1 Waterfront Promenade adjacent to the Hong Kong Children's Hospital at Kai Tak Harbourfront Commission Aug 2015
2 Project Scope 1. A continuous traffic-free pedestrian waterfront promenade 2. Landscaped areas with benches, rain shelters, pavilions & flowering trees 3. Easy accessibility from the Hong Kong Children s Hospital 4. Children s play area 5. Ancillary facilities (including toilets, meter room, baby care room, drinking fountains, park lighting, storage room and a depot) 2
3 Location Plan 3
4 Site Context Located in the South Apron of Kai Tak Development (KTD) area (approx. 6710m 2 ) 企業廣場 5 期 Enterprise Square Five 4
5 Shing Fung Road Project Site Plan Project Site 5
6 Site Photos B Site Area Approx m 2 Approx. 339m (Length) x 20m (Width) A View A Project Site View B Kai Tak Cruise Terminal Project Site Hong Kong Children s Hospital (under construction) 6
7 Site Photos C View C Stormwater drainage channel 7
8 Site Photos Existing seawall at +3.6m drop to +2.7m near Shing Fung Road View D View E View F 8
9 Shing Fung Road Cheung Yip Street Existing Topography Level difference (about 1000mm) between the promenade and the existing Shing Fung Road
10 Shing Fung Road Existing Trees Cheung Yip Street Only 1 existing tree within site on top of the seawall in fair condition Recommended to be felled 10
11 Connectivity Vehicular Circulation Pedestrian Circulation Kowloon Bay Kowloon Bay Van to Kowloon Bay MTR Station Kwun Tong Kai Tak Runway 11
12 Shing Fung Road District Cooling System 6m (width) non-building zone along the waterfront for District Cooling System by EMSD 2 no. of large Sectional Valve Pits Sectional valve pit Sectional valve pit 12
13 Shing Fung Road Drainage Reserves 3 no. of 8m (width) non-building zone Drainage Reserves 8m non-building zone for Drainage Reserve Sectional valve pit 8m non-building zone for Drainage Reserve Sectional valve pit 8m non-building zone for Drainage Reserve 13
14 Shing Fung Road Loading Limit 10kPa (max) loading requirement at 10m zone from sea wall 20kPa (max) loading requirement at 10m zone from HKCH 8m non-building zone for Drainage Reserve Sectional valve pit 8m non-building zone for Drainage Reserve Sectional valve pit 8m non-building zone for Drainage Reserve 14
15 Thematic Design Historical Significance South Apron of ex-kai Tak Airport 15
16 Thematic Design Children x Playful x Energetic 16
17 Master Layout Plan 17
18 Shing Fung Road Connectivity Visual Linkage Hong Kong Children s Hospital Cheung Yip Street Existing Kwun Tong Promenade Panoramic sea view (towards Kai Tak Cruise Terminal) Existing View at Night Project Site 18
19 Shing Fung Road Connectivity Barrier-free Pedestrian Access Hong Kong Children s Hospital Cheung Yip Street 19
20 Shing Fung Road Way findings Path with Thematic Design Hong Kong Children s Hospital Cheung Yip Street Promenade Stepped seating Rain shelter with seating Feature seating Viewing Deck Pavilion Lawn Rain shelter with seating Children's play area Depot Entrance Plaza Toilet & baby care room 20
21 West Entrance Visual Linkage with Kai Tak Runway Shing Fung Road Pedestrian Entrance Stepped seating 啟德香港兒童醫院旁的海濱長廊 21
22 Thematic Feature Design Children s Play Area 22
23 West Entrance Entrance Plaza Cheung Yip Street Pedestrian Entrance 23
24 Ancillary Facilities Accessibility Cheung Yip Street Pedestrian Entrance Depot Toilet & Baby Care Room Pedestrian Path 24
