No.2 Whitehall Riverside, Leeds July 2013
|
|
- Diana Harper
- 5 years ago
- Views:
Transcription
1 No.2 Whitehall Riverside, Leeds July 2013
2 New Office_ View from Whitehall Road
3 New Office_ Site location No.2
4 New Office_ Site location
5 New Office_ Proposal in context 1
6 No.2 Whitehall Riverside No.1 Whitehall Riverside New Office_ Proposal in context 2 n
7 Multi-Storey Car Park No.2 Whitehall Riverside New Office_ Proposal in context 3 No.1 Whitehall Riverside
8 Scheme Design_ Current Outline Planning application No.1 Whitehall Riverside
9 Drop off point leading to entrance court Existing no-build zone Dedicated high quality reception areas New shared surface feature roundabout with sculpture and drop off at entrance to office New integrated ramp and water feature Existing landscaping Site in context_ Landscape Not to Scale Enclosed circular light well through building to ground floor n
10 No.1 Leeds Wellington Place. Northern Street No.2 Whitehall Riverside 5 Scheme Design_ Key View 5: Whitehall Road looking away from Leeds City Centre
11 New Office_ Landscape precedent
12 Ground floor office with strong kerbside presence on Whitehall Road Ground floor office with strong kerbside presence on Whitehall Road Reception 1 Reception 2 Back of House servicing 1.5m planning grid 0m 15m Atrium New Office_ Ground Not to Scale
13 New Office_ Reception Hall
14 Canopy from drop-off to entrance Centralised core allows for 1-4 separate tenancies Atrium Level < 1 1.5m planning grid Strong riverside frontage 0m 15m New Office_ Level 1 Not to Scale
15 Level 4 Level 3 Level < 2 1.5m planning grid Atrium 0m 15m New Office_ Level 2, 3 and 4 Not to Scale
16 Level 6 Level < 5 Atrium 0m 15m New Office_ Level 5 and 6 Not to Scale
17 Level < 7 Roof Garden 0m 15m Roof Garden_ Precedent New Office_ Level 7 Not to Scale
18 Cycle storage. Access via MSCP adjacent Showers and 10% of cycle accommodation to achieve BREEAM Excellent credit. QUANTUM 66 car parking spaces (inc. 3 disabled) 10 motorcycles 72 bicycles 0m 15m New Office_ Basement Not to Scale
19 GROUND Riverside_ 9,591ft² Whitehall Rd_ 3,068ft² 12,659ft² LEVEL 1 Riverside_ 10,947ft² Whitehall Rd_ 6,717ft² 17,664ft² LEVEL 2 Riverside_ 12,260ft² Whitehall Rd_ 8,396ft² 20,656ft² LEVEL 3 Riverside_ 12,260ft² Whitehall Rd_ 8,396ft² 20,656ft² LEVEL 4 Riverside_ 12,260ft² Whitehall Rd_ 8,396ft² 20,656ft² LEVEL 5 Riverside_ 12,734ft² Whitehall Rd_ 8,396ft² 21,130ft² LEVEL 6 Riverside_ 12,734ft² Whitehall Rd_ 8,396ft² 21,130ft² LEVEL 7 Riverside_ 10,441ft² Whitehall Rd_ 8,396ft² 18,837ft² New Office_ Arrangement Not to Scale
20 Gross Internal Area Nett Internal Area Floor Sq.m Sq.ft Sq.m Sq.ft Nett: Gross Basement Parking and Plant 2,554 27, Ground Floor Reception Areas Ground Floor Office_ Whitehall Rd Ground floor Office_ Riverside 674 7,255 1,666 17, , ,591 50% Level 1_ Whitehall Rd Level 1_ Riverside Level 2_ Whitehall Rd Level 2_ Riverside Level 3_ Whitehall Rd Level 3_ Riverside Level 4_ Whitehall Rd Level 4_ Riverside Level 5_ Whitehall Rd Level 5_ Riverside Level 6_ Whitehall Rd Level 6_ Riverside Level 7_ Whitehall Rd Level 7_ Riverside Roof 2,178 23, ,017 6,717 10,947 2,222 23, ,139 8,396 12,260 2,222 23, ,139 8,396 12,260 2,222 23, ,139 8,396 12,260 2,266 24, ,183 8,396 12,734 2,266 24, ,183 8,396 12,734 2,266 24, , ,441 75% 86% 86% 86% 87% 87% 77% TOTAL (Excluding Basement, and roof plant) 17, ,558 14, ,387 79% New Office_ Quantum
21 New Office_ Space Planning Level 1 Not to Scale New Office_ Space Planning > 20,656ft² single open plan floor > 350 people over 2 floors > This floor 128 workstations + breakout and ancillary accommodation
22 New Office_ Space Planning Level 2 Not to Scale New Office_ Space Planning > 20,656ft² single open plan floor > 350 people over 2 floors > This floor 222 workstations + breakout and ancillary accommodation
23 < m > < m > < 8m > < m > New Office_ Key Dimensions Not to Scale
24 MONTH STAGE Outline Planning Aug 13 Detailed Planning Nov 13 Tender Preparation Jan 14 Contractor pricing Mar 14 Section 106 Award Contract / Mobilisation Apr 14 Start on Site May 14 Oct 15 Fit Out Dec 15 New Office_ Anticipated Programme
25 D2 Unit at Ground Level No2 Whitehall Ramp in to MSCP 20m Diameter Turning circle Ramp in to No2 Pick up / Drop off area New Office_ MSCP and Masterplan Not to Scale Riverside walkway n
