1 SPONSOR: Mark Prosser Public Notice ISSUED: 7/3/218 EXPIRES: 8/29/218 REFER TO: MVP LSP SECTION:44 - Clean Water Act 1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL 2. SPECIFIC INFORMATION SPONSOR S ADDRESS: SPONSOR S AGENT Mark Prosser th Street Halma, Minnesota Joey Goeden Widseth, Smith, Nolting 784 Industrial Park Road Baxter, Minnesota PROJECT LOCATION: The project site is located in Section 19, Township159N, Range 46W, Kittson County, Minnesota. The approximate UTM coordinates are: Zone 14 N , E , Latitude , Longitude BANK SERVICE AREA: The proposed bank service area is Lower Red River of the North BSA 3. DESCRIPTION OF PROJECT: The sponsor is proposing to develop the Prosser Wetland Bank. The proposed bank site is approximately 75.8 acres in size, including upland buffer areas. NEED AND OBJECTIVE OF PROJECT: As stated in the prospectus for this wetland bank: No wetland banks are currently active in Kittson County, MN. No wetland banks are currently active in the Tamarack/Joe Rivers Watershed. There are no active wetland banks within the same county or watershed as the proposed wetland bank. Creating a wetland bank at the proposed location would be beneficial, as any projects proposing wetland impacts in Tamarack/Joe Rivers Watershed would be mitigated for in the same watershed. Wetland areas on neighboring properties have been disturbed by agricultural activities and some wetlands have been drained from ditch construction. The proposed project would allow for the storage of additional hydrology onsite which would be beneficial to the watershed and neighboring properties during high water conditions. ESTABLISHMENT, OPERATION AND MANAGEMENT: The project objectives will be achieved by blocking drainage features, leveling a portion of project area, seeding a portion of the project area and monitoring the project area to ensure the project is establishing as proposed. According to information supplied by the applicant, areas labeled Map ID I and Map ID III contain existing wetland and are dominated by hydrophytes. Additional areas would be restored and/or enhanced with native wetland plant species to meet vegetation standards for wetland establishment. The area to be restored or enhanced originally consisted mainly of Shrub-Carr or Hardwood Swamp wetland, with some Fresh Wet Meadow Wetland. The applicant proposes to establish a high quality Shrub-Carr wetland throughout a majority of the bank site. Currently, willows appear to be establishing throughout the project area. The applicant believes that the shrubs will eventually become dominant

2 Regulatory Branch (File No. MVP LSP) throughout the entire project area, excluding the proposed Shallow Marsh. Quaking aspen found in the adjacent wooded area on the subject property will likely spread throughout much the project area and will return the project area to near natural conditions over time. The sponsor proposes to create a high quality Shallow Marsh in an existing gravel pit in the northeast corner of the property. The gravel pit is currently a Shallow Marsh wetland with a cattail monoculture, but the sponsor proposes to partially fill the basin and increase the vegetation diversity with additional seeding. The proposed plant communities and seeding zones for this wetland bank are shown on pages 6 and 7 of the attached drawings. OWNERSHIP AND LONG-TERM MANAGEMENT: Mark Prosser is the project sponsor and land owner that is ultimately responsible for completing the project. Mark Prosser is the fee title owner of the subject property (entire 151 acre property) and will be in charge of the long-term management of the site once all credits have been sold. See Figure 1 (Page 1 of 8) showing the location of the subject property. Long-term management will ensure that the conservation easement signs are not removed or vandalized. The bank site would be periodically visited to ensure that no disturbances had occurred. If any site disturbances occurred or if portion of the bank site is degraded, the appropriate agencies would be contacted to determine the appropriate actions and the area would be restored. ECOLOGICAL SUITABILITY: Please see the map on Page 6 of 8 in the attached drawings. This drawing depicts the proposed planting areas discussed in this paragraph. Much of the subject property appears to be wetland. Hydrophytic vegetation currently exists and is dominant throughout much of the area labeled as Map ID I and Map ID III on Figure 9. According to the NRCS Web Soil Survey Map ID I, II and III are comprised of Rosewood fine sandy loam, and Rosewood and Cormant soils. Both soils are poorly drained with a depth to water table of 18 inches. A restrictive soil layer was found in some of the soil pits. This restrictive layer may perch groundwater for long enough duration to create hydric soils and contribute hydrology near the ground surface. Blocking surface drainage features may enhance existing hydrology to what may be considered to be pre-disturbance conditions. An exhausted gravel pit is located in the northeast corner of the property. The gravel pit area has filled with water and is currently a Shallow Marsh wetland (Map ID IV). The areas north and south of the gravel pit (Map ID V) are mainly upland. A Shrub-Carr wetland has developed on the north side of the gravel pit. This wetland area currently retains adequate hydrology to support wetland functions. The sponsor proposes to create a continuous swale area connecting Map ID IV and V. Map ID V is proposed to be scraped with the excavated soil to be used to partially fill Map ID IV and create a variety of water depths. Map ID IV will continue to collect runoff from the surrounding land and will be planted with an emergent wetland seed mix to increase vegetation diversity. Map ID V will be at a slightly higher elevation, but will also collect runoff from the surrounding land which may contribute to wetland establishment. Map ID V will be planted with a wetland seed mix and willows will be transplanted to encourage hydrophytic vegetation to become established. HYDROLOGY: The site was visited by WSN personnel on November 2, 217. WSN personnel looked for evidence of hydrology and recorded their findings on data sheets. Hydric soils were found throughout the project area. The gravel pit area had approximately 1-foot of standing water in November of 217. The observed water table in sample pits was approximately 1.5 to 3.5 feet below the surface in most of the project area. Surface saturation was observed on the northwest side of the project area (SP-6). Sample point locations are shown on Figure 6, Page 3 of 8. Four drainage features are found within the subject property (see locations on Figure 3, page 8 of 8 on the included drawings). These drainage features are connected and ultimately drain to the northwest which carries water off of the property. Blocking these features within the project area will reduce the quantity of water leaving the bank site. These shallow surface features were constructed prior to 1991 and appear to be an attempt to drain surface water from the site to allow for agricultural production. A private drainage ditch is located adjacent west of the subject property that collects hydrology from the Page 2 of 4

