(E) PARKING LOT OPEN TO PUBLIC (E) PARKING LOT OPEN TO PUBLIC (E) BUILDING TO REMAIN PUBLIC (E) BUILDING TO REMAIN (E) BUILDING TO REMAIN
|
|
- Alban Arnold
- 5 years ago
- Views:
Transcription
1 G R OUN D (E) TRANSFORMER TO BE REMOVED ENTRY AT TO BE ACCESSIBLE DURING CONSTRUCTION No. Revision Description YYYY-MM-DD Major Permit - Stage Major Permit - Stage Response. EXISTING UTILTIES REMOVED.. UTILITY RELOCATION, STOP LIGHT INSTALLATION AT CIRBY WAY. (E) WEST LOT. (E) ASPHALT, PARKING & LANDSCAPE TO BE DEMOLISHED.. NEW GRADING, UNDER UTLITIES, CURBS AND ASPHALT. 2. NEW PARKING AREA TO BE STRIPED TO PROVIDE DURING CONSTRUCTION. LOOP ROAD OPEN TO THE (E) SIGNAGE TO RIVERSIDE ENTRY TO OPEN DURING CONSTRUCTION (E) LOOP ROAD OPEN TO THE SOUTH LOT. (E) ASPHALT, PARKING & LANDSCAPE TO BE DEMOLISHED. 2. (E) SOIL CUT WILL BE USED TO FILL WEST LOT ABOVE.. NEW GRADING, UNDER UTLITIES, CURBS AND ASPHALT. 2. NEW PARKING DECK FOUNDATION. MATURE TREES TO BE PROTECTED/PRESERVED THIS AREA. ROSEVILLE MEDICAL CENTER 00 RIVERSIDE AVENUE ROSEVILLE, CALIFORNIA SITE PLAN - PHASE SITE PLAN - PHASE Kaiser No /6/207 :08:23 PM Graphic inch = 40 feet 0 40' 80' 20' 60' HOK No A00
2 (E) RELOCATED WITH (N) BUS SHELTER & CONCRETE PAD ENTRY OPEN TO THE DURING CONSTRUCTION Major Permit - Stage ASPHALT & SOIL REMOVAL TO LOWER GRADE. 2. EXISTING CURBS AND ASPHALT DEMOLISHED AS NEEDED FOR RIGHT TURN LANE STREET IMPROVEMENTS. 3. (E) RELOCATED. (E). GRADE LOWERED. 2. RIGHT TURN LANE CONSTRUCTED INCLUDING ASPHALT, CURBS, SIDEWALK, AND LANE STRIPING 3. RELOCATED WITH NEW SHELTER & CONCRETE PAD TEMPORARY TEMPORARY DEPARTMENT ACCESS ONLY. NO PATIENT ACCESS BEYOND THIS POINT. LOOP ROAD OPEN TO THE TEMPORARY (E) SIGNAGE TO ACCESS FROM MEDICAL OFFICE BUILDING. (E) ASPHALT, PARKING & LANDSCAPE TO BE DEMOLISHED.. MOB UNDER UTILITIES, SLAB ON GRADE PREP BEGINS EGRESS EXISTING STRIPING REMOVED (E) SOUTH LOOP ROAD DECOMISSIONED - CLOSED TO THE. DEPARTMENT ACCESS ONLY SOUTH LOOP ROAD RELOCATED & REPAVED. DEPARTMENT ACCESS ONLY PARKING DECK. CONSTRUCTION COMPLETED THIS PHASE 00 RIVERSIDE AVENUE SITE PLAN - PHASE 2 SITE PLAN - PHASE 2 Kaiser No /3/206 :42:28 AM NOT FOR CONSTRUCTION Graphic inch = 40 feet 0 40' 80' 20' 60' MAJOR PROJECT PERMIT - STAGE 2 HOK No A002