26 No. 2 Whitehall Riverside undercroft car park Pedestrian access to lift & stair to all floors Shallow ramp parking, 72no. spaces per 1:23 gradient Escape stair Office core Vehicular access up to multi storey car park Adjacent available office plot Service access to adjacent office Ramped access down to adjacent office undercroft 1:7 gradient Ramped access down to adjacent office undercroft 1:7 gradient Ramped access up to multi storey car 1:10 gradient New MSCP_ Integration with proposed office
27 Pedestrian access to lift & stair to all floors Roof mounted photo voltaic cells Escape stair Service access to adjacent office Vehicular access up to multi storey car park Ramped access down to adjacent office undercroft 1:7 gradient Adjacent available office plot New MSCP_ Integration with proposed office
28 MSCP Core located away from corner to minimise impact of wind. Glazing allows activity to be expressed and circulation areas to be naturally lit and well seen. GYM 5m high, primarily clear glazed ground storey KEY MSCP An aluminium cladding system is proposed whereby a sequence of randomly orientated cowls allow sufficient free area for natural ventilation whilst creating an interesting texture and pattern that disguises the utilitarian structure behind. Design Code_ MSCP
29 KEY Pavilion The location of the pavilion within a landscaped garden presents the opportunity for a unique single story building at the entrance to the site. It is envisaged that this will become a coffee shop / café with a small external area for when weather permits. The material palette will be subject to reserved matter discussions however an initial indicative concept is shown here. The proposal would be for a circular, drum like building, predominantly glazed with a shroud like enclosure. The precedents across the page show a variety of similar precedents, each unique in character and location but relevant in treatment of form and material. Design Code_ Pavilion
30 Design Code_ Pavilion_ Precedent studies
31 Reflective coating on glass limits solar gain and reduces need for cooling thus minimising energy expenditure 50:50 Solid to void ratio to contribute towards minimising solar gain Vision glazing panel has reflective coating minimising solar gain 2.8m Floor to Ceiling Glazed look-a-like panels with laminate interlayer Aluminium spandrel flush within curtain wall system Energy efficient mechanical ventilation with heat recovery maintains fresh air and comfortable temperature Planar glazed ground and first floor Roof mounted Photovoltaic panels generate renewable energy and contribute towards BREEAM Excellent rating. Large roof area will allow significant renewable gains from photovoltaic sand solar hot water heating. New Office_ Façade build up and Sustainability
32 New Office_ Material precedent
33 New Office_ View from Whitehall Riverside
34 New Office_ View from Whitehall Road
35
36
Artists impression of the Park Promenade and plot H4 with café and restaurant uses that is still subject to change
The Park Promenade Artists impression of how a café might look Artists impression of the Park Promenade and plot H4 with café and restaurant uses that is still subject to change Precedent images for balconies
More informationIntroduction to MP3. MP3 H4 Park Central (North)
MP H4 Park Central (North) Introduction to MP A visualisation of the Illustrative Masterplan with MP shaded in blue MP is the third phase of the Elephant Park regeneration and is bounded by on the north,
More informationNew Street Proposed Redevelopment Architecture & Urban Design Brief
2130 2136 New Street Proposed Redevelopment Architecture & Urban Design Brief Prepared By: Cynthia Zahoruk Architect Inc. 3077 New Street, Burlington, ON, L7N 1M6 TABLE OF CONTENTS Background and Objective
More information10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS
SCHEME EVOLUTION STARBUCKS The proposed Starbucks Drive Thru alongside the proposed food store provides an appropriate mix of uses, suitable for this location. The proposed store is bespoke, designed specifically
More informationDescription Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.
