FINAL CONSTRUCTION PLANS FOR
|
|
- Cassandra Farmer
- 5 years ago
- Views:
Transcription
1 FINAL CONSTRUCTION PLANS FOR COUNTRY HILLS OFFICE CAMPUS LOT 3A A PARCEL OF LAND LOCATED IN THE SOUTHWEST QUARTER OF SECTION 30, CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO S. REERE PARKWAY, SUITE CENTENNIAL, CO 0 () 22-4 CASCO 0 WATSON ROAD ST. LOUIS, MO 32 (34) 2-42 CEI TRI WEST PLAZA 3030 LBJ FREEWAY, SUITE 00 DALLAS, TX (2) 4-33 PUBLIC SERICE COMPANY OF COLORADO WEST 0TH AENUE ARADA, COLORADO 0003 (303) COLORADO BLD. SITE UTILITY NOTIFICATION CENTER OF COLORADO SOUTH YOUNGFIELD STREET, SUTIE 30 GOLDEN, COLORADO 0 (00) 22- CENTURYLINK 0 CALIFORNIA ST. #0 DENER, CO 03 (303) S. Revere Parkway, Suite Centennial, Colorado 0 P:-22-4 E. 2th AENUE SCALE: " = 300' C.0 COER SHEET C. NERAL NOTES C2.0 SITE PLAN C3.0 HORIZONTAL CONTROL PLAN C4.0 EROSION CONTROL PLAN C4. EROSION CONTROL DETAILS C.0 GRADING PLAN C.0 OERALL UTILITY PLAN C.0 SITE DETAILS C. SITE DETAILS Phoenix, Arizona 0 N:\ Projects\-00 CLA Thornton\Dwg\3 Final\C.0-Title Sheet.dwg A PARCEL OF LAND BEING A PART OF LOTS 4, AND, COUNTRY HILLS OFFICE CAMPUS AS RECORDED AT RECEPTION NUMBER CO3 OF THE RECORDS OF THE ADAMS COUNTY CLERK AND RECORDER, BEING A PART OF THE SOUTHWEST /4 OF SECTION 30, TOWNSHIP SOUTH, RAN WEST OF THE TH P.M., CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF SAID SECTION 30 AND CONSIDERING THE SOUTH LINE OF SAID SOUTHWEST /4 OF SECTION 30 TO BEAR N 4'"E, WITH ALL BEARINGS SHOWN HEREON RELATIE THERETO; THENCE N 4'"E ALONG THE SOUTH LINE OF SAID SOUTHWEST /4, A DISTANCE OF FEET; THENCE N00 33'0"W, A DISTANCE OF.04 FEET TO THE SOUTH LINE OF SAID LOT AND THE TRUE POINT OF BEGINNING; THENCE N 4'3'E ALONG THE SOUTH LINE OF SAID LOT AND SAID LINE EXTENDED EASTERLY, A DISTANCE OF 22.2 FEET; THENCE N00 4'"W, A DISTANCE OF 4.0 FEET; THENCE N3 0'03"E, A DISTANCE OF 4.4 FEET; THENCE N 30'"E, A DISTANCE OF.' FEET; THENCE N00 4'0"W, A DISTANCE OF. FEET; THENCE S '4"W. A DISTANCE OF 2. FEET; THENCE S00 33'0"E, A DISTANCE OF 33.3 FEET TO THE TRUE POINT OF BEGINNING. THE DESCRIBED PARCEL CONTAINS 0,0 SQUARE FEET OR 2.0 ACRES, MORE OR LESS. THE BEARINGS ARE BASED ON THE SOUTH LINE OF THE SOUTHWEST QUARTER OF SECTION 30, TOWNSHIP SOUTH, RAN WEST OF THE TH PRINCIPAL MERIDIAN, ASSUMED TO BEAR NORTH 4 '" EAST ADAMS COUNTY CONTROL POINT "EAST LAKE", A STANDARD 3 /4" DIA. ADAMS COUNTY BRASS CAP SUREY MARK SET IN A CONCRETE POST LOCATED ON THE EASTERLY SIDE OF RAILROAD TRACKS SOUTHEAST OF THE INTERSECTION OF E. TH AE. AND YORK STREET. ELEATION = 22.2 US SUREY FEET NAD. WORK SHALL BE CONSTRUCTED TO THE CITY OF THORNTON STANDARDS AND SPECIFICATIONS. THIS APPROAL IS FOR CONFORMANCE WITH THESE STANDARDS AND SPECIFICATIONS AND OTHER CITY REQUIREMENTS. THE DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE PROFESSIONAL ENGINEER OR LANDSCAPE PROFESSIONAL. I HEREBY AFFIRM THAT THESE CONSTRUCTION PLANS WERE PREPARED BY ME (OR UNDER MY DIRECT SUPERISION) FOR THE OWNERS THEREOF IN ACCORDANCE WITH THE PROISIONS OF THE CITY OF THORNTON STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF PUBLIC IMPROEMENTS. I UNDERSTAND THAT IT IS THE POLICY OF THE CITY OF THORNTON THAT THE CITY DOES NOT AND WILL NOT ASSUME LIABILITY FOR FACILITIES DESIGNED BY OTHERS. FOR AND ON BEHALF OF. PE 3224 SITE ADDRESS: 4 E. 2TH AENUE COER SHEET C.0
2