3 ENTRY OPEN TO Major Permit - Stage TEMPORARY TEMPORARY ROAD OPEN TO DURING CONSTRUCTION NO PATIENT ACCESS BEYOND THIS POINT. EGRESS MEDICAL OFFICE BUILDING. MOB STRUCTURAL STEEL AND ENCLOSURE ACCESS FROM SOUTH LOOP ROAD - DEPARTMENT ACCESS ONLY PARKING DECK FOR CONSTRUCTION STAFF USE 00 RIVERSIDE AVENUE SITE PLAN - PHASE 3 SITE PLAN - PHASE 3 0/3/206 :42:33 AM Graphic inch = 40 feet 0 40' 80' 20' 60' NOT FOR CONSTRUCTION MAJOR PROJECT PERMIT - STAGE 2 Kaiser No HOK No A003
4 ENTRY OPEN TO Major Permit - Stage TEMPORARY ACCESSIBLE ACCESS TEMPORARY PAVILION BUILDING:. (E) ASPHALT, CURBS & LANDSCAPING DEMOLISHED.. CORE & SHELL, INTERIOR FIT OUT 2. ADJACENT ROADS INCLUDING ASPHALT, CURBS, STORM DRAINS AND LANDSCAPING 3. ENTRY CANOPY ACCESS FROM MEDICAL OFFICE BUILDING:. MOB CORE & SHELL, INTERIOR FIT OUT 2. SERVICE YARD ASPHALT, CURBS, GATES, TRASH & RECYCLING ENCLOSURES 3. COURTYARDS INCLUDING LANDSCAPING, FURNISHINGS, STORM WATER TREATMENT, UNDER UTLITIES EGRESS SOUTH LOOP ROAD - DEPARTMENT ACCESS ONLY PARKING DECK FOR CONSTRUCTION STAFF USE 00 RIVERSIDE AVENUE SITE PLAN - PHASE 4 SITE PLAN - PHASE 4 0/3/206 :42:38 AM Graphic inch = 40 feet 0 40' 80' 20' 60' NOT FOR CONSTRUCTION MAJOR PROJECT PERMIT - STAGE 2 Kaiser No HOK No A004
5 No. Revision Description YYYY-MM-DD ENTRY OPEN TO EAST LOT. (E) ASPHALT, CURBS, SIDEWALKS, AND LANDSCAPING REMOVED. 2. COMMUNICATIONS BUILDING BE DEMOLISHED TEMPORARY. (N) ASPHALT, CURBS, SIDEWALKS, UTILITIES, BIOSWALE AND LANDSCAPE TEMPORARY WALK WAY FOR BUILDING ACCESSIBLE ACCESS LOOP ROAD OPEN TO TEMPORARY PAVILION BUILDING OPEN TO EGRESS MEDICAL OFFICE BUILDING OPEN TO LOOP ROAD OPEN TO EXISTING ENTRY DECOMMISSIONED NEW ACCESS FROM LOOP ROAD OPEN TO PARKING DECK OPEN TO 00 RIVERSIDE AVENUE SITE PLAN - PHASE 5 SITE PLAN - PHASE 5 0/3/206 :42:44 AM Graphic inch = 40 feet 0 40' 80' 20' 60' NOT FOR CONSTRUCTION MAJOR PROJECT PERMIT - STAGE 2 Kaiser No HOK No A005
6 ENTRY - REMOVE (E) CURB AND STRIPING No. Revision Description YYYY-MM-DD TEMPORARY NORTH PARKING LOT. (E) ASPHALT, PARKING, SIDEWALKS & LANDSCAPE 2. (E) BUILDINGS & CANOPIES. NEW GRADING, UNDER UTLITIES, CURBS, SIDEWALKS, ASPHALT, LANDSCAPING, STORM DRAINS, BIOSWALES AND STRIPING 2. NEW LOOP ROAD CONNECTION 3. NEW COURTYARD INCLUDING LANDSCAPING & SITE WORK 4. PATIENT PARKING LOT FOR CONSTRUCTION STAFF ONLY TEMPORARY CURB AT PARKING STALLS TEMPORARY (E) (E) (E) TEMPORARY WALK WAY FOR BUILDING ACCESSIBLE ACCESS PATIENT TEMPORARY EXIT THROUGH ROAD OPEN TO PAVILION BUILDING OPEN TO. SELECTIVE DEMOLITION OF (E) ASPHALT, SIDEWALKS & LANDSCAPE.. PATIENT & SURROUNDING