction Steve Alldritt Business Development Manager: Central Region Uponor Housing Solutions Ltd THE NATIONAL ENERGY FOUNDATION Ground Source

More information

Carbon Film Installation Instructions

Carbon Film Installation Instructions Contents Page 2 Page 3 Page 4 Page 5 Page 8 Product Overview Pre-Installation & Electrical Provision Depron Underlay Installation Carbon Film Installation - Under Wood/Laminate Flooring Notes & Trouble

More information

UNDERFLOOR HEATING SYSTEM C SYH ME UNDERFLOOR HEATING SYSTEM. Heating Homes All Around The World.

UNDERFLOOR HEATING SYSTEM C SYH ME UNDERFLOOR HEATING SYSTEM. Heating Homes All Around The World. C SYH ME Heating Homes All Around The World www.buteline.co.uk About Buteline Buteline TM was developed and established by its founder and current Managing Director, David J. Picton, in 1980 taking a small

More information

Branan Field Master Plan A. Introduction

Branan Field Master Plan A. Introduction Branan Field Mater Plan A. troduction With the advent of the long-awaited Firt Coat Expreway (SR 23), official were concerned about potential impact to the north central portion of the County. A tate tranportation

More information