1 Pelican Bay Community Improvement Plan Lighting Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in May 2010 construction rates) D3-A: Replace the existing HID ballast and Metal Halide Light sources in the Boulevard street lighting with energy conserving LED fixtures. Proposed Improvement: Install 6 foot Sternberg CA bracket arm and Sternberg Omega R 1527 LED fixture in verde green on all existing concrete poles in Gulf Park Drive and Pelican Bay Boulevard medians (206 fixtures). Opinion of Probable Cost: $ 712,600 ($ 3,459 /fixture) Alternative solutions: Same as proposed improvement but with Metal'Halide (MH) fixtures in lieu of LED. Opinion of Probable Cost: $ 506,600 ($ 2,459 /fixture) Alternative solutions: Replace the concrete poles in the Boulevard street lighting scenario with new smooth tapered shaft and decorative base. Install 30 foot Hapco York Post to receive the Sternberg Omege/R 1527R LED Fixture and six foot CA roadway arm Opinion of Probable Cost: $ 1,033,900 ($ 5,619 /fixture) a) no a_ a_ +-a a) E a) 0 E >1 to C co k.) a_ Phasing: If phased, entire street lengths should be done at one time. The pole replacement in the Boulevards could be phased separately from the fixture and roadway arm replacements however this would need to be known at the time of replacing the fixture and adding the roadway arm so that the manufacturer can plan for a pole connection retrofit in the future in the current connection design of the roadway arms to the concrete pole. Sequencing; Coordinate with the additional improvements of light poles outlined in D3- C below and landscape, irrigation changes within the medians should be considered within the same phase of work. D3-B: Replace the existing HID ballast, Metal Halide lamp and fixture and the 16 foot concrete poles in the single family residential street lighting with energy conserving LED fixtures, bracket arms and poles (reference Roadway Lighting Diagram). Proposed Improvement: Install Sternberg 480PM Backet and Sternberg Euro E-460 LED Medium Fixture on 16 foot Sternberg 7700 series Birmingham Pole in verde green along Ridgewood Drive, Oakmont Parkway and Green Tree Drive (93 fixtures). Opinion of Probable Cost: $ 646,000 ($ 6,946 /fixture) Alternative solutions: Same as proposed improvement but with existing concrete poles in lieu of new poles. Opinion of Probable Cost: $ 334,500 ($ 3,596 /fixture) Same as proposed improvement but with MH fixtures in lieu of LED. Opinion of Probable Cost: $ 553,000 ($ 5,946 /fixture) 05/18/2010

2 3. Same as proposed improvement but with MH fixtures on existing concrete poles in lieu of LED on new poles. Opinion of Probable Cost: $ 241,500 ($ 2,596 /fixture) cu P1 Phasing: If phased, entire street lengths should be done at one time. +- C au E cu 2> 0 E rd co C Sequencing; The solution choosen by the Owner becomes the dedicated solution for the single family residential streets noted in the proposed solution and as outlined on the Option 3 Lighting Master Plan Diagram. Landscape, irrigation and streetscape improvements should be considered within the same phase of work. D3 -C: Move the existing double fixture light poles in the three entry drive medians of the Community from US 41 to both edges of the roadway in single fixture configurations and replace the existing HID ballast and Metal Halide light sources in these three locations and the secondary entry streets to the Community with energy conserving LED fixtures and bracket arms (reference Roadway Lighting Diagram). Proposed Improvement: Install Sternberg 480PM Bracket and Sternberg Euro E-460 LED Medium Fixture on 18 foot Sternberg 7700 series Birmingham pole in verde green at the 3 main entries along US 41, North Point Drive, Hammock Oak Drive, Oakmont Drive Extension, Crayton Road, Myra Banco Daniels Boulevard and Ridgewood Drive South (102 fixtures). Opinion of Probable Cost: $ 665,000 ($ 6,520 /fixture) Alternative solutions: Same as proposed improvement but with existing concrete poles in lieu of new poles. Opinion of Probable Cost: $ 355,100 ($ 3,481 /fixture) Same as proposed improvement but with MH fixtures in lieu of LED. Opinion of Probable Cost: $ 563,000 ($ 5,520 /fixture) 3. Same as proposed improvement but with MH fixtures on existing concrete poles in lieu of LED on new poles. Opinion of Probable Cost: $ 253,100 ($ 2,481 /fixture) Phasing: If phased, entire street lengths should be done at one time. Sequencing; The solution chosen by the Owner becomes the dedicated solution for the primary and secondary entry streets noted in the proposed solution and as outlined on the Option 3 Lighting Master Plan Diagram. Lighting from both sides of the street in the three primary entries and matching fixtures in the secondary entries provides a level of street illumination that is indicative of community rather than a roadway thoroughfare. Landscape, irrigation and streetscape improvements should be considered within the same phase of work. 05/18/2010

3 D3-D: Install LED bollard lighting along the community pathways where indicated in the master plan (reference Pathway Lighting Plan). Proposed Improvement: Install Gardco Bevel Top, LED Demand Response bollards on the side of St. Raphael beach pathway in dark bronze color (reference St. Raphael Pathway Lighting Plan graphic). Opinion of Probable Cost: $ 46,000 Alternative solutions: Install Sternberg bollard #3901 LB Richmond in 35W MH (with goal to provide Sternberg in LED if available) 36" 42" in height and verde green color to match street light fixtures in immediate needs areas throughout Community minus berm access areas (reference Pathway Lighting Plan). Opinion of Probable Cost: $ 412,000 Alternative solutions: Same as alternative solution but install the Stone Light fluorescent bollards as used elsewhere in the community. Opinion of Probable Cost: $ 412,000 (entire project noted) Phasing: This is a one time bollard lighting addition project. Sequencing: As an entire and complete project, add landscape, irrigation, Pelican Bay Boulevard mid-block cross walk, signage and street furnishings improvements at the same time. a_ co E4-0 C cu cu 2> 0 E >1 ca C to Tu a_ Future maintenance and improvement guidelines: Lighting improvements that provide better CPTED conditions when principles of territorial surveillance are applied are encouraged in the parks and along the pathway edges of the community. Street lighting and bollard fixtures in the road rights of way shall be of a common family and green color. Future bollard fixtures used in the roadways are to match the family of street light poles and fixtures with the intention of having available LED lamped fixtures available. Pathway bollards that lead to the Community Berm and Boardwalk areas are to be of a common family and dark bronze color. Maintain the maturing landscape to be free from direct blockage of the street lighting of the roadways relocate street lights in favor of trees in the landscape and remove Sabal Palms where necessary to better provide light to the ground or streets. Specimen landscape up-lighting or down-lighting is encouraged for evening lighting of specimen landscapes and for CPTED purposes in amongst the roadway and park areas existing large trees. Banner arms and other decorative holiday lighting options/duplex electrical outlets in new poles may be considered and added to the proposed street light pole improvements. Banner arms would need to meet wind loading criteria and we recommend that the electrical outlets be added high on the pole for maintenance access by lift only. Hanging landscape baskets and internal irrigation supply may also be considered and added in a limited location basis only to new street light pole improvements on Foundation properties and sites. 05/18/2010

4 Option 1 - Street Lighting : Maintenance Program of Current Conditions Existing concrete poles and fixtures - maintenance of current conditions. WilsonMiller - February 25, 2010 DEMOLITION $42,550 Subtotal Demolition - Clearing and Grubbing (Palm and stump removal) 26 EA $1, $31, EA $ $6, Demolition - Selective Clearing (Palm Trimming) 8 EA $75.00 $ Light Pole - Remove and Relocate Existing 20 EA $ $4, SITEWORK $17,000 / Location Subtotal' Light Pole - Install Existing (Includes conduit, conductor, and pullbox within 30.0' of original location) 20 EA $ $17, (TOTAL: 115% CONTINGENCY: $59,550 I $8,933 I Design / Permit Fee Estimates $5,000 Item Subtotal Engineering and Survey 1 LS $3, $3, Landscape Architecture 1 LS Permitting 1 LS $1, $1,500.00!GRAND TOTAL: _{ $73,483( *Existing site conditions at time of installation may cause additional expenses. Pricing above reflects reasonable field conditions without utility conflicts.

