6. Drawing E29: Replace E29 with attached RE29, provided in Attachment #1.
|
|
- Rudolf Daniels
- 6 years ago
- Views:
Transcription
1
2 Section Process Control Panels and Hardware: ) Paragraph.05.M.7.A Replace Ruckus Zone Director 00 Controller with Ruckus Zone Director 000 Controller. ) Paragraph.05.M.7.b Add Qty. 7 ) Paragraph.05.M.7.c Add Qty. DRAWINGS. Drawing S: Revise Construction Note # to read: 4 THICK CONCRETE MAT SLAB FOOTING REINFORCE LEVEL SLAB AT ELEVATION 95-9 W/ 9 o/c EACH WAY TOP & BOTTOM SEE DETAIL /S FOR REINFG AT SLOPED PORTION OF SLAB.. Drawing A4.0: Replace note to Window Types, Detail E with the following: Window for chlorine room shall be -inch insulated glass with both lites/sides to be ASTM C7 laminated architectural safety flat glass.. Drawing E4: Replace E4 with attached RE4, provided in Attachment #. 4. Drawing RE: a. Clarification: i. ACP-0 shall be a single door controller for Door 0-, ACP-0 shall be a single door controller for Door E09-, and ACP-0 shall be a single door controller for Door E07. ii. Add a single door controller to Door 0- (ACP-04) and Door 07- (ACP-05). iii. Electrical Contractor shall follow Note 8 for the additional ACP s. iv. All ACP s shall be mounted above each individual door in lieu of J-box per Detail 4/E. b. Replace Note 0 with the following: i. Electrical Contractor shall coordinate Access Control System component installation with Access Control System Contractor. See Detail 4/E for conduit routing from ACP mounted above door to peripheral devices. Door 0 shall have () ¾ RSC from door position switches (one per door wired in series) to ACP-0. Door 07- shall have () ¾ RCS from door position switch to ACP Drawing E8: Elevation /E8 Delete the 0 vertical MCC section containing the text House H0 Pump VFD and revise both sludge pump sections to be across the line starters. 6. Drawing E9: Replace E9 with attached RE9, provided in Attachment #. 7. Drawing E6: Revise panel L5 Main breaker to be 60A/P. 8. Drawing RIC: New Town WTP Phase Expansion September 4, 04 Addendum No. Page Project No. P
3 a. Replace NWP-0 Patch Panel A with NWP-0 Patch Panel C, provided in Attachment #. 9. Drawing RIC4: a. Replace NWP-0 Patch Panel B with NWP-0 Patch Panel A, provided in Attachment #. b. Replace NWP-0 Patch Panel C with NWP-0 Patch Panel B, provided in Attachment #. 0. Drawing RIC45: a. Replace Rack 0, Slot ENBT with 756-ENT b. Replace Rack 0, Slot 756-ENBT with 756-ENT. Drawing RIC46: a. Replace Rack, Slot ENBT with 756-ENT. Drawing RIC48: a. Replace MCP-0 IO Schedule with MCP-0 IO Schedule, provided in Attachment #. END OF ADDENDUM NO. New Town WTP Phase Expansion September 4, 04 Addendum No. Page Project No. P
4 Attachment No. Addendum Drawings New Town WTP Phase Expansion September 4, 04 Attachment No. of Project No. P
5 REVISION AES PROJECT: P DESCRIPTION BY MAIN BREAKER 5 MOTOR STARTERS WELL # VFD 5'-0'' MINIMUM SPACING BETWEEN RODS #/0 BARE STRANDED COPPER (TYP.) WELL # VFD WELL # VFD 5/8''X0' COPPER-CLAD STEEL GROUND ROD WITH TOP AT 8'' BELOW GRADE, TYPICAL OF TWO GENERAL NOTES. SEE SHEET E FOR GENERAL NOTES. DEMOLITION NOTES CONSTRUCTION NOTES 4 5 DISCONNECT AND REMOVE THE () VFDS FROM THE EXISTING MCC AND PROVIDE NEW ONCE THE NEW WELL IS INSTALLED AND OPERATIONAL. SEE ONE-LINE DIAGRAM FOR DETAILS. EXISTING MCC SECTIONS CONTAINING WELL PUMP VFDS. VFD SECTIONS ARE TO BE REPLACED. SEE ONE-LINE FOR DETAILS. FURNISH NEW WALL MOUNTED NEMA ENCLOSURE HOUSING A NEW VFD. SEE ONE-LINE FOR DETAILS. ROUTE COMMUNICATIONS FROM NEW VFDS TO EXISTING WELL CONTROL PANEL. SEE ONE-LINE FOR DETAILS. ROUTE -/C-#6 SHIELDED SIGNAL IN () /4'' RSC