1 Information for File # ARC Applicant Consultant Corps Contact Bob Manzoline St. Louis and Lake Counties Regional Rail Authority Natalie White Short Elliot Hendrickson (SEH) Inc. Andrew R Chambers Address 00 South Lake Avenue, Suite 211, Duluth, MN Andrew.R.Chambers@usace.army.mil Phone Primary County St. Louis County Section 2 & 3 3 Township 2 3 North Range West Information Complete n September 14, 2017 Posting Expires n December 8, 2017 Authorization Type LP-05-MN This application is being reviewed in accordance with current practices for documenting Corps jurisdiction under Section 404 of the Clean Water Act identified in Regulatory Guidance Letter We have made a preliminary determination that the aquatic resources that would be impacted by the proposed project are subject to Corps of Engineers jurisdiction under Section 404 of the Clean Water Act. If an approved jurisdictional determination is completed as part of the review process for this application, a copy will be posted on the St. Paul District web page at the following link: Project: The purpose and need of the proposed project is to extend the Mesabi Trail an additional 2.8 miles to connect the existing trail terminus at the Trunk Highway (TH) 19 underpass to a proposed parking area on County State Aid Highway (CSAH) 88. The project location is on the north side of Trunk Highway 19 approximately 3 miles west of Ely, MN. PRJECT DESCRIPTIN AND PURPSE: The purpose of the proposed project is to extend the Mesabi Trail 2.8 miles from its existing terminus at the TH 19 underpass to a proposed parking area at CSAH 88, which will support future development of the Mesabi Trail to its ultimate terminus near Ely, Minnesota. The trail extension satisfies a need for an accessible multi-user trail system a safe distance from high speed vehicles traveling TH 19. The project proposes to construct a 9-foot wide paved trail with 2-foot shoulders on each side and 3:1 side-slopes. The trail would head east from TH 19 for 0.7 miles on an existing railroad 1
2 grade before diverting southeast from the grade towards TH 19. The trail would then continue within the TH 19 right-of-way (RW) for approximately 0.27 miles before turning northeast and diverting back onto the railroad grade. The trail would continue on the grade for approximately 0.22 miles before diverting southeast to the TH 19 RW once again. The trail would be routed within the TH 19 RW for approximately 0.28 miles before being routed back onto the grade. nce the trail diverted onto the grade again it would immediately cross over Armstrong Creek via an existing culvert under the grade. The trail would remain on the railroad grade until reaching CSAH 88, approximately 1.11 miles. The trail terminus at CSAH 88 would include a paved parking area with vehicle access from CSAH 88 and an associated water treatment pond. The parking area would be 2,50 square feet with 4 parking stalls. The water treatment pond would be 1,230 square feet and treat precipitation runoff from the impervious parking area, with a treatment volume of 1,820 cubic feet. NAME, AREA AND TYPES F WATERS (INCLUDING WETLANDS) SUBJECT T LSS: The Mesabi Trail extension would include the proposed discharge of dredged and fill materials in wetlands adjacent to Armstrong Creek. The project would result in permanent discharge of dredged and fill materials into acres of wet meadow, sedge meadow, shrub-carr, shallow marsh, and forested wetlands. The permanently impacted wetlands occur within Major Watershed #72 (Rainy River Headwaters) in Bank Service Area (BSA) 2. Erosion control measures and sediment control BMP s would be in place such as silt fence, erosion control blanket, coir logs, and sediment control devices. The disturbed areas would be reseeded and/or planted and stockpiles stabilized to limit erosion and further impact to wetlands. ALTERNATIVES CNSIDERED: The no build alternative consisted of not connecting the current Mesabi Trail terminus to Ely, MN. Alternative 1 This alternative would route the trail entirely on the existing railroad grade