ITEM 9 Application Number: 18/00266/DISCON Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. AT The Point, 602 Midsummer Boulevard,
More informationSite 5 Development Brief
Union Street Crichton Street South Crichton Street Thomson Avenue (Northern Boulevard) Site 5 South Union Street Earl Grey Place West Site 6 Riverside Esplanade (Southern Boulevard) South Crichton Street
More informationpublic spaces and accociated development
4.0 Public Spaces and Associated Development The development must address appropriately the public spaces immediately adjoining it: the River Walkway and Parkgate Street. The development is also highly
More informationPotten End C of E First School Proposed Expansion to One Form Entry Primary Planning Consultation Presentation
01 05 06 01 02 06 EXISTING SITE The school is located in an attractive village with predominately two storey pitched roofed houses, gardens and open common land. The existing school building is more modern
More informationI615. Westgate Precinct
I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct
More informationWaikato Innovation Park Masterplan. 13 NOVEMBER 2015 Prepared for Waikato Innovation Park Limited // Prepared by Beca
Waikato Innovation Park Masterplan 13 NOVEMBER 2015 Prepared for Waikato Innovation Park Limited // Prepared by Beca Figure 1: Waikato Innovation Park Strategic Context 1 INTRODUCTION 1.1 Waikato Innovation
More informationCOURTHOUSE CAMPUS BARNSLEY Executive Summary March 2010
COURTHOUSE CAMPUS BARNSLEY Executive Summary March 2010 Estell Warren Cartwright Pickard Buro Happold King Sturge BWA Barnsley Metropolitan Borough Council introduction Courthouse Campus is the last major
More informationBel-Air Lexus Automobile Service Station
Bel-Air Lexus Automobile Service Station Design Brief 443-447 McArthur Avenue Ottawa April 30, 2015 14-1299-MCA Site Details Application: Site Plan Control Legal Description and Municipal Addresses: 443
More informationdesign & access statement Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping
Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping Promenade, design & access statement lawrencemcphersonassociates 6 new road, ayr, ka8 8ex On Behalf of July 2015 CONTENTS
More informationADELAIDE COMETS CLUBROOMS DESIGN CONCEPT
PREPARED FOR Adelaide Comets FC Tampawardli Park (Ellis Park) Lot 587 West Terrace Adelaide SA 5000 P +61 8 8333 9796 ATTENTION Jim Tsouvalas P +61 8 8231 1885 E webmaster@adelaidecomets.com.au PREPARED
More informationINDOOR SPORTS COMPLEX PROJECT BRIEF
a PROJECT BRIEF 1.0 INTRODUCTION This Project consists of designing and built of an Indoor sports complex which will become the first building developed in Hulhumale solely for indoor sports and recreational
More informationChapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas
Chapter 13 Residential Areas: Appendices Page 1 Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas Design Code for Intensive Housing INTRODUCTION DESIGN ELEMENTS A NEIGHBOURHOOD DESIGN
More informationMEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.