FROM TT-908 TO WCP-0. INSTALL NEW BREAKER TO FEED WELL PUMP VFD 4 IN SECTION #. WATER TREATMENT PLANT EXPANSION CITY OF NEW TOWN, NORTH DAKOTA ~ ~ /'' CONCRETE HOUSEKEEPING PAD EXISTING ALLEN-BRADLEY CENTERLINE MCC CONDUIT INTO FLOOR SLAB K:\New Town\P ATEC New Town WTP Expansion\040 Final Design\Drawings\06-Electrical\Addendum No. \E-Well House Floor Plan.dwg UNDERGROUND SIGNAL AND CONTROL CIRCUITRY TO WASTEWATER RECOVERY BASIN JUNCTION BOX ~ ~ ~ RE4 WELL CONTROL PANEL WCP-0 UNDERGROUND FIBER OPTIC TO MAIN CONTROL PANEL MCP-0 TT TT MPZ WELL HOUSE (VFD BUILDING) PLAN " 0 ' ' ' 4' 5' N O R T H 5 RE4 EXISTING WELL MCC ADDENDUM NO. WELL HOUSE BUILDING PLAN DATE: DRWN BY: CHKD BY: PROJECT NO: SHEET: OF: 9/5/04 PGM CDH M08 RE4 --- Advanced Engineering and Environmental Services, Inc. PO Box 0 Dickinson, ND 5860 (t)
6 REVISION AES PROJECT: P EXISTING MOTOR CONTROL CENTER (MCC) (PARTIAL) NEW MCC MOUNTED VFDS DESCRIPTION BY 600A, Ø, W W/GROUND, 4KAIC EXISTING MCC 4 USE EXISTING CIRCUITRY -5% LINE REACTOR OUT DV/DT FILTER IN 00A/P MCP 6-PULSE VARIABLE FREQUENCY DRIVE (VFD) (6 9 ) 070A ENET COOLING FANS USE EXISTING CIRCUITRY -5% LINE REACTOR OUT DV/DT FILTER IN 00A/P MCP 6-PULSE VARIABLE FREQUENCY DRIVE (VFD) (6 9 ) 070B ENET COOLING FANS USE EXISTING CIRCUITRY -5% LINE REACTOR OUT DV/DT FILTER IN 00A/P MCP 6-PULSE VARIABLE FREQUENCY DRIVE (VFD) (6 9 ) 070C ENET COOLING FANS ~ 00A/P NEW WELL PUMP 4 VFD GENERAL NOTES. SEE SHEET E FOR GENERAL NOTES. CONSTRUCTION NOTES 4 5 NEW LINE REACTOR PROVIDED AS PART OF NEW MCC SECTION CONTAINING THE NEW WELL PUMP VFD. DISCONNECT EXISTING CIRCUITRY AND REMOVE EXISTING MCC SECTION CONTAINING ALLEN BRADLEY 6 VFD. FURNISH AND INSTALL ALLEN BRADLEY MCC SECTION CONTAINING POWERFLEX 75 IN THE LOCATION OF THE PREVIOUSLY REMOVED MCC SECTION. RECONNECT ALL EXISTING CONTROL CIRCUITRY AND INDICATING LIGHTS TO THE NEW VFD. NEW DV/DT FILTER PROVIDED INTEGRAL WITH NEW MCC SECTION CONTAINING THE NEW WELL PUMP VFD. EXTEND MCC WITH () NEW MCC SECTIONS MATCHING LOCATIONS OF REMOVED EXISTING MCC. FURNISH AND INSTALL A NEW 00A/P THERMAL MAGNETIC MOLDED CASE 65 KAIC CIRCUIT BREAKER IN A SPARE MCC BUCKET (-SPACE FACTOR) TO FEED THE NEW WELL #4 WALL MOUNTED VFD. WATER TREATMENT PLANT EXPANSION CITY OF NEW TOWN, NORTH DAKOTA 40 EXISTING WELL PUMP # TO WCP-0 40 EXISTING WELL PUMP # TO WCP-0 40 EXISTING WELL PUMP # TO WCP-0-5% LINE REACTOR IN NEW VFD AND LINE REACTOR MOUNTED INSIDE OF A WALL MOUNTED NEMA ENCLOSURE K:\New Town\P ATEC New Town WTP Expansion\040 Final Design\Drawings\06-Electrical\Addendum No. \E-One Line Diagrams.dwg RE9 NEW DV/DT FILTER IN A NEMA ENCLOSURE MOUNTED ON FLOOR UNDER THE WALL MOUNTED VFD SUBMERSIBLE WELL PITLESS ADAPTER UNIT SUBMERSIBLE MANUFACTURER CABLE PARTIAL EXISTING MOTOR CONTROL CENTER (MCC-) DEMOLITION AND IMPROVEMENTS ONE-LINE DIAGRAM SCALE: NONE 40 OUT DV/DT FILTER 05 NEW WELL PUMP #4 6-PULSE VARIABLE FREQUENCY DRIVE (VFD) (6 9 ) TO WCP-0 05 DRAWDOWN LEVEL SENSOR 07 ENET TO WCP-0 ADDENDUM NO. EXISTING MOTOR CONTROL CENTER (MCC-) ONE-LINE DIAGRAM DATE: DRWN BY: CHKD BY: PROJECT NO: SHEET: OF: 9/5/04 PGM CDH M08 Advanced Engineering and Environmental Services, Inc. PO Box 0 Dickinson, ND 5860 (t) RE9 ---
7 Attachment No. Addendum I&C Schedules New Town WTP Phase Expansion September 4, 04 Attachment No. of Project No. P