3 S ' 4.3 "W 2. ' MAINTENANCE PL 0.' PL S ' 4" W 2.' GROUND BY OTHERS FENCE 4:.' % MIN FF= 3.00.' FENCE " GROUND LAR 2' TENNIS GROUND AREA 23,00 SFT BASKETBALL MIDSIZE ' ' ' 0 0 SCALE: " = ' KEYSTONE OR APPROED EQUAL, 2' HIGH NTS 24" WIDE CONCRETE NTS S 00 33' 0" E 33.' 2,3 sft ' ' ' ' 3' 4 ' N 30' " E.' 24' N 00 4' 0" W.3' SMALL CONSTRUCT ' CONCRETE SIDEWALK 24" HIGH RETAINING WALL SMALL ' EXCLUSIE WATER INSTALL HANDICAP PARKING SIGN 2 CONSTRUCT HANDICAP RAMP 3 PAINT HANDICAP PARKING SYMBOL 4 PAINT PARKING STALL STRIPE CONSTRUCT " ERTICAL CONCRETE CURB WITH CATCH GUTTER CONSTRUCT " ERTICAL CONCRETE CURB WITH SPILL GUTTER STOP SIGN CONSTRUCT ' WIDE CONCRETE SIDEWALK CONSTRUCT ' WIDE COLORED & PATTERNED CONCRETE CROSSWALK NOT USED 2 CONSTRUCT 24" CONCRETE PERIMETER FENCE, SEE LANDSCAPE PLANS INSTALL LIGHT STANDARD 4 PATTERNED CONCRETE PER ARCHITECTURAL PLANS CONSTRUCT 4.' WIDE CONCRETE WALK TRASH ENCLOSURE, SEE ELEATIONS FOR MORE INFORMATION CONSTRUCT DRY STACK MODULAR BLOCK INSTALL PERIMETER FENCING, SEE ARCHITECTURAL PLANS FOR DETAILS TRAFFIC SPEED CONTROL DEICE SPEED HUMP BY GNR TECHNOLOGY P: CONCRETE CATCH CURB CONCRETE SPILL CURB CONCRETE SIDEWALK SITE LIGHTING SIGNA FENCE PROPERTY LINE CURB / ED PAEMENT CONCRETE SIDEWALK LIGHT POLE HANDICAP RAMP SIGNA S. Revere Parkway, Suite Centennial, Colorado 0 P:-22-4 Phoenix, Arizona ' UTILITY ' ' 2 STREET LIGHT BY OTHERS 0' EXCLUSIE A ' EXCLUSIE WATER 4 4 ' SIDEWALK BY OTHERS ' 24' ' 2' 0 0 3' N 00 4' " W 4.' N 3 0' 03" E 4.4' EXCLUSIE A SITE PLAN N 4' 3" E 22.2' N:\ Projects\-00 CLA Thornton\Dwg\3 Final\C2.0-Site Plan.dwg EAST 2th AENUE COLORADO P.E C2.0
4 S ' 4" W 2.' S ' 4.3 "W 2. N 00 4' 0" W.3' L L L L L L 2,3 sft L22 N 4' 3" E 22.2' L L L L L L L24 L2 L23 L2 L2 EAST 2th AENUE EAST 2TH AENUE C4 C 2.0'.0'.'.0'.0' 24.0'.0' 2.0'.0'.0'.0' 3.2'.0'.0' 3.4'.0'.0' 2.0' C L0 C C C 2.0' 24.0' N 30' " E.' L4 L2 C3 L2 L3 N 3 0' 03" E 4.4' C2 C L C0 L4 L C N 00 4' " W 4.' C C C2 C C 2.3' C4 2.'.0'.0' 22.'.' C C S 00 33' 0" E 33.'.'.'.' 4.' 2.0'.' 2.0'.' 2.3'.'.'.' 2.0' 2.0' Phoenix, Arizona 0 S. Revere Parkway, Suite Centennial, Colorado 0 P: SCALE: " = ' L L2 L3 L4 L L L L L L0 L L2 L L4 L L L L L L L2 L22 L23 L24 L2 L2 C C2 C3 C4 C C C C C C0 C C2 C C4 C C C C C 4" WHITE PAINT STRIPES FACE OF CURB HORIZONTAL CONTROL PLAN '-0" (TYP.) '-" DIAM. CONC. BASE '-0" (TYP.) LANDSCAPING OR SIDEWALK STANDARD PARKING HANDICAP SYMBOL HANDICAP SIGNA DETAIL CONCRETE CATCH CURB CONCRETE SPILL CURB CONCRETE SIDEWALK SITE LIGHTING SIGNA FENCE PROPERTY LINE CURB / ED PAEMENT CONCRETE SIDEWALK LIGHT POLE HANDICAP RAMP SIGNA COLORADO P.E C3.0 N:\ Projects\-00 CLA Thornton\Dwg\3 Final\C3.0-Horizontal Control Plan.dwg
5 S '4.3"W 2. x x x x x x x x x x x 2,3 sft N 00 4' " W 4.' N 00 4' 0" W.' S 00 33' 0" E 33.3' > > > > > > > > > N 30' " E.' N 3 0' 03" E 4.4' S ' 4" W 2.' 23 FF = N 4' 3" E 22.2' EAST 2th AENUE RETAINING WALL 24" HDPE 30" HDPE 24" HDPE AREA INLET AREA INLET AREA INLET AREA INLET AREA INLET CURB INLET AREA INLET AREA INLET x x x x x x x x x x > > > > > > > > x x x x MAJOR CONTOUR MINOR CONTOUR MAJOR CONTOUR MINOR CONTOUR DIERSION DITCH EROSION CONTROL BLANKET INLET PROTECTION SOIL STOCKPILE AREA STABILIZED STAGING AREA EHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE CONSTRUCTION FENCE SEEDING AND MULCHING SURFACE ROUGHENING LIMITS OF CONSTRUCTION STANDARD SEDIMENT BASIN CHECK DAM PROPERTY LINE LEND > S. Revere Parkway, Suite Centennial, Colorado 0 P:-22-4 x x EROSION CONTROL PLAN Phoenix, Arizona SCALE: " = '. WORK SHALL BE CONSTRUCTED TO CITY OF THORNTON STANDARDS AND SPECIFICATIONS. THIS APPROAL IS FOR CONFORMANCE TO THESE STANDARDS AND SPECIFICATIONS AND OTHER CITY REQUIREMENTS. THE ENGINEERING DESIGN AND CONCEPT REMAINS THE RESPONSIBILITY OF THE PROFESSIONAL ENGINEER. 