and greatly avoid and minimize wetland impacts. This design would utilize the previously filled grade the entire length of the trail extension, and would result in the permanent discharge of fill into 0.5 acre of wetlands. Alternative 2 (Preferred Alternative) Construct the trail along the railroad grade where easements can be secured. The trail would be diverted to TH 19 RW in areas where easements cannot be secured, and would involve a 20-foot corridor in this span. CMPENSATRY MITIGATIN: The applicant has avoided and minimized wetland impacts by utilizing an existing railroad grade and proposes to compensate for the loss of function associated with the discharge of dredged and fill materials into acres of wetlands by purchasing wet meadow wetland credits from the Hasbargen Wetland Mitigation Bank in Bank Service Area 2. Drawings See attached. 2
3 Mesabi Trail TH 19 - CSAH 88 Legend City Hall Giants Ridge Golf & Ski Resort Municipal Airport Vermilion Community College 2017 Google Image Landsat / Copernicus 20 mi N
4 Project Construction Limits (Aug. 9, 2017) Morse Twp., MN Project Construction Limits (Approx. 2.8 miles) Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 1 - Site Location USGS.mxd PHNE: (51) Print Date: 8/15/2017 Background: USGS 24k Quad MESABI TRAIL - TH 19 UNDERPASS T CSAH 88 Site Location Map USGS 24k Topography 1
5 Project Construction Limits (Sept., 2017) Wetland Plant Community Type Fresh (Wet) Meadow Alder Thicket Shrub-Carr Hardwood Swamp Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH
6 Project Construction Limits (Sept., 2017) Proposed Permanent Wetland Impacts Wetland Plant Community Type Sedge Meadow Shrub-Carr Hardwood Swamp Coniferous Swamp Wetland 2 Type /PSS1B Impact: sf Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd Wetland 3 Type 7/PF4B Impact: ac. Twin Lakes Rd Wetland 3 Type 7/PF4B Impact: ac. PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH
7 Project Construction Limits (Sept., 2017) Proposed Permanent Wetland Impacts Wetland Plant Community Type Fresh (Wet) Meadow Shallow Marsh Wetland 2 Type /PSS1B Impact: sf Wetland 2 Type /PSS1B Impact: 205sf Wetland 2 Type /PSS1B Impact: 14sf Wetland 3 Type 7/PF4B Impact: 0.032ac Wetland 3 Type 7/PF1B Impact: ac. Wetland 4 Impact: 372sf Shrub-Carr Hardwood Swamp Coniferous Swamp Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd Wetland 3 Type 7/PF4B Impact: ac. Wetland 4 Type 7/PF4B Impact: 0.01ac. Wetland 4 Type 3/PEM1C Impact: ac. Wetland 4 Type 7/PF4B Impact: ac. Wetland 4 Type 3/PEM1C Impact: 0.035ac. PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH
8 Wetland 5 Impact: 18sf Wetland Impact: ac. Wetland Impact: ac Wetland Type /PSS1B Impact: 0.153ac. Project Construction Limits (Sept., 2017) Proposed Permanent Wetland Impacts Wetland Plant Community Type Fresh (Wet) Meadow Sedge Meadow Shallow Marsh Shrub-Carr Wetland 7 Impact: 17sf Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd Wetland 4 Impact: 372sf Wetland Impact: 0.048ac. Wetland Type /PSS1B Impact: ac. PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH
9 Project Construction Limits (Sept., 2017) Proposed Permanent Wetland Impacts Wetland Plant Community Type Fresh (Wet) Meadow Sedge Meadow Shallow Marsh Shrub-Carr Wetland Type /PSS1B Impact: 0.153ac Wetland 7 Type /PSS1B Impact: ac. Wetland 7 Impact: ac Hardwood Swamp Coniferous Swamp Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd Wetland 7 Wetland 7 Type 7/PF1B Impact: 17sf Impact: 12sf Wetland 7 Type 7/PF4B Impact: 172sf Wetland 7 Impact: 0.013ac. PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH
10 Project Construction Limits (Sept., 2017) Proposed Permanent Wetland Impacts Wetland Plant Community Type Sedge Meadow Alder Thicket Hardwood Swamp Wetland 8 Type 7/PF1B Impact: 194sf Wetland 9 Type /PSS1B Impact: ac Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH 88 5-
11 Project Construction Limits (Sept., 2017) Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH
12 Project Construction Limits (Sept., 2017) Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH
13 Project Construction Limits (Sept., 2017) Proposed Permanent Wetland Impacts Wetland Plant Community Type Fresh (Wet) Meadow Sedge Meadow Shallow Marsh Alder Thicket Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd Wetland 11 Type 3/PEM1C Impact: 47sf PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH
14 Project Construction Limits (Sept., 2017) Proposed Permanent Wetland Impacts Wetland Plant Community Type Fresh (Wet) Meadow Sedge Meadow Shallow Marsh Alder Thicket Hardwood Swamp UV 88 Coniferous Swamp Path: S:\PT\R\REGRA\134132\3-env-stdy-regs\GIS\WetlandPermit\ 5 - Wetland Impacts.mxd Wetland 11 Type /PSS1B Impact: 24sf Wetland 12 Impact: ac. ST 98 ld Hwy 19 PHNE: (51) Background: St. Louis Co., 201 MESABI TRAIL - TH 19 UNDERPASS T CSAH 88 5-
15
16
Information for File # ARC
Information for File # 2017-00054-ARC Applicant Consultant Corps Contact Linda Keith City of Tower Natalie White SEH Inc. Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail
More informationInformation for File # ARC
Information for File # 2016-02630-ARC Applicant Corps Contact Will Bomier-Carlton County Transportation Department Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil
More informationInformation for File # ARC
Information for File # 2015-02781-ARC Applicant Corps Contact Enbridge Energy, Limited Partnership Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil
More informationInformation for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships)
Information for File MVP-2014-03830-MMJ; Reconstruction (Waconia and Watertown Townships) Applicant: Carver County Corps Contact: Melissa Jenny Address: 180 Fifth Street East, Suite 700, St. Paul, MN 55101
More informationInformation for File MMJ Main Stem Bassett Creek Restoration Project
Information for File 2013-03866-MMJ Main Stem Bassett Creek Restoration Project Applicant: Minneapolis Park and Recreation Board (MPRB) Corps Contact: Melissa Jenny Address: Corps of Engineers, St. Paul
More informationInformation for File # JTF
Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil
More informationInformation for File # MVP MMJ; Elim Care
Information for File # MVP-217-2628-MMJ; Elim Care Applicant: Elim Care of Maple Plain Corps Contact: Melissa Jenny Address: 18 Fifth Street East, Suite 7, St. Paul, MN 5511-168 E-Mail: Melissa.m.jenny@usace.army.mil
More informationInformation for File # SEK
Information for File # Applicant: Dane County Corps Contact: Simone Kolb Address: 20711 Watertown Rd., Suite F, Waukesha, WI, 53186 E-Mail: simone.e.kolb@usace.army.mil Phone: 262-717-9539 Primary County:
More informationInformation for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project
Information for File # 2016-01223-MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project Applicant: Park Nicollet, Attn: Robert Riesselman Corps Contact: Melissa Jenny Address:
More informationInformation for File # MMW
Information for File #07-0870-MMW Applicant: Menards (Tyler Edwards) Corps Contact: Mariah Weitzenkamp Address: 80 Fifth Street East, Suite 700, Saint Paul, MN 0-78 E-Mail: Mariah.M.Weitzenkamp@usace.army.mil
More informationTour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed
Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed On September 8 th, 2006 Minnesota's Lake Superior Coastal Program and the South St Louis Soil and Water Conservation
More informationInformation for File # MVP MMJ
Information for File # MVP-218-477-MMJ Applicant: City of Rogers Corps Contact: Melissa Jenny Address: 18 Fifth Street East, Suite 7, St. Paul, MN 5511-1648 E-Mail: Melissa.m.jenny@usace.army.mil Phone:
More informationInformation for File #MVP MVM
Information for File #MVP-2004-02804-MVM Applicant: St. Michael MF, LLC Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil
More informationExecutive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:
Executive Committee Meeting Addendum #7/15 July 3, 2015 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Maria Augimeri Michael Di Biase David Barrow Ronald Chopowick Vincent Crisanti Glenn