3 Regulatory Branch (File No. MVP LSP) subject property and flows south into the Trunk Highway 11 roadway ditch. This adjacent private ditch is located on private land and will not be modified. There are no county or judicial ditches within or adjacent to the subject property. The major hydrology input for the project area is from precipitation events and spring snow melt. During normal or wetter than normal climatic conditions the project area is expected to retain adequate hydrology to support wetland functions, as hydrophytic vegetation is currently dominant throughout most of the project area prior to construction. CURRENT LAND USES: The applicant states that the entire parcel was enrolled in the Conservation Reserve Program (CRP) continuously from 199 to 216 when portions of the property were removed from the program. Some portions of the property remain in the CRP program and will continue to be enrolled in the CRP program after the construction of the bank site. These areas will be excluded from the wetland bank easement. A map depicting the areas within the property that will remain in the CRP program is included in the attached project drawings on Page 5 of 8. Prior to enrollment in the CRP program, the parcel appears to have been partially cleared and agricultural production was attempted. COORDINATION WITH RESOURCE AGENCIES: This project has been coordinated with the following members of the Interagency Review Team (IRT) and other resource agencies: U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service, Minnesota Department of Natural Resources, Minnesota Board of Water and Soil Resources. 3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR CRITICAL HABITAT None were identified by the bank sponsor or are known to exist in the action area. However, Kittson County is within the known historic range for the following Federally-listed species: Northern Long-Eared Bat Hibernates in caves and mines swarming in surrounding wooded areas in autumn. Roosts and forages in upland forests during spring and summer. Gray Wolf Utilizes a wide variety of habitats within its range which, in Minnesota, is generally the northern forested portions of the state. Dakota Skipper Unplowed native prairie on dry to mesic calcareous gravelly soils. Can occur in moderately grazed prairie pastures. Not known from the location of this proposal. This notice is being coordinated with the U.S. Fish and Wildlife Service. Any comments it may have concerning Federally-listed threatened or endangered wildlife or plants or their critical habitat will be considered in our final assessment of the described work. 4. JURISDICTION Page 3 of 4

4 Regulatory Branch (File No. MVP LSP) This proposal is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 1 of the Rivers and Harbors Act of 1899 and Section 44 of the Clean Water Act identified in Regulatory Guidance Letter HISTORICAL/ARCHAEOLOGICAL The Corps will review information on known cultural resources and/or historic properties within and adjacent to the project area. The Corps will also consider the potential effects of the project on any properties that have yet to be identified. The results of this review and the Corps determination of effect will be coordinated with the State Historic Preservation Officer independent of this public notice. Any adverse effects on historic properties will be resolved prior to the Corps authorization of the work in connection with this project. 6. PUBLIC HEARING REQUESTS Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, in detail, the reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served. 7. REPLIES/COMMENTS Interested parties are invited to submit to this office written facts, arguments, or objections within 3 days of the date of this notice. These statements should bear upon the suitability of the location and the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable. Comments received may be forwarded to the applicant. A copy of the full prospectus submitted by the Sponsor is available to the public for review upon request. Replies may be addressed to: Regulatory Branch St. Paul District Corps of Engineers Bemidji Field Office 4111 Technology Drive NW, Suite 2 Bemidji, MN 5661 Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call Larry Puchalski at the Bemidji office of the Corps, telephone number (651) To receive Public Notices by , go to: and add your information in the New Registration Box. Enclosure(s) Chad Konickson, Chief, Regulatory Branch Page 4 of 4

