1 Mekong River Commission Regional Flood Management and Mitigation Centre Weekly Flood Situation Report for the Mekong River Basin Prepared at: //, covering the week from the th to th August Weather Patterns, General Behaviour of the Mekong River and Flood Situation General weather patterns During the week of th to th August, the weather bulletins were issued by the Department of Meteorology (DOM) of Cambodia. The weather maps were referenced from Thailand Meteorology Department (TMD) of the th August and 9 th August in the Figures & as follows: Figure : Weather map for th August Figure : Weather map for 9 th August Moderate South-West (SW) Monsoon During the last week, abundant rainfall occurred due to the influential southwest monsoon prevailing over Lower Mekong Basin together with low-pressure air mass cells. (see Figure and ). Tropical depressions (TD), tropical storms (TS) or typhoons (TY) No TD, TS or TY was presented in LMB during last week. Other weather phenomena that affect the discharge According to the Thai Meteorological Department (TMD), there will influence the prevailing southwest monsoon over Mekong region, including the Gulf of Thailand to become more rainfall. The low pressure was hit the upper part of the Mekong region, during that time (see Fig.). Over weather situation During the last week, the weather was scattered thundershowers with moderate rain of the Southwest monsoon. Consequently, in this week there was moderate rainfall over Chiang Sean to Stung Treng catchment areas, included the S area. The observed rainfall at Pakseane to Pakse and the S area showed high rainfall between mm to mm. This was likely caused by the th tropical storm of BENICA that hit to the upper lower Mekong Basin. The weekly rainfall distribution is shown in Figure and daily rainfall at key stations in the Lower Mekong Basin are shown Table A. MRC Weekly Flood Situation Report Week th -9 th August Page

2 Figure : Weekly Rainfall Distribution over the LMB from th to th August MRC Weekly Flood Situation Report Week th -9 th August Page

3 General behaviour of the Mekong River During the last week, the water levels at stations from upper to middle part of LMB has been decreasing due to inflow operation upstream part, while at downstream part has been slightly rising. For stations from Chiang Saen and Luang Prabang Water levels from th - th August at Chiang Sean station were fluctuated over its long-term average (LTA), while at Luang Prabang station water levels were rapidly increased from.m on th Aug to. m on th August. For stations from Chiang Khan, Vientiane and Nong Khai and Paksane Water levels at these stations were reached to the alarm levels at Chiang Khan and Vientiane on th and 9 th August. At Nong Khai water level were reach to the flood level on th August (.7 m), while water level at Paksane was almost reached to alarm level on th August (. m). For stations from Nakon Phanom/Thakhet to Mukdaha/Sovannakhet Water levels from Nakhon Phanom/Thakhet to Mukdahan/Sovannakhet stations were drastically increased which reached to the flood levels from th to th August. This caused rising water level was due to the heavy rainfall from Middle part of LMB (BENICA Storm). For stations from Khong Chiam to Pakse Water levels from Khong Chiam to Pakse stations were also continued increased, which stay above the alarm levels from th to th August. For stations from Stung Treng to Kompong Cham/ Phnom Penh to Koh Khel/Neak Luong Water levels at these stations were slightly increasing above their LTAs and reached to the alarm levels from th to th August at Stung Treng, Kratie, Kompong Cham and Koh Khel. Tan Chau and Chau Doc Water level at these tidal stations were also reached to alarm levels from th August onward, and it is expected to continue rising over the alarm level next week. Note: For more detail the flood situation during the last week, please see the hydrographic in Annex C. Flood Situation Flood stage or alarm stage: The alarm and flood levels appeared at Chiang Khan, Vietnaine, Nong Khai, Pasksane, Nakhon Phanom, Thakhet, Mudahan, Khong Chiam, Pakse, Stung Treng, Kratie, Kompong Cham, Koh Khel, Tan Chau and Chau Doc. However, the water levels have been gradually decreased and reached to the lower flood levels from next week. No damage or victims were reported by the Mekong member countries For more details see the following annexes: - tables and graphs for water level and rainfall for the last week in Annex A - a graph for accuracy in Annex B - a table of forecast achievement in Annex B - tables and graphs for performance in Annex B - the water level graphs showing the observed water level for the season in Annex C MRC Weekly Flood Situation Report Week th -9 th August Page

4 Jinghong Chiang Saen Luang Prabang Chiang Khan Vientiane Nongkhai Paksane Nakhon Phanom Thakhek Mukdahan Savannakhet Khong Chiam Pakse Stung Treng Kratie Kompong Cham Phnom Penh (Bassac) Phnom Penh Port Koh Khel Neak Luong Prek Kdam Tan Chau Chau Doc Jinghong Chiang Saen Luang Prabang Chiang Khan Vientiane Nongkhai Paksane Nakhon Phanom Thakhek Mukdahan Savannakhet Khong Chiam Pakse Stung Treng Kratie Kompong Cham Phnom Penh (Bassac) Phnom Penh Port Koh Khel Neak Luong Prek Kdam Tan Chau Chau Doc Annex A: Graphs and Tables Table A: observed water levels Unit in m. // // // // /7/ // /9/ // Table A: observed rainfall Unit in mm. // nr. nr nr nr.. // nr nr nr nr - nr nr... // nr nr nr 7.. //.... nr nr - nr nr nr.. /7/ nr. nr nr nr - nr. nr nr nr // nr. nr. nr /9/.. nr nr. nr. nr 7.. nr nr.. //.... nr nr... nr.. - nr.... MRC Weekly Flood Situation Report Week th -9 th August Page

5 Figure A: Observed water level and rainfall for Jinghong, Chiang Saen, and Luang Prabang Jinghong Chiang Sean Luang Prabang 9 7 Chau Doc observed water level Flood level Alarm Level 9 7 Jinghong Chiang Saen Luang Prabang Average level: 9-7 Average level: (Jinghong) MRC Weekly Flood Situation Report Week th -9 th August Page

6 Figure A: Observed water level and rainfall for Chiang Khan, Vientiane, Nongkhai, and Paksane Chiang Khan Vientiane Nongkhai Paksane Chiang Khan Vientiane Nongkhai Paksane MRC Weekly Flood Situation Report Week th -9 th August Page

