1 Information for File # ARC Applicant Consultant Corps Contact Linda Keith City of Tower Natalie White SEH Inc. Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN Andrew.R.Chambers@usace.army.mil Phone Primary County St. Louis County Section 32 Township Range 62 North 15 West Information Complete On February 15, 2018 Posting Expires On April 12, 2018 Authorization Type LOP-05-MN This application is being reviewed in accordance with current practices for documenting Corps jurisdiction under Section 404 of the Clean Water Act identified in Regulatory Guidance Letter We have made a preliminary determination that the aquatic resources that would be impacted by the proposed project are subject to Corps of Engineers jurisdiction under Section 404 of the Clean Water Act. If an approved jurisdictional determination is completed as part of the review process for this application, a copy will be posted on the St. Paul District web page at the following link: Project: The purpose and need of the proposed project is to provide recreational residential units in an area planned for mixed-use re-development. The proposed project would include the construction of a pedestrian hiking trail, three residential townhomes, and a realigned roadway with associated utilities. The project area is located adjacent to the Tower Harbor on East Two River in the City of Tower, MN. PROJECT DESCRIPTION AND PURPOSE: The purpose of the proposed project is to promote public recreational use in the area along with filling the demand for lakefront and riverfront residential developments. The development would provide a means of economic growth in the form of residential units within close proximity to Lake Vermilion and the City of Tower s traditional business district. The project proposes to construct three townhome buildings (20 residential unit s total) on the south side of the East Two River harbor. These buildings would have off-street parking in front 1

2 of each along with waterfront views and access. A new 23-foot wide roadway with a hammerhead turn-around would be constructed on the south side of the townhomes for vehicle access. The townhome utilities (propane, water, and sewer) would be installed under the roadway. The 10-foot wide by 1,225-foot long pedestrian hiking trail would be constructed around the perimeter of the harbor. Along the north side of the harbor, the trail would incorporate a 6-foot wide boardwalk approximately 110 feet long in an effort to minimize wetland impact. The paved trail on the east side of the harbor would utilize the existing Enterprise Drive Bridge as a means of crossing East Two River. This portion of Enterprise Drive would be abandoned and used for the pedestrian trail, and the southern portion of Enterprise Drive would be realigned to include a smooth gradual right turn onto Pine Street. This realignment would be 29 feet wide and provide efficient vehicle access to the Tower business district. A storm water retention pond would be constructed south of the proposed townhome buildings to treat storm water runoff from the new impervious surfaces. The 6,282 square-foot pond would treat a total volume of 17,895 cubic feet of storm water. NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS: The development construction would include the proposed permanent discharge of dredged and fill materials into 0.89 acres (38,720 square feet) of wet meadow, shrub-carr, coniferous swamp, and seasonally flooded wetlands adjacent to East Two River. The impacted wetlands occur within Major Watershed 73 (Vermilion River) and Bank Service Area (BSA) 2. Best Management Practices (BMP s) would be utilized throughout the entirety of the project. The applicant would obtain a NPDES/SDS Construction Storm water Permit from the MPCA which will include a project-specific Storm water Pollution Prevention Plan (SWPPP). Appropriate BMP s would be installed and maintained in accordance with the terms and conditions of the storm water permit and SWPPP. The disturbed areas would be reseeded and/or planted and stockpiles stabilized to limit erosion and further impact to wetlands. ALTERNATIVES CONSIDERED: The no build alternative consists of abandoning the proposed trail and townhome development. This alternative would not meet the project need for residential units with harbor access, and involve an incomplete pedestrian trail requiring users to cross over heavy traffic on Highway 169. Alternative 1 This concept would involve constructing two townhome buildings on the harbor side of the roadway, and construct the third townhome on the south side of Pine Street near Enterprise Drive. This alternative would not include a roadway extension and hammerhead turnaround which would force large vehicles to reverse onto the connecting street, posing a safety concern. This alternative would involve one townhome without waterfront access or harbor views. This alternative would involve approximately of 4,800 square feet of wetland impact. Alternative 2 This alternative would involve the townhome buildings and the storm water treatment pond on the north side of the realigned roadway. This alternative would give the storm water pond a larger footprint and convenient location, however would require 0.5 acre of additional wetland impact to Wetland 2. This alternative would result in approximately 1.4 acres of wetland impact, approximately 0.52 acres greater than the preferred alternative. Alternative 3 (Preferred Alternative) This concept would construct three townhome buildings (20 units) with waterfront views and access, along with an improved roadway, hammerhead turn-around, pedestrian trail, and a storm water pond south of the realigned roadway. This alternative is economically viable and would provide street infrastructure with safe access and 2