8 NWP-0 - PATCH PANEL A PATCH PORT TAGNAME DESCRIPTION A MCP-0 MASTER CONTROL PANEL NO. A MCP-0 MASTER CONTROL PANEL NO. A MCP-0 MASTER CONTROL PANEL NO. A4 MCP-0 MASTER CONTROL PANEL NO. A5 MCP-0 MASTER CONTROL PANEL NO. A6 MCP-0 MASTER CONTROL PANEL NO. A7 IOP-0 FILTER CONTROL PANEL NO. A8 IOP-0 FILTER CONTROL PANEL NO. A9 IOP-0 FILTER CONTROL PANEL NO. A0 IOP-0 FILTER CONTROL PANEL NO. A IOP-0 FILTER CONTROL PANEL NO. A IOP-0 FILTER CONTROL PANEL NO. A IOP-0 FILTER CONTROL PANEL NO. A4 IOP-0 FILTER CONTROL PANEL NO. A5 CFP-0 CHEMICAL FEED PANEL A6 CFP-0 CHEMICAL FEED PANEL A7 CFP-0 CHEMICAL FEED PANEL A8 CFP-0 CHEMICAL FEED PANEL A9 SSCP- RDP SLAKER CONTROL PANEL NO. A0 SSCP- RDP SLAKER CONTROL PANEL NO. A WD-0 WATER DEPOT COMPUTROL A M-0 AERATOR BLOWER A MCC SPARE VFD A4 M-04 SCB SCRAPER A5 M-0 SCB MIXER A6 M-705 SLUDGE OVERFLOW PUMP A7 M-607 HIGH SERVICE PUMP NO. A8 M-70 SLUDGE PIT PUMP NO. A9 M-704 SLUDGE PIT PUMP NO. A0 CAM-0 EAST ENTRANCE VESTIBULE CAMERA A CAM-0 CHEMICAL FEED CAMERA A CAM-0 NEW PUMP ROOM CAMERA A CAM-04 NORTH ENTRY CAMERA A4 CAM-05 EXISTING FILTER PIPE GALLERY CAMERA A5 CAM-06 EXISTING PUMP ROOM CAMERA A6 CAM-07 CHLORINE ROOM CAMERA A7 CAM-08 NORTH EAST CORNER OUTSIDE CAMERA A8 CAM-09 SOUTH EAST PTZ CAMERA A9 CAM-0 CONTROL ROOM CAMERA A40 CAM- FILTERS 4, 5, AND 6 CAMERA A4 CAM- CONTROL ROOM A4 WAP-0 NEW PIPE GALLERY WAP A4 WAP-0 NEW PUMP ROOM WAP A44 WAP-0 NORTH ENTRY WAP A45 WAP-04 EXISTING PIPE GALLERY WAP A46 WAP-05 EXISTING PUMP ROOM WAP A47 WAP-06 CONTROL ROOM WAP A48 WAP-07 NEW FILTER AREA WAP
9 NWP-0 - PATCH PANEL B PATCH PORT TAGNAME DESCRIPTION B - LOWER LEVEL NORTH DATA/PHONE B - LOWER LEVEL NORTH DATA/PHONE B - LOWER LEVEL PIPE GALLERA DATA/PHONE B4 - LOWER LEVEL PIPE GALLERA DATA/PHONE B5 - PUMP ROOM EAST DATA/PHONE B6 - PUMP ROOM EAST DATA/PHONE B7 - LOWER LEVEL MECHANICAL ROOM DATA/PHONE B8 - LOWER LEVEL MECHANICAL ROOM DATA/PHONE B9 - PUMP ROOM WEST DATA/PHONE B0 - PUMP ROOM WEST DATA/PHONE B - OPERATIONS LEVEL EAST DATA/PHONE B - OPERATIONS LEVEL EAST DATA/PHONE B - OPERATIONS LEVEL ELECTRICAL ROOM DATA/PHONE B4 - OPERATIONS LEVEL ELECTRICAL ROOM DATA/PHONE B5 - CONTROL ROOM EAST NO. DATA/PHONE B6 - CONTROL ROOM EAST NO. DATA/PHONE B7 - CONTROL ROOM EAST NO. DATA/PHONE B8 - CONTROL ROOM EAST NO. DATA/PHONE B9 - CONTROL ROOM EAST NO. DATA/PHONE B0 - CONTROL ROOM EAST NO. DATA/PHONE B - CONTROL ROOM EAST NO. 4 DATA/PHONE B - CONTROL ROOM EAST NO. 4 DATA/PHONE B - CONTROL ROOM SOUTH DATA/PHONE B4 - CONTROL ROOM SOUTH DATA/PHONE B5 - CONTROL ROOM WEST NO. DATA/PHONE B6 - CONTROL ROOM WEST NO. DATA/PHONE B7 - CONTROL ROOM WEST NO. DATA/PHONE B8 - CONTROL ROOM WEST NO. DATA/PHONE B9 - CONTROL ROOM WEST NO. DATA/PHONE B0 - CONTROL ROOM WEST NO. DATA/PHONE B - CONTROL ROOM WEST NO. 4 DATA/PHONE B - CONTROL ROOM WEST NO. 4 DATA/PHONE B - CONTROL ROOM NORTH NO. DATA/PHONE B4 - CONTROL ROOM NORTH NO. DATA/PHONE B5 - CONTROL ROOM NORTH NO. DATA/PHONE B6 - CONTROL ROOM NORTH NO. DATA/PHONE B7 - NEW FILTER AREA WEST DATA/PHONE B8 - NEW FILTER AREA WEST DATA/PHONE B9 - SPARE B40 - SPARE B4 - SPARE B4 - SPARE B4 - SPARE B44 - SPARE B45 - SPARE B46 - SPARE B47 - SPARE B48 - SPARE
10 NWP-0 - PATCH PANEL C PATCH PORT TAGNAME DESCRIPTION C WAP-0 LIME FEED AREA WAP C WAP-0 CHEMICAL FEED AREA WAP C WAP-0 PUMP ROOM NO. WAP C4 WAP-04 PUMP ROOM NO. WAP C5 WAP-05 LIME BATCH AREA WAP C6 WAP-06 FILTER NO. 4-6 AREA WAP C7 WAP-07 FILTER NO. - AREA WAP C8 WAP-08 CONTROL ROOM WAP C9 ACP-0 ACCESS CONTROL PANEL C0 ACP-0 ACCESS CONTROL PANEL C ACP-0 ACCESS CONTROL PANEL C ACP-04 ACCESS CONTROL PANEL 4 C ACP-05 ACCESS CONTROL PANEL 5 C4 - SPARE C5 - SPARE C6 - SPARE C7 - SPARE C8 - SPARE C9 - SPARE C0 - SPARE C - SPARE C - SPARE C - SPARE C4 - SPARE C5 - SPARE C6 - SPARE C7 - SPARE C8 - SPARE C9 - SPARE C0 - SPARE C - SPARE C - SPARE C - SPARE C4 - SPARE C5 - SPARE C6 - SPARE C7 - SPARE C8 - SPARE C9 - SPARE C40 - SPARE C4 - SPARE C4 - SPARE C4 - CONTROL ROOM TV NO. C44 - CONTROL ROOM TV NO. C45 - TO TELEPHONE BOARD C46 - TO TELEPHONE BOARD C47 - TO TELEPHONE BOARD C48 - TO TELEPHONE BOARD
