ATTACK INSTRUCTION FOR USE EKO, PLQ, KLQ, KLV, E, EZ, P CAST IRON FLOOR STANDING GAS BOILER
|
|
- Ira Williams
- 5 years ago
- Views:
Transcription
1 ATTACK CAST RON FLOOR STANDNG GAS BOLER EKO, PLQ, KLQ, KLV, E, EZ, P NSTRUCTON FOR USE W W W. A T T A C K. S K
2 Putting te boiler into operation: ATTACK EKO, PLQ, KLQ, KLV, E, EZ, P Capacity of 9, 12, 15, 20, 25, 30, 35, 40, 45, 49,9 kw 1. Plug te connector of te power supply flex into te 230 V/50 Hz socket. Test te socket wit anoter appliance. Te main switc of te boiler must be in te off position. 2. Let te gas flow into te boiler by turning a manual valve. Wen starting operation after a longer period of inactivity, it is necessary to deaerate te gas piping. Force te air out by gas troug te burner (EKO, PLQ, P). 3. Set te termostat to te maximum operation temperature. 4. Ligt te burner following te instructions on te internal side of te door (see more details in te instructions EKO, PLQ, P). 5. Turn te boiler s main switc on. Te control ligt goes on and te main burner is ignited. Set te termostat back to te required temperature of te eating water. 6. To put te boiler out of operation for a sort time, turn te main switc off and tereby, te boiler remains in te stand-by mode, disconnected from power supply. 7. To put te boiler out of operation for a long time, turn te combined valve into te off position (see instruction EKO, PLQ, P), close te manual gas valve and put te power supply flex out of te socket 230 V/50 Hz. 8. f it comes to te power failure during te operation, te gas supply into te burner is interrupted, wile te burner still burns (EKO, PLQ, P). Wen te power is supplied again, te burners burn automatically witout need of intervention. 9. For PLQ and KLQ modifications, te excessive output can be reduced by switcing a button on te front board. Te excessive output is reduced automatically by te E and EZ modifications. 10. All te repairs during te guarantee and post-guarantee period ave to be done by an autorized service organization. ATTACK, s.r.o. Vrútky 2
3 CAST RON FLOOR STANDNG GAS BOLER Contents Putting te boiler into operation... 2 ntroduction... 4 General description... 4 Purpose of use... 4 Modifications of te cast iron gas boilers... 5 Conditions of installation... 5 Conditions of operation... 6 Safety conditions... 7 Examples of classification of te building materials by te inflammable level... 7 Conditions to keep te ecological parameters... 7 Tecnical description EKO, PLQ, KLV, KLQ, E, EZ, P types... 7 Electrical front panel of te EKO, PLQ, KLV, KLQ, E boilers... 8 Electrical front panel of te EZ boilers... 8 External dimensions of te EKO, KLV, PLQ, KLQ, P boilers... 9 Main parts of EKO, KLV, PLQ, KLQ, P boilers... 9 External dimensions of E, EZ boilers Main parts of E, EZ boilers Connecting te boiler to te electricity mains (not for ATTACK P boilers) Electrical equipment of boilers Start putting te boiler into operation Stop putting te boiler out of operation Operation control Failure states of operation Wat to do in te case of failure Cimney draugt breaker Function of te draugt breaker Function of te flue gas termostat Boiler function Output regulation After set up Regulation of operation Marking of te boiler Spare parts Guarantee, claim Service Maintenance Packaging, transport, storing Boiler accessories and documentation Tecnical canges Conclusion Setting of te modulation electronics of te ATTACK EZ boiler Tecnical data Connecting te electrical installation of te ATTACK EKO boiler Connecting te electrical installation of te ATTACK KLV boiler Connecting te electrical installation of te ATTACK PLQ boiler Connecting te electrical installation of te ATTACK KLQ boiler Connecting te electrical installation of te ATTACK EZ boiler Connecting te electrical installation of te ATTACK E boiler
4 ntroduction Dear customer, Tank you for your confidence and purcase of our product, te ATTACK floor standing cast iron gas boiler wit fluent electronic output regulation. We wis it serves you reliably for a long time. Please, read tis instruction for use carefully to ensure reliable and correct function of te boiler. Te manual is written wit reference to te faultless operation of te boiler connected into te central eating system. Te conditions of correct operation of te boiler: ycoice of a suitable boiler type and output ycorrect commission yreasonable operation y regular tecnical maintenance y reliable service General description Te latest types of te ATTACK cast iron gas boilers are marked as EKO, PLQ, KLQ, KLV, E, EZ, P. Tese products acieve ig level of te tecnical-economic parameters, comparable wit te top foreign products. Tanks to progressive design, wit ig efficiency and long life tey attain very low level of pollutants in te flue gas and terefore tey considerably save te environment. n all te modifications is used an automatic gas valve, enabling reliable, safe and economical operation wit minimum need for manipulation. Te boilers are assembled from te control and regulation elements from te top European manufacturers and cast iron bodies (consisting from 2, 3, 4, 5, 6, 7 elements). Te ATTACK gas boilers are equipped wit te ig quality stainless steel burners. All te ATTACK floor standing boilers are certified under te CE1015. Purpose of use Te type line of EKO, KLV boilers is produced wit te stable capacity of 9, 12, 15, 20, 25, 30, 35, 40, 45, 49,9 kw. Te P type line is produced in te stable capacity of 9, 18, 25, 35, 45, 50 kw. Te PLQ, KLQ type ranges are produced in modulated capacity of 6 9, 12 15, 15 20, 18 25, 24 30, 28 35, 38 45, 42 49,9 kw. Te E and EZ boilers are produced wit te automatically modulated output of 6 9, 10 18, 16 25, 25 35, 33 49,9 kw. Tey are used for eating or central eating of family ouses, flats, sops and similar premises were te natural gas as fuel is used. Te boiler is intended to operate wit te eating water of te maximum ydrostatic pressure of 0,4 MPa (4 bar) in line wit te STN norm (it must not be acidic, i.e. te ph value must be iger tan 7 and te carbonic ardness must be low) and operating temperature up to 90 C wit connection to te eating systems wit forced or natural flow (marked as S or P). For te domestic ot water preparation tere are te indirect eated floor standing ot water tanks of te same design as te ATTACK floor standing gas boilers. 4
5 CAST RON FLOOR STANDNG GAS BOLER Modifications of te cast iron gas boilers Adequately to te project requirements, it is necessary to coose a suitable boiler type and output. Terefore we produce boilers in various modifications: ATTACK EKO floor standing cast iron boiler wit permanent flame controlled by a termocouple. ATTACK PLQ floor standing cast iron boiler wit permanent flame controlled by a termocouple and two-stage output regulation controlled by a switc on te front panel. ATTACK KLV floor standing cast iron boiler wit electric ignition controlled by te ionization electrode. Te function of te boiler is similar to te one of boilers wit permanent flame, only te burners are ignited electronically after turning te boiler (or room) termostat on. ATTACK KLQ floor standing cast iron boiler wit electronic ignition controlled by ionization electrode wit two-level output regulation controlled by a switc. Te function of te boiler is similar to te one of boilers wit permanent flame, only te burners are ignited electronically after turning te boiler (or room) termostat on. ATTACK E floor standing cast iron boiler wit electronic ignition controlled by ionization electrode. Te boilers are made wit modulation system (graduated modulation) wic is automatically controlled transition between two output levels of te boiler in te range of %. ATTACK EZ floor standing cast iron boiler wit electronic ignition controlled by ionization electrode. Te boiler is made wit modulation system (fluent modulation) wic is automatically controlled transition between two capacity levels of te boiler in te range of %. Te boilers are equipped wit additional regulation tat adjusts a tree-way valve and starts eating te ot water tank after te water tank temperature gets under 60 C. ATTACK P non-electrical floor standing cast iron boiler wit permanent flame controlled by termocouple. Tis boiler is intended for a system wit natural flow only. Conditions of installation A gas boiler can be installed only by an autorized company. Before installation is te installation company obliged to ceck te correct coice of te boiler type wit regard to te functional attributes and required parameters. Tere is no expanse vessel nor safety valve installed in te boiler. Te installation must be done in line -wit te valid norms and prescriptions - see ČSN EN 1775, ČSN , ČSN and ČSN Te door in te room were te boiler is placed must be open outwards. Because of service works, tere must be free space around te boiler of at least 1x1 m in front and 4 m by te bot sides. Te boiler must not be installed in dusty, wet, aggressive environments wic sould cause damage and clog of burner and excanger parts. Te boiler must stand on a solid base (concrete floor, tiles, etc.). Cleaning of te boiler must be done in a dry way only (e.g. vacuum cleaning). Following te norm ČSN , tere must be ordinary environment in te boiler room, protected from frost wit te air temperature witin te range of C and relative moisture up to 80 %. Te combustion air must not contain alogen ydrocarbons and vapours of aggressive substances, it must not be wet and dusty. 5
