1 Reevaluation of Categorical Exclusion Route 659 Reconstruction to 4 Lanes VDOT Project No , B670, B671, C504, P101, R204 (UPC 76244) Loudoun County The Virginia Department of Transportation (VDOT) is proposing to widen Belmont Ridge Road (Route 659) from two to four lanes, from Hay Road (Route 642) to Gloucester Parkway (Route 2150). The proposed project is a right-of-way (RW) and construction (CN) phase of the preliminary engineering (PE) design completed under VDOT Project No , P102 (UPC 8828). In compliance with the National Environmental Policy Act (NEPA) and 23 CFR 771, a Categorical Exclusion was approved in 2007 by the Federal Highway Administration Virginia Division (FHWA) for the PE phase project. Although the proposed project s design is the same as the design evaluated in the 2007 Categorical Exclusion, no major actions or approvals to advance the project have occurred since design approval in Pursuant to 23 CFR , this reevaluation of the 2007 Categorical Exclusion is being prepared to determine what effects changes to the project s concept, to the affected environment, or to applicable environmental laws/regulations might have on the validity of the approved NEPA document. Background The preliminary engineering design for the proposed project began as part of the Route 659, Belmont Ridge Road Improvements Project (VDOT Project No , P102 / UPC 8828) which covered the 3.5-mile corridor from the Dulles Greenway (Route 267) to Harry Byrd Highway (Route 7). The project scope involves the widening of an existing two lane road to four lanes on six-lane right of way, providing shared-use paths, and constructing a bridge over the Washington and Old Dominion (W&OD) Railroad Regional Park, including the W&OD Trail. A Categorical Exclusion (CE) was prepared and accepted by the FHWA on October 15, 2007, confirming FHWA s preliminary approval on February 23, 2006 that the proposed project met the criteria for a CE level of NEPA documentation (Attachment A). The CE was made publicly available for review and comment at the Design Public Hearing held on December 10, Subsequently, major design features were approved by the VDOT s Chief Engineer on May 8, Proposed Action Project Description The Route 659 Reconstruction to 4 Lanes Project (VDOT Project No , B670, B671, C504, P101, R204 / UPC 76244) is located in eastern Loudoun County in northern Virginia (see Figure 1-1). The purpose of the proposed project is to address current and future traffic volumes along the corridor. The improvement of Belmont Ridge Road (between Gloucester Parkway and Hay Road) from a functionally obsolete rural two-lane facility to a fourlane median divided facility on a minimum 150-foot wide right-of-way will help relieve congestion at the intersections along the corridor and improve operation and safety of the corridor. The project includes a grade-separated crossing of Belmont Ridge Road over the W&OD Railroad Regional Park, shared use paths on both sides of Belmont Ridge Road with Page 1 of 9

2 direct connections to the W&OD Trail and to a trail network linking to residential communities to the east. Figure 1-1: Project Location Map Page 2 of 9

3 Logical Termini and Independent Utility Since the approval of the 2007 CE, there have been some changes within the original study limits. Improvements to Route 659 north of Gloucester Parkway were incorporated into an Environmental Assessment (EA) prepared for a proposed Route 7 / Belmont Ridge Road (Route 659) Interchange Project (VDOT Project No , B667, C501, D655, P101, R201 (UPC 99481)). Specifically, improving Route 659 to a four-lane divided roadway with a wide median was extended to Gloucester Parkway to establish a logical terminus for the interchange project. FHWA issued a Finding of No Significant Impact (FONSI) for the Route 7 / Belmont Ridge Road (Route 659) Interchange Project in April 2013 and final design activities began with federal RW authorization in October Route 659 was also improved to a four-lane divided roadway from Hay Road to the Dulles Greenway by a county imposed developer proffer. Since the proffered road improvements occurred without federal funds and prior to the federal right-of-way authorization of the Route 659, Belmont Ridge Road Improvements Project, this segment of Route 659 is not considered irrevocably federalized from a NEPA standpoint. While 23 CFR (f) does not address reevaluations per se, the Route Reconstruction to Four Lane project meets the three general principles outlined in FHWA s regulation: 1. Connect logical termini and be of sufficient length to address environmental matters on a broad scope - The termini are logical in that the southern limits connect to a four-lane section of Route 659, and the northern limits connect to a planned four-lane section of Route 659 that is funded and in the right-of-way acquisition phase. Environmental issues throughout the entire corridor were addressed in the Route 659 Belmont Ridge Road Improvements CE. Additionally, the EA for Route 7 / Belmont Ridge Road (Route 659) Interchange Project addressed environmental issues to north of Gloucester Road. 2. Have independent utility or independent significance - The proposed project can function as stand-alone improvements without forcing other improvements which may have impacts; and 3. Not restrict consideration of alternatives for other reasonably foreseeable transportation improvements - The improvements related to the proposed project do not restrict consideration of other reasonably foreseeable transportation improvements. The other reasonably foreseeable transportation improvement in the immediate vicinity of the project is the Route 7 / Belmont Ridge Road (Route 659) Interchange Project. Right-of-way is currently being acquired for this project; therefore, the scope of that project is set and location alternatives are no longer under consideration. Typical Section Lane width will remain at existing condition (12 feet) and number of traffic lanes will increase from two to four lanes on a minimum 150-foot right-of-way. Additionally, the project will include grade-separated crossing of Belmont Ridge Road over the W&OD Trail, shared use Page 3 of 9

4 paths on both sides of Belmont Ridge Road with direct connections to the W&OD Trail and to a trail network linking to residential communities to the east. Financial Constraint The proposed project is listed in an approved, financially constrained FFY15-18 STIP/TIP approved by FHWA/FTA on September 30, Subsequent phases for RW and CN will be funded through local revenue contributions (see Figure 1-2). Figure 1-2: Local Revenue Contributions Page 4 of 9