7 Figure A: Observed water level and rainfall for Nakhon Phanom, Thakhek, Mukdahan and Savannakhet Nakhon Phanom Thakhek Mukdahan Savannakhet. Nakhon Phanom 7. Thakhek. Mukdahan 9. Savannakhet MRC Weekly Flood Situation Report Week th -9 th August Page 7

8 Figure A: Observed water level and rainfall for Khong Chiam, Pakse, Stung Treng, and Kratie Khong Chiam Pakse Stung Treng Kratie Khong Chiam 7 Pakse Stung Treng Kratie MRC Weekly Flood Situation Report Week th -9 th August Page

9 Figure A: Water level and rainfall for Kompong Cham, Phnom Penh (Bassac and Port), and Koh Khel Kompong Cham Pnom Penh (Bassac) Phnom Penh Port Koh Khel 9 7 Kompong Cham Phnom Penh (Bassac) Phnom Penh Port Koh Khel MRC Weekly Flood Situation Report Week th -9 th August Page 9

10 Figure A: Water level and rainfall for Neak Luong, Prek Kdam, Tan Chau and Chau Doc Neak Luong Prek Kdam Tan Chau Chau Doc 9 7 Neak Luong Prek Kdam Tan Chau Chau Doc MRC Weekly Flood Situation Report Week th -9 th August Page

11 Annex B: Accuracy and performance Accuracy Accuracy describes the accuracy of the adjusted and published forecast, based on the results of the MRC Mekong Flood Forecasting System, which are then adjusted by the Flood Forecaster in Charge taking into consideration known biases in input data and his/her knowledge of the response of the model system and the hydrology of the Mekong River Basin. The information is presented as a graph below, showing the average flood forecasting accuracy along the Mekong mainstream. In general, the overall accuracy is fair for -day to -day forecast lead time at stations in the upper and lower parts of the LMB. However, the accuracies at upper and middle reaches of the LMB stations from Chaing Sean to Nongkhai stations for -day to -day forecast were considered large. The above differences due to three main factors: () internal model functionality in forecasting; for which the parameter adjustment in the model is not possible especially at stations in the upper part and in the Mekong delta where are affected by tidal; () the adjustment by utilizing the practical knowledge and experience of flood forecaster-in-charge; and () the forecasted accumulated rainfall was not well represented. Figure B: Average flood forecast accuracy along the Mekong mainstream MRC Weekly Flood Situation Report Week th -9 th August Page

12 Forecast Achievement The forecast achievement indicates the % of days that the forecast at a particular station for a lead-time is successful against a respective benchmark (Table B). Table B: Evaluation performance forecasting (from th to th Aug ) base on New Benchmark (%). Unit in % Unit in cm MRC Weekly Flood Situation Report Week th -9 th August Page

13 Table B: Evaluation performance forecasting (from th to th Aug ) base on Old Benchmark (%). Unit in % Unit in cm Note: An indication of the accuracy given in the Table B is based on the performance of the forecast made in from the new flood forecasting system and the configuration for the 9 flood season and is published on the website of MRC ( A new set of performance indicators that is established by combining international standards and the specific circumstances in the Mekong River Basin, is applied officially for the flood season of onward. MRC Weekly Flood Situation Report Week th -9 th August Page

14 Time FF completed and sent (time) Stations without forecast FF completed and sent (time) Weather data available (time) NOAA data China Cambodia - DHRW Cambodia - DOM Lao PDR - DMH Thailand - DWR Viet Nam - SRHMC Viet Nam - HMS NOAA data/dataset China/ Cambodia - DHRW/ Cambodia - DOM/ Lao PDR - DMH/ Thailand - DWR/ Viet Nam - SRHMC/ Viet Nam - HMS/9 Performance Performance is assessed by evaluating a number of performance indicators, see table and graphs below: Table B: Overview of performance indicators for the past 7 days including the current report date FF time sent Arrival time of input data Missing data (number-mainstream and trib.st.) week : : - - : 7: 7:9 : :7 :7 7: : 9 7 month : : - - : 7: 7: 7: : : 7: : Week is the week for which this report is made; Month is actually the last days (or less if the flood season has just begun); Season is the current flood season up to the date of this report. : 9: Data Delivery - Delivery Times NOAA data/dataset China/ Cambodia - DHRW/ 7: : Cambodia - DOM/ Lao PDR - DMH/ : : Date Figure B: Data delivery times for the past days including the current report date Thailand - DWR/ Viet Nam - SRHMC/ Viet Nam - HMS/9 MRC Weekly Flood Situation Report Week th -9 th August Page

15 Number Date Figure B: Missing data for the past days including the current report date Data Delivery - Missing Data NOAA data/dataset China/ Cambodia - DHRW/ Cambodia - DOM/ Lao PDR - DMH/ Thailand - DWR/ Viet Nam - SRHMC/ Viet Nam - HMS/9 Time : Flood Forecast - Completion Time Flood Forecast - Stations without Forecast Time : Flood Forecast - Second Forecast Needed :9 : : :7 : : : : : : Date Date 9: Date Figure B: Flood forecast completion time Figure B: Flood forecast stations without forecast Figure B: Second forecast needed MRC Weekly Flood Situation Report Week th -9 th August Page

16 Annex C: Season Water Level Graphs This Annex has the water level graphs of the report date. These graphs are distributed daily by together with the Flood Bulletins. HYDROGRAPHS OF THE MEKONG AT MAINSTREAM STATIONS IN FLOOD SEASON FROM JUNE TO OCTOBER Water Level at 7am of Mekong at Jing Hong -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Time in days Av Water Level at 7am of Mekong at Chiang Saen -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Time in days MRC Weekly Flood Situation Report Week th -9 th August Page

17 Water Level at 7am of Mekong at Luang Prabang -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Time in days Water Level at 7am of Mekong at Chiang Khan -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Vientiane -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av MRC Weekly Flood Situation Report Week th -9 th August Page 7

18 Water Level at 7am of Mekong at Nong Khai -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Paksane -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Nakhon Phanom -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Time in days MRC Weekly Flood Situation Report Week th -9 th August Page

19 Water Level at 7am of Mekong at Thakhek -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Savannakhet -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Mukdahan -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av MRC Weekly Flood Situation Report Week th -9 th August Page 9