25 Green Coverage Site Coverage of Greenery Requirement Total Greenery Areas At-grade Greenery Areas As required by PDS for Kai Tak Development 40% 20% Area of the Site = 6710m 2 Site Coverage of Greenery requirements: (a) Minimum total Greenery Areas = 2684m 2 (i.e. 40% of Area of the Site) (b) Minimum At-grade Greenery Areas = 1342m 2 (i.e. 20% of Area of the Site) At-grade Greenery Types of countable Greenery Areas Site Coverage of Greenery Greenery Areas (m 2 ) Reduction Factor (%) 2858 (Subject to adjustment upon N/A design development) 2858/6710 x 100% = 42.5% (Subject to adjustment upon design development) 25
26 Thank You
Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study. PlanD CEDD GPA IRD ArchSD
Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study PlanD CEDD GPA IRD ArchSD Overview of Kai Tak Former North Apron Kai Tak Land Use Plan Kowloon Bay To Kwa
More informationTask Force on Kai Tak Harbourfront Development
Task Force on Kai Tak Harbourfront Development For discussion on 1 September 2014 TFKT/08/2014 Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study PURPOSE This
More informationTask Force on Kai Tak Harbourfront Development. Station Square at Kai Tak
For discussion on 24 February 2017 Station Square at Kai Tak PURPOSE This paper seeks Members views on the design of the Station Square at Kai Tak. BACKGROUND 2. Upon the relocation of the Hong Kong International
More informationTask Force on Kai Tak Harbourfront Development
Task Force on Kai Tak Harbourfront Development For discussion on 29 March 2018 TFKT/04/2018 Study of Kai Tak Promenade Design Control and Guidelines Conceptual design scheme for Promenade at Runway Precinct
More informationTask Force on Kai Tak Harbourfront Development. Update on Implementation of Public Creatives in Kai Tak Development
Task Force on Kai Tak Harbourfront Development For information on 24 February 2017 TFKT/05/2017 Update on Implementation of Public Creatives in Kai Tak Development PURPOSE This paper updates Members on
More informationOverview of Land Use Framework for Victoria Harbourfront. Planning Department February 2011
Overview of Land Use Framework for Victoria Harbourfront Planning Department February 2011 Background TPB set out Vision Statement for the Victoria Harbour in 1999 To make Victoria Harbour attractive,
More informationTask Force on Kai Tak Harbourfront Development. Proposed Establishment of Government Flying Service Kai Tak Division at Ex-Kai Tak Runway Tip
Task Force on Kai Tak Harbourfront Development For discussion on 08 September 2017 TFKT/16/2017 Proposed Establishment of Government Flying Service Kai Tak Division at Ex-Kai Tak Runway Tip PURPOSE This
More informationTask Force on Water-land Interface
Task Force on Water-land Interface For discussion on 2 June 2016 TFWL/02/2016 An Overview of Railing Design along Victoria Harbourfront PURPOSE This paper gives Members an overview of the design of existing
More informationUrban Microclimate Design in Hong Kong
Urban Microclimate Design in Hong Kong Mr CHEUNG Hau-wai, SBS Chairman, Hong Kong Green Building Council 28 April 2018 HKGBC Guidebook on Urban Microclimate Study A collaboration between HKGBC an Chinese
More informationAgreement No. CE 57/2013 (TT) Pedestrian Environment Improvement Scheme for Transformation of Kwun Tong Business Area.