5 Environmental Review Socio-Economics Low income/minority populations are present within the project area and will not be impacted by the proposed project. The impacts from the project are not predominantly borne by this population and the effect is not greater in magnitude for this population than for nonminority/non low-income populations. Although an Environmental Justice (EJ) population is present there are no impacts to the EJ population (i.e., no relocations, no displacements, no disruption of community, and no disruption of emergency services). No minority or low-income populations have been identified that would be adversely impacted by the proposed project as determined above. Therefore, in accordance with the provisions of E.O and FHWA Order , no further EJ analysis is required. Community services and publicly owned recreation facilities are present within the project area; impacts from grade-separated crossing of Belmont Ridge Road over W&OD Railroad Regional Park will be minor and will not adversely affect the park. The crossing upgrade will be constructed in accordance with Northern Virginia Regional Park Authority (NVRPA) standards for vertical and horizontal clearances over the W&OD Trail. The project will include shared use paths on both sides of the road with connections to W&OD Trail. No adverse impacts anticipated on the Belmont Elementary School. Road closures, right-of-way abandonment, and interruption of emergency access onto the W&OD Railroad Regional Park may impact emergency responders. There are existing and planned bicycle/pedestrian facilities within the project area. Route 659 crossed over the W&OD trail which is a regional bicycle and pedestrian facility. Per the Loudoun County Transportation Plan, Route 659 is planned to have four lanes and is therefore also planned to have a 10 foot wide shared use path. The proposed project will accommodate the planned and existing facilities by providing a shared use path on either side of the roadway; by providing direct connections to the existing W&OD trail; and by providing a grade-separated intersection at the W&OD trail. The proposed project will not disrupt any existing or planned communities. The proposed project is an existing facility that will be upgraded. Per the Loudoun County Countywide Transportation Plan, Route 659 in the location of the proposed project is planned as four lanes and several previous land developments along Route 659 have already accommodated the rightof-way for the proposed widening. The project is consistent with the Loudoun County s Comprehensive Plan and more specifically with the Revised General Plan, which envisions this segment of Route 659 as a dividing line between residential communities on the east side and business and other land uses on the west side. Page 5 of 9

6 Cultural Resources On June 5, 2014, the Virginia Department of Historic Resources (DHR) concurred with VDOT s recommendation that the W&OD Railroad Historic District retains sufficient integrity to remain eligible for listing in the National Register of Historic Places and that the six recorded properties; identified as DHR inventory numbers , , , , , and ; are neither individually eligible or eligible as contributing resources to the historic district. Subsequently, the DHR provided their concurrence with VDOT on July 18, 2014 that the proposed project will have No Adverse Effect on the W&OD Railroad Historic District and no additional cultural resources investigation was necessary. Section 4(f) and 6(f) As previously noted, the W&OD Railroad Historic District is eligible for the National Register of Historic Places. VDOT recommended a No Adverse Effect determination and informed DHR of FHWA s intent to make a de minimis finding; DHR provided their concurrence with VDOT on July 18, W&OD Railroad Regional Park, a Section 4(f) and Section 6(f) property is a public park, with funding from the Land Conservation and Water Act (LCWA). The estimated area of impact to parkland is approximately 1.64 acres. The project will require approximately 0.42 acre of permanent easements and 1.12 acres of temporary construction easements. The use of this property comes in the form of drainage improvements, a bridge crossing at Belmont Ridge Road over the W&OD Railroad Regional Park, and shared use paths on both sides of Belmont Ridge Road with direct connections to the W&OD Trail and to a trail network linking residential communities to the east. A parking area for users will be constructed with an access path to the W&OD Trail and no piers or structures of the bridges will occur within W&OD Railroad Regional Park property. NVRPA concurred with VDOT on November 3, 2014 that the permanent and temporary construction easements would not adversely impact the W&OD Railroad Regional Park; and, based on the proposed design, impacts to park property that could be expected as a result of the project would not adversely affect the activities, features, and attributes of the Section 4(f) property. NVRPA concurrence was granted with the understanding that VDOT will consult with NVRPA as project development proceeds. FHWA made a finding of de minimis impact for the W&OD Railroad Regional Park/W&OD Railroad Historic District on November 4, 2014 (Attachment B). With regard to Section 6(f), NVRPA informed VDOT in an dated December 18, 2013 that the finding in the original letter dated September 26, 2007 from Virginia Department of Conservation and Recreation (DCR) is still valid. In that letter DCR advised NVRPA that there is no conversion or use of the 6(f) property. NVRPA concurred on November 3, 2014 that there are no permanent easements and that temporary easements are less than six months, and NVRPA has granted a license for areas that require temporary easements greater than six months. As such there are no 6(f) conversions on W&OD Railroad Regional Park property. Natural Resources Three unnamed tributaries of Goose Creek would be crossed by the project and result in approximately 521 feet of stream impacts. VDOT conducted a database search and coordinated Page 6 of 9

7 with Department of Game and Inland Fisheries and DCR for potential threatened and endangered species in the project area; no species were identified. The project crosses a flood area located approximately 1300 feet south of Route 7. Per FEMA Floodplain Map 51107C0235D, this flood area is designated Zone X, which is characterized as an area of 500-year flood, an area of 100- year flood with an average depth of less than 1 foot or with a drainage area of less than one square mile, or an area protected by levees from a 100-year flood. Approximately 0.75 acres of jurisdictional areas (streams and wetlands) would be impacted, which would require an SPGP and VWP General Permit from the U.S. Army Corps of Engineers (COE) and the Virginia Department of Environmental Quality, respectively. Due to design changes related to drainage improvements there will be additional impacts to jurisdictional waters of the U.S. primarily associated with the outfalls of SWM5 and SWM6. These additional impact quantities could affect the permitting such that a COE Individual Permit would be required. Also, additional impacts will require additional compensatory mitigation. No T&E species are within the required search distance. Agricultural/Open Space Agricultural/Forrestal Districts and Open Space Easements are not present within the project footprint. Farmland The entire area is either zoned for or is in urban or industrial use. No agriculture or farmland is present in the project area. Invasive Species Based on site visits by VDOT, invasive species are likely to be present in the project area. DCR has only general information about the distribution of invasive species. Many invasive species are adapted to take advantage of soil disturbances and poor soil conditions. Non-native invasive plants are found throughout Virginia. Therefore the potential exists for some VDOT projects to further the establishment of invasive species. Minimizing soil disturbance will help to inhibit the establishment of invasive species. Noxious weeds common to Virginia are the Purple Loosestrife and the European Wand Loosestrife. Air Quality The proposed project is exempt under 40 CFR The clearance also references traffic forecasts for the project that are below current thresholds at which modeling would be required. In addition, the previous air study (conducted before the current thresholds for carbon monoxide were established) addressed air quality impacts. Noise Due to the changes in FHWA s Noise Abatement Regulations (23 CFR 772) and new developments in the project area since the 2007 Noise Impact Analysis Technical Report, VDOT determined that a new noise study would be prudent. A Final Design Noise Analysis was completed in June 2014 to evaluate potential traffic noise impacts and abatement measures associated with the proposed Route 659 Reconstruction to Four Lanes Project. Potential Page 7 of 9