More informationInformation for File #MVP DAS
Information for File #MVP201702209DAS Applicant: HyVee, Inc. Corps Contact: David Studenski Address: 1114 South Oak Street, La Crescent, Minnesota 559471560 EMail: david.a.studenski@usace.army.mil Phone:
More informationInformation for File # RMM
Information for File #2015-00067-RMM Applicant: New Ulm Public Schools Corps Contact: Ryan Malterud Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: ryan.m.malterud@usace.army.mil
More informationCity of Stoughton Erosion Control Permit Application (effective 2/6/2018)
City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner
More informationPROPOSED DRAINAGE PATTERNS
1121 1118.50 Basin Floor 1120 1119 0 N 100 200 PROPOSED DRAINAGE PATTERNS Deroiser Drive Riverwood Drive County 260 0 100 200 Project Name: Riverwood Drive LITTLE FALLS TOWNHOMES Project Location: LITTLE
More informationI-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination
I-494 Rehabilitation Project SP 2785-330 (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination State Project Number 2785-330 Federal Project No. NHPP-I494 (002) Trunk Highway:
More information7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES
7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an
More informationNPDES - PCSM. Permit Preparation
NPDES - PCSM National Pollutant Discharge Elimination System Post Construction Stormwater Management Permit Preparation Jim Pillsbury, PE Engineer s Workshop - March 4 and 5, 2010 Who needs NPDES? Earth
More informationInformation for File # MHK
Information for File #2014-03555-MHK Applicant: Corps Contact: Wimmer Communities Marie Kopka Address: 250 N. Sunnyslope Road, Suite 296 Brookfield, Wisconsin 53005 E-Mail: Marie.H.Kopka@usace.army.mil
More informationBASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT
FACT SHEET BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT MINNESOTA VALLEY NATIONAL WILDLIFE REFUGE, MINNESOTA ENVIRONMENTAL MANAGEMENT PROGRAM LOCATION Three areas located on the Minnesota Valley
More informationChecklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:
Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number
More informationACT 167 STORMWATER CONSISTENCY VERIFICATION REPORT FOR CHESTER COUNTY 1.0 INTRODUCTION
ACT 167 STORMWATER CONSISTENCY VERIFICATION REPORT FOR CHESTER COUNTY 1.0 INTRODUCTION Tetra Tech, Inc. (Tt) has prepared this Act 167 Stormwater Consistency Verification Report. The report verifies consistency
More informationBLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 5 IMPERVIOUS SURFACES
BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 5 IMPERVIOUS SURFACES Draft November 2009 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...
More informationProject Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM
Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600
More informationDraft Rhode Island Stormwater Design and Installation Standards Manual
Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately
More informationUse of Best Management Practices
Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions
More informationSTREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA
STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION AREA SITE LOCATION & DRAINAGE AREA SITE LOCATION Drainage Area = 1.14 sq. miles STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
More informationENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report
Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION
More informationSTORMWATER UTILITY FREQUENTLY ASKED QUESTIONS
STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS What is Stormwater? Stormwater is water that falls to the ground during a precipitation event. When land is undeveloped or covered with vegetative surface,
More informationProject: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:
Permit Application No.: 15-445 Rules: Erosion Control, Wetland Protection, & Stormwater Management Applicant: BPS Properties, LLC Project: Mooney Lake Preserve Received: 8-24-15 Location: 300 Sixth Ave.