Agreement No. CE 57/2013 (TT) Pedestrian Environment Improvement Scheme for Transformation of Kwun Tong Business Area Executive Summary 1 1. Study Background 1.1. Kwun Tong was traditionally an important
More informationSub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting
Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee Ninth Meeting Date: 5 October 2005 Time: 3:30pm Venue: Conference Room 15/F, North Point Government Offices, 333 Java Road, North
More informationRepresenting Hong Kong Institution of Engineers. Representing Society for Protection of the Harbour
11th Meeting of Harbourfront Commission Task Force on Kai Tak Harbourfront Development 5 February 2013 (Tuesday) at 2:15 p.m. in Conference Room (Room G46) at Upper Ground Floor, Hong Kong Heritage Discovery
More informationTask Force on Harbourfront Developments on Hong Kong Island. Hong Kong Island East Harbour-front Study
For discussion on 30 August 2011 Hong Kong Island East Harbour-front Study PURPOSE The purpose of this paper is to seek Members views on the recommended enhancement proposals formulated under the Hong
More informationPreliminary Land Use Proposal for the Western Part of Kennedy Town Task Force on Harbourfront Developments on Hong Kong Island
Preliminary Land Use Proposal for the Western Part of Kennedy Town Task Force on Harbourfront Developments on Hong Kong Island 2013.6.7 Planning Department Review Area Review Area WIL s works area Bus
More informationSMOKE AND FIRE CURTAINS
SMOKE AND FIRE CURTAINS ALWAYS PROTECTING PEOPLE Specialising in fire and smoke engineering solutions for the construction and industrial, Smoke and Fire curtains, GELEC is the world-wide supplier and
More informationEast Grove Public Realm
H - - MP - Elephant Park Public Realm RO EY DN NEW KENT ROAD E AC PL The public realm has been designed to create an environment which is easy to move through, accessible to all, safe and playful. The
More informationTask Force on Harbourfront Developments on Hong Kong Island
Task Force on Harbourfront Developments on Hong Kong Island For discussion on 10 May 2012 TFHK/04/2012 Proposed Composite Hotel, Residential and Public Open Space Development In Comprehensive Development
More informationTask Force on Kai Tak Harbourfront Development. Minutes of Twenty-sixth Meeting
Task Force on Kai Tak Harbourfront Development Minutes of Twenty-sixth Meeting Date : 5 April 2017 (Wednesday) Time : 2:30 p.m. Venue : 15/F Conference Room, North Point Government Offices, 333 Java Road,
More informationTask Force on Kai Tak Harbourfront Development
Task Force on Kai Tak Harbourfront Development Minutes of Fourteenth Meeting Date : 14 January 2014 Time : 2:30 p.m. Venue : Conference Room, 15/F, North Point Government Offices, 333 Java Road, North
More informationTask Force on Harbourfront Developments in Kowloon, Tusen Wan and Kwai Tsing. Provision of An Art Square at Salisbury Garden, Tsim Sha Tsui
For discussion on 22 January 2013 Provision of An Art Square at Salisbury Garden, Tsim Sha Tsui PURPOSE This paper outlines the proposal to create an art square at Salisbury Garden, being the first phase
More informationHBF Marine Study: Victoria Harbour: Water dependent and water related uses and associated land/water interface implications
HBF Marine Study: Victoria Harbour: Water dependent and water related uses and associated land/water interface implications Presentation on the Initial Findings 9 February 2011 Harbour Business Forum Background
More informationBy & Fax. Creating a Better Pedestrian Environment to Improve Streetscape and Promote Walking
The Secretary for Transport and Housing, Transport and Housing Bureau, 22/F, East Wing, Central Government Offices, 2 Tim Mei Avenue, Tamar, Hong Kong. (Attn. Mr. Chan Fan, Frank JP) Dear Mr. Chan, By
More informationProvidence Waterfront Park
I-195 Redevelopment Parcels Providence Waterfront Park June 30, 2014 I-195 30% Design Review 1 November 19, 2012 endorses open space design. 2 Design Chronology October 2013 10% Design Submitted for both
More informationThe South-East Kowloon Planning Review (2005-6)
The Hong Kong Institute of Architects Position Paper on The South-East Kowloon Planning Review (2005-6) A) Background The Hong Kong Institute of Architects (HKIA) has been invited by the Planning Department
More informationVEHICULAR AND PEDESTRIAN CIRCULATION
This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide
More informationSALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem
SALEM PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY For the City of Salem 6-13-17 This process undertaken by Weston & Sampson is to outline preliminary ideas only of what possibilities exist for
More informationGOODY CLANCY WITH KITTELSON & ASSOCIATES RHODESIDE & HARWELL FARR ASSOCIATES W-ZHA