2. ANY BMPS SHOWN THAT REQUIRE GRADING, E.G. SEDIMENT BASINS, SEDIMENT TRAPS, CONCRETE WASH OUT AREAS, ETC, SHALL NOT BE PLACED UNTIL AFTER THE PRE-CONSTRUCTION MEETING. IN ADDITION, THE SEDIMENT BASIN (OR OTHER BMP) SHALL NOT BE INSTALLED UNTIL AFTER THE SC PRE-CONSTRUCTION MEETING AND ISSUANCE OF THE SC PERMIT BUT MUST BE FULLY FUNCTIONAL PRIOR TO ANY LAR SCALE GRADING. THE INITIAL PLAN ILLUSTRATES CONDITIONS NO INFRA IS SHOWN. 3. DURING HAULING OPERATIONS, SWEEPING SHALL OCCUR THROUGHOUT THE DAY AND AT THE END OF EACH DAY. COLORADO P.E C N:\ Projects\-00 CLA Thornton\Dwg\3 Final\C4.0-Erosion Control Plan.dwg
6 2" 2'0" MIN. '-Min. 2" 'X' MIN. '-Min. 2" SCL 3 ' 3 3 2" MIN. ' MAXIMUM 0 2" MINIMUM SCL A B B A EROSION CONTROL DETAILS Phoenix, Arizona 0 S. Revere Parkway, Suite Centennial, Colorado 0 P:-22-4 C4. N:\ Projects\-00 CLA Thornton\Dwg\3 Final\C4.-Erosion Control Details.dwg
7 S '4.3"W 2. 0.%.% 2,3 sft N 00 4' " W 4.' N 00 4' 0" W.'.4%.2%.3% 2.4%.% S 00 33' 0" E 33.3' 2.4%.% 2.% 2.%.% 4.0% ' 3' ' ' ' ' 24' ' 23 24' ' S ' 4" W 2.' TENNIS BASKETBALL N 30' " E.' N 3 0' 03" E 4.4' 23 EAST 2th AENUE RETAINING WALL 2' HP HP HP FF = " HDPE 30" HDPE 24" HDPE.2%.2% 2.% 2.% 3.0% 3.% 2.% 2.% N 4' 3" E 22.2' BOW:3.00 BOW:3.00 BOW: BOW:3.00 LAR MIDSIZE BOW: % 0.% 0.% 2.% Phoenix, Arizona 0 S. Revere Parkway, Suite Centennial, Colorado 0 P:-22-4.% 2.4% 2.4% HC RAMP HC RAMP BOW:32..%.% HC RAMP HC RAMP SCALE: " = ' STORM A PIPE STORM A PIPE PROPERTY LINE RIGHT OF WAY LINE MAJOR CONTOURS MAJOR CONTOURS SPILL CURB CATCH CURB ELEATION SPOT ELEATION COLORADO P.E XX.XX (XX.XX) GRADING PLAN C.0. OERLOT GRADING SHALL BE IN CONFORMANCE WITH THE RECOMMENDATIONS IDENTIFIED IN THE APPROED SOILS AND FOUNDATION INESTIGATION PREPARED FOR THIS SITE. 2. CONTOURS SHOWN ARE FOR FINISHED PAING, SIDEWALK SLAB OR GROUND. ADJUSTMENTS TO SUBGRADE OR OER EXCAATION WITHIN THE RECOMMENDATIONS IDENTIFIED IN THE APPROED SOILS REPORT ARE THE CONTRACTORS RESPONSIBILITY. 3. IF DURING THE OERLOT GRADING PROCESS CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE AN UNIDENTIFIED SITUATION IS PRESENT, THE SOILS ENGINEER SHALL BE CONTACTED FOR RECOMMENDATIONS. 4. LOCATIONS OF UNDERGROUND UTILITIES ARE BASED ON THE INFORMATION PROIDED FROM DRAWINGS AND FIELD LOCATIONS. LOCATIONS SHALL BE ERIFIED IN THE FIELD PRIOR TO ANY CONSTRUCTION.. SPOT ELEATIONS SHALL TAKE PRECEDENCE OER CONTOURS AND SLOPES SHOWN. SPOT ELEATIONS AND SPECIFIC PROFILE DESIGN SHALL BE USED FOR SETTING ELEATIONS OF CURB AND GUTTER, AND UTILITIES.. SPOT ELEATIONS REPRESENT OW LINE OF CURB OR FINISHED GRADE UNLESS OTHERWISE NOTED.. CONTOURS SHOWN AS REPRESENT FINISHED SURFACE.. CONTRACTOR SHALL ERIFY ALL ASPHALT AND PAING SECTIONS WITH OTECHNICAL ENGINEER OF RECORD PRIOR TO SUBGRADE PREPARATION AND PLACEMENT.. FOR LIMITS OF OER EXCAATION, REFER TO OTECHNICAL REPORT. 23 N:\ Projects\-00 CLA Thornton\Dwg\3 Final\C.0-Grading Plan.dwg
