1 Bell Shoals Roadway Widening Phase II Wetland Resource Impact and Mitigation Report

2 Bell Shoals Roadway Widening Wetland Resource Impact and Mitigation Report Document Information Prepared for Hillsborough County Engineering, Division of Public Works / Newland Communities Project Name Bell Shoals Roadway Widening, Phase 2 Project Number Project Manager John Bailey Date August 26, 2014 Prepared for submission to: Southwest Florida Water Management District 7601 US Highway 301, Tampa, FL Prepared by: John B. Bailey, PWS Project Scientist Timothy L. Neldner, PWS Senior Consultant Cardno ENTRIX 3905 Crescent Park Drive, Riverview, FL 33578

3 Bell Shoals Roadway Widening Wetland Resource Impact and Mitigation Report Table of Contents Introduction Project Description and Purpose Site Description Wetland and Surface Water Impact Area Justification and Descriptions Public Interest Wetland Mitigation Listed Species... 7 Tables Table 3.1 Bell Shoals Road Widening, Phase 2, Wetland and Surface Water Impact Area Summary Table... 2 Appendices Appendix A ERP Application Form Tables 1, 2 and 3 Appendix B Wetland Impact Area Cross Sections Appendix C U.S. Coast Guard Approval Letter Appendix D Wetland Impact Area Pictures

4 Bell Shoals Roadway Widening Wetland Resource Impact and Mitigation Report Introduction The Bell Shoals Roadway Improvement Project is part of Hillsborough County s Capital Improvement Program (CIP 69112). Newland Communities and Hillsborough County formed a public/private partnership for the design, permitting and construction of this project in order to satisfy the obligations of the Lake Hutto DRI. The applicant for this approval is Hillsborough County. The roadway is planned to be widened from 2 lanes to 4 lanes including turn lanes, intersection improvements, sidewalks and traffic signals. This report was prepared by Cardno ENTRIX on behalf of Hillsborough County Engineering, Division of Public Works/Newland Communities in order to provide the environmental information necessary to evaluate the environmental aspects of the project in support of the issuance of an Environmental Resource Permit (ERP). This report describes the wetland and wildlife resources present within the Phase 2 project limits, the measures taken to avoid and minimize impacts to wetlands to the extent practicable, and the mitigation offered to compensate for unavoidable impacts to wetlands and listed wildlife species. 1 Project Description and Purpose The Bell Shoals roadway widening project is located in central Hillsborough County, approximately five miles east of the intersection of Interstate 75 and Bloomingdale Avenue near Bloomingdale, Florida. The County s entire CIP project includes the entirely of Bell Shoals Road beginning at the intersection at Fishhawk Boulevard extending northward to approximately 600 feet north of the Bloomingdale Road intersection; however, the Phase 2 portion of the project is limited to the area beginning near Wetland 5 and extending to the northern end of the project (Figure 1. Location Map, and Figure 2. Quad Map). The total length of the Phase 2 portion of the project is approximately 2.3 miles. Phase 2 of the road widening will require 10 permanent impacts to wetlands totaling 1.73 acres as well as 0.71 acre of temporary wetland impacts, and 0.86 acre of impacts to surface waters (ditches) (see Table 3.1 and Figures 3 through 16 detailing the wetland and surface water impact areas). Because of the nature of the project (roadway improvement), there is little that can be done to avoid the proposed wetland impacts. The size of the wetland impacts is minimized by the use of 1:3 side slopes where possible. The loss in wetland functions resulting from the filling of wetlands was quantified by performing a Unified Mitigation Assessment Method (UMAM) analysis on the impact areas. Mitigation for the loss in wetland functions will be provided by the enhancement and creation of wetlands as well as by using the UMAM functional units resulting from the preservation of the Gauss Parcel during a previous phase of the project (see ERP No ). 2 Site Description The project area is limited to the roadway right of way and the areas needed for pond construction. The entire approximately 2.3 miles of the project area consist of residential and commercial developments. There is no native upland habitat remaining within the project limits. Several areas of uplands are included within the project boundaries for pond sites. These areas consist of vacant lots dominated bahia grass (Paspalum notatum) pastures that are no longer used. Wetlands within the project limits were delineated by Cardno ENTRIX and were field inspected and approved by Mr. Joe Andress of the Southwest Florida Water Management District (SWFWMD). Portions May 2013 Cardno ENTRIX 1 Ph2 SWFWMD Final Bell Shoals environmental narrative report.docx

5 Bell Shoals Roadway Widening Wetland Resource Impact and Mitigation Report of the wetland boundaries were also field reviewed by Ms. Pat Frantz of the SWFWMD. Wetland boundaries are shown in the attached wetland impact area Figures 3 through16. All wetlands affected by the project are described below. The wetland summary Tables 1, 2 and 3 of the ERP application have been included as Appendix A. 3 Wetland and Surface Water Impact Area Justification and Descriptions The project limits include only those areas absolutely necessary to construct the project. Avoiding all wetland impacts associated with the road expansion is not possible; however, wetland impacts were minimized by the use of 1:3 side slopes. Ponds sites were chosen based on available vacant land in uplands wherever possible. All wetland and surface water impacts required to construct the project are summarized in Table 3.1, and a detailed description of each wetland impact area is provided below. Table 3.1 Bell Shoals Road Widening, Phase 2, Wetland and Surface Water Impact Area Summary Table Wetland or Surface Water ID Impact ID Wetland type Impact Type Impact Size (ac.) Surface Water 7A A Ditch Fill 0.03 Surface Water 8 A Ditch Fill 0.10 Surface Water 9A-A A Ditch Fill 0.13 Surface Water 9A-B B Ditch Fill 0.31 Surface Water 9A-C C Ditch Fill 0.23 Surface Water 10A A Ditch Fill 0.05 Surface Water 10B A Ditch Fill 0.01 Subtotal: 0.86 Wetland 9 A Ditch Temporary 0.66 Wetland 9 C Ditch Temporary Wetland 9 E Ditch Temporary Wetland 11 B Forested Temporary Subtotal: Wetland 5 A Shrub Fill 0.03 Wetland 5 B Shrub Fill 0.03 Wetland 6 A Ditch Fill 0.19 Wetland 6 B Forested Fill/Dredge 0.53 Wetland 7 A Forested Fill 0.26 Wetland 9 B Ditch Fill 0.42 Wetland 9 D Ditch Fill Wetland 9 F Ditch Fill Wetland 11 A Forested Fill 0.18 Wetland 12 A Forested Fill 0.08 Subtotal: 1.73 May 2013 Cardno ENTRIX 2 cardno_entrix_2012_report_template_1sided_r4.docx