1 1. Welcome 5 min. 2. Follow-up from 9/22 / Corridor of Light, ground floor uses 20 min. 3. Small on-site open spaces / Overview of types, identities 15 min. 4. Rosslyn Plaza Park / Rosslyn Plaza PDSP
More informationAppendix B. Tentative Silt Curtain Layouts
Expansion of Hong Kong International Airport into a Three-Runway System Appendix B. Tentative Silt Curtain Layouts 25 February 2017 B.1 Marine Filling Activities Figure B.1: Tentative Layouts of Silt Curtains
More informationCENTRAL HARBOURFRONT AND ME (CHarM) DESIGN BRIEF
CENTRAL HARBOURFRONT AND ME (CHarM) DESIGN BRIEF March 2006 Design Brief for the Central Ferry Piers and Adjoining Areas Enhancement PURPOSE OF THE BRIEF 1. The Central Ferry Pier and adjoining areas (named
More informationEnvironmental Permit No. EP-457/2013/C. Central Kowloon Route. Independent Environmental Checker Verification
Environmental Permit No. EP-457/2013/C Central Kowloon Route Independent Environmental Checker Verification Works Contract: (HY/2014/09) Reference Document/Plan Document/Plan to be Certified/ Verified:
More informationBRADENTON RIVERWALK EXPANSION MASTER PLAN
BRADENTON RIVERWALK EXPANSION MASTER PLAN INTRODUCTION & AGENDA Process Update Community Engagement Summary Center for Active Design (CfAD) Recommendations Context and Existing Conditions Master Plan Alternatives
More informationPedestrian Connectivity Facilities. Consultation Digest
Connectivity Consultation Digest December 2014 Project j Information Anderson Road Quarry is located at the southwestern ridge of Tai Sheung Tok Hill in East Kowloon. The development platform covers an
More informationURBAN DESIGN STUDY FOR THE WAN CHAI NORTH AND NORTH POINT HARBOURFRONT AREAS FEASIBILITY STUDY
Agreement No. CE 54/2014 (TP) Meeting with Task Force on Harbourfront Developments on HK Island 10 Feb 2015 2 CONTENTS STUDY TEAM STUDY METHODOLOGY & APPROACH STUDY PROGRAMME KEY ISSUES Study Team Organization
More informationDesign Criteria and Action Checklist on Sustainability and Green Issues for New Capital Projects
and Checklist on Sustainability and Green Issues for New Capital Projects The Consultant should refer to the Recommendations in the CUHK Campus Master Plan (CMP) available in the University CMP website:
More informationCharles P. Johnson and Associates. Annapolis Landscape Architects
Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros
More informationThank you! Events and Entertainment in Northeast False Creek. Tuesday, March 7, 2017
Events and Entertainment in Northeast False Creek Tuesday, March 7, 2017 Thank you! Thank you for taking the time to attend the Events and Entertainment in Northeast False Creek (NEFC) workshop in partnership
More informationPRELIMINARY DESIGN + DEVELOPMENT PLAN
WELCOME! To The Public Open House May 30 th, 2017 HARBOUR WEST PARKS Vision Project Overview The City s vision for Port Credit Harbour West Parks is to develop a vibrant waterfront destination that integrates
More informationHighland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017
Village Board Meeting March 20, 2017 Agenda I. Public Meeting #1 Visioning Summary II. Public Meeting #2 Comment Summary III. IV. IV. Case Study: Milton Train Station Schematic Design Concepts Schedule/Next
More informationThe open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..
The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance
More informationBroadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012
Broadway Avenue Streetscape Project City of Albert Lea Streetscape Design Committee Meeting October 29, 2012 1 Presentation Outline Street Widths, Sidewalk Widths and Bump-Out Configuration Decorative
More informationTask Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing
Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing For discussion on 19 October 2011 TFK/14/2011 Proposed District Revitalisation with Minor Relaxation of Building Height and
More informationExtension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar
Task Force on Harbourfront Developments on Hong Kong Island For discussion on 31 July 2012 TFHK/10/2012 Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar PURPOSE This
More informationA L F O N S O A R C H I T E C T S
A L F O N S O A R C H I T E C T S A L M A T H E P I E R O F S T. P E T E R S B U R G A L F ALFONSO O N S O A R ARCHITECTS C H I T E C T S ALMA 1. Please demonstrate how the project fits within the Pinellas
More informationTask Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing
Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing For discussion on 2 June 2016 TFK/03/2016 AMENDMENTS TO THE APPROVED TSUEN WAN OUTLINE ZONING PLAN NO. S/TW/31 PURPOSE This
More informationWelcome! HORSESHOE BAY PARK. Welcome!