8 traffic noise impacts were assessed in accordance with the current procedures and criteria approved by the FHWA and VDOT. A total of 212 noise sensitive sites were modeled in the project study area representing 271 residences, and eight recreational sites at Founder s Park. A total of 21 residences represented by 21 noise sensitive sites, are predicted to be impacted by traffic noise under the future design year (2036) build condition, due to levels approaching or exceeding the FHWA s Noise Abatement Criteria (NAC). For all sites studied, the future design year (2036) build noise levels are predicted to range from 40 to 69 decibels (dba). Noise abatement measures were evaluated where future noise impacts were predicted to occur. Three barrier systems were evaluated as part of the final design noise analysis, which include proposed and existing noise barriers. Barrier System 1 would be located along the Route 659 northbound lane from Hay Road to north of Chesterton Street. The barrier system was broken down into five separate noise barriers due to the need to provide access to the shared use path within the Common Noise Environment. Barrier System 1 would benefit 11 impacted receptors and 50 non-impacted receptors. Barrier System 1 was determined to be warranted, feasible and reasonable. Barrier System 2 consists of 2 separate noise barriers located along Route 659 northbound lane in the vicinity of Belmont Station Drive and would benefit 4 noise impacted receptors. While Barrier System 2 was determined warranted and feasible, it was not reasonable. Barrier System 3 was found to be both feasible and reasonable under the VDOT's State Noise Abatement Policy. While this barrier system, located east of Route 659 and north of Gloucester Parkway, will be constructed under the Route 7 / Belmont Ridge Road (Route 659) Interchange Project, it was evaluated as an existing barrier for this analysis and there were no noise impacts identified behind this barrier in the design year Subsequently, Barrier System 3 was not reevaluated for reasonableness and feasibility per the VDOT's State Noise Abatement Policy. Construction activity may cause intermittent fluctuations in noise levels. During the construction phase of the project, all reasonable measures will be taken to minimize noise impact from these activities. Right-of-Way and Relocations The project will require approximately 34 acres of right-of-way, including one total acquisition of 0.50-acre of vacant land. Of the 34 acres, approximately 16 acres is fee simple acquisition, 17 acres is permanent easements, and 0.06 acre is utility easements. Hazardous Materials VDOT assessed the potential for hazardous materials and/or contamination within the Project area. While no known hazardous materials condition within the existing right of way is anticipated, Phase I Environmental Site Assessment (ESA) will need to be performed prior to acquisition of any new right-of-way or permanent easements. Page 8 of 9

9 Cumulative and Indirect Impacts Loudoun County currently has a design underway for the construction of an interchange at the intersection Route 7 (Harry Byrd Highway) and Route 659 (Belmont Ridge Road) from Route 7 (Harry Byrd Highway to Route 2150 (Gloucester Parkway). Additionally, Loudoun County has one zoning application for a future development along Belmont Ridge Road. When combined with the proposed action the intensity of the incremental impacts of these projects are not considered significant, when viewed in the context of impacts from other past, present, and reasonably foreseeable future actions and would not rise to a level that would cause significant cumulative or indirect impacts. Public Outreach The CE for the Route 659 Belmont Ridge Road Improvements Project was made available for public review and comment at a Design Public Hearing meeting held on December 10, 2007 from 5:30 p.m. to 8:30 p.m. at the Stone Bridge High School in Ashburn, Virginia. The attendance sheet contained 118 signatures. Oral comments were received from 1 speaker and written comments were received from 78 citizens: 14 comments about air quality and noise/sound wall issues, 12 comments about view shed impact concerns, 4 commented about impacts to a historic graveyard and 4 commented about impacts/access at W&OD Trail crossing. There was no substantial controversy on environmental grounds, there is however opposition to the project from the Coalition for Smarter Growth, who is largely focused on concerns of sprawl and additional traffic (Loudoun County Scoping Letter). By resolution dated July 15, 2008, the Loudoun Board of County Supervisors endorsed the plans for Belmont Ridge Road from Harry Byrd Highway (Route 7) to the Dulles Greenway (Route 267) as presented at the VDOT public hearing. Additionally, the Board of Supervisors further requested VDOT to continue work on the road improvement project on Belmont Ridge Road with the phasing for the first segment for construction to be the half section from Portsmouth Boulevard to Gloucester Parkway. A Public Notice for this Reevaluation of Categorical Exclusion will be published in at least three locally accessible newspapers. The document will be available for 15 days for public review and comment at the VDOT- Northern Virginia District Office, and on the VDOT s website under the Northern Virginia Projects page. Summary and Conclusion The Virginia Department of Transportation believes that this reevaluation demonstrates that the Route 659 Reconstruction to Four Lanes Project referenced above continues to meet the criteria for a Categorical Exclusion pursuant to 40 CFR and 23 CFR and will not result in significant impacts to the human or natural environment. Page 9 of 9

10 Attachment A

11 Categorical Exclusion (CE) Project Information Project Name: Route 659, Belmont Ridge Road Improvements Federal Project#: STP-053-9(021) Project Number: , P102 Project Type: Construction UPC: 8828 Charge Number: Route Number: 659 Route Type: Secondary Project Limit--From: DULLES GREENWAY (ROUTE 267) To: ROUTE 7 (HARRY BYRD HIGHWAY) Additional Project Description: Widen existing 2-lane road to 4 lanes on 6 lane right of way, provide shared-use paths, and bridge crossing of W&OD Railroad Regional Park, also known as the W&OD Trail. District: City/County: Residency: Northern Virginia Loudoun Leesburg Date CE level document approved by VA Division FHWA: 02/23/2006 FHWA Contact: Sundra, Ed Project in STIP: Yes In Long Range Plan? Yes CE Category 23 CFR : d01 Description of Category: Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (e.g. parking, weaving, turning, climbing). Logical Termini and Independent Utility: Yes Comments: Rt. 659 (Belmont Ridge Road) is a secondary roadway and classified as a Rural Major Collector. The existing two-lane roadway has approximately 20 feet of asphalt pavement with minimal shoulders and a 50-foot right of way (ROW). The project has a logical terminus at the southern end at the intersection of Rt. 267 (Dulles Greenway); the northern end has a logical terminus at Rt. 7/Harry Byrd Highway where the roadway ties into the existing intersection. The total project is approximately 3.40 miles. The existing two-lane roadway is inadequate for current traffic volumes. The project will improve traffic flow and safety in the corridor. The widening will also help relieve congestion at the Rt. 7 intersection. The Rt. 7 intersection is a major bottleneck where rock quarry trucks hold up traffic due to turning movements. The project provides independent utility by addressing current and future traffic volumes and ongoing developments along the Rt. 659 corridor. Typical Section: The roadway would consist of four 12-foot lanes on a minimum 150-foot six-lane) ROW, with turning lanes, mountable curb and gutter on the outside, eight-foot median shoulders, 10-foot shared use paths on each side, and a 42-foot depressed grass median. Additional ROW width may be needed for turning lanes at major intersections, storm-water management basins, increased curve radii, grading, sound barriers, and other associated items. Structures: There are two box culverts at one unnamed stream crossing and separate bridges for the north-bound and south-bound lanes spanning the W&OD Railroad Regional Park (W&ODRRP, known locally as W&OD Trail) Page 1 of 5 10/15/2007