6 Size of te space, were te boiler is installed and te way of ventilation must be in line wit te norms ČSN EN 1775 and TPG Diameter of te flue gas exaust must be appropriate to te boiler output and it sould be resistant against condensate from te waste gas, filled wit suitable flue blocks or non-corrosive material. Te exaust pipe from te boiler to te flue ventilation pipe must be from a non-corrosive material and beind te orizontal draugt breaker wic is a part of te boiler, tere must be vertical eigt of 50 cm before te cange of flow direction. By connection of te exaust pipes, te upper one is always sifted into te bottom one. Te top of te cimney must be at least 0.65 m above te top part of te slant roof and 1 m above te flat roof (eventually attic under te ČSN norm) to prevent creation of te pressure zones by te wind around te cimney tat can be stronger tan te flue exaust. We recommend to consult weter te flue waste gas exaust is suitable for connection wit a gas boiler wit a local cimneyer wo could also inspect te flue. Te boiler operation must be ensured under te non-condensing conditions, not to damage te cimney and te boiler. A manual sut off gas valve, not included in te boiler accessories, must be installed into te gas supply pipe. Tere must be free access to te sut off valve. Te boiler is connected wit eating system wit screw joints of 1" (forced circulation) or 6/4" (natural circulation S or P). Te boiler is filled troug a filling valve tat is delivered wit te boiler. A pressure gauge for control of surpressure in te eating system is a part of te boiler togeter wit a termometer. Te view from te rear side of te boiler C 30 A Connection A B C flow connection of eating 1" or 6/4" return flow connection of eating 1" or 6/4" natural gas B Conditions of operation Te boiler must be operated in line wit te rules given in tis manual tat is delivered wit te boiler. Except te service works, te user must not do any repairs on te appliance nor adjustments or dismounting and cleaning te internal parts of te boiler. Te boiler can be operated by an adult person only. After leaving ome in te winter (e.g. for oliday), a supervision by an adequately responsible person is needed. 6
7 CAST RON FLOOR STANDNG GAS BOLER f tere is a danger of approac of inflammable (explosive) gases or fumes to te boiler (e.g. by PVC application), it must be put out of operation early including te burning flame (EKO, PLQ, P). Safety conditions Wen installing a boiler, a safe distance of its surface from inflammable materials depending on te degree of flammability must be kept. Distances: yfrom inflammable materials of B, C1, C2 categories 200 mm yfrom inflammable materials of C3 category 400 mm yfrom materials not tested by STN mm Examples of classification of te building materials by te inflammable level: ya category non-combustible (brick, blocks, concrete, tiles, mortar, plaster) yb category very difficult to ignite (eraklit, lignos, basalt boards) yc1 category difficult to ignite (beec, oak, wood-fibre, werzalit, cardboard) yc2 category normally flammable (pinewood, solodur) yc3 category easily flammable (wood-fibre boards, polyuretan, PVC, styrofoam) f a boiler stands on te floor made from flammable materials, it must be protected by incombustible insulating plate exceeding boiler dimensions for at least in 150 mm. Solid materials of te A category can be used as incombustible and insulating materials. Objects from flammable materials cannot be placed on te boiler nor in te distance sorter tan 500 mm. Conditions to keep te ecological parameters Te boiler is set up and tested by te producer to ensure te optimum process of burning in line wit te ecological requirements. Te boiler must be installed into te dry and dustless environment, witout possibility to suck strange, aggressive materials or fogs troug te air supply. Ask te specialized company to take care about te te flue gas exaust. t is necessary to make te annual tests and cleaning. Tecnical description EKO, PLQ, KLV, KLQ, E, EZ, P types: Te body of boilers consists of cast-iron elements wit te system of excanger ribs, were te flue gas go into te collector and troug draugt breaker into te cimney. Te pipes wit screw joints 1 or 6/4 (S, P) ave to be connected to te eating system on te rear side of te body. n te upper front in a copper sleeve tere are emergency termostat and sensors of boiler termostat and termomanometer. n te rear bottom part tere is te inlet and outlet valve and in te front upper part tere is a reverse valve wit a sensor of te pressure gauge. Te boiler body is insulated by insulating material preventing te eat leakage into surroundings. Te front wall is covered by protective metal seet. After demounting te boiler skeleton and draugt breaker, it is possible to get to te combustion camber, to ceck or to clean te excang- 7
8 5 5 er. Wen mounting back, it is necessary to pay attention to seal te draugt breaker wit te boiler body tigtly. Te function of draugt breaker is described in a separate part. Under te excanger is te burning camber wit atmosperic burners. Te bottom of te camber is equipped by a dis on stands to keep condensate. Te burner set consists of burner tubes older wit accessories and of burning system. t is connected to te burning camber in two points. Gas distributor is made as a closed steel profile. On te burner board tere are burner tubes. Above tem tere is an ignition burner togeter wit termocouple (ionization electrode) and ignition electrode in a separated older. Te ignition burner and burning level can be watced troug a small ole above te older of burning system. Tis part is accessible after removing te front door. Beind te door tere is an electromagnetic combined valve positioned on te gas supply pipe, wic is one of te main functional parts of te boiler. Tis valve is set up by a producer to te optimal burning quality and tere sould be no manipulation wit it. Due to tis is te regulation screw painted. Under te valve tere is a older on te gas distributor (EKO, PLQ, P) wit a piezoelectric ignitor used for starting te ignition burner. Above te valve near te upper edge of te front door tere is a covered electroinstallation board wit all te electroinstallation. Te boiler body is protected by a protective coating. Te external cover is treated by eat resistant dust paint. Electrical front panel of te EKO, PLQ, KLV, KLQ, E boilers HV PR KT ZD HV main switc PR operation mode switc (only PLQ, KLQ) C 90 KT boiler termostat (1 5) KT PRODGY "E" boiler termostat 4 bar ZD termomanometer Electrical front panel of te EZ boilers HV PR KT ZD HV main switc switc of te tank (EZ) TD unblock button (EZ) C KP adjustable boiler potentiometer ZD combined termomanometer bar
9 C V 4600C kol CAST RON FLOOR STANDNG GAS BOLER External dimensions of te EKO, KLV, PLQ, KLQ, P boilers Heigt A C B External boiler dimensions in mm Boiler type on kw Widt Heigt 845 Dept Widt Dept Main parts of EKO, KLV, PLQ, KLQ, P boilers Electrical installation box 2. Main switc 3. Output switc 4. Boiler termostat 5. Termomanometer 6. Emergency termostat + dis 7. Flue gas termostat 8. Cast iron body 9. Flow connection of C. H. 10. Return connection of central eating 11. Reverse valve 12. Burners 13. Termal insulation 14. Condensing dis 15. Draugt breaker 16. Plastic board 17. Plate of te plastic board 18. Bottom plastic cover 19. Left side cover 20. Rigt side cover 21. Upper cover 22. Door 23. Covering plate 24. Rear bottom cover 25. Rear upper cover 26. Stands 9
10 C V 4600C kol External dimensions of E, EZ boilers Heigt A C B External boiler dimensions in mm Boiler type on kw Widt Heigt 845 Dept Widt Dept Main parts of E, EZ boilers Electrical installation box 2. Main switc / Water tank switc 3. Failure unblock 4. Prodigy (E), potentiometer (EZ) 5. Termomanometer 6. Emergency termostat + sensor 7. Waste gas termostat 8. Cast iron body 9. Riser pipe of eating 10. Runback pipe of eating 11. Ceck valve 12. Burners 13. Termal insulation 14. Condensing dis 15. Draugt breaker 16. Plastic board 17. Plate on te plastic board 18. Bottom plastic cover 19. Left side board 20. Rigt side board 21. Upper plastic cover 22. Door 23. Protective metal seet 24. Rear bottom sleeve 25. Rear upper cover 26. Stands 10