MEMORANDUM Date: August 28, 2015 Our File: 1010-20-15-062 To: Design Review Committee From: Lisa Berg, Senior Community Planner Re: Amendment to Development Permit for Park Royal North This memo deals
More informationCity of Redlands Architectural Guidelines for Non-Residential Development
14. Building articulation shall be included in the design of building, in order to create a formal entry statement. Avoid this Do this Page 11 15. Give special attention to creating pedestrian scale and
More informationNorth Oakville East Parks Facilities Distribution Plan. November, 2009
North Oakville East November, 2009 POLICY CONTEXT 1) Purpose a) The purpose of this document is to be a guide for the location, configuration, design and development of the parks system for the North Oakville
More informationFormer Keighley College Buildings, North Street
Introduction The Vision To create a high quality, mixed-use destination that will lead to the successful redevelopment of the site and contribute to the wider regeneration of the town centre The Opportunity
More informationArmourers Court, Woolwich
Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental
More informationBirmingham University, Pritchatts Road, Adjacent to Gisbert Kapp Building, Edgbaston, Birmingham, B15
Committee Date: 07/03/2013 Application Number: 2013/00181/PA Accepted: 10/01/2013 Application Type: Reserved Matters Target Date: 11/04/2013 Development Ward: Edgbaston Birmingham University, Pritchatts
More informationSite Planning. 1.0 Site Context. 2.0 Pedestrian Circulation Systems. Pag e 2-23
The following photographs from throughout the country illustrate key urban design principles. Photographs are provided to illustrate the overall urban design concepts described in Chapter 1 of the Downtown
More informationTURNING CONCEPTS INTO REALITY
TURNING CONCEPTS INTO REALITY AMRON ASSOCIATES An Introduction Amron Associates is part of the Wire Belt Group, which has been manufacturing metal mesh for over 50 years. Amron Associates is the special
More informationURBAN DESIGN BRIEF REPORT
URBAN DESIGN BRIEF REPORT PREPARED FOR 2568401 ONTARIO INC NEW GASBAR, CONVENIENCE STORE & CARWASH DEVELOPMENT @ 1509 FANSHAWE PARK ROAD WEST LONDON, ONTARIO GAMA ENGINEERING INC. PROJECT NUMBER 1669 PREPARED
More informationEastside Locks (Building 5), Plot C, Land at Cardigan Street/Belmont Row, Birmingham, B4 7RJ
Committee Date: 06/02/2014 Application Number: 2013/08194/PA Accepted: 11/11/2013 Application Type: Reserved Matters Target Date: 10/02/2014 Development Ward: Nechells Eastside Locks (Building 5), Plot
More informationYMCA Erdington (Phase 2), 300 Reservoir Road, Erdington, Birmingham, B23 6DB
Committee Date: 13/06/2013 Application Number: 2013/03011/PA Accepted: 30/04/2013 Application Type: Full Planning Target Date: 30/07/2013 Ward: Stockland Green YMCA Erdington (Phase 2), 300 Reservoir Road,
More informationNew-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario
URBAN DESIGN BRIEF New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario TABLE OF CONTENTS: 1.0 Executive Summary 2.0 Creating Vibrant and Sustainable Urban Places: Excerpts from
More informationURBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville
URBAN DESIGN BRIEF 2136&2148 Trafalgar Road Town of Oakville Prepared By: METROPOLITAN CONSULTING INC For 2500674 Ontario Inc November 2016 TABLE OF CONTENTS Page No. 1.0 Introduction/Description of Subject
More informationStadium District Masterplan
Stadium District Masterplan Masterplan (noun): an evolving long-term planning document that establishes the framework and key elements of a site. It reflects a clear vision synthesizing developer goals
More information(DC1) Direct Development Control Provision DC1 Area 4
. General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the
More informationColchester Northern Gateway Master Plan Vision Review Draft. July 2016
Colchester Northern Gateway Master Plan Vision Review Draft July 2016 Contents Introduction 4 Context 8 Purpose of the Report 8 Strategic Position 9 Overview of the Process 11 2012 Master Plan Vision 12
More informationTHEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC
THEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC PROJECT SUMMARY Project Name: Theodore Roosevelt Senior High School Modernization Client: DC Department of General Services Program: Roosevelt Senior
More informationStoke Newington High Street 1.0 Site Analysis
1.0 Site Analysis 9-11 Stoke Newington Church Street Grade II Existing Entrance via Wilmer Place Stoke Newington Church Street 187-191, 18th C; Grade II* including forecourt wall, railings and gates Rights
More informationEastside Locks (Building 6), Plot C, Land at Cardigan Street/Belmont Row, Birmingham, B4 7RJ
Committee Date: 06/02/2014 Application Number: 2013/08196/PA Accepted: 11/11/2013 Application Type: Reserved Matters Target Date: 10/02/2014 Development Ward: Nechells Eastside Locks (Building 6), Plot
More information6.0 Access & Maintenance
Design and Access Statement April 2017 125 6.1 Inclusive Design - Site This proposal has been designed with consideration of the principles of inclusive design, as to be as inclusive as possible including
More informationIn partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013
In partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013 Project Intro 2-miles of Harbor Boulevard Westminster/17 th Street to just north of Edinger Avenue Many people use the corridor
More informationThe Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN
The Village SPECIFIC PLAN Chapter 3 3.1 INTRODUCTION 3.1.1 Purpose This Chapter describes the development regulations applicable to the Mixed-Use and Transit Center Planning Areas. These form-based regulations
More informationHuddersfield Urban Design Framework. 3. Framework
3. Framework The illustrative plan has been used as the basis for developing an urban design framework and strategy in Part 3 of this report. This is based on a series of regulatory plans that code the
More informationProposed Mixed-Use Development at Barking Road, Newham, London. Design & Access Statement. March 2013
Proposed Mixed-Use Development at 110-114 Barking Road, Newham, London Design & Access Statement March 2013 Stephen Davy Peter Smith Architects Ltd Fanshaw House, Fanshaw Street, London N1 6HX Company
More informationt wo t a be r n ac l e s t r e e t shoreditch london
t wo t a be r n ac l e s t r e e t Shoreditch London T WORKSPACE C ONC E P T wo Tabernacle Street is a distinctive,50sq. ft office development in London s creative Shoreditch. Just off Silicon Roundabout,
More informationDESIGN & ACCESS STATEMENT - PART I. Blythe Valley Park - Plot F5 Development. webbgray
DESIGN & ACCESS STATEMENT - PART I Blythe Valley Park - Plot F5 Development webbgray DOCUMENT INFORMATION Issue Date: 10/03/17 Revision: - webbgray 2 Design & Access Statement CONTENTS Introduction Site
More information4. MASTERPLAN FRAMEWORK
6a 6b 4. MASTERPLAN FRAMEWORK 6. Car Parks 6c Car Parks 6a and 6b will provide permanent parking. Area 6a will serve the foodstore with tarmac surfacing within a defined area to the west of the adjacent
More informationIntegrated Building Environmental Design Case Study: Beijing Parkview Green
Integrated Building Environmental Design Case Study: Beijing Parkview Green The 7th International Energy Agency Annex 44 Forum 24 October 2007 Dr Raymond Yau Director Ove Arup & Partners Hong Kong Ltd.
More informationUNIVERSITY OF TORONTO FACULTY OF LAW
VIEW LOOKING NORTH FROM HOSKIN AVENUE AND PHILOSOPHER S WALK UNIVERSITY OF TORONTO FACULTY OF LAW Kuwabara Payne McKenna Blumberg Architects September 00 Consultant Team Phillips Faarrevaag Smallenberg
More information3.1 The hybrid planning application proposes the following description of development:
CHAPTER 3: PROPOSED DEVELOPMENT 3.1 The hybrid planning application proposes the following description of development: Hybrid (part-outline/part-full) planning application for a single composite development
More informationWINDSOR GLEN DESIGN GUIDELINES
WINDSOR GLEN DESIGN GUIDELINES Adopted by Council, 2006 WINDSOR GLEN REDEVELOPMENT DESIGN GUIDELINES August 2006 1.0 Master Plan Organization For this area of the Coquitlam Town Centre, a mix of high,
More informationA new park will be delivered as part of the Elephant Park regeneration.