3 efficient traffic flow. This alternative would reduce the wetland impact from 1.4 acres in Alternative 2 to 0.89 acres in this preferred alternative. COMPENSATORY MITIGATION: The applicant proposes to compensate for the loss of function associated with the discharge of dredged and fill materials into 0.89 acres of wetlands by purchasing 0.89 wetland credits to be debited from the Welle Peatlands Wetland Mitigation Bank (BWSR Account #1638) in Bank Service Area 2. Drawings See attached. 3

4 Project Location Path: S:\PT\T\\143822\3-env-stdy-regs\32-permit\GIS\Figure 1_Site Location.mxd Project Location Legend Project Location ± Miles 418 W SUPERIOR ST, SUITE 200 DULUTH, MN PHONE: (218) FAX: (888) TF: (800) Project: Print Date: 1/29/2018 Map by: nwhite Projection: NAD 83 UTM 15N Source: ESRI, USGS, SEH Project Location Map Tower Harbor Development Tower, Minnesota Figure 1 This map is neither a legally recorded map nor a survey map and is not intended to be used as one. This map is a compilation of records, information, and data gathered from various sources listed on this map and is to be used for reference purposes only. SEH does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and SEH does not represent that the GIS Data can be used for navigational, tracking, or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The user of this map acknowledges that SEH shall not be liable for any damages which arise out of the user's access or use of data provided.

5 MESOJEDEC THOMAS J MESOJEDEC THOMAS J MNTH 1/169 MATICH BRADLEY J East Hoodoo ANDERSON BRIAN D PEYLA RICHARD ANDERSON ROBERT J BIRK KATHERINE HELEN Two Point Rd LARSON JEFFREY A NELSON PAMELA K PEYLA JAMES F ETUX PEYLA RICHARD WRIGHT JAMES R VERMILION FRONTIER LLC River ECONOMIC VANDEUSEN LEON W III ST OF MN C278 L35 ST OF MN C278 L35 VOGH TYLER A BLAEDE MICHAEL J Cedar St VOGH TYLER A MELLESMOEN GARY C Pine St DESANNOY DAVID OSTERMANN BROTEN KARJALA GARY DANIEL H JASON ABRAHAMSON ELIZABETH A MARTINSON LANETTE A Poirier LAKOSKEY LAKOSKEY MARY P MARY P Enterprise Dr EDWARDS DENNIS J MATICH MARK J WISCONSIN CENTRAL LTD Rd LAKOSKEY MARY P Pine St JANISCH LISA A M WISCONSIN CENTRAL LTD ECONOMIC N 3rd S WALKER BYSTROM ROBINSON JEFFREY C LARSEN JOHN A PONG HUI MICHAEL C ETUX CARLSON BRUCE G KOTZIAN TIMOTHY L LAKE VERMILION CULTURAL CENTER INC ABRAHAMSON RONALD L ETUX N Main S DESANNOY DAVID ANTHONY FLAT IRON HOLDINGS LLC BURGESS GARY W ETUX HILTUNEN WM P ETUX STATE OF MINNESOTA STATE OF MINNESOTA WISCONSIN CENTRAL LTD Path: S:\PT\T\\143822\3-env-stdy-regs\32-permit\GIS\Figure 2_2016 Aerial Photo.mxd STATE OF MINNESOTA STATE OF MINNESOTA ECONOMIC ECONOMIC Legend ECONOMIC ± Parcel Boundaries Approximate Construction Limits Feet 418 W SUPERIOR ST, SUITE 200 DULUTH, MN PHONE: (218) FAX: (888) TF: (800) Project: Print Date: 2/14/2018 Map by: nwhite Projection: NAD 83 UTM 15N Source: SEH Background: 2016 St. Louis Co 2016 Aerial Photograph Tower Harbor Development Tower, Minnesota Figure 2 This map is neither a legally recorded map nor a survey map and is not intended to be used as one. This map is a compilation of records, information, and data gathered from various sources listed on this map and is to be used for reference purposes only. SEH does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and SEH does not represent that the GIS Data can be used for navigational, tracking, or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The user of this map acknowledges that SEH shall not be liable for any damages which arise out of the user's access or use of data provided.