20 Water Level at 7am of Mekong at Khong Chiam -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Pakse -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Stung Treng -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av MRC Weekly Flood Situation Report Week th -9 th August Page

21 Water Level at 7am of Mekong at Kratie -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Kampong Cham -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Phnom Penh Chaktomuk -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av MRC Weekly Flood Situation Report Week th -9 th August Page

22 Water Level at 7am of Tonle Sap at Phnom Penh Port -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Bassac at Koh Khel 7 -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Neak Luong 7 -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av MRC Weekly Flood Situation Report Week th -9 th August Page

23 Water Level at 7am of Tonle Sap at Prek Kdam -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Mekong at Tan Chau - -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av Water Level at 7am of Bassac at Chau Doc - -Jun -Jun -Jul -Jul -Jul -Aug -Aug -Sep 9-Sep -Oct 9-Oct -Nov Alarm Flood Av MRC Weekly Flood Situation Report Week th -9 th August Page

Singapore Index on Cities Biodiversity

Singapore Index on Cities Biodiversity Singapore Index on Cities Biodiversity 2011 Xi an City & Biodiversity International Forum 14 May 2011 by Ms Linda Goh and Mr Muslim Anshari Rahman Why a Biodiversity Index for Cities? 2008: > 50% of people

More information

1. How are Mekong wetlands distributed. 1. In ecological zones. 2. In climate zones. 2. Synthesising the case study vulnerability

1. How are Mekong wetlands distributed. 1. In ecological zones. 2. In climate zones. 2. Synthesising the case study vulnerability Basin-wide Climate Change Impact and Assessment for Wetlands of the LMB for Adaptation Planning 3rd Regional Workshop, Phnom Penh 2-3 February 2012 Basin-wide Wetland Peter-John Meynell 1 2 Overview of

More information

Outfall Flow Analysis for the Oswego Canal and Blue Heron Canal

Outfall Flow Analysis for the Oswego Canal and Blue Heron Canal DRAFT REPORT Outfall Flow Analysis for the Oswego Canal and Blue Heron Canal Prepared for: City of Lake Oswego, Oregon Prepared by: Pacific Water Resources, Inc. January 31, 2008 We Think the World of

More information

WLAC Facilities Committee Meeting. September 18, 2017

WLAC Facilities Committee Meeting. September 18, 2017 Campus Program Report WLAC Facilities Committee Meeting September 18, 2017 Page 1 DSA approved the plans on May 15, 2017. Notice to Proceed was issued June 8, 2017 and the project remains on schedule for

More information

Millburn, NJ, Residential Area Stormwater Analyses

Millburn, NJ, Residential Area Stormwater Analyses Base Conditions Parameter Files: Millburn, NJ, Residential Area Stormwater Analyses R. Pitt March 12, 2012 1 Millburn Typical Medium Density Home: Source Area Area (acres) Description Roofs 1 0.08 Pitch

More information

Application of GIS and Remote Sensing for Identifying Flood Risk in Ho Chi Minh City, Vietnam

Application of GIS and Remote Sensing for Identifying Flood Risk in Ho Chi Minh City, Vietnam Application of GIS and Remote Sensing for Identifying Flood Risk in Ho Chi Minh City, Vietnam Vo Le Phu and Luu Dinh Hiep Faculty of Environment Ho Chi Minh City University of Technology volephu@hcmut.edu.vn

More information

URBAN DEVELOPMENT INTHEGREATER MEKONG SUBREGION. Edited by Florian Steinberg and Januar Hakim ADB ASIAN DEVELOPMENT BANK

URBAN DEVELOPMENT INTHEGREATER MEKONG SUBREGION. Edited by Florian Steinberg and Januar Hakim ADB ASIAN DEVELOPMENT BANK URBAN DEVELOPMENT INTHEGREATER MEKONG SUBREGION Edited by Florian Steinberg and Januar Hakim ASIAN DEVELOPMENT BANK ADB Contents Tables and Figures Foreword Urban Development and Urbanization in the Greater

More information

Progress of Multipurpose and Proactive Rainwater Management in Korea

Progress of Multipurpose and Proactive Rainwater Management in Korea Environ. Eng. Res. 2013 June,18(2) : 65-69 Review Paper pissn 1226-1025 eissn 2005-968X Progress of Multipurpose and Proactive Rainwater Management in Korea Mooyoung Han Department of Civil and Environmental

More information

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013 LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES MS4 Statewide Stormwater Summit June 18, 2013 Powerpoint Templates Evan Canfield, Ph.D, P.E. Pima County Regional Flood Control Outline

More information

WS 6 Developing a Business Plan for Manual E-Waste Recycling

WS 6 Developing a Business Plan for Manual E-Waste Recycling WS 6 Developing a Business Plan for Manual E-Waste Recycling Objectives: Introduce different e-waste programs Analyse and discuss different framework conditions for e-waste dismantling facilities Program:

More information

A Regional Research and Dissemination Programme. Phase III SOLAR BOX DRYER DESIGN, CONSTRUCTION AND OPERATION MANUAL

A Regional Research and Dissemination Programme. Phase III SOLAR BOX DRYER DESIGN, CONSTRUCTION AND OPERATION MANUAL RENEWABLE ENERGY TECHNOLOGIES IN ASIA: A Regional Research and Dissemination Programme Phase III SOLAR BOX DRYER DESIGN, CONSTRUCTION AND OPERATION MANUAL Energy Field of Study School of Environment, Resources

More information

Better Buildings By Design 2013 Building the Renewable Energy Ready Home Solar Thermal Lessons Learned and Results

Better Buildings By Design 2013 Building the Renewable Energy Ready Home Solar Thermal Lessons Learned and Results Image Courtesy of Harvestar Better Buildings By Design 2013 Building the Renewable Energy Ready Home Solar Thermal Lessons Learned and Results Doug Merrill, Sunward Systems Doug Merrill 20 + years of manufacturing

More information

Flood Mitigation by Adaptive Use of Urban Infrastructure Taejung Kwon, Jungdon Kim, Hong Gyu Kim