SIDEWALKS, ASPHALT, CURBS, UNDER UTLITIES, STORM DRAINS, BIOSWALES, LANDSCAPING. (E) (E) EAST COURTYARD. SELECTIVE DEMOLITION OF (E) ASPHALT, SIDEWALKS & LANDSCAPE. (E) TEMPORARY CURB AT PARKING STALLS TEMPORARY PATIENT MEDICAL OFFICE BUILDING OPEN TO. EAST COURTYARD & SURROUNDING SIDEWALKS, ASPHALT, CURBS, UNDER UTLITIES, STORM DRAINS, BIOSWALES, LANDSCAPING. EXISTING RIVERSIDE DRIVE ENTRY DECOMMISSIONED RIVERSIDE NEW ENTRY OPEN TO PARKING DECK OPEN TO 00 RIVERSIDE AVENUE SITE PLAN - PHASE 6 SITE PLAN - PHASE 6 Kaiser No /3/206 :42:50 AM NOT FOR CONSTRUCTION Graphic inch = 40 feet 0 40' 80' 20' 60' MAJOR PROJECT PERMIT - STAGE 2 HOK No A006
7 RIGHT TURN ONLY EXIT ENTRY OPEN TO Major Permit - Stage WEST LOT. SELECTIVE DEMOLITION OF (E) ASPHALT, & LANDSCAPING.. FINAL WEST PARKING LOT & GREEN ZONE NEW GRADING, UNDER UTLITIES, STORM DRAINS, BIOSWALES, CURBS, SIDEWALKS, ASPHALT, LANDSCAPING. PARKING LOT OPEN TO THE ROAD OPEN TO THE PARKING LOT OPEN TO THE GREEN ZONE LANDSCAPING UNDER CONSTRUCTION FINAL WEST LOT PARKING STRIPING COMPLETED PAVILION BUILDING OPEN TO THE EAST PARKING LOT COMPLETION. ING (E) LOOP ROAD ASPHALT, CURBS, LANDSCAPING DEMOLISHED.. COMPLETE EAST PARKING LOT INCLUDING ASPHALT, CURBS, STORM DRAINS, STRIPING, AND LANDSCAPING. MOB OPEN TO THE EXISTING ENTRY DEMOLISHED RIVERSIDE NEW ENTRY OPEN TO ROAD OPEN TO THE PARKING DECK OPEN TO THE 00 RIVERSIDE AVENUE SITE PLAN - PHASE 7 SITE PLAN - PHASE 7 Kaiser No /3/206 :42:55 AM NOT FOR CONSTRUCTION Graphic inch = 40 feet 0 40' 80' 20' 60' MAJOR PROJECT PERMIT - STAGE 2 HOK No A007
CHAPTER 2 PROJECT DESCRIPTION
CHAPTER 2 PROJECT DESCRIPTION 2.1 PROJECT LOCATION The proposed Kaiser Riverside-Cirby Medical Office Building Project (proposed project) area encompasses approximately 14 acres in the City of Roseville
More informationThe Van Ness Campus. Weekly Construction Bulletin #259
The Van Ness Campus Weekly Construction Bulletin #259 Construction Update Week of September 24, 2018 The Van Ness Campus Weekly Bulletins are intended to help inform members of the community about upcoming
More informationCITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS
CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS 2010 EDITION CITY OF OZARK, MISSOURI REVISIONS TO THE 2009 EDITION The following revisions have been made to the 2009 edition of the city
More informationThe following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.