11 CAST RON FLOOR STANDNG GAS BOLER Connecting te boiler to te electricity mains (not for ATTACK P boilers) Boilers are plugged into te electrical socket of 230 V/50 Hz placed near te boiler, wit a supply cable ended wit a plug. n line wit te ČSN EN , te plug must be approacable after te boiler is installed. Te socket must be adequately protected by zeroising or grounding and it must be connected in line wit te ČSN Te boiler and oter parts of installation must be grounded. nstallation of te socket, room termostat, circulation pump and service of electrical boiler parts can be carried out only by a person wit proper electrotecnical qualification, by te law No. 718/2002. Electrical equipment of boilers All te electroinstallation is placed on an insulating pad of te electrical board. On te front cover tere is a main switc, output switc (PLQ, KLQ), switc of failure unblocking (E, EZ), control button of te boiler termostat and termomanometer. Wen te power supply fails, all te euipment supplied wit te power of 230 V is out of operation wic means tat a valve closes gas flow to te burners. Te flame of ignition burner (EKO, PLQ, P) is still burns and te boiler stays in a standby mode. After te power supply starts again, te function starts automatically. Electrical installation is ready to connect te additional room termostat, pump and switc contacts of tree-way valve. Te room termostat or te contacts of te tree-way valve are connected after removing te jumper on terminals 7, 8 and te circulation pump is connected to te terminals 3, 4, 5. By te E boiler type is te room termostat connected to te terminals 8, 9 and circulation pump to te terminals 11, 12, 13. By te EZ boiler type is te room termostat connected to te terminals 6, 7, tree-way valve to te terminals 3, 4, 5 and circulation pump to te terminals 12, 13, 14. Connection of te room termostat, circulation pump and tree-way valve can be performed only by a person wit electrical qualification by te law No. 718/2002. Start putting te boiler into operation 1. Remove te door. 2. Plug te flex cable into te electricity mains, te main switc is in te off position. 3. Open te gas supply to te boiler by a manual valve on te inlet pipe. 4. Set te required temperature of outlet water by knob of te termostat. 5. Te temperature is increased by turning te switc to te rigt (clockwise) and decreased by turning te switc to te left (anticlockwise). 6. Press te control button of te gas combined electrical valve and old it for 20 seconds. At te same time press te button of piezo ignitor ardly for few times. Ceck te ignition burner troug te ole. ATTENTON around te ceck ole tere is a risk of burn wen touc. Be careful by work wit te valve and piezo ignitor, not to get burned. Release te button of te valve. Te gas flows into te ignition burner and te sensor of termo-couple is eated by flame. f te flame is extinguises, te process of ignition must be repeated (EKO, PLQ, P). By te KLQ, KLV and EZ versions, are te burners ignited automatically after switcing te main switc and setting up te boiler termostat. 11
12 7. Turn te main switc into te on position. Te gas flows into te burner were it is ignited. 8. Close te boiler front door. Warning: ATTACK P boiler is a version of non-electrical installation. Stop putting te boiler out of operation For a sort-time inactivity: yswitc te main switc off. Te valve closes because of losing te voltage and te gas supply is interrupted yte flame of ignition burner still burns, te boiler is in a stand-by mode (EKO, PLQ, P) yin te case of need, put te boiler into operation by switcing te main switc on yensure te eating system against frost damage For a long-time inactivity: yremove te boiler door yturn te main switc off - te gas supply to te burners gets closed yturn te control button of te valve in te direction of arrow and release, tus close te gas supply to te ignition burner and oter burners (EKO, PLQ, P) yunplug te supply cable from electricity mains yclose te manual gas valve on te supply pipe next to te boiler yclose te boiler door yensure te eating system against frost damage Warning: Te ATTACK P boiler is witout electrical installation. Operation control Te boiler is secured against dangerous operation states wile working. However, it is not possible to prevent from te failures te cause of wic is not included in te boiler mecanism. Terefore it is necessary test te boiler once in tree days after being started and to ceck te following: yweter te system is filled wit water and tere is no leakage yweter tere is free approac of te outside air yweter te flue gas or gas cannot be smelled yweter tere is no extra noise wen burning te gas and no imperfect burning indicated by te cange of flame's blue color Te breakdowns detected must be reported to te service worker wo put te boiler to operation. f tere is a gas leakage, te gas supply must be closed. Te breakdowns found must be removed immediately. 12
13 CAST RON FLOOR STANDNG GAS BOLER Failure states of operation Wen tese occur, te gas supply into te main burner and ignition burner is automatically closed: ywen te termo-couple (ionisation electrode) is cooled because of: gas supply breakdown, clogging by dirts, te flame extinguised by condensate, wrong setting of te termo-couple wit reference to te ignition burner, ywen tere is breakdown in te circuit of te boiler termostat, te water in te boiler body gets overeated. Te boiler operation cannot be started automatically in suc cases. t is not possible to start te boiler again witout te professional service action to remove te problem. Wat to do in te case of failure: No. Failure Possible cause Removing Removed by 1. Water leakage from unsealed areas a1) released joint a2) damaged sealing element a3) damaged cast iron a1) tigt te joint a2) replace te element a3) replace te cast iron a1) service a2) service a3) service 2. Gas discarge from unsealed areas 3. Te ignition burner is not burning properly or went off after start a) close te gas supply b) find te place of leakage and remove te failure a) low gas pressure a1) set up te flame by a screw a2) set up te gas pressure a3) deaerate a) customer b) service a1) service a2) service a3) service 4. Boiler as a low output a) low gas pressure b) unsuitable main jets a) set up te gas pressure a) service 5. gnition burner goes off after igniting repeatedly a) faulty emergency termostat b) faulty termocouple c) faulty gas inlet valve a) replace te termostat b) replace te termocouple c) replace te valve a) service b) service c) service 6. Hot water does not flow into te eating system a) same as by 5 b) boiler aerated, low water pressure c) faulty reversevalve or pump d) damaged termostat a) same as by 5 b) deaerate, fill in wit water c) replace damaged parts d) replace termostat a) same as by 5 b) customer c) service d) service 7. Main burners are not ignited after switcing te termostat a) faulty gas valve b) reset on te flue gas termostat activated a) cange te valve b) ceck te flue, press reset on te flue gas termostat a) service b) service 13
14 Cimney draugt breaker Te draugt breaker is an important part of te boiler. t is installed on te flue gas exaust wit stable exaust from 2 to 200 Pa. Tis item is removable to enable approac for service works. Wen installing back, it is necessary to seal it properly. Dimensions and sape of te draugt breaker are given by te producer and must not be canged! Function of te draugt breaker: ysafe and perfect burning ypartial elimination of an excessive exaust, stabilization of te boiler efficiency yprotection of te boiler against possible influence of reverse draugt in te cimney yreverse draugt can start as a result of an incorrectly selected exaust ventilator in a flat or a ouse wic is dangerous and not allowed yin te case of accidental intake of flue gas or outside air intake into te boiler, te draugt breaker ensures accomplised burning for a limited time and flue gas returns from te draugt breaker back to te boiler room Function of te flue gas termostat Te flue gas termostat serves to interrupt te boiler operation by closing te gas supply into te boiler, if te reverse flue gas flow occurs. Te flue gas termostat is not switced on automatically after te sensor cools down. t is necessary to switc it on manually, by te red or black button on te termostat. f te boiler operation is blocked again, it is necessary to call service tecnician. Te flue gas termostat must not be out of order during te boiler operation. Te faulty termostat must be replaced only wit an original one supplied by producer. Boiler function Te required water temperature is kept by te boiler termostat. Wen te water temperature acieves te adjusted value, te appropriate electrical part of te combined valve is closed.tereby is te gas supply into te burners stopped. Te termostat enables te power supply and te main burners are ignited immediately after te water temperature decreases for several degrees under te adjusted value (i.e. starting difference value of termostat). Te flame control is automatic. f te burning conditions cange (big drop of gas pressure, gas supply broken or burning stopped), te valve closes te gas supply into te burners. Te emergency termostat protects te boiler against overeating, if te boiler termostat or valve fails. Output regulation Te boiler is equipped wit te basic regulation and control elements tat serve for one-level (EKO, KLV), two-level (PLQ, KLQ) and automatically controlled (E, EZ) output regulation. Te regulation of te boiler can be set up and controlled only by a specialized service worker. 14