6 Wetland RS-5 Impact 28 sq ft Shallow Marsh --- Impact below OHW (non-wca) 28 sq ft Wetland RS-7 Impact 622 sq ft Fresh (Wet) Meadow East Culvert Two River Wetland 2 Impact 13,054 sq ft Shrub-Carr Culvert Culvert Wetland RS-6 Impact 2,599 sq ft Fresh (Wet) Meadow Wetland 2 Impact 17,644 sq ft Coniferous Swamp Wetland 3 Impact 1,844 sq ft Seasonally Flooded Basin Wetland 3 Impact 2,957 sq ft Fresh (Wet) Meadow Path: S:\PT\T\\143822\3-env-stdy-regs\32-permit\GIS\Figure 5_Wetland Impacts.mxd Legend Approximate Construction Limits Wetland Type Fresh (Wet) Meadow Seasonally Flooded Basin Shallow Marsh Alder Thicket Shrub-Carr Coniferous Swamp Hardwood Swamp Feet± 418 W SUPERIOR ST, SUITE 200 DULUTH, MN PHONE: (218) FAX: (888) TF: (800) Project: Print Date: 2/14/2018 Map by: nwhite Projection: NAD 83 UTM 15N Source: ESRI, MNDNR, SEH Background: 2016 St. Louis Co Wetland Impact Map Tower Harbor Development Tower, Minnesota Figure 6 This map is neither a legally recorded map nor a survey map and is not intended to be used as one. This map is a compilation of records, information, and data gathered from various sources listed on this map and is to be used for reference purposes only. SEH does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and SEH does not represent that the GIS Data can be used for navigational, tracking, or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The user of this map acknowledges that SEH shall not be liable for any damages which arise out of the user's access or use of data provided.

7

8

9 ARC Drawing 6 of 6

Information for File # ARC

Information for File # ARC Information for File # 2017-03115-ARC Applicant Consultant Corps Contact Bob Manzoline St. Louis and Lake Counties Regional Rail Authority Natalie White Short Elliot Hendrickson (SEH) Inc. Andrew R Chambers

More information

Information for File # ARC

Information for File # ARC Information for File # 2016-02630-ARC Applicant Corps Contact Will Bomier-Carlton County Transportation Department Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil

More information

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships)

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships) Information for File MVP-2014-03830-MMJ; Reconstruction (Waconia and Watertown Townships) Applicant: Carver County Corps Contact: Melissa Jenny Address: 180 Fifth Street East, Suite 700, St. Paul, MN 55101

More information

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project Information for File # 2016-01223-MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project Applicant: Park Nicollet, Attn: Robert Riesselman Corps Contact: Melissa Jenny Address:

More information

Information for File # ARC

Information for File # ARC Information for File # 2015-02781-ARC Applicant Corps Contact Enbridge Energy, Limited Partnership Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil

More information

Information for File # MMW

Information for File # MMW Information for File #07-0870-MMW Applicant: Menards (Tyler Edwards) Corps Contact: Mariah Weitzenkamp Address: 80 Fifth Street East, Suite 700, Saint Paul, MN 0-78 E-Mail: Mariah.M.Weitzenkamp@usace.army.mil

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2004-02804-MVM Applicant: St. Michael MF, LLC Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil

More information

Information for File # MVP MMJ; Elim Care

Information for File # MVP MMJ; Elim Care Information for File # MVP-217-2628-MMJ; Elim Care Applicant: Elim Care of Maple Plain Corps Contact: Melissa Jenny Address: 18 Fifth Street East, Suite 7, St. Paul, MN 5511-168 E-Mail: Melissa.m.jenny@usace.army.mil

More information

Information for File # SEK

Information for File # SEK Information for File # Applicant: Dane County Corps Contact: Simone Kolb Address: 20711 Watertown Rd., Suite F, Waukesha, WI, 53186 E-Mail: simone.e.kolb@usace.army.mil Phone: 262-717-9539 Primary County:

More information

Information for File # MVP MMJ

Information for File # MVP MMJ Information for File # MVP-218-477-MMJ Applicant: City of Rogers Corps Contact: Melissa Jenny Address: 18 Fifth Street East, Suite 7, St. Paul, MN 5511-1648 E-Mail: Melissa.m.jenny@usace.army.mil Phone:

More information

Watertown City Council

Watertown City Council City of Watertown Watertown City Council April 14 th, 2015 Agenda Item: City Comment on Sun Share CUP Application Request for Action: Motion to Approve City Comments regarding CUP Application Department:

More information

Information for File #MVP DAS

Information for File #MVP DAS Information for File #MVP201702209DAS Applicant: HyVee, Inc. Corps Contact: David Studenski Address: 1114 South Oak Street, La Crescent, Minnesota 559471560 EMail: david.a.studenski@usace.army.mil Phone:

More information

Information for File # RMM

Information for File # RMM Information for File #2015-00067-RMM Applicant: New Ulm Public Schools Corps Contact: Ryan Malterud Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: ryan.m.malterud@usace.army.mil

More information

Information for File # MHK

Information for File # MHK Information for File #2014-03555-MHK Applicant: Corps Contact: Wimmer Communities Marie Kopka Address: 250 N. Sunnyslope Road, Suite 296 Brookfield, Wisconsin 53005 E-Mail: Marie.H.Kopka@usace.army.mil

More information

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana JOINT PUBLIC NOTICE 26 June 2017 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services 7400

More information

PROPOSED DRAINAGE PATTERNS

PROPOSED DRAINAGE PATTERNS 1121 1118.50 Basin Floor 1120 1119 0 N 100 200 PROPOSED DRAINAGE PATTERNS Deroiser Drive Riverwood Drive County 260 0 100 200 Project Name: Riverwood Drive LITTLE FALLS TOWNHOMES Project Location: LITTLE

More information

Coffee Creek Park Development Low Impact Development (LID)

Coffee Creek Park Development Low Impact Development (LID) Coffee Creek Park Development Low Impact Development (LID) City of Duluth, St. Louis County, MN Presented By: Christopher J. Rousseau, P.E. February 27, 2008 Developer / Owner Information Trinity Development

More information

Information for File MMJ Main Stem Bassett Creek Restoration Project

Information for File MMJ Main Stem Bassett Creek Restoration Project Information for File 2013-03866-MMJ Main Stem Bassett Creek Restoration Project Applicant: Minneapolis Park and Recreation Board (MPRB) Corps Contact: Melissa Jenny Address: Corps of Engineers, St. Paul

More information

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed On September 8 th, 2006 Minnesota's Lake Superior Coastal Program and the South St Louis Soil and Water Conservation

More information

Appendix A. Project Location and Preferred Alternative Figures

Appendix A. Project Location and Preferred Alternative Figures Appendix A Project Location and Preferred Alternative Figures Figure 1: Project Location Map Figure 2A: Preferred Alternative Layout Sheet 1 Figure 2B: Preferred Alternative Layout Sheet 2 Figure 2C: Preferred