W E L C O M E T O T H E F O R T C O L L I N S D O W N T O W N A L L E Y S A N D I N T E G R AT E D W A L K W AY S M A S T E R P L A N O P E N H O U S E The following concept plans and illustrations are
More information3.13. Development Guidelines
3.3 Landscaping Elements Landscaping should be used to frame and soften structures, define site functions, enhance the quality of the environment, and screen undesirable views. Safety, environmental impacts,
More informationVEHICULAR AND PEDESTRIAN CIRCULATION
This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide
More informationRezoning Petition Pre-Hearing Staff Analysis April 16, 2018
Rezoning Petition 2017-177 Pre-Hearing Staff Analysis April 16, 2018 REQUEST LOCATION Current Zoning: O-2 (office) and MUDD-O (mixed use development, optional) Proposed Zoning: MUDD-O (mixed use development,
More informationTRI-LAKES MONUMENT FIRE PROTECTION DISTRICT
TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT LOCAL AMENDMENTS INTERNATIONAL FIRE CODE 2009 December 5, 2012 1 Chapter 1 Administration Chapter 5 Fire Service Features Chapter 9 Fire Protection Systems Chapter
More informationGYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015
GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin
More informationLAND USE ASSESSMENT REPORT (LUAR) PROPOSED AFFORDABLE HOUSING COMPLEX MAIN ROAD PDE FILE NUMBER: REZ
LAND USE ASSESSMENT REPORT (LUAR) PROPOSED AFFORDABLE HOUSING COMPLEX 560-564 MAIN ROAD PDE FILE NUMBER: REZ13-00008 PREPARED FOR P.O. BOX 908 ST. JOHN'S, NL CANADA A1B 4C4 PROPONENT BROOKSIDE DEVELOPMENTS
More informationZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)
BUILDING CODE ANALYSIS REFERENCE CODES 0 CALIFORNIA BUILDING CODE 0 INTERNATIONAL BUILDING CODE OCCUPANCY USE AND CLASSIFICATION SECTION 0 & THE PROPOSED BUILDING CONSISTS OF STORIES OF OVER STORY OF VALET
More informationNorthPoint, Inc. Community-Based Development Concept
NorthPoint, Inc. Community-Based Development Concept 6.0.01 EXECUTIVE SUMMARY The NorthPoint Community Board Development concept is a community development strategy. It leverages NorthPoint s mission,
More informationFall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More informationCity of Redlands Architectural Guidelines for Non-Residential Development
14. Building articulation shall be included in the design of building, in order to create a formal entry statement. Avoid this Do this Page 11 15. Give special attention to creating pedestrian scale and
More informationP: Site Plan Approval
STAFF REPORT 2018-37P: Site Plan Approval Community Development Department Council Chambers, 7:30 PM, October 18, 2018 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Steve Marciani, AICP, Planning
More informationrussell+mills studios
S C H E M A T I C D E S I G N B O O K L E T O C T O B E R 2 2, 2 0 0 8 114 east oak st, fort col TABLE OF CONTENTS...ii SITE CONTEXT...1 BACKGROUND...2 PARK PROGRAM...3 SLOPE ANALYSIS...4 SPATIAL ANALYSIS...5
More informationGREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle
GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration
More informationCleveland Park Streetscape and Drainage Improvement Project 1
Cleveland Park Streetscape and Drainage Improvement Project 1 Urban Context Washington, D.C. Connecticut Avenue Cleveland Park Streetscape and Drainage Improvement Project 2 Neighborhood Context Contributing
More informationFLUSH MOUNT 6' SIDEWALK PAINTED WITH COURT DELINEATIONS REMOVABLE BOLLARD, TYP. PRIVATE ALLEY CURB AND GUTTER (STREET NAME TO BE DETERMINED)
P:\COLUMBIA GROVE\DWG\SHEETS\.. Submittal\L.0.dwg Xrefs: A-tb-W6 L-mp-W6-Phase L-sp-W6-Phase A-sp-W6-FP0 Phase 768L-SV L-tb-W6-Key Plan,) WALK TRASH AND RECYCLING RECEPTACLES WITH " STABILIZED MULCH PLAY
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 27, 2007 DATE: January 12, 2007 SUBJECT: U-3101-04-2 Use Permit Review for drive-through facilities; premises known as 5222 Lee Highway
More informationShell Beach Road Streetscape Frequently asked Questions
Shell Beach Road Streetscape Frequently asked Questions General What is the Shell Beach Road Streetscape Improvements Project? The overall goal of the Shell Beach Road Streetscape Improvement project is
More informationConstruction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)
Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) 1 Firm Overview 2 We are a well established multi disciplinary firm that has
More informationFigure Example of out door dining in the public right-of-way.