Flood Mitigation by Adaptive Use of Urban Infrastructure Taejung Kwon, Jungdon Kim, Hong Gyu Kim Flood Mitigation by Adaptive Use of Urban Infrastructure Taejung Kwon, Jungdon Kim, Hong Gyu Kim This research was funded by the Ministry of Land, Infrastructure and Transport, Korea (11 첨단도시 G09) Contents

More information

Albert R. Jarrett. Annual and Individual-Storm Green Roof Stormwater Response Models

Albert R. Jarrett. Annual and Individual-Storm Green Roof Stormwater Response Models Annual and Individual-Storm Green Roof Stormwater Response Models Albert R. Jarrett Professor of Agricultural Engineering Penn State University arj@psu.edu www.abe.psu.edu/fac/jarrett.html D. J. Beattie,

More information

Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives

Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives Project Sponsor/Partners The Nature Conservancy Dike District #3

More information

THE INNOVATION OF GREEN ROOF TO DADICATE THE BUILDING ENVIRONMENT IN HONG KONG

THE INNOVATION OF GREEN ROOF TO DADICATE THE BUILDING ENVIRONMENT IN HONG KONG SAJCCE 2:1 (2016) 1-14 March 2016 ISSN: 2394-2258 Available at http://scientificadvances.co.in DOI: http://dx.doi.org/10.18642/sajcce_7100121592 THE INNOVATION OF GREEN ROOF TO DADICATE THE BUILDING ENVIRONMENT

More information

Roof Runoff Harvesting Benefits for Regional Conditions in Low Density and Medium Density Residential Areas. Leila Talebi 1 and Robert Pitt 2

Roof Runoff Harvesting Benefits for Regional Conditions in Low Density and Medium Density Residential Areas. Leila Talebi 1 and Robert Pitt 2 Roof Runoff Harvesting Benefits for Regional Conditions in Low Density and Medium Density Residential Areas Leila Talebi 1 and Robert Pitt 2 1Graduate Student, Department of Civil, Construction, and Environmental

More information

Appendix A. Reference Evapotranspiration (ETo) Table.

Appendix A. Reference Evapotranspiration (ETo) Table. Appendix A. Reference Evapotranspiration (ETo) Table. Appendix A - Reference Evapotranspiration (ETo) Table* KINGS Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Caruthers 1.6 2.5 4.0 5.7 7.8 8.7

More information

MONROE COUNTY EMERGENCY MANAGEMENT HURRICANE S THAT AFFECTED THE KEYS

MONROE COUNTY EMERGENCY MANAGEMENT HURRICANE S THAT AFFECTED THE KEYS MONROE COUNTY EMERGENCY MANAGEMENT HURRICANE S THAT AFFECTED THE KEYS 1995 T.S CHANTAL Jul 13, 1995 NO EVACUATIONS Hurricane ERIN Non-Residents evacuation Special needs shelters opened in County T.S. JERRY

More information

Regional Overview of EIA in Asean. Nagoya, Japan 13 May 2016

Regional Overview of EIA in Asean. Nagoya, Japan 13 May 2016 Regional Overview of EIA in Asean Nagoya, Japan 13 May 2016 Future infrastructure spending ADB has es4mated that Asia needs to invest about $8 trillion in na4onal infrastructure and $290 billion in regional

More information

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018 Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3. September 18, 2018 Agenda Welcome Introductions Rules of the Ad-Hoc Presentation Background Vulnerability Assessment Results Non-Agenda

More information

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015 "The beginning is the most important part of the work." Plato, The Republic MASTER PLAN KICK-OFF Open House #1A, April 28, 2015 YOUR CAMPUS PLANNING TEAM Campus Planners Landscape Architects Urban Designers

More information

Identification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data. June 10, 2014

Identification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data. June 10, 2014 Identification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data June 10, 2014 1 Agenda Background / Overview Solution Approach Groupings Criteria Sites Speed Weight

More information

Daikin Altherma Selection Report

Daikin Altherma Selection Report Daikin Altherma Selection Report Produced on 20.10.2014 with Daikin Altherma Simulator V4.4.7 - database Central 9.7.9 Project name Energa Sistemi Reference Airabela Client name Energa Sistemi Revision

More information

Irrigation management in a drought year. What drought means to the tree, and how best to deal with it

Irrigation management in a drought year. What drought means to the tree, and how best to deal with it Irrigation management in a drought year What drought means to the tree, and how best to deal with it Ken Shackel, Jan/Feb 2014 The current US Drought Monitor Saving water: some general recommendations

More information

Green Roof Research at. Michigan State University

Green Roof Research at. Michigan State University Green Roof Research at Michigan State University Bradley Rowe Michigan State University Department of Horticulture Design Intent Intensive greening Extensive greening Cantonel University Hospital,

More information

Pha Tad Ke Botanical Garden

Pha Tad Ke Botanical Garden Anther and stigma of Curcuma stenochila, Zingiberaceae Sokdee Pimai! That¹s happy New Year in Lao. We¹ve just enjoyed the annual week of blessings and blasts from water guns, a celebration of the end of

More information

Three Rivers Park District Administration Center Rain Garden

Three Rivers Park District Administration Center Rain Garden Three Rivers Park District Administration Center Rain Garden Introduction There are significant changes to the hydrologic regime and nutrient loading following urban and industrial development. The post-development

More information

Biosolids Dewatering, Monitoring, and Disposal Programs

Biosolids Dewatering, Monitoring, and Disposal Programs Water and Waste Department Environmental Standards Division Biosolids Dewatering, Monitoring, and Disposal Programs Environment Act Licence #1089E RR 2016 Water and Waste Department Service des eaux et

More information

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm Welcome Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment #1 6 pm to 8 pm Why We Are Here Tannery

More information

Special edition paper

Special edition paper Proving Tests for Countermeasures Against Localized Torrential Downpours at Stationhouses Hideki Osumi* Kiyoshi Sakamoto* Localized torrential downpours have been tending to increase in recent years, notably

More information

Principles for Promoting Resilient Economies. Pacific Economic Cooperation Council September 11, 2015 Sofitel Philippine Plaza, Manila

Principles for Promoting Resilient Economies. Pacific Economic Cooperation Council September 11, 2015 Sofitel Philippine Plaza, Manila Principles for Promoting Resilient Economies Pacific Economic Cooperation Council September 11, 2015 Sofitel Philippine Plaza, Manila Background A. Location and Topography Gateway to Region X (Northern