12 SOCIO-ECONOMIC Minority/Low Income Populations: Not Present Disproportionate Impacts to Minority/Low Income Populations: No Source: US Census Bureau Fact Sheets and Factfinder for zipcode Existing or Planned Public Recreational Facilities: Present with no impact Community Services: Present with no impact Consistent with Local Land Use: Yes Source: Loudoun County ADC map; VDOT site visits; Loudoun County Office of Transportation Services; Loudoun County Planning Dept.; Loudoun County Fire, Rescue & Emergency Services; Comprehensive Plan Existing or Planned Bicycle/Pedestrian Facilities Present with no impact Source: Loudoun County Planning Department Socio-Economic Comments: Based on the 2000 Census, minority or low income populations are not present in project area. Project includes improving at-grade intersection with the W&OD Railroad Regional Park (W&ODRRP, also known as W&OD Trail) by constructing bridges over the trail. The W&ODRRP is eligible for the National Register of Historic Places (NRHP). The crossing upgrade would be in accordance with Northern Virginia Regional Park Authority (NVRPA) policies with no piers in the W&ORRP R/W. Project will include shared use paths on both sides of the road with connections to W&ODRRP. No adverse impacts anticipated on the Belmont Elementary School. Road closures, R/W abandonment, re-naming of streets, and interruption of emergency access onto the W&ODRRP may impact emergency responders. Planned uses in the project corridor are "keynote" employment, business, general industrial, heavy industry, community center and residential. The project is consistent with proposed land uses and zoning. SECTION 4(f) and SECTION 6(f) Use of 4(f) Property: Yes 4(f) Evaluations: Selected Evaluation(1): Acres of Use: 0.36 Type of Use: Permanent Type of Resource: Public Park Name of Resource: W&OD Railroad Regional Park (W&ODRRP) Comments: W&ODRRP is a public park and also eligible for the National Register of Historic Places. The project would require 0.36 acre of permanent maintenance easement and 0.45 acre of temporary easement.additional information is included in the Section 4(f) de minimis Impact Finding Checklist. De Minimis: Yes The officials with jurisdiction have concurred that the transportation use of the Section 4(f) resource, together with any impact avoidance, minimization, and mitigation or enhancement measures incorporated into the project, does not adversely affect the activities, features, and attributes that qualify the resource for protection under Section 4(f). Based on this FHWA intends to make a De minimis impact finding. Source: VDOT project plans, Northern Virginia Regional Park Authority, Loudoun County Planning Department 6(f) Conversion: No Acres of Conversion: 0 4(f) and 6(f) Comments: Constructed shared use paths will provide connection to the right of way of the W&ODRRP, a 4(f)/6(f) property. A parking area for users will be constructed with an access path to W&ODRRP. No piers or structures of the bridges will occur within W&ODRRP R/W. NVRPA concurred with VDOT that temporary construction easements would not permanently adversely impact the W&ODRRP, and, based on the proposed design, impacts to park property that could be expected to result from the project would not adversely affect activities, features, and attributes of the park; NVRPA concurrence was granted with the understanding that VDOT will consult with NVRPA as project development proceeds. DCR advised NVRPA that there is no conversion or use of the 6(f) property. CULTURAL RESOURCES Section 106 Effect Determination: NO ADVERSE EFFECT Name of Historic Property: W&OD Railroad Regional Park (W&ODRRP) DHR Concurrence date: 08/27/2007 National Register eligible MOA Execution Date: None Cultural Resource Comments: VDOT conducted an architectural resources survey and determined that no structure in the project area was individually eligible for the NRHP and no structure was a contributing element to a historic district. The W&ODRRP had been determined NRHP-eligible. VDOT conducted an archaeological resources survey and determined that potential archaeological resources were present in proposed R/W. A Phase II archaeological survey was conducted and no significant resource was identified. Excavations were conducted in proposed easement near African-American cemetery at Rt. 7; no additional burials or other archaeological features were identified. VDOT coordinated with NVRPA in design of crossing over W&ODRRP to ensure impacts would be minimal. VDHR concurred with VDOT recommendations of no effect on the cemetery and the effect on W&ODRRP would not be adverse Page 2 of 5 10/15/2007

13 NATURAL RESOURCES Waters of the U.S.: Present with impacts Compensatory Mitigation Required Linear Feet of Impact: 521 Federal Threatened or Endangered Species: None T&E Review: No T&E Species are within the required search distance. As of 01/29/2007 S Pomeroy 100 Year Floodplain: Not Present Regulatory Floodway Zone: Not Present Public Water Supplies: Not Present Tidal Waters/Wetlands: Not Present Wetlands: Present with impacts Wetlands: Acres of Impact: 0.75 Wetland Type: Forested Permits Required: Yes Natural Resource Comments: Three unnamed tributaries of Goose Creek would be crossed by the project and result in approximately 521 feet of stream impacts. VDOT Natural Resources staff conducted a data search of the DGIF data base and coordinated with Department of Game and Inland Fisheries and DCR for potential threatened and endangered species in the project area; no species were identified. The project crosses a flood area located approximately 1300 feet south of Rt.7. Per FEMA Floodplain Map 51107C0235D, this flood area is designated Zone X, which is characterized as an area of 500-year flood, an area of 100-year flood with an average depth of less than 1 foot or with a drainage area of less than one square mile, or an area protected by levees from a 100-year flood. Four jurisdictional areas (streams and wetlands) would be impacted. AGRICULTURAL/OPEN SPACE Open Space Easements: Not Present Agricultural/Forestal Districts: Not Present Source: VDOT Comprehensive Environmental Data and Reporting System (CEDAR) GIS Integrator, Virginia Outdoors Plan, Natural Resources and Conservation Service District Conservationist, Loudoun County Planning Dept, Agricultural/Open Space Comments: No open space easements or agricultural/forestal districts are present in the project area. FARMLAND NRCS Form CPA-106 Attached? No NRCS Form CPA-106 not attached because: Land already in Urban use. Entire project in area not zoned agriculture. Alternatives Analysis Required? No Source: Census Bureau Urbanized Map; Loudoun County Board of Supervisors, Aerial photos, Site visits Farmland Comments: The entire area is either zoned for or is in urban or industrial use. No agriculture or farmland is present in the project area. INVASIVE SPECIES Invasive Species in the project area? Unknown VDCR indicated that the potential exists for some VDOT projects to further the establishment of invasive species. All seeds used will be tested in accordance with the Virginia Seed Law to ensure there are not prohibited Noxious Weed-Seeds in the seed mixes. Invasive Species Comments: Based on site visits by VDOT, invasive species are likely present in the project area. DCR has only general information about the distribution of invasives. Many invasive plant species are adapted to take advantage of soil disturbances and poor soil conditions. Non-native invasive plants are found throughout Virginia. Therefore, the potential exists for some VDOT projects to further the establishment of invasive species. Soil disturbances will be minimized to the extent feasible to inhibit the establishment of invasive species in the disturbed areas. Only approved seeds will be used for stabilization Page 3 of 5 10/15/2007