5 Option 2 - Street Lighting : Original Poles with New Fixtures & Arms Add 4.0' arms and decorative fixtures to existing concrete poles. WilsonMiller - February 25, 2010 Total DEMOLITION $62,480 Item Subtotal' 20 EA $ $3, Demolition - Selective Clearing (Palm Trimming) 8 EA $75.00 $ EA $ $58, I Item / Location Subtotal I (TOTAL: $1,284,955( 115% CONTINGENCY: r" $192,743 I Total SITEWORK $1,222, EA $2, $576, Light Fixture - Euro Type (LED) - Residential / Secondary Community Entries 162 EA $2, $429, Light Fixture - Arm Fitting (Single) 102 EA $ $86, Light Fixture - Arm Fitting (Dual) 133 EA $ $129, Design / Permit Fee Estimates $48,500 Item Engineering and Survey Landscape Architecture Permitting!GRAND TOTAL: Pelican Bay Boulevard Demolition Demolition - Selective Clearing (Palm Trimming) Sitework Subtotal! 1 LS $45, $45, LS 1 LS $3, $3, Add/deduct for Omega MH Fixture = $1800 ea. Add/deduct for Euro MH Fixture = $1650 ea. / Location Light Fixture - Euro Type (LED) - Residential / Secondary Community Entries Light Fixture - Arm Fitting (Single) Light Fixture - Arm Fitting (Dual) Pelican Bay Boulevard Subtotal: 8 EA $ EA $ EA $ % $28,380 Subtotal $1, $ $26, $552,300 Sitework $124,925 / Location Light Fixture - Euro Type (LED) - Residential / Secondary Community Entries Light Fixture - Arm Fitting (Single) Light Fixture - Arm Fitting (Dual) IGulf Park Drive Subtotal: 168 EA $2, EA $2, EA $ EA $ EA $2, EA $2, EA $ EA $ $1,526,198 I Subtotali $470, $81, $580,680 I Gulf Park Drive 10% Demolition $6,980 Item Demolition - Selective Clearing (Palm Trimming) Quantity Unit Unit Cost EA $ EA $75.00 EA $ Subtotal' $ $ $6, Subtotal $106, $18, $131,905 I 1 I

6 Ridgewood Drive Demolition I Item Demolition - Selective Clearing (Palm Trimming) 1 1 Sitework Item / Location Light Fixture - Euro Type (LED) - Residential / Secondary Community Entries Light Fixture - Arm Fitting (Single) Light Fixture - Arm Fitting (Dual) Rid ewood Drive Subtotal: Oakmont Neighborhood Demolition Item Demolition - Selective Clearing (Palm Trimming) Sitework IItem / Location Light Fixture - Euro Type (LED) - Residential / Secondary Community Entries Light Fixture - Arm Fitting (Single) Light Fixture - Arm Fitting (Dual) 7% $4,450 Subtotal' EA EA EA $ $75.00 $ $ $4, $85,325 Subtotal 1 0 EA $2, EA $2, $66, EA $ $16, EA $ $2, r $ % $11,970 Subtotal 1 3 EA $ $ EA EA $75.00 $ $11, $243,300 Subtotal i 0 EA $2, EA EA EA $2, $ $ $190, $40, $11, I Oakmont Neighborhood Subtotal: L $255 2'29,1 ) Secondary Community Entries 18% Demolition $10,700 i Item Subtotal 1 2 EA $ $ Demolition - Selective Clearing (Palm Trimming) 0 EA $ EA $ $10, i Sitework $216,625 Item / Location Subtotal i 0 EA $2, Light Fixture - Euro Type (LED) - Residential / Secondary Community Entries 65 EA $2, $172, Light Fixture - Arm Fitting (Single) 35 EA $ $29, Light Fixture - Arm Fitting (Dual) 15 EA $ $14, I Secondary Community Entries Subtotal: 1 $227,325 I

7 Option 3 - Street Lighting : New Poles & Fixtures with Arms Community entries and single-family neighborhoods to single decorative fixtures & poles. Boulevards to decorative fixtures & poles. WilsonMiller - February 25, 2010 DEMOLITION Demolition - Selective Clearing (Palm Trimming) Light Pole - Remove SITEWORK 1 Item / Location Light Fixture - Euro Type (LED) - All Community Entries / Residential Light Fixture - Arm Fitting (Dual) for Omega Light Pole for Omega - Hapco 30.0' ht Decorative (Includes conduit, conductor, and pullbox) Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes Single bracket, conduit, conductor, and pullbox) Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes Dual brackets, conduit, conductor, and pullbox) Additional Conduit and Conductor for Relocated Poles (Includes horizontal drilling) (TOTAL: $109,480 Subtotal' 20 EA $ $3, EA $75.00 $ EA $ $58, EA $ $47, $1,847,570 Subtotal' 182 EA $2, $509, EA $2, $519, EA $ $88, EA $2, $206, EA $2, $362, EA $3, $125, EA $1, $35, $1,957,050 I 115% CONTINGENCY: F $293,558 Design / Permit Fee Estimates $80,000 Engineering and Survey Landscape Architecture Permitting LS $75, LS LS $5, Subtotal' $75, $5, GRAND TOTAL: I $2,330,608( Add/deduct for Omega MH Fixture = $1800 ea. Add/deduct for Euro MH Fixture = $1650 ea.

8 Option 3a - Street Lighting : New Poles & Fixtures with Gulf Park Drive Community entries and single-family neighborhoods to single decorative fixtures & poles. Boulevards to decorative fixtures & poles. WilsonMiller - March 31, 2010 DEMOLITION $16,160 Subtotal' 20 EA $ $3, Demolition - Selective Clearing (Palm Trimming) 8 EA $ $ EA $ $7, Light Pole - Remove 26 EA $ $5, SITEWORK $229,190 Subtotal' 34 EA $2, $95, EA $2, $37, EA $ $16, EA $2, $38, EA $2, $23, EA $3, $10, EA $1, $8, / Location Light Fixture - Euro Type (LED) - All Community Entries / Residential Light Fixture - Arm Fitting (Dual) for Omega Light Pole for Omega - Hapco 30.0' ht Decorative (Includes conduit, conductor, and pullbox) Light Pole for Euro - Sternberg 18.0' ht Decorative (Includes Single bracket, conduit, conductor, and pullbox) Light Pole for Euro - Sternberg 18.0' ht Decorative (Includes Dual brackets, conduit, conductor, and pullbox) Additional Conduit and Conductor for Relocated Poles (Includes horizontal drilling)!total: $245,350 I I15% CONTINGENCY: $36,803 I Design / Permit Fee Estimates $26,000 I Item Subtotal! Engineering and Survey 1 LS $18, $18, Landscape Architecture 1 LS $3, $3, Permitting 1 LS $5, $5, Add/deduct for Omega MH Fixture = $1800 ea. Add/deduct for Euro MH Fixture = $1650 ea.