11 NEW MCP-0 IO SCHEDULE Rack / Slot Point Type Tagname Description EGU Lo EGU Hi EGU Tag Signal RACK 0 POWER SUPPLY 794-PS RACK 0 ETHERNET/IP COMMUNICATIONS MODULE 794-AENT RACK 0 0 AI GEN-980.LI GENERATOR LEVEL 0 GAL 4-0mA SLOT 0 AI TT-MCP-0.TI MCC ROOM AMBIENT TEMPERATURE 0 50 F 4-0mA 794-IF4I AI SPARE 4-0mA AI SPARE 4-0mA RACK 0 0 DI GEN-980.YN GENERATOR IN AUTO OFF AUTO 0 VAC SLOT DI GEN-980.MN GENERATOR RUNNING OFF RUNNING 0 VAC 794-IA8I DI GEN-980.XN GENERATOR PRE-WARNING ALARM NORMAL ALARM 0 VAC DI GEN-980.XA GENERATOR SHUTDOWN ALARM NORMAL ALARM 0 VAC 4 DI GEN-980.LL GENERATOR LOW FUEL ALARM NORMAL 0 VAC 5 DI GEN-980.YA GENERATOR RUPTURE BASIN ALARM NORMAL 0 VAC 6 DI GEN-980.EA GENERATOR BATTERY CHARGER FAULT NORMAL ALARM 0 VAC 7 DI GEN-980.ZL GENERATOR BREAKER TRIP NORMAL ALARM 0 VAC RACK 0 0 DI DS-980.ZN GENERATOR INTRUSION OPEN CLOSED 0 VAC SLOT DI BRK-98.ZL MCC GENERATOR BREAKER TRIP NORMAL ALARM 0 VAC 794-IA8I DI ATS-98.JH UTILITY POWER AVAILABLE OFF ON 0 VAC DI ATS-98.JL GENERATOR POWER AVAILABLE OFF ON 0 VAC 4 DI ATS-98.ZH ATS CONNECTED TO UTILITY OPEN CLOSED 0 VAC 5 DI ATS-98.ZL ATS CONNECTED TO GENERATOR OPEN CLOSED 0 VAC 6 DI PM-98.JF POWER MONITOR PHASE FAILURE ALARM NORMAL 0 VAC 7 DI SPARE 0 VAC RACK 0 0 DI SPD-985.JF MAIN SWITCH GEAR - SPD FAULT ALARM NORMAL 0 VAC SLOT DI BRK-986.ZL MAIN SWITCH GEAR - BREAKER TRIP ALARM NORMAL 0 VAC 794-IA8I DI CONTROL POWER AVAILABLE ALARM NORMAL 0 VAC DI UPS POWER AVAILABLE ALARM NORMAL 0 VAC 4 DI CONTROL PANEL TVSS FAILURE ALARM NORMAL 0 VAC 5 DI SPARE 0 VAC 6 DI SPARE 0 VAC 7 DI SPARE 0 VAC RACK 0 0 DI SWG TVSS FAIL ALARM NORMAL 0 VAC SLOT 4 DI MCC TVSS FAIL ALARM NORMAL 0 VAC 794-IA8I DI MCC 4 TVSS FAIL ALARM NORMAL 0 VAC DI ACCESS CONTROL GENERAL ALARM ALARM NORMAL 0 VAC 4 DI SPARE 0 VAC 5 DI SPARE 0 VAC 6 DI SPARE 0 VAC 7 DI SPARE 0 VAC RACK 0 0 DO GEN-980.MY GENERATOR REQUIRED ALARM NORMAL RELAY SLOT 5 DO SPARE RELAY 794-OA8I DO SPARE RELAY DO SPARE RELAY 4 DO SPARE RELAY 5 DO SPARE RELAY 6 DO SPARE RELAY 7 DO SPARE RELAY
M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings
1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL
More informationPS12 CITY OF TERRE HAUTE VIGO COUNTY, INDIANA DRAWING NO. EXISTING AND NEW STRUCTURE DATA TABLE JW, CM. No. DATE DESCRIPTION REVISED BY JLH ACS
C JW, CM EXISTING AND NEW STRUCTURE DATA TABLE PS12 #5933 NEW OUTFALL STRUCTURE #1 1"=60' EXISTING OPENING THROUGH TREE LINE ( SEWER AND OUTFALL STRUCTURE SHALL BE INSTALLED AT THIS LOCATION TO AVOID ANY
More informationSECTION 4000 LIFT STATIONS
SECTION 4000 LIFT STATIONS LIFT STATIONS PART 1 GENERAL 1.01 Section Summary A. Lift station control panels. B. Related requirements include those established in the General Requirements Division 1, Division
More informationElectrical Design Guidelines Table of Contents
C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6
More informationR E C T I F I E R I N V E R T E R C O N V E R T E R SB7
SCR Battery Charger Product Specifications Description The is RIC Electronics premiere SCR battery charger/rectifier. The provides power to critical DC loads through a wide range of outputs and is engineered
More informationSECTION GENERATOR PARALLELING CONTROLS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable
More informationHMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3
HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California 95833 September 15, 2016 Woodland Joint Unified School District Spring Lake Area Elementary School HMC No. 3535003.000 DSA Appl.