5 AREA LOCATION Kittson Roseau Lake of the Woods Marshall Koochiching Pennington Beltrami Cook Red Lake Polk St. Louis Clearwater Lake Itasca Norman Mahnomen Hubbard Becker Clay Cass Wadena Aitkin Carlton Crow Wing Otter Tail Wilkin Mille Lacs Todd Morrison Pine Grant Douglas Kanabec Traverse Benton Stevens Pope Isanti Stearns Big Stone Chisago Sherburne Swift Wright Anoka Kandiyohi Meeker Chippewa Hennepin Ramsey Lac Qui Parle McLeod Carver Yellow Medicine Renville Scott Dakota Sibley Redwood Goodhue Lincoln Lyon Le Sueur Rice Nicollet Wabasha Brown Pipestone Murray Cottonwood Blue Earth Waseca Steele Dodge Olmsted Winona Watonwan Rock Nobles Houston Jackson Martin Faribault Freeborn Mower Fillmore PROJECT LOCATION PROSSER WETLAND BANK - NEAR KARLSTAD, MN Washington SITE LOCATION MAP LSP Page 1 of 8 NUMBER 1 TITLE SHEET 2 LAND USE MAP DRAWING INDEX SHEET TITLE 3 EXISTING CONDITIONS TOPOGRAPHIC MAP 3A 3B CROSS SECTION A-A' CROSS SECTION B-B' 4 WEB SOIL SURVEY MAP 5 WATERSHED MAP 6 EXISTING WETLANDS MAP 7 EXISTING CONDITIONS VEGETATION MAP 8 PROPOSED CONSERVATION EASEMENT BOUNDARY MAP 9 CREDIT ALLOCATION AREA MAP 1 PROPOSED VEGETATION CONDITIONS MAP 11 CONCEPT PLAN MAP 12 QUAD MAP WITH NWI OVERLAY 13 MARSCHNER HISTORIC VEGETATION MAP 14 SITES OF BIODIVERSITY MAP : MM/DD/YYYY LIC. NO TIMOTHY T. RAMERTH SUBJECT MAY 218 : AS SHOWN SCALE: JWR DRAWN BY: TTR CHECKED BY: 26B1399. JOB NUMBER: U.S.G.S. QUADRANGLE MAPS: KARLSTAD, KARLSTAD SW PUBLISHED: 1982, 1982 PHOTOREVISED: NA, NA TITLE SHEET 1 J:\26B-Brainerd Environmental\26B1399-Prosser Wetland Banking Plan\26B1399.-Prosser Wetland Banking Plan\CADD\Enviro\Wetland Bank Preliminary Design\W-TS-26B1399..dwg Plotted by:joshua Rebennack 5/16/218 2:3:3 PM

6 WETLAND AGRICULTURAL FIELD IMAGE: ESRI, INC. AGRICULTURAL FIELD AGRICULTURAL FIELD WOODED CRP LAND SUBJECT CRP LAND WOODED AGRICULTURAL FIELD FALLOW FIELD CRP LAND WOODED HOMESTEAD AREAS EXCLUDED FROM CRP) HOMESTEAD AGRICULTURAL FIELD AGRICULTURAL FIELD WOODED J:\26B-Brainerd Environmental\26B1399-Prosser Wetland Banking Plan\26B1399.-Prosser Wetland Banking Plan\CADD\Enviro\Wetland Bank Preliminary Design\W-LU-26B1399..dwg Plotted by:paul Strong 5/17/218 11:8:7 AM GRAVEL PIT LSP Page 2 of 8 LEGEND DENOTES EXISTING CRP AREA(S) DENOTES EXISTING AREA(S) EXCLUDED FROM CRP : MAY 218 SCALE: AS SHOWN DRAWN BY: JWR CHECKED BY: TTR LAND USE MAP JOB NUMBER: 26B1399. : MM/DD/YYYYLIC. NO TIMOTHY T. RAMERTH

7 SP-1 J:\26B-Brainerd Environmental\26B1399-Prosser Wetland Banking Plan\26B1399.-Prosser Wetland Banking Plan\CADD\Enviro\Wetland Bank Preliminary Design\W-WM-26B1399..dwg 3 Plotted by:joshua Rebennack 5/17/218 8:51:34 AM 6 6 EXISTING WETLANDS MAP JOB NUMBER: 26B1399. SP-4 TIMOTHY T. RAMERTH : MM/DD/YYYY LIC. NO SUBJECT JWR BY DENOTES SOIL TEST PIT LOCATION CHECKED BY: TTR REVISIONS DESCRIPTION SP DRAWN BY: REV# DENOTES APPROX. EXISTING WETLAND AREAS 5 AS SHOWN DENOTES EXISTING MINOR INTERVAL CONTOUR MAY SCALE: DENOTES EXISTING MAJOR INTERVAL CONTOUR : LEGEND SP SP SP IMAGE: ESRI, INC LSP Page 3 of 8 SP-3

8 IMAGE: ESRI, INC. SEDGES, RUSHES, WET MEADOW GRASSES WITH SHRUBS UPLAND GRASSES TREES WET MEADOW GRASSES PLANTED OATS TREES WET MEADOW GRASSES SHRUBS AND WET MEADOW GRASSES WITH SEDGES SEDGES, RUSHES, WET MEADOW GRASSES WITH SHRUBS UPLAND GRASSES UPLAND GRASSES UPLAND GRASSES UPLAND GRASSES WITH SHRUBS WET MEADOW GRASSES WITH SHRUBS CATTAILS SHRUBS AND WET MEADOW GRASSES WITH SEDGES UPLAND GRASSES SHRUBS J:\26B-Brainerd Environmental\26B1399-Prosser Wetland Banking Plan\26B1399.-Prosser Wetland Banking Plan\CADD\Enviro\Wetland Bank Preliminary Design\W-EV-26B1399..dwg Plotted by:joshua Rebennack 5/17/218 8:54:35 AM SHRUBS UPLAND GRASSES WITH SHRUBS LSP Page 4 of 8 LEGEND TYPE DENOTES APPROX AREA OF EXISTING VEGETATION & TYPE EXISTING CONDITIONS VEGETATION MAP : MAY 218 SCALE: AS SHOWN DRAWN BY: JWR CHECKED BY: TTR JOB NUMBER: 26B1399. : MM/DD/YYYYLIC. NO TIMOTHY T. RAMERTH