9 Option 3b - Street Lighting : New Poles & Fixtures with Ridgewood Community entries and single-family neighborhoods to single decorative fixtures & poles WilsonMiller - March 31, 2010 DEMOLITION $7,740 Demolition - Selective Clearing (Palm Trimming) Light Pole - Remove Subtotal' 4 EA $ $ EA $75.00 $ EA $ $3, EA $ $3, SITEWORK $113,070 / Location Light Fixture - Euro Type (LED) - All Community Entries / Residential Light Fixture - Arm Fitting (Dual) for Omega Light Pole for Omega - Hapco 30.0' ht Decorative (Includes conduit, conductor, and pullbox) Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes Single bracket, conduit, conductor, and pullbox) Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes Dual brackets, conduit, conductor, and pullbox) Additional Conduit and Conductor for Relocated Poles (Includes horizontal drilling) Subtotal 1 0 EA $2, EA $2, $50, EA $ EA $2, EA $2, $54, EA $3, EA $1, $8,000.00!TOTAL: $120, % CONTINGENCY: r $18,122 I Design / Permit Fee Estimates $23,000 Subtotal' Engineering and Survey 1 LS $15, $15, Landscape Architecture 1 LS $3, $3, Permitting 1 LS $5, $5, :GRAND TOTAL: F $161,932( Add/deduct for Omega MH Fixture = $1800 ea. Add/deduct for Euro MH Fixture = $1650 ea.

10 Option 3c - Street Lighting : New Poles & Fixtures with Oakmont Community entries and single-family neighborhoods to single decorative fixtures & poles WilsonMiller - March 31, 2010 DEMOLITION 1 Item Demolition - Selective Clearing (Palm Trimming) Light Pole - Remove (TOTAL: $22,220 Subtotal' 4 EA $ $ EA $75.00 $ EA $ $9, EA $ $11, SITEWORK $340,010 / Location Subtotal 1 0 EA $2, Light Fixture - Euro Type (LED) - All Community Entries / Residential 62 EA $2, $164, Light Fixture - Arm Fitting (Dual) for Omega 0 EA $ Light Pole for Omega - Hapco 30.0' ht Decorative (Includes conduit, conductor, and pullbox) 0 EA $2, Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes Single bracket, conduit, conductor, and pullbox) 52 EA $2, $149, Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes Dual brackets, conduit, conductor, and pullbox) 5 EA $3, $17, Additional Conduit and Conductor for Relocated Poles (Includes horizontal drilling) 5 EA $1, $8, I- $362,230 I 115% CONTINGENCY: F $54,335 Design / Permit Fee Estimates $23,000 Engineering and Survey Landscape Architecture Permitting LS $15, LS $3, LS $5, Subtotal' $15, $3, $5, (GRAND TOTAL: 1- $439,565 Add/deduct for Omega MH Fixture = $1800 ea. Add/deduct for Euro MH Fixture = $1650 ea.

11 Option 3d - Street Lighting : New Poles & Fixtures with Pelican Bay Blvd. Community entries and single-family neighborhoods to single decorative fixtures & poles WilsonMiller - March 31, 2010 DEMOLITION $55,550 IItem Demolition - Selective Clearing (Palm Trimming) Light Pole - Remove Subtotal 20 EA $ $3, EA $75.00 $ EA $ $30, EA $ $21, SITEWORK $822,360 / Location Light Fixture - Euro Type (LED) - All Community Entries / Residential Light Fixture - Arm Fitting (Dual) for Omega Light Pole for Omega - Hapco 30.0' ht Decorative (Includes conduit, conductor, and pullbox) Light Pole for Euro - Sternberg 18.0' ht Decorative (Includes Single bracket, conduit, conductor, and pullbox) Light Pole for Euro - Sternberg 18.0' ht Decorative (Includes Dual brackets, conduit, conductor, and pullbox) Additional Conduit and Conductor for Relocated Poles (Includes horizontal drilling) (TOTAL: Engineering and Survey Landscape Architecture Permitting Subtotal' 150 EA $2, $420, EA $2, $106, EA $ $73, EA $2, $169, EA $2, $8, EA $3, $28, EA $1, $16, LS $20, LS $7, LS $5, $877,910 I 115% CONTINGENCY: $131,687 I Design / Permit Fee Estimates $32,500 Subtotal $20, $7, $5,000.00,GRAND TOTAL: I $1,042,097 Add/deduct for Omega MH Fixture = $1800 ea. Add/deduct for Euro MH Fixture = $1650 ea.

12 Option 3e - Street Lighting : New Poles & Fixtures with Secondary Entries Community entries and single-family neighborhoods to single decorative fixtures & poles WilsonMiller - March 31, 2010 DEMOLITION $21,235 Subtotal' 10 EA $ $1, Demolition - Selective Clearing (Palm Trimming) 5 EA $75.00 $ EA $ $9, Light Pole - Remove 48 EA $ $9, SITEWORK $312,320 1 Item / Location Subtotal 1 0 EA $2, Light Fixture - Euro Type (LED) - All Community Entries / Residential 61 EA $2, $161, Light Fixture - Arm Fitting (Dual) for Omega 0 EA $ Light Pole for Omega - Hapco 30.0' ht Decorative (Includes conduit, conductor, and pullbox) 0 EA $2, Light Pole for Euro - Sternberg 18.0' ht Decorative (Includes Single bracket, conduit, conductor, and pullbox) 35 EA $2, $100, Light Pole for Euro - Sternberg 18.0' ht Decorative (Includes Dual brackets, conduit, conductor, and pullbox) 13 EA $3, $46, Additional Conduit and Conductor for Relocated Poles (Includes horizontal drilling) 2 EA $1, $3, (TOTAL: 1 $333,555 I 15% CONTINGENCY: $50,033 Design / Permit Fee Estimates $23,000 I Item Engineering and Survey Landscape Architecture Permitting (GRAND TOTAL: LS $15, LS $3, LS $5, Subtotal 1 $15, $3, $5, I- $406,588 I Add/deduct for Omega MH Fixture = $1800 ea. Add/deduct for Euro MH Fixture = $1650 ea.

13 Option 4 - Street Lighting : Lighting at Outside Edges of Street ROW All community boulevard street lights shift to ROW with decorative fixtures & poles. All single-family neighborhood & community entry street lights. WilsonMiller - February 25, 2010 DEMOLITION $111,880 Light Pole - Remove Subtotal 1 40 EA $ $6, EA $ $58, EA $ $47, SITEWORK $2,681,645 Item / Location Subtotal' 1 Conduit and Conductor for Poles 42,510 LF $13.50 $573, Light Fixture - Euro Type (LED) - Boulevards, Entries and Residential 378 EA $2, $1,001, Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes dual brackets) 35 EA $3, $111, Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes single bracket) 308 EA $2, $763, Roadway - Horizontal Drilling to 100.0' 14 EA $2, $33, Transformer, Meter, Point of Connection 1 LS $70, $70, Trenching - Common Earth 42,510 LF $3.00 $127, (TOTAL: I- $2,793,525] 115% CONTINGENCY: I- $419,029) Design / Permit Fee Estimates $197,000 I Item Engineering and Survey Landscape Architecture Permitting LS $185, LS LS $12, Subtotal 1 $185, $12,000.00!GRAND TOTAL: $3,409,554 ** Final design power requirements to be reviewed by an Engineer - costs may vary on necessary power requirements/loads, conduit and conductor sizes, and transformers. 1. Add/deduct for Euro MH Fixture = $1650 ea.