14 AIR QUALITY Carbon Monoxide This project is located in: A Carbon Monoxide Attainment Area CO Microscale Analysis Required for NEPA? Yes Study completed and uploaded to CEDAR in June This air form was completed August 2007 following the implementation of a new air form format on CEDAR. Ozone This project is located in: An 8-hour Ozone Nonattainment Area This project is modeled properly for conformity in the 2006 LRP. Particulate Matter This project is located in: A PM2.5 Maintenance Area This project is modeled properly for conformity in the 2006 LRP. PM Hotspot Analysis Required for NEPA? Yes A qualitiative analysis was included with the air study completed and uploaded to CEDAR in June Mobile Source Air Toxicse This project requires: A qualitative MSAT analysis The project potentially expands intermodal centers or impacts truck traffic only to the exent that requires a qualitative assessment. A qualitiative analysis was included with the air study completed and uploaded to CEDAR in June NOISE Noise Scoping Decision: Type I - Noise study required Barriers Under Consideration? Yes Noise Comments: Twenty sites (48 residential properties) are impacted by design-year build conditions. Two sites are impacted under existing and no-build conditions. Four noise barriers appear feasible, but only one would be reasonable. The reasonable barrier would protect 6 sites (18 residential properties) and benefit 10 additional sites (23 residential properties). No schools or churches are present. A noise impact is not predicted to occur at the W&ODRRP under design year conditions, but would occur under existing and no-build conditions. No noise impacts to commercial facilities are predicted. RIGHT OF WAY AND RELOCATIONS Residential Relocations: Yes Number of Residential Relocations: 2 Commercial Relocations No Non-Profit Relocations: No Right of Way required? Yes Amount of Right of Way Acreage: 27 Septic Systems or Wells: Present with impacts Hazardous Materials: Not Present Source: Loudoun County Health Department; VDOT Location & Design memo 6/16/05; VDOT R/W Data Sheets; Loudoun County Health Department; VDOT CEDAR GIS Integrator; VDOT Hazardous Materials Manager ROW and Relocations Comments: VDOT Location and Design estimates that two residential relocations would be required; no non-profit, commercial, or industrial relocations would be required. Loudoun County Health Department initially stated that all properties in close proximity to the roadway have been placed on public sewer; it was later determined that the septic system of one property would be impacted and it will be connected to public sewer. Loudoun County Health Department stated three properties with wells may be impacted. VDOT data searches indicated a public water supply at Goose Creek Reservoir. Virginia Department of Health did not provide any comments. The Project has been cleared by VDOT Regional Hazardous Materials Manager. VDOT GIS Integrator searches and searches of the Virginia Department of Environmental Quality hazardous waste databases revealed no hazardous materials in the project area Page 4 of 5 10/15/2007

15 CUMULATIVE AND INDIRECT IMPACTS Present or reasonably foreseeable future projects (highway and non-highway) in the area: Yes Impact same resources as the proposed highway project (i.e. cumulative impacts): Yes Indirect (Secondary) impacts: Yes Source: Loudoun County Planning Dept. Cumulative and Indirect Impacts Comments: The project area is zoned for offices parks, industries, commercial development and residential development. Road improvements south of the project area are underway or planned. The project will result in a minor cumulative increase in the impervious surface in the area with increased runoff managed by basins. In the project area, and along its length, the W&ODRRP has been and is being encroached on and its setting compromised. In the project vicinity, residential development has occurred adjacent to W&ODRRP, and roads constructed parallel to it. The incremental impact of the project on the W&ODRRP is not significant in the context of past, present, and reasonably foreseeable projects. The loss of both wetlands and forest lands at the regional level from past land practices and development is well documented. The incremental impact of the project on these resources would not be considered significant in the context of the impact from past, present, and reasonably foreseeable projects. PUBLIC INVOLVEMENT Substantial Controversy on Environmental Grounds: No Source: Loudoun County Planning Department coordination and comments, and VA agencies reviews Public Hearing: Yes Type of Hearing: Combined Hearing Other Public Involvement Activities: No Type of Public Involvement: Public Involvement Comments: No Public Hearning or other Public Involvement Activity has occurred at time of this document preparation. A public hearing is anticipated for December COORDINATION State Agencies: Department of Health DEQ - Air Division DEQ - Water Division Department of Conservation and Recreation Department of Forestry Dept. of Mines, Minerals and Energy Department of Game and Inland Fisheries Department of Historic Resources Local Entity: Loudoun Housing Director Loudoun Public Works Loudoun County Administrator Loudoun Parks and Recreation Loudoun County Health Department Loudoun Office of Transportation Loudoun Economic Development Office Loudoun County Board Of Supervisors Loudoun Regional Park Authority Loudoun Superintendent of Schools Loudoun County Board Of Supervisors Loudoun Planning District Loudoun Regional Park Authority Loudoun Regional Park Authority Loudoun Fire and Rescue Other Coordination Entities: City of Fairfax Dept. of Utilities Loudoun County Sanitation Authority USDA District Conservationist Loudoun County Dept. of Social Services Loudoun County Div. of Environmental Health Federal Agencies: NRCS This project meets the criteria for a Categorical Exclusion pursuant to 40 CFR and 23 CFR and will not result in significant impacts to the human or natural environment Page 5 of 5 10/15/2007