9 IMAGE: ESRI, INC. PROPOSED CONSERVATION EASEMENT 7.73 ACRES PROPOSED CONSERVATION 5.6 ACRES EASEMENT SUBJECT J:\26B-Brainerd Environmental\26B1399-Prosser Wetland Banking Plan\26B1399.-Prosser Wetland Banking Plan\CADD\Enviro\Wetland Bank Preliminary Design\W-EB-26B1399..dwg Plotted by:joshua Rebennack 5/17/218 8:57:1 AM LSP Page 5 of 8 LEGEND DENOTES PROPOSED CONSERVATION EASEMENT AREA DENOTES EXISTING CRP AREA(S) DENOTES EXISTING AREA(S) EXCLUDED FROM CRP & CONSERVATION EASEMENT : MAY 218 SCALE: AS SHOWN DRAWN BY: JWR CHECKED BY: TTR PROPOSED CONSERVATION EASEMENT BOUNDARY MAP JOB NUMBER: 26B1399. : MM/DD/YYYYLIC. NO TIMOTHY T. RAMERTH

10 IMAGE: ESRI, INC. MAP ID III MAP ID I 25' WIDE VEGETATION BUFFER 25' WIDE VEGETATION BUFFER UPLAND BUFFER SUBJECT MAP ID II UPLAND BUFFER MAP ID V MAP ID VI MAP ID IV MAP ID II MAP ID III MAP ID VI MAP ID V MAP ID I J:\26B-Brainerd Environmental\26B1399-Prosser Wetland Banking Plan\26B1399.-Prosser Wetland Banking Plan\CADD\Enviro\Wetland Bank Preliminary Design\W-CM-26B1399..dwg Plotted by:joshua Rebennack 5/17/218 8:59:18 AM LSP Page 6 of 8 MAP ID AREAS MAP ID AREA I 58.4 ACRES II ACRES III 1.37 ACRES IV 2.78 ACRES V 1.38 ACRES VI.9 ACRES : MAY 218 SCALE: AS SHOWN DRAWN BY: JWR CHECKED BY: TTR CREDIT ALLOCATION AREA MAP JOB NUMBER: 26B1399. : MM/DD/YYYYLIC. NO TIMOTHY T. RAMERTH

11 IMAGE: ESRI, INC. SUBJECT SHRUB-CARR SHRUB-CARR UPLAND PRAIRIE SHALLOW MARSH UPLAND PRAIRIE SHRUB-CARR J:\26B-Brainerd Environmental\26B1399-Prosser Wetland Banking Plan\26B1399.-Prosser Wetland Banking Plan\CADD\Enviro\Wetland Bank Preliminary Design\W-PV-26B1399..dwg Plotted by:joshua Rebennack 5/17/218 9:2:12 AM LSP Page 7 of 8 LEGEND DENOTES CONSERVATION EASEMENT BOUNDARY TYPE DENOTES AREA OF PROPOSED VEGETATION & TYPE : MAY 218 SCALE: AS SHOWN DRAWN BY: JWR CHECKED BY: TTR PROPOSED VEGETATION CONDITIONS MAP JOB NUMBER: 26B1399. : MM/DD/YYYYLIC. NO TIMOTHY T. RAMERTH

12 25' WIDE VEGETATION BUFFER TO PROTECT THE RESTORED WETLANDS FROM ADJACENT LAND USE FILL DRAINAGE DITCH(ES) (HATCHED AREA) W/ SOIL FOUND ON SITE TO RESTORE HYDROLOGY; WILL BE PLANTED W/ BWSR SEED MIX & WILLOWS WILL BE TRANSPLANTED REMOVE PORTION OF TOPSOIL TO BE USED AS DRAINAGE DITCH FILL AND TO INCREASE HYDROLOGY IN THESE AREAS; WILL BE PLANTED W/ BWSR SEED MIX & WILLOWS WILL BE TRANSPLANTED SUBJECT LSP Page 8 of 8 LOWER AREA TO PREVENT OFFSITE FLOODING TO THE & INCREASE HYDROLOGY IN THE RESTORED WETLANDS EXISTING SOIL STOCKPILES TO BE USED FOR DRAINAGE DITCH FILL LEVEL AREA TO MATCH SURROUNDING TOPOGRAPHY LEGEND DENOTES CONSERVATION EASEMENT BOUNDARY DENOTES CONSTRUCTION FEATURES SOIL TO BE GRADED TO ALLOW EXCESS WATER TO FLOW SOUTH INTO THE WETLAND CREATION AREA. THE PROJECT DESIGN WILL PREVENT OFFSITE FLOODING. THIS AREA WILL BE PLANTED W/ BWSR SEED MIX & WILLOWS WILL BE TRANSPLANTED. SOIL BERM IN CRP AREA WILL USED FOR GRAVEL PIT AREA FILL; THE CRP AREA WILL BE SEEDED W/ A USDA APPROVED SEED MIX SOIL FILL WILL BE ADDED TO GRAVEL PIT AREA TO APPROX. 6" BELOW EXISTING SURFACE WATER ELEVATION. THIS AREA WILL BE PLANTED W/ BWSR SEED MIX. SOIL TO BE GRADED TO ALLOW EXCESS WATER TO FLOW INTO THE WETLAND CREATION AREA. THIS AREA WILL BE PLANTED WITH A BWSR SEED MIX & WILLOWS WILL BE TRANSPLANTED. UPLAND BUFFER TO PROTECT THE CREATED WETLANDS FROM ADJACENT LAND USE; THIS AREA WILL BE PLANTED WITH A BWSR SEED MIX DRAINAGE DITCH TO REMAIN TO ALLOW PORTION OF THE SITE HYDROLOGY TO FLOW WARD FROM THE WESTERLY HOMESTEAD MAY 218 : AS SHOWN SCALE: JWR DRAWN BY: TTR CHECKED BY: : MM/DD/YYYY LIC. NO TIMOTHY T. RAMERTH 26B1399. JOB NUMBER: NOTE: ANY AREAS WITHIN MAP I, II, III DOMINATED BY NON-NATIVE/INVASIVE PLANT SPECIES WILL BE DISKED & RESEEDED WITH A BWSR SEED MIX & WILLOWS WILL BE TRANSPLANTED IMAGE: ESRI, INC. CONSTRUCT DITCH BLOCK TO REDUCE HYDROLOGY LOSS TO THE SOUTH J:\26B-Brainerd Environmental\26B1399-Prosser Wetland Banking Plan\26B1399.-Prosser Wetland Banking Plan\CADD\Enviro\Wetland Bank Preliminary Design\W-PC-26B1399..dwg Plotted by:paul Strong 5/17/218 11:15:14 AM 3 6 CONCEPT PLAN MAP 11