More informationENGINE GENERATORS AND ACCESSORIES
ENGINE GENERATORS AND ACCESSORIES GENERAL INFORMATION 1.1 This section applies to engine generators and accessories. DESIGN REQUIREMENTS 2.1 The Engineer of Record will consult with the University s Engineering
More informationPLATTEVILLE MIDDLE SCHOOL
Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S
Revised 04/13/16 SPECIFICATIONS - DETAILED PROVISIONS Section 17210 - Magnetic Flowmeters C O N T E N T S PART 1 - GENERAL... 1 1.01 GENERAL REQUIREMENTS... 1 1.02 PROJECT SPECIFIC REQUIREMENTS... 1 1.03
More informationTT /97. Features INSTALLATION INSTRUCTIONS. Horn. Lamps
TT-1023 1/97 INSTALLATION INSTRUCTIONS Original Issue Date: 2/94 Model: 6-2000 kw Market: Industrial Subject: Flush- or Surface-Mount Remote Annunciator Kits PA-293991 and PA-293991-SD The remote annunciator
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC
More informationSAN ANTONIO WATER SYSTEM DSP WATER PRODUCTION FACILITY UPGRADES PROJECT SAWS JOB NUMBER ADDENDUM NO. 1 September 23, 2013
SAN ANTONIO WATER SYSTEM DSP WATER PRODUCTION FACILITY UPGRADES PROJECT SAWS JOB NUMBER 12-6103 To Respondent of Record: ADDENDUM NO. 1 September 23, 2013 This addendum, applicable to work referenced above,
More informationElement D Services Electrical
PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.
More informationCT CABINET AND UTILITY METERING WELL AND BOOSTER PUMP CONTROL 12"x12" WIREWAY 200A MCB 200A, 120/208V, 3Ø, 4W BOARD TVSS CIA ALARM 400A, DOUBLE-THROW SWITCH PORTABLE GENERATOR CONNECTION ENCLOSURE EXISTING
More informationINSTALLATION INSTRUCTIONS
TT-46 8/05 INSTALLATION INSTRUCTIONS Original Issue Date: 8/05 Model: Automatic Transfer Switches equipped with MPAC 500 Controls Market: ATS Subject: External Alarm Module (EAM) Kit GM38795-KP Introduction
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph
More informationCHAPTER 20 SERVICE EQUIPMENT
SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control
More information5U Compact System. Installation Manual V1.0. Manufactured by Enatel Ltd. 321 Tuam Street PO Box Christchurch New Zealand
5U Compact System Installation Manual V1.0 Manufactured by Enatel Ltd. 321 Tuam Street PO Box 22-333 Christchurch New Zealand Phone +64-3-366-4550 Fax +64-3-366-0884 Email sales@enatel.net www.enatel.net
More informationEBC 10 Fan Control USA CAN. Product Information. ... Chapter 1+2. Mechanical Installation. ... Chapter 3. Electrical Installation. ...
Installation & Operating Manual EBC 10 Fan Control USA CAN Product Information... Chapter 1+2 Mechanical Installation... Chapter 3 Electrical Installation... Chapter 4 Start Up and Configuration... Chapter
More informationTONY ESPOSITO LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY
LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY 1 1A. POWER DISTRIBUTION SYSTEMS a. EXECUTIVE SUMMARY b. SUMMARY DESCRIPTION
More informationPort of Portland Conveying Equipment Guidelines
Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate
More informationReplacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus
ADDENDUM FORM INVITATION TO TENDER: 2016-067 ADDENDUM NO: 1 DATE ISSUED: June 23, 2016 ISSUED BY: Monty Thibeault DESCRIPTION: Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus
More information350 Pine Street, Suite 720 Edison Plaza Beaumont, TX Fax
350 Pine Street, Suite 720 Edison Plaza Beaumont, TX 77701 409.866.7196 409.866.1745 Fax Project: Addendum No. 1 FIRE STATION #2 NORTH END CITY OF BEAUMONT 4990 HELBIG ROAD, BEAUMONT, TEXAS BID PROPOSAL:
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018
SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationIDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems
SECTION 26 05 54 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Labels. 3. Wire markers. 4. Conduit markers. 5. Permanent Marking. 6. Underground
More informationSECTION ISOLATED POWER SYSTEMS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to
More informationDivision 26 ELECTRICAL TABLE OF CONTENTS
Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND
More information.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.
Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code
More informationMyFAST 16.0 Plus. Layout. Influent See note 4
NOTES: 1. The air supply line into the FST unit must be secured so as to prevent damage from pipe vibration. 2. The units are supplied with 3" semi-flexible airline connections with stainless steel MPT
More informationFRONT END ENCLOSURE (FEE) - ROOM DATA SHEET
ROOM DATA SHEETS FACILITY COMPONENT WBS and System Managers: Richard Bionta/ John Arthur FRONT END ENCLOSURE (FEE) - ROOM DATA SHEET Name of Building LCLS Organization or Department SLAC, Stanford University
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as
More informationCITY OF MEXICO BEACH REQUEST FOR QUOTES: LIFT STATION PANELS REPLACEMENT
CITY OF MEXICO BEACH REQUEST FOR QUOTES: LIFT STATION PANELS REPLACEMENT The City of Mexico Beach is requesting quotes for replacement of 18 lift station control panels. The lift stations range from 2
More informationC. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.
SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers
More informationSECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationMolded Case Circuit Breakers, Bulletin 140G
ROCKWELL AUTOMATION PROCUREMENT SPECIFICATION PROCUREMENT SPECIFICATION Molded Case Circuit Breakers Bulletin 140G NOTICE: The specification guidelines in this document are intended to aid in the specification
More informationB. Section Transfer Switches: Automatic transfer switch.
SECTION 263213 - ENGINE GENERATORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Packaged engine generator set. B. Exhaust silencer and fittings. C. Remote control panel. D. Battery and charger. E. Weatherproof
More informationPowerWave 2 Busway System
PowerWave 2 Busway System Guide Specifications (Revision 004, 11/17/2017) 1 GENERAL 1.1 Summary This specification covers the electrical characteristics and general requirements for a continuous opening,
More informationMyFAST 8.0 Plus. Layout
Influent from a prescreening device 1618 SaniTEE Screens emergency overlfow from Sludge Holding Zone Sludge Collection 1015 MIN 400 MIN Lateral Brace by others 246.4 MIN 97 MIN NOTES: 1. The air supply
More informationPowerCommand FT-10 Network LONWORKS System Annunciator
PowerCommand FT-10 Network LONWORKS System Annunciator PowerCommand Common Alarm Genset Supplying Load Genset Running Not In Auto High Battery Voltage Low Battery Voltage Charger AC Failure Fail To Start
More informationTYPE POS Oil Shield Sump Pump
Type POS Oil Shield Provides protection for the environment by preventing oil products from entering sewer systems, environmentally Sensitive River and waterways, while protecting equipment and areas from
More informationLINETRAXX RCMA420. Residual current monitor for monitoring AC, DC and pulsed DC currents in TN and TT systems
LINETRAXX RCMA420 Residual current monitor for monitoring AC, DC and pulsed DC currents in TN and TT systems RCMA420_D00059_01_D_XXEN/06.2016 LINETRAXX RCMA420 Residual current monitor for monitoring AC,
More information20 Light Remote Annunciator
Light Remote Annunciator Owner s Manual Surface Mount Flush Mount 94-95- Standard Annunciator 94-, 94-95-, 95-4- 4- Annunciator w/remote Relay Panel 4-, 4-4-, 4-49-, 49-49-, 49- Time Multiplexed Annunciator
More informationSECTION INTRUSION DETECTION SYSTEM
SECTION 13845 INTRUSION DETECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete, operable, tested intrusion detection system, bearing Underwriters Laboratories (UL) mercantile listing
More informationPROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER
PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer --------------------------------------------------------------------------------------------------------------------------------------------
More informationIntroduction Consultant shall incorporate the material in the DSS into the project specifications.
DIVISION 16 - ELECTRICAL Section 16000 - General Discussion Introduction Consultant shall incorporate the material in the DSS into the project specifications. Refer any questions, clarifications regarding
More informationA. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR
September 2012, rev. 00 26 0553 Identification for Electrical Systems PART 1. GENERAL 1.01 Summary A. Section Includes: 1.02 Submittals 1. Identification for raceways. 2. Identification of power and control
More informationCARD ACCESS CONTROL SYSTEM
SECTION 13851 CARD ACCESS CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete, operable, tested, integrated proximity access control system, to operate on a proximity principle where
More informationPUMP CONTROL CENTER (PCC)
PART 1 SUMMARY A. In accordance with the plans and specifications, the Contractor shall provide and install a complete pre-fabricated, pre-tested ArcSafe Pump Control Center including all required equipment,
More informationRFP Addendum 2 March 31, 2016
RFP Addendum 2 March 31, 2016 For Best Value Procurement Option Three Security Upgrades Ph 1 UT Health Science Center SBC No. 540/013-04-2015 This Addendum forms a part of the Request for Proposals (RFP)
More informationIEEE Transformer Committee PC Distribution Transformer Monitoring - User
IEEE Transformer Committee PC57.167 Distribution Transformer Monitoring - User Mark Scarborough Electrical Engineering Consultant DuPont January 9, 2019 Transformer Types in DuPont Control power Dry-type
More informationTRANS ATLANTIC TRADING ENTERPRISE INC.
TA GLOBAL SOLUTIONS INDUSTRIAL COMMERCIAL RESIDENTIAL AUTOMATION +1 (416) 317-3325 +1 (647) 294-2594 www.transatinc.com info@transatinc.com ELECTRICAL BUSWAY DISTRIBUTION EQUIPMENT TRANSFORMERS CIRCUIT
More informationTHE FAIRWAYS of IRONHORSE
COMPUTER SERVICES, INC. LE CHAU CHAU LE COMPUTER SERVICES, INC. CHAU LE COMPUTER SERVICES, INC. EXTEND RED BRASS PIPE CONDUIT TO NEW WATER LEVEL LER NOTE: NOT ALL ITEMS ARE SHOWN ON SCHEMATIC; THEREFORE,
More informationA. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section.
SECTION 16770 PAGE 1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section. B. Division 16
More informationCALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.
CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. NAME OF TENDER: CONSTRUCT, DELIVER AND COMMISSION 3 (THREE) LIFT STATION ELECTRICAL LOCATION OF WORK: 3 Separate work sites in
More informationTechnical Data Submittal Documents
Project: Customer: Engineer: Pump Manufacturer: Technical Data Submittal Documents Model PD - FM Diesel Engine Driven Fire Pump Controller Contents: Data Sheets Dimensional Data Wiring Schematics Field
More informationFiber Optic Cable Fence Disturbance Sensor
Architectural & Engineering Specification for Fiber Optic Cable Fence Disturbance Sensor Purpose of document This document is intended to provide performance specifications and operational requirements
More informationSAFETY INFORMATION AND WARNINGS
This manual refers to the Model SST-3 control panel manufactured since October 31, 2013, which uses a universal (100 277 VAC; 50/60 Hz) power supply. Older units use a voltage-specific power supply and
More informationTHERMAL MANAGEMENT SOLUTIONS
Pipe Freeze Protection and Flow Maintenance ECW-GF, ECW-GF-DP Digital electronic controllers and remote display panel Fire Sprinkler System Freeze Protection ECW-GF with FTC-PSK pipe stand and power connection
More informationWall-Mount Preferred-Cutout Disconnects Hoffman WATERSHED Wall-Mount Disconnects
763.422.2600 Spec-00042 J763.422.2211 Wall-Mount Preferred-Cutout s Hoffman WATERSHED Wall-Mount s Wall-Mount Preferred-Cutout s Hoffman WATERSHED Wall-Mount s WATERSHED Enclosure, Type 4X INDUSTRY STANDARDS
More information7800 SERIES RM7888A Relay Module
7800 SERIES RM7888A Relay Module SPECIFICATION DATA FEATURES APPLICATION The Honeywell RM7888A Relay Module is a microprocessor-based integrated burner control for industrial process semi-automatically
More informationRevitalize Building Mechanical Systems (4619)
SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationNFPA Changes
Chapter 12, Circuits and Pathways Summary. Chapter 12, Circuits and Pathways, is a new chapter. It brings together requirements that were formerly found in SIG-FUN, Fundamentals of Fire Alarm Systems regarding
More informationPWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R
Region Project Page 1 PART 1 - GENERAL 1.1 REFERENCES.1 CAN/ULC-S524-2006, Standard for the Installation of Fire Alarm Systems..2 CAN/ULC-S525-2007, Audible Signal Device for Fire Alarm Systems..3 CAN/ULC-S526-2007,
More informationSCC Inc. TS Series. Technical Instructions. Document No. TS 5000 February 12, TS CE Combustion Enclosures with LMV3.
TS CE Combustion Enclosures with LMV3 February 12, 2019 Description TS CE series combustion enclosure with Siemens LMV3 linkageless controller sets the new standard for combustion control and monitoring
More informationSCC Inc. Master Panel. Specifications. Document No. TS 2010 February 11, Product Description. Sample Specification
February 11, 2019 Master Panel Product Description The Master Panel shall provide lead/lag control and time based, automatic rotation of up to eight (8) boilers, when used in conjunction with LMV3 or LMV5
More informationSECTION ENCLOSED CONTROLLERS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,
More informationRE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan
ADDENDUM NO. 2 RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan TO: All Bidders Gentlemen: You are hereby directed to make the following changes in the Project Manual and/or
More informationELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED
SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED
More informationPlease refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing
The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior
More informationInstallation Instructions. (Applicable to all front door models)
COOL CELL Passive Temperature Regulating Battery Enclosures Installation Instructions (Applicable to all front door models) CONTENTS 1. Safety Instructions 2. General Information 3. Cool Cell Description
More informationTS Series. Technical Instructions. Document No. TS-4000 June 25, TS-CE Combustion Enclosures with LMV5. Description
SCC Inc. TS Series TS-CE Combustion Enclosures with LMV5 June 25, 2018 Description TS-CE series combustion enclosure with Siemens LMV5 linkageless controller sets the standard for combustion control and
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationASSESSING THE HIDDEN DANGERS IN YOUR INDUSTRIAL CONTROL PANELS
Schneider Electric NEC 409.2 January 15, 2008 ASSESSING THE HIDDEN DANGERS IN YOUR INDUSTRIAL CONTROL PANELS by Grant Van Hemert, P.E., application engineer, Water and Wastewater Competency Center, Schneider
More information1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection
Technical Bulletin Arc Fault Monitor 4 Zones, 8 Sensors Features Four independent arc fault tripping zones 1 or 2 arc fault sensors per zone allowing up to 8 arc fault sensors per module Trip indication
More informationNovember 11, City of Sparks 215 S. 21 st St. Sparks, NV
November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of
More informationSINGLE CONVENIENCE OUTLET, WALL MOUNTED RECESSED +18" AFF
LUORESCENT STRIP SURACE/PENDANT MOUNTED ' X ' LUORESCENT RECESS MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT STRIP WALL MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT EMERGENCY STRIP SURACE/PENDANT
More informationSection PERIMETER SECURITY SYSTEMS
Section 28 16 43 PERIMETER SECURITY SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Provide and install a perimeter security system as herein specified for the purpose of detecting entry into a designated security
More informationProduct Specifications Dialog Room Controller* (*patent pending)