14 Option 5 - Street Lighting : New Poles & Fixtures with Arms Community entries & single-family neighborhoods to single decorative fixtures & poles. Boulevards to decorative fixtures on existing poles. WilsonMiller - April 14, 2010 DEMOLITION $90,480 Demolition - Selective Clearing (Palm Trimming) Light Pole - Remove (TOTAL: Subtotal I 20 EA $ $3, EA $75.00 $ EA $ $58, EA $ $28, SITEWORK $1,641,455 / Location Subtotal' 182 EA $2, $509, Light Fixture - Euro Type (LED) - All Community Entries / Residential 196 EA $2, $519, Light Fixture - Arm Fitting (Dual) for Omega 91 EA $ $88, Light Pole for Omega - Hapco 30.0' ht Decorative (Includes conduit, conductor, and pullbox) 0 EA $2, Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes Single bracket, conduit, conductor, and pullbox) 126 EA $2, $362, Light Pole for Euro - Sternberg 16.0' ht Decorative (Includes Dual brackets, conduit, conductor, and pullbox) 35 EA $3, $125, Additional Conduit and Conductor for Relocated Poles (Includes horizontal drilling) 22 EA $1, $35, r $1,731,935 I 115% CONTINGENCY: T $259,790( Design / Permit Fee Estimates $80,000 I Item Subtotal' Engineering and Survey 1 LS $75, $75, Landscape Architecture 1 LS Permitting 1 LS $5, $5, ' GRAND TOTAL: L $2,071,725 Add/deduct for Omega MH Fixture = $1800 ea. Add/deduct for Euro MH Fixture = $1650 ea.

15 Option 1 a - Pathway Lighting : On-demand LED to immediate need, dark areas only Gardco pathway bollard additions in suggested locations to subsidize low light levels. WilsonMiller - April 13, 2010 DEMOLITION $0 Item Demolition - Existing Bollards / Location Trenching - Common Earth Conduit and Conductor for Bollards Bollard Fixture - Gardco LED (60.0' OC) - Replace Existing Bollard Fixture - Gardco LED (60.0' OC) - Proposed Location Transformer, Meter, Point of Connection Engineering and Survey Landscape Architecture Permitting EA 0 $ Subtotal $0. 00 SITEWORK $301,707 ITOTAL: Subtotal' 6,661 LF $3.00 $19, ,661 LF $13.50 $89, EA $1, EA $1, $156, LS $35, $35, LS $57, LS LS $8, L $301,707 I [15% CONTINGENCY: $45,256 I Design / Permit Fee Estimates $65,000 Subtotal $57, $8, IGRAND TOTAL: T- $411,962) "* As required by an Engineer - power requirements, conduit and conductor sizes, and transformers shall be based upon final design and may adjust costs.

16 Option 1 b - Pathway Lighting : Standard MH to immediate need, dark areas only Sternberg pathway bollard additions in suggested locations to subsidize low light levels. WilsonMiller - April 13, 2010 DEMOLITION $0 Demolition - Existing Bollards 0 EA $ Subtotal SITEWORK $271,467 / Location Subtotal' Trenching - Common Earth 6,661 LF $3.00 $19, Conduit and Conductor for Bollards 6,661 LF $13.50 $89, Bollard Fixture - Sternberg 70w MH (60.0' OC) - Replace Existing 0 EA $1, Bollard Fixture - Sternberg 70w MH (60.0' OC) - Proposed Location 112 EA $1, $126, Transformer, Meter, Point of Connection 1 LS $35, $35,000.00!TOTAL: $271,467 I 1.15% CONTINGENCY: $40,720 I Design / Permit Fee Estimates $65,000 Item Subtotal Engineering and Survey 1 LS $57, $57, Landscape Architecture 1 LS Permitting 1 LS $8, $8, (GRAND TOTAL. *" As required by an Engineer - power requirements, conduit and conductor sizes, and transformers shall be based upon final design and may adjust costs. $377,186 I

17 Option 2a - Pathway Lighting : On-demand LED to one side of boulevards Gardco pathway bollard additions along west side of PBB and north side of GPD in addition to low light level area additions. WilsonMiller - April 13, 2010 DEMOLITION $0 Item Demolition - Existing Bollards 0 EA $ Subtotal' SITEWORK $979,361!Item / Location Subtotal! Trenching - Common Earth 21,937 LF $3.00 $65, Conduit and Conductor for Bollards 21,937 LF $13.50 $296, Bollard Fixture - Gardco LED (60.0' OC) - Replace Existing 0 EA $1, Bollard Fixture - Gardco LED (60.0' OC) - Proposed Location 366 EA $1, $512, Transformer, Meter, Point of Connection 1 LS $105, $105,000.00!TOTAL: $979,361 I 115% CONTINGENCY: $146,904 I Design / Permit Fee Estimates $105,000 Item Subtotal Engineering and Survey 1 LS $96, $96, Landscape Architecture 1 LS Permitting 1 LS $9, $9,000.00!GRAND TOTAL: r $1,231,265 ** As required by an Engineer - power requirements, conduit and conductor sizes, and transformers shall be based upon final design and may adjust costs.

18 Option 2b - Pathway Lighting : Standard MH to one side of boulevards Sternberg pathway bollard additions along west side of PBB and north side of GPD in addition to low light level area additions. WilsonMiller - April 13, 2010 DEMOLITION $0 Demolition - Existing Bollards 0 EA $ (TOTAL: Subtotal SITEWORK $880,541!Item / Location Trenching - Common Earth 21,937 LF $3.00 Conduit and Conductor for Bollards 21,937 LF $13.50 Bollard Fixture - Sternberg 70w MH (60.0' OC) - Replace Existing 0 EA $1, Bollard Fixture - Sternberg 70w MH (60.0' OC) - Proposed Location 366 EA $1, Transformer, Meter, Point of Connection 1 LS $105, $880,541 I 115% CONTINGENCY: $132,081 I Design / Permit Fee Estimates $105,000 Item Engineering and Survey Landscape Architecture Permitting!GRAND TOTAL- 1 LS $96, LS 1 LS $9, "" As required by an Engineer - power requirements, conduit and conductor sizes, and transformers shall be based upon final design and may adjust costs. I Subtotal' $65, $296, $413, $105, Subtotal' $96, $9, $1,117,622(

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 2, 2015 # 9 SUBJECT: ELECTION DISTRICT: Identification of Funds for the Traffic Signal at the Intersection of Northstar Boulevard

More information

LIGHT NIGHT THE. with Standard and Decorative LED Fixtures

LIGHT NIGHT THE. with Standard and Decorative LED Fixtures LIGHT THE NIGHT with Standard and Decorative LED Fixtures TECHNICALLY ADVANCED LIGHTING SOLUTIONS WITH TIMELESS VALUES Much of the charm of the South is found in its blend of classic architecture with

More information

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration

More information

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015 GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin

More information

2 January 9, 2013 Public Hearing APPLICANT: BURNETTE DEVELOPMENT, LLC

2 January 9, 2013 Public Hearing APPLICANT: BURNETTE DEVELOPMENT, LLC 2 January 9, 2013 Public Hearing APPLICANT: BURNETTE DEVELOPMENT, LLC PROPERTY OWNER: PARETTA D MUDD REQUEST: Conditional Use Permit (Mini-Warehouse / Self-Storage Facility) STAFF PLANNER: Faith Christie

More information

STREET LIGHTING CATALOGUE

STREET LIGHTING CATALOGUE STREET LIGHTING CATALOGUE 2 3 CONTENTS About FortisAlberta... 2 Overview... 3 Guidelines... 3 Bug Rating... 4 Typical Lighting Arrangements... 4 Road and Pedestrian Classifications... 5 LED Streetlight

More information

Sidewalks Street Lights

Sidewalks Street Lights Boston Complete Streets Guidelines 013 Boston Transportation Department Sidewalks Introduction 17 Sidewalk Design Principles 18 Sidewalk Zones 0 Sidewalk Zones Widths Preferred and Minimum Widths for Sidewalk

More information

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item TO: THRU: FROM: RE: Mayor Leon Skip Beeler and Members of the City Commission Chuck Billias, City Manager Anthony

More information

AIRPORT BUSINESS PARK

AIRPORT BUSINESS PARK PIER MAC PETROLEUM INSTALLATION LTD. AIRPORT BUSINESS PARK DEVELOPMENT APPLICATIONS March 2003 4.1 Airport Business Park Development Permit Area 4.1.1 Justification/Design Concept The design concept envisioned

More information

RONALD REAGAN. Corridor Design Guidelines HENDRICKS COUNTY, INDIANA

RONALD REAGAN. Corridor Design Guidelines HENDRICKS COUNTY, INDIANA i. Table of Contents ii. Section 1: Introduction Section 2: Materials 1 Purpose of the Design Guidelines... 1-2 Design Implementation... 1-2 Introduction to the Parkway Enhancements... 1-4 2 Material Selection...

More information

HOLOPHANE. Vector Luminaire. Optimum visibility. Improved highway safety. Outstanding visibility in critical security applications HL /98

HOLOPHANE. Vector Luminaire. Optimum visibility. Improved highway safety. Outstanding visibility in critical security applications HL /98 HOLOPHANE Vector Luminaire Optimum visibility Improved highway safety Outstanding visibility in critical security applications HL-9 /98 HOLOPHANE Meets AASHTO requirements High vertical illumination Up

More information

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street. 3.3.6.2 Wayfinding Existing Conditions Wayfinding signage is important to direct visitors and tourists to different locations in the downtown. A significant part of the wayfinding signage in the downtown

More information

SECTION INTERIOR AND EXTERIOR LIGHTING FIXTURES

SECTION INTERIOR AND EXTERIOR LIGHTING FIXTURES SECTION 26 50 00 INTERIOR AND EXTERIOR LIGHTING FIXTURES PART 1: GENERAL 1.1 WORK INCLUDED: A. Interior lighting fixtures and accessories B. Exterior lighting fixtures and accessories C. Emergency battery

More information

Baltimore Gas and Electric Company Electric -- Retail 57. Billing Watts Description Rate

Baltimore Gas and Electric Company Electric -- Retail 57. Billing Watts Description Rate Baltimore Gas and Electric Company Electric -- Retail 57 PRIVATE AREA LIGHTING ELECTRIC SCHEDULE P L AVAILABILITY: For unmetered outdoor area lighting of private property. MONTHLY RATES: 1. For supply

More information

3.0 master plan concept

3.0 master plan concept 3.0 master plan concept 3.1 introduction The purpose of the Huron Church Road Master Plan Concept is to provide an overview of the Master Plan design process, identify preliminary streetscape installations

More information

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the

More information

KEY MAP DEVELOPMENT PERMIT AREA MAP. Sunnymede North Sub-Area Plan

KEY MAP DEVELOPMENT PERMIT AREA MAP. Sunnymede North Sub-Area Plan Richmond Official Community Plan BROADMOOR AREA SUNNYMEDE NORTH SUB-AREA PLAN Bylaw 7100 Schedule 2.6C SUNNYMEDE NORTH SUB-AREA PLAN SUNNYMEDE NORTH SUB-AREA PLAN SUNNYMEDE NORTH SUB-AREA PLAN KEY MAP

More information

TREE GUARDS AND EDGING

TREE GUARDS AND EDGING CUSTOM BENCHES TREE GUARDS AND EDGING DETECTABLE WARNING PLATES Custom Bench with Rail Spikes (inset into concrete, wood bench seat) Custom Bench with Rail Wheel (inserted into end of bench) Tree guards

More information

JOB CREATION PROJECTS

JOB CREATION PROJECTS SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each

More information

SECTION EXTERIOR LIGHTING

SECTION EXTERIOR LIGHTING SECTION 26 56 00 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of exterior luminaries, controls, poles and supports. 1.2 RELATED WORK A. Section 26

More information

SECTION 1000 HIGHWAY CORRIDOR OVERLAY DISTRICT REGULATIONS

SECTION 1000 HIGHWAY CORRIDOR OVERLAY DISTRICT REGULATIONS SECTION 1000 HIGHWAY CORRIDOR OVERLAY DISTRICT REGULATIONS 1001.00 INTENT AND PURPOSE... 1000-1 1002.00 CLASSIFICATIONS... 1000-1 1003.00 DEVELOPMENT STANDARDS TABLES Page 1003.01 Buffer Requirements...................................

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES 01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2

More information

AREA LIGHTING TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS FOR YOUR PROPERTY OVERHEAD FEED UNDERGROUND FEED. Electrical Service Requirements

AREA LIGHTING TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS FOR YOUR PROPERTY OVERHEAD FEED UNDERGROUND FEED. Electrical Service Requirements Electrical Service Requirements AREA LIGHTING PUD SERVICE TERRITORY & CONTACTS FOR YOUR PROPERTY Yard light Flood light OVERHEAD FEED PUD responsibilities Customer responsibilities UNDERGROUND FEED PUD

More information

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Garfield Elementary School Feasibility Study for New Library Building Project Number A C Larry Teixeira Selma Unified School District 3036 Thompson Avenue Selma, CA 93662 Subject: Feasibility Study for New Library Building Project Number A 12-8581.00 C Dear Mr. Teixeira: At your request, we

More information

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville

More information

MIAMI 21 PUBLIC HEARING-FIRST READING 2009

MIAMI 21 PUBLIC HEARING-FIRST READING 2009 General Principles Public access waterfront walkways shall: 1. Feel public. No one should feel as if he or she is intruding on private property. The public should feel welcome and at ease to move along

More information

Lighting Depth Part 1: Exterior Space

Lighting Depth Part 1: Exterior Space Lighting Depth Part 1: Exterior Space Metaphor and Ideas: The first space of my lighting redesign is the front façade of the Recreation Center shown below. Metaphorically, I want the front porch to act

More information

Indianapolis Power & Light Company I.U.R.C. No. E-16 Original No. 110 One Monument Circle Indianapolis, Indiana