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project Information for File # 2016-01223-MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project Applicant: Park Nicollet, Attn: Robert Riesselman Corps Contact: Melissa Jenny Address:

More information

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships)

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships) Information for File MVP-2014-03830-MMJ; Reconstruction (Waconia and Watertown Townships) Applicant: Carver County Corps Contact: Melissa Jenny Address: 180 Fifth Street East, Suite 700, St. Paul, MN 55101

More information

Information for File # ARC

Information for File # ARC Information for File # 2017-03115-ARC Applicant Consultant Corps Contact Bob Manzoline St. Louis and Lake Counties Regional Rail Authority Natalie White Short Elliot Hendrickson (SEH) Inc. Andrew R Chambers

More information

Information for File #MVP DAS

Information for File #MVP DAS Information for File #MVP201702209DAS Applicant: HyVee, Inc. Corps Contact: David Studenski Address: 1114 South Oak Street, La Crescent, Minnesota 559471560 EMail: david.a.studenski@usace.army.mil Phone:

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2004-02804-MVM Applicant: St. Michael MF, LLC Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil

More information

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana JOINT PUBLIC NOTICE 26 June 2017 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services 7400

More information

Section 1 TABLE OF CONTENTS

Section 1 TABLE OF CONTENTS Section 1 TABLE OF CONTENTS... [M]ineral fertilizer is essential to feed around half of the world s population, and will be fundamental to ensure global food security through the 21 st century. 2013 U.N.

More information

Master Gardener Program 2010 Annual Report

Master Gardener Program 2010 Annual Report Master Gardener Program 2010 Annual Report MESSAGE FROM THE STATE DIRECTOR Thank you to all 2,269 Master Gardener volunteers who generously gave over 128,000 valuable hours of themselves in 2010 to the

More information

Information for File # ARC

Information for File # ARC Information for File # 2015-02781-ARC Applicant Corps Contact Enbridge Energy, Limited Partnership Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil

More information

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk

More information

Information for File # JTF

Information for File # JTF Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil

More information

Information for File MMJ Main Stem Bassett Creek Restoration Project

Information for File MMJ Main Stem Bassett Creek Restoration Project Information for File 2013-03866-MMJ Main Stem Bassett Creek Restoration Project Applicant: Minneapolis Park and Recreation Board (MPRB) Corps Contact: Melissa Jenny Address: Corps of Engineers, St. Paul

More information

Information for File # MHK

Information for File # MHK Information for File #2014-03555-MHK Applicant: Corps Contact: Wimmer Communities Marie Kopka Address: 250 N. Sunnyslope Road, Suite 296 Brookfield, Wisconsin 53005 E-Mail: Marie.H.Kopka@usace.army.mil

More information

Information for File # ARC

Information for File # ARC Information for File # 2017-00054-ARC Applicant Consultant Corps Contact Linda Keith City of Tower Natalie White SEH Inc. Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail

More information

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Information for File # MMW

Information for File # MMW Information for File #07-0870-MMW Applicant: Menards (Tyler Edwards) Corps Contact: Mariah Weitzenkamp Address: 80 Fifth Street East, Suite 700, Saint Paul, MN 0-78 E-Mail: Mariah.M.Weitzenkamp@usace.army.mil

More information

PROPOSED DRAINAGE PATTERNS

PROPOSED DRAINAGE PATTERNS 1121 1118.50 Basin Floor 1120 1119 0 N 100 200 PROPOSED DRAINAGE PATTERNS Deroiser Drive Riverwood Drive County 260 0 100 200 Project Name: Riverwood Drive LITTLE FALLS TOWNHOMES Project Location: LITTLE

More information

Information for File # SEK

Information for File # SEK Information for File # Applicant: Dane County Corps Contact: Simone Kolb Address: 20711 Watertown Rd., Suite F, Waukesha, WI, 53186 E-Mail: simone.e.kolb@usace.army.mil Phone: 262-717-9539 Primary County:

More information

Information for File # RMM

Information for File # RMM Information for File #2015-00067-RMM Applicant: New Ulm Public Schools Corps Contact: Ryan Malterud Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: ryan.m.malterud@usace.army.mil

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

Non-Metallic Mining Reclamation Checklist

Non-Metallic Mining Reclamation Checklist Eau Claire County DEPARTMENT OF PLANNING AND DEVELOPMENT Eau Claire County Courthouse, Rm. 1510 721 Oxford Avenue Eau Claire, Wisconsin 54703-5481 (715) 839-4741 f Housing & Community Development 839-6240