A new park will be delivered as part of the Elephant Park regeneration. The exhibition boards presented here introduce the first phase of the new park that is scheduled to open in spring 2017 that has
More informationPlots L4 & L5 Marchwood Industrial Park Presentation to Marchwood Parish Council 27 th February 2017
Plots L4 & L5 Marchwood Industrial Park Presentation to Marchwood Parish Council 27 th February 2017 The team presenting to you tonight are: Sam Baggley Group Container Sales Manager, Pentalver Transport
More informationPUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN
PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN Tuesday, February 28, 2012 6pm 9pm 1 st Floor Atrium, City Hall 2 Wellington Street West, Brampton 1 POLICY FRAMEWORK The 2006 Provincial Growth
More informationlot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site
Commercial General Commercial Objectives Create developments compatible with adjacent land uses in scale, function and character Define a consistent and attractive street edge with quality landscaping,
More information/05 Architectural Response
/05 Architectural Response 5.1 Inspiration Stacked Boxes (Artist : Rachael Whiteread) Cubism ( Architect : Le Corbusier) 52 1133 Melville Rezoning Submission Patterns ( Textile Artist : Annie Albers) Overlapping
More informationCHESAPEAKE CHILD DEVELOPMENT CENTER
Client: Chesapeake Energy Corporation Completion: May 2011 Scope: 60,000 sq. ft. Cost: Withheld at Owner s Request Awards: Citation Award, AIA Oklahoma; American Architecture Award, Chicago Atheaneum;
More informationA1 Portrait: Pdf/print with bleed & slug
01 Hammersmith Campus Imperial West St Mary's Campus South Kensington Campus Charing Cross Campus Royal Brompton Campus Chelsea and Westminster Campus Existing Imperial College London campuses ABOUT IMPERIAL
More informationSurface Materials Strategy Reference Images
2.0 RETAIL & HOTEL PLOTS, BRENT CROSS MAIN SQUARE THRESHOLD SPACES & ENERGY CENTRE Surface Materials Strategy Reference Images Riparian themes and patterns reflected in the paving Palette of warm granite
More informationCarton Avenue Action Area Plan Maynooth
Carton Avenue Action Area Plan Maynooth Kildare County Council JULY 2006 (AAP) Table of Contents Section 1. Introduction...3 Statement of Strategy...3 Location of the Lands...3 Context in the Town Development
More informationCRYSTAL CITY BLOCK PLAN # CCBP- G 1
CRYSTAL CITY BLOCK PLAN # CCBP- G 1 BLOCK G (Metro Market Square block) Long Range Planning Committee Meeting #3 April 2, 2018 1 1. Tonight s Agenda 1. Introductory Remarks (Jane Siegel) 2. Follow-up from
More informationWELCOME. Spend a little Live a lot. View of store entrance, overlooking the adjacent park - bonded warehouse detailing
WELCOME View of store entrance, overlooking the adjacent park - bonded warehouse detailing Aldi is pleased to be bringing forward a planning application to develop a new discount foodstore on Commercial
More informationEast Grove Public Realm
H - - MP - Elephant Park Public Realm RO EY DN NEW KENT ROAD E AC PL The public realm has been designed to create an environment which is easy to move through, accessible to all, safe and playful. The
More informationUK-GBC Project Case Study Smithfield, Manchester
UK-GBC Project Case Study Smithfield, Manchester KEY FACTS Location: Northern Quarter, Manchester Classification: Large scale community infrastructure Type: Mixed-use Size: Multi-phase project in Smithfield
More informationUrban Design Brief. 875 Wellington Road. Proposed One-Storey Fast Food Restaurant and Two-Storey Restaurant. Wellington Harlech Centre Inc.
Urban Design Brief 875 Wellington Road Proposed One-Storey Fast Food Restaurant and Two-Storey Restaurant Wellington Harlech Centre Inc. Prepared By: (519) 433-7587 info@yorkdev.ca May 3 rd 2013 1 Table
More informationDesign and Access Statement Planning Application: Royal Wharf Marketing Suite Ref: DAS. September 2014 Arup Associates
Design and Access Statement Planning Application: Royal Wharf Marketing Suite Ref: 237810-DAS September 2014 Arup Associates This document has been produced by Arup Associates, the lead designers for the
More informationClairtrell Area Context Plan
Clairtrell Area Context Plan March 2005 Urban Development Services City Planning Contents 1. Introduction... 4 2. Development Structure... 6 2.1 Streets... 7 2.1.1 Sheppard Avenue and Bayview Avenue...
More informationLecture 4 Circulation MoveMent through Space
Islamic University-Gaza Faculty of Engineering Architecture Department Principles of Architectural and Environmental Design EARC 2417 Lecture 4 Circulation MoveMent through Space Instructor: Dr. Suheir
More informationILLUSTRATIVE MASTERPLAN
ILLUSTRATIVE MASTERPLAN The Development Dairy Crest (Imperial College) The Proposed Development aims to create a new high quality residential neighbourhood, alongside a new public park for White City.
More informationProposals for a new college and homes. Thank you for visiting our exhibition.