More informationChapter 4 - Preparation of Stormwater Site Plans
Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed
More informationSection 3 Non-Structural BMPs
3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide
More informationMeeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge
Meeting Agenda City of Guelph River Systems Advisory Committee September 19, 2018 City Hall, Meeting Room B From 4:00 to 6:00 p.m. Meeting Chair: Mariette Pushkar Agenda Items Welcome to all Item 1, 2
More informationMississippi Skyway Preliminary Engineering Report
EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge
More informationBalancing Conservation and Development on the Jordan River
Balancing Conservation and Development on the Jordan River Jordan River Parkway Trail Regional Athletic Complex Conservation & Restoration Balancing Conservation and Development on the Jordan River Jordan
More informationNine Mile Creek Regional Trail Update. Edina City Council Workshop March 4, 2014
Nine Mile Creek Regional Trail Update Edina City Council Workshop March 4, 2014 Presentation Outline: Where we ve been - Recap of route assessment process and approved route Where we are now - Summary
More informationPublic Information Centre. Welcome
Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff
More informationZoning Ordinance Article 3
Article 3 Natural Resources Protection Section 301 Natural Resources Protection 301.1. Purpose - The following natural resources protection standards are established to protect the public health, safety
More informationStormwater Drainage Assessment For Single Family Residence
Stormwater Drainage Assessment For Single Family Residence Project Name: SEADER SFD Project Address: 2301 NE Perkins Way, Lake Forest Park, King County WA. Parcel Number(s): Tax Parcel No. 86659-00181
More informationCity of Waco Stormwater Management Regulations
1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial
More informationCoffee Creek Park Development Low Impact Development (LID)
Coffee Creek Park Development Low Impact Development (LID) City of Duluth, St. Louis County, MN Presented By: Christopher J. Rousseau, P.E. February 27, 2008 Developer / Owner Information Trinity Development
More informationCan Urban Redevelopment Restore Aquatic Resources
Can Urban Redevelopment Restore Aquatic Resources with Standards for Stormwater Retention and Landscape Performance? Rebecca C. Stack District of Columbia Department of the Environment Industry, Agriculture,
More informationPlan Review Checklist
Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project
More informationWeston s Wetlands, Stormwater, & Open Space
Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Conservation Commission Role and Responsibilities Laws that protect wetlands What residents can do to protect wetlands
More informationHIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL
Effective July 1, 2007 HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL EFFECTIVE JULY 1, 2007 FIFTH EDITION Lower Colorado River Authority TABLE OF CONTENTS DESIGN SPREADHEET
More informationEnvironmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County
Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County ARTICLE VI. PERFORMANCE STANDARDS Section 600 Compliance All uses, activities, subdivisions and/or land developments
More informationTown of Essex Small Site Erosion Control Guide
Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams
More informationChagrin River Watershed Partners, Inc. Local Regulations. Amy H. Brennan (440)
Chagrin River Watershed Partners, Inc. Local Regulations Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org July 9, 2013 Applicable Zoning and Building Codes Erosion and Sediment Control Grading
More informationChesapeake Bay Watershed Restoration Jessica Seipp, PMP Water Resources Department Manager
Chesapeake Bay Watershed Restoration Jessica Seipp, PMP Water Resources Department Manager Bite of Science Loyola University, Baltimore, MD November 13, 2017 Agenda Who am I and where do I work? How did
More informationStream Restoration: Working with Nature?
Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability
More informationStream Restoration: Working with Nature? Greg Jennings, PhD, PE
Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability
More informationBeyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management
Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management VORS 2018 Stormwater Management Session 2 Stormwater Management, Green Infrastructure,
More informationSOIL EROSION AND SEDIMENT CONTROL
SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86
More informationTown of Vershire Road Erosion Inventory Report
Town of Vershire Road Erosion Inventory Report Taylor Valley Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation
More informationErosion Control for Home Builders in the. City of Jacksonville
Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck
More informationErosion control practices meet District requirements.