Section 2 Core Area Goal 2.2.1 To maintain and enhance the character of existing streets in the Downtown Area. Character Figure 2.2.1 Example of out door dining in the public right-of-way. A. Provide street
More informationSFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE
SFMTA Municipal Transportation Agency Image: a bus in front of the Palace of the Legion of honor SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN AVENUE @ OCEAN AVENUE Community Meeting May 23, 2012 San Francisco,
More informationACTION SUMMARY FOR DESIGN REVIEW COMMITTEE MEETING May 21, :00 PM
Planning and Development Department Land Use Planning Division ACTION SUMMARY FOR DESIGN REVIEW COMMITTEE MEETING May 21, 2009 7:00 PM GORING, J P TOMA, M P ALLEN, B. P MCCULLOCH, C P DORAN, T P SNIPPEN,
More informationSTANDARDS THAT APPLY TO ALL OR SOME DEVELOPMENT PROJECTS WITH RESIDENTIAL USES
6 STANDARDS THAT APPLY TO ALL OR SOME DEVELOPMENT PROJECTS WITH RESIDENTIAL USES STANDARDS THAT APPLY TO ALL OR SOME DEVELOPMENT PROJECTS WITH RESIDENTIAL USES 6-1 Figure 6-1: Parking Stall Width 9 Stall
More informationBriar Crest Elementary
Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary
More informationFROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!
FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW Welcome! Meeting Agenda 6:00 PM Open House 6:30 PM Presentation 7:00 PM Open House / Q&A at the Boards Project Design Team Connecticut Avenue, NW Project
More informationThe open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..
The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance
More informationSITE PLAN REVIEW APPLICATION AND CHECKLIST
SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description
More informationConstruction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017
Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition June 2017 OVERVIEW Today s board action will provide for the construction of improvements to the Wollaston
More informationRezoning Petition Zoning Committee Recommendation August 1, 2017
Rezoning Petition 2017-090 Zoning Committee Recommendation August 1, 2017 REQUEST LOCATION SUMMARY OF PETITION PROPERTY OWNER PETITIONER AGENT/REPRESENTATIVE COMMUNITY MEETING STATEMENT OF CONSISTENCY
More information30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN
LEGAL PROPERTY DESCRIPTION SEE NOTES SHEET FOR LEGAL PROPERTY DESCRIPTIONS THE CITY OF PLEASANT RIDGE GAINSBORO PARK IMPROVEMENT PROJECT CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN 4444 Second Avenue
More informationReview Zone Application for D&R Canal Commission Decision
Review Zone Application for D&R Canal Commission Decision MEETING DATE: July 20, 2016 DRCC #: 16-4803 Latest Submission Received: June 13, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road, 2
More informationSITE PLAN REVIEW APPLICATION
SITE PLAN REVIEW APPLICATION CITY OF THE DALLES Community Development Department 313 Court Street The Dalles, OR 97058 (541) 296-5481, ext. 1125 Fax (541) 298-5490 www.ci.the-dalles.or.us Date Filed File#
More informationEffective September 1, 2015
Effective September 1, 2015 Recycling and trash service Sidewalk maintenance and cleaning Sidewalk power washing Snow removal Weeding of tree grates and sidewalk cracks Installation and maintenance of
More informationProperty Owners Association. Annual Meeting Notice July 26, :00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah
Property Owners Association Annual Meeting Notice July 26, 2016 5:00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah Annual Meeting Agenda Welcome Approval of Minutes Introduction of
More informationDarwin International Airport Current Projects 21/02/2018 Page 1 of 5
ABC No Location Project Name Applicant ALC Consent Date ABC Permit Application Date ABC Permit Issue Date Certificate of Compliance Issued Date Date of ABC Closure (for o/s ABC files) DWN18/B002 DIA Terminal
More informationPLANNED UNIT DEVELOPMENT APPLICATION
PLANNED UNIT DEVELOPMENT APPLICATION CITY OF THE DALLES Community Development Department 313 Court Street The Dalles, OR 97058 (541) 296-5481, ext. 1125 Fax (541) 298-5490 www.ci.the-dalles.or.us Date