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

PUBLIC NOTICE. us Anny Corps CENAE-R-A FILE NO. NAE

PUBLIC NOTICE. us Anny Corps CENAE-R-A FILE NO. NAE CENAE-R-A FILE NO. NAE-2007-02926 PUBLIC NOTICE us Anny Corps of Engineers s. New England District 696 Virginia Road Concord, MA 01742-2751 Comment Period Begins: January 15, 2019 Comment Period Ends:

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

Information for File # ARC

Information for File # ARC Information for File # 2016-02630-ARC Applicant Corps Contact Will Bomier-Carlton County Transportation Department Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil

More information

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015 Public Notice U.S. Army Corps In Reply Refer to US Army Corps of Engineers, Pittsburgh District of Engineers Notice No. below 1000 Liberty Avenue Pittsburgh District Pittsburgh, PA 15222-4186 Application

More information

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION FOR AVALON INN (APN 069-241-27 & -04) 1201 & 1211 NORTH MAIN STREET FORT BRAGG, CA MENDOCINO COUNTY prepared for:

More information

Weston s Wetlands, Stormwater, & Open Space

Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Conservation Commission Role and Responsibilities Laws that protect wetlands What residents can do to protect wetlands

More information

Huntington Stormwater Utility

Huntington Stormwater Utility Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April

More information

Wisconsin Dept. of Transportation November 2017

Wisconsin Dept. of Transportation November 2017 Wisconsin Dept. of Transportation November 2017 Jennifer Gibson WisDOT Environmental Coordinator Mike Helmrick WisDOT Environmental Coordinator Background on compensatory wetland mitigation Site purpose

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION

MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION 410-728-2900 Fax: 410-728-3160 www.rkk.com To: From: CC: U.S. Fish and Wildlife Service, Pennsylvania Fish and Boat Commission Jennifer A Ottenberg Miller,

More information

Information for File # MVP MMJ; Elim Care

Information for File # MVP MMJ; Elim Care Information for File # MVP-217-2628-MMJ; Elim Care Applicant: Elim Care of Maple Plain Corps Contact: Melissa Jenny Address: 18 Fifth Street East, Suite 7, St. Paul, MN 5511-168 E-Mail: Melissa.m.jenny@usace.army.mil

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21

PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21 PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21 TITLE 15 - LAND MANAGEMENT CODE CHAPTER 2.21 - SENSITIVE LAND OVERLAY ZONE (SLO) REGULATIONS 15-2.21-1. PURPOSE...1

More information

Preparing a Wetland Delineation Report

Preparing a Wetland Delineation Report Preparing a Wetland Delineation Report Why is the report important? In addition to documenting the wetland determination/delineation, the report often provides the basis for further regulatory permitting/compliance.

More information

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME: Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME: General Information: 1. Completed application signed by the owner, review fee, one set of

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86

More information

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses NRDB Why Use Density Bonuses & This Checklist Local units of government

More information

Decision Notice. Proposed Action

Decision Notice. Proposed Action Decision Notice Paving Weld County Road 105 USDA Forest Service Arapaho and Roosevelt National Forest and Pawnee National Grassland Pawnee National Grassland Ranger District Weld County, Colorado November

More information

January 18, JOINT PUBLIC NOTICE Savannah District/State of Georgia

January 18, JOINT PUBLIC NOTICE Savannah District/State of Georgia DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3640 January 18, 2019 Regulatory Branch SAS-2009-00770 JOINT PUBLIC NOTICE Savannah District/State

More information

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Presented to Pennsylvania Agency Coordination Meeting May 27, 2015 Doug Smith & Ryan Gordon 1 Southwestern

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY: AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 7, 2016 AGENDA ITEM: Consideration of approval of a resolution approving Engineering Services Amendment No. 1 with

More information

Information for File # MVP MMJ

Information for File # MVP MMJ Information for File # MVP-218-477-MMJ Applicant: City of Rogers Corps Contact: Melissa Jenny Address: 18 Fifth Street East, Suite 7, St. Paul, MN 5511-1648 E-Mail: Melissa.m.jenny@usace.army.mil Phone:

More information

SECTION 11.07: WETLAND BUFFER ORDINANCE

SECTION 11.07: WETLAND BUFFER ORDINANCE 11.07. Wetland Buffer Ordinance 1.0 Council Findings, Purpose, and Means. SECTION 11.07: WETLAND BUFFER ORDINANCE Section 11.07: Wetland Buffer Ordinance Subdivision 1.0: Council Findings, Purpose, and

More information

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan Prepared for City of Oceanside Planning Department 300 N. Coast Highway Oceanside, CA 92054 Prepared by Ogden Environmental

More information

1/21/2014. Definitions vary widely Legal vs. functional Not always obvious. Wetlands are legally protected by Clean Water Act (1972)

1/21/2014. Definitions vary widely Legal vs. functional Not always obvious. Wetlands are legally protected by Clean Water Act (1972) What is a Wetland? Freshwater Wetlands of Gulf Coast Plains Definitions vary widely Legal vs. functional Not always obvious What is a Wetland? Wetlands are legally protected by Clean Water Act (1972) Corps

More information

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA 98273 Inspections 360.336.9306 Office 360.336.9410 Fax 360.336.9416 Application will expire 6 mo from this date: Floodplain Development

More information

17.18 SENSITIVE AREAS

17.18 SENSITIVE AREAS 17.18 SENSITIVE AREAS 17.18.010 Purpose...1 17.18.020 Definitions...1 17.18.030 Review Process...1 17.18.040 Sensitive Areas Analysis...2 17.18.050 Standards and Development Plan...3 17.18.060 Geotechnical