Indianapolis Power & Light Company I.U.R.C. No. E-16 Original No. 110 One Monument Circle Indianapolis, Indiana Indianapolis Power & Light Company I.U.R.C. No. E-16 Original No. 110 Indianapolis, Indiana RATE APL AUTOMATIC PROTECTIVE LIGHTING SERVICE AVAILABILITY: Available to any Customer for outdoor area lighting,

More information

LIGHTING DESIGN STANDARDS SECTION City of Maryland Heights ZONING CODE

LIGHTING DESIGN STANDARDS SECTION City of Maryland Heights ZONING CODE SECTION 25-18 City of Maryland Heights ZONING CODE The Zoning Code text contained in the Interpretive Version is current as of Ordinance #2018-4308 adopted on February 15, 2018. The City Planner comments

More information

The Hammock at Twenty Mile

The Hammock at Twenty Mile The Hammock at Twenty Mile Homeowner s Architectural Criteria and Review Procedure Manual March 14, 2016 Purpose The Declaration of Covenants and Restrictions for Twenty Mile East (the Declaration ) establishes

More information

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015 White Street Area Sewer Separation, Project ID 11240090 Date Issued: June 8, 2015 ADDENDUM NO. 3 This addendum will only be distributed via e-mail, but will remain available for viewing on the MSDGC website

More information

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012 Broadway Avenue Streetscape Project City of Albert Lea Streetscape Design Committee Meeting October 29, 2012 1 Presentation Outline Street Widths, Sidewalk Widths and Bump-Out Configuration Decorative

More information

Non-Cutoff and Semi-Cutoff Wall Pack Primary Use and Edits to Outdoor Wall-Mounted Luminaire Primary Use

Non-Cutoff and Semi-Cutoff Wall Pack Primary Use and Edits to Outdoor Wall-Mounted Luminaire Primary Use Non-Cutoff and Semi-Cutoff Wall Pack Primary Use and Edits to Outdoor Wall-Mounted Luminaire Primary Use DLC proposes to include non-cutoff and semi-cutoff (or "open face") wall packs in the Technical

More information

a. Sample Streets b. Technical Sketches c. Product Information d. Proposed Dark Skies By-law e. Proposed Sign By-law f. Public Consultation

a. Sample Streets b. Technical Sketches c. Product Information d. Proposed Dark Skies By-law e. Proposed Sign By-law f. Public Consultation Appendix a. Sample Streets b. Technical Sketches c. Product Information d. Proposed Dark Skies By-law e. Proposed Sign By-law f. Public Consultation Downtown SUDBURY STREETSCAPE PROJECT Phase II: Site

More information

Lighting. Showroom Lighting Requirements. Introduction. Technology. Fixture and Performance

Lighting. Showroom Lighting Requirements. Introduction. Technology. Fixture and Performance Showroom Lighting Requirements Introduction The Chevrolet Showroom Lighting Strategy is designed to assist the Dealer in reducing energy consumption through the use of high performance tested and approved

More information

Humber Bay Shores Precinct Plan Final Report

Humber Bay Shores Precinct Plan Final Report STAFF REPORT ACTION REQUIRED Humber Bay Shores Precinct Plan Final Report Date: May 21, 2010 To: From: Wards: Reference Number: Etobicoke York Community Council Director, Community Planning, Etobicoke

More information

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS

More information

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date: STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date: 2-14-2007 Thru: Charles McNeely, City Manager Subject: Staff Report: Approval of a project to be submitted for the NDOT 2007-2009 Landscape

More information

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples. Gordon River Project Location Naples Beach Golf Club East Naples Naples Naples Bay Evergreen Golf and Country Club and Gordon River Greenway Connector Bridge Gordon River Greenway CONNECTOR BRIDGE AND

More information

LIGHTING LIGHTING. Overhead Electric Distribution Standards INTRODUCTION

LIGHTING LIGHTING. Overhead Electric Distribution Standards INTRODUCTION INTRODUCTION 1. MERCURY VAPOR MV luminaires are for removal only. Maintenance of these fixtures will be for the photocontrol, bulb, or the ballast only. Any other work will constitute replacement with

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

Schematic Design Ideas for the Westlake Recreation Center. Presented by: Summer Padgett At Lutron Electronics On December 9, 2003

Schematic Design Ideas for the Westlake Recreation Center. Presented by: Summer Padgett At Lutron Electronics On December 9, 2003 Schematic Design Ideas for the Westlake Recreation Center Presented by: Summer Padgett At Lutron Electronics On December 9, 2003 The Westlake Recreation This facility serves as a park and recreation center

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

LED Lighting Products Listings Outdoor

LED Lighting Products Listings Outdoor Page1 NCC LED Lighting 7-19-17 LED Lighting Products Listings Outdoor BL-12 RFP - $198.33 LED Bollard Light Retrofit Package Equivalent to a 150-watt High Pressure Sodium or Metal Halide Fixture. Operating

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 18, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

\\ Comprehensive Facilities Master Plan. Design Guidelines

\\ Comprehensive Facilities Master Plan. Design Guidelines Design Guidelines CU-Boulder What are Design Guidelines? Institution Character Continuity of Fabric Accelerate Design Process, constrained options MIT Descriptive Buildings on the campus reflect many styles,

More information

Hidden Pointe Landscape Master Plan. June, archi terra

Hidden Pointe Landscape Master Plan. June, archi terra Hidden Pointe Landscape Master Plan June, 2006 t h e archi terra g r o u p 1 Table of Contents Background Purpose and Goals of the Master Plan Master Plan Process Existing Conditions Entrance Hidden Pointe

More information

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015 Project Title Campus Beautification Projects Volunteer Blvd Ph 1 540/009-08-2015 Institution Description UT Knoxville This project will improve Volunteer Boulevard from West Cumberland Ave. to East Cumberland

More information

AS ADOPTED - JULY 2012

AS ADOPTED - JULY 2012 TBLE OF CONTENTS General Principles Public access waterfront walkways shall: 5 Bulkheads or Seawalls 5 Natural Shorelines 6 Design Standards for Bulkheads or Seawalls 6 Design Standards for Waterfront

More information

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016 KASPER City of Georgetown, Texas PUD Planned Unit Development December 30, 2015 Revised January 27, 2016 Applicant: Sentinel Land Company, LLC 4910 Campus Drive Newport Beach, CA Prepared by: SEC Planning

More information

ROAM DCM Control Specification Guideline Division 16520

ROAM DCM Control Specification Guideline Division 16520 ROAM DCM Control Specification Guideline Division 16520 PART 1. GENERAL 1.1 INTRODUCTION A. The intent of this specification is to provide for furnishing, installing, testing and placing into operation,

More information

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles Corridor Identity An attractive and healthy community is a critical element of a quality place, and the design of quality places is a balance between environmental, economic, and social considerations.