16 Attachment B

17 From: To: Cc: Subject: Date: Muse, John C. (VDOT) Brown, Anissa (VDOT) RE: VDOT Project No , P101, R204/UPC Belmont Ridge Road Reconstruction/Rte. 659 in Loudoun County Tuesday, November 04, :02:31 PM John, We hereby make a finding of de minimis impact for the W&OD Railroad Regional Park/W&OD Railroad Historic District. John John Simkins Planning and Environment Team Leader FHWA - Virginia Division (804) John.Simkins@dot.gov From: Muse, John C. (VDOT) [mailto:john.muse@vdot.virginia.gov] Sent: Tuesday, November 04, :28 PM To: Simkins, John (FHWA) Cc: Brown, Anissa (VDOT) Subject: VDOT Project No , P101, R204/UPC Belmont Ridge Road Reconstruction/Rte. 659 in Loudoun County John, The subject project to widen Route 659 to four lanes involves constructing a bridge over the W&OD Railroad Regional Park (i.e., W&OD Trail). In December 2013, VDOT obtained preliminary concurrence from the Northern Virginia Regional Park Authority (NVRPA) of VDOT s assessment that the project will not permanently adversely affect the W&OD Railroad Regional Park. A 15-day Public Notice (attached) was published in three readily available newspapers: Papers to Publish Dates to Publish Washington Post August 29 Loudoun Times-Mirror September 3 El Tiempo Latino September 5 No comments were received from the Public Notice and VDOT obtained NVRPA s final concurrence with Section 4(f) applicability criteria for temporary occupancy and de minimis impacts on November 3, I have attached their signed final concurrence letter which is conditioned on: The temporary construction easements will not be occupied for anytime greater than 6 months. The permanent easements will be in the form of a drainage easements and an aerial easement for the bridge.

18 A minimum vertical clearance of 14.5 feet above the highest point in the trail under the bridge and no bridge supports/piers on W&OD Railroad Regional Park property. Parkland will be restored to NVRPA specifications. Continuity of trail traffic will be maintained during construction. Lastly, VDOT coordinated Section 106 with VDHR to obtain a No Adverse Effect concurrence on July 7, No further Section 4(f) analysis for eligible historic resources was necessary. Based upon the above information and attachments, VDOT is requesting a Section 4(f) de minimis finding from FHWA. If any additional information is needed, please let me know. John C. Muse District Environmental Manager Virginia Department of Transportation 4975 Alliance Drive Fairfax, Virginia (o) (c)

19

20

21

22

23

24

25

26

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION Suite 900 - James K. Polk Building 505 Deaderick Street Nashville, Tennessee 37243-0334 MEMORANDUM TO: FROM: Files Joe W. Matlock,

More information

ITS Concept Development Activity Descriptions

ITS Concept Development Activity Descriptions ITS Concept Development Activity Descriptions October 2015 Procedures are subject to change without notice. Check the NJDOT website to ensure this is the current version. Table of Contents Concept Development

More information

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates... PROJECT COMMITMENTS SUMMARY... S-1 1. Type of Action... S-1 2. Description of Action... S-1 3. Summary of Purpose and Need... S-1 4. Alternatives Considered... S-2 5. NCDOT Alternatives Carried Forward...

More information

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

North Carolina Department of Transportation Project Development and Environmental Analysis Branch North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,

More information

CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY)

CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY) December 11, 2012 CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY) Project Number: Kansas Department of Transportation (KDOT) Project No. 435-46 KA-1002-03 Route:

More information

NEPA Categorical Exclusion Documentation

NEPA Categorical Exclusion Documentation NEPA Documentation May 2018 NEPA Categorical Exclusion Documentation Belmont Bridge Replacement Project VDOT Project: 0020-104-101 UPC #75878 Final - May 1, 2018 P R EPARED FOR P R EPARED BY Documentation

More information

SECTION 4(f) DE MINIMIS DOCUMENTATION

SECTION 4(f) DE MINIMIS DOCUMENTATION SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)

More information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination I-494 Rehabilitation Project SP 2785-330 (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination State Project Number 2785-330 Federal Project No. NHPP-I494 (002) Trunk Highway:

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2 DATE: January 27, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT DATE: January 26, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the

More information

Response: The public school use, including the SWM facility, is within the R-1 District.

Response: The public school use, including the SWM facility, is within the R-1 District. Loudoun County School Board Dulles North Elementary School (ES-31) CMPT 2017-0006 and SPMI 2017-0015 First Response to Referral Comments Zoning Administration Comments dated October 2, 2017 Comment 1:

More information

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below: Race Road/Jessup Village Planning Study (H550601) Project Newsletter Spring 2015 Project Description The Study Team, consisting of staff from Anne Arundel County (Department of Public Works and Department

More information

Project Overview. Get Involved. Public Information Meeting. Contact Information

Project Overview. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Presented to Pennsylvania Agency Coordination Meeting May 27, 2015 Doug Smith & Ryan Gordon 1 Southwestern

More information

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina 1.0 INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 U.S.C. 303, requires that prior to

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

Appendix E Section 4(f) Evaluation

Appendix E Section 4(f) Evaluation Appendix E Section 4(f) Evaluation Appendix E Draft Section 4(f) Evaluation E.1 Introduction This appendix addresses a federal regulation known as Section 4(f), which protects parks, recreation areas,

More information

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES 7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an

More information

INTER-AGENCY COORDINATION MEETING

INTER-AGENCY COORDINATION MEETING Virginia Department of Transportation INTER-AGENCY COORDINATION MEETING Joint Permit Application DEQ COE VMRC I. VDOT PROJECT INFORMATION PERMIT #: PRE-APP#: Route: VDOT Project Number: City/County: Contract

More information

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility. SUMMARY THE I-69 LOCATION STUDY The proposed I-69 Location Study from El Dorado to McGehee, Arkansas, represents one section (Section of Independent Utility No. 13) of the nationally designated I-69 Corridor

More information

Fairfax County Parkway (Route 286) Widening Project

Fairfax County Parkway (Route 286) Widening Project Fairfax County Parkway (Route 286) Widening Project Route 29 (Lee Highway) to Route 123 (Ox Road) State Project No. 0286-029-259, P101; UPC 107937 Fairfax Station HOA Meeting January 30, 2018 7:00 to 9:00

More information

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING I-66 EASTBOUND WIDENING INSIDE THE BELTWAY From the Dulles Connector Road (Route 267) to Fairfax Drive (Route 237) PARDON OUR DUST MEETING Bill Cuttler, PE (VDOT District Construction Engineer, Northern

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Endorsement of Design for Route 7/George Washington Boulevard Overpass. Algonkian and Broad Run

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Endorsement of Design for Route 7/George Washington Boulevard Overpass. Algonkian and Broad Run BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: March 7, 2017 # 14 SUBJECT: ELECTION DISTRICTS: CRITICAL ACTION DATE: STAFF CONTACTS: Endorsement of Design for Route 7/George Washington

More information

7.0 DRAFT SECTION 4(f) EVALUATION

7.0 DRAFT SECTION 4(f) EVALUATION 7. DRAFT SECTION 4(f) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects on parks, recreation areas, wildlife and waterfowl

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Landscape Architecture Program NUMBER: SPECIFIC SUBJECT: Integration of Landscape