More information

Information for File # JTF

Information for File # JTF Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No. September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements

More information

Information for File # KDZ

Information for File # KDZ Information for File # 016-098-KDZ Applicant: Wisconsin Department of Transportation Corps Contact: Kyle Zibung Address: 96 Post Road, Suite B, Stevens Point, WI 4467 -Mail: kyle.d.zibung@usace.army.mil

More information

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Executive Committee Meeting Addendum #7/15 July 3, 2015 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Maria Augimeri Michael Di Biase David Barrow Ronald Chopowick Vincent Crisanti Glenn

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

16-198/ W16-18 Erosion Control, Wetland Protection, Waterbody Crossings & Structures, & Stormwater Management Irwin Jacobs ity of Orono

16-198/ W16-18 Erosion Control, Wetland Protection, Waterbody Crossings & Structures, & Stormwater Management Irwin Jacobs ity of Orono Permit Application No.: 16-198/ W16-18 Rules: Erosion Control, Wetland Protection, Waterbody Crossings & Structures, & Stormwater Management Applicant: Irwin Jacobs/ City of Orono Received:4/26/2016 Project:

More information

Non-Residential&Multi-Family PropertyCreditManual

Non-Residential&Multi-Family PropertyCreditManual CityofRichmond DepartmentofPublicUtilities StormwaterManagementProgram Non-Residential&Multi-Family PropertyCreditManual ApprovedFebruary2011 City of Richmond Stormwater Non-Residential & Multi-Family

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure

More information

Technical Memorandum 5

Technical Memorandum 5 Technical Memorandum 5 Environmental Resources August 2015 PREPARED BY AECOM Table of Contents Introduction... 3 Natural Features... 6 Watersheds... 6 Rivers, Lakes, Creeks... 6 Wetlands... 8 Floodplains...

More information

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES 7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an

More information

Red Fox Commercial Outline Plan

Red Fox Commercial Outline Plan Red Fox Commercial Outline Plan City of Cold Lake, Alberta Prepared by Durrance Projects Ltd and Ross W. Sharp & Associates Ltd October 2014 Rupert 1 Table of Contents 1. PURPOSE...3 1.1. Location...4

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session Manning Freeway to Whitemud Drive Welcome to this Construction Information Session Purpose To inform interested residents and businesses about the plans accommodation. Background: The Government of Alberta

More information

Erosion control practices meet District requirements.

Erosion control practices meet District requirements. Permit Application No.: 16-631 Rules: Erosion Control, Stormwater Management, Wetland Protection, and Variance Applicant: Woodridge Church Received:11/23/16 Project: Woodridge Church Building Addition

More information

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination I-494 Rehabilitation Project SP 2785-330 (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination State Project Number 2785-330 Federal Project No. NHPP-I494 (002) Trunk Highway:

More information

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Huntington Stormwater Utility

Huntington Stormwater Utility Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 & PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

Planning & Zoning Commission Planning & Development Department February 17, 2014

Planning & Zoning Commission Planning & Development Department February 17, 2014 Request Applicant Owner Zoning Location Attachments Subdivision of 2.79 acres of currently vacant property to create 27 town home lots and 6 restricted reserves for the use of HOA Parks. John English;

More information

1. Project Description

1. Project Description To: By: Checked By: Jimmy Vilce, E.I. (FOT istrict 1 Project Manager) Jennifer Nunn, P.E. (The Balmoral Group) Lori Stanfill, P.E. (The Balmoral Group) Memorandum ate: July 10, 2018 Subject: In May of

More information

Project Narrative For Fruita RV Resort Conditional Use Permit

Project Narrative For Fruita RV Resort Conditional Use Permit Project Narrative For Fruita RV Resort Conditional Use Permit Date: November 18, 2016 Prepared by: Robert W. Jones, II, P.E. Vortex Engineering & Architecture, Inc. 2394 Patterson Rd., Ste. 201 Grand Junction,