6 Bell Shoals Roadway Widening Wetland Resource Impact and Mitigation Report Wetland 5 Impact Areas A (0.03 ac.) and B (0.03 ac.) These two small wetland impacts are the direct result of construction of the road. The size of the impacts were minimized by the use of 1:3 side slopes (See Appendix B, Wetland Impact Area Cross Sections, Sheet 73). Although Wetland 5 is an altered forested creek system, the canopy has been removed from the proposed wetland impact area and they are in a highly disturbed condition as a result of its location in the maintained right of way. The dominant species include primrose willow, grape vine, blackberry (Rubus argutus), Caesar weed (Uren lobata), Bermuda grass, button bush (Cephalanthus occidentalis) and American elderberry (Sambucus canadensis). This area receives roadway and residential runoff. Wetland 6 Impact Area A (ditch) (0.19 ac.) Wetland 6 Impact Area A is the roadside ditch portion of the wetland that will be directly impacts by construction of the road expansion (See Figure 11). It is dominated by Carolina willow, cattail, primrose willow, torpedo grass and maidencane (Panicum hemitomon). Wetland 6 Impact Area B (0.53 ac.) Wetland 6 Impact Area B is needed to construct a floodplain storage pond and a stormwater pond. This is the only undeveloped area in this portion of the roadway and therefore, to avoid taking existing homes and/or businesses for the ponds, this existing low, wetland area was selected. The floodplain pond area will be replanted with wetland vegetation after construction is completed as described in Section 5. Wetland 6 Impact Area B is forested with a canopy that is approximately 70 percent cover and is dominated by slash pine (Pinus elliottii). The next most prevalent species are laurel oak, live oak (Quercus virginiana) and red maple. The shrub stratum mirrors the overstory. Dominant herbaceous species include poison ivy, Virginia chain fern (Woodwardia virginicus), spikerush (Eleocharis baldwinii), cat briar (Smilax sp.)and grape vine. The wetland receives roadway and residential runoff but, based on the prevalence of upland and facultative tree species, appears to have a short, altered hydroperiod. Wetland 7 Impact Area A (0.26 ac.) Wetland 7 impact A is needed for roadway construction. The portion of Wetland 7 that will be impacted is only approximately 10-feet wide and was minimized by the use of a 1:3 side slope. The proposed impact area consists of the disturbed edge of the wetland and is a part of a maintained electric utility corridor. Most trees are small and less than 30 feet tall as a result of periodic trimming. Because this is the edge of the wetland, the dominant tree is laurel oak, however some maples are also present. Ground cover is very sparse (approximately 5 percent cover), likely the result of the dense canopy cover and long hydroperiod. Surface Water 7A Impact Area A (0.03 ac.) Surface Water 7A Impact Area A is a ditch flowing into a lake that is to the west of the roadway. It is dominated by wild taro (Colocassia esculenta). The impact is needed for roadway construction. Surface Water 8A Impact Area A (0.10 ac.) Surface Water 8A Impact Area A is a ditch that flows from the stormwater management system in the development east of the road. The dominant vegetation is torpedo grass which accounts for approximately 95 percent cover. The impact is needed for roadway construction and was minimized by the use of a 1:3 side slope. Wetland 9 Temporary Wetland Impact Area A (0.66 ac.) Wetland 9 Temporary Impact Area A is needed to construct a floodplain pond. The construction activity will consist of scraping down the north bank of the ditch to elevation feet NGVD. The field verified season high water (SHW) elevation at the west end of Wetland 9 is 40.2 feet NGVD. Although the construction plans show the entirety of Wetland 9 west of the right of way being temporarily impacted, in practice, the area of temporary disturbance will likely be much more limited. May 2013 Cardno ENTRIX 3 cardno_entrix_2012_report_template_1sided_r4.docx

7 Bell Shoals Roadway Widening Wetland Resource Impact and Mitigation Report The portion of the wetland that may be temporarily impacted consists of a ditch through a historic wetland system. The overstory trees are primarily laurel oak growing on the stream bank above the area that experiences wetland hydrology. The creek bottom is sparsely vegetated. The dominant species are wild taro and Virginia chain fern. Wetland 9 Impact Area B (0.42 ac.) Wetland 9 impact B is needed for roadway construction. The size of the proposed impact was minimized by the use of a 1:3 side slope. Wetland 9 Impact Area B is a ditch through a historic wetland. The overstory trees are primarily live oak and laurel oak growing on the stream bank. Much of the canopy is covered with grape vine. The dominant shrub is American elderberry. The herbaceous areas are overgrown with nuisance vegetation including primrose willow, grape vine, skunk vine (Paederia foetida) and air potato (Dioscorea bulbifera). Surface Water 9A Impact Area A (0.13 ac.), B (0.31) C (0.23 ac.) and Surface Water 10A Impact Area A (0.05 ac.) Impacts to Surface Waters 9 and 10A are needed for roadway construction. The flows from these roadside ditches will be maintained via buried 48-inch reinforced concrete pipe. Surface Waters 9 and 10A are upland-cut ditches dominated by nuisance vegetation. The dominant species are primrose willow, climbing hempvine (Mikania scandens) and cattail. There are some non-nuisance species also present including lance-leaved arrowhead (Sagittaria latifolia) and spreading dayflower (Commelina diffusa). Surface Water 10B Impact A (0.01 ac.) This impact is to a very small portion of the upper bank of a stormwater pond dominated by wax myrtle. Wetland 11 Impact Area A (0.18 ac.) Wetland 11 impact A is needed for roadway construction. The portion of Wetland 11 that will be impacted was minimized by the use of a 1:3 side slope. Wetland 11 Impact Area A is the disturbed edge of a forested wetland. The south portion of the area is dominated by a mixture of Carolina willow, Chinese tallow (Sapium sebiferum) and red maple. Skunk vine is prevalent also. The majority of the area is dominated a stand of maple saplings approximately 1 to 2 inches dbh. There is very little herbaceous understory in this area. The 5 to 10 percent cover of herbaceous vegetation consists of about half Virginia chain fern, other half being Chinese tallow seedlings, skunk vine, water grass (Hydrochloa caroliniensis) and alligatorweed (Alternanthera philoxeroides). The wetland appears to have a long hydroperiod. Wetland 11 Temporary Impact Area B (0.007 ac.) This is a very small temporary impact area needed to create an outfall swale for Floodplain pond FP7. No trees will be removed and the area will be allowed to re-vegetate naturally. Wetland 12 Impact Area A (0.08 ac.) Wetland 12 impact A is needed for roadway construction. The entirety of the wetland falls within the right of way. Wetland 12 Impact Area A consists of a small ditch with a small shelf dominated by laurel oak and red maple. Herbaceous vegetation is dominated by wedelia (Wedelia triloba) and taro with small amounts of broadleaf arrowhead (Sagittaria latifolia), primrose willow, swamp fern (Blechnum serrulatum) and skunk vine. May 2013 Cardno ENTRIX 4 cardno_entrix_2012_report_template_1sided_r4.docx

