1 African Utility Week Leak Detection and Repair in the ethekwini Municipality EWS NRW Branch

2 Leak Detection and Repair Progress 1. Review of Programme 2. Review of Real Loss Reduction Approach 3. Targets, Monitoring and Evaluation 4. Leak Detection and Repair Progress Report 5. Impact and Results 6. Challenges 7. Lessons Learned 8. Further Research 9. Communication/Publicity EWS NRW Branch 2

3 Review of NRW Reduction Programme Monitoring & Evaluation Preparation & prioritisation System maintenance Real loss reduction Apparent loss reduction Infrastructure Assessment & Upgrade Meeting & sustaining NRW target levels Quality Assurance Financial Management Programme Management EWS NRW Branch 3

4 Review of NRW Reduction Programme ethekwini Water and Sanitation Monthly Volumes and Connections May 2004 to July Monthly Volumes (kl) Number of Connections May-04 Nov-04 May-05 Nov-05 May-06 Nov-06 May-07 Nov-07 May-08 Nov-08 May-09 Nov-09 May Total SIV - Monthly ethekwini Water Sales Total number of connections EWS NRW Branch 12 per. Mov. Avg. (Total SIV - Monthly) 12 per. Mov. Avg. (ethekwini Water Sales) 4

5 Review of NRW Reduction Programme 2006/07 - NRW 30,6%; budget R17,1m 2007/08 - NRW 36,4%; budget R24,2m 2008/09 - NRW 38,9%; budget R37,3m 2009/10 - NRW 37,6%; budget R65,0m 2010/11 - NRW Target 35%; budget R75,0m EWS NRW Branch 5

6 Review of NRW Reduction Programme ethekwini Municipality Water Purchase, Sales and Connection Trends Average Daily Volumes (kl/day) Number of Registered Connections / / / / / / Average SIV (kl/day) Average Water Sales (kl/day) Total Number of Connections in Municipality EWS NRW Branch 6

7 Review of NRW Reduction Programme 45.0% ethekwini Municipality Non-Revenue Water and Inefficiency of Use Trends 40.0% 36.4% 38.9% 37.5% 35.0% 31.8% 33.4% Non-Revenue Water by Volume (%) 30.0% 25.0% 20.0% 15.0% 29.0% 19.1% 19.0% 19.2% 22.1% 24.9% 25.8% 10.0% 5.0% 0.0% 2004/ / / / / /10 EWS NRW Branch 7 Fi46 NRW by Volume (%) WR1 Inefficiency of Use (%)

8 Review of NRW Reduction Programme 9.4 ethekwini Municipality Infrastructure Leakage Index Trends Infrastructure Leakage Index (ILI) / / / / / /10 Op29 Infrastructure Leakage Index EWS NRW Branch 8

9 Review of NRW Reduction Programme ethekwini Municipality Total Water Losses per Connection Trends Non-Revenue Water by Volume (%) / / / / / /10 EWS NRW Branch 9 Op23 Total Water Losses per Connection (l/conn/day)

10 Review of Real Loss Reduction Approach 5 different levels of leak detection: Level 1 visual Level 2 listening + correlating suspected leaks Level 3 correlation Level 4 leak noise loggers Level 5 trunk mains All of these carried out by leak detection contractor New addition use of Category B plumbers; and step testing EWS NRW Branch 10

11 Review of Real Loss Reduction Approach Why leak detection and repair? EWS NRW Branch 11

12 Level 1 Leak Detection

13 Level 2 Leak Detection

14 Level 3 Leak Detection

15 Level 4 Leak Detection

16 Level 5 Leak Detection

17 Targets, Monitoring & Evaluation Indicator Financial Year 2004/ / / / / /10 Total Number of Connections in Municipality Fi46 NRW by Volume (%) 29.0% 31.8% 33.4% 36.4% 38.9% 37.5% WR1 Inefficiency of Use (%) 19.1% 19.0% 19.2% 22.1% 24.9% 25.8% Op29 Infrastructure Leakage Index Op23 Total Water Losses per Connection (l/conn/day) Average SIV (kl/day) Average Water Sales (kl/day) Real Loss Volume (kl/day) Unbilled Authorised and Illegal Volume (kl/day) Total Water Losses (kl/day) Non-Revenue Water Volume (kl/day) Metering Inaccuracies (kl/day) Illegal Consumption (kl/day) EWS NRW Branch 17

18 Targets, Monitoring & Evaluation Monthly water balances per reservoir zone.. MONTHLY WATER BALANCE COMPONENT TRENDS - December 2009 Entire Southern Operational Area Current Month Analysis Remainder/ Unassigned Legend: Green - all data confirmed and available Orange - some SIV meters are missing, or zone may be breached Red - no SIV meters installed Grey - to be separated later; have been included in other areas Adams Mission 1 Reservoir Athlone Park Chatsworth 4 Ehlanzeni Garden Lots Klaarwater Lower Illovo 1 Northdene 1/2 Shallcross Reservoir Umbumbulu Umlazi 5 Adams Mission 2 Reservoir Bluff 1 Chesterville Ehlanzeni (Metro) Glenwood 2/3 KwaMakutha Magabeni 1 North Ridge Sherwood 1/2 Umgababa Umlazi 6 Adams Mission 3 Reservoir Bluff 2/3 Clansthal Ehlanzeni (Umgeni) Harinagar Reservoir Lamont Magabeni 2 Panarama Park Smithfield Umkomaas 1 Umnini Adams Mission 4 Reservoir Bluff South Clansthal 3 Ensimbini Illovo Beach Launceston Road Malabar Hills Ridge End Smithfield HL Umkomaas 2 Umzinto 5 Adams Mission 5 Reservoir Cato Manor Craigieburn 1 Extreme South Isipingo Beach Lewis Drive Midnite Cafe Ridge View South Ridge Umlazi 1/7 Wentworth Adams Mission 6 Reservoir Chatsworth 1 Craigieburn 2 Folweni Isipingo Hills Lotus Park Mobeni 1/2 Ridley Park St Thomas Umlazi 2/8 Westcliff Almond Road Chatsworth 2 Currie Road Folweni 2 Isipingo Rail Lovu Mobeni Rear Rosetta Toti Purification Works Umlazi 3 Woodlands 1/2 Amagcingo Chatsworth 3 Doonside Firwood 1/2 Isolempilo Lovu ET Montille SAICCOR Umbogintwini Umlazi 4 Woodlands 3/4 EWS NRW Branch 18