More information

Article 14. LIGHTING REGULATIONS

Article 14. LIGHTING REGULATIONS Article 14. LIGHTING REGULATIONS PART I. OUTDOOR LIGHTING Section 14-1: Intent and Purpose Outdoor lighting shall be designed to provide the minimum lighting necessary to ensure adequate safety, night

More information

BUILDING DESIGN STANDARDS FACILITIES MANAGEMENT AND ANCILLARY SERVICES EXTERIOR IMPROVEMENTS DIVISION 32 Exterior Lighting

BUILDING DESIGN STANDARDS FACILITIES MANAGEMENT AND ANCILLARY SERVICES EXTERIOR IMPROVEMENTS DIVISION 32 Exterior Lighting PART 1 GENERAL 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying exterior lighting for landscape use. These standards are not intended to restrict or replace professional

More information

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC A LIMITED LIABILITY COMPANY Popp s Ferry Causeway Park Master Plan Prepared for: City of Biloxi Department of Parks

More information

REVISIONS Summary of Change. 6/1/12 All Replaced entire document with new revision

REVISIONS Summary of Change. 6/1/12 All Replaced entire document with new revision Revision Date Section REVISIONS Summary of Change 6/1/12 All Replaced entire document with new revision REV 6/12 1 of 5 UNIVERSITY CONTACT: EXTERIOR LIGHTING Electrical Services, Maintenance & Operations

More information

2017 Lighting Incentive

2017 Lighting Incentive Commercial & Industrial Retrofit 2017 Lighting Section A: CUSTOMER INFORMATION Customer Name Electric Account Number Rate Application Number Facility Address City State Zip Service Location Identification

More information

Technical Advisory Committee

Technical Advisory Committee CULVER DOWNTOWN STREETSCAPE PLAN STREETSCAPE IDEAS REPORT 01.08.2008 Project Team Matt Crall, Transportation and Growth Management Quick Response Program Donna McCormack, City of Culver Darrell Newton,

More information

LIGHTRECYCLE PRODUCT GUIDE

LIGHTRECYCLE PRODUCT GUIDE April 2016 1. Fluorescent tubes measuring less than or equal to 2 ft Includes all diameters and light outputs, shaped fluorescent tubes, and UV-A and UV-B tubes. 2. Fluorescent tubes measuring greater

More information

OUTDOOR LIGHTING. Features and Benefits O Distinctive, European style with a sleek design

OUTDOOR LIGHTING. Features and Benefits O Distinctive, European style with a sleek design HOLOPHANE Pechina THE SLEEK CONTEMPORARY LINES OF PECHINA COMBINED WITH STRONG MECHANICAL ATTRIBUTES MAKE IT A NATURAL FIT FOR MUNICIPAL, ROADWAY AND AREA APPLICATIONS. THE LUMINAIRE, COMBINED WITH COMPLEMENTARY

More information

Golden Gate Downtown Center Commercial Overlay District (GGDCCO).

Golden Gate Downtown Center Commercial Overlay District (GGDCCO). Golden Gate Downtown Center Commercial Overlay District (GGDCCO). Golden Gate Downtown Center Commercial Overlay District (GGDCCO): Special conditions for properties in the vicinity of Golden Gate Parkway

More information

Severn River Sub-Watershed: BMP 09-Retrofit

Severn River Sub-Watershed: BMP 09-Retrofit Project ID: BMP_09 Total Treated Drainage Area: 4.57 acres Total Treated Impervious Area: 2.9 acres Total Water Quality Volume (WQv): ~10,300 cubic feet; 0.236 acre-foot Rainfall Depth Treated (Pe): 1

More information

23 EA , , , , , , , LF , , ,596.

23 EA , , , , , , , LF , , ,596. Mast Arm Traffic Signals at Central Ave. 5th, 6th, 8th & 31st St. Engineering & Capital Improvements Department, City of St. Petersburg, FL Project No.: 11027-112 Bid date: January 10, 2012 Item Description

More information

Eligible Prescriptive Measures List:

Eligible Prescriptive Measures List: Eligible Prescriptive Measures List: Business, Non-Profit, Institutional Energy Savings Program Products must meet the Canadian Certification Standards as outlined by the Standards Council Canada for product

More information

4.500 Preston Road Overlay District

4.500 Preston Road Overlay District Section 4.500 Preston Road Overlay District 2004 Zoning Ordinance 4.500 Preston Road Overlay District (ZC 98-29; Ordinance No. 98-9-12) 4.501 Purpose To provide appropriate design standards for the use

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Problem: Anecdotal evidence suggests a natural spring exists in the backyard

More information

3 Focusing the Vision Following the second workshop, the Project

3 Focusing the Vision Following the second workshop, the Project 3 Focusing the Vision Following the second workshop, the Project Team undertook the task of refining the Vision developed during the workshops. The final plan addresses participant desires while incorporating

More information

3.1 Streetscape Overview

3.1 Streetscape Overview 3.0 Streetscape 3.1 Streetscape Overview Existing streetscape There are four main elements within the streetscape, these include: street lighting, surfacing, street furniture, street trees and planting.

More information

DESIGN REVIEW BOARD Staff Report

DESIGN REVIEW BOARD Staff Report DESIGN REVIEW BOARD Staff Report Agenda Item I.2 Meeting Date: February 24, 2015 TO: Goleta Design Review Board FROM: Michael Concepcion, Assistant Planner; (805) 961-7566 SUBJECT: 622 Dara Road (APN 069-371-007)

More information

THE COMPLETE GUIDE TO OUTDOOR WALL LIGHTS

THE COMPLETE GUIDE TO OUTDOOR WALL LIGHTS THE COMPLETE GUIDE TO OUTDOOR WALL LIGHTS CONTENTS 1. INTRODUCTION 2. TYPES OF OUTDOOR WALL LIGHTS 3. LIGHT SOURCES IN OUTDOOR WALL LIGHTS 4. FACTORS IN SELECTING OUTDOOR WALL LIGHTS 5. SUMMARY lighting

More information

INDEPENDENCE VISITOR CENTER PHILADELPHIA, PA

INDEPENDENCE VISITOR CENTER PHILADELPHIA, PA The trellis lines the east wall of the independence visitor center. It has brick columns with a white painted wooden trellis that is covered in ivy. The trellis is built on top of a brick walkway. The

More information

DEVELOPMENT CONTROLS MEDICAL DISTRICT

DEVELOPMENT CONTROLS MEDICAL DISTRICT 6.01. GENERAL DESIGN GUIDELINES A. Site Planning B. Architectural Design C. Medical Facility Signage & Lighting D. Exhibit 48. ARCHITECTURAL DESIGN CONCEPTS 6.02. MEDICAL FACILITY STANDARDS & GUIDELINES

More information

STANFORD UNIVERSITY EXTERIOR LIGHTING

STANFORD UNIVERSITY EXTERIOR LIGHTING STANFORD UNIVERSITY EXTERIOR LIGHTING NOTE: THE LIST OF STANDARD LIGHT TYPES IS INTENDED FOR CONSULTANT USE IN DEVELOPING A LIGHTING DESIGN STRATEGY. CONSULTANTS SHOULD ALWAYS CONSIDER SPECIFIC PROJECT

More information

REFRACTOPACK. Corrosion resistant construction allows this luminaire to be installed in corrosive and marine outdoor applications.

REFRACTOPACK. Corrosion resistant construction allows this luminaire to be installed in corrosive and marine outdoor applications. REFRACTOPACK The Refractopack luminaire is a versatile unit, combining the options of vertical/horizontal entry, top/side mounting capabilities, and three distinct prismatically controlled light patterns

More information

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES CHAPTER 4: GENERAL LANDSCAPING STANDARDS This chapter describes plant material minimum standards that apply to landscaping both on private property (on-site) and within the public right-of-way (off-site).