More information

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME: Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME: General Information: 1. Completed application signed by the owner, review fee, one set of

More information

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO. 2017-05 AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT In the interest of the health, safety, and welfare of its citizens, the

More information

Working Group Meeting

Working Group Meeting April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome

More information

17 Jul 2002 PUBLIC NOTICE

17 Jul 2002 PUBLIC NOTICE 17 Jul 2002 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

FY Capital Improvement Program Arroyo Projects

FY Capital Improvement Program Arroyo Projects FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 Hahamongna - Implement Master Plan - Oak Grove Area Improvements (7756) Hahamongna - Implement Master

More information

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples. Gordon River Project Location Naples Beach Golf Club East Naples Naples Naples Bay Evergreen Golf and Country Club and Gordon River Greenway Connector Bridge Gordon River Greenway CONNECTOR BRIDGE AND

More information

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, 2015 6:30 P.M. - ARDEN HILLS CITY HALL PLANNING CASES A. Planning Case 15-016; Final Planned Unit Development Arden Plaza;

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

COLLIER BOULEVARD (CR 951) CORRIDOR

COLLIER BOULEVARD (CR 951) CORRIDOR Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts

More information

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners Swan Creek Urban BMP Inventory and Assessment Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners Presentation Outline Project Background Methods Inventory Desktop

More information

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk

More information

River Corridor Overlay Zone (RCOZ) Article 5

River Corridor Overlay Zone (RCOZ) Article 5 River Corridor Overlay Zone (RCOZ) Article 5 The site is in one of two designated districts. The first is the CBD (central business district) River District, which recognizes the urban character and unique

More information

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST City of Seminole 9199 113 th Street N. Seminole, FL 33772 Ph: (727) 392-1966 Fx: (727) 319-6583 SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST Note: This checklist is designed to aid designers in the review

More information

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed: Permit Application No.: 15-445 Rules: Erosion Control, Wetland Protection, & Stormwater Management Applicant: BPS Properties, LLC Project: Mooney Lake Preserve Received: 8-24-15 Location: 300 Sixth Ave.

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION DATE: January 6, 2016 TO: LEAD AGENCY: Responsible Agencies, Organizations, and Interested Parties Contact: Tyler Barrington, Principal Planner Planning Department Community Development

More information

Procedures IV. V. Rural Road Design Option

Procedures IV. V. Rural Road Design Option i IV. Procedures A. All applicants required to prepare a Conservation Design Subdivision shall provide the Planning Board with a conceptual conventional subdivision design as well as a proposed layout

More information

Appendix E: Illustrative Green Infrastructure Examples

Appendix E: Illustrative Green Infrastructure Examples Appendix E: Illustrative Green Infrastructure Examples Integrating LID into San Francisco s Urban Landscape Figure E. High-density Residential Figure E. Low-density Residential Figure E. Mixed Use 7 Figure

More information

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility Costs of Stormwater Management and How to Structure a Stormwater Utility Richard Claytor, P.E. Horsley Witten Group, Inc How to Fund Your Municipal Stormwater Program April 30, 2009 Peabody Institute Library

More information

Minnesota Local Road Research Board Local Operational Research Assistance Program (OPERA)

Minnesota Local Road Research Board Local Operational Research Assistance Program (OPERA) Minnesota Local Road Research Board Local Operational Research Assistance Program (OPERA) September 30, 2011 Storm Water Pollutant Removal in Rain Gardens OPERA Project Number: 2010-3 Project Sponsor:

More information

ALTERNATIVE STATION AREA -

ALTERNATIVE STATION AREA - ALTERNATIVE STATION AREA - THE 10 TH STREET GARDEN STATION Two alternative land use scenarios and designs are illustrated here: Scheme A - Transit-Oriented Development High to Mid-Density Residential /Office