More informationCity of Hermosa Beach Administrative Policy #
City of Hermosa Beach Administrative Policy # SUBJECT: Living Streets Policy Date: Approved by: City Council Authority: Public Works Department & Community Development Department Mayor, PURPOSE The City
More informationCanal Road City Limits (East of Van Dyke Ave) to Saal Road
Canal Road City Limits (East of Van Dyke Ave) to Saal Road Construction Update 9/14/2018 The ashalt paving on the southside of Canal Road is expected to start Saturday, September 15 (weather permitting)
More informationVISION PLAN PRESENTATION - SEPTEMBER 28, 2013
AREAS OF IMPROVEMENT E A POOL HOUSE POOL DECK B B MAIN BUILDING UPPER PLAZAS A D F G C MAJOR BLEACHERS DUGOUTS FIELD MAIN COURTYARD D REGGIE PARK C E SPORT COURT ADA RAMP H F G H TENNIS COURTS KITCHENETTE
More informationMULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist
MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for
More informationCity of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION
City of San Juan Capistrano PROJECT PRESENTATION PROJECT PRESENTATION FOR THE NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) PLANNING COMMISSION 1 PROCESS & OBJECTIVES A. Develop a new Concept Plan for
More informationCITY OF DAVIS DESIGN REVIEW INFORMATION CHECKLIST
CITY OF DAVIS DESIGN REVIEW INFORMATION CHECKLIST The purpose of a design review is comprehensive site plan and architectural review so as to determine compliance with article 40.31 of the Davis Municipal
More informationReport or technical documentations of the target areas in Siauliai
WP 4 Energy Supply Report or technical documentations of the target areas in Siauliai 2011.10.27 Summary of the draft version of technical documentation for two target areas Lieporiai park 1.1. Works basis
More information# Cog Circle Menards Project Review for Planning and Zoning Commission
#2012-114 4850 Cog Circle Menards Project Review for Planning and Zoning Commission Meeting Date: November 19, 2012 Request: Location: Acreage: Zoning: Surrounding Properties: Final PUD Amendment for outdoor
More informationCONTEXT + PROGRAM. CONTEXT - Site Photos RIALTO THEATRE STATION DEPOT HOTEL CONGRESS GREYHOUND SITE 4TH AVENUE BROADWAY BOULEVARD
PROJECT SITE - View facing South - GREYHOUND SITE RIALTO THEATRE HOTEL CONGRESS STATION DEPOT BROADWAY BOULEVARD 4TH AVENUE CONGRESS STREET TOOLE STREET CONTEXT - Site Photos CONTEXT + PROGRAM 6th Avenue
More informationVILLAGE OF CHANNAHON COMMERCIAL DESIGN GUIDELINES. Village of Channahon S. Navajo Drive Channahon, IL (815)
VILLAGE OF CHANNAHON COMMERCIAL DESIGN GUIDELINES Village of Channahon 24555 S. Navajo Drive Channahon, IL 60410 (815) 467-6644 www.channahon.org Adopted March 6, 2006 VILLAGE OF CHANNAHON COMMERCIAL DESIGN
More informationAPPENDIX I: GREENWAY DESIGN STANDARDS
APPENDIX I: GREENWAY DESIGN STANDARDS The goal of this report is to develop a palette of standard design elements that will help establish a distinct identify for the Bronx River Greenway. The greenway
More informationBRADENTON RIVERWALK EXPANSION MASTER PLAN
BRADENTON RIVERWALK EXPANSION MASTER PLAN INTRODUCTION & AGENDA Process Update Community Engagement Summary Center for Active Design (CfAD) Recommendations Context and Existing Conditions Master Plan Alternatives
More informationPROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.
PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE OCTOBER, 2016 for 2.4.2 STREETS Streets are the single largest component
More informationCENTERS AND CORRIDORS
INITIAL DESIGN STANDARDS AND GUIDELINES for CENTERS AND CORRIDORS City of Spokane Planning Services Third Floor, City Hall 808 W. Spokane Falls Blvd. Spokane, WA 99201-3329 (509) 625-6300 www.spokaneplanning.org
More information3.10 ROW Overlay District
3.10 A. Purpose The purpose of this Overlay District is to regulate items which could be placed or constructed within the Rights-of-way lying wholly or partially within the jurisdictional area of the Town
More informationCOMPLETE GREEN STREET CHECKLIST
COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.