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar

More information

Right-of-Way Acquisitions and Relocations Technical Memorandum

Right-of-Way Acquisitions and Relocations Technical Memorandum Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional

More information

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I SBCAG STAFF REPORT SUBJECT: Cabrillo-UPRR Bridge Project MEETING DATE: March 17, 2016 AGENDA ITEM: 5I STAFF CONTACT: Fred Luna RECOMMENDATION: Authorize the chair to sign a Memorandum of Understanding

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

Appendix E Preliminary Location Hydraulic Study

Appendix E Preliminary Location Hydraulic Study Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally

More information

Public Information Meeting

Public Information Meeting Public Information Meeting Corridor Study / Environmental Analysis for County Road 600 West from County Road 300 North to County Road 1000 North (96 th Street) Study Limits it County Road 600 West from

More information

S SUMMARY S.1 PREFACE S.2 PURPOSE AND NEED S.3 PROJECT BACKGROUND

S SUMMARY S.1 PREFACE S.2 PURPOSE AND NEED S.3 PROJECT BACKGROUND S SUMMARY S.1 PREFACE The Federal Highway Administration (FHWA) and the District Department of Transportation (DDOT), in cooperation with the National Park Service (NPS), are proposing the rehabilitation

More information

Existing Conditions and Environmental Consequences Floodplains

Existing Conditions and Environmental Consequences Floodplains 3.9 Environmental Consequences 3.8 3.8.1 WHAT ARE FLOODPLAINS? are low-lying areas adjacent to rivers, streams, and other waterbodies that are susceptible to inundation (flooding) during rain events. These

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

BeltLine Corridor Environmental Study

BeltLine Corridor Environmental Study BeltLine Corridor Environmental Study Joint TAC and SAC Meeting December 8, 2008 What We Will Discuss Today Outreach and Agency Coordination Scoping Results Existing Conditions Historical and Archeological

More information

Pennsy Greenway Trail

Pennsy Greenway Trail Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad

More information

KING GEORGE COUNTY BOARD OF SUPERVISORS. Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018

KING GEORGE COUNTY BOARD OF SUPERVISORS. Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018 KING GEORGE COUNTY BOARD OF SUPERVISORS Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018 Tonight s Goals Project Design and Schedule Update Noise Analysis Results Determine

More information

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m. Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)

More information

DuPage Mayors and Managers Conference June 21, 2013 TRANSPORTATION PROGRAM (STP) WORKSHOP

DuPage Mayors and Managers Conference June 21, 2013 TRANSPORTATION PROGRAM (STP) WORKSHOP DuPage Mayors and Managers Conference June 21, 2013 TRANSPORTATION PROGRAM (STP) WORKSHOP Lombard Village Hall Marilin Solomon, P.E. Field Engineer West Division (Central & North Central Cook County, DuPage

More information

Decision Notice. Proposed Action

Decision Notice. Proposed Action Decision Notice Paving Weld County Road 105 USDA Forest Service Arapaho and Roosevelt National Forest and Pawnee National Grassland Pawnee National Grassland Ranger District Weld County, Colorado November

More information

US-69 McAlester. Anthony Echelle, P.E. ODOT Division II Engineer

US-69 McAlester. Anthony Echelle, P.E. ODOT Division II Engineer US-69 McAlester US-69 from the US-270 junction south approximately 2 miles to Fourteenth Street, including the Village Road (Kinkead Road) interchange and adjacent frontage roads. Anthony Echelle, P.E.

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 20, 2018 # 6 SUBJECT: ELECTION DISTRICT: Potomac River Crossing Study Countywide CRITICAL ACTION DATE: At the pleasure of the

More information

Pedestrian Trails Within Regulated Areas

Pedestrian Trails Within Regulated Areas New Jersey Department of Environmental Protection Pedestrian Trails Within Regulated Areas Joslin Tamagno, Environmental Specialist Division of Land Use Regulation, Bureau of Inland Regulation www.nj.gov/dep/landuse

More information

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP. (10/27/14) PennDOT Section 106 Field Assessments and Finding Combined Early tification/finding? Yes Concurrence required or requested: Yes MPMS: 51507 ER# (if consultation with PHMC required) ): County:

More information

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac PLAN AMENDMENT 2013-I-B1: SEVEN CORNERS SPECIAL STUDY Summary of Pre-staffing Comments Planner: Bernard Suchicital bsuchi@fairfaxcounty.gov (703) 324-1254 Background On October 29, 2013, the Board of Supervisors

More information

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF. Overall Map Summit Chicago Bloomington-Normal Lincoln New Station Planned New Station Planned Dwight Pontiac Joliet Pedestrian overpass and second platform planned Higher speed service began in this section

More information

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET 7th Avenue Creek Master Plan Development Project MARKET City of St. Charles, IL IAFSM CONFERENCE March 14, 2018 7 TH AVENUE CREEK PROJECT AREA 2 2008 RAIN EVENT 3 RESIDENTIAL STRUCTURE FLOODING COMMERCIAL

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 SOUTHWEST CORRIDOR EXTENSION Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 AGENDA I. Welcome/Introductions II. Project Review and Status III. Environmental

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY KICK-OFF PRESENTATION SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PROJECT IDENTIFICATION NUMBER (PID): #001036A May 13, 2015 1 2 PROJECT LOCATION PROJECT HISTORY

More information

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION County: Linn County, IA GREEN SHEET Location: IA 100, from its terminus at Edgewood Rd. to US 30 southwest of Cedar Rapids Route: IA 100 Extension Project No.: NHS-100-1(36) 19-57 OLE Project Managers:

More information

Floodplain Technical Memorandum

Floodplain Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222 PD&E STUDY SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # 435808-1-22-02 ETDM 14222 WELCOME TO THE KICK-OFF MEETING May 24, 2016 1 1 2 3 4 5 6 PLANNING PROJECT DEVELOPMENT AND ENVIRONMENT

More information

Ann Arbor Intermodal Station Environmental Review

Ann Arbor Intermodal Station Environmental Review Ann Arbor Intermodal Station Environmental Review Park Advisory Commission September 19, 2017 AGENDA 1. Project Update 2. Draft Environmental Assessment 3. Draft Preferred Alternative 4. Next Steps 5.