Welcome! HORSESHOE BAY PARK Welcome! Where are we in the process? Today we would like your input on how Horseshoe Bay Park can be upgraded to serve the community s needs better. CONSULT STAKEHOLDERS TAKE
More informationJACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017
JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017 JACKsON STREET PIER Process outline DESIGN PROCESS OVERVIEW: Sandusky s Jackson Street Pier Conceptual Design process included input from
More informationThe Process. Phase 1: Detailed Assessment, Design Framework Phase 2: Conceptual Design. Phase 3: Master Plan Document
Background The Ship Point master planning process was initiated in March of 2017 to advance policy direction from Harbour Vitality Principles (2014) Ship Point design and initial implementation a key action
More information3 Summary of Major Views and Responses
3 Summary of Major Views and Responses 3.1 Major Views 3.1.1 The comments and suggestions received from various channels and parties during the two-month Stage 1 PE on the Study, which have been discussed
More informationBURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE PUBLIC MEETING 3/26/18
BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE PUBLIC MEETING 3/26/18 1 WHERE WE ARE? 2 PRIMARY OBJECTIVES OF THE PLAN UPDATE 1. Update the land use designation for Burton Station Village to reflect
More informationCIVIC PLAZA 4.4 OPEN SPACE AND PUBLIC REALM
OPEN SPACE AND PUIC REALM 44 he City has identified the need to provide an outdoor performance/event space within the Plaza of Nations Neighbourhood his was confirmed through a study, Demand Analysis Study
More informationMASTERPLAN AND PARK IMPROVEMENTS
ST.JAMES PARK MASTERPLAN AND PARK IMPROVEMENTS Stakeholder Meeting 3 April 26, 2016 Team: PMA Landscape Architects Ltd. Lead Landscape Architects MASS LBP Public Facilitation Consultant RAW Design Architectural
More information1. Seattle Central Waterfront Park
1. Seattle Central Waterfront Park More than any one element or technology, the sustainable heart of this project is the transformation of 15- acres (23 city blocks) of once asphalt and concrete surfaces
More informationGlen Road Pedestrian Bridge Environmental Assessment
Glen Road Pedestrian Bridge Environmental Assessment Presentation to Design Review Panel July 18, 2017 Glen Road Pedestrian Bridge Class Environmental Assessment STUDY AREA Bloor Street East Streetscape
More informationTask Force on Harbourfront Developments on Hong Kong Island
Task Force on Harbourfront Developments on Hong Kong Island For discussion TFHK/10/2016 On 25 May 2016 PURPOSE This paper seeks Members views on the reprovisioning of Tin Chiu Street Playground (TCSP)
More informationFLAME ITEM PART NO CLIENT REF. NO. DESCRIPTION DESIGNATION MANUFACTURER CLASS UL FILE NO.
BOM FOR UL CERTIFICATE NUMBER Model Name: CLASSIC TOWER LIGHT Documents Number 122-EI04 This is to certify that the above product was supplied to SUZO Internation (NL) BV Revision A2 are made of the followings,
More informationCity of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design
City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design INTRODUCTION The City of Langley, WA is soliciting submissions from qualified designers/design teams for a design to improve the
More informationHarbour-front Enhancement Committee. Urban Design Study for the New Central Harbourfront Revised Planning and Urban Design Concepts
Harbour-front Enhancement Committee Paper No. 5/2010 For discussion on 18 February 2010 Urban Design Study for the New Central Harbourfront Revised Planning and Urban Design Concepts Purpose 1. This Paper
More informationAVENUE OF STARS & SALISBURY GARDEN REVITALISATION PLAN PROGRESS UPDATE
AVENUE OF STARS & SALISBURY GARDEN REVITALISATION PLAN PROGRESS UPDATE Harbourfront Commission 1 September 2015 Presented by: New World Development Limited 1 Presentation Outline Background Update Overall
More informationMinutes of Seventeenth Meeting
HEC Sub-committee on Harbour Plan Review Minutes of Seventeenth Meeting Date : 18 April 2007 Time : 2:30 pm Venue : Conference Room 15/F, North Point Government Offices 333 Java Road, North Point Present
More informationProject Consulting Team:
THE DOWNTOWN CHERRYVILLE LAND USE + STREETSCAPE MASTER PLAN WAS FUNDED THROUGH THE GENEROUS DONATIONS OF THE FOLLOWING: The Community Foundation of Gaston County ElectriCities of North Carolina The Cherryville
More informationThe principal elements of the NTC Strategic Vision plan are as follows.
The proposed project would improve the NTC site plan, circulation, visitor amenities, and landscaping, and would include construction of two new stadiums to replace the existing Louis Armstrong Stadium
More informationPlanning for Liveability in Hong Kong
Asian-Pacific City Summit 2013 Planning for Liveability in Hong Kong Phyllis C M LI Deputy Director of Planning/Territorial Planning Department Government of the Hong Kong Special Administrative Region
More informationMEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.
MEMORANDUM Date: August 28, 2015 Our File: 1010-20-15-062 To: Design Review Committee From: Lisa Berg, Senior Community Planner Re: Amendment to Development Permit for Park Royal North This memo deals
More informationWilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres
Wilbur Young Park Park Location: 1100 SE Adams Dairy Parkway Park Land Established: 1987 Park Size: 40 acres Developed Acres: 15 acres Undeveloped Acres: 25 acres Park Type: Community Park Amenities: Shelter
More informationFORT MONROE WATERFRONT PARK. February 09, 2016
FORT MONROE WATERFRONT PARK February 09, 2016 THEMES: Series of Experiences Connectivity Cohesiveness Multi-functional Spaces Resiliency THEME: SERIES OF EXPERIENCES History Water / Beaches Open Space
More informationGreen Neigbourhood in High-Density High-rise Contexts
Green Neigbourhood in High-Density High-rise Contexts Tony Ip HKGBC Green Building Faculty Member B.Eng.(Civil & Struct.)(Env. Eng.), B.BltEnv.(Arch. Studies)(Dist.), M.Sc.(Geot. Eng.), M.Arch.(Dist.),
More informationThe following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.
W E L C O M E T O T H E F O R T C O L L I N S D O W N T O W N A L L E Y S A N D I N T E G R AT E D W A L K W AY S M A S T E R P L A N O P E N H O U S E The following concept plans and illustrations are
More informationWoods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.
Woods Chapel Park Park Location: 3925 NW Dogwood Park Land Established: 1979 Park Size: 10 acres Developed Acres: 6 acres Undeveloped Acres: 4 acres Park Type: Neighborhood Park Amenities: Playground,
More informationDogpatch/22nd Street Greening
TEAM MEMBERS Prepared for: GreenTrustSF Central Waterfront www.gtsfcw.org Prepared by: Fletcher Studio San Francisco, CA www.fletcherstudio.com Landscape Architecture Urban Design Environmental Planning
More informationBENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)
BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION) COUNTY BOARD MEETING DECEMBER 16, 2017 County Board Consideration: Adopt the Benjamin Banneker Park Framework Plan and Design Guidelines Framework
More informationHarbour-front Enhancement Committee Sub-committee on Harbour Plan Review
Paper No.13/2009 For discussion on 22 July 2009 Harbour-front Enhancement Committee Sub-committee on Harbour Plan Review Draft Planning Brief for Comprehensive Development Area (1) Site at the Guangzhou
More informationThe George Washington University Square Phase 1 Design Garage Base Building
The George Washington University Square 103 - Phase 1 Design Garage Base Building DRAWING INDEX SHEET TITLE COVER SHEET AP1 AERIAL PHOTOGRAPH SECOND STAGE APPROVAL AUGUST 16, 2010 D1 D2 S1 S2 DEVELOPMENT
More informationGREENFIELD MEADOWS. Healthy Lifestyle. Refined by Nature. FOR BOOKINGS CALL. Call: Call: APPROVED BEHIND NITK, SURATHKAL
FOR BOOKINGS CALL Call: +91 9900254184 Call: +918880116555 rangolimangalore GREENFIELD MEADOWS MUDA APPROVED This brochure is purely conceptual and is not a legal offering. The promoters or architects
More informationA uli Advisory Services Panel Report. Kai Tak and Kowloon East Hong Kong SAR December 2011