More information

ARTICLE 17 SITE PLAN REVIEW

ARTICLE 17 SITE PLAN REVIEW ARTICLE 17 SITE PLAN REVIEW 17.01 INTENT AND PURPOSE The intent of this section is to provide for consultation and cooperation between the applicant and the township planning commission so that the applicant

More information

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting 1. Call To Order 2. Roll Call of Members 3. Chairman's Comments PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Joint Planning and Zoning Meeting January 11, 2017 6:00 PM Courthouse

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

Landowner's Guide to the Lower St. Croix Riverway. Protect. Restore. Celebrate. stcroixriverassociation.org

Landowner's Guide to the Lower St. Croix Riverway. Protect. Restore. Celebrate. stcroixriverassociation.org Landowner's Guide to the Lower St. Croix Riverway Protect. Restore. Celebrate. stcroixriverassociation.org Cover and page spread photographs by Craig Blacklock. For more information on how to be a river

More information

Mendota Heights 2040 Comprehensive Plan Draft Vers

Mendota Heights 2040 Comprehensive Plan Draft Vers 4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs

More information

Understanding Drainage Options What s Feasible and Legal. February 2019

Understanding Drainage Options What s Feasible and Legal. February 2019 Understanding Drainage Options What s Feasible and Legal February 2019 Outline for the Presentation Do you need a permit? Does common law apply? Does local government approve it? Will my neighbor allow

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose

More information

SECTION 4(f) DE MINIMIS DOCUMENTATION

SECTION 4(f) DE MINIMIS DOCUMENTATION SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)

More information

Palisades Outline Plan

Palisades Outline Plan NE ¼ 25 36 28 W4 Town of Penhold Approved August 13, 2012 Contents Figures & Tables... 2 Introduction... 1 Overview... 1 Purpose... 1 Development Area... 3 Ownership... 3 Topography... 3 Existing & Surrounding

More information

Prado Ranch North Common Open Space Tentative Map. Washoe County Planning Commission July 3, 2018

Prado Ranch North Common Open Space Tentative Map. Washoe County Planning Commission July 3, 2018 Prado Ranch North Common Open Space Tentative Map Washoe County Planning Commission July 3, 2018 Site Characteristics Intersection of Chickadee and Lemmon Drive ~1 mile north of Deodar/Lemmon Drive intersection

More information

DRAFT SECTION 4(F) EVALUATION STILLWATER MUNICIPAL BARGE FACILITY

DRAFT SECTION 4(F) EVALUATION STILLWATER MUNICIPAL BARGE FACILITY DRAFT SECTION 4(F) EVALUATION I. DESCRIPTION OF SECTION 4(F) RESOURCE The Section 4(f) resource discussed in this evaluation is known as the Stillwater Municipal Barge Facility property, known previously

More information

Public Information Centre. Welcome

Public Information Centre. Welcome Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff

More information

elm creek Watershed Management Commission

elm creek Watershed Management Commission elm creek Watershed Management Commission ADMINISTRATIVE OFFICE 3235 Fernbrook Lane Plymouth, MN 55447 PH: 763.553.1144 FAX: 763.553.9326 Email: judie@jass.biz Hickory Drive Utility & Street Improvements

More information

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations & Considerations Morse Study Area Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations Development Considerations Floodplain

More information

CHAPTER 3 REGULATED LAND-DISTURBING ACTIVITIES AND APPLICABLE REQUIREMENTS

CHAPTER 3 REGULATED LAND-DISTURBING ACTIVITIES AND APPLICABLE REQUIREMENTS CHAPTER 3 REGULATED LAND-DISTURBING ACTIVITIES AND APPLICABLE REQUIREMENTS 3.1 INTRODUCTION As discussed in Chapter 1, development in Henrico County is subject to numerous environmental programs required