More information

Don t Flood The Rodeo! Preparing for Fort Worth s New Arena

Don t Flood The Rodeo! Preparing for Fort Worth s New Arena Don t Flood The Rodeo! Preparing for Fort Worth s New Arena T F M A S P R I N G C O N F E R E N C E APRI L 27 2017 Scott Hubley, P.E., CFM Justin Oswald, P.E., CFM Christopher Johnson, P.E., CFM PHOTO

More information

WLAC Facilities Committee Meeting. May 15, 2017

WLAC Facilities Committee Meeting. May 15, 2017 Campus Program Report WLAC Facilities Committee Meeting May 15, 2017 Page 1 DSA completed the initial review June 24, 2016 and the Design Builder is proceeding through the back check process. DSA reports

More information

Asparagus Response to Water and Nitrogen

Asparagus Response to Water and Nitrogen Asparagus Response to Water and Nitrogen Item Type text; Article Authors Roth, Robert L.; Gardner, Byrant R. Publisher College of Agriculture, University of Arizona (Tucson, AZ) Journal Vegetable Report

More information

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017 Boulder County Comprehensive Drilling Plan Surface Owner Meeting Thursday, Oct. 19, 2017 Contact Crestone Crestone Peak Resources Quick Facts www.crestonepeakresources.com cdpboulder@crestonepr.com (720)

More information

Food Control Plans or National Programmes Cold Hold Records 2019

Food Control Plans or National Programmes Cold Hold Records 2019 Food Control Plans or National Progrmes Cold Hold Records 2019 Ne of business: These 2018 pre-dated records have been compiled by a private company not affiliated with MPI See website disclaimer at http://foodcontrolplan.com/disclaimer-and-terms/

More information

Irrigating Olives. Janet Caprile UCCE Farm Advisor Alameda & Contra Costa Counties

Irrigating Olives. Janet Caprile UCCE Farm Advisor Alameda & Contra Costa Counties Irrigating Olives Janet Caprile UCCE Farm Advisor Alameda & Contra Costa Counties Olive Production Basics: Introduction to Irrigation Management Sunday, July 21, 1 3:30 pm, Livermore Why do olives need

More information

Microirrigation of Young Blueberries in Florida 1

Microirrigation of Young Blueberries in Florida 1 BULLETIN 301 Microirrigation of Young Blueberries in Florida 1 Dorota Z. Haman, Allen G. Smajstrla, Fedro S. Zazueta, Paul M. Lyrene, Robert T. Pritchard 2 Blueberry production shows great promise as a

More information

Rainfall, Streamflow, and Water-Quality Data During Stormwater Monitoring, Halawa Stream Drainage Basin, Oahu, Hawaii, July 1, 2000 to June 30, 2001

Rainfall, Streamflow, and Water-Quality Data During Stormwater Monitoring, Halawa Stream Drainage Basin, Oahu, Hawaii, July 1, 2000 to June 30, 2001 U.S. Department of the Interior Rainfall, Streamflow, and Water-Quality Data During Stormwater Monitoring, Halawa Stream Drainage Basin, Oahu, Hawaii, July 1, 2 to June 3, 21 U.S. GEOLOGICAL SURVEY Open-File

More information

Sivu 2/8 Rate data Description Suomi Shut off times total 0.0 h/day Weekends with shut off times yes Daytime rate of heat pump Time for daytime rate 5

Sivu 2/8 Rate data Description Suomi Shut off times total 0.0 h/day Weekends with shut off times yes Daytime rate of heat pump Time for daytime rate 5 Sivu 1/8 Design of a heat pump heating system with Aquarea Designer Project: Suomi 1 Date: Created by:?, (no data provided), (no data provided) Phone: (no data provided) Email: (no data provided) Building

More information

Full Season Comparison of Weather Based Smart Controllers

Full Season Comparison of Weather Based Smart Controllers Full Season Comparison of Weather Based Smart Controllers Mark A. Crookston, P.E., D.WRE, CAIS, CIC, CID, CIT, CLIA Northern Water, 22 Water Ave, Berthoud, CO 813, mcrookston@northernwater.org Abstract

More information

DFH JOINT VENTURE. Stormwater Management Report for Proposed Residential Subdivision at Graham Block, Pokeno

DFH JOINT VENTURE. Stormwater Management Report for Proposed Residential Subdivision at Graham Block, Pokeno DFH JOINT VENTURE Stormwater Management Report for Proposed Residential Subdivision at Graham Block, Pokeno DOCUMENT CONTROL RECORD Document: DFH Joint Venture Graham Block Stormwater Management Report

More information

SURVEY ON THE OCCUPANT BEHAVIOR RELATING TO WINDOW AND AIR CONDITIONER OPERATION IN THE RESIDENTIAL BUILDINGS

SURVEY ON THE OCCUPANT BEHAVIOR RELATING TO WINDOW AND AIR CONDITIONER OPERATION IN THE RESIDENTIAL BUILDINGS Proceedings of BS13: SURVEY ON THE OCCUPANT BEHAVIOR RELATING TO WINDOW AND AIR CONDITIONER OPERATION IN THE RESIDENTIAL BUILDINGS Hiromi Habara 1, Rakuto Yasue 1 and Yoshiyuki Shimoda 1 1 Graduate School

More information

YOU NAM ELECTRIC CO.,LTD.