8 Bell Shoals Roadway Widening Wetland Resource Impact and Mitigation Report 4 Public Interest Public Interest The project meets the public interest criteria found in section (1) (a) 1.-7, FAC. The project will not significantly degrade any Outstanding Florida Waters, therefore the public interest standard is merely to demonstrate that the project is not contrary to the public interest. However, we believe that the project is in the public interest because the project is part of Hillsborough County s Capital Improvement Program (CIP 69112). This included a County funded PD&E Study in Newland Communities and Hillsborough County formed a public/private partnership to fund the design and construction for this project in The roadway improvement project will increase traffic safety and reduce traffic congestion. The following is a list of the Public Interest criteria (in italics) followed by a brief discussion of each criterion as it relates to the Bell Shoals Road widening project. a) Whether the regulated activity will adversely affect the public health, safety, or welfare or the property of others. The regulated activity will not adversely affect the public health, safety or welfare, or the property of others. The project will not result in any environmental hazards to public health. The stormwater management system will prevent the project from causing any negative impact to offsite water quality. Traffic safety will be improved as a result of adding the additional capacity to the roadway. Hillsborough County funded and obtained a PD&E Study for this roadway project in b) Whether the regulated activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats. The project will not adversely affect fish and wildlife or their habitats because the habitat that will be impacted is not unique and will be offset by the functional lift provided as a result of the mitigation. The attached Unified Mitigation Assessment Method (UMAM) analysis (Exhibit 1) indicates that this project will result in 1.14 units of functional loss. Mitigation for this project has already been provided as a result of the excess functional lift resulting from the preservation of the Gauss Parcel under ERP No The Gauss Parcel mitigation provided an excess of 1.78 functional units. The ERP issued for expansion of the Bridge over the Alafia River (No ) required the use of 0.08 of the excess functional units, resulting in a remainder of 1.70 excess functional units, 1.14 of which will be required to provide compensation for the wetland impacts required to construct this project. c) Whether the regulated activity will adversely affect the navigation or the flow of water or cause harmful erosion or shoaling. The project will not negatively affect navigation or water flows and will not result in erosion or shoaling. The only navigable water located near the project is the Alafia River. An earlier permitted phase of the project required the widening of the bridge over the Alafia River. The widened bridge will mirror the design of the existing bridge and will not alter the flow of water under the bridge. The bridge expansion has been determined to have no navigational impacts by the U.S. Coast Guard (Appendix B - USCG letter dated August 6, 2012 enclosed). d) Whether the regulated activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity. The project will not affect any marine habitats as there are no marine habitats on-site or near the site. All offsite flows will first be treated in the stormwater management system. e) Whether the regulated activity will be of a temporary or permanent nature. All permanent project impacts will be mitigated. May 2013 Cardno ENTRIX 5 cardno_entrix_2012_report_template_1sided_r4.docx

9 Bell Shoals Roadway Widening Wetland Resource Impact and Mitigation Report f) Whether the regulated activity will adversely affect or will enhance significant historical and archaeological resources under the provisions of Section , F.S. The project will have no effect on historical or archaeological resources. g) The current condition and relative value of functions being performed by areas affected by the proposed regulated activity. The current condition of all on-site habitats is degraded due to the various surrounding and existing uses such as residential and commercial development, utility corridors and transportation networks. The relative value of function being performed by areas within the project will be mitigated or only temporarily disrupted. 5 Wetland Mitigation The UMAM analysis of the wetland impact areas and mitigation area is provided in Exhibit 1. The scores used in the UMAM analysis were verified during a 10 July 2013 field review with staff of the SWFWMD and Hillsborough County EPC. The UMAM analysis shows that the project results in 1.15 units of functional loss. Impacts to wetlands will be mitigated by the establishment of Mitigation Area M-1 (the reestablishment of a marsh in Floodplain Pond 5) and via the excess mitigation created by preservation of the acre Gauss Parcel. Mitigation Area M-1 is the enhancement and expansion of the originally herbaceous Wetland 6. The area will be graded at a 1:4 side slope to a bottom elevation of 63.5 feet NGVD. The SHW elevation of Wetland 6 is feet NGVD. The Planting Plan for Mitigation Area M-1 is shown in Figure 11A. The UMAM analysis indicates that Mitigation Area M-1 results in the creation of 0.14 functional units. The Gauss parcel was provided as mitigation for unavoidable impacts to wetlands required to construct an earlier Phase of this project (the portion of Bell Shoals Road from Fishhawk Boulevard to the Alafia River Bridge, ERP No ). Permit indicates that preservation of the Gauss parcel provided an excess1.78 units beyond that required to compensate for impacts associated with Phase 1 of the project. The ERP issued for expansion of the Bridge over the Alafia River (No ) required the use of 0.08 of the excess functional units, resulting in a remainder of 1.70 excess functional units available for use on this phase of the project. The table below summarizes the UMAM functional units. UMAMCreditSummary Assessment Area Phase2WetlandandSWImpacts MitigationAreaM1 GaussMitigationUnits Functional Units ExcessGaussCreditsSummary GaussParcelExcessMitigation BridgeWideningWetlandImpacts Phase2WetlandandSWImpacts RemainingGaussParcelExcessFunctional Units Functional Units May 2013 Cardno ENTRIX 6 cardno_entrix_2012_report_template_1sided_r4.docx

10 Bell Shoals Roadway Widening Wetland Resource Impact and Mitigation Report Grading of Mitigation Area M-1 is part of the roadway construction. The only costs required to establish the mitigation are planting monitoring and maintenance. We estimate that the cost to establish the mitigation area is less than $25, Listed Species Because of the highly urbanize nature of the project area, potential utilization of the upland and wetland habitats within the project limits by Federal or State listed species of wildlife is extremely limited. The forested and shrubby nature of the wetlands limits the suitability of the habitat as wading bird foraging area. The only listed species that is likely to be affected by the project is the State listed gopher tortoise (Gopherus polyphemus) that may be present on the upland portions of the project proposed as pond sites. These areas have been surveyed and a gopher tortoise relocation permit (no GTC A) was issued by The Florida Fish and Wildlife Conservation (FWC). Because of the relatively high density of roads and predatory pets associated with residential housing, the potential for the eastern indigo snake to occur within the project area is low; however the applicant has no objection to adhering to the standard protection measures for this species as approved by the US Fish and Wildlife Service (FWS). May 2013 Cardno ENTRIX 7 cardno_entrix_2012_report_template_1sided_r4.docx

11 Bell Shoals Roadway Widening Figures

12 Project Location Legend Project Location Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, ipc, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, 2012 rimage:esri Data Source: Sec 23, 24 Twp 30 S Rng 20 E This map and all data contained within are supplied as is with no warranty. Cardno ENTRIX, Inc. expressly disclaims responsibility for damages or liability from any claims that may arise out of the use or misuse of this map. It is the sole responsibility of the user to determine if the data on this map meets the user s needs. This map was not created as survey data, nor should it be used as such. It is the user s responsibility to obtain proper survey data, prepared by a licensed surveyor, where required by law. Figure 1 - Location Map Bell Shoals Road Widening Phase 2 Hillsborough County, Florida 0 3,600 7,200 Feet 0 1,100 2,200 Meters 3905 Crescent Park Drive, Riverview, FL USA Phone (+1) Fax (+1) Date Created: 8/13/2014 Date Revised: 8/13/2014 GIS Analyst: james.bottiger File Path: Q:\UnitedStates\Florida\Tampa\5070\053\working\arcmap\5070_053_SWFWMD&EPC_fig1_loc_A_1_ _jmb.mxd

13 Project Location Legend Project Location rimage:riverview Data Source: Sec 23, 24 Twp 30 S Rng 20 E This map and all data contained within are supplied as is with no warranty. Cardno ENTRIX, Inc. expressly disclaims responsibility for damages or liability from any claims that may arise out of the use or misuse of this map. It is the sole responsibility of the user to determine if the data on this map meets the user s needs. This map was not created as survey data, nor should it be used as such. It is the user s responsibility to obtain proper survey data, prepared by a licensed surveyor, where required by law. Figure 2 - Quad Map Bell Shoals Road Widening Phase 2 Hillsborough County, Florida 0 1,300 2,600 Feet Meters 3905 Crescent Park Drive, Riverview, FL USA Phone (+1) Fax (+1) Date Created: 8/13/2014 Date Revised: 8/13/2014 GIS Analyst: james.bottiger File Path: Q:\UnitedStates\Florida\Tampa\5070\053\working\arcmap\5070_053_SWFWMD&EPC_fig2_quad_A_1_ _jmb.mxd

14 BELL SHOALS ROAD FLOODPLAIN POND FP6 POND 6 FLOODPLAIN POND FP7 MATCH LINE BELL SHOALS ROAD WETLAND IMPACT POND 5 E-105 E-104 E-103 E-102 FLOODPLAIN POND POND 7 BELL SHOALS ROAD BELL SHOALS ROAD E-108 E-110 E-109 E-107 Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/26 11:32 AM JAMES BOTTIGER Figure-3 H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: KEY SHEET WETLAND AND OTHER SURFACE WATERS IMPACT EXHIBIT BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK MATCH LINE SCALE: 1" = 1000' E-106 E-105 SHEET E-100 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

15 0.03 Ac. Wetland 5 Impact A 0.03 Ac. Wetland 5 Impact B Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/22 1:14 PM JAMES BOTTIGER Figure-8 H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: WETLAND IMPACT EXHIBIT BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK 0 1 SCALE: 1" = 1' SHEET E-102 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

16 Limits of Construction Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/13 2:10 PM JAMES BOTTIGER Figure-9 H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: WETLAND IMPACT EXHIBIT BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK 0 1 SCALE: 1" = 1' SHEET E-103 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

17 Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/13 2:10 PM JAMES BOTTIGER Limits of Construction Figure-10 H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: WETLAND IMPACT EXHIBIT BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK 0 1 SCALE: 1" = 1' SHEET E-104 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

18 0.26 Ac. Wetland 7 Impact - A Limits of Construction Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/25 3:23 PM JAMES BOTTIGER 0.1 Ac. Wetland Creation Area Figure-11 H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: BELL SHOALS ROAD WETLAND IMPACT POND 5 PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK MAINTENANCE BERM 0.98 Ac. Wetland Impact / Enhancement Area 0.53 Ac. Wetland 6 Impact - B 0.19 Ac. Wetland 6 Impact A (ditch) WETLAND IMPACT EXHIBIT BELL SHOALS ROAD 0 1 SCALE: 1" = 1' SHEET E-105 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

19 M1 Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE 11A 2014/08/25 3:23 PM JAMES BOTTIGER Figure-11A H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: Mitigation Area - M1 (1.08 ac.) Zone Scientific Name Common Name Acres Quantity Size Spacing Spartina bakeri sand cordgrass gal 3' o.c. Pontederia cordata Sagittaria lancifolia Scirpus validus Eleocharis interstincta pickerelweed lance-leaved arrowhead great bulrush knotted spikerush Thalia geniculata alligator flag Nuphar lutea spatter-dock MITIGATION AREA M1 PLANTING PLAN BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK " pot/bare root eq. 3' o.c. Cephalanthus occidentalis buttonbush 886' 60 3 gal 15' o.c SCALE: 1" = 50' SHEET E-105A COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

20 Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/13 2:12 PM JAMES BOTTIGER Limits of Construction Figure-12 H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: WETLAND IMPACT EXHIBIT BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK 0 1 SCALE: 1" = 1' SHEET E-106 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

21 0.03 Ac. Surface Water 7A Impact - A Limits of Construction Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/13 2:13 PM JAMES BOTTIGER Figure-13 H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: WETLAND IMPACT EXHIBIT BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK 0 1 SCALE: 1" = 1' SHEET E-107 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

22 0.23 Ac. Surface Water 9A Impact - C FLOODPLAIN POND FP Ac. Wetland 9 Impact D Ac. Wetland 9 Temporary Impact C Ac. Wetland 9 Impact F Ac. Wetland 9 Temporary Impact E POND Ac. Wetland 9 Temporary Impact A POND 6 DHW 100= 47.6 DHW 25= 46.7 DLW= 43.5 NWL= FLOODPLAIN POND Limits of Construction 0.42 Ac. Wetland 9 Impact B 0.10 Ac. Surface Water 8 Impact - A BELL SHOALS ROAD Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/25 11:02 AM JAMES BOTTIGER Figure-14 H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: WETLAND IMPACT EXHIBIT BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK 0 1 SCALE: 1" = 1' SHEET E-108 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

23 0.18 Ac. Wetland 11 Impact - A 0.08 Ac. Wetland 12 Impact - A Limits of Construction 0.01 Ac. Surface Water Impact 10B Impact - A Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/13 2:14 PM JAMES BOTTIGER 0.13 Ac. Surface Water 9A Impact A 0.05 Ac. Surface Water 10A Impact - A 0.31 Ac. Surface Water 9A Impact B Figure-15 H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: WETLAND IMPACT EXHIBIT BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK 0 1 SCALE: 1" = 1' SHEET E-109 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

24 FLOODPLAIN POND FP POND 7 Limits of Construction POND 7 DHW 100 = 50.2 DHW 25 = 49.8 DLW= 48.8 NWL= 48.5 BELL SHOALS ROAD Q:\UNITEDSTATES\FLORIDA\TAMPA\5070\053\WORKING\CAD\ACOE_BELL_SHOALS_ERP_FIGURES_ DWG -FIGURE /08/25 11:02 AM JAMES BOTTIGER Figure Ac. Wetland 11 Temporary Impact H E I D T DESIGN 5806-B Breckenridge Parkway Tampa, Florida Phone: Ac. Wetland 11 Impact - A 0.08 Ac. Wetland 12 Impact - A WETLAND IMPACT EXHIBIT BELL SHOALS ROAD PREPARED FOR: HILLSBOROUGH COUNTY DEPARTMENT OF PUBLIC WORKS DATE: 04/26/2013 DRAWN BY: CBK SCALE: 1" = 100' SHEET E-110 COPYRIGHT 2012, HEIDT DESIGN, LLC. ALL RIGHTS RESERVED. NO DOCUMENTATION (INCLUDING BUT NOT LIMITED TO DRAWINGS OR EXHIBITS) MAY BE COPIED, REPRODUCED, OR DISTRIBUTED UNLESS SPECIFIC WRITTEN PERMISSION HAS BEEN OBTAINED FROM HEIDT DESIGN, LLC. IN ADVANCE. CONSENT IS HEREBY GRANTED SPECIFICALLY TO GOVERNMENTAL AGENCIES TO REPRODUCE THIS DOCUMENTATION IN COMPLIANCE WITH F.S. CHAPTER 119.

25 Bell Shoals Roadway Widening Exhibit 1 UMAM ANALYSIS

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59 Bell Shoals Roadway Widening APPENDIX AERP APPLICATION FORM TABLES 1, 2 AND 3

60 Table 1: Project Wetland and Other Surface Water Summary Wetland/ SW ID Type Size Portion Not Impacted Temporary Impacts Permanent Impacts Type Size Impact Type Type Size Impact Type Mitigation Area ID W F Gauss W6* F Gauss W6** F M-1 W F Gauss SW 7A F Gauss SW F Gauss W grading F Gauss SW9A F Gauss SW10A F Gauss SW10B F Gauss W grading F Gauss W F Gauss Total *This is the area of Wetland Impact A. **This is the remainder of Wetland 6. Comments: The Gauss Parcel has1.78 units of excess mitigation provided in ERP no by the preservation of the Gauss Parcel. Notes: WL=Wetland; SW=Surface Water; ID=Identification number, letter, etc. Wetland type: from an established wetland classification system Impact Type: D=Dredge; F=Fill; H=change hydrology; S=shading, C=Clearing; O=other

61 Table 2: Project On-Site Mitigation Summary Mitigation Area ID Area Creation Restoration Enhancement Wetland Preserve Upland Preserve Target type Area Target type Area Target type Area M M Target type Area Target type Total Note: Florida Land Use, Cover and Forms Classification code 641 = freshwater marsh Area Other Target type

62 Table 3: Project Off-Site Mitigation Summary Mitigation Area ID Area Creation Restoration Enhancement Target type Area Target type Area Target type Area Wetland Preserve Target type Upland Preserve Gauss parcel Area Target type Area Other Target type Total Notes: 1) Florida Land Use, Cover and Forms Classification code 412 = longleaf pine xeric oak, code 630 = wetland forested mixed, 2) The Gauss Parcel was offered as mitigation and placed under a conservation easement for Phase 1 of this project under ERP no The UMAM analysis conducted as part of permit demonstrated that preservation of the Gauss Parcel generated 3.15 functional units and that the wetland impacts resulted in the loss of 1.37 functional units. Permit specified that the excess 1.78 functional units were available to the permittee for future use. This project will require the use of 1.01 units of the 1.78 reserved units. The applicant reserves the right to use the remaining 0.80 functional units for future use.

63 Bell Shoals Roadway Widening APPENDIX B WETLAND IMPACT AREA CROSS SECTIONS

64 H E I D T

65 H E I D T

66 Bell Shoals Roadway Widening APPENDIX C

67

68

69 Bell Shoals Roadway Widening APPENDIX D WETLAND IMPACT AREA PICTURES

70 Photo 16. Surface Water 7A Impact A Photo 17. Surface Water 8 Impact A

71 Photo 18. Surface Water 9A Impact A Photo 19. Surface Water 9A Impact A

72 Photo 20. Surface Water 9A Impact B (facing south) Photo 21. Surface Water 9A Impact C (facing south)

73 Photo 22. Surface Water 10A Impact A Photo 23. Surface Water 10A Impact A/Wetland 11Impact A

74 Photo 24. Wetland 5 Impact A Photo 25. Wetland 5 Impact B

75 Photo 26. Wetland 6 Impact A Photo 27. Wetland 6 Impact B

76 Photo 28. Wetland 7 Impact A Photo 29. Wetland 7 Impact B

77 Photo 30. Wetland 9 Impact B Photo 31. Wetland 9 Impact A

78 Photo 32. Wetland 11 Impact A Photo 33. Wetland 12 Impact A

79 Photo 34. Wetland 12 Impact A

Towne Park Estates Subdivision Phase II

Towne Park Estates Subdivision Phase II Towne Park Estates Subdivision Phase II ENVIRONMENTAL NARRATIVE October 21, 2014 Submitted to: Submitted by: Horner Environmental Professionals, Inc. 4252 Hay Road Lutz, Florida 33559 HEP TOWNE PARK ESTATES

More information

Table 1. Physical Characteristics of Your Lake.

Table 1. Physical Characteristics of Your Lake. The lake assessments are created in partnership with Hillsborough County and the Florida Center for Community Design and Research LAKE ASSESSMENT DOCUMENT Lake Virginia /23/98 Watershed: Rocky/ Brushy

More information

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana JOINT PUBLIC NOTICE 26 June 2017 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services 7400

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

Section 1 TABLE OF CONTENTS

Section 1 TABLE OF CONTENTS Section 1 TABLE OF CONTENTS... [M]ineral fertilizer is essential to feed around half of the world s population, and will be fundamental to ensure global food security through the 21 st century. 2013 U.N.

More information

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative Introduction Mitchell Ranch South is a proposed single family (detached) residential development on

More information

Gadsden County Planning Commission Agenda Request

Gadsden County Planning Commission Agenda Request Date of Meeting: November 16, 2017 To: From: Through: Subject: Gadsden County Planning Commission Agenda Request Honorable Chairperson and Members of the Board Jill A. Jeglie, AICP, Senior Planner Clyde

More information

Information for File # MHK

Information for File # MHK Information for File #2014-03555-MHK Applicant: Corps Contact: Wimmer Communities Marie Kopka Address: 250 N. Sunnyslope Road, Suite 296 Brookfield, Wisconsin 53005 E-Mail: Marie.H.Kopka@usace.army.mil

More information

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future. The Duck Pond Watershed is located in northern Hillsborough County in an area in which a number of land and water management issues are currently being addressed by citizen's action groups and state, regional

More information

MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION

MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION MEMORANDUM OF BOG TURTLE HABITAT INVESTIGATION 410-728-2900 Fax: 410-728-3160 www.rkk.com To: From: CC: U.S. Fish and Wildlife Service, Pennsylvania Fish and Boat Commission Jennifer A Ottenberg Miller,

More information

SITE SUMMARY REPORT Arlington Dump NONCD Yadkin County

SITE SUMMARY REPORT Arlington Dump NONCD Yadkin County SITE SUMMARY REPORT Arlington Dump NONCD 0000644 Yadkin County Hurricane Recovery Act of 2005 State of North Carolina State Contract N06009S Schnabel Project No. 06210002.15 July 31, 2009 Prepared for:

More information

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST City of Seminole 9199 113 th Street N. Seminole, FL 33772 Ph: (727) 392-1966 Fx: (727) 319-6583 SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST Note: This checklist is designed to aid designers in the review

More information

January 18, JOINT PUBLIC NOTICE Savannah District/State of Georgia

January 18, JOINT PUBLIC NOTICE Savannah District/State of Georgia DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3640 January 18, 2019 Regulatory Branch SAS-2009-00770 JOINT PUBLIC NOTICE Savannah District/State

More information

COLLIER BOULEVARD (CR 951) CORRIDOR

COLLIER BOULEVARD (CR 951) CORRIDOR Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts

More information

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS Chapter 6: Stormwater Management 6.1. INTRODUCTION This Chapter describes the current drainage patterns on the Project Site, the stormwater management system that is proposed as part of the Proposed Project,

More information

MILL POND OVERLOOK. A project of the Town of Oyster Bay. Prepared by Cameron Engineering & Associates, LLP

MILL POND OVERLOOK. A project of the Town of Oyster Bay. Prepared by Cameron Engineering & Associates, LLP MILL POND OVERLOOK A project of the Town of Oyster Bay Prepared by Cameron Engineering & Associates, LLP Funded in part through an EPF grant from the NYS Department of State Project Goals & Advisory Committee

More information

TREE REMOVAL PERMIT PACKET

TREE REMOVAL PERMIT PACKET PERMIT INTAKE HOURS Permit Applications will be accepted between 8:30 am and 4:30 pm. Community Development Engineering Division 38 Hill Street, Suite G-30 Roswell, GA 30075 770-641-3780 www.roswellgov.com

More information

Information for File #MVP DAS

Information for File #MVP DAS Information for File #MVP201702209DAS Applicant: HyVee, Inc. Corps Contact: David Studenski Address: 1114 South Oak Street, La Crescent, Minnesota 559471560 EMail: david.a.studenski@usace.army.mil Phone:

More information

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers Stormwater Standards Clackamas County Service District No. 1 APPENDIX B Planting Guide for Buffers Table of Contents Appendix B - Planting Guide for Buffers... Page B.1 General... 1 B.1.1 Introduction...

More information

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL

More information

Application for Certificate of Environmental Compatibility and Public Need

Application for Certificate of Environmental Compatibility and Public Need Application for Certificate of Environmental Compatibility and Public Need Central Hudson Gas & Electric A and C Lines Towns of Pleasant Valley, LaGrange, Wappinger, and East Fishkill Dutchess County,

More information

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County ARTICLE VI. PERFORMANCE STANDARDS Section 600 Compliance All uses, activities, subdivisions and/or land developments

More information

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION FOR AVALON INN (APN 069-241-27 & -04) 1201 & 1211 NORTH MAIN STREET FORT BRAGG, CA MENDOCINO COUNTY prepared for:

More information

Huntington Stormwater Utility

Huntington Stormwater Utility Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April

More information

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS Caldwell County Pathways along with our co-partners City of Lenoir, Town of Gamewell,

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 4 To conserve, manage, appropriately use and protect the natural resources of the City ensuring continued resource availability and environmental

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

Sec/Twp/Rge: S12/T33S/R18E, S01/T33S/R18E, S06/T33S/R19E, S07/T33S/ R19E

Sec/Twp/Rge: S12/T33S/R18E, S01/T33S/R18E, S06/T33S/R19E, S07/T33S/ R19E April 03, 2015 Cavoli Engineering, Inc. John F. Cavoli, P.E. 5824 Bee Ridge Road, Suite 325 Sarasota, FL 34233 Subject: Clarification of Received Information Project Name: Buckhead Trails Subdivision Application/Petition

More information

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES TABLE C-1: Resource Actions and Priorities GOAL NRM-4 Objective 4.1: Restore Natural floodplain functions. Objective 4.2: Define and

More information

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m. Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)

More information

Chesapeake Bay Critical Area Conservation Plan

Chesapeake Bay Critical Area Conservation Plan The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL R-1: DEVELOP A RECREATION, OPEN SPACE AND GREENWAYS SYSTEM AS AN INTEGRAL COMPONENT OF AN OVERALL, COUNTY-WIDE ECONOMIC

More information

LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER [Rules Effective July 1, 2004]

LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER [Rules Effective July 1, 2004] LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER 6135 [Rules Effective July 1, 2004] Minnesota Department of Natural Resources Division of Lands and Minerals

More information

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. November 30, 2017

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. November 30, 2017 SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY November 30, 2017 Agenda Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Existing Conditions Corridor Constraints

More information

Pond Siting Report Update

Pond Siting Report Update Pond Siting Report Update Prepared for: Florida Department of Transportation District 5 CR 46A Realignment from SR 46 to North of Arundel Way Lake County, Florida FPID No. 238275-8-32-02 October 2013 (Draft

More information

Chapter 4 - Preparation of Stormwater Site Plans

Chapter 4 - Preparation of Stormwater Site Plans Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed

More information

SECTION 4(f) DE MINIMIS DOCUMENTATION

SECTION 4(f) DE MINIMIS DOCUMENTATION SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)

More information

APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS CARRBORO DEVELOPMENT GUIDE APPENDIX A

APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS CARRBORO DEVELOPMENT GUIDE APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS Conceptual Preliminary Guide/Checklist for Major Subdivisions Page 1 FORM: REVIEW DATE: CONCEPTUAL PLAN REVIEW 2000 REVIEWED BY:

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015 Public Notice U.S. Army Corps In Reply Refer to US Army Corps of Engineers, Pittsburgh District of Engineers Notice No. below 1000 Liberty Avenue Pittsburgh District Pittsburgh, PA 15222-4186 Application

More information

Information for File # MVP MMJ; Elim Care

Information for File # MVP MMJ; Elim Care Information for File # MVP-217-2628-MMJ; Elim Care Applicant: Elim Care of Maple Plain Corps Contact: Melissa Jenny Address: 18 Fifth Street East, Suite 7, St. Paul, MN 5511-168 E-Mail: Melissa.m.jenny@usace.army.mil

More information

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION County: Linn County, IA GREEN SHEET Location: IA 100, from its terminus at Edgewood Rd. to US 30 southwest of Cedar Rapids Route: IA 100 Extension Project No.: NHS-100-1(36) 19-57 OLE Project Managers:

More information

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001 STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP 2014-0030 FEBRUARY 26, 2015 CPA - 1 OWNER/APPLICANT: AGENT: REQUEST: HANS HEIM PO BOX 238 APTOS, CA 94001 JAMES HAY PO BOX 762 MENDOCINO, CA 95460

More information

Understanding Drainage Options What s Feasible and Legal. February 2019

Understanding Drainage Options What s Feasible and Legal. February 2019 Understanding Drainage Options What s Feasible and Legal February 2019 Outline for the Presentation Do you need a permit? Does common law apply? Does local government approve it? Will my neighbor allow

More information

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk

More information

CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707)

CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707) CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707) 449-5140 TITLE: THE FARM AT ALAMO CREEK ENVIRONMENTAL IMPACT REPORT (EIR)

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM DATE REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL Community Development PUD Concept & Development Stage Plan Preliminary Plat & Final Plat PREVIOUS

More information

Woolley and Lee Properties Choctawhatchee Bay, Walton County. SAJ IP-AWP, issued 3/3/08

Woolley and Lee Properties Choctawhatchee Bay, Walton County. SAJ IP-AWP, issued 3/3/08 LIVE OAK PENINSULA MITIGATION FIRST ANNUAL MONITORING REPORT Woolley and Lee Properties Choctawhatchee Bay, Walton County SAJ-2007-1175 IP-AWP, issued 3/3/08 Impact: US 331 (US 98 to Choctawhatchee Bay)

More information

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road 13. corner of 159 th Street and Quivira Road 1. APPLICANT: HNTB Corporation is the applicant for this request. 2. REQUESTED ACTION: The applicant is requesting approval of a preliminary plat for a 383-lot

More information

USF System Campus Master Plan Updates Goals, Objectives and Policies

USF System Campus Master Plan Updates Goals, Objectives and Policies 2015-2025 USF System Campus Master Plan Updates Goals, Objectives and Policies Tampa Goals, Objectives, and Policies Table of Contents Executive Summary 2015 2025 USF Campus Master Plan Update Introduction

More information

Healthy Living Strategy: Shorelines

Healthy Living Strategy: Shorelines Healthy Living Strategy: Shorelines Shoreline Vegetation in Muskoka The basis of a natural ecosystem is a complex combination of vegetation that forms canopy, understory, and herbaceous layers. It is easier

More information

City of Sun Prairie Wetland Buffer Reduction Request

City of Sun Prairie Wetland Buffer Reduction Request City of Sun Prairie Wetland Buffer Reduction Request Westside Development Area January 9, 2017 Prepared by: City of Sun Prairie 300 E. Main Street Sun Prairie, WI 53590 BACKGROUND The City of Sun Prairie

More information

October 28, May 25, 2010

October 28, May 25, 2010 October 28, 2009 May 25, 2010 Jim Farr Staff Director, Acquisition and Restoration Council Office of Environmental Services Division of State Lands Florida Department of Environmental Protection 3900 Commonwealth

More information

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY Board of County Commissioners Public Hearing March 20, 2018 Presentation Overview Study Overview Existing Conditions Project Development Plan Public Involvement

More information

Northern Branch Corridor SDEIS March 2017

Northern Branch Corridor SDEIS March 2017 14. Water Quality 14.1. Chapter Overview 14.1.1. Introduction This section discusses changes to the potential for activities associated with the development and operation of the Preferred Alternative to

More information

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination I-494 Rehabilitation Project SP 2785-330 (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination State Project Number 2785-330 Federal Project No. NHPP-I494 (002) Trunk Highway:

More information

Josephine County, Oregon Board of Commissioners: Jim Riddle, Dwight F. Ellis, & Jim Raffenburg

Josephine County, Oregon Board of Commissioners: Jim Riddle, Dwight F. Ellis, & Jim Raffenburg Josephine County, Oregon Board of Commissioners: Jim Riddle, Dwight F. Ellis, & Jim Raffenburg PLANNING OFFICE Michael Snider, Director 510 NW 4 th Street / Grants Pass, OR 97526 (541) 474-5421 / FAX (541)

More information

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES 7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM

More information

Non-Metallic Mining Reclamation Checklist

Non-Metallic Mining Reclamation Checklist Eau Claire County DEPARTMENT OF PLANNING AND DEVELOPMENT Eau Claire County Courthouse, Rm. 1510 721 Oxford Avenue Eau Claire, Wisconsin 54703-5481 (715) 839-4741 f Housing & Community Development 839-6240

More information

CHAPTER BEAUTIFICATION AND LANDSCAPE MANAGEMENT

CHAPTER BEAUTIFICATION AND LANDSCAPE MANAGEMENT APPLICATIONS FOR BEAUTIFICATION GRANTS (STARTING FISCAL YEAR 2017-2018) MUST ADHERE TO THE REQUIREMENTS OF RULE CHAPTER 14-40, FLORIDA ADMISTRATIVE CODE Including the pending revisions shown below CHAPTER

More information

Response to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo)

Response to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo) Environmental Science & Assessment, LLC MEMORANDUM DATE: August 13, 2010 TO: Oregon City Planning CC: Jill Long Lane Powell FROM: RE: Jack Dalton Response to Comments (July 28, 2010 Oregon City Determination

More information

water resource specialists

water resource specialists Vaughn Collins, PE, CFM, Northwest Hydraulic Consultants Brad Livingston, Oregon Department of Transportation Melissa Reich, North Coast Land Conservancy Location Necanicum River 75 sq mi watershed Active

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review City of Pontiac Office of Land Use and Strategic Planning 47450 Woodward Ave, Pontiac, MI 48342 T: 248.758.2800 F: 248.758.2827 Property/Project Address: Sidwell Number:

More information

March 31, PENNDOT District Geerdes Road King of Prussia, PA Attn: Mr. Lawrence J. Link, P.E. Dear Mr. Link:

March 31, PENNDOT District Geerdes Road King of Prussia, PA Attn: Mr. Lawrence J. Link, P.E. Dear Mr. Link: March 31, 2002 PENNDOT District 6-0 7000 Geerdes Road King of Prussia, PA 17406 Attn: Mr. Lawrence J. Link, P.E. Re: S.R. 4005 and 4007, Sections 15P & 15B Germantown Avenue Reconstruction Project Letter

More information

Exhibit A. 8:9 Scuffletown Rural Conservation District

Exhibit A. 8:9 Scuffletown Rural Conservation District Exhibit A 8:9 Scuffletown Rural Conservation District 8:9.1 Intent and Purpose The Scuffletown Rural Conservation (SRC) District is intended to provide for residential development that supports the development

More information

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies GOAL 1: To create developmental patterns that direct future growth to appropriate areas on campus, in a manner that promotes the educational mission of the University, the protection of environmentally

More information

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

Goal 1 To establish and follow land use patterns for the long-range development of the campus. ELEMENT 4 FUTURE LAND USE Goal 1 To establish and follow land use patterns for the long-range development of the campus. Objective 1A Correct existing incompatible campus land uses. Policy 1A-1 Reduce

More information

Article 6 Tree Protection

Article 6 Tree Protection Article 6 Tree Protection 8.1 Purpose 8.2 Applicability 8.2.1 General Provisions 8.2.2 Exemptions 8.3 Permitting Procedure 8.4 Planting Procedure 8.5 Performance Guarantee Required for Belated Planting

More information

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We will provide you information on the overall project and

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

Appendix 2.2: Hicks & Company Preliminary Field Investigations of WOTUS Memo

Appendix 2.2: Hicks & Company Preliminary Field Investigations of WOTUS Memo Appendix 2.2: Hicks & Company Preliminary Field Investigations of WOTUS Memo 1504 WEST 5TH STREET AUSTIN, TEXAS 78703 TEL: 512 / 478.0858 FAX: 512 / 474.1849 January 8, 2018 To: Mr. Kane Carpenter Environmental

More information

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina 1.0 INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 U.S.C. 303, requires that prior to

More information

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION Site Development Plan Submittal Application Requirements Project Name: Project Site Plan # C: Date: Instructions: All submissions

More information

Weston s Wetlands, Stormwater, & Open Space

Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Weston s Wetlands, Stormwater, & Open Space Conservation Commission Role and Responsibilities Laws that protect wetlands What residents can do to protect wetlands

More information

PASCO COUNTY, FLORIDA

PASCO COUNTY, FLORIDA PASCO COUNTY, FLORIDA Bringing Opportunities Home June 3, 205 WEST PASCO GOVERNMENT CENTER PLANNING AND DEVELOPMENT DEPARTMENT 873 CITIZENS DRIVE, SUITE 230 NEW PORT RICHEY, FL 34654 TELEPHONE: (727) 847-832

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

EXHIBIT A LAND USE EQUIVALENCY MATRIX

EXHIBIT A LAND USE EQUIVALENCY MATRIX EXHIBIT A LAND USE EQUIVALENCY MATRIX Trade To Single Family Single Family Multi- Shopping Medical Nursing Trade From Detached (DU's) Attached (DU's) Family (DU's) Center (KSF) ALF (Beds) Hotel (Rooms)

More information

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No. September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

Public Information Centre. Welcome

Public Information Centre. Welcome Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff

More information

Polpis Bike Path. General Impacts: 1.47 acres forested, marsh, shrub swamp

Polpis Bike Path. General Impacts: 1.47 acres forested, marsh, shrub swamp Polpis Bike Path File No.: 199201570 City and State: Nantucket, MA General Impacts: 1.47 acres forested, marsh, shrub swamp Functions and Values Lost: (from EA/SOF) Floodflow Alteration Groundwater Discharge

More information

ME DOT Route 3. File No.: City and State: Bar Harbor, ME

ME DOT Route 3. File No.: City and State: Bar Harbor, ME ME DOT Route 3 File No.: 199600361 City and State: Bar Harbor, ME General Impacts: 0.28 acre tidal emergent 0.77 acre non-tidal forested 0.15 acre non-tidal emergent 0.51 acre non-tidal scrub-shrub Functions

More information

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

North Carolina Department of Transportation Project Development and Environmental Analysis Branch North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,

More information

There are 11 different micro-ecosystems that are found in 76 different areas throughout Stoneybrook. They are divided into three major groups.

There are 11 different micro-ecosystems that are found in 76 different areas throughout Stoneybrook. They are divided into three major groups. by Larry Eichert There are 11 different micro-ecosystems that are found in 76 different areas throughout Stoneybrook. They are divided into three major groups. Wetlands Upland Mitigated sections (a term

More information

Major Subdivision Sketch Plan Checklist

Major Subdivision Sketch Plan Checklist This checklist provides specific requirements that are apart of the Sketch process. The entire process is described by the Huntersville Subdivision Review Process which details all the submittal and resubmittal

More information

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses NRDB Why Use Density Bonuses & This Checklist Local units of government

More information

Section General Tree Preservation Requirements for New Nonresidential and Residential Development

Section General Tree Preservation Requirements for New Nonresidential and Residential Development DIVISION 2: TREE PRESERVATION AND PROTECTION Section 5.5.2.1 General Tree Preservation Requirements for New Nonresidential and Residential Development (a) Application. The provisions of this Section apply

More information

Preparing a Wetland Delineation Report

Preparing a Wetland Delineation Report Preparing a Wetland Delineation Report Why is the report important? In addition to documenting the wetland determination/delineation, the report often provides the basis for further regulatory permitting/compliance.

More information

Decision Notice. Proposed Action

Decision Notice. Proposed Action Decision Notice Paving Weld County Road 105 USDA Forest Service Arapaho and Roosevelt National Forest and Pawnee National Grassland Pawnee National Grassland Ranger District Weld County, Colorado November

More information

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 July 7, 2015 RFP NO. 16-02 POPES CREEK RAIL TRAIL DESIGN ADDENDUM NUMBER ONE TO: All

More information

Ecosystem Restoration Business Line Budgeting A Systems Approach

Ecosystem Restoration Business Line Budgeting A Systems Approach Ecosystem Restoration Business Line Budgeting A Systems Approach Laura Orr (NWS), Shawn Phillips (MVM), Greg Steele (NAO) Introduction Chesapeake Bay Bridge Mouth of Mississippi River Bonneville Dam Fish

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward

More information

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships)

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships) Information for File MVP-2014-03830-MMJ; Reconstruction (Waconia and Watertown Townships) Applicant: Carver County Corps Contact: Melissa Jenny Address: 180 Fifth Street East, Suite 700, St. Paul, MN 55101