1 Product Specifications Dialog Room Controller* (*patent pending) 1. GENERAL 1.1. OVERVIEW 1.1.1. Provide a complete stand-alone, decentralized, low voltage, digital lighting control system for classrooms,
More informationTechnical Data. Approvals The 1-1/2 in. to 8 in. (DN40 to DN200) DV-5 Red-E Cabinets are UL Listed and C-UL Listed with the following system types:
Worldwide Contacts www.tyco-fire.com DV-5 Red-E Cabinet Integrated Preaction Fire Protection Package General Description The TYCO DV-5 Red-E Cabinet is a pre-assembled fire protection valve package enclosed
More informationSTATEMENT OF WORK. System Description:
STATEMENT OF WORK Scope of Work: To install a paging/sound system throughout the Rapid City Swim Center (RCSC). This work shall includes all labor, material equipment and related services necessary to
More informationTHERMAL MANAGEMENT SOLUTIONS
DIGITAL ELECTRONIC CONTROLLERS AND REMOTE DISPLAY PANEL ECW-GF with FTC-PSK pipe stand and power connection kit ECW-GF using RayClic power connection kit ECW-GF-DP remote display panel available only with
More informationDV-5 Red-E Cabinet Integrated Deluge Fire Protection Package. General Description. Technical Data. Page 1 of 6 AUGUST 2018 TFP1300. Worldwide Contacts
Worldwide Contacts www.tyco-fire.com DV-5 Red-E Cabinet Integrated Deluge Fire Protection Package General Description The TYCO DV-5 Red-E Cabinet is a pre-assembled fire protection valve package enclosed
More informationAS950 REFRIGERATED SAMPLERS
AS950 REFRIGERATED SAMPLERS Applications Wastewater Collections Industrial Pretreatment Environmental Monitoring Stormwater Sampling has never been this easy. The AS950 Refrigerated Sampler makes programming,
More information*************************************************************************** SECTION D50 ELECTRICAL 02/18
NAVFAC PTS-D50 (February 2018) -------------------------------- Preparing Activity: NAVFAC SUPERSEDING PTS D50 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION D50 ELECTRICAL 02/18 NOTE: This
More informationPage 1 of General
Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors
More informationHo-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)
Ho-Chunk Gaming POWER SYMBOLS X ELECTRICAL PANEL - REFER TO DRAWINGS FOR WIDTH AND PANEL SCHEDULES PANEL NAMING: XXP-#X: DENOTES PANEL FUNCTION: L = LIGHTING P = GENERAL POWER E = EMERGENCY S = OPTIONAL
More informationA. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.
SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:
More information631RF Amp Power Supply
631RF - 1.5 Amp Power Supply Modular Access Control Power Supply Field Selectable 12VDC or 24VDC Output - Standard Dual 12VDC and 24VDC Output - Optional Quality, Performance and Versatility The SDC 631RF
More informationHOME LOAD MANAGER INSTALLATION MANUAL Hardware Revision 1.4 & Higher
Micro Control Systems APPLICATION NOTE APP-006 5400-1 Division Drive Ft. Myers, FL 33905 USA (941)-694-0089 Fax (941) 694-0031 HOME LOAD MANAGER INSTALLATION MANUAL Hardware Revision 1.4 & Higher Revision
More informationChapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations...
Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6
More informationI P. Tough Starters for Tough Environments. Explosion Proof Starter. Ready to Install, Completely Wired and Assembled
I P Explosion Proof Starter 1Ø & 3Ø, 115~600VAC, 1 75HP START/STOP AND RESET PUSHBUTTONS ELECTRONIC MOTOR PROTECTION Tough Starters for Tough Environments Ready to Install, Completely Wired and Assembled
More informationAT10.1 Series Microprocessor-Controlled Float Battery Charger (single phase input)
STANDARD SAMPLE SPECIFICATION AT10.1 Series Microprocessor-Controlled Float Battery Charger (single phase input) A battery charger shall be furnished in accordance with the following specification: 1.0
More informationCONTROL PANEL INTERFACE ACTIVATE THE GENERATOR DISPLAY INTERFACE MENUS. Control Panel USING THE AUTO/OFF/MANUAL SWITCH
CONTROL PANEL INTERFACE USING THE AUTO/OFF/MANUAL SWITCH With the switch set to AUTO, the engine may crank and start at any time without warning. Such automatic starting occurs when utility power source
More informationABH BASIN HEATER CONTROLS PACKAGE. engineering data and specifications
BH BSIN HETER CONTROLS PCKGE engineering data and specifications BH Basin Heater Control Package 2 BH DVNCED BSIN HETER CONTROLS The Marley BH basin heater package controls the ON and OFF operation of
More informationFlexPS. Architectural & Engineering. Specification for FlexPS. Architectural/Engineering Specification for a
Architectural/Engineering Specification for a Fence-Mounted Perimeter Intrusion Detection System FlexPS Disclaimer Senstar, and the Senstar logo are registered trademarks, and FlexPS, Silver Network and
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT
More informationCITY OF WHITEHORSE SERVICING STANDARDS MANUAL SECTION 2 - CONSTRUCTION DESIGN CRITERIA SUB-SECTION 2.A SCADA STANDARDS.
CITY OF WHITEHORSE SERVICING STANDARDS MANUAL SECTION 2 - CONSTRUCTION DESIGN CRITERIA SUB-SECTION 2.A SCADA STANDARDS Table of Contents 2.A.1 SCADA Standards 2.5-2 2.A.1.1 Generators 2.5-2 2.A.1.2 Building
More informationCHAPTER SIX Automatic Gates
CHAPTER SIX Automatic Gates Contents: Steps to Obtain Permits Installation Requirements Electrical Requirements Gate Construction Knox Key Switch Placement and Installation Preemption Automatic Gate Signage
More informationWorldwide Contacts.
Worldwide Contacts www.tyco-fire.com DV-5 Red-E Cabinet Integrated Deluge Fire Protection Package General Description The TYCO DV-5 Red-E Cabinet is a pre-assembled fire protection valve package enclosed
More information