15 CAST RON FLOOR STANDNG GAS BOLER After set up Te most simple regulation is to set up te operation termostat correctly, depending on te outside temperature according to te informative values wic must be adjusted by te user by is own experience and various ways of te source dimensioning, eating bodies, construction of te building, etc. Te boiler works adequately to te selected mode. After reacing te required temperature of eating water, te flame on burners extinguises and only te ignition burner burns (EKO, PLQ, P). After it gets colder, te flame is ignited automatically. Wit tis way of regulation te cycles (on-off) of te boiler cange often, mainly in te transient times of seasons wen te eating water temperature is low, and tere is excess output. Suc operation mode is not good for te boiler and it increases average consumption of gas. For tese times we recommend to decrease te output for PLQ, KLQ modifications, to prolong te boiler lifetime and to decrease te average gas consumption. By te E, EZ modifications is te output decreased automatically. Regulation of operation t is possible to use te additional regulation wic is not included into te equipment of te boiler. Te installation must be done adequately to te project. t is also possible to use regulators and room termostats according to te temperature of te selected reference room or equitermal regulation of te eating water. Tere is a wide range of room termostats of domestic and foreign production from simple ones up to programmable ones wit daily or weekly cycle to regulate te room temperature. n tis case is te temperature of eating water stable and keeps te boiler in longer operating modes. Due tis, te producer recommends to install te mixing circle as a basic element to regulate te operation. Te regulation is done troug mixing te ot water from te boiler wit returning water in te eating system. Te water of te adequate temperature is prepared by mixing te water from te boiler wit return water and te eated object gets only te necessary amount of eat. Except of te mixing device tere are also te servo-gear and te electronic regulator. Te mixing device can be used separately, witout automatic regulation by servo-gear. n tis case it must be manually set to a certain point of scale according to te estimated temperature. A suitable type and size is selected by project maker as a part of complete additional regulation for automatic operation. Marking of te boiler Te marking means te wole identification of te boiler and it is in te form of a adesive label placed on te rear cover of te boiler. A brief summary of instructions and information about manipulation is on te label on te internal part of te boiler door. Spare parts Te producer keeps te particular parts of boilers as spare parts wic are provided for guarantee and post-guarantee service only to contract partners on te base of order or claim. 15
16 Guarantee, claim Te guarantee conditions and instructions for claim are exactly given in te guarantee letter. Repairs witin te guarantee period ave to by done by te autorized company. Attention! Regarding te conditions of guarantee, te producer does not permit any repairs by an unautorized organization witin te guarantee period. Service Te autorized company as to ceck and adjust te boiler every year witin te guarantee period. Tis ceck is not included into te guarantee. Even after finising te guarantee time, te producer recommends to make any interventions aiming to repairs by a contract service partner. Te actions of te user witin te post guarantee time are determined in te part Maintenance. Maintenance Te user is instructed to do only te basic maintenance like removing dirts and dust according to te cleanliness of environment. Te burner parts can be congested by dust and impurities during te boiler operation. To clean te boiler, it is necessary to undo and clean te burner system by air or by a water pressure. Only te autorized trained specialist can make te reparations and cleaning of te boiler. Packaging, transport, storing Boilers are transported in vertical position fixed to a wooden pallet tat is removed during te installation of te boiler. n any case it must not be used as a stand for boiler. To prevent damaging during manipulation and transport, te boiler is protected by a paper box. Te paper box is secured by a granoflex tape. Te boiler must be stored in an un-aggressive space wit te temperature of +5 to +50 C and maximum relative umidity of air of 75 %, witout any organic steams, gases and dust. Boiler accessories and documentation Te ATTACK EKO, PLQ, KLQ, KLV, E, EZ, B boilers are delivered completely assembled and functionally tested. Te delivery contains te following documentation: yinstruction manual togeter wit a document boiler test certificate on its back side yguarantee letter Tecnical canges Te producer reserves rigt for adjustments of te product related to te innovation and tecnological canges. Suc canges do not ave to be contained in te instructions. Conclusion Te producer recommends to study all te consumer documentation torougly and keep it as a source of information and instructions regarding to operation of te eating system. Following te 16
17 CAST RON FLOOR STANDNG GAS BOLER advice from te instructions you can use all te advantages of te boiler and avoid various failures and claims. You will be awarded by comfortable moments and satisfied wit your investment. Classification of te appliance by STN Appliance category: 2 H Boiler design: B11BS Connection overpressure of natural gas G20: 20 mbar Setting of te modulation electronics of te ATTACK EZ boiler 1. Trimmers P1 CH. CAPACTY setting of te max. boiler output into te eating system P2 NG. CAPACTY setting of te starting output (10 seconds after ignition) 2. Jumpers JP1 natural gas connected JP2 anti-cycling timer 1 60 seconds seconds seconds JP3 connected (sould not be disconnected) 17
18 TECHNCAL DATA ATTACK boiler type Unit Nominal output EKO, KLV, P kw ,9 Nominal input EKO, KLV, P kw 9,9 13,2 16, , , ,5 55 Number of elements pc Adjustable output PLQ, KLQ kw ,9 Modulable output E, EZ kw ,9 Adjustable input PLQ, KLQ kw 5,5 9,9 13,2 16,5 16, ,8 24,5 26, ,8 38,5 41,8 49,5 46,2 55 Modulable input E, EZ kw 5,5 9, ,5 17,6 24,5 27,5 38, ,5 36,3 55 Gas pressure in front of te boiler mbar 20 Diameter of nozzles mm 2,5 2,5 2,5 2,7 2,5 2,7 2,7 2,5 2,7 2,5 Pressure to nozzles EKO, PLQ, KLV, KLQ, P kpa 0,8 1,4 0,95 0,7 1,05 0,8 1,2 0,8 1,35 1 1,35 0,7 1,15 1,35 0,85 1,15 0,85 1,25 Pressure to nozzles E, EZ kpa 0,8 1,4 0,5 1,4 0,5 1,35 0,65 1,15 0,6 1,15 0,6 1,25 Fuel consumption by max. output EKO, PLQ, KLV, KLQ, P Fuel consumption by max. output E, EZ Fuel consumption by min. output EKO, PLQ, KLV, KLQ, P Fuel consumption by min. output E, EZ m 3 / 1,06 1,4 1,76 2,35 2,94 3,5 4,12 4,7 5,3 5,85 m 3 / 1,06 2,13 2,94 4,12 5,3 5,85 m 3 / 0,88 1,4 1,76 2,13 2,82 3,3 4,4 4,9 m 3 / 0,88 1,17 1,88 2,94 3,5 3,8 Fuel Natural gas G 20 Natural gas connection DN 15 (Pass troug nut 3/4") Flue exaust diameter mm Volume of te cast iron body l ,8 16,8 19,8 22,8 Max. pressure in eating system bar PMS = 4 Connection of eating forced circulation / natural circulation (S, P) G 1" / 6/4" Boiler weigt kg Power supply V / Hz ~ 230 / 50 Grade of protection P 40 Temperature of te eating water C / 0 90 (P) Efficiency % 90 Flue gas flow g/s 14,4 20,5 28,9 37,2 Electrical input W 15 18
19 CAST RON FLOOR STANDNG GAS BOLER Connecting te electrical installation of te ATTACK EKO boiler U1 1 A ST N 2 TK U2 N ČERPADLO PUMP nterconnection OČ S V U2 U1 T P 7 8 PP TP 9 O N 10 C U 11 F PE 12 ~ 220 V/50 Hz ATTENTON: Connect te TP (room termostat), eventually te TV (tree-way valve) as well into te terminals 7 and 8. Remove te interconnection! DESCRPTON: A automatics V 4600C V main switc TK boiler termostat TP room termostat TV OČ circuit pump C capacitor ST flue gas termostat wit reset TV tree-way valve Honeywell VC4613 O orange conductor of te tree-way valve S grey conductor of te tree-way valve Connecting te electrical installation of te ATTACK KLV boiler ST U1 1 A N 2 TK HT V U2 N ČERPADLO PUMP nterconnection OČ S U2 U1 T P 7 8 PP TP 9 O N 10 C U 11 PE 12 F ~ 220 V/50 Hz ATTENTON: Connect te TP (room termostat), eventually te TV (tree-way valve) as well into te terminals 7 and 8. Remove te interconnection! DESCRPTON: A automatics VK 4100C V main switc TK boiler termostat TP room termostat OČ circuit pump TV C capacitor HT emergency termostat wit reset ST flue gas termostat wit reset TV tree-way valve Honeywell VC4613 O orange conductor of te tree-way valve S grey conductor of te tree-way valve 19
20 Connecting te electrical installation of te ATTACK PLQ boiler ST TK U1 N U2 N ČERPADLO PUMP nterconnection A A1 OČ S U2 U1 T P 7 8 PP TP V 9 O PR F C N U PE ~ 220 V/50 Hz ATTENTON: Connect te TP (room termostat), eventually te TV (tree-way valve) as well into te terminals 7 and 8. Remove te interconnection! DESCRPTON: A automatics V 4600Q TP room termostat C capacitor A1 two-stage regulator of automatics TV V main switc TK boiler termostat OČ circuit pump PR output switc ST flue gas termostat wit reset TV tree-way valve Honeywell VC4613 O orange conductor of te tree-way valve S grey conductor of te tree-way valve Connecting te electrical installation of te ATTACK KLQ boiler ST U1 N 1 2 A A1 TK HT U2 N ČERPADLO PUMP nterconnection S OČ U2 U1 T P 7 8 PP TP V PR F C N U PE O ~ 220 V/50 Hz ATTENTON: Connect te TP (room termostat), eventually te TV (tree-way valve) as well into te terminals 7 and 8. Remove te interconnection! DESCRPTON: A automatics V 4100Q TP room termostat C capacitor A1 two-stage regulator of automatics V main switc TV TK boiler termostat OČ circuit pump PR output switc HT emergency termostat wit reset ST flue gas termostat wit reset TV tree-way valve Honeywell VC4613 O orange conductor of te tree-way valve S grey conductor of te tree-way valve 20
21 CAST RON FLOOR STANDNG GAS BOLER Connecting te electrical installation of te ATTACK EZ boiler DESCRPTON: č Black m Blue Brown z/ž Yellow-green J4 1 m m m t m t m m J1 1 z/ž J5 r 1 J2 r 1 J3 1 m R 10 kω m L m Filter č č 2 4 m 1 3 m Connecting te electrical installation of te ATTACK E boiler ST U1 1 N 2 A A1 TK U2 N ČERPADLO PUMP nterconnection OČ Connector of modulator HT S Sensor of eating U2 U1 T P 7 8 PP TP Boiler termostat Potentiometer Sensor of te tank Terminal of te gas valve s electronics V 9 O N C 10 U 11 PE 12 ~ 220 V/50 Hz Grounding of te controller * Note: if te D.H.W. tank is not connected, it is necessary to remove te sensor of te tank and to replace it wit te interconnection! Mains switc z/ž Flue gas termostat wit reset Emergency termostat wit reset F1 summer / winter z/ž m z/ž m č m č č Terminal 15 PE 14 L 13 N z/ž m Tree-way valve M Room termostat Pump Mains supply L N ATTENTON: Connect te TP (room termostat), eventually te TV (tree-way valve) as well into te terminals 7 and 8. Remove te interconnection! DESCRPTON: A automatics V 4100Q TP room termostat C capacitor A1 two-stage regulator of automatics V main switc TV TK boiler termostat PRODGY OČ circuit pump PR output switc HT emergency termostat wit reset ST flue gas termostat wit reset TV tree-way valve Honeywell VC4613 O orange conductor of te tree-way valve S grey conductor of te tree-way valve 21
22 NOTeS: 22
23 Tis page serves for confirming te service inspections and is kept by te customer! Obligatory service inspection after te 1st year of operation Date:... Stamp, signature of te service organization:... Obligatory service inspection after te 2nd year of operation Date:... Stamp, signature of te service organization:... Obligatory service inspection after te 3rd year of operation Date:... Boiler commissioning certificate Serial number:... Date of commission:... Service organization:... Stamp, signature Data of te customer: (legibly) Name and surname:... Street:... ZP code, town:... Tel.:... Stamp, signature of te service organization:... Obligatory service inspection after te 4t year of operation Date:... Stamp, signature of te service organization:...
24 ATTACK, s.r.o. Dielenská Kružná Vrútky Slovak republic Tel: Fax: Web: Výrobca ATTACK, s.r.o. si vyradzuje právo tecnickýc zmien výrobkov bez predcádzajúceo upozornenia. ATTACK, s.r.o. producer reserves te rigt to cange tecnical parameters and dimensions of boilers witout previous warning. Der Hersteller ATTACK, s.r.o. beält sic das Rect der tecniscen Veräderungen an Produkten one eine vorige Warnung. Изготовитель ATTACK, s.r.o. оставляет за собой право изменения технических параметров и размеров котла без предыдующего предупреждения. Le producteur ATTACK, s.r.o. réserve le droit des modifications tecniques sans l avertissement précédent. Productor ATTACK, s.r.o. reserva el dereco de cambios técnicos sin advertencia anterior. ATTACK, s.r.o. 01/2016
ADDITIONAL FLUE GAS DRAUGHT FAN ATTACK PV150 INSTRUCTIONS FOR USE
ADDITIONAL FLUE GAS DRAUGHT FAN ATTACK PV150 INSTRUCTIONS FOR USE W W W. A T T A C K. S K INTRODUCTION Dear customer, thank you for your trust and purchase of our product Additional flue gas draught fan.
More informationATTACK DPX USER MANUAL. for correct installation, operation and cleaning WOOD GASIFYING BOILER STANDARD / PROFI / LAMBDA
WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA USER MANUAL for correct installation, operation and cleaning W W W. A T T A C K. S K Important! Read this manual properly before the boiler start-up!
More informationTechnical data Chimney fans, controllers & accessories
Tecnical data Cimney fans, controllers & accessories y Solid fuel and wood-burning stoves and fireplaces y Biofuel boilers y Decentralised multiple eating appliances connected to same cimney 1 a D W a
More informationBIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS
BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS W W W. A T T A C K. S K About the company ATTACK, s.r.o. The largest Slovak producer of heat technology with purely Slovak capital and sole owner. Company
More informationTechnical System Catalogue Chillers for IT cooling
Tecnical System Catalogue Cillers for IT cooling Cillers for IT cooling Te Rittal IT ciller in conjunction wit free cooling supplies exceptionally energy- and cost-efficient IT cooling media. Te system
More informationBIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS
BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK FD PELLET yattack
More informationNew GuideLed safety luminaires
CEAG GuideLed safety luminaires New GuideLed safety luminaires Linear design combined wit ig economy GuideLed SL 111.1, 121.1 CG-S Recessed mounting EN 1838 LED * GuideLed SL 111.1 CG-S IP1 GuideLed SL
More informationSOLAR HUB RADIATOR. Patented high-efficiency heat pump direct exchange refrigerant / water to produce heating and DHW circuit with integrated solar
Standard components UB RADIATOR SOAR R SOAR 125 R SOAR 300 Solar collector SEECTIVE 2,0 Solar station UNIT-2 2/12 Solar controller CONTRO MUTI Single support solar collector double support solar collector
More informationSPE Logo Quick Use Guide
SPE Logo Quick Use Guide Print & Digital Tis guide as been created to elp you get up to speed quickly on te logo formats permitted and most important usage rules tat govern te SPE logo. For more information,
More informationThe Compact Automatic Garage Door. HHHHH 5 Star Quality & Service. Is your Garage Door CE Approved? New EU regulation now in force.
F u l l y A p p r o v e d Is your Garage Door CE Approved? New EU regulation now in force by Warm Protection Products Limited Te Compact Automatic Garage Door HHHHH 5 Star Quality & Service Wen space is
More informationEmergency Lighting Design Guide
Emergency Ligting Design Guide Step 1 Identify mandatory Points of Empasis for te positioning of luminaires, eamples as follows: FINAL EXIT EXIT SIGNS DIRECTION CHANGE INTERSECTIONS At eac eit door At
More informationCombined boiler. for solid fuel and pellets
Combined boiler ATTACK WOOD&PELLET for solid fuel and pellets W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK
More informationINSTALLATION AND MANINTENANCE INSTRUCTIONS
INSTALLATION AND MANINTENANCE INSTRUCTIONS Appr. Nr. A 9503 T - 0085 AQ 0765 PEGASUS F2 T HIGH EFFICIENCY GAS-FIRED CAST-IRON BOILERS Models 51-68 - 85-102 2 Contents 1. General technical data 2. Dimensional
More informationAir-Conditioners PKA-RP FAL INSTALLATION MANUAL. English
ir-onditioners PK-RP FL INSTLLTION MNUL FOR INSTLLR For safe and correct use, please read tis installation manual torougly before installing te air-conditioner unit. nglis ontents. Safety precautions....
More informationUSERS MANUAL FOR GAS BOILERS
USERS MANUAL FOR GAS BOILERS PLEASE READ THE MANUAL CAREFULLY: IT CONTAINS IMPORTANT INFORMATION REGARDING SAFETY, INSTALLATION, USE AND MAINTENANCE OF THE APPLIANCE MODELS: NOVADENS 24 NOVADENS 24C NOVADENS
More informationRequirements of EN 1838: illuminance of 5 lx for safety equipment
GuideLed SL 151, 152 CG-S Ceiling recessing, ceiling surface-mounting for illuminance of 5 lx vertically Requirements of EN 1838: illuminance of 5 lx for safety equipment Te aim of emergency ligting is
More informationOpteon XP10. Opteon XP10 Retrofit Guidelines to Replace R-134a. Refrigerant. Introduction. Important Safety Information
Opteon XP10 Opteon XP10 Retrofit Guidelines to Replace R-134a Introduction Opteon XP10 is a low global warming potential (GWP) ydrofluoro-olefin (HFO)-based refrigerant developed to replace R-134a in medium-temperature
More informationOil burners Brûleurs fioul Stookoliebranders
Installation, use and maintenance instructions Manuel d entretien Installatie-, gebruiks- en onderhoudsvoorschriften GB F NL Oil burners Brûleurs fioul Stookoliebranders One stage operation Fonctionnement
More informationP4490 Kill A Watt Edge Operation Manual
P4490 Kill A att Edge Operation Manual Feature Locations : ON / OFF Key Tank you for purcasing te P4490 Kill A att Edge. Tis operating anual will provide an overview of te product, safety instructions,
More informationAir-Conditioners For Building Application Inverter Y-Series OUTDOOR UNIT
ir-onditioners or uilding pplication Inverter Y-Series OUTOOR UNIT PUY-P-YK (-S) or use wit R410 INSTLLTION MNUL or safe and correct use, please read tis installation manual torougly before installing
More informationO. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2017/09) en
8 716 473 216-00.3O Gas boiler WBN 6000-30-H-E-N/L-S2400 Operating instructions for the end customer en 2 Contents Contents 1 Key to symbols and safety instructions................... 2 1.1 Key to symbols..................................
More informationOpteon XP40. Opteon XP40 Retrofit Guidelines to Replace R-402A (HP80) and R-408A. Refrigerant (R-449A) Introduction. Important Safety Information
Opteon XP40 (R-449A) Opteon XP40 Retrofit Guidelines to Replace R-402A (HP80) and R-408A Introduction Opteon XP40 (R-449A) is a low global warming potential (GWP) ydrofluoro-olefin (HFO)-based refrigerant
More informationMikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc
Mikrofill Ethos Condensing combination boiler Maintenance Instructions 24cc IMPORTANT Benchmark Installation, Commissioning and Service Record Log Book is enclosed in your customer information pack. This
More informationOpteon XP40. Opteon XP40 Retrofit Guidelines to Replace R-404A/R-507. Refrigerant. Introduction. Important Safety Information
Opteon XP40 Opteon XP40 Retrofit Guidelines to Replace R-404A/R-507 Introduction Opteon XP40 is a low global warming potential (GWP) ydrofluoro-olefin (HFO)-based refrigerant developed as a direct replacement
More informationWHE 2.24 / WHE 2.24 FF
EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3
More informationW W W. A T T A C K. S K
Combined boiler ATTACK WOOD&PELLET for WoOd and pellets INSTRUCTIONS FOR USE W W W. A T T A C K. S K CONTENTS CONTENTS... 2 1. GENERAL INFORMATION... 4 1.1 INTRODUCTION... 4 1.2. SAFETY... 4 1.3 BOILER
More informationHG 675 CX 60 HG 675 CN 60 HG 675 CW 60
HG 675 X 60 HG 675 CX 60 HG 675 CN 60 HG 675 CW 60 1 2 1. : 93/68: 90/396: 2006/95/CE: 2004/108/CE: - 1935/2004:. 2002/95/CE: RoHS 2.,.,,,,...,. (,..)..,,.,. ( ),,, ;,,.,.....,.,,,,,,...,. (..),,.,..,.,,,,
More informationParts Available from
Montage und Bedienungsanleitung Manuel d entretien Installation, use and maintenance instructions Installatie-, gebruiks- en onderhoudsvoorschriften Oδηγίες εγκατάστασης, χρήσης και συντήρησης D F GB NL
More informationStoebich. Flexible Fire & Smoke Curtains. Innovation for your Protection! Stoebich
Stoebic Flexible Fire & Smoke Curtains Automatic fire & smoke curtains Stoebic Fire & Smoke Curtain S Stoebic Fire & Smoke Curtain H / HC Stoebic Fire Curtain U Stoebic Fire & Smoke Curtain P Stoebic Fire
More informationluxcontrol lighting control system SWITCH sensors smartswitch HF 5DP f Automatic switching based on motion and light level
Automatic switcing base on motion an ligt level Prouct escription Motion etector for luminaire installation Motion etection troug glass an tin materials (except metal) For automatic on/off switcing of
More informationOperating instructions
Operating instructions Capriz 2 24c 28c GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information... 4 2 Notes on the documentation...
More informationOperation Manual Multi-parameter Transmitter M800
Operation Manual Multi-parameter Transmitter M800 Transmitter Multi-parameter M800 52 121 825 Operation Manual Multi-parameter Transmitter M800 Transmitter M800 4 Transmitter M800 5 Content 1 Introduction
More informationSOLAR TECHNIQUE ATTACK SOLARTHERM, VAKUUMTHERM
ATTACK SOLARTHERM, VAKUUMTHERM W W W. A T T A C K. S K SUN COLLECTORS water warming in swimming pools and sometimes as a support of heating in lowenergetic houses with lowtemperature heating system (floor,
More informationCHESNEY S. The Bio Ethanol Collection
CHESNEY S Te Bio Etanol Collection Cesney s Bio Etanol Fires Sometimes it isn t possible to install a orking fire. Tere may be problems it te cimney or no provision for a orking fireplace. A fire from
More informationVICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power
VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power VICTRIX 90 is the new wall-hung condensing boiler for room heating only, set-up for independent functioning and for that in cascade mode
More informationENERGY TOP. Condensing boiler solutions
ENERGY TOP Condensing boiler solutions 1 ENERGY TOP > ENERGY TOP RANGE A wide array of flexible solutions both for centralised residential application and big commercial plants The increasing need for
More informationINSTALLATION MANUAL. System air conditioner RWEYQ8PY1 RWEYQ10PY1* RWEYQ16PY1 RWEYQ18PY1 RWEYQ20PY1* RWEYQ24PY1 RWEYQ26PY1 RWEYQ28PY1 RWEYQ30PY1*
INSTALLATION MANUAL System air conditioner Installation manual VRVWIII System air conditioner Englis Installationsanweisung VRVWIII System Klimaanlage Deutsc Manuel d installation Conditionneur d air VRVWIII
More informationOperation Manual Multiparameter Transmitter M400
Operation Manual Multiparameter Transmitter M400 Transmitter Multiparameter M400 52 121 378 Transmitter M400 2 Transmitter M400 3 Operation Manual Multiparameter Transmitter M400 Transmitter M400 4 Content
More informationUser Manual FLOWMAX-90. for model. Condensing water heater 85,000 BTU. Installation, operating, commissioning and maintenance instructions.
User Manual for model FLOWMAX-90 Condensing water heater 85,000 BTU WARNING If the information in these instructions is not followed exactly, a fire or explosion may result, causing property damage, personal
More information1 VICTRIX ZEUS Superior kw I features
Wall-hung condensing VICTRIX ZEUS Superior kw I is the new range of wall-hung condensing boilers with 54 litre stainless steel storage tank available in two versions with nominal heat output of 26 kw and
More informationGreenstar 12i/24i System
USER INSTRUCTIONS & CUSTOMER CARE GUIDE Greenstar 12i/24i System WALL HUNG GAS-FIRED CONDENSING SYSTEM BOILER FOR SEALED CENTRAL HEATING SYSTEMS & INDIRECT FED DOMESTIC HOT WATER THIS BOILER IS USED WITH
More informationPRESSURE REGULATING VALVES
Type EPR PRESSURE REGUATING VAVES Evaporating pressure regulating valves Direct operated, 2-way valves designed for maintaining suitable evaporating pressure in refrigeration. Fitted at te evaporator outlet
More informationTAHITI CONDENSING KR 55 - KR 85
IST 03 C 351-01 TAHITI CONDENSING KR 55 - KR 85 GB INSTALLATION USE AND MAINTENANCE Dear Customer, Thank you for choosing and buying one of our boilers. Please read these instructions carefully. They will
More informationThe Exploration on the Energy Saving Potential of an Innovative. Dual-temperature Air Conditioner and the Mechanism of the
Te Exploration on te Energy Saving Potential of an Innovative Dual-temperature Air Conditioner and te Mecanism of te Teoretical Mixed Refrigeration Cycle Zao Lei, Zao Xijin, Hu Andu Professor, graduate
More informationPropane Heater REMKO PGM 30 REMKO PGM 60
Propane Heater REMKO PGM 30 REMKO PGM 60 Operation Technology Spare Parts Edition GB L07 REMKO strong as a bear. Operating instructions Make sure to read these instructions carefully before starting/using
More informationProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.
1 MHG Heating Ltd ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR Telephone 08456 448802 Fax 08456 448803
More informationMESURED PARAMETERS Parameters Measuring units Identification Symbols
INSTRUCTION MNUL IM425-U v3.1 EMM-R3-V EMM-µ3-V MULTIFUNCTION VOLT/MMETER GENERL Te digital Multifunction Volt/mmeter series EMM-V allow monitoring te main electrical parameters present on a distribution
More informationPERFORMANCE IMPROVEMENT POTENTIALS OF LOW GLOBAL WARMING POTENTIAL REFRIGERANTS FOR INTERCITY BUS AIR CONDITIONING SYSTEM
THERMAL SCIENCE: Year 0, Vol., No., pp. -4 PERFORMANCE IMPROVEMENT POTENTIALS OF LOW GLOBAL WARMING POTENTIAL REFRIGERANTS FOR INTERCITY BUS AIR CONDITIONING SYSTEM Saban UNAL a, Cagri KUTLU a, and M.
More informationAXIAL FANS USER S MANUAL
AXIAL FANS USER S MANUAL WARNING! Disconnect the fan from power supply prior to any connection, servicing and repair operations. Only duly qualified electricians with valid electrical permit for electric
More informationActive Infrared Sensor OA-EDGE1/EDGE2. to the sensor module d4 = Distance from the pivot edge to the sensor module n = Number of sensor modules h
DETECTION AREA Active Infrared Sensor OA-EDGE1/EDGE Recommended installation position Leading edge d3 w Pivot edge W Door widt Mounting eigt / d Detection area widt d3 Distance from te leading edge to
More informationOperating instructions
The energy you need Operating instructions Betacom 3 24c -A (H-GB) 30c -A (H-GB) GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information...
More information15 20 kw kw kw
Burner Set-up Details 15 20 kw 20 26 kw 29 36 kw Riello RDB2 Please read these instructions carefully before commissioning and using this appliance. To be retained by the householder HEALTH AND SAFETY
More informationOperations & Maintenance Plan for Mold and Moisture Control in Apartment Properties
Operations & Maintenance Plan for Mold and Moisture Control in Apartment Properties 2002 National Multi Housing Council, Inc. All rigts reserved. Tis O&M Plan is intended for informational purposes and
More informationGas Instantaneous Water Heater
6 720 607 823 GB (06.06) SM Installation and Operating Instructions Gas Instantaneous Water Heater WR10..B... WR11..B... With electronic ignition and triple safety system consisting of ionisation detector,
More informationINSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20
INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8
More informationRIELLO 40 GS/M SERIES
The Riello 40 GS/M series of two stage progressive or modulating gas burners, is a complete range of products developed to respond to any request of gas burners for hot air generator according to EN 1020.
More informationNAYLOR METRODRAIN TWINWALL HIGHWAY DRAINAGE SYSTEM NAYLOR METRODRAIN TWINWALL HIGHWAY DRAINAGE SYSTEM 150 MM TO 750 MM PIPES AND COUPLERS
H A P A S Naylor Drainage Ltd Cloug Green Cawtorne Barnsley Sout Yorksire S75 4AD Tel: 01226 790591 Fax: 01226 791531 e-mail: sales@naylor.co.uk website: www.naylor.co.uk NAYLOR METRODRAIN TWINWALL HIGHWAY
More informationCase Study: Cabinet Cooling Using a Water and Refrigeration System C m C /
Case Study: Cabinet Cooling Using a Water and Refrigeration System Escalating computing capabilities and srinking cip packages are leading to corresponding increases in server and rack poer densities.
More informationUSER S MANUAL NKP. Duct heater for supply air pre-heating with external control
USER S MANUAL Duct heater for supply air pre-heating with external control CONTENTS Contents... 2 Safety requirements... 2 Purpose... 4 Delivery set... 4 Designation key... 4 Technical data... 5 Design
More informationMF-RHT Series - High Temperature PTC Resettable Fuses
*RoHS COMPLINT, **HLOGEN FREE & EC COMPLINT RH750 7180S Features n Compliant wit EC-Q200 Rev-C- Stress Test Qualification for Passive Components in utomotive pplications n Operating temperature range up
More informationModelling of Specific Moisture Extraction Rate and Leakage Ratio in a Condensing Tumble Dryer
Modelling of Specific Moisture Extraction Rate and Leakage Ratio in a Condensing Tumble Dryer Lena Stawreberg, Lars Nilsson To cite tis version: Lena Stawreberg, Lars Nilsson. Modelling of Specific Moisture
More informationUser Manual. PO Box 11 Ashton Under Lyne OL6 7TR +44. (0) Fax +44. (0)
User Manual PO Box 11 Ashton Under Lyne OL6 7TR +44. (0) 161 621 5960 Fax +44. (0) 161 621 5966 info@atlantic2000.co.uk www.atlanticboilers.com 1 CONTENTS CONTROL STRATEGY GENERAL RULES.. P3 Variable temperature...
More informationNIKE Star 24 3 E. Instantaneous wall-hung with open chamber boilers. NIKE Star 24 3 E
Instantaneous wall-hung with open chamber boilers Small wall-mounted open chamber, conventional flue instant boiler. General features. is a wall-mounted, open combustion chamber, conventional flue generator
More informationHOT GAS GENERATOR INSTALLATION, OPERATING AND MAINTENANCE MANUAL
HOT GAS GENERATOR INSTALLATION, OPERATING AND MAINTENANCE MANUAL SHG 25 SHG 50 SHG 75 SHG 100 SHG 150 SHG 200 SHG 250 SHG 500 SHG 750 SHG 1000 SHG 1500 SHG 2000 SHG 2500 SHG 3000 www.ecostar.com.tr DEAR
More informationMANUAL. Page 1/44
MANUAL FOR INSTALLATION AND OPERATION OF A HEATING SYSTEM, CONSISTING OF HOT WATER WOOD PELLET BOILER FROM SERIES PELLETHERM V4 AND AUTOMATED WOOD PELLET BURNER FROM SERIES GP IV http:// www.greenecotherm.eu
More informationFIELD STUDY OF THE ROTARY DESICCANT SYSTEM USING THE CROMER CYCLE BRONISLAVA VELTCHEVA
FIELD STUDY OF THE ROTARY DESICCANT SYSTEM USING THE CROMER CYCLE By BRONISLAVA VELTCHEVA A THESIS PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY OF FLORIDA IN PARTIAL FULFILLMENT OF THE REQUIREMENTS
More informationResidential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...
70 80 99-00-O Residential Gas Condensing Boiler ZBR//8/35/4-3A... ZWB8/35/4-3A... 70 80 993 (03/03) CA/US Operating Instructions Contents Contents Key to symbols and safety instructions............................
More informationTermEfekt USER S MANUAL AIR HEATER. Model PGA 14
Przedsiębiorstwo Produkcyjno-Wdrożeniowe ARAJ sp. z o.o. 55-080 Kąty Wrocławskie, ul. Mireckiego 30 POLAND USER S MANUAL AIR HEATER TermEfekt Model PGA 14 Kąty Wrocławskie, 2004 Product identification
More informationGreenstar 25Si/30Si USER INSTRUCTIONS & CUSTOMER CARE GUIDE
USER INSTRUCTIONS & CUSTOMER CARE GUIDE Greenstar 25Si/30Si WALL HUNG GAS-FIRED CONDENSING COMBINATION BOILER FOR SEALED CENTRAL HEATING SYSTEMS & DOMESTIC HOT WATER THIS BOILER IS USED WITH NATURAL GAS
More informationBG2000S PRE-MIX GAS BURNER
BG000S PRE-MIX GAS BURNER INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL: 08707 707 77 FAX: 08707 707 767 E-MAIL:info@stokvisboilers.com
More informationUSER S INFORMATION MANUAL
USER S INFORMATION MANUAL HOT WATER HEATING BOILERS DOMESTIC WATER HEATERS 150,000-300,000 Btu/hr MODELS EB-EWU-02 IMPORTANT INSTALLER - AFFIX INSTALLATION MANUAL ADJACENT TO THE BOILER CONSUMER - RETAIN
More informationMOBA-MATIC AND BIG SONIC-SKI. LEVELING to THE HIGHEST STANDARD
MOBA-MATIC AND BIG SONIC-SKI LEVELING to THE HIGHEST STANDARD MOBA-MATIC THE MOST VERSATILE CONTROL SYSTEM in te world Weter ultrasonic sensor, laser or rotary sensor, MOBA-matic te most flexible control
More informationTHE WOOD GASIFYING BOILER ATTACK SLX PROFI / LAMBDA TOUCH INSTRUCTIONS FOR USE
THE WOOD GASIFYING BOILER ATTACK SLX PROFI / LAMBDA TOUCH INSTRUCTIONS FOR USE W W W. A T T A C K. S K CONTENT 1 INTRODUCTION... 5 2 3 4 5 6 1.1 GENERAL DESCRIPTION... 5 1.2 DESCRIPTION OF MARKINGS OF
More informationSIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A
cod. 6272262A GENERAL DATA Heating Data Heat Output Input (Adjustable) (Adjustable) Format 34i 11.2 34KW 45 145MJ/hr Format 34e 11.2 34KW 45 145MJ/hr General Specifications FORMAT 34i 34e Main burner injectors
More informationOperating instructions
Operating instructions For the operator Operating instructions HOME SYSTEM GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Tel. +49 21 91 18 0 Fax +49 21 91 18 28 10 info@vaillant.de
More informationConversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler
Gas boiler UPON COMPLETION OF THE INSTALLATION THE INSTALLER MUST INSTRUCT THE OWNER AND OPERATOR ON THE FUNCTIONALITY AND THE PROPER OPERATION OF THE BOILER AND THE HEATING SYSTEM. INSTALLER MUST REVIEW
More informationThe guarantee on this appliance is valid for 12 months from the first day of installation.
Users Manual Dear Customer, Thank you for choosing an ARISTON boiler. We guarantee that your boiler is a reliable and technically sound product. This Users Manual provides detailed instructions and recommendations
More informationENAMELED INDIRECT WATER HEATERS
INSTRUCTIONS ENAMELED INDIRECT WATER HEATERS ST-300DE HEAT PUMPS Please read this manual carefully before installing the heater! Dear Customer, Sinclair Corporationt Ltd. thanks you for your decision
More informationINSTRUCTION FOR THE USER THC V E OIL BLU
INSTRUCTION FOR THE THC V E OIL BLU CONTENTS General safety information 4 Precautions 4 Control panel 5 Mode selection 8 User levels 10 Start-up 12 Temporary shutdown 15 Preparing for extended periods
More information04/2013. Mod: GS6/5BFVA-N. Production code: SPT-90/5 GL
04/2013 Mod: GS6/5BFVA-N Production code: SPT-90/5 GL CONTENT Declaration of conformity standards 3 Technical data 3 Packing and device check 6 Important notice 6 Installation 6 Placement 6 Chart 8 Check
More informationTECHNICAL INSTRUCTIONS USE AND MAINTENANCE
TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set For boilers CentroPlus 25/35 and CentroPlus-B 25/35 (solid fuel and wood pellets fuel firing) TUPSCP-K-11-2016-ENG CONTENTS 1.Introduction 2. Status
More informationSo old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty.
ARREDO E BENESSERE So old fashioned... An intelligent choice When on a cold winters night the warm glowing flames of the KALDUS boiler are there to welcome you back home, you will be pleased that you decided
More informationIDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80
IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 EN OPERATING MANUAL OIL HEATER TRT-BA-IDE20-30-50-60-80-TC-001-EN Table of contents Information on the use of this manual... 1 Scope of delivery... 1 General safety...
More informationINSTRUCTION MANUAL FOR OIL BURNER MODELS
INSTRUCTION MANUAL FOR OIL BURNER MODELS X500 Bio B10 E90-803-001-001-00 Rev 7-1 - Contents Technical specifications Technical data... 3 Working field... 3 Dimensions... 4 Head and electrode settings...
More informationINSTRUCTION MANUAL FOR OIL BURNER MODELS
INSTRUCTION MANUAL FOR OIL BURNER MODELS X400 Bio B10 E90-803-001-001-03 Rev 13-1 - Contents Technical specifications Technical data... 3 Working field... 3 Dimensions... 4 Head and electrode settings...
More informationInstallation and Operating Instructions
Installation and Operating Instructions Models: Verso 4G Hob As part of Parmco Appliances commitment to improving and updating product ranges, we reserve the right to alter, change and update technical
More informationMod. ANBR9..G. CR DOC. NO. GAS-HEATED TILTING BRATT PAN. INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT, USE AND MAINTENANCE...
-HEATED TILTING BRATT PAN Mod. ANBR9..G. INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT, USE AND MAINTENANCE...page 2-5 APPENDIX....pagina 6-7 Read the manual thoroughly and keep it in a safe place throughout
More informationACCUMULATION OF EUROPEAN CLASS
ACCUMULATION OF EUROPEAN CLASS Total comfort MODEL nominal output kw minimum output kw DUA PLUS B TN DUA PLUS B TFS natural draught room sealed forced draught 28 12.4 28 12.4 DUA PLUS B was born from the
More informationSPECIFICATIONS - NIKE
Wall-mounted instant boilers NIKE Mini kw Special is the ideal Immergas solution for modern building and wherever space is limited and has to be made the most of. Simple to use and easy to install, thanks
More informationSirius FS. Working towards a cleaner future
Sirius FS Floor Standing Stainless Steel Condensing Boilers Single Boiler Applications: 50 to 160kW Modular Boiler Applications: up to 640kW Working towards a cleaner future heating specialists 1. Product
More informationLight oil / kerosene burner
Installation, use and maintenance instructions Light oil / kerosene burner One stage operation CODE MODEL TYPE 374445 G5 444T50 290238 (5) - 05/20 TECHNICAL DATA Thermal power output 28 60 kw 2.3 5 kg/h
More informationDTG Eco / V130
ECODENS Gas fired condensing boiler EN User Guide 300010111-001-B Contents 1 Introduction.............................................................................3 1.1 Symbols and abbreviations................................................................................3
More informationCONTENTS PRODUCT GAS TYPE CONVERSION ADJUSTMENTS FAULT & FAILURE. Product Notation Safety Systems Technical Data Main Components Operating Functions
24 kw Open Flued Gas Combination Boiler (bithermic type) 24 kw Room Sealed Fan Assisted Gas Combination Boiler (bithermic type) 24 kw Room Sealed Fan Assisted Gas Combination Boiler (monothermic type)
More information/2010 US/CA
6 720 646 148-11/2010 US/CA (en) For the user User s Instructions Condensing gas boiler Logamax plus GB162-L.B. 80 kw/100 kw Please read thoroughly before operating This manual is available in the English
More informationINSTALLATION AND OPERATING INSTRUCTIONS JAKA HFD JAKA HFS
INSTALLATION AND OPERATING INSTRUCTIONS JAKA HFD JAKA HFS CGM-04/392 ER-0170/1996 Thank you for choosing a DOMUSA TEKNIK heating boiler. You have chosen a boiler which will provide the ideal level of comfort
More informationTurbo. Service Instructions
Turbo Service Instructions E BAUBERG Company is happy to offer your attention a new highquality inline mixed-flow Blauberg Turbo fan. The solid team of highqualified professionals with many years of working
More informationRoom sealed circuit appliance sold without the terminal or the combustion air supply and exhausted gas ducts. TYPE C 63 TYPE B TYPE B 23
Room sealed circuit appliance sold without the terminal or the combustion air supply and exhausted gas ducts. TYPE C 63 TYPE B Type B 23 on the wall Ø 80 duct, available in the following lengths: 1000,
More informationCapri B Cast iron combination oil-fired boiler with water tank
C 151-01 Cast iron combination oil-fired boiler with water tank Life-enhancing heat GB Cast iron combination oil-fired boiler with water tank RELIABILITY SAFETY EASY OPERATION EASE OF MAINTENANCE Life-enhancing
More informationINSTALLATION, OPERATION AND MAINTENANCE MANUAL
INSTALLATION, OPERATION AND MAINTENANCE MANUAL Air Curtains RUND Please, read these instructions carefully before attempting installation SECURITY ADVISE SYMBOLS Attention, Danger, Safety Advice! Danger
More informationINDEX 1. LAY-OUT OF ELECTRICAL BOX LAYOUT AND COMPONENTS OF E124 BOARD... 5
E124 INDEX 1. LAY-OUT OF ELECTRICAL BOX... 3 2. LAYOUT AND COMPONENTS OF E124 BOARD... 5 2.1 Description o components...5 2.2 Tecnical speciications...6 2.3 Inputs deault setting terminal board...6 3.
More information