1 Welcome Thank you for visiting our exhibition. The college are pleased to welcome you to view our plans to regenerate. If you have any questions, please feel free to speak with a member of the project
More informationCITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT
CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT Agenda Item: 2 March 9, 2011 Project: Description: Applicant: DSR11-004 The applicant is requesting approval to replace the existing exterior wood framed
More information40 UPPER HEIDELBERG ROAD, IVANHOE PLANNING REPORT
40 UPPER HEIDELBERG ROAD, IVANHOE PLANNING REPORT REVISION 2 - APRIL 2017 PREPARED FOR S&G 40 UPPER HEIDELBERG ROAD (IVANHOE) PTY LTD STAFF RESPONSIBLE FOR THIS REPORT WERE: Consultant Erin Skurrie Project
More informationMechanical System Redesign. Dedicated Outdoor Air System. Design Criteria
Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed
More information4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon
4.0 Design Guidelines For The Village Centre 4.0 Design Guidelines for the Village Centre The Village Centre is the focal point of the entire South Fields Community and is designed as a traditional commercial
More information1.2: Worked Example: Plot WV04 (North East)
1.2: Worked Example: Plot WV04 (North East) Appearance: Tri-partite Elevations Guideline 4.1.26: Tri-partite Design There is...a unifying principles across all elevations which is a tri-partite division.
More informationGREENFORD HALL & ADJOINING LAND
GREENFORD HALL & ADJOINING LAND CONTENTS 1. Introduction 1. Introduction 2. Urban Context 2.1 The Site and Surroundings 2.2 Urban Context Map 2.3 Access and Movement 3. Planning Context 3.1 Planning History
More informationDEVELOPMENT DESIGN GUIDELINES
DEVELOPMENT DESIGN GUIDELINES Approved by Surrey City Council January 26, 2004 Campbell Heights Business Park - Development Design Guidelines TABLE OF CONTENTS 1.0 DEVELOPMENT CONCEPT... 1 2.0 DESIGN OBJECTIVES...
More informationSCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN
DD/MM/YY Proposed C120 SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO12. GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN 1.0 Design objectives DD/MM/YY Proposed
More informationI404 Beachlands 2 Precinct
I404. Beachlands 2 I404.1. Precinct Description The Beachlands 2 precinct covers approximately 6 hectares of land at the corner of Beachlands and Whitford Maraetai Roads. Its purpose is to provide for
More informationRegency Developments. Urban Design Brief. Holyrood DC2 Rezoning
Regency Developments Urban Design Brief Holyrood DC2 Rezoning Stantec Consulting Ltd. 7-31-2017 1. Overview Regency Developments intends to rezone the lands located at 8510 and 8511 93 Avenue, within the
More informationPLANNING COMMITTEE AGENDA 28 April 2016
PLANNING COMMITTEE AGENDA 28 April 2016 PART 6: Development Presentations 1 INTRODUCTION 1.1 This part of the agenda is for the committee to receive presentations on proposed developments, including when
More informationPoolbeg West SDZ Draft Planning Scheme
Poolbeg West SDZ Draft Planning Scheme Introduction/vision Housing Community Economy/Employment Movement/transport Infrastructure green infrastructure /open space Land-use and phasing Public Realm Urban
More informationURBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018
URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES
More informationSite 2 Development Brief
a South Marketgait Site 2 b Union Street c Site 2 Development Brief Thomson Avenue (Northern Boulevard) Dundee Riverside Drive Discovery Plaza South Union Street Station Earl Grey Place West Site 5 Site
More informationDESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018
DESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018 1 FILE NTHCU-STL-XX-XX-RP-A-9075-RP013 PROJECT New Talybont Halls, Cardiff University CLIENT Cardiff University STRIDE TREGLOWN
More informationWest Street Underpass View
Underpass View distinctly maidenhead THE SITE TODAY View towards Telephone Exchange View west down View east from A4 The 0.24 ha site is a car park situated at the end of. runs to the north. Service bays
More informationBuilding Regulations Part M 2004 Access To And Use Of Buildings Checklist Of Provisions/Areas For Consideration
Building Regulations Part M 2004 Access To And Use Of Buildings Checklist Of Provisions/Areas For Consideration N.B This list is not intended to be comprehensive, it merely acts as a quick reference guide
More informationARCHITECTURAL DESIGN BRIEF