More information

4. Contractor (and subcontractors if applicable) certification statement(s)

4. Contractor (and subcontractors if applicable) certification statement(s) CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651) DATE: October 24, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000; TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Tori Dupre, Senior

More information

5-Year Street Reconstruction Plan ( )

5-Year Street Reconstruction Plan ( ) 5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek

More information

City of Shady Cove Riparian Ordinance Ordinance XXX

City of Shady Cove Riparian Ordinance Ordinance XXX 1 Updated October 8, 2015 City of Shady Cove Riparian Ordinance Ordinance XXX This language is to be located in Chapter 155 of the Shady Cove Code of Ordinances. This will affect property inside city limits,

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

Town of Clinton. New Jersey Highlands Water Protection and Planning Council. January Prepared for the Town of Clinton by:

Town of Clinton. New Jersey Highlands Water Protection and Planning Council. January Prepared for the Town of Clinton by: Clarke Caton Hintz Architecture Planning Landscape Architecture Town of Clinton Module 3: Addendum 100 Barrack Street Trenton NJ 08608 clarkecatonhintz.com Tel: 609 883 8383 Fax: 609 883 4044 New Jersey

More information

Presented By: Matt Roberts and Cass Chapman The University of Minnesota Law School Environmental Sustainability Clinic

Presented By: Matt Roberts and Cass Chapman The University of Minnesota Law School Environmental Sustainability Clinic Presented By: Matt Roberts and Cass Chapman The University of Minnesota Law School Environmental Sustainability Clinic Overview Who We Are and MIDS Project The Problem Recommendations Benefits to Communities

More information

UPDATE ON: Water Quality Enhanced BMPs / Landscaping. January 2017

UPDATE ON: Water Quality Enhanced BMPs / Landscaping. January 2017 UPDATE ON: Water Quality Enhanced BMPs / Landscaping January 2017 Technical Studies in Preparation Water Quality Assessment Report Hydrology Study Storm Water Data Report Flood Control Facilities Report

More information

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS What is Stormwater? Stormwater is water that falls to the ground during a precipitation event. When land is undeveloped or covered with vegetative surface,

More information

OP Council Resolution June 16, Planning and Development Services

OP Council Resolution June 16, Planning and Development Services OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership

More information

UNIVERSITY OF MICHIGAN:

UNIVERSITY OF MICHIGAN: Chapter Eight UNIVERSITY OF MICHIGAN: North Campus I. Introduction The University of Michigan currently owns approximately 800 acres of land in the northeast section of Ann Arbor. North Campus refers to

More information

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

Folly Beach Planning Commission

Folly Beach Planning Commission Folly Beach Planning Commission September 10, 2018 7:00 PM REGULAR MEETING ---------------------------------------------------------------------------------------------------- Commission Members: Greg

More information

SPECIFIC PLAN Requirements

SPECIFIC PLAN Requirements CITY OF LANCASTER PLANNING DEPARTMENT 44933 Fern Avenue, Lancaster, California 93534 (661) 723-6100 SPECIFIC PLAN Requirements Purpose The purpose of a specific plan is to provide for the logical development

More information

FKW PROPERTIES LINDON. Site VINEYARD OREM. Vicinity Map. Timpridge Development 451 East 1000 South Suite A Pleasant Grove, Utah

FKW PROPERTIES LINDON. Site VINEYARD OREM. Vicinity Map. Timpridge Development 451 East 1000 South Suite A Pleasant Grove, Utah Legend LINDON Site VINEYARD OREM Vicinity Map Planning Department Electricity Developer: 240 East Gammon Rd Vineyard, Utah 84058 Phone (801) 226-1929 Community Development Director - Morgan Brim 385.248.7029

More information

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES The following 2019 information is based on the information available to staff at the time of creation. Dates & time may change

More information

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection Stormwater Retrofitting: The Art of Opportunity Presented by the Center for Watershed Protection What Are Stormwater Retrofits? Retrofits are stormwater management measures inserted in an urban or ultra-urban

More information