More information

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA 1 1 Purpose of Public Information Centre #2 To provide interested and/or potentially affected stakeholders with an opportunity to participate in the planning and decision-making process for this Municipal

More information

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects Gessner Widening: T-1701 What: Widen the road from a six-lane divided boulevard to an eight-lane divided boulevard street section, increase turn lanes, update traffic signal system, improve drainage by

More information

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Heritage Road Improvements from Steeles Avenue to Rivermont Road The Corporation of the City of Brampton Heritage Road Improvements from Steeles Avenue to Rivermont Road Class Environmental Assessment Study (Schedule C) September 19, 2013 The Corporation of the City

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on

More information

Understanding Drainage Options What s Feasible and Legal. February 2019

Understanding Drainage Options What s Feasible and Legal. February 2019 Understanding Drainage Options What s Feasible and Legal February 2019 Outline for the Presentation Do you need a permit? Does common law apply? Does local government approve it? Will my neighbor allow

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio SR 46 (Niles Cortland Road) and SR 82 Proposed Improvements Howland Township, Trumbull County, Ohio

More information

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 July 7, 2015 RFP NO. 16-02 POPES CREEK RAIL TRAIL DESIGN ADDENDUM NUMBER ONE TO: All

More information

Technical Memorandum 5

Technical Memorandum 5 Technical Memorandum 5 Environmental Resources August 2015 PREPARED BY AECOM Table of Contents Introduction... 3 Natural Features... 6 Watersheds... 6 Rivers, Lakes, Creeks... 6 Wetlands... 8 Floodplains...

More information

Categorical Exclusion (CE) Determination Project Narrative

Categorical Exclusion (CE) Determination Project Narrative Categorical Exclusion (CE) Determination Project Narrative Project Information Project Name: SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET

More information

Citizen Information Meeting

Citizen Information Meeting Prince William County Government Citizen Information Meeting Vint Hill Road Extension May 11, 2016 Benefits: Route 28 Corridor Improvement Program Estimated significant cost savings versus bidding these

More information

State Project No Heroes Tunnel

State Project No Heroes Tunnel Public Scoping Meeting State Project No. 167-108 Bridge No. 00773 Heroes Tunnel Route 15 Wilbur Cross Parkway Through West Rock Ridge Towns of Hamden, Woodbridge City of New Haven Agenda Show Project Location

More information

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004)

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363 4210 Fax: (916) 363 4230 M e m o r a n d u m To: Julie Myrah, Branch Chief Date: May 5, 2017 California Department of Transportation

More information

7.0 SECTION 4(F) EVALUATION

7.0 SECTION 4(F) EVALUATION Chapter 7 Section 4(f) Evaluation 7.0 SECTION 4(F) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects to parklands and

More information

LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013

LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013 LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013 Environmental Assessment (EA) Availability Completed in Compliance with the National Environmental Policy Act (NEPA)

More information

Project Purpose. Project Need

Project Purpose. Project Need Project Purpose The purpose of the project is to implement a bridge improvement solution that corrects the existing safety problem at the Strasburg Pike Bridge. The project will provide a structurally

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

Northern Branch Corridor SDEIS March 2017

Northern Branch Corridor SDEIS March 2017 Northern Branch Corridor SDEIS March 2017 15. 15.1. Chapter Overview 15.1.1. Introduction This chapter discusses changes to the Preferred Alternative resulting in the potential for project improvements

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 & PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL

More information

Transportation Research Center

Transportation Research Center Increasing Design Flexibility in the AASHTO Green Book Your Department Name Presentation to AASHTO Subcommittee on Design Doug Harwood, MRIGlobal July 2017 Transportation Research Center Resolution of

More information

PROPOSED IMPROVEMENTS

PROPOSED IMPROVEMENTS IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways

More information

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Town of Windham. Planning Department 8 School Road Windham, ME voice fax Town of Windham Planning Department 8 School Road Windham, ME 04062 voice 207.864-5960 fax 207.892.1916 MEMO DATE: TO: Staff Review Committee FROM: Amanda Lessard, Planner Cc: Ellen Rathbone, St. Germain

More information

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the

More information

Major Subdivision Sketch Plan Checklist

Major Subdivision Sketch Plan Checklist This checklist provides specific requirements that are apart of the Sketch process. The entire process is described by the Huntersville Subdivision Review Process which details all the submittal and resubmittal

More information

B. DESCRIPTION OF THE PROPOSED ACTION

B. DESCRIPTION OF THE PROPOSED ACTION Executive Summary A. INTRODUCTION Metro-North Commuter Railroad Company ( Metro-North or the Project Sponsor ) is proposing the construction of a new, expanded parking garage at 50 Haarlem Avenue (formerly

More information

City of Meriden Harbor Brook Flood Control Project Overview

City of Meriden Harbor Brook Flood Control Project Overview City of Meriden Harbor Brook Flood Control Project Overview Updated August 2013 OVERVIEW The center of Meriden, including the HUB site is the low point of the town which is ringed by basalt ridges. Running

More information

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016 Rt. 29 Solutions Project Delivery Advisory Panel January 7, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Dec

More information

HAZARD MITIGATION GOALS AND OBJECTIVES

HAZARD MITIGATION GOALS AND OBJECTIVES SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations. This section of the Draft EIR addresses the existing land uses on and adjacent to the project site and discusses the potential impacts of the proposed project on existing land uses. Key issues addressed

More information

POTOMAC YARD METRORAIL STATION

POTOMAC YARD METRORAIL STATION POTOMAC YARD METRORAIL STATION DRAFT ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY R Introduction Environmental Impact Statement for a New Metrorail Station at Potomac Yard The Federal Transit Administration

More information

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment (PD&E) STUDY Miami-Dade County, Florida Preliminary Executive Summary Alternative Corridor Evaluation (ACE) Report

More information

Plan Policies. Introduction

Plan Policies. Introduction Plan Policies Introduction The purpose of the Plan Policies section is to identify the various Governing Body and Planning Commission land use related policy resolutions for use in evaluating development

More information

Figure 5. Previously Identified Viable Corridors

Figure 5. Previously Identified Viable Corridors OVERVIEW The Central Florida Expressway Authority (CFX) is evaluating the potential to expand SR 408 from its current eastern terminus along SR 50 to SR 520 in northeastern Orange County, Fl. This new

More information

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Affected Environment, Environmental 2.1.8 Cultural Resources This section evaluates the potential for historical and archaeological resources within the proposed

More information

FINDINGS FOR APPROVAL SPEX and SPMI , Goose Creek Gardens and Pavilion

FINDINGS FOR APPROVAL SPEX and SPMI , Goose Creek Gardens and Pavilion FINDINGS FOR APPROVAL SPEX-2015-0028 and SPMI-2015-0011, Goose Creek Gardens and Pavilion 1. The proposed special exception use is consistent with the Comprehensive Plan. Specifically, the Revised General

More information

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No Committee Report Business Item No. 2017-21 Community Development Committee For the Metropolitan Council meeting of January 25, 2017 Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan

More information

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Background and Process Monroe Expressway will be open by the end of 2018 Union County and Indian Trail identified a need to revisit

More information

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information