8 S ' 4.3"W 2. N 00 4' 0" W.3' 2-LF " S ' 4" W 2.' -LF 0" SDIN-02 G.E.:. I.E.: 22.4 (IN) I.E.: 22.4 (OUT) SDIN-0 G.E.:.0 I.E.: 23.0 SDIN-04 G.E.:.0 I.E.: (IN) I.E.: (OUT) SDIN-03 G.E.:. I.E.: 22.2 (IN) I.E.: (OUT) 4-LF 2" MID. SIZE 0 LAR TENNIS BASKETBALL -LF 2" SDST-0 R.E.:.4 I.E.: (IN) I.E.: 22.0 (OUT) " WATER SDIN-0 G.E.:.3 I.E.: 230. (IN) I.E.: 22. (OUT) SDST-0 R.E.:.4 I.E.: 22.3 (W) I.E.: 22.3 (S) I.E.: 22.3 (E) SDST-04 R.E.:.3 I.E.: 22.4 (E) I.E.: 22.4 (W) I.E.: (S) G.E:.3 G.E:.3 04-LF 0" SDIN-0 G.E.:.2 I.E.: 22.3 (IN) I.E.: 22. (OUT) 32-LF " SDIN-0 G.E.:.3 I.E.: LF " 0-LF 0" 0-LF 2" 0.% -LF 2" 0 0 SCALE: " = ' S. Revere Parkway, Suite Centennial, Colorado 0 P:-22-4 EX. SSMH-0 IN OUT = 22.2 (FIELD ERIFY) SANITARY CLEAN OUT W/ TRAFFIC RATED CAP G.E:.3 G.E:.3 SDST-0 R.E.:.0 I.E.: 23.3 S 00 33' 0" E 33.' 4-LF 0" 24" HDPE " SANITARY SERICE SEE PLUMBING PLANS FOR CONTINUATION SANITARY CLEAN OUT I.E.: ' " PC I.E.: GAL. GREASE INTERCEPTOR, SEE PLUMBING PLANS I.E.: 22..' " PC CONNECT TO " PC TIE IN ELE.: 224. (FIELD ERIFY) WYE I.E.: " SANITARY % 0' EXCLUSIE A 2,3 sft FF=23.00 ' EXCLUSIE WATER -LF " 0.% 2" DOMESTIC WATER METER PIT SDST-02 R.E.:.0 I.E.: 22.3 (IN) I.E.: 22. (OUT) 2-LF " 0.% SDST-0 4' DIA. MANHOLE R.E.:.3 I.E.: (IN) I.E.: 22.4 (OUT) 2-LF " 0.% CONNECT TO 4' STORM M.H. I.E.(E): 22.0 (EX., F..) I.E.(S): 22.4 I.E.(W): 22.0 (EX., F..) I.E.(N): 22.0 SDIN-0 TYPE R, ' TRANSFORMER PAD G.E.: 23. I.E.: 22. BOP STORM: 22. TOP SS: 223. DELTA:.' SDST-03 R.E.:. I.E.: 22.0 (IN) I.E.: 22.0 (OUT) EX. SSMH-0 IN IN = 222. (FIELD ERIFY) -LF " W.M. N 00 4' " W 4.' 0 " WATER " DIP FIRE LINE SEE PLUMBING PLANS FOR CONTINUATION N 3 0' 03" E 4.4' 2 N 30' " E.' 24" ADCP " SANITARY SEWER ' EXCLUSIE WATER ' EXCLUSIE A 30" HDPE WET TAP 2" DOMESTIC WATER SERICE 2 WET TAP " DIP FIRE SERICE LINE 3 INSTALL " PC SANITARY SEWER SERICE 4 TAP " SANITARY SEWER SERICE TO " MAIN INSTALL NYLOPLAST BASIN WITH SOLID COER, 24CGC OR EQUIALENT INSTALL NYLOPLAST BASIN WITH LIGHT DUTY 24" PEDESTRIAN GRATE TYPE B, 24CGP " PC CONNECT TO " ROOF, SEE PLUMBING PLANS CONNECT TO DOOR, SEE PLUMBING PLANS INSTALL " WIDE, 0' LONG DURA SLOPE CHANNEL TYPE DS-00 WITH DS-0 GRATE OR APPROED EQUAL. 0 INSTALL FIRE HYDRANT ASSEMBLY IN ACCORDANCE WITH CITY OF THORNTON STANDARDS & SPECIFICATIONS.. CONTRACTOR IS RESPONSIBLE TO ERIFY CONNECTIONS OF SITE UTILITIES WITH BLDG UTILITIES. REFER TO ARCHITECTURAL MEP PLANS FOR EXACT LOCATION OF UTILITY TIE-INS. 2. ROOF S ARE TO BE CONNECTED TO THE STORM SURROUNDING THE. SEE ARCHITECTURAL PLANS FOR ROOF LEADER LOCATIONS. 3. LOCATIONS OF UNDERGROUND UTILITIES ARE BASED ON THE INFORMATION PROIDED FROM DRAWINGS AND FIELD LOCATIONS. LOCATIONS SHALL BE ERIFIED IN THE FIELD PRIOR TO ANY CONSTRUCTION. Phoenix, Arizona 0 OERALL UTILITY PLAN N:\ Projects\-00 CLA Thornton\Dwg\3 Final\C.0-Overall Utility Plan.dwg N 4' 3" E 22.2' EAST 2th AENUE COLORADO P.E C.0
9 N:\ Projects\-00 CLA Thornton\Dwg\3 Final\C.0-Site Details.dwg ONSITE CURB DETAILS ONSITE HANDICAP RAMP COLORADO P.E C. SITE DETAILS Phoenix, Arizona 0 S. Revere Parkway, Suite Centennial, Colorado 0 P:-22-4
PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED "E"
GENERAL NOTES: PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: 1086 & 10875 MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO LOCATION MAP 17 1.00 Acres PROPOSED SITE 12 OWNER / APPLICANT:
More informationSTANDARD DETAILS QUICK REFERENCE
STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)
More informationPreventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL PROTECTION
More informationROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID
ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK 13440 DELTA PROJECT NO. 2017.226.001 SEPTEMBER 2017 ISSUED FOR BID INDEX OF DRAWINGS GENERAL CIVIL ARCHITECT/ENGINEER PROJECT
More informationCITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS
CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS 2010 EDITION CITY OF OZARK, MISSOURI REVISIONS TO THE 2009 EDITION The following revisions have been made to the 2009 edition of the city
More informationAPPENDIX F: DETAIL DRAWINGS
APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900
More informationCRESCENT RESOURCES INC.
CRESCENT RESOURCES INC. Due Diligence Checklist Project Name: Client: Project No. Date: 1 Survey Review survey for compliance with Crescent Resources, Inc. s Instructions to Surveyors (see below): All
More informationA. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationCounty of El Dorado Standard Plans
County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20
More informationCITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO EAST 124TH AVE WASHINGTON CENTER PKWY WASHINGTON ST PROJECT LOCATION PRIVATE DRIVE
EXISTING OWNER WASHINGTON CENTER, LLC 7400 CRESTLINE CIRCLE SUITE 50 GREENWOOD VILLAGE, CO 80 70-554-949 STANDARD SYMBOLS RCP STORM SEWER PVC STORM SEWER PVC ROOF DRAIN/FOUNDATION DRAIN SANITARY SEWER
More informationA. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains
Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure
More informationCITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO EAST 124TH AVE WASHINGTON CENTER PKWY WASHINGTON ST PROJECT LOCATION PRIVATE DRIVE
EXISTING OWNER WASHINGTON CENTER, LLC 7400 CRESTLINE CIRCLE SUITE 150 GREENWOOD VILLAGE, CO 80111 720-554-9419 STANDARD SYMBOLS RCP STORM SEWER PVC STORM SEWER PVC ROOF DRAIN/FOUNDATION DRAIN SANITARY
More informationCITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO GRANT ST WASHINGTON CENTER PKWY WASHINGTON ST PROJECT LOCATION LAFAYETTE ST PENNSYLVANIA ST
EXISTING OWNER WASHINGTON CENTER, LLC 7400 CRESTLINE CIRCLE SUITE 150 GREENWOOD VILLAGE, CO 80111 720-554-9419 STANDARD SYMBOLS RCP STORM SEWER PVC STORM SEWER PVC ROOF DRAIN/FOUNDATION DRAIN SANITARY
More informationTABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08
TABLE OF CONTENTS Sheet Number Title Revision Date I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 STREETS ST-1 LOCAL STREETS 03/17/08 ST-1A LOCAL STREETS, 2015 GENERAL PLAN 11/15/04 ST-2 COLLECTOR AND ARTERIAL
More informationEssential Skills: Reading and Interpreting Maps and Plans
Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NYS Tug Hill Commission Local Government Conference March 31, 2016 Prepared by: Peter G. Vars, P.E. BME ASSOCIATES Stages of Plan
More informationAPPLICATION FOR MINOR SITE PLAN REVIEW
www.appleton.org APPLICATION FOR MINOR SITE PLAN REVIEW Community and Economic Development Department 100 N. Appleton St. PH: 920-832-6468 Appleton, WI 54911 FAX: 920-832-5994 Stamp date received PROPERTY
More informationA. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationGeneral Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration
Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General
More informationGRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.
GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387
More informationW E A V E R C R O S S I N G Concept Plan
W E A V E R C R O S S I N G Concept Plan February 19, 2014 APPLICANT: Contact: Scott Murray 2522139501 EUBANKS ROAD RAMP NC 86 MLK JR. BLVD. INTERSTATE 40 Vicinity Map DEVELOPER: Mangement Co. Inc. Contact:
More informationMASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS
MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct
More informationAPPLICATION FOR MINOR SITE PLAN REVIEW
www.appleton.org APPLICATION FOR MINOR SITE PLAN REVIEW Community and Economic Development Department 100 N. Appleton St. PH: 920-832-6468 Appleton, WI 54911 FAX: 920-832-5994 Stamp date received PROPERTY
More informationTOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST
TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk
More informationStorm Water Basics for Construction Sites Presented by Representatives from the City of Grass Valley and Nevada County
September 22nd, 2015 3:30PM Sign up at: www.stormwaterawareness.org Workshop is free! Nevada County Contractor s Association 149 Crown Point Ct. Grass Valley, CA 95945 Storm Water Basics for Construction
More informationCity of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18
City of Mt. Juliet Planning & Zoning Department Site Plan Checklist Site Plan approval is required for all specified community facilities, all commercial, industrial, and multi-family residential activities
More informationVICINITY MAP 1" = 1000'
SITE PLAN - MINI U STORAGE LOCATED IN A PORTION OF THE SOUTHWEST QUARTER OF SECTION 15, TOWNSHIP 6 SOUTH, RANGE 66 WEST OF THE 6th P.M. 18901 LONGS WAY, PARKER, CO 80134 SITE DEVELOPMENT DATA: SITE ACREAGE:
More informationA/E REVIEW CHECKLIST SITE & LANDSCAPE
A/E REVIEW CHECKLIST SITE & LANDSCAPE Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Architectural, Boiler Safety Devices Operation
More informationM-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT
M-231 and Water Quality Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT M-231 Facts: 7-Miles long 2-Lane Limited Access Highway Connects I-96 and M-45 M-231 Facts: Includes Michigan
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
More informationPlan Review Checklist
Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project
More informationSITE PLAN REVIEW APPLICATION AND CHECKLIST
SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description
More informationWHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area
City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the
More informationLetter of Credit Itemized Cost Estimate For: 100% Site Development Costs
Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for
More informationa. Site Topography and Relationship to Surrounding Topography
C. Topography and Slopes 1. Existing Conditions a. Site Topography and Relationship to Surrounding Topography The Site is gently rolling, as is the surrounding topography (Figure I.A-8). The Property is
More informationSUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE
SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.
More informationGDP BOUNDARY Christopher A. Brooks, PLS for and on behalf of Matrix Design Group, Inc. VICINITY MAP SCALE: N.T.S.
COVER SHEET I, Christopher A. Brooks, a Registered Land Surveyor in the State of Colorado, do hereby certify that the description as shown on Sheet 2, for the Buckley Annex General Development Plan was
More informationShelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN
Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.
More informationGloucester County PLAN SUBMITTER'S CHECKLIST
Page 1 of 9 Gloucester County PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and please reference the plan sheets/pages where the information may be found,
More informationRotary Park / Railroad Lake
Rotary Park / Railroad Lake Park Location: 600 NW Vesper St. Park Land Established: 1975 Park Size: 12 acres Developed Acres: 12 acres Undeveloped Acres: 0 acres Park Type: Community Park Amenities: 2
More informationUrban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT
NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.
More informationNORTH EAST ELEMENTARY SCHOOL PAVING EXPANSION CECIL COUNTY, MARYLAND
SITE ANALYSIS TOTAL SITE AREA AREA TO BE DISTURBED AREA TO BE VEGETATIVELY STABILIZED AREA TO BECOME IMPERVIOUS EXISTING IMPERVIOUS (NOT TO BE DISTURBED) ESTIMATED CUT VOLUME ESTIMATE FILL VOLUME ESTIMATE
More informationJOB CREATION PROJECTS
SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each
More informationCARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015
CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide
More informationTHENCE NORTH 20 31'13" EAST, A DISTANCE OF 1, FEET ALONG SAID WEST LINE TO THE NORTH LINE OF SAID TRACT A;
PEORIA ST BRONCOS PARKWAY CENTENNIAL AIRPORT ARAPAHOE COUNTY DOUGLAS COUNTY NORTH DOUGLAS COUNTY INDUSTRIAL PARK AIRPORT 0 E-0 PARK DOVE VALLEY HIGHFIELD BUSINESS CHAMBERS ROAD DOVE VALLEY M.U. PUD JORDAN
More informationCHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES
CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES TOPICS Steps Prior to construction Pre-Construction Meeting Defining the Critical Stages with the Contractor Brady s Run Lake Site
More informationHANOVER EXTON SQUARE
RESIDENTIAL DEVELOPMENT PLAN SITUATED IN: (S.R. 000) & LINCOLN HIGHWAY (U.S. BUSINESS ROUTE 30) TAX MAP RCEL 4-5-90 CHESTER COUNTY, PENNSYLVANIA OWNER: PR EXTON PROPERTY LP THE BELLEVUE 200 SOUTH BROAD
More information12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1
The ABC s of BMP s Aux Sable Watershed Plan St. Charles, IL Why are BMP s Important Best Management Practices (BMPs) developed as a set of practices which help to achieve goals of the Clean Water Act and
More informationPHASE III DRAINAGE REPORT
PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village
More informationPROPOSED DRAINAGE PATTERNS
1121 1118.50 Basin Floor 1120 1119 0 N 100 200 PROPOSED DRAINAGE PATTERNS Deroiser Drive Riverwood Drive County 260 0 100 200 Project Name: Riverwood Drive LITTLE FALLS TOWNHOMES Project Location: LITTLE
More informationChecklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:
Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number
More informationProtect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer
Protect Stormwater Quality Project and Site Management Training for General Contractors Presenter Becky Pearson Professional Civil Engineer Part II Best Management Practices (BMPs) What is a Best Management
More information3" TO 4" OF TOPSOIL 2:1 MIRAFI HP 565 GEO FABRIC OR EQUIVALENT 9' SPILLWAY EL=7147 2:1 SPILLWAY SECTION N.T.S. TOP OF POND EL=7149' RIP-RAP D 50 8" WRAPPED IN FILTER FABRIC 45 MIL HDPE POND LINER OR EQUIVALENT
More informationCase Martin Luther King Drive and 212 and 216 North 6 th Street
Case 93 Applicant: Owner: Request: Location: Zoning: Stable Family Investment, LLC Same Site Plan Approval for the District on Martin Luther King a 6 unit, 4-bed residential condominium development 35
More informationHUNTSVILLE PHYSICAL SERVICES DEPARTMENT
HUNTSVILLE PHYSICAL SERVICES DEPARTMENT URBAN DEVELOPMENT SITE PLAN CONTROL DRAWING DESIGN GUIDE April, 2000 (Revised June, 2003) TABLE OF CONTENTS Part A. General Information Page 1 Part B. Site Servicing
More informationC ity of Grande Prairie Development Services Department
C ity of Grande Prairie Development Services Department FAIRWAY DEVELOPMENT OUTLINE PLAN OP 08 09 Approved April 6, 2009 Prepared by: Focus Corporation Table of Contents 1.0. Introduction 2 3 1.1. Plan
More informationGPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts
Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationSpreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev
Spreadsheet Report Page 1 Phase I Wickenburg, AZ SD Estimate Rev 0 9-29-11 Project name Estimator Labor rate table Equipment rate table Job size Duration Wickenburg AZ Hal White Denver Denver 121 ac 9
More informationCITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details
CITY OF LATHROP Department of Public Works DESIGN & CONSTRUCTION Standard Details January 2014 General G-1A Signature Blocks G-1B Signature Blocks G-2 Drafting Standards G-3 Drafting Standards G-4 Drafting
More informationFederal Project No.: OC-095-1(365), OC-095-1(367)
Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-964-415, C501 Federal Project : OC-095-1(365), OC-095-1(367) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING CONSTRUCTION
More informationPLAN SUBMITTER'S CHECKLIST
Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write
More informationSILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.
STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE
More informationTown of Essex Small Site Erosion Control Guide
Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams
More informationPRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT
PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL
More informationAPPLICATION FOR SITE PLAN REVIEW
www.appleton.org APPLICATION FOR SITE PLAN REVIEW Community and Economic Development Department 100 N. Appleton St. PH: 920-832-6468 Appleton, WI 54911 FAX: 920-832-5994 Stamp date received PROPERTY OWNER
More information5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion
Topics Erosion, TESC and Construction sequencing Procedures and timing Remedies for failing sites Curtis Hinman WSU Extension and Bio Systems Eng. Faculty Low Impact Development Specialist chinman@wsu.edu
More informationProject: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.
City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:
More informationFACT SHEET: Pervious Pavement with Infiltration
FACT SHEET: Pervious Pavement with Infiltration DESCRIPTION Pervious pavement is a Green Infrastructure (GI) technique that combines stormwater infiltration, storage, and structural pavement consisting
More informationDESIGN SCENE SUBJECT INDEX
DESIGN SCENE SUBJECT INDEX CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS
More informationSheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'
LOCATED IN THE SOHWEST QUARTER OF SECTION, TOWNSHIP SOH, Case # Z 6 - Legal Description Tract G, H and J of the Villages at Riverdale Filing No., a part of the Southwest quarter of Section, Township South,
More informationSOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL
Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing
More informationSTANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS
STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B
More informationSection 11 Grading and Drainage Standards
Section 11 Grading and Drainage Standards 11.1 INTRODUCTION The proper grading, conveyance, storage and release of storm water is critical to maintain the integrity of the Property. Drainage facilities,
More informationSoil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District
Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District The following is a list of the minimum requirements required on Soil Erosion and Sediment Control
More informationPDR /21/15 Noah Beals 1/7/15 xx
PDR150001 1/21/15 Noah Beals 1/7/15 xx 01.07.15 HTP Harmony Frontage Infrastructure Preliminary Design Review Project Narrative a) What are you proposing/use? The HTP Harmony Frontage Infrastructure project
More informationStandard Drawings Table of Contents
Standard Drawings Table of Contents 1. Standard Symbols, Abbreviations, & Legends 2. 1 Water Service 3. 1 ½ or 2 Water Service 4. 3 Water Service 5. 1 ½ 3 Water Service Manifold Assembly 6. 2 Blow Off
More information6. CPRC Group, requests sketch plan review for 70 Pleasant Hill Road, Map R77, Lot 7
REGULAR MEETING AGENDA Planning Board November 20, 2017 1. Call to Order (7:00 P. M.) 2. Roll Call 3. Approval of Minutes (October 30, 2017) 4. Rosewood Land Development, Inc., requests sketch plan review
More information66-90 RIVER ROAD EAST RESIDENTIAL DEVELOPMENT BREMONT HOMES TOWN OF WASAGA BEACH OPERATIONS AND MAINTENANCE MANUAL. Prepared by: Phone:
66-90 RIVER ROAD EAST RESIDENTIAL DEVELOPMENT BREMONT HOMES Prepared by: Pinestone Engineering Ltd. Barrie Office 20 Bell Farm Road, Unit 1 Barrie, Ontario L4M 6E4 Phone: 705-503-1777 Email: Web: pinestone@pel.ca
More informationHomeowners Guide to Stormwater BMP Maintenance
Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management
More informationOctober 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report
October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and
More informationWILSON PLACE FINAL DESIGN
WILSON PLACE FINAL DESIGN SANTA MONICA, CA P:\2007\07-812.1_Borderline_Neighborhood\04 Design\Sheetfiles\_Phases\DD Wilson Place\C4.0 Grading and Drainage Plan.dwg,C1.0 Coversheet,Mike Amodeo,4/9/2009
More informationTitle 11 Streets and Sidewalks
Chapter 11.01 - Definitions Title 11 Streets and Sidewalks Low Impact Development (LID) - A stormwater and land use management strategy that strives to mimic predisturbance hydrologic processes of infiltration,
More informationCHAPTER 5: SITE DEVELOPMENT
CHAPTER 5: SITE DEVELOPMENT SECTION 5.1 GRADING, DRAINAGE, AND EROSION AND SEDIMENT CONTROL... 1 A. General... 1 1. Natural Features... 1 2. Plant Materials... 1 3. Drainage, Sedimentation, Erosion...
More informationPS12 CITY OF TERRE HAUTE VIGO COUNTY, INDIANA DRAWING NO. EXISTING AND NEW STRUCTURE DATA TABLE JW, CM. No. DATE DESCRIPTION REVISED BY JLH ACS
C JW, CM EXISTING AND NEW STRUCTURE DATA TABLE PS12 #5933 NEW OUTFALL STRUCTURE #1 1"=60' EXISTING OPENING THROUGH TREE LINE ( SEWER AND OUTFALL STRUCTURE SHALL BE INSTALLED AT THIS LOCATION TO AVOID ANY
More informationENGINEERS AND SURVEYORS INSTITUTE A public/private partnership CITY OF ALEXANDRIA, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS SITE PLAN
ENGINEERS AND SURVEYORS INSTITUTE A public/private partnership CITY OF ALEXANDRIA, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS SITE PLAN PROJECT NAME: PROJECT ADDRESS: TAX MAP REFERENCES: ENGINEER: E-MAIL:
More informationAppendix G. Detailed Design
Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information
More informationEROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL 1 EROSION & SEDIMENT CONTROL Effective Soil & Water Protection Whether you want to prevent soil erosion caused by rain, water and wind, or protect waterways from inevitable build
More informationCHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment
CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017
& PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL
More informationTour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed
Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed On September 8 th, 2006 Minnesota's Lake Superior Coastal Program and the South St Louis Soil and Water Conservation
More informationORDINANCE NO LC
ORDINANCE NO. 07-52-LC AN ORDINANCE OF THE CITY OF DESTIN, FLORIDA RELATING TO EROSION AND SEDIMENT CONTROL; PROVIDING FOR AUTHORITY; PROVIDING FOR FINDINGS OF FACT; PROVIDING FOR THE CREATION OF LAND
More informationREMOVE 20' OF STONE WALL C.C.B. REBUILD 20' OF R=1,000.00' L=130.00' CONSTRUCTION STONE WALL ENTRANCE PER DETAIL R=1,000.00' L=65.09' DMH U.P. HYD.
45.2' EROSION CONTROL NOTES: 1. EROSION CONTROLS SHALL BE INSTALLED PRIOR TO ANY EXCAVATION. EROSION CONTROLS SHALL BE MAINTAINED IN GOOD CONDITION AT ALL TIMES. EROSION CONTROLS SHALL REMAIN UNTIL SUCH
More informationTamarac St. Valentia St. E. 128th Avenue SITE
Quebec St. Tracts,H & J LOCATED IN THE SOHWEST QUARTER OF SECTION 8, TOWNSHIP SOH, RANE 67 WEST OF THE 6TH P.M., Legal Description Tract, H and J of the Filing No., a part of the Southwest quarter of Section
More informationCITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL
CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL The following is a list of conditions requiring completion to the City s Satisfaction prior to Site Plan Approval being granted
More informationMonica Smith, PE President Robinson Engineering Company
Monica Smith, PE President Robinson Engineering Company Owner Robinson Engineering Masters Degree in Water Resource Management for Colorado State University The Dry Run Creek project got me interested
More informationAPPROXIMATE LIMIT OF CITY LANDFILL LIMIT OF CONTRACTOR WORK ZONE. INSTALL CONSTRUCTION SNOW FENCE.
EX. 5Ø WM EX. 6Ø SAN EX. 4Ø STM EX. 5Ø SAN EX. 75Ø SAN APPROXIMATE LIMIT OF CITY LANDFILL ZONE. INSTALL CONSTRUCTION SNOW FENCE. STUB FOR FUTURE 6Ø WATERMAIN 4 6 8 ZONE. INSTALL CONSTRUCTION SNOW FENCE.
More informationINFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities
7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure
More informationIllinois Urban Manual
Illinois Urban Manual Jim Nelson: Association of Illinois Soil and Water Conservation Districts (AISWCD) Funding for this project provided, in part, by the Grand Victoria Foundation of Elgin IL, the Governor
More informationThe Engineer/Developer s Perspective on Storm Water Management
The Engineer/Developer s Perspective on Storm Water Management CASE STUDY: An Innovative Approach to Storm Water Management for Small Parcel Site Development Presented by: James B. Leedom, P.E. The Sigma
More informationNAPA COUNTY PUBLIC WORKS Standards & Specifications
Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6
More information