A uli Advisory Services Panel Report Kai Tak and Kowloon East Hong Kong SAR 11 16 December 2011 A uli Advisory Services Panel Report Kai Tak and Kowloon East Hong Kong SAR Formulating a Sustainable and
More informationSouth th E ast Communit ity Centre (SECC)
South East Community Centre (SECC) 1 New Park Design & Community Centre Update Thursday, February 8, 2018 Public Open House Thank you for attending this Open House! The town and the Consulting Team will
More informationEXISTING VEHICULAR & PEDESTRIAN CIRCULATION
46 EXISTING CONDITIONS EXISTING VEHICULAR & PEDESTRIAN CIRCULATION Vehicular and pedestrian circulation patterns are illustrated on this graphic. Campus entry points and major vehicular circulation routes
More informationMaster in architecture. (Urban Landscape Design)
Master in architecture () 1. Details of module and its structure Module detail Subject name Paper name Module name/title Objectives Keywords M.arch - architecture Urban landscape design Case study _ fort
More informationSOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design
1 SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design Meeting Agenda 2 1. Project Scope 2. Design Direction 3. Design Details 4. Schedule and Construction Logistics 3 SOUTH UNIVERSITY
More informationBRITTINGHAM PARK DOG PARK IMPROVEMENTS PUBLIC INPUT MEETING #2. Sarah Lerner, Landscape Architect - City of Madison Parks Division
BRITTINGHAM PARK DOG PARK IMPROVEMENTS PUBLIC INPUT MEETING #2 Sarah Lerner, Landscape Architect City of Madison Parks Division TONIGHT S GOALS Existing Conditions Design Considerations Surfacing Options
More informationV. Gateways GATEWAYS / V-1
V. GATEWAYS / V-1 Many of Chesapeake s gateways are located on highways and call for bold and attractive designs that motorists can understand, appreciate, and enjoy. can also take the form of natural
More informationSingapore International School (Hong Kong) Secondary School Campus
Singapore International School (Hong Kong) Secondary School Campus The Singapore International School in Hong Kong (HKSIS) was established in 1995, as the only overseas school funded by the Ministry of
More informationNew Towns in Hong Kong: Planning for the Next Generation
ctbuh.org/papers Title: Author: Subject: Keywords: New Towns in Hong Kong: Planning for the Next Generation Pun Chung Chan Urban Design Density Development Planning Publication Date: 2001 Original Publication:
More information3.1 community vision. 3.3 required plan elements
Chapter 3 Community Form 3.1 community vision 3.2 Parks & landscaping concepts 3.3 required plan elements D R A F T 20 Community Form Chapter 3 3.0 Community form 3.1 community vision The Specific Plan
More informationCreating an integrated waterfront. Recommendations
Creating an integrated waterfront Recommendations Railway Square Post Office + Shell Station Post Office Square Civic Square Ilot Green Wakefield St Wakefield St (Tory Cars) Wakefield St (New World Supermarket)
More informationCity of Los Angeles Department of Public Works
City of Los Angeles Department of Public Works Environmental Scoping Meeting for the Proposed Sixth Street Park, Arts, River & Connectivity Improvements (PARC) Project May 3, 2017 1 Agenda Introductions
More informationLearning Places Fall 2016 Chin/Swift. SITE REPORT 2 [Part A: Manhattan, NY] LINCOLN CENTER
Learning Places Fall 2016 Chin/Swift SITE REPORT 2 [Part A: Manhattan, NY] LINCOLN CENTER STEDROY BRAND 30 TH.09.2016 INTRODUCTION The scope of this activity was to observe Lincoln Center to understand
More informationPlanning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park