More information

Understanding Drainage Options What s Feasible and Legal. February 2019

Understanding Drainage Options What s Feasible and Legal. February 2019 Understanding Drainage Options What s Feasible and Legal February 2019 Outline for the Presentation Do you need a permit? Does common law apply? Does local government approve it? Will my neighbor allow

More information

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING IV 13 404 MASTER PLANNING Master Planning through the Site Analysis (Master Planning Site Analysis) or Planned Development (Master Planning Planned Development) is provided to encourage development which

More information

Josephine County, Oregon Board of Commissioners: Jim Riddle, Dwight F. Ellis, & Jim Raffenburg

Josephine County, Oregon Board of Commissioners: Jim Riddle, Dwight F. Ellis, & Jim Raffenburg Josephine County, Oregon Board of Commissioners: Jim Riddle, Dwight F. Ellis, & Jim Raffenburg PLANNING OFFICE Michael Snider, Director 510 NW 4 th Street / Grants Pass, OR 97526 (541) 474-5421 / FAX (541)

More information

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM This form is intended for use by applicants (primarily private landowners) who need to conduct a Scoped EIS in support of minor development

More information

Horner-McLaughlin Woods: Soil Types

Horner-McLaughlin Woods: Soil Types Horner-McLaughlin Woods: Soil Types Not present at HMW Adrian Muck Conover Loam 0-4% Slopes Houghton Muck Miami Loam 2-6% Slopes Miami Loam 6-12% Slopes Miami Loam 12-18% Slopes t 0 0.125 0.25 Miles Mary

More information

Rule D Wetland and Creek Buffers

Rule D Wetland and Creek Buffers Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

Unit II Soil Management

Unit II Soil Management Unit II Soil Management Lesson 2: Using Soil Survey Manuals Soil survey manuals provide useful information for grassland management. Soil scientists evaluate the soil for chemical and physical properties,

More information

Washtenaw County Conservation District 7203 Jackson Rd Ann Arbor MI Phone: (734) x 5 Fax: (734) Web:

Washtenaw County Conservation District 7203 Jackson Rd Ann Arbor MI Phone: (734) x 5 Fax: (734) Web: Washtenaw County Conservation District 7203 Jackson Rd Ann Arbor MI 48103-9506 Phone: (734) 761-6721 x 5 Fax: (734) 662-1686 Web: www.washtenawcd.org STEPS IN BUILDING A POND The following list has been

More information

DETERMINATION OF SIGNIFICANCE FOR THE LONGWOOD PUBLIC LIBRARY EXPANSION & RENOVATION; STATE ENVIRONMENTAL QUALITY REVIEW ACT (SEQRA) RESOLUTION

DETERMINATION OF SIGNIFICANCE FOR THE LONGWOOD PUBLIC LIBRARY EXPANSION & RENOVATION; STATE ENVIRONMENTAL QUALITY REVIEW ACT (SEQRA) RESOLUTION Longwood Public Library Resolution Library Board of Trustees August 13, 2012 DETERMINATION OF SIGNIFICANCE FOR THE LONGWOOD PUBLIC LIBRARY EXPANSION & RENOVATION; STATE ENVIRONMENTAL QUALITY REVIEW ACT

More information

Information for File # KDZ

Information for File # KDZ Information for File # 016-098-KDZ Applicant: Wisconsin Department of Transportation Corps Contact: Kyle Zibung Address: 96 Post Road, Suite B, Stevens Point, WI 4467 -Mail: kyle.d.zibung@usace.army.mil

More information

TREE REMOVAL PERMIT PACKET

TREE REMOVAL PERMIT PACKET PERMIT INTAKE HOURS Permit Applications will be accepted between 8:30 am and 4:30 pm. Community Development Engineering Division 38 Hill Street, Suite G-30 Roswell, GA 30075 770-641-3780 www.roswellgov.com

More information

ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: March 12, 2008

ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: March 12, 2008 Next Publication: February 25, 2008 Vol. 32, No. 3 Submittal Deadline: February 15, 2008 Project Title: ENVIRONMENTAL ASSESSMENT WORKSHEETS EAW Comment Deadline: March 12, 2008 Project Title: Hilltop Estates

More information

LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER [Rules Effective July 1, 2004]

LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER [Rules Effective July 1, 2004] LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER 6135 [Rules Effective July 1, 2004] Minnesota Department of Natural Resources Division of Lands and Minerals

More information

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

Master Land Use Plan Application

Master Land Use Plan Application Development Review Division Development Services Department CITY OF OVIEDO 400 Alexandria Boulevard Oviedo, Florida 32765 Application No. Date Received Phone: (407) 971-5775 Fax: (407) 971-5819 www.cityofoviedo.net

More information

Stormwater Management Plan Narrative Quality Fleet Services, Inc. SITE RE-DEVELOPMENT 548 New Ludlow Road South Hadley, MA The project proposed by Quality Fleet Services, Inc. consists of the site improvements

More information

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 4 To conserve, manage, appropriately use and protect the natural resources of the City ensuring continued resource availability and environmental

More information

ME DOT Route 3. File No.: City and State: Bar Harbor, ME

ME DOT Route 3. File No.: City and State: Bar Harbor, ME ME DOT Route 3 File No.: 199600361 City and State: Bar Harbor, ME General Impacts: 0.28 acre tidal emergent 0.77 acre non-tidal forested 0.15 acre non-tidal emergent 0.51 acre non-tidal scrub-shrub Functions