Permit Application No.: 16-631 Rules: Erosion Control, Stormwater Management, Wetland Protection, and Variance Applicant: Woodridge Church Received:11/23/16 Project: Woodridge Church Building Addition
More informationWorking Group Meeting
April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome
More informationLincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013
Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site
More informationCITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS
CITY OF CYPRESS 5275 Orange Avenue Cypress, California 90630 (714) 229-6720 DESIGN REVIEW COMMITTEE PERMIT PROCESS 1. Discuss project with Planning staff to determine zoning regulations, any unusual characteristics
More informationWatertown City Council
City of Watertown Watertown City Council April 14 th, 2015 Agenda Item: City Comment on Sun Share CUP Application Request for Action: Motion to Approve City Comments regarding CUP Application Department:
More informationIllinois Urban Manual
Illinois Urban Manual Jim Nelson: Association of Illinois Soil and Water Conservation Districts (AISWCD) Funding for this project provided, in part, by the Grand Victoria Foundation of Elgin IL, the Governor
More informationLake Nokomis Shoreline Enhancement Project
Lake Nokomis Shoreline Enhancement Project Community Meeting 2 February 13, 2018 Agenda Current Problems Project Goals Project Status Existing Conditions Community Input Draft Schematic Design Long-term
More informationPOST CONSTRUCTION STORMWATER MANAGEMENT FOR "WHITE OAK SEWER INTERCEPTOR"
POST CONSTRUCTION STORMWATER MANAGEMENT PLAN FOR "WHITE OAK SEWER INTERCEPTOR" Located in Newberry Township, York County March 21, 2008 Prepared by: Mellott Engineering, Inc. 7500 Devonshire Heights Road
More informationPreliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:
Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME: General Information: 1. Completed application signed by the owner, review fee, one set of
More informationTentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total
HARLEM RIVER, EAST RIVER AND WESTERN LONG ISLAND SOUND PLANNING REGION Flushing Bay and Creek Ecosystem Restoration Source Feasibility Study Background Study Resolution (1994), Reconnaissance Report (1996),
More informationRiver Corridor Overlay Zone (RCOZ) Article 5
River Corridor Overlay Zone (RCOZ) Article 5 The site is in one of two designated districts. The first is the CBD (central business district) River District, which recognizes the urban character and unique
More informationJOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana
JOINT PUBLIC NOTICE 26 June 2017 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services 7400
More informationCITY OF KELOWNA MEMORANDUM. Date: June 20, 2001 File No.: Z City Manager Planning and Development Services Department
CITY OF KELOWNA MEMORANDUM Date: June 20, 2001 File No.: Z00-1033 To: From: City Manager Planning and Development Services Department Subject: APPLICATION NO. Z00-1033 OWNER: ELDORADO RANCH LTD. AT: JIM
More informationPLANNING REPORT CITY OF EAGAN. APPLICANT: Janet Manley HEARING DATE: August 22, PROPERTY OWNER: Janet Manley APPLICATION DATE: July 19, 2017
PLANNING REPORT CITY OF EAGAN REPORT DATE: August 16, 2017 CASE: 36-PS-03-04-17 APPLICANT: Janet Manley HEARING DATE: PROPERTY OWNER: Janet Manley APPLICATION DATE: July 19, 2017 REQUEST: Rezoning and
More informationSlow it, Spread it, Sink it using Green Stormwater Infrastructure
Milly Archer Water Resources Coordinator Becky Tharp Green Infrastructure Collaborative Slow it, Spread it, Sink it using Green Stormwater Infrastructure Overview Defining LID and GSI Hydrology and impacts
More information16-198/ W16-18 Erosion Control, Wetland Protection, Waterbody Crossings & Structures, & Stormwater Management Irwin Jacobs ity of Orono
Permit Application No.: 16-198/ W16-18 Rules: Erosion Control, Wetland Protection, Waterbody Crossings & Structures, & Stormwater Management Applicant: Irwin Jacobs/ City of Orono Received:4/26/2016 Project:
More informationPennsy Greenway Trail
Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad
More informationSTREAM BUFFER PROTECTION AND MANAGEMENT
ORDINANCE NO. 753 AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF PLEASANT HILL, IOWA 1998, BY ESTABLISHIING CHAPTER 104, STREAM BUFFER PROTECTION AND MANAGEMENT Be it enacted by the City of
More informationEnvironment and Natural Resources Trust Fund 2009 Phase 2 Request for Proposals (RFP)
Environment and Natural Resources Trust Fund 2009 Phase 2 Request for Proposals (RFP) LCCMR ID: 049B1 Project Title: Preventing Nonpoint Pollution in Cannon, Rum, Mississippi Rivers Total Project Budget:
More informationSoil Erosion and Sediment Control
PDHonline Course C188 (3 PDH) Soil Erosion and Sediment Control Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
More informationTechnical Memorandum 5
Technical Memorandum 5 Environmental Resources August 2015 PREPARED BY AECOM Table of Contents Introduction... 3 Natural Features... 6 Watersheds... 6 Rivers, Lakes, Creeks... 6 Wetlands... 8 Floodplains...