YOU NAM ELECTRIC CO.,LTD. YOU NAM ELECTRIC CO.,LTD. 2011 COMPANY INTRODUCTION Younam Electric Corporation, started in 1986 to provide components for refrigerators and air conditions, is growing to be a global core supplier to the

More information

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017 Boulder County Comprehensive Drilling Plan Surface Owner Meeting Thursday, Nov. 2, 2017 Contact Crestone Crestone Peak Resources Quick Facts www.crestonepeakresources.com cdpboulder@crestonepr.com (720)

More information

Early Warning Systems for. Natural Disasters in Korea

Early Warning Systems for. Natural Disasters in Korea EWC III Bonn, March 2006 Early Warning Systems for Natural Disasters in Korea Sam-Kew ROH, Ph.D. National Institute for Disaster Prevention National Emergency Management Agency Republic of Korea 2 Background

More information

SIMS Discover and SIMS FFT Estimates. Chris Sherwood

SIMS Discover and SIMS FFT Estimates. Chris Sherwood SIMS Discover and SIMS FFT Estimates Chris Sherwood SIMS FFT Estimates - Introduction The Fischer Family Trust (FFT) calculate estimates for all pupils in England and Wales. These are used by LA s and

More information

Division Study of Rainwater Utilization in China

Division Study of Rainwater Utilization in China Division Study of Rainwater Utilization in China Haisheng Mou, Huilin Wang, Hsiang-te Kung Beijing Research and Application Institute of Water 1900 Clinton Ave. S., Apt. 11 Minneapolis, MN 55404 USA Fax:

More information

Technical Session 1: Detection, prevention and control of illegal traffic of. e-waste and near-end-of-life electronics

Technical Session 1: Detection, prevention and control of illegal traffic of. e-waste and near-end-of-life electronics Greater Mekong Sub-region (GMS) subregional training workshop on building capacity to deal with the illegal shipments of e-waste and near-end-of-life electronics 10-13 July 2012, Hanoi, Viet Nam Technical

More information

Understanding Surface Water Runoff at Breneman Farms

Understanding Surface Water Runoff at Breneman Farms Understanding Nutrient & Sediment Loss at Breneman Farms 4 Understanding Surface Water Runoff at Breneman Farms Kevan Klingberg, Dennis Frame and Fred Madison UW Extension/Discovery Farms AnitaThompson

More information

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013 City of Norfolk Coastal Flood Mitigation Program March 13, 2013 Topics Brief overview of Norfolk s Coastal Flood Program Data-driven analysis and decision making City-wide vulnerability, project concepts,

More information

(3) Human Settlement. 1) Urbanized Area Collective housings, such as apartments and flats, are not common. Chapter 1 Urban Development

(3) Human Settlement. 1) Urbanized Area Collective housings, such as apartments and flats, are not common. Chapter 1 Urban Development 3) Rural/Heritage Area Land use in Rural Area is mainly the cultivated field. In addition to this, forest area is expanded around the Heritage Area, and shrub area is expanded around the forest area. In

More information

Japan s Activities on

Japan s Activities on Ministry of the Environment Government of Japan Japan s Activities on Environmentally Sound Management of E-waste with the Asian Countries Shunichi Honda, PhD. Office of Waste Disposal Management Ministry

More information

THE ROLE OF GREEN ROOFS IN URBAN DRAINAGE A REVIEW OF THE CASE FROM AUGUSTENBORG ECO-CITY

THE ROLE OF GREEN ROOFS IN URBAN DRAINAGE A REVIEW OF THE CASE FROM AUGUSTENBORG ECO-CITY THE ROLE OF GREEN ROOFS IN URBAN DRAINAGE A REVIEW OF THE CASE FROM AUGUSTENBORG ECO-CITY Justyna Czemiel Berndtsson, PhD The work done at Water Resources Eng., Lund University, Sweden Currently Sydvatten

More information

Integrated Studies of Social and Natural Environmental Transition in Laos

Integrated Studies of Social and Natural Environmental Transition in Laos Integrated Studies of Social and Natural Environmental Transition in Laos Advances in Asian Human-Environmental Research Series Editor Prof. Marcus Nüsser South Asia Institute, University of Heidelberg,

More information

Village of Glenview Appearance Commission

Village of Glenview Appearance Commission Village of Glenview Appearance Commission STAFF REPORT July 23, 2014 TO: Chairman and Appearance Commissioners CASE #: A2014-059 LOCATION: 727 Harlem Avenue FROM: Community Development Department PROJECT

More information

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project PROJECT OVERVIEW Windsor Woods, Princess Anne Plaza and The Lakes are neighborhoods located in what was once

More information

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement Analogue to Digital Telecare Technical Advisory Board 21 st June 2017 Work Stream 3 Procurement Euan Kidd Senior Procurement Specialist Euan.kidd@scotland-excel.org.uk 1 Purpose of Work stream 3 - procurement

More information

JUNE La'Wn Seeding. L. E. Longley. University of Minnesota Agricultural Experiment Station

JUNE La'Wn Seeding. L. E. Longley. University of Minnesota Agricultural Experiment Station Ill 355 JUNE 1941 of La'Wn Seeding By L. E. Longley University of Minnesota Agricultural Experiment Station Date and Rate of Lawn Seeding 1 L. E. Longley THE AMOUNT of lawn grass to sow and the time of

More information

WHEAT DEVELOPMENT AND GROWTH

WHEAT DEVELOPMENT AND GROWTH WHEAT DEVELOPMENT AND GROWTH Ron Rickman and Tami Johlke USDA, Agricultural Research Service, Columbia Plateau Conservation Research Center, Pendleton OR Workshop objective: How would you like to be able

More information

Countywide Recycling and Disposal Facility Weekly Progress Report 08/22/08

Countywide Recycling and Disposal Facility Weekly Progress Report 08/22/08 Countywide Recycling and Disposal Facility Weekly Progress Report 08/22/08 This Weekly Progress Report is prepared by Countywide and submitted to the OEPA weekly by the close of business on each Friday.

More information

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project Project Overview... 2 Thalia Creek (Windsor Woods) Tide Gate... 6 Club House Road Drainage Project... 9 Updated

More information

SOUTHERN GRAMPIANS WETLANDS INFORMATION DAY Sunday 23 rd November 2014

SOUTHERN GRAMPIANS WETLANDS INFORMATION DAY Sunday 23 rd November 2014 SOUTHERN GRAMPIANS WETLANDS INFORMATION DAY Sunday 23 rd November 2014 Progress of wetland restoration trials at Walker, Gooseneck and Brady Swamps Mark Bachmann, Nature Glenelg Trust (NGT) The Walker,

More information

CHART PERUVIAN TECHNICAL STANDARDS

CHART PERUVIAN TECHNICAL STANDARDS CHART PERUVIAN TECHNICAL STANDARDS Peruvian Technical Standards Elaborated by the Normative Technical Committee Rational Use of Energy and the Energy Efficiency - (December 2007) Electric Motors Industrial

More information

TRAINING SCHEDULE. Peachtree City, Georgia Course Schedules for 2018

TRAINING SCHEDULE. Peachtree City, Georgia Course Schedules for 2018 Peachtree City, Georgia Course Schedules for 2018 Non-Condensing & Condensing Tankless Water Heaters Direct Vent Wall Furnaces / Vent- Free Fan Convectors Condensing Boilers TRAINING REVIEW Who Should

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC AND HYDRAULIC CALCULATIONS FOR ACCESS ROADS ALONG THE CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Home Improvement. Sarasota/Bradenton/Venice Market

Home Improvement. Sarasota/Bradenton/Venice Market Home Improvement Sarasota/Bradenton/Venice Market In Sarasota/Bradenton/Venice Per capita home center & hardware sales are 19% over the national average. Home Center & Hardware Store Sales Per Capita $218

More information

SOUTHEND CARELINE ANNUAL REPORT

SOUTHEND CARELINE ANNUAL REPORT SOUTHEND CARELINE ANNUAL REPORT 2015-2016 Meet some of the CareLine Team Southend Careline TSA accredited 2015-2016 Southend Careline offers reassurance and peace of mind to our service users their family

More information

PEANUT PROGRESS. In this issue. Current Peanut Situation. Volume 6, Issue 4. Jason Woodward, Extension Plant Pathologist- State Peanut Specialist

PEANUT PROGRESS. In this issue. Current Peanut Situation. Volume 6, Issue 4. Jason Woodward, Extension Plant Pathologist- State Peanut Specialist Volume 6, Issue 4 September 2012 PEANUT PROGRESS In this issue CURRENT PEANUT SITUATION Weather and crop update Determining peanut maturity Irrigation termination LATE SEASON DISEASE MANAGEMENT Fungicide

More information

Impact of Storm Drains on Urbanized Alluvial Fan Flooding in Ventura County, California

Impact of Storm Drains on Urbanized Alluvial Fan Flooding in Ventura County, California Impact of Storm Drains on Urbanized Alluvial Fan Flooding in Ventura County, California Presented to: FMA Annual 2015 Conference September 8-11, 2015 Presented by: Jim O Brien, Ph.D., P.E. Noemi Gonzalez,

More information

Land SAF LSA-SAF Evapotranspiration (ET) Product

Land SAF LSA-SAF Evapotranspiration (ET) Product Land SAF LSA-SAF Evapotranspiration (ET) Product Alirio Arboleda Budapest 25 April 2017 In collaboration with: Nicolas Ghilain and Françoise Gellens-Meulenberghs Royal Météorological Institute of Belgium

More information

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018 Regional Open Space Conservation Plan Regional Staff Committee January 18, 2018 Schedule We are here Task 1 - Stakeholder Input & Work Plan Dev. v z 2016 2017 2018 Oct Nov Dec Jan Feb Mar Apr May Jun Jul

More information

Flowering Behaviour of Helichrysum obconicum DC.

Flowering Behaviour of Helichrysum obconicum DC. Flowering Behaviour of Helichrysum obconicum DC. M.J.Oliveira Dragovic Direcção Regional de Agricultura, Centro de Floricultura, Lugar de Baixo, 936-119 Ponta do Sol, Madeira Portugal Keywords: Madeira,

More information

Strategies for Summer Utility Savings. Residential Environmental Program Series May 15, 2013

Strategies for Summer Utility Savings. Residential Environmental Program Series May 15, 2013 Strategies for Summer Utility Savings Residential Environmental Program Series May 15, 2013 Are FC Summers Getting Hotter? 200 Fort Collins Annual Hours 90 F or Above 150 100 50 1970 1980 1990 2000 2010

More information

How increased prices in bananas show people will move store for produce January Kantar Worldpanel

How increased prices in bananas show people will move store for produce January Kantar Worldpanel How increased prices in bananas show people will move store for produce January 2015 1 Background Bananas especially loose have been seen as a key battleground within retail over the last few years. The

More information

Towards a Resilient Stormwater Future: Building Back from Hurricane Irene and Tropical Storm Lee. October 15, 2015 VUSP Symposium

Towards a Resilient Stormwater Future: Building Back from Hurricane Irene and Tropical Storm Lee. October 15, 2015 VUSP Symposium Towards a Resilient Stormwater Future: Building Back from Hurricane Irene and Tropical Storm Lee October 15, 2015 VUSP Symposium Russ Dudley, P.E., LEED AP Environmental Engineer Presentation Outline Impacts

More information

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015 RFP 2018-02 DRAINAGE OUTFALL DESIGN AND PERMITTING Mandatory Meeting for Proposers August 15, 2015 IMPORTANT DATES August 15 th, 2:00pm August 17 th, 5:00pm August 22 nd, 5:00pm September 5 th, 2:00pm

More information

Bench Top Production Hydroponic Production

Bench Top Production Hydroponic Production Brian A. Krug Bench Top Production Hydroponic Production Bench Top Production January February March April May June July August September October November December Does it make money? Media Fort Vee mix

More information

ESTIMATING OF CONSUMPTIVE USE OF WATER IN BABYLON GOVERNORATE-IRAQ BY USING DIFFERENT METHODS

ESTIMATING OF CONSUMPTIVE USE OF WATER IN BABYLON GOVERNORATE-IRAQ BY USING DIFFERENT METHODS International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 2, February 2018, pp. 798 807, Article ID: IJCIET_09_02_077 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=2

More information

STATION RISK PROFILE 2018 EWYAS HAROLD

STATION RISK PROFILE 2018 EWYAS HAROLD COMMUNITY RISK MANAGEMENT PLAN 2014-2020 Mid-Point Review 2017-18 STATION RISK PROFILE 2018 EWYAS HAROLD Station Risk Profile 2018 Contents 1 Introduction 3 2 Fire Station Overview 4 3 Incident Overview

More information

Vetiver System for Xinchang Railway Embankment Stabilization The First Vetiver Application for Railway in China

Vetiver System for Xinchang Railway Embankment Stabilization The First Vetiver Application for Railway in China Vetiver System for Xinchang Railway Embankment Stabilization The First Vetiver Application for Railway in China Liyu Xu (China Vetiver Network, P.O. Box 821, Nanjing 210008, China) There has been a great

More information

Toward Environmentally Sustainable and Healthy Urban Transportation in Phnom Penh, Cambodia. By Phnom Penh Healthy City Committee

Toward Environmentally Sustainable and Healthy Urban Transportation in Phnom Penh, Cambodia. By Phnom Penh Healthy City Committee Toward Environmentally Sustainable and Healthy Urban Transportation in Phnom Penh, Cambodia By Phnom Penh Healthy City Committee Secretariat of Phnom Penh Healthy City March 2010 1 Summary With demand

More information

Company Introduction QUALIFICATION STATEMENT ( 주 ) KMS

Company Introduction QUALIFICATION STATEMENT ( 주 ) KMS Company Introduction QUALIFICATION STATEMENT ( 주 ) KMS Ⅰ. Company Overview KMS Corporation has made a ceaseless effort to become the key company in the disaster prevention industry in Korea based on its

More information

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach Hazem Gheith and Vinnie Treatment, Water Division, ARCADIS-US Hunter Kelly, Department of Sewage and Drainage,

More information

Thermal equalization is the obvious answer to the situation. But, how is "thermal equalization" achieved?

Thermal equalization is the obvious answer to the situation. But, how is thermal equalization achieved? OVERVIEW The Airius Thermal Equalizer product line is designed to create a more pleasant working/living environment and to reduce total energy consumption, which results in significant annual cost savings.

More information

VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS. Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign

VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS. Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign Dept of Mechanical & Industrial Engineering 1206 WGreen St Urbana,

More information

Indoor Moisture Control of Auckland Houses with Different Ventilation Systems

Indoor Moisture Control of Auckland Houses with Different Ventilation Systems Indoor Moisture Control of Auckland Houses with Different Ventilation Systems Bin Su International Science Index, Architectural and Environmental Engineering waset.org/publication/17141 Abstract Auckland

More information

FLAGSTAFF FAMILY FOOD BANK Erik Henricksen, Elena Smith, Garrett Ribas, and Meshal Alotaibi Client: Joshua Spears TA: Dr.

FLAGSTAFF FAMILY FOOD BANK Erik Henricksen, Elena Smith, Garrett Ribas, and Meshal Alotaibi Client: Joshua Spears TA: Dr. FOOD STORAGE FACILITY FLOODING FLAGSTAFF FAMILY FOOD BANK Erik Henricksen, Elena Smith, Garrett Ribas, and Meshal Alotaibi Client: Joshua Spears TA: Dr. Wilbert Odem 1 BACKGROUND Figure 1: Food Bank Front

More information

A Functional Annex Alert and Warning

A Functional Annex Alert and Warning A Functional Annex Alert and Warning Approved (June 3, 2004) This page left blank intentionally Table of Contents 1 Purpose... 3 2 Situation and Assumptions... 3 2.1 Situation... 3 2.2 Assumptions... 4

More information

AFTER THE STORM DISPUTING SOME COMMON TREE FAILURE BELIEFS

AFTER THE STORM DISPUTING SOME COMMON TREE FAILURE BELIEFS AFTER THE STORM DISPUTING SOME COMMON TREE FAILURE BELIEFS I began my arboriculture career working for my dad at the age of 16. I am ASCA RCA #633. I have been a Certified Arborist for over ten years.

More information

Presentation Contents

Presentation Contents Department of Conservation & Recreation Division of Dam Safety & Floodplain Management Rappahannock-Rapidan Regional Commission Emergency Action Planning & Other Information November 18, 2014 Presented

More information

EWB Challenge Floating Land Project

EWB Challenge Floating Land Project 1 Executive Summary The floating docks we have designed, through the Engineers Without Borders challenge, can dramatically improve the health and lifestyle of Cambodians living on the Tonle Sap river.

More information

Each Permittee s program must meet the requirements of the Los Angeles County municipal storm water permit (Permit), as summarized in Table 5-1.

Each Permittee s program must meet the requirements of the Los Angeles County municipal storm water permit (Permit), as summarized in Table 5-1. 5. Section 5 F IVE Storm D rain O per ation an d Man ag em ent 5.1 INTRODUCTION 5.1.1 Program Goal and Objectives This program component is applicable to all Permittees who own and operate a storm drain

More information

Welcome to the. Open House

Welcome to the. Open House Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect

More information

Summer School Strategic Spatial Planning: Responding to Territorial Development Challenges in Rural Areas. Organized by

Summer School Strategic Spatial Planning: Responding to Territorial Development Challenges in Rural Areas. Organized by Summer School 2013 Strategic Spatial Planning: Responding to Territorial Development Challenges in Rural Areas Organized by Ministry of Land Management, Urban Planning and Construction (MLMUPC) Faculty

More information

Seasonal soil moisture and nitrogen availability

Seasonal soil moisture and nitrogen availability Farmers inspiring farmers Seasonal soil moisture and nitrogen availability Dr Cassandra Schefe 1 and Stephen Lowe 2 1 Riverine Plains Inc 2 Stony Creek Vineyard Key points Soils in the Rutherglen region

More information

Infiltration basin under normal conditions, with generous grassed area for water soakage (Source: WSUD in the Sydney Region)

Infiltration basin under normal conditions, with generous grassed area for water soakage (Source: WSUD in the Sydney Region) Practice Notes Infiltration basin under normal conditions, with generous grassed area for water soakage (Source: WSUD in the Sydney Region) Water sensitive development involves simple design and management

More information

Hydrology and Aquatic ecology, VVR111 Period 2

Hydrology and Aquatic ecology, VVR111 Period 2 Ronny Berndtsson, Water resources engineering 20 August, 2008 Lars-Anders Hansson, Ecology Cintia Uvo, Water resources engineering Hydrology and Aquatic ecology, VVR111 Period 2 STUDY VISIT FOR PROJECT

More information

Sustainable Urban Drainage Systems (SuDs)

Sustainable Urban Drainage Systems (SuDs) Sustainable Urban Drainage Systems (SuDs) Brendan Colgan, Chartered Engineer Hydrological Cycle - managing the entire cycle is the goal Disruption of the Hydrological Cycle Why use SuDS? G Traditional

More information