More informationDESIGN AND LANDSCAPE GUIDELINES FOR DEVELOPMENT
DESIGN AND LANDSCAPE GUIDELINES FOR DEVELOPMENT IN THE SECOND SUPERVISORIAL DISTRICT (REVISED) ADOPTED BY RIVERSIDE COUNTY BOARD OF SUPERVISORS ON SEPTEMBER 15, 1998 REVISED OCTOBER 23, 1998 REVISED AUGUST
More informationNovember 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165
Planning Commission Charter Township of Lyon 58000 Grand River Ave. New Hudson, MI 48165 Subject: AP-18-68; 11 Mile and Milford Road Park, Site Plan Review #1 Based on site plan dated 11/12/18 Location:
More informationWELCOME. Welcome to the Public Open House
WELCOME City of Catharines Streetscaping St. Paul Street and Carlisle Street Public Open House June 9, 2016 FirstOntario Performing Arts Centre 6:00 pm to 8:00 pm Welcome to the Public Open House Please
More informationChapter 22. Alternatives to the Proposed Project
Page 22-1 Chapter 22. Alternatives to the Proposed Project Introduction This chapter assesses the potential environmental effects of alternatives to the Proposed Project. The alternatives analyzed include
More informationCITY OF INVER GROVE HEIGHTS A G E N D A CITY COUNCIL WORK SESSION June 3, :00 PM INVER GROVE HEIGHTS CITY HALL COUNCIL CHAMBERS
CITY OF INVER GROVE HEIGHTS A G E N D A CITY COUNCIL WORK SESSION June 3, 2013 6:00 PM INVER GROVE HEIGHTS CITY HALL COUNCIL CHAMBERS 1. CALL TO ORDER Mayor Tourville 2. RENTAL REGULATIONS 3. FRONT YARD
More informationCounty of El Dorado Standard Plans
County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20
More informationPage 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.
Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St. Project Summary Project Type: Technologies: Major Benefits: Light industrial retrofit (parking lot) - demonstration project Landscape
More informationSpoonfed, A Full Service Restaurant
Newly Constructed, State-of-the-Art, Entertainment-Media Campus Up to ± 163,000 RSF Available / ± 81,000 RSF Contiguous Large Efficient Floor Plates Spoonfed, A Full Service Restaurant Under Construction
More informationBuilding Permit Type & Sub-Type Definitions
Building Permit Type & Sub-Type Definitions New Any new commercial building and the tenant is known (e.g., New grocery store). Foundation only Allows foundation to be started while the building plans are
More informationTABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08
TABLE OF CONTENTS Sheet Number Title Revision Date I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 STREETS ST-1 LOCAL STREETS 03/17/08 ST-1A LOCAL STREETS, 2015 GENERAL PLAN 11/15/04 ST-2 COLLECTOR AND ARTERIAL
More informationFebruary 17, Sara Ullman Planner I. Sincerley,
February 17, 2016 Sara Ullman Planner I City of Aurora Planning Department Re: Mrachek Middle School Replacement (#1116704)/Response Initial Submission Review Dear Ms. Ullman, Thank you for your assistance
More informationJOB CREATION PROJECTS
SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each
More informationSTANDARD DETAILS QUICK REFERENCE
STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)
More informationVILLAGE OF PITTSFORD PLANNING AND ZONING BOARD OF APPEALS Regular Meeting January 27, 2014 at 7:00 PM. George Wallace Jill Crooker Joe Maxey
VILLAGE OF PITTSFORD PLANNING AND ZONING BOARD OF APPEALS Regular Meeting January 27, 2014 at 7:00 PM PRESENT: Chairperson: Members: Attorney: Building Inspector: Recording Secretary: Remegia Mitchell
More informationARB ACTION MEMO. Mr. Wardell called the meeting to order at 1:03 p.m. and established a quorum.
Date: November 20, 2017 Time: 1:00 PM Meeting Room: Room 241, Second Floor Members: Frank Stoner: Present Frank Hancock: Present Bruce Wardell, Chair: Present Stan Binsted, Vice Chair: Absent Dade Van
More informationThis Review Is Divided Into Two Phases:
Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South
More informationORDINANCE NO
ORDINANCE NO. 2014-032 Amending Ordinance 2012-059 granting encroachment to the University of South Carolina for use of the right of way area of the 1500 block of Greene Street and 800 block of Pickens
More informationStudy Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project
Olympia, WA: Greening Capitol Way Supporting Communities move towards sustainability is a priority for the federal government. A Greening America s Capitals Project Office of Sustainable Communities U.S.