More information

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed

More information

Polpis Bike Path. General Impacts: 1.47 acres forested, marsh, shrub swamp

Polpis Bike Path. General Impacts: 1.47 acres forested, marsh, shrub swamp Polpis Bike Path File No.: 199201570 City and State: Nantucket, MA General Impacts: 1.47 acres forested, marsh, shrub swamp Functions and Values Lost: (from EA/SOF) Floodflow Alteration Groundwater Discharge

More information

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination I-494 Rehabilitation Project SP 2785-330 (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination State Project Number 2785-330 Federal Project No. NHPP-I494 (002) Trunk Highway:

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

Syfeld Keene Associates

Syfeld Keene Associates Syfeld Keene Associates File No.: 198100675 City and State: Keene, NH General Impacts: 9.8 acres PSS/PFO/PEM (permit states most of 13 acre site ) Functions and Values Lost: Floodflow alteration (only

More information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION

More information

THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS

THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS 00216106.DOC NMA/RRK 1/30/14 THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS Open space subdivisions, sometimes called cluster developments, maintain a significant portion of a development site in

More information

Gloucester County PLAN SUBMITTER'S CHECKLIST

Gloucester County PLAN SUBMITTER'S CHECKLIST Page 1 of 9 Gloucester County PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and please reference the plan sheets/pages where the information may be found,

More information

AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS

AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS Antiquities Permit 6097 By William E. Moore Brazos Valley Research Associates

More information

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE TABLE OF CONTENTS SECTION TITLE PAGE 1 INTRODUCTION AND OVERVIEW 1-1 1.1 Purpose and Need 1-1 1.2 Goals and Objectives 1-3 1.3 Overview of the Planning Process 1-5 1.4 Federal and State Requirements and

More information

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION County: Linn County, IA GREEN SHEET Location: IA 100, from its terminus at Edgewood Rd. to US 30 southwest of Cedar Rapids Route: IA 100 Extension Project No.: NHS-100-1(36) 19-57 OLE Project Managers:

More information

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017 Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017 Conservation Design Forum Geosyntec Consultants 403 W. St. Charles Road 1420 Kensington Road, Suite 103 Lombard,

More information

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT Date June 20, 2018 Project Northern Natural Gas Company Northern Lights 2017 Expansion Project Rice, Sherburne, and Isanti Counties, Minnesota

More information

SEMSWA s Role in the Land Development Process

SEMSWA s Role in the Land Development Process SEMSWA s Role in the Land Development Process One of SEMSWA s responsibilities is to ensure that any new development or redevelopment within its service area is designed and constructed in compliance with

More information

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP. (10/27/14) PennDOT Section 106 Field Assessments and Finding Combined Early tification/finding? Yes Concurrence required or requested: Yes MPMS: 51507 ER# (if consultation with PHMC required) ): County:

More information

Gadsden County Planning Commission Agenda Request

Gadsden County Planning Commission Agenda Request Date of Meeting: November 16, 2017 To: From: Through: Subject: Gadsden County Planning Commission Agenda Request Honorable Chairperson and Members of the Board Jill A. Jeglie, AICP, Senior Planner Clyde

More information

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend BE WATER WISE Managing Your Onlot Stormwater Sept. 23, 2006 Watershed Weekend 2006 1 All water resources are interrelated through the Hydrologic Cycle Sept. 23, 2006 Watershed Weekend 2006 2 What is Storm

More information

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL

More information

Community LID Workgroup Issue Paper #6

Community LID Workgroup Issue Paper #6 Community LID Workgroup Issue Paper #6 Topic: Hard and Impervious Surface Coverage Limits Objective: Minimize the amount of hard and impervious surfaces in developments to allow more stormwater to infiltrate

More information

ALL SECURE SELF STORAGE SEPA APPEAL RECOMMENDATION TO THE HEARING EXAMINER

ALL SECURE SELF STORAGE SEPA APPEAL RECOMMENDATION TO THE HEARING EXAMINER KITSAP COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 619 DIVISION STREET MS-36, PORT ORCHARD WASHINGTON 98366-4682 LOUISA GARBO, DIRECTOR (360) 337-5777 FAX (360) 337-4415 HOME PAGE - www.kitsapgov.com ALL

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION THURSTON COUNTY DEVELOPMENT SERVICES OPEN SPACE TAX PROGRAM ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION Use this checklist to help you determine whether your property is eligible for open

More information

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Applicant Name Phone / Fax / Address City State Zip Code  . Property Owner Phone / Fax / Address City State Zip Code Master Development Plan Application Community Development Department City of Redmond 411 SW 9 th Street Redmond, Oregon 97756 541-923-7721 541-548-0706 FAX Master Development Plan Fee $38,862.52 File Number

More information

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements Coco Palms Community Development District Engineer s Report Infrastructure Improvements Prepared for Coco Palms Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

Photo by Carlton Ward Jr. Executive Summary

Photo by Carlton Ward Jr. Executive Summary Photo by Carlton Ward Jr. Executive Summary The Cooperative Conservation Blueprint (Blueprint) is a multi-partner strategic conservation process developed by the Florida Fish and Wildlife Commission (FWC)

More information

West Norriton Township

West Norriton Township West Norriton Township Earth Disturbance and Drainage Permit Application 1630 W. Marshall Street Norristown, PA 19403 Phone: (610) 631-0450 Fax: (610) 630-0304 www.westnorritontwp.org A stormwater permit

More information

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES 7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an

More information