More information

DRAFT. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008

DRAFT. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008 DRAFT RJM DESIGN GROUP, INC. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008 INTRODUCTION This report summarizes the results of the planning process that was conducted as a part of

More information

PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES

PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES 2.1.0 GENERAL REQUIREMENTS: 1. Approved warm season turf varieties shall be used for LMD/CFD, commercial, industrial, and public landscape areas. The use of

More information

City of Lafayette Staff Report Design Review Commission

City of Lafayette Staff Report Design Review Commission City of Lafayette Staff Report Design Review Commission Meeting Date: February 13, 2017 Staff: Subject: Niroop K. Srivatsa DR13-14DDII Lennar Homes (Applicant), C-Zoning: Request for: (1) Review of Phase

More information

1 st now. Design Elements. iii STREET TREES PATTERNED CROSSWALKS SPECIAL SIDEWALK PAVING. First Street ELEMENTS TRANSIT SHELTER / LANTERN

1 st now. Design Elements. iii STREET TREES PATTERNED CROSSWALKS SPECIAL SIDEWALK PAVING. First Street ELEMENTS TRANSIT SHELTER / LANTERN Design Elements A framework for Design Elements has been developed in response to Project Restore s vision and goals for the First Street Corridor. Guided by the principles good urban design and smart

More information

DESIGN PARAMETERS DESIGN OBJECTIVES. Design Focus and the Elements of the Corridor. Driver Confidence. Visual Organization.

DESIGN PARAMETERS DESIGN OBJECTIVES. Design Focus and the Elements of the Corridor. Driver Confidence. Visual Organization. Design Focus and the Elements of the Corridor LBJ Corridor DESIGN PARAMETERS For any project to be successful, the project goals must be clear. Therefore, with the assistance of TxDOT, the Urban Design

More information

Electrical Inspection Lighting & Power

Electrical Inspection Lighting & Power 0921 Light Fixtures & Controls Fixtures, controls, conduit, wiring, etc. Interior classroom and corridor lighting consists of T12 fluorescent lamps with magnetic ballasts. In the classrooms the luminaires

More information

Design Guidelines for Residential Subdivisions

Design Guidelines for Residential Subdivisions Design Guidelines for Residential Subdivisions Development Services 972-466-3225 cityofcarrollton.com This page intentionally left blank. Table of Contents Purpose... 1 Design Objectives... 1 Design Guidelines

More information

Pedestrian and Bike Bridge LOGO

Pedestrian and Bike Bridge LOGO 6.2.2 Pedestrian and Bike Bridge The proposed pedestrian and bike crossing re-envisions the existing bridge at Pismo Creek on Cypress Street. The bridge is currently underutilized by vehicular through

More information

Streetscape Patterns. Design Guidelines, Ridgewood Village Center Historic District, Ridgewood, N.J. page 20

Streetscape Patterns. Design Guidelines, Ridgewood Village Center Historic District, Ridgewood, N.J. page 20 North Broad Street has a unique streetscape pattern with broad curving street, tight enclosure on the east side with attached commercial buildings aligned with the sidewalk, and landscaped open space on

More information

Strategic Planning Near Term & Current

Strategic Planning Near Term & Current Agenda Roll Call / Pledge of Allegiance Strategic Planning 2017 Audit Report Board Member Discussion Items Public Comments Consultant Reports Other Business Public Comments Board Member comments Adjourn

More information

D. Landscape Design. 1. Coverage Intent: To provide adequate landscaping materials that enhance the appearance of development projects.

D. Landscape Design. 1. Coverage Intent: To provide adequate landscaping materials that enhance the appearance of development projects. D. Landscape Design The standards and guidelines in this section give design guidance for the landscaping components of industrial and office projects. City regulations require that all landscaping be

More information

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, 2010 6:00 pm - 8:00 pm 1 Project Area 2 Sheridan Parking Structure RTD Ownership 3 Project Elements Structure and amenities include: 1.

More information

ROSS BRIDGE NEIGHBORHOOD ASSOCIATION ARCHITECTURAL REVIEW COMMITTEE ARCHITECTURAL STANDARDS

ROSS BRIDGE NEIGHBORHOOD ASSOCIATION ARCHITECTURAL REVIEW COMMITTEE ARCHITECTURAL STANDARDS ROSS BRIDGE NEIGHBORHOOD ASSOCIATION ARCHITECTURAL REVIEW COMMITTEE ARCHITECTURAL STANDARDS Revised & Approved July 25, 2006 Table of Contents I. BASKETBALL GOAL POSTS AND BACKBOARDS 3 II. RECREATIONAL

More information

CHAPTER 10 GC GENERAL COMMERCIAL DISTRICT

CHAPTER 10 GC GENERAL COMMERCIAL DISTRICT CHAPTER 10 GC GENERAL COMMERCIAL DISTRICT SECTION 10.01 DESCRIPTION AND PURPOSE A. This District is intended for commercial development of a general nature near areas where greater concentrations of residential

More information

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL Design Guidelines and Standards for Sight Triangles Sight Triangle MANUAL Table of Contents 1.0 Introduction..............................................7 1.1 Key Terms..............................

More information

V. Gateways GATEWAYS / V-1

V. Gateways GATEWAYS / V-1 V. GATEWAYS / V-1 Many of Chesapeake s gateways are located on highways and call for bold and attractive designs that motorists can understand, appreciate, and enjoy. can also take the form of natural

More information

The Anaheim Resort Specific Plan. The Anaheim Resort Identity Program

The Anaheim Resort Specific Plan. The Anaheim Resort Identity Program Specific Plan Appendix C The Anaheim Resort Specific Plan Appendix C This page is intentionally blank. City of Anaheim Adopted September 1994 (94R-238) Amendment No. 1 September 2001 (2001R- 239) Amendment

More information

1.4 Commercial Signage

1.4 Commercial Signage SECTION 1: COMMERCIAL DEVELOPMENT 1.4 Commercial Signage Design Principle Commercial signage is an integral part of the urban design fabric of our cities. It is absolutely necessary and shall be deemed

More information

High Mast Series HMAO HMSC

High Mast Series HMAO HMSC High Mast Series HMAO HMSC HOLOPHANE HMAO Series High Mast Series HOLOPHANE HIGH MAST LIGHTING SERIES PROVIDES SUPERIOR BENEFITS FOR ILLUMINATING LARGE AREAS. THE OPTIMIZED LIGHT CONTROL PROVIDED BY THE

More information

POLESTAR II SERIES HL /01

POLESTAR II SERIES HL /01 POLESTAR PoleStar luminaires provide a variety of expressions to complement any architectural design while also satisfying the requirement for a functional, maintainable lighting system. The distinctive

More information

Assessment of the Extent and Quality of the Landscape Features of the Campus.

Assessment of the Extent and Quality of the Landscape Features of the Campus. Assessment of the Extent and Quality of the Landscape Features of the Campus. 1. In 2012 the University used geographic information systems to create georeferenced layers for all landscape and hardscape

More information

Central Village Design Guidelines Westport, MA

Central Village Design Guidelines Westport, MA Central Village Design Guidelines Westport, MA Development in Westport s Central Village, if required to submit an application for Site Plan Review, shall adhere to Section 21 Supplemental Performance

More information

Business Customer Information. Account Number (9 digits) Account Holder Name Phone (As shown on your utility bill) Service Street Address

Business Customer Information. Account Number (9 digits) Account Holder Name Phone  (As shown on your utility bill) Service Street Address Commercial Lighting Rebate Application Please complete the application including existing and installed information. Application will be returned without valid purchase receipt/invoice or if equipment

More information