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: APRIL 19, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director
More information8 October 14, 2015 Public Hearing
8 October 14, 2015 Public Hearing APPLICANT & PROPERTY OWNER: PRICE S HOLDINGS, LLC STAFF PLANNER: Karen Lasley REQUEST: A. Conditional Use Permit (Automobile Repair Garage) B. Change in Nonconforming
More informationCAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013
Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN
More informationCapital Projects Update March 2017
Capital Projects Update March 2017 Partnership Initiatives Eastside Community Center Metro Parks is working with Tacoma Public Schools, the City of Tacoma, Tacoma Housing Authority, Boys & Girls Clubs
More informationCITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK
Page 34 CITY PLANNING COMMISSION AGENDA ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK FILE NOS: CPC ZC 12-00035 QUASI-JUDICIAL CPC NV 12-00036 QUASI-JUDICIAL AR DP 12-00039 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER:
More informationLOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES
LOS ANGELES MISSION COLLEGE MASTER PLAN DESIGN & DEVELOPMENT PRINCIPLES 34 Quality Learning Along the Arroyo PROGRAM SUMMARY BY PROJECT The following are program summaries for each of the projects planned
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 3, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,
More informationGarden edges provide vertical plantings to buffer the neighbors from the building facilities around the entire campus.
Open Space Existing Open Space Children s intends to maintain the landscape as a garden around the campus to help children heal while providing spaces for visitors, caregivers, staff and neighbors. Children
More informationSouth East Sports Complex Phase I
South East Sports Complex Phase I City of Spokane Design Review Board August 29, 2018 (Revised) Objectives 1. Early discussion and collaboration. 2. Provide framework / catalyst for future improvements
More informationPROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES
CITY OF LARKSPUR PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES PRESENTED BY Julian Skinner Larkspur Public Works Director DATE July 13, 2016 Bon Air Bridge
More informationUrban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges
222221 2.0 DRIVE-THROUGH FACILITIES Background In recent years, drive-through facilities have grown significantly in popularity with drive-through restaurants, in particular, being established on numerous
More information6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB
6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB REQUEST: Conditional Use Permit (outdoor recreational facility) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:
More informationPLANNING COMMISSION STAFF REPORT MEETING DATE: PROJECT NUMBER: ZONE: REQUEST: ADDRESS: APPLICANT: PREPARED BY: 6 July 2017 D-17-006 Commercial Corridorr Design Review Approval a parking lot expansion 26
More informationCommunity Development Department Commercial Permit Application
Commercial Permit Application Permit # Property Project Information Address Suite # Business Name Parcel # Fire Department County Type of Improvement (check all that apply) New Addition Alteration Repair
More information4 January 11, 2012 Public Hearing APPLICANT:
. 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk
More informationSOUTH UNIVERSITY Street Design Alternatives in Progress
1 Alternatives in Progress 2016.01.20 Meeting Agenda 2 1. Progress & Schedule 2. Utilizing the Street Design Manual 3. Site Characteristics and Input Received 4. Street Geometry What can we accomplish
More informationLetter of Credit Itemized Cost Estimate For: 100% Site Development Costs
Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for
More informationMonroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018
Monroe Street Reconstruction Public Preconstruction Meeting February 21, 2018 Thank you to Edgewood College! Tonight s Agenda 1. Project Overview 2. Initial project schedule and phasing 3. Expectations
More informationSpeedway Mall Project Frequently Asked Questions
Speedway Mall Project Frequently Asked Questions These FAQs will continue to be updated as new questions arise. Purpose of the Project and Uses of the Mall Q: Why is this project being done? A: The 1999
More informationSUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA
1 SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA Downtown Bozeman should be the location of buildings of greatest height and intensity in the community. The following guidelines apply
More informationCITY OF SIMI VALLEY MEMORANDUM