VANDENBERG & WILDEBOER ARCHITECTS INC. ARCHITECTURAL DESIGN BRIEF BARRHAVEN FELLOWSHIP CHURCH 3058 JOCKVALE ROAD NOVEMBER 30, 2017 November 30, 2017 City of Ottawa: Planning Department 110 Laurier Avenue
More informationFRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project
FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project DEVELOPER: SIGNATURE PROPERTIES ARCHITECT: HKIT ARCHITECTS April 23, 2010 TABLE OF CONTENTS 3 Vision 4 Description of Site 5 Guiding Concepts 6
More informationHarmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021
ITEM NO FDP #130021 MEETING DATE July 23, 2013 STAFF Pete Wray ADMINISTRATIVE TYPE I HEARING STAFF REPORT PROJECT: APPLICANT: OWNER: Harmony Technology Park Third Filing, Second Replat Custom Blending,
More information4.00 STAKEHOLDERS. urbanprojects
4.00 STAKEHOLDERS 94 heuston gateway: regeneration strategy and development framework plan 95 The Heuston Gateway presents one of the greatest concentrations of brown field development sites located adjacent
More informationHousing Development at Balloonagh Tralee Co Kerry
Design Statement Housing Development at Balloonagh Tralee Co Kerry Area of site 10,400m2 24 houses-12no 3 bed, 12no 2 bed and 4 single bed apartments total residential area of 2411m2 Open space provided
More informationtherry, elizabeth, franklin and queen: BLOCK plan
therry, elizabeth, franklin and queen: BLOCK plan INTRODUCTION Therry, Elizabeth, Franklin and Queen Street block Purpose & background The City of Melbourne has prepared this document for developers and
More informationMixed Use Centres Development Permit Guidelines
1 Mixed Use Centres Development Permit Guidelines Area Commercial or Mixed Use development occurring in City Centre, Urban Centre, Neighbourhood Centre, or Institutional Complex land use designations is
More informationKeystone Business Park Precinct Structure Plan North East Industrial Precinct. Part 2 Design Principles
Keystone Business Park Precinct Structure Plan North East Industrial Precinct Part 2 Design Principles Context Issues Services Landform Issues Geotech and contamination Ecology Traffic and access Issues
More information5.1 Site Plan Guidelines
5. Community Core Guidelines Development of the Community Core will take place by plan of subdivision and site plan approval. It will occur in a phased manner that will reflect the timing of residential
More informationCENTERS AND CORRIDORS
INITIAL DESIGN STANDARDS AND GUIDELINES for CENTERS AND CORRIDORS City of Spokane Planning Services Third Floor, City Hall 808 W. Spokane Falls Blvd. Spokane, WA 99201-3329 (509) 625-6300 www.spokaneplanning.org
More informationT O W N O F A J A X URBAN DESIGN GUIDELINES FOR MOTOR VEHICLE GAS BARS / SERVICE CENTRES
T O W N O F A J A X URBAN DESIGN GUIDELINES FOR MOTOR VEHICLE GAS BARS / SERVICE CENTRES June 2006 Table of Contents TABLE OF CONTENTS... 1 1.0 INTRODUCTION... 2 1.1 Purpose... 2 1.2 Organization of the...
More informationStory Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.
Story Homes An Introduction to Story Homes Founded by Fred Story in 1987, Story Homes has a long and successful reputation of building high quality and high specification homes. The family owned business
More informationLighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1
Lighting Proposal Angela Nudy Lighting/Electrical Dr. Mistrick 12.16.2006 Lighting Proposal Memo 1 Executive Summary I have chosen to redesign the lighting for four interior spaces and one exterior space
More informationSchematic Design Proposal Presentation
Steven A. Neimeister 9 December 2003 Architectural Engineering 481W AstroPower Headquarters Newark, Delaware Lighting/Electrical Option Consultant: Dr. M. Moeck Introduction to AstroPower Welcome to AstroPower!
More information0.0 Design and Access Statement. South Shields & Westoe Club / 11-17
0.0 Design and Access Statement South Shields & Westoe Club 17-006 / 11-17 1.0 Introduction 1.1 Vision 1.2 Planning Policy 1.3 Neighbourhood 2.0 Design Concepts/Masterplan 2.1 Site Constraints & Opportunities
More information3.1 community vision. 3.3 required plan elements
Chapter 3 Community Form 3.1 community vision 3.2 Parks & landscaping concepts 3.3 required plan elements D R A F T 20 Community Form Chapter 3 3.0 Community form 3.1 community vision The Specific Plan
More informationPLANNING APPLICATION REPORT
PLANNING APPLICATION REPORT CONTENTS 1.0 Introduction 1 2.0 Overview of Current Application 3 3.0 Compliance with Cherrywood Planning Scheme 2014 & UFDF 12 4.0 Compliance with Ministerial Guidelines 22
More information