19 Leak Detection and Repair Progress Report The leak detection and repair strategy was amended to use Category B plumbers in informal areas This proved extremely successful, with the number of leaks repaired increasing dramatically in the last few months, and was achieved at a lower cost. 98% of the target for length of mains surveyed in the year was reached A total of leaks were located and repaired. This resulted in 1.2 leaks/km being found and fixed, an improvement from 0,88 leaks/km in the previous financial year. EWS NRW Branch 19

20 Leak Detection and Repair Progress Report Baseline Target Achievement to date Performance to date (%) 172% 122% 113% 107% 103% 98% 99% 106% 100% 96% 94% 98% EWS NRW Branch 20

21 Leak Detection and Repair Progress Report Visible leaks 403 Non-visible leaks EWS NRW Branch 21

22 Leak Detection and Repair Progress Report Main Line Leaks Service Connection Leaks EWS NRW Branch 22

23 Leak Detection and Repair Impact and Results 2500 FEB/MARCH/APR/MAY = 1425 leaks found & repaired Umlazi 1 Real Loss Reduction Flow Profile Monitoring FEB/MARCH/APR/MAY/JUNE = 1740 leaks found & repaired 2000 FEB/MARCH/APR/MAYJUNE/JULY = 2007 leaks found & repaired FEB/MARCH/APR/MAY/JUNE/JULY/AUG = 2440 leaks found & repaired Flowrate (kl/hr) kl/day kl/day kl/day kl/day kl/da PRV Settings Optimised Theoretical Average Zone Pressure : 57m Theoretical Average Zone : 56m /09/ /08/ /06/ /05/ /03/ /01/ /12/03 EWS NRW Branch 23 Logging Period (05/01/ /08/2010)

24 Leak Detection and Repair Impact and Results Chatsworth 4 Real Loss Reduction Flow Profile Monitoring 2000 FEB = 6 leaks found & repaired FEB/MARCH = 11 leaks found & repaired 1800 FEB/MARCH/APR = 146 leaks found & repaired FEB/MARCH/APR/MAY = 403 leaks found & repaired AVE = AVE = kl/hr 800 Flow Rate (kl/hr) EWS NRW Branch /05/22 00: /05/12 00: /05/02 00: /04/22 00: /04/12 00: /04/02 00: /03/23 00: /03/13 00: /03/03 00: /02/21 00: /02/11 00:00 Logging Period (21/02/ /05/2010)

25 Leak Detection and Repair Impact and Results Sherwood Real Loss Reduction Flow Profile Monitoring 2000 FEB = 32 leaks found & repaired 1800 FEB/MARCH = 69 leaks found & repaired FEB/MARCH/APR = 109 leaks found & repaired Flow rate (kl/hr) AVE = kl/hr AVE = kl/hr AVE = kl/hr AVE = kl/hr EWS NRW Branch /07/21 00: /07/01 00: /06/11 00: /05/22 00: /05/02 00: /04/12 00: /03/23 00: /03/03 00: /02/11 00: /01/22 00: /01/02 00:00 Logging Period (20/01/ /06/2010)

26 EWS NRW Branch 26

27 EWS NRW Branch 27

28 EWS NRW Branch 28

29 Leak Detection and Repair Impact and Results Intervention Description Verifiable Impact on NRW (Ml/day) Real Loss Reduction: Leak Detection and Repair -5.3 Pressure Reduction -2.9 Advanced Pressure Management System attrition 43.9 Sub-Total Real Loss Reduction 9.1 Billing Improvement: Metro Housing Projects 4.5 Small Diameter Meter Replacement 0.4 Large Diameter (ICI) Meter Replacement 2.7 Metering WD s/ebu s 3.5 Amnesty Programme 0.3 Ablution Blocks 0.8 Incomplete Connections -3.6 New Connections/Normal Growth 7.1 Sub-Total Billing Improvement 15.7 EWS NRW Branch 29

30 Leak Detection and Repair Methodology... Preparation EWS NRW Branch 30

31 Leak Detection and Repair Methodology... Briefing EWS NRW Branch 31

32 Leak Detection and Repair Methodology... Detection EWS NRW Branch 32

33 Leak Detection and Repair Methodology... Leaks EWS NRW Branch 33

34 Leak Detection and Repair Methodology... Leaks EWS NRW Branch 34

35 Leak Detection and Repair Methodology... Repair EWS NRW Branch 35

36 Leak Detection and Repair Methodology... Repair EWS NRW Branch 36

37 Leak Detection and Repair Methodology... Illegal Connections EWS NRW Branch 37

38 Leak Detection and Repair Methodology... Sahara Inspection EWS NRW Branch 38

39 Leak Detection and Repair Methodology... Smartball Inspection EWS NRW Branch 39

40 Challenges 1. Competence of leak detection contractors 2. Non-reporting of leaks in township areas (use of toll-free number) 3. Turn-over of roster plumbers (two week shifts) 4. Tampering with water infrastructure and repeated illegal connections 5. Internal leaks 6. Pipeline materials EWS NRW Branch 40

41 Lessons Learned 1. Leak detection in informal areas as well as in formal reticulation systems 2. Plastic fittings preferable to brass fittings 3. Rather concentrate in specific areas than stretch resources over greater area 4. Repeated multiple sweeps required to attain and sustain low levels of leakage 5. Theoretical and practical competence tests essential to ensure quality of work and desirable impact 6. Very few non-visible leaks found EWS NRW Branch 41

42 Further Research 1. Masters Research has commenced in : Extending the life of pipelines, delaying pipe replacement and establishing drivers that prioritise pipeline replacement Development of appropriate procedures that can be used to monitor the effectiveness and sustainability of leak detection in informal areas EWS NRW Branch 42

43 Consumer Awareness and Publicity 1. Media consultant appointed and communication strategy designed and implemented (through NRW Programme) 2. Media campaign through TV, radio, magazines and newspapers 3. Existing community liaison continued through Customer Service Agents (Customer Services) 4. Use of Community Focus Groups 5. Targeted street pole signage EWS NRW Branch 43

44 Street Pole Signage EWS NRW Branch 44

A Comprehensive Approach to Leak Detection

A Comprehensive Approach to Leak Detection A Comprehensive Approach to Leak Detection Real Water Loss: A Real Issue for Water Utilities Every day, water utilities lose billions of gallons of water designated for public use. In many areas of the

More information

Leak Detection and Water Loss Control. Maine Water Utilities September 9, 2010

Leak Detection and Water Loss Control. Maine Water Utilities September 9, 2010 Leak Detection and Water Loss Control Maine Water Utilities September 9, 2010 Leak Detection and Water Loss Control Utilities can no longer tolerate inefficiencies in water distribution systems and the

More information

Environmental Design & Maintenance of Public Realm for Urban Design DURBAN

Environmental Design & Maintenance of Public Realm for Urban Design DURBAN Environmental Design & Maintenance of Public Realm for Urban Design DURBAN Jonathan Edkins ethekwini City Architect Urban Safety & Crime Prevention Urban Strategy Environmental design Maintenance of public

More information

PRESENTS AQUADUCT AUTOMATED WATER-LEAK MONITORING SYSTEM A KINGPIN TECHNOLOGY

PRESENTS AQUADUCT AUTOMATED WATER-LEAK MONITORING SYSTEM A KINGPIN TECHNOLOGY PRESENTS AQUADUCT AUTOMATED WATER-LEAK MONITORING SYSTEM A KINGPIN TECHNOLOGY INTRODUCING THE INNOVATIVE NEW TECHNOLOGY FOR THE DETECTION OF LEAKS IN WATER NETWORKS. SA WATER CRISIS the rising tide The

More information

Non-Revenue Water Management. Leakage Control

Non-Revenue Water Management. Leakage Control Non-Revenue Water Management Leakage Control SUIDOU TECHNICAL SERVICE CO., LTD 1 Non-Revenue Water Management 1. Management and analysis of the leakage 2. Periodical exchange of the aging pipe 3. Exchange

More information

Index. Premises Information 2 About This Log Book 3 Service and Maintenance Requirements 4 8. Fire Risk Assessments 9

Index. Premises Information 2 About This Log Book 3 Service and Maintenance Requirements 4 8. Fire Risk Assessments 9 Index Premises Information 2 About This Log Book 3 Service and Maintenance Requirements 4 8 Fire Risk Assessments 9 Fire Alarm Systems 10-20 Locations 10 Servicing 11 12 Activations 13 14 Weekly Checks

More information

CONDITIONS OF SERVICE - NBN SERVICES 1. ABOUT

CONDITIONS OF SERVICE - NBN SERVICES 1. ABOUT CONDITIONS OF SERVICE - NBN SERVICES 1. ABOUT These Conditions of Service apply to all NBN Services. These Conditions of Service form part of our Standard Form of Agreement found at www.adam.com.au/legal.

More information

Dan Gray, Property Director. Date: November 2017 Review Due Date: November 2020

Dan Gray, Property Director. Date: November 2017 Review Due Date: November 2020 Policy title: Scope: Policy owner & job title: Approver: Fire Safety Policy Group-wide Dan Gray, Property Director Aspire Housing Board Date: November 2017 Review Due Date: November 2020 POLICY SUMMARY

More information

PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY

PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY BACKGROUND INFORMATION AND INVITATION TO PARTICIPATE IN AN ENVIRONMENTAL AUTHORISATION

More information

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21 POSITION NAME OF FIRM SPECIALISATION : Director : UrbanEQ Consulting Engineers (Pty) Ltd : Transportation Engineer DATE OF BIRTH : 23 October 1971 NATIONALITY : South African YEARS EXPERIENCE : 21 Andrew

More information

Millfield Schools Fire Risk Prevention Policy

Millfield Schools Fire Risk Prevention Policy Millfield Schools Fire Risk Prevention Policy This policy refers to the Senior School, Preparatory School, Pre-Preparatory School and EYFS 1. Introduction This policy sets out the approach that the school

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form Tim Nyander Submitted By 2016-0447 Legistar File ID 10/18/2016 City Council Meeting Date - Agenda Item Only N/A for Non-Agenda Item 9/28/2016 Submitted Date Action

More information

SHOW REPORT. Delivering you a quality audience ready to spend

SHOW REPORT. Delivering you a quality audience ready to spend SHOW REPORT Delivering you a quality audience ready to spend THE MELBOURNE HOME SHOW With a 4% increase in visitor attendance in 2015, the iconic Melbourne Home Show proves once again its importance for

More information

Aquarius - Spectrum. multi-layer acoustic water pipe monitoring solutions. Game changer in water network management

Aquarius - Spectrum. multi-layer acoustic water pipe monitoring solutions. Game changer in water network management Aquarius - Spectrum multi-layer acoustic water pipe monitoring solutions Game changer in water network management ID Founded in 2009 20 Employees Invested by Hutchinson Water Over 3,000 correlation sensors

More information

Washington Metropolitan Area Transit Authority (WMATA)

Washington Metropolitan Area Transit Authority (WMATA) Washington Metropolitan Area Transit Authority () National Transportation Safety Board (NTSB) Detailed Tracker As of 0/0/18 Description #s * Unacceptable: The hazard must be mitigated in the most expedient

More information

Multi-Family Recycling Discussion Paper

Multi-Family Recycling Discussion Paper UE2011-06 ATTACHMENT 2 The City of Calgary Multi-Family Recycling Discussion Paper February 2011.docx ISC: UNRESTRICTED Table of Contents Residential Recycling in Calgary... 1 Notice of Motion NM2008-25...

More information

The Remodeling Market

The Remodeling Market The Remodeling Market Kermit Baker Remodeling Futures Program International Builders Show January 21, 2010 www.jchs.harvard.edu Remodeling Market Issues 1. Where do we stand in the remodeling cycle at

More information

Itron Water Loss Management Solutions. Advanced Digital Leak Detection Overview Session

Itron Water Loss Management Solutions. Advanced Digital Leak Detection Overview Session Itron Water Loss Management Solutions Advanced Digital Leak Detection Overview Session Pipeline Assessment Management The Hidden/Aware/Locate/Repair cycle of a leak can cause extensive water loss The Conventional

More information

The role of urban mobility in (re)shaping cities

The role of urban mobility in (re)shaping cities The role of urban mobility in (re)shaping cities Mr. Andre Dzikus Urban Basic Services Branch Coordinator www.unhabitat.org Structure 1) Urbanisation - Challenges 2) Mobility shaping the city 3) Mobility

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

Making ENERGY STAR Water Heaters a National Early Replacement Priority. February 23, 2016

Making ENERGY STAR Water Heaters a National Early Replacement Priority. February 23, 2016 Making ENERGY STAR Water Heaters a National Early Replacement Priority February 23, 2016 Overview Water Heater market overview 2015 ENERGY STAR national promotion recap 2016 ENERGY STAR national program

More information

Interim Life Safety Measures. Healthcare Construction Certificate - Level 1

Interim Life Safety Measures. Healthcare Construction Certificate - Level 1 Interim Life Safety Measures Purpose of Interim Life Safety Management BASIC SAFETY: During renovations projects in healthcare occupancies, the basic level of protection for the occupants must be maintained

More information

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Dennis S. Painter, Tennessee Valley Authority, Nashville, Tennessee Donald Becker, Tennessee Valley

More information

Cool Savings Program Report

Cool Savings Program Report Cool Savings Program Report Prepared by: Michael Fung Jennifer Wang San Francisco Department of the Environment 1455 Market St. Suite 1200 San Francisco, CA 94103 Technical Contributors: Denis Livchak

More information

Mission Transformation: India's Smart City Mission. Jagan Shah Director, National Institute of Urban Affairs India

Mission Transformation: India's Smart City Mission. Jagan Shah Director, National Institute of Urban Affairs India Mission Transformation: India's Smart City Mission Jagan Shah Director, National Institute of Urban Affairs India India s Urban Awakening Opportunities Net increase in working age population will be 270

More information

2002/ Modernisation Road N 4

2002/ Modernisation Road N 4 2002/000-606.02 - Modernisation Road N 4 1. Basic Information 1.1. CRIS Number 2002/000-606.02 1.2. Title: Modernisation of the national road No 4 1.3 Sector : Cross Border Co-operation / Infrastructure

More information

Code of Practice on Closed Circuit Television (CCTV)

Code of Practice on Closed Circuit Television (CCTV) Code of Practice on Closed Circuit Television (CCTV) Rev Date Purpose of Issue/Description of Change Equality Impact Assessment Completed 1. December, 2011 Initial Issue 2. 5 th June, 2017 Review and approval

More information

We encourage you to join the discussion! PUBLIC MEETING DATES ITEMS TO BE ADDRESSED VOICE YOUR OPINION IN OUR SURVEY

We encourage you to join the discussion! PUBLIC MEETING DATES ITEMS TO BE ADDRESSED VOICE YOUR OPINION IN OUR SURVEY ``````` CITY OF ROCKDALE IS HOLDING PUBLIC MEETINGS TO GET YOUR INPUT We encourage you to join the discussion! Aging Infrastructure is Struggling to Provide Continuous and Adequate Service to our Community.

More information

Appendix B DETAILED DESIGN

Appendix B DETAILED DESIGN Appendix B DETAILED DESIGN Design details for bioretention/bioswale Figures 1 and 2 provide cross-sectional details of standard bioswales and bioretention installations used in design drawings. Table 1

More information

Rethinking precincts in urban green space revitalisation: the role of place identity and social cohesion within urban horticultural practise

Rethinking precincts in urban green space revitalisation: the role of place identity and social cohesion within urban horticultural practise Rethinking precincts in urban green space revitalisation: the role of place identity and social cohesion within urban horticultural practise High Line, New York - planting design Inspired by self-seeded

More information

Grangegorman Update. College of Engineering & Built Environment 29 November 2013

Grangegorman Update. College of Engineering & Built Environment 29 November 2013 Grangegorman Update College of Engineering & Built Environment 29 November 2013 Campas nua ITBÁC i lár na cathrach i ngráinseach Ghormáin DIT new city centre campus at Grangegorman Agenda Major Changes

More information

Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London

Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London Scope of document General This document sets out the procedure for the management and control

More information

HOME DESIGN & REMODELING

HOME DESIGN & REMODELING kitchen bathroom basement additions HOME DESIGN & REMODELING SYNERGY BUILDERS is the turn key solution for your remodeling needs. Homeowners typically tackle a remodel project once or twice in their lifetime,

More information

B&M European Value Retail SA Interim Results Presentation 26 weeks to 23 rd September 2017

B&M European Value Retail SA Interim Results Presentation 26 weeks to 23 rd September 2017 B&M European Value Retail SA Interim Results Presentation 26 weeks to 23 rd September 2017 Interim FY18 Group Highlights Group revenues increased by 21.7% to 1,346.4m B&M LFL revenues +7.5%, Q2 LFL +7.7%

More information

IERM CONVENTION. Gauteng City Region: Green Infrastructure. Johannesburg. Date: September Desiree Sehlapelo Ibouanga

IERM CONVENTION. Gauteng City Region: Green Infrastructure. Johannesburg. Date: September Desiree Sehlapelo Ibouanga IERM CONVENTION Gauteng City Region: Green Infrastructure Johannesburg Date: 11-13 September 2017 Desiree Sehlapelo Ibouanga Department of Environmental Sciences Presentation outline Gratitude Context

More information

Allison Macdonald Program Manager Solid Waste Department

Allison Macdonald Program Manager Solid Waste Department Allison Macdonald Program Manager Solid Waste Department Presentation Outline 1 Project Implementation/Goals 2 Contracting 3 Construction 4 Marketing and Education 5 Results Geographic Location St. Lucie

More information

SECTION 7 EVACUATION PROCEDURES

SECTION 7 EVACUATION PROCEDURES SECTION 7 EVACUATION PROCEDURES 7.1 Refinery Evacuation Procedure 2 7.1.1 Procedures for Operating Critical Equipment Prior to Evacuation 3 7.2 Sulfur Recovery Unit Evacuation Procedure 4 7.3 HF Alkylation

More information

REF: INSPECTION OF THE CONSTRUCTION AREAS [CONTRACTOR NO. 1, 2, 3 & 4].

REF: INSPECTION OF THE CONSTRUCTION AREAS [CONTRACTOR NO. 1, 2, 3 & 4]. TO: COPIES TO: FROM: PROJECT ENGINEERS [CAMDEKON] PROJECT TEAM NJABULO MKHOSANA INDEPENDENT ENVIRONMENTAL CONTROL OFFICER DATE: 30 JUNE 2015 REF: INSPECTION OF THE CONSTRUCTION AREAS [CONTRACTOR NO. 1,

More information

Mayor s Neighborhood Summit

Mayor s Neighborhood Summit Mayor s Neighborhood Summit Be Green, Save Green! Chris Castro, Director of Sustainability Brittany C. Sellers, Sustainability Project Manager Workshop Agenda Overview of Green Works and focus area on

More information

INDEX INDEX 2 FOREWARD 3 SECTION 1 COMPANY INFORMATION 4 SECTION 2 GRADING AND CERTIFICATION 5 SECTION 3: ADDITIONAL REQUIREMENTS 6 7

INDEX INDEX 2 FOREWARD 3 SECTION 1 COMPANY INFORMATION 4 SECTION 2 GRADING AND CERTIFICATION 5 SECTION 3: ADDITIONAL REQUIREMENTS 6 7 Code of Practice INDEX INDEX 2 FOREWARD 3 SECTION 1 COMPANY INFORMATION 4 SECTION 2 GRADING AND CERTIFICATION 5 SECTION 3: ADDITIONAL REQUIREMENTS 6 7 SECTION 4 EMERGENCY SERVICES 8 9 SECTION 5 POLICE

More information

2006/2007 Washer Rebate. Yukon Government s Energy Solutions Centre and Natural Resources Canada

2006/2007 Washer Rebate. Yukon Government s Energy Solutions Centre and Natural Resources Canada 2006/2007 Washer Rebate Yukon Government s and Natural Resources Canada Final Report April 19, 2007 PROGRAM OVERVIEW One of the fundamental objectives of the (ESC) is to serve Yukon s energy efficiency

More information

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE DRAFT BASIC ASSESSMENT REPORT PUBLIC REVIEW LANDOWNERS MEETING FICKSBURG 23 JULY 2013 T his project is being conducted on behalf of Eskom PRESENTATION

More information

SIOUX FALLS FIRE RESCUE STRATEGIC PLAN

SIOUX FALLS FIRE RESCUE STRATEGIC PLAN SIOUX FALLS FIRE RESCUE The mission of Sioux Falls Fire Rescue is to protect the citizens and visitors of Sioux Falls and their property from fires and other emergencies through education, prevention,

More information

Appendix G. Detailed Design

Appendix G. Detailed Design Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information

More information

HLP AND OWNER DRIVEN APPROACHES

HLP AND OWNER DRIVEN APPROACHES HLP AND OWNER DRIVEN APPROACHES 06 September, 2016 Somalia Country Programme SUMMARY 01 Housing Land and Property Somalia Outlook 02 The People s Process where owner driven approaches improve tenure security

More information

To protect the lives and property of citizens, by providing professional fire and life safety services to people in need.

To protect the lives and property of citizens, by providing professional fire and life safety services to people in need. Mission To protect the lives and property of citizens, by providing professional fire and life safety services to people in need. Fire Department Priorities Emergency Response Training Fire Prevention

More information

LIFE SEC ADAPT PROJECT

LIFE SEC ADAPT PROJECT LIFE SEC ADAPT PROJECT Upgrading Sustainable Energy Communities in Mayor Adapt initiative by planning Climate Change Adaptation strategies Report networking event: Fosterreg project, final conference Zagreb,

More information

National Grid Residential Active Demand Reduction Demonstration Project. MA EEAC Demand Reduction Sub-Committee February 23, 2017

National Grid Residential Active Demand Reduction Demonstration Project. MA EEAC Demand Reduction Sub-Committee February 23, 2017 National Grid Residential Active Demand Reduction Demonstration Project MA EEAC Demand Reduction Sub-Committee February 23, 2017 What are we testing? Impact of calling DR events using Direct Load Control

More information

E-waste Management in India: Current Status, Emerging Drivers & Challenges

E-waste Management in India: Current Status, Emerging Drivers & Challenges E-waste Management in India: Current Status, Emerging Drivers & Challenges Regional Workshop on E-waste/ WEEE Management July 8 th, 2010, Osaka, Japan United Nations Environment Programme UNEP-DTIE-IETC

More information

Wiles Road from University Drive to Riverside Drive

Wiles Road from University Drive to Riverside Drive Wiles Road from University Drive to Riverside Drive Presented to: Broward County WSP Parsons Brinckerhoff is now Presented by: WSP USA Inc. Our Team.. Introduction / Project Team Cecilia Villoria, PE Project

More information

low carbon strategies - energy efficiency

low carbon strategies - energy efficiency SUSTAINABLE MOBILITY low carbon strategies - energy efficiency Mediterranean area Sustainable mobility planning on university campuses in the Mediterranean region: Lessons learned from the CampSUMP project

More information

SHOW REPORT. 8,141 quality visitors attended in Canterbury s No.1 Renovation & Building Expo

SHOW REPORT. 8,141 quality visitors attended in Canterbury s No.1 Renovation & Building Expo 2018 Canterbury s No.1 Renovation & Building Expo SHOW REPORT 8,141 quality visitors attended in 2018 * Statistics in this report are taken directly from the 2018 Canterbury Home Show Visitor and Exhibitor

More information

National Research Infrastructure Roadmapping in Europe

National Research Infrastructure Roadmapping in Europe www.inroad.eu info@inroad.eu @InRoadproject @InRoad_Project National Research Infrastructure Roadmapping in Europe Drivers and Trends InRoad Isabel Bolliger University of Lausanne Swiss Graduate Institute

More information

HEALTH & SAFETY. An operator at MPC s Galveston Bay refinery in Texas City, Texas MPC CITIZENSHIP REPORT

HEALTH & SAFETY. An operator at MPC s Galveston Bay refinery in Texas City, Texas MPC CITIZENSHIP REPORT An operator at MPC s Galveston Bay refinery in Texas City, Texas MPC CITIZENSHIP REPORT 213 21 Metrics We are uncompromising in our approach to health and safety, and to our vision: that every day is accident-free,

More information

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 12/20/2016 ITEM NO: 12 DATE: TO: FROM: SUBJECT: MAYOR AND TOWN COUNCIL LAUREL PREVETTI, TOWN MANAGER RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II

More information

Logbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater

Logbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater APPROVED BY: JBJ Precept EN Fire Detection/Alarm Panel & Precept EN Repeater Logbook PAGE 1 of 19 List of Contents 1. FIRE ALARM SYSTEM MAINTENANCE... 3 2. USER RESPONSIBILITIES... 3 2.1. RESPONSIBLE PERSON...

More information

SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM. Standards Training SANS 369 ORIGINATOR

SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM. Standards Training SANS 369 ORIGINATOR SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM COURSE Standards Training SANS 369 ORIGINATOR Keith Norgate DATE 24th July 2014 Amendment 1 17th September 2014 Add power battery calculations Amendment

More information

Branch Fire Rescue Services

Branch Fire Rescue Services Branch Fire Rescue Services Introduction Through the protection of life, property and the environment, Fire Rescue Services strives to improve the livability of all Edmontonians. The provision of internationally-recognized

More information

2005 Proposition II. Bond Construction & Projects Report

2005 Proposition II. Bond Construction & Projects Report 2005 Proposition II Bond Construction & Projects Report as of September 30, 2008 INDEX Financial Report Narrative Budget Report by Project Bills Paid for Current Month 2005 Proposition II Bond Construction

More information

TOURIST AREA DESIGN GUIDELINES

TOURIST AREA DESIGN GUIDELINES TOURIST AREA DESIGN GUIDELINES INTRODUCTION The purpose of the Tourist Area Design Guidelines is to provide a comprehensive reference manual to the urban design principles that will be used to evaluate

More information

ScS Group plc Preliminary Results for the year ended 30 July October 2016

ScS Group plc Preliminary Results for the year ended 30 July October 2016 ScS Group plc Preliminary Results for the year ended 30 July 2016 4 October 2016 October 2014 ScS Group plc preliminary results for the year ended 30 July 2016 Agenda Agenda Introduction David Knight Chief

More information

Appendix 29. Mount Emerald Wind Farm Fire Management Plan Prepared by RATCH Australia Corporation Limited

Appendix 29. Mount Emerald Wind Farm Fire Management Plan Prepared by RATCH Australia Corporation Limited Mount Emerald Wind Farm, Herberton Range North Queensland Environmental Impact Statement Volume 3 Appendix 29 Mount Emerald Wind Farm Fire Management Plan Prepared by RATCH Australia Corporation Limited

More information

CCTV Policy. Core values in daily life at St John Rigby College are expressed as:

CCTV Policy. Core values in daily life at St John Rigby College are expressed as: CCTV Policy Mission Statement St John Rigby College is a Catholic College dedicated to the education and development of the whole person and supporting all students to realise their full potential. In

More information

The battle for south Durban and a sustainable city

The battle for south Durban and a sustainable city The battle for south Durban and a sustainable city Environmental & community impacts 1950s Why south Durban communities are fed up more than 100 year of oppression Indentured labour system to

More information

FIRE PROCEDURES 1. APPOINTMENTS

FIRE PROCEDURES 1. APPOINTMENTS 12b FIRE PROCEDURES 1. APPOINTMENTS Responsible Person In compliance with the Regulatory Reform (Fire Safety) Order 2005 (FSO), the School s Head, Mrs C Cameron is appointed as the Responsible Person for

More information

An Overview of Security of Radioactive Sources on Industrial Radiography and a Case of Responding to Security Incident involving Radioactive sources

An Overview of Security of Radioactive Sources on Industrial Radiography and a Case of Responding to Security Incident involving Radioactive sources Technical Meeting on Radiation Safety in Industrial Radiography IAEA Vienna 23-27 June 2014 An Overview of Security of Radioactive Sources on Industrial Radiography and a Case of Responding to Security

More information

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 PERIODIC REVIEW OF FIRE RISK ASSESSMENT

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 PERIODIC REVIEW OF FIRE RISK ASSESSMENT REGULATORY REFORM (FIRE SAFETY) ORDER 2005 PERIODIC REVIEW OF FIRE RISK ASSESSMENT Responsible person (e.g. employer) or person having control of the premises: Address of premises: Tel: Person(s) consulted:

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

Integrated urban policies and land management The URBACT Experience Didier Vancutsem

Integrated urban policies and land management The URBACT Experience Didier Vancutsem Integrated urban policies and land management The URBACT Experience Didier Vancutsem Didier Vancutsem URBACT Expert Prof Urban Planner ISOCARP Contents Integrated urban policies and land management: a

More information

Signing Up... 1 Logging in for the First Time... 2 The Search Panel... 3

Signing Up... 1 Logging in for the First Time... 2 The Search Panel... 3 A Guide to Using TABLE OF CONTENTS Signing Up... 1 Logging in for the First Time... 2 The Search Panel... 3 Keywords... 3 Type... 3 Location... 3 Current Status... 3 On Site... 3 Commencement Received...

More information

ARE YOU AN AUTHORISED REFRIGERATION GAS PRACTITIONER?

ARE YOU AN AUTHORISED REFRIGERATION GAS PRACTITIONER? ARE YOU AN AUTHORISED REFRIGERATION GAS PRACTITIONER? HISTORY Through a voluntary registration process the safe handling of refrigerants started in 2000 this was replaced by a mandatory registration

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan DRAFT Gerald Richards & Pleasantview Park Master Plan 19 Historic Features According to the National Register of Historic Places and the National Historic Landmarks Program, there is nothing of national

More information

Scope of Work Urban Design Review Framework Monitoring Program Item #7.1

Scope of Work Urban Design Review Framework Monitoring Program Item #7.1 1.0 Background The Urban Design Review Framework (Framework) project (PUD2017-0601) explored design review protocols and processes, and proposed revisions to achieve better built outcomes. In 2017 July,

More information

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X. Action Pack Published in March 2005 by the Ministry for the Environment Manatū Mō Te Taiao PO Box 10-362, Wellington, New Zealand ISBN: 0-478-18994-X ME number: 580 This document is available on the Ministry

More information

June 2017 (Updated 18 January 2018) Fire Safety Policy. Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited

June 2017 (Updated 18 January 2018) Fire Safety Policy. Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited June 2017 (Updated 18 January 2018) Fire Safety Policy Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited Trusted provider of quality homes, excellent landlord and support services,

More information

Applications. Features & Benefits ULTRASONIC WATER METER

Applications. Features & Benefits ULTRASONIC WATER METER MEASURE TODAY. ENSURE TOMORROW wprime TM Series 280W-CI Spire Metering offers the latest in Commercial/Industrial ultrasonic metering technology for reliable flow measurement. The rugged 280W-CI water

More information

Meridian Hills Improvements

Meridian Hills Improvements Meridian Hills Improvements Public Information Meeting Background The Town Planning Committee - ad hoc committee established December 2005 Volunteer members Create a long-range plan of improvements that

More information

Vietnam Scaling up Urban Upgrading Project (SUUP)

Vietnam Scaling up Urban Upgrading Project (SUUP) 1. Introduction Vietnam Scaling up Urban Upgrading Project (SUUP) Terms of Reference (TOR) Technical Advisory Services on Universally Accessible Infrastructure Design September 2018 The project is part

More information

APPENDIX 4J SECURITY AND SURVEILLANCE SERVICES

APPENDIX 4J SECURITY AND SURVEILLANCE SERVICES TABLE OF CONTENTS APPENDIX 4J SECURITY AND SURVEILLANCE SERVICES 1. INTERPRETATION... 2 2. SECURITY SERVICES... 2 2.1 Security and Surveillance Services Plan... 2 2.2 General Requirements... 2 2.3 Periodic

More information

Informal Green Infrastructure (IGI) for Urban Mobility

Informal Green Infrastructure (IGI) for Urban Mobility Informal Green Infrastructure (IGI) for Urban Mobility Ignacio Loor Transport and Mobilities: Early Career Researcher s workshop 3 rd May 2018, University of Oxford, UK Introduction Housing densification

More information

Fire risk management plan. MH/05/Revised/06/17

Fire risk management plan. MH/05/Revised/06/17 Fire risk management plan MH/05/Revised/06/17 1 1. Scope This policy applies to fire safety arrangements in all workplaces, common areas of residential premises and any other premises managed and/or owned

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

LFR - Code 3 Fire Report

LFR - Code 3 Fire Report LFR - Code 3 Fire Report May 2017 Kudos to South Metro Fire Rescue and CDOT crews for their response to the tanker fire on I-25 Wednesday, May 31, 2017 that closed the highway in both directions. They,

More information

Approved by Principal Investigator: Date: Approved by Laser Safety Officer: Date:

Approved by Principal Investigator: Date: Approved by Laser Safety Officer: Date: Approved by Principal Investigator: Date: Approved by Laser Safety Officer: Date: Standard Operating Procedure Hildebrand Hall Room B70 Coherent Genesis MX Optically Pumped Semiconductor (OPS) Laser (514

More information

SYSTEM 5000 USER MANUAL

SYSTEM 5000 USER MANUAL SYSTEM 5000 USER MANUAL Table of Contents Section Page No 1 Introduction: -... 3 1.1 Procedure:... 3 1.2 Warnings and Cautions:... 3 2 User Control Levels:... 4 3 User Passwords:... 4 4 Controls and Displays:

More information

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Metro Orange Line Extension Four Years Early and $61 Million Under Budget White Paper: Metro Orange Line Extension Four Years Early and $61 Million Under Budget July 2013 Innovation for better mobility Metro Orange Line Extension Iteris, Inc. was the prime consultant leading

More information

High-Performance, Coin-Operated Clothes Washer Demonstration and Evaluation

High-Performance, Coin-Operated Clothes Washer Demonstration and Evaluation High-Performance, Coin-Operated Clothes Washer Demonstration and Evaluation Gregory P. Sullivan, Pacific Northwest Division Graham B. Parker, Pacific Northwest Division J. William Currie, Pacific Northwest

More information

COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX. on the European Rail Traffic Management System European deployment plan

COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX. on the European Rail Traffic Management System European deployment plan EUROPEAN COMMISSION Brussels, XXX [ ](2016) XXX draft COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX on the European Rail Traffic Management System European deployment plan EN EN COMMISSION IMPLEMENTING

More information

CONSULTANT VACANCY ANNOUNCEMENT

CONSULTANT VACANCY ANNOUNCEMENT United Nations Human Settlements Programme P.O. Box 30030, Nairobi00100, KENYA Tel: +254-20 7623120, Fax: +254-20 7624266/7 infohabitat@unhabitat.org, www.unhabitat.org CONSULTANT VACANCY ANNOUNCEMENT

More information

Electrical Safety Policy and Management System

Electrical Safety Policy and Management System TITLE: PAGE: 1 OF 14 Housing Solutions Limited Electrical Safety Policy and Management System Page 1 of 15 TITLE: PAGE: 2 OF 14 FOREWORD This document details the system for the management of electrical

More information

GOOD PRACTICE Limerick/Clare/Kerry Region

GOOD PRACTICE Limerick/Clare/Kerry Region GOOD PRACTICE Limerick/Clare/Kerry Region (now part of the larger Southern Region): Mixed Dry Recyclable Bin (MDR Bin) September 2014 Content table 1. General information on the good practice (GP)... 3

More information

Leak Detection of Critical Watermains in the City of Hamilton

Leak Detection of Critical Watermains in the City of Hamilton Leak Detection of Critical Watermains in the City of Hamilton Chris Martire, Robinson Consultants Inc. Michael Zantingh, City of Hamilton TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3760:2003 (Incorporating Amendment No. 1) AS/NZS 3760:2003 Australian/New Zealand Standard In-service safety inspection and testing of electrical equipment AS/NZS 3760:2003 This Joint Australian/New

More information

Investor Event November 2003

Investor Event November 2003 Investor Event November 2003 1 Gerry Murphy CEO 2 Ian Harding Director of Communications 3 Today s agenda Castorama Brico depot 12:15 - Lunch Atrium B&Q Asia 14:00 Store visits 19:30 - Aperitifs 20:00

More information

Cape Environmental Assessment Practitioners(Pty)

Cape Environmental Assessment Practitioners(Pty) BACKGROUND INFORMATION DOCUMENT (BID) Introduction Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 First Floor, Eagles View Building Facsimile: (044)

More information

Durango Parks & Recreation Department. Strategic Plan

Durango Parks & Recreation Department. Strategic Plan Durango Parks & Recreation Department Strategic 2019-2023 Adopted April 2019 Overview The purpose of the adopted 2010 Parks, Open Space, Trails and Recreation Master is to provide a 10-year road map for

More information

LPS 1014 Scheme Requirements for certificated fire detection and alarm system firms. Presented by - Reg Grigg LPCB

LPS 1014 Scheme Requirements for certificated fire detection and alarm system firms. Presented by - Reg Grigg LPCB LPS 1014 Scheme Requirements for certificated fire detection and alarm system firms Presented by - Reg Grigg LPCB The aim of this brief presentation Why are LPCB schemes specified? pedigree, experience,

More information

Extension of Registered Gas Installer Scheme to include Non-Domestic Gas Works

Extension of Registered Gas Installer Scheme to include Non-Domestic Gas Works Extension of Registered Gas Installer Scheme to include Non-Domestic Gas Works Information Paper Reference: CER/16373 Date Published: 15/12/2016 Closing Date: NA Executive Summary The CER has decided to

More information

Lowe's Companies Inc (LOW) - Financial and Strategic SWOT Analysis Review

Lowe's Companies Inc (LOW) - Financial and Strategic SWOT Analysis Review Lowe's Companies Inc (LOW) - Financial and Strategic SWOT Analysis Review Lowe's Companies Inc (LOW) - Financial and Strategic SWOT Analysis Review The Business Research Store is run by Sector Publishing

More information