More informationErosion & Sediment Control Plan Application Form & Checklist
Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:
More informationNon-Metallic Mining Reclamation Checklist
Eau Claire County DEPARTMENT OF PLANNING AND DEVELOPMENT Eau Claire County Courthouse, Rm. 1510 721 Oxford Avenue Eau Claire, Wisconsin 54703-5481 (715) 839-4741 f Housing & Community Development 839-6240
More informationBLACK CREEK VALLEY CONNECTION SIGNIFICANT WETLAND CONNECTION PROPOSED OFFSITE NATURAL AREAS MANAGEMENT STRATEGY BLACK CREEK WATERSHED
BLACK CREEK VALLEY V:\01609\active\2001 Active Projects\1100-1199\G1188\graphics\GIS\MXD\_Final Draft Sept 2008\MXD\Section_7\62601188_Fig7-1_ProposedNaturalAreasMngmtStrategyBCWSNorth_28Nov08_MC.mxd HIGHWAY
More informationMendota Heights 2040 Comprehensive Plan Draft Vers
4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs
More informationNortheast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session
Manning Freeway to Whitemud Drive Welcome to this Construction Information Session Purpose To inform interested residents and businesses about the plans accommodation. Background: The Government of Alberta
More informationPreventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL PROTECTION
More informationRed Fox Commercial Outline Plan
Red Fox Commercial Outline Plan City of Cold Lake, Alberta Prepared by Durrance Projects Ltd and Ross W. Sharp & Associates Ltd October 2014 Rupert 1 Table of Contents 1. PURPOSE...3 1.1. Location...4
More informationOverall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.
Overall Map Summit Chicago Bloomington-Normal Lincoln New Station Planned New Station Planned Dwight Pontiac Joliet Pedestrian overpass and second platform planned Higher speed service began in this section
More informationFEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT
FIELD INSPECTION REPORT Date September 19, 2018 Project Northern Natural Gas Company (Northern) Cedar Station Upgrade Project Dakota County, Minnesota Authority: Section 7(c) Personnel FERC Staff: Company
More informationChapter 3 Site Planning and Low Impact Development
CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),
More informationCity of Shady Cove Riparian Ordinance Ordinance XXX
1 Updated October 8, 2015 City of Shady Cove Riparian Ordinance Ordinance XXX This language is to be located in Chapter 155 of the Shady Cove Code of Ordinances. This will affect property inside city limits,
More informationStormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division
Stormwater Regulations & Considerations Morse Study Area Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations Development Considerations Floodplain
More informationPennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose
Pennsylvania Stormwater Best Management Practices Manual Chapter 1 Introduction and Purpose Chapter 1 Introduction and Purpose 1.1 Purpose of this Manual 1 1.2 How to Use this Manual...1 1.3 Overview
More informationNorthern Branch Corridor SDEIS March 2017
Northern Branch Corridor SDEIS March 2017 15. 15.1. Chapter Overview 15.1.1. Introduction This chapter discusses changes to the Preferred Alternative resulting in the potential for project improvements
More informationWETLAND SOD u Bare Root Wetland Plants u Deep Rooted Willows u Coir Logs u Native Trees & Shrubs u Habitat Islands u Custom Growing
WETLAND SOD u Bare Root Wetland Plants u Deep Rooted Willows u Coir Logs u Native Trees & Shrubs u Habitat Islands u Custom Growing 2009 PROJECT HIGHLIGHTS The following 10 projects highlight the interesting
More informationDecision Notice. Proposed Action
Decision Notice Paving Weld County Road 105 USDA Forest Service Arapaho and Roosevelt National Forest and Pawnee National Grassland Pawnee National Grassland Ranger District Weld County, Colorado November
More informationSt. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013
St. Croix County Shoreland Overlay Zoning Districts Public Hearing Community Development Committee December 19, 2013 Timeline CDC Review October 17 Public Information Meeting October 29 (6:00-8:00 pm)
More informationGloucester County PLAN SUBMITTER'S CHECKLIST
Page 1 of 9 Gloucester County PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and please reference the plan sheets/pages where the information may be found,
More informationMEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION
MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION 410-728-2900 Fax: 410-728-3160 www.rkk.com To: From: CC: U.S. Fish and Wildlife Service, Pennsylvania Fish and Boat Commission Jennifer A Ottenberg Miller,
More informationSTREAM BUFFERS
88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve