1 EIR Scoping Meeting MULTI-BENEFIT/MULTI USE PROJECT in Hahamongna Watershed Park July 12, 2012 and July 14, 2012 presented by City of Pasadena, Department of Public Works and Willdan Engineering
2 Purpose of this Meeting Describe the project to the community Provide information regarding CEQA and the EIR process Get community input on the scope of EIR What should be considered? What are your environmental concerns? Identify alternatives and mitigation measures Identify the next steps and additional opportunities for public input
3 Hahamongna Watershed Park Master Plan Establishes a community vision for the park Identifies projects for the restoration and enhancement of the park Does not provide projectlevel detail Master EIR analyzed entire Master Plan on the program level
4 Hahamongna Multi-Benefit/Multi-Use Project Sycamore Grove Field Westside Perimeter Trail Berkshire Creek Restoration Habitat Restoration Oak Grove Field Restroom Foothill Drain Improvements Expanded Parking Area
5 Sycamore Grove Field New multi-purpose sports field Ancillary park furnishings (e.g., picnic tables, barbecues, benches, etc.) Improvements to existing ~50- person amphitheatre Relocate at least 4 existing disc golf holes Part of site is currently used for overflow parking; part of site is vegetated open space
6 Westside Perimeter Trail Trail improvements to provide year-round access on a portion of the larger Perimeter Trail loop Provides a connection between the Flint Wash Bridge trail crossing and the Sycamore Field area of the park
7 Berkshire Creek Restoration Restoration of urban creek and its surroundings Replacement/installation of hydrologic structures (e.g., transition structure, drainage pipe under park road, etc.) Habitat restoration Improvements to water quality entering the Arroyo Seco stream Improvements to facilities at neighboring picnic area Enhancements to the neighboring trail & habitat at Sunrise Overlook Improvements to park road
8 Habitat Restoration Proposed in the vicinity of Sycamore Grove Field, along the Westside Perimeter Trail, along Berkshire Creek, within Berkshire Creek project area, and between the Westside Perimeter Trail and the basin Hahamongna Master Plan calls for: Removal of non-native and invasive plants Sycamore woodland Oak woodland Southern willow scrub Mulefat
9 Oak Grove Field Restroom Replace burnt-down restroom Would be comparable to existing newly upgraded restrooms in the park Would include storage space Sewage lift station Foothill Drain Improvements Intended to correct a drainage and erosion problem on the slope above Oak Grove Field Extend drain pipe down the slope
10 Expanded Parking Area Expand existing parking area south into open space/disc golf area Approximately 110 spaces Replace parking capacity affected by Sycamore Grove Field Reconfigure affected disc golf facilities Ancillary improvements (e.g., repairs/resurfacing) to park road NO expansion of road capacity
11 Project Objectives Respect, and to the extent applicable to the project, implement the Guiding Principles for the Arroyo Seco and the Goals and Objectives of the HWP Master Plan. Respect, and to the extent applicable to the project, implement the goals and objectives of the City of Pasadena s Green Space, Recreation and Parks Element, Open Space & Conservation Element, and Green City Action Plan. Implement components of the HWP Master Plan, leveraging state, local, and other funding sources as available. Satisfy the commitments that the City of Pasadena has made in grant applications for components of the project. Comply with the requirements of awarded grants and committed funding entities.
12 Project Objectives Comply with the provisions of the Settlement Agreement between the City of Pasadena and the Spirit of the Sage Council regarding the Arroyo Seco Master Plan Project Master EIR. Restore, enhance, and reestablish the historical native plant communities of the Arroyo Seco, including improving habitat quality and diversity where possible, and removing non-native and invasive plants where possible. Correct the erosion and sedimentation impacts that have occurred in the Berkshire Creek drainage and provide for a self-sustaining watercourse that manages flows and water quality with appropriate improvements.
13 Project Objectives Improve the quality of stormwater in Berkshire Creek by capturing urban trash before it enters the basin. Restore creek/stream hydrology in Berkshire Creek. Respect the functional benefits of the Hahamongna Basin and Devil s Gate Dam and the County of Los Angeles responsibility to maintain those facilities and their functional benefits. Assist the City in meeting the demand for athletic fields.
14 Project Objectives Provide a safe and suitable trail system for hiking and equestrian use that links the Flint Wash Bridge with trails in the Oak Grove Area and that is passable year-round during most years of normal rainfall; secondarily this trail system should afford adequate access for security, emergency responses, and maintenance vehicles. Accommodate, to the extent possible, existing recreation facilities, including but not limited to disc golf, hiking, cycling, soccer, softball/baseball, day camp, etc., during project construction. Provide adequate parking in the project area for existing and proposed recreational activities and facilities.
15 California Environmental Quality Act and the Environmental Impact Report Process
16 What is an EIR? Informational document that informs the public and decisionmakers about potential impacts of a project Problem solving document that identifies ways to avoid or lessen impacts: Mitigation Measures (ways to lessen impacts) Alternatives (other ways of accomplishing the Project Objectives) Environmental impacts are just one of the factors considered by the decision-makers when deciding whether or not to approve a project
17 What is a Supplemental EIR? Project-level analysis that adds to or modifies the analysis in the Arroyo Seco Master EIR, which was a program-level analysis that considered the Arroyo Seco Master Plans Considers substantial changes to the project in this case project details that were not available at the Master Plan-level Considers substantial changes to circumstances under which the project is being proposed
18 The EIR Process We are here
19 Steps in the EIR Process Adequacy of EIR Analysis Adequacy of Responses Certification Hearing Final EIR Response to Comments Public Comment Period Scope of EIR Draft EIR Scoping Meeting Initial Study/Notice of Preparation We are here
20 Role of the EIR Consultant To work with City staff to prepare a technical document that: analyzes the environmental impacts of the project identifies ways to lessen impacts clarifies the environmental issues and choices Provide guidance to the City on complying with CEQA The EIR Consultant is not an advocate for a particular decision the task is to assist in environmental issue identification and resolution
21 Preliminary Scope of EIR Aesthetics Air Quality Biological Resources Cultural Resources Greenhouse Gas Emissions Hydrology and Water Quality Noise Transportation/Traffic
22 How To Stay Informed Sign up for mailing list: Sign-up cards available today Visit the project website: Send an Call: City of Pasadena, Parks & Natural Resources Staff at Write to: City of Pasadena Department of Public Works, Rm. N306 Attn: Engineering Division/MBMU Project 100 N. Garfield Avenue Pasadena, CA 91101
23 Where Documents are Available for Review Project website: Printed copies of Initial Study and, when available, Draft EIR: City of Pasadena, Permit Center (Window 3), 175 N. Garfield Avenue, Pasadena, CA Central Library,285 E. Walnut Avenue, Pasadena, CA La Cañada Flintridge Library, 4545 N. Oakwood Ave., La Canada Flintridge, CA Altadena Library, 600 East Mariposa St., Altadena, CA 91001
24
ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET
A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -
More informationADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS
ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213
More informationFY Capital Improvement Program Arroyo Projects
FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 Hahamongna - Implement Master Plan - Oak Grove Area Improvements (7756) Hahamongna - Implement Master
More informationImproving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment
Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment Arroyo Seco Headwaters in the San Gabriel Mountains Major tributary to the Los Angeles River 44 square mile
More informationSECTION 2.0 PROJECT DESCRIPTION
SECTION 2.0 PROJECT DESCRIPTION The is located approximately 10 miles northeast of the City of Los Angeles in the County of Los Angeles (Figure 2.1-1, Regional Map). The proposed Arroyo Seco Master Plan
More informationOak View Estates Specific Plan
Oak View Estates Specific Plan Environmental Impact Report SCOPING MEETING MARCH 14, 2018 CITY OF BRADBURY PLANNING DEPARTMENT Welcome and Project Team Kevin Kearney, City Manager Jim Kasama, City Planner
More informationLong Branch-Wayne Local Park Renovation Project
Montgomery Parks Long Branch-Wayne Local Park Renovation Project Community Meeting #2 September 20, 2016 Oak View Elementary School 7:00-9:00 PM Welcome / Team Introductions M-NCPPC (Montgomery Parks)
More informationNOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE WEST BROADWAY SPECIFIC PLAN COMMENT PERIOD
DATE: July 11, 2018 TO: FROM: RE: Interested Persons Tom Buford, Principal Planner Community Development Department NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE WEST
More informationThe River Future. San Gabriel River Confluence with Cattle Canyon Creek Improvements Project (the Cattle Canyon Project)
The River Future San Gabriel River Confluence with Cattle Canyon Creek Improvements Project (the Cattle Canyon Project) Collaboration Agency Leads Engaged Stakeholders Non-Profit Organizations USFS Pacific
More informationPublic Hearing April 12, Information as of April 12, 2018
Public Hearing April 12, 2018 Meeting Agenda California Environmental Quality Arts District Act (CEQA) Project Area Overview Project Background & Description Draft Environmental Impact Report (DEIR) Next
More informationArroyo Seco Foundation
Arroyo Seco Foundation October 11, 2000 Ms. Rosa Laveaga Arroyo Seco Park Supervisor Planning and Permitting Department 175 North Garfield Pasadena, California 91109 RE: Arroyo Seco Master Plan Initial
More informationRedesigning Vogel Flat Angeles National Forest, California
Redesigning Vogel Flat Angeles National Forest, California WRPI Watershed Management Internship 2017 Cristina Plemel, Master s of Landscape Architecture California State Polytechnic University, Pomona
More informationCOMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:
COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT http://www.edcgov.us/devservices/ PLACERVILLE OFFICE: LAKE TAHOE OFFICE: 2850 Fair Lane Court, Placerville, CA 95667 924 B Emerald Bay Rd.
More informationCITY OF ALHAMBRA DEVELOPMENT SERVICES DEPARTMENT 111 S. First Street. Alhambra, CA (626) FAX (626)
CITY OF ALHAMBRA DEVELOPMENT SERVICES DEPARTMENT 111 S. First Street. Alhambra, CA 91801 (626) 570-5030 - FAX (626) 458-4201 NOTICE OF PREPARATION TO: SUBJECT: Agencies, Organizations and Interested Parties
More informationCity of Los Angeles Department of Public Works
City of Los Angeles Department of Public Works Environmental Scoping Meeting for the Proposed Sixth Street Park, Arts, River & Connectivity Improvements (PARC) Project May 3, 2017 1 Agenda Introductions
More informationFY Capital Improvement Program Arroyo Projects - Lower Arroyo Summary
LOWER ARROYO FY 214-218 Capital Improvement Program Description FY 213 FY 214 FY 215 FY 216 FY 217 FY 218 1 Bird Sanctuary Improvements (7749) 35, 225, 125, 2 Lower Arroyo - Implement Master Plan - Signage
More information(DRAFT) SUMMARY OF CARRYING CAPACITY ANALYSIS
Envrionmental Education Center (Area F) 1 Park ranger/facility manager residence & detached garage (1,388 2 Xeriscape demo garden (5,300 3 Outdoor classroom (south) (4,200 4 Main building (total 7,000:
More informationDepartment of Community Development. Planning and Environmental Review Division Revised Notice of Preparation
Department of Community Development Michael J. Penrose, Acting Director Divisions Building Permits & Inspection Code Enforcement County Engineering Economic Development & Marketing Planning & Environmental
More informationNOTICE OF PREPARATION
NOTICE OF PREPARATION DATE: January 6, 2016 TO: LEAD AGENCY: Responsible Agencies, Organizations, and Interested Parties Contact: Tyler Barrington, Principal Planner Planning Department Community Development
More informationProject Team. 2M Associates. City of Saratoga. HT Harvey Biology. PlaceWorks. NV5 Infrastructure. Tom Origer Associates History/Archeology
Project Team City of Saratoga John Cherbone, Director of Public Works Iveta Harvancik, Senior Engineer PlaceWorks Isabelle Minn, Principal-in-Charge Isby Fleischmann, Project Manager Kyle Simpson, CEQA
More informationFY Capital Improvement Program Parks and Landscaping. 8 - Summary
PARK PROJECTS FY 211-215 Capital Improvement Program Description FY 21 FY 211 FY 212 FY 213 FY 214 FY 215 1 Restroom Bldgs (Replace or Construct)-Jefferson, McDonald, 5,774,623 4,669,623 1,15, Allendale,
More informationNotice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project
of an Environmental Impact Report and Scoping Meeting for the As the Lead Agency, the County of San Mateo (County) will prepare an Environmental Impact Report (EIR) for the (project), and would like your
More informationSCC PRD (2016) COUNTY PARK MASTER PLAN
SCC PRD (2016) COUNTY PARK MASTER PLAN MASTER PLAN UPDATE PARKS AND RECREATION COMMISSION NOVEMBER 7, 2018 PURPOSE OF THE MASTER PLAN The Sanborn County Park Master Plan will provide the Department with
More informationFY Capital Improvement Program Arroyo Projects - Central Arroyo Summary
CENTRAL ARROYO FY 214-218 Capital Improvement Program Description FY 213 FY 214 FY 215 FY 216 FY 217 FY 218 1 Trail and Rubble Wall Restoration - Central Arroyo (77371) 1,94,66 543,848 55,812 2 Brookside
More informationPG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER
PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER CEQA scoping Meeting March 19 th, 2014 Winters City Council Chambers - 6:30 pm AGENDA FOR THE MEETING 6:30 Welcome (John Donlevy) 6:40 Overview
More informationNOTICE OF PREPARATION
Date: June 30, 2017 CITY OF CITRUS HEIGHTS COMMUNITY & ECONOMIC DEVELOPMENT DEPARTMENT, PLANNING DIVISION 6360 Fountain Square Drive, Citrus Heights, CA 95621 (916) 727-4740 NOTICE OF PREPARATION To: Subject:
More informationWelcome to the San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101
Welcome to the San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101 Public Scoping Meeting June 6, 2013 Open House 7:00 7:15 Project Presentation
More informationCALIFORNIA ERIC GARCETTI MAYOR NOTICE OF PREPARATION. Responsible Agencies, Trustee Agencies, Stakeholders, and Interested Parties
BOARD OF PUBLIC WORKS MEMBERS KEVIN JAMES PRESIDENT MONICA RODRIGUEZ VICE PRESIDENT HEATHER MARIE REPENNING PRESIDENT PRO TEMPORE MICHAEL R. DAVIS COMMISSIONER JOEL F. JACINTO COMMISSIONER FERNANDO CAMPOS
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN
TO: FROM: SUBJECT: Honorable Mayor and City Council Planning Department ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN RECOMMENDATION: It is recommended that the City Council:
More informationNOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC SCOPING MEETING: VERMONT CORRIDOR PROJECT
NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC SCOPING MEETING: VERMONT CORRIDOR PROJECT DATE: May 4, 2017 TO: FROM: PROJECT TITLE: PROJECT ADDRESS: All Interested Agencies,
More informationCounty of Los Angeles
SACHI A. HAMAI Chief Executive Officer County of Los Angeles CHIEF EXECUTIVE OFFICE Kenneth Hahn Hall of Administration 500 West Temple Street, Room 713, Los Angeles, California 90012 (213) 974-1101 http://ceo.lacounty.gov
More informationSaratoga Quarry Park Master Plan
Project Team City of Saratoga John Cherbone, Director of Public Works Iveta Harvancik, Senior Engineer PlaceWorks Isabelle Minn, Principal-in-Charge Isby Fleischmann, Project Manager Kyle Simpson, CEQA
More informationFAQ S about Restoration Planning FROM THE Department of Ecology WEBSITE:
FAQ S about Restoration Planning FROM THE Department of Ecology WEBSITE: http://www.ecy.wa.gov/programs/sea/sma/st_guide/smp/restoration/qanda.html Notations in parentheses are staff notes directing you
More information2019 Hillcrest Campus LRDP EIR Scoping Meeting
2019 Hillcrest Campus LRDP EIR Scoping Meeting March 21, 2018 Agenda Scoping Meeting Purpose Hillcrest Campus Context What Is The Long Range Development Plan (LRDP)? Why A New Plan? Key LRDP Components
More informationNotice of Preparation and Notice of Public Scoping Meeting. At Dublin Project
Notice of Preparation and Notice of Public Scoping Meeting Date January 17, 2018 To Project Title Project Application Number Project Location Project Applicant Contact For questions or submitting comments.
More informationDecember 18, January 14, 2019, 5:00 P.M. 7:00 P.M. See below for additional information.
December 8, 208 ENVIRONMENTAL CASE NO.: ENV-208-6667-EIR PROJECT NAME: Reese Davidson Community Project PROJECT APPLICANT: Venice Community Housing Corp./ Hollywood Community Housing Corp. PROJECT ADDRESS:
More information4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING
4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING 4.7.1 INTRODUCTION The following analysis discusses the consistency of the Proposed Project with the corresponding land use and zoning designations
More informationChris James Park Planner July 16, Master Plan Kick Off Meeting
Chris James Park Planner July 16, 2014 Master Plan Kick Off Meeting Meeting Overview Introductions Purpose of Meeting and Master Plan History & Background of Park Property Prior Planning Considerations
More informationCITY OF SIMI VALLEY MEMORANDUM
CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. 9.1 May 18, 2016 TO: FROM: Planning Commission Department of Environmental Services SUBJECT: REVIEW OF POTENTIAL FISCAL YEAR (FY) 2016-17 CAPITAL IMPROVEMENT
More information& SUSTAINABILITY PLAN
Chapter 6: IMPLEMENTATION, MANAGEMENT, & SUSTAINABILITY PLAN Overview The Oxbow Park and Zollman Zoo Master Plan presents a long-term vision for the park. While phasing of improvements is suggested, Olmsted
More informationLos Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona
Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona The Los Angeles River Watershed Arroyo Seco Watershed Map
More informationParks, Trails, and Open space Element
Parks, Trails, and Open space Element Parks, Trails, and Open Space element Parks, Recreation, and Open Space are important components of the quality of life desired by the residents of Elk Grove. This
More informationCHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA
CHAPTER 2 SUMMARY This is an Initial Study format used to determine, pursuant to CEQA Guidelines Section 15177, whether a project 1) is within the scope of a Master EIR (MEIR), 2) may result in additional
More informationParks, Trails, and Open Space Element
P arks, Recreation, and Open Space are important components of the quality of life desired by the residents of Elk Grove. This Element of the General Plan addresses the City s goals, policies, and actions
More informationCity of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters
City of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters FirstCarbon Solutions Y:\Publications\Client (PN-JN)\2765\27650002\EIR\10
More informationNOTICE OF PREPARATION and ANNOUNCEMENT OF SCOPING MEETINGS
NOTICE OF PREPARATION and ANNOUNCEMENT OF SCOPING MEETINGS Environmental Impact Report Release Date: June 22, 2018 To: Subject: Lead Agency: California and Nevada State Clearinghouses, California Responsible
More informationPARTF Scoring System for Grants
PARTF Scoring System for Grants The members of the N.C. Parks and Recreation Authority use the PARTF scoring system as one of several tools to select grant recipients. Please provide all of the information
More informationSection 3 INVENTORY OF RECREATION LAND AND FACILITIES
Photo of Juan Bautista de Anza Park Section 3 INVENTORY OF RECREATION LAND AND FACILITIES Summary of Findings Park Definitions Summary of Recreation Facilities Other Recreation Facilities Nearby Recreation
More informationRECOMMENDATION REPORT
DEPARTMENT OF CITY PLANNING RECOMMENDATION REPORT City Planning Commission Case No.: CPC-2012-1165-GPA-ZC Date: August 9, 2012 Time: After 8:30 AM Place: City Hall, Room 350 Public Hearing: Required CEQA
More informationNOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING
City of Alhambra October 10, 2017 Development Services Department 111 South First Street Alhambra, CA 91801 NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING CASE NO.: Residential
More informationPLANNING COMMISSION. Submitted
PLANNING COMMISSION City Hall 1275 Main Street El Centro, CA 92243 Submitted PLANNING COMMISSION ACTION ITEM (1844) Meeting: 05/10/16 12:00 AM Department: Community Development Category: Public Hearing
More informationArana Gulch Park Master Plan
809 Center Street, Santa Cruz, CA 95060 Arana Gulch Park Master Plan Executive Summary The Arana Gulch Master Plan completes the last master planning work for the parks and open spaces within the City
More informationCalifornia Environmental Quality Act (CEQA) Environmental Review Process
California Environmental Quality Act (CEQA) Environmental Review Process Los Angeles Union Station Forecourt and Esplanade Improvements constitute a Project Los Angeles County Metropolitan Transportation
More informationCentral Reservoir Replacement Project. Community Meeting #2 February 13, 2018
Central Reservoir Replacement Project Community Meeting #2 February 13, 2018 Project Team EBMUD David Rehnstrom, P.E., Division Manager Bill Maggiore, P.E., Senior Engineer Aaron Hope, P.E., Project Manager
More informationCity of Larkspur. Notice of Mitigated Negative Declaration for the 285
Notice of Mitigated Negative Declaration for the 285 Magnolia Avenue Mixed-Use Project Date: December 2, 2013 Responsible Agency: Project Title: 285 Magnolia Avenue Mixed-Use Project Project Address: 285
More informationNAPA COUNTY LAND USE PLAN
NAPA COUNTY LAND USE PLAN 2008-2030 * LEGEND URBANIZED OR NON-AGRICULTURAL Cities Urban Residential Rural Residential Industrial Public-Institutional Study Area OPEN SPACE * * Agriculture, Watershed &
More informationSTREAM BUFFERS
88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve
More informationMEMORANDUM HONORABLE MAYOR AND CITY COUNCIL MEMBERS. SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING & BUILDING DIRECTOR /s/
MEMORANDUM Agenda Item #: 13 Meeting Date: 9/12/17 TO: THRU: FROM: SUBJECT: HONORABLE MAYOR AND CITY COUNCIL MEMBERS ANTON DAHLERBRUCH, CITY MANAGER /s/ SHERI REPP LOADSMAN, DEPUTY CITY MANAGER/ PLANNING
More informationNOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project
Planning and Development Department Land Use Planning Division NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project Notice
More informationRule D Wetland and Creek Buffers
Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions
More informationPHASE I BUDGET FOR THE GREATER DES MOINES BOTANICAL GARDEN IMPROVEMENTS
The Greater Des Moines Botanical Garden proposes to improve the Des Moines Botanical Center through upgrades to the building and expansion of the exterior landscape. In May of 2011 the Greater Des Moines
More informationCharles P. Johnson and Associates. Annapolis Landscape Architects
Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros
More information& SUSTAINABILITY PLAN
Chapter 6: IMPLEMENTATION, MANAGEMENT, & SUSTAINABILITY PLAN Overview The Chester Woods Master Plan presents a long-term vision for the park. While phasing of improvements is suggested, Olmsted County
More informationCOASTAL CONSERVANCY. Staff Recommendation March 25, 2004 LOS ANGELES GREEN VISION PLAN. File No.: Project Manager: Marc Beyeler
COASTAL CONSERVANCY Staff Recommendation March 25, 2004 File No.: 04-014 Project Manager: Marc Beyeler RECOMMENDED ACTION: Authorization to disburse up to $50,000 to the University of Southern California
More informationCommunity Open House March 26 th, 2018
Community Open House March 26 th, 2018 Open House Agenda 1. Overview of Planning Process What we heard 2. Future Land Use Policy 3. Priority Growth Areas 4. Plan Elements Making it happen What is a Comprehensive
More informationTABLE OF CONTENTS. Tables Table UC Davis Park and Open Space Resources
TABLE OF CONTENTS 4.13 Recreation... 4.13-1 4.13.1 Environmental Setting... 4.13-1 4.13.2 Impacts and Mitigation Measures... 4.13-4 4.13.3 References... 4.13-8 Tables Table 4.13-1 UC Davis Park and Open
More informationWEST OAKLAND SPECIFIC PLAN & DRAFT ENVIRONMENTAL IMPACT REPORT
WEST OAKLAND SPECIFIC PLAN & DRAFT ENVIRONMENTAL IMPACT REPORT Landmarks Preservation Advisory Board Public Hearing February 10, 2014 1 Specific Plan Overview Plan Area is generally bounded by I-580 to
More informationSustainable Storm Water Management
Incorporating Water Management into the Community Planning Process August 16, 2012 Sustainable Storm Water Management Samantha Brown Environmental Engineer SD1 SD1 s Service Area CVG Airport SD1 Service
More informationNOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT
NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT TO: State Clearinghouse, Responsible and Trustee Agencies, and Other Interested Parties DATE: May 18, 2017 SUBJECT: Notice of Preparation of Environmental
More informationSection 3 Non-Structural BMPs
3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide
More informationEnhance the High Line Canal Projects
Enhance the High Line Canal Projects Joint Project Proposal for Arapahoe County Open Spaces Funding Partner Sponsors: South Suburban Park and Recreation District City of Centennial City of Littleton October
More informationArroyo Seco Design Guidelines
Arroyo Seco CITY OF PASADENA Adopted February 28, 2003 THE CITY OF PASADENA ARROYO SECO DESIGN GUIDELINES Adopted: February 28. 2003 The Arroyo Seco Master Plans consist of the following: Hahamongna Watershed
More informationThe scope of the plan will focus on the Prospect Heights Slough and Hillcrest Lake as one entity.
Plan for Prospect Heights Natural Resources Commission Plan for Improved Public Access and Enjoyment of the Prospect Heights Slough and Hillcrest Lake July 23, 2018 The City Council has requested the Natural
More informationBEST MANAGEMENT PRACTICES IN THE ARROYO SECO
BEST MANAGEMENT PRACTICES IN THE ARROYO SECO Francisco Fernandez AECOM Table of Contents Executive Summary... 4 1.0 Introduction... 6 2.0 The Arroyo Seco Watershed... 7 2.1 A Brief History of the Arroyo
More informationPUBLIC EIR SCOPING MEETING
MIRAMAR HOTELPROJECT PUBLIC EIR SCOPING MEETING PCR Services Corporation May 16, 2013 1 INTRODUCTION & MEETING PURPOSE Welcome and introductions City staff / PCR Services Corp., environmental consultant
More informationSan Francisco Bay Pilot: Sausal Creek Community Leader Charrette May 11, 2016 Marcus Griswold
San Francisco Bay Pilot: Sausal Creek Community Leader Charrette May 11, 2016 Marcus Griswold 1 Overview Project Overview Watershed Context Assets and Challenges Opportunities Green Streets Creek Access
More informationPC RESOLUTION NO
PC RESOLUTION NO. 14-01-14-02 TENTATIVE TRACT MAP fttm) 17441. REZONE {RZ) 13-003, ARCHITECTURAL CONTROL (AC) 13-003, TREE REMOVAL PERMIT (TRP) 13-052. GRADING PLAN MODIFICATION (GPM) 13-002. CONDITIONAL
More informationAPPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES
APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES TABLE C-1: Resource Actions and Priorities GOAL NRM-4 Objective 4.1: Restore Natural floodplain functions. Objective 4.2: Define and
More informationNotice of Preparation
Notice of Preparation OF ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING August 23, 2017 CASE NO.: ENV-2017-506-EIR PROJECT NAME: 8th, Hope, and Grand PROJECT APPLICANT: MFA 8th Grand and Hope LLC
More informationNOTICE OF PREPARATION
NOTICE OF PREPARATION To: Agencies, Organizations, and Interested Parties From: City of Alameda, Community Development Services Department Subject: Notice of Preparation of a Draft Environmental Impact
More informationORDINANCE NO
ATTACHMENT CC-1 ORDINANCE NO. 13-2113 AN ORDINANCE OF THE CUPERTINO CITY COUNCIL APPROVING THE REZONING OF AN APPROXIMATELY 1.1 ACRE AREA FROM PARK AND RECREATION (PR) TO PLANNED INDUSTRIAL PARK (P(MP))
More informationStudy Area Map. Wasatch Hollow Open Space Restoration, Use, & Management Plan. Legend. Harrison Ave East. Roosevelt East.
Harrison Ave Roosevelt Emerson «4 «5 Rosecrest 1900 East «3 1800 East Wasatch Hollow Open Space Restoration, Use, & Management Plan Study Area Map Legend «2 «1 Potential Access Location Emigration Creek
More informationCITY OFLOS ANGELES CALIFORNIA
BOARD OF PUBLIC WORKS MEMBERS KEVIN JAMES PRESIDENT HEATHER MARIE REPENNING VICE PRESIDENT MICHAEL R. DAVIS PRESIDENT PRO TEMPORE JOEL F. JACINTO COMMISSIONER VACANT COMMISSIONER FERNANDO CAMPOS EXECUTIVE
More informationCITY OF PASADENA HAHAMONGNA WATERSHED PARK ADVISORY COMMITTEE SPECIAL MEETING MEETING MINUTES
CITY OF PASADENA HAHAMONGNA WATERSHED PARK ADVISORY COMMITTEE SPECIAL MEETING MEETING MINUTES Thursday, April, 200 :00 p.m. Fellowship Hall ~ Salvation Army Fellowship Hall 90 East Walnut, Pasadena, CA
More informationA 3: Scoping Meeting Materials
A 3: Scoping Meeting Materials SCOPING MEETING ACADEMY MUSEUM OF MOTION PICTURES SCOPING MEETING OBJECTIVES Provide information about Academy Museum of Motion Pictures Project Provide information
More informationLas Colonias Park Master Plan
2013 Las Colonias Park Master Plan City of Grand Junction June 2013 Introduction Las Colonias Park, a 101 acre parcel on the edge of the Colorado River south of downtown, was deeded to the City of Grand
More informationMendota Heights 2040 Comprehensive Plan Draft Vers
4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs
More informationBISCUIT RUN PARK MASTER PLAN
BOARD OF SUPERVISORS November 14, 2018 BISCUIT RUN PARK MASTER PLAN COUNTY OF ALBEMARLE ANHOLD ASSOCIATES Contents Project Introduction Property Background County Park Planning Process Existing Site &
More informationNOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT
NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT PUBLIC COMMENT PERIOD November 12, 2015 to December 14, 2015 INTRODUCTION The City
More informationCITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT
CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 Staff Contact: Fred Buderi (707) 449-5307 TITLE: PURPOSE: BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT INFORMATIONAL
More informationSouth Bend Park. Visioning Plan
South Bend Park Visioning Plan 2007 South Bend Park, Visioning Program, Executive Summary The South Bend Park Visioning Program began with the receipt of an application from the Friends of South Bend Park,
More informationOPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN
OPPORTUNITIES AT OXBOW EXISTING WETLANDS Site is undeveloped and we can design a park that works well from the start. SAND BEACH Potential to eliminate invasive species. DEBRIS (CONCRETE, OLD CARS) VEGETATION
More informationPlanning Projects: Highlights
Planning Projects: Highlights In Process, Under Review, and Under Construction. Transportation Advisory Commission October 23, 2014 Overview of Planning Process PPR Entitlement Design Review Building Permit
More information2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016
2035 General Plan Update and Belmont Village Specific Plan Joint Study with the City Council and Planning Commission April 12, 2016 Agenda 1. Welcome and Introductions 2. General Plan Update Status of
More informationPhase 2 Eden Landing Ecological Reserve Scoping Meeting for EIS/EIR. June 30, 2016
Phase 2 Eden Landing Ecological Reserve Scoping Meeting for EIS/EIR June 30, 2016 Today s Purpose Introduction to Scoping / Purpose of Meeting South Bay Salt Pond Restoration Project Project Overview EIS/EIR
More informationRESOLUTION NO: WHEREAS, the subject property has a Public, Semi-Public (PS) zoning designation and a General Plan designation of Institutional; and
RESOLUTION NO: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASADENA APPROVING A 14-YEAR, EIGHT-PHASE MASTER PLAN AMENDMENT FOR HUNTINGTON MEMORIAL HOSPITAL LOCATED AT 100 WEST CALIFORNIA BOULEVARD
More informationPURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationWhittier Greenway Trail. Est. 2009
Whittier Greenway Trail Est. 2009 The Whittier Greenway Trail begins in the northwest corner of Whittier, near the 605 Freeway, and closely parallels Whittier Boulevard. When it reaches Painter Avenue,
More informationTABLE OF CONTENTS 1.0 INTRODUCTION GENERAL OBJECTIVES LAND USE DESIGNATIONS, OBJECTIVES AND POLICIES 4
Schedule I- Redstone Golf Course Resort Area Sector Plan 1 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 GENERAL OBJECTIVES 3 3.0 LAND USE DESIGNATIONS, OBJECTIVES AND POLICIES 4 4.0 TRANSPORTATION AND ROAD
More information