Planning Stage Long Term Project Planning Stage Project Underway Mosaic Park Restoration of 4 Mile Run Herndon and 13 th Clarendon Central Park Arlington County Parks, Recreation and Cultural Resources
More informationAppendix H: Easement cross sections
Appendix H: Easement cross sections SHARED PATH 1.5m FOOTPATH NATURE STRIP 7.3m CARRIAGEWAY 2.7m NATURE STRIP EXISTING PIPELINE 150mm DIA 5.0m (approx.) LOCAL ACCESS ROAD EXISTING PIPELINE 500mm DIA 2.7m
More informationCECW-AG 11 June 1998 MEMORANDUM FOR MAJOR SUBORDINATE COMMANDS AND DISTRICT COMMANDS
CECW-AG 11 June 1998 MEMORANDUM FOR MAJOR SUBORDINATE COMMANDS AND DISTRICT COMMANDS SUBJECT: Policy Guidance Letter No. 59, Recreation Development at Ecosystem Restoration Projects 1. References: a. ER
More informationWelcome. Welcome to our public exhibition to explain the future of Griffin Park.
Welcome Aerial view of griffin park Welcome to our public exhibition to explain the future of Griffin Park. As you may know, Brentford Football Club will be relocating to a new, purpose-built site at Lionel
More informationCIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS
7. The Vision 80 East River Esplanade Vision Plan Site Specific Visions Through research, analysis, outreach, and discussions with city and state agency representatives, it became apparent that a phased,
More informationNew Park / Entry Court & Plaza Concept Design
New Park / Entry Court & Plaza Concept Design The SECC Public realm is proposed to have a focus on health, wellness, and community and that site users will include patrons of the neighbourhood. The block
More informationLANDSCAPE ARCHITECTURE - NEW JERSEY
LANDSCAPE ARCHITECTURE - NEW JERSEY MD ANDERSON CANCER CENTER AT COOPER ROOFTOP GARDEN Camden NJ Cooper University Hospital Landscape Architecture Langan provided comprehensive planning design and construction
More informationMIAMI 21 PUBLIC HEARING-FIRST READING 2009
General Principles Public access waterfront walkways shall: 1. Feel public. No one should feel as if he or she is intruding on private property. The public should feel welcome and at ease to move along
More informationKnowledge Sharing of Green Wall Systems
Knowledge Sharing of Green Wall Systems Organizer: IFMA (18 TH Annual General Meeting) Prepared by: Hong Kong Greenlink Kusters Co., Ltd Mr. Yau Chun Wang MHKIE, CEng, MICE, RPE Tel: (852) 3690 3723 (M)
More informationHeritage Park Master Plan. Heritage Park Master Plan
November 03, 2008 Presentation Objectives 1. Seek Council s endorsement on the design concept 2. Seek pre-budget approval for Phase 1 construction 3. Approve schedule for Phase 1 construction 3 Actions
More informationSouth East Sports Complex Phase I
South East Sports Complex Phase I City of Spokane Design Review Board August 29, 2018 (Revised) Objectives 1. Early discussion and collaboration. 2. Provide framework / catalyst for future improvements
More informationProgram Schedule, Budget and Scope
Sewer System Improvement Program + Program Schedule, Budget and Scope Mission & Valencia Green Gateway Presentation: July 9, 2013 San Francisco Public Utilities Commission Mission & Valencia Green Gateway
More informationGroup Profit Increased by 30% to HK$22 billion
Group Profit Increased by 30% to HK$22 billion Wheelock and Company Limited 2014 Final Results Presentation 17 March 2015 Highlights Group profit increased by 30% to $22b $18.8b record property contracted
More informationChairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building
LA.09.TOR (Toronto) DATE: TO: FROM: SUBJECT: Chairman and Members of the Planning and Development Committee Thomas S. Mokrzycki, Commissioner of Planning and Building Central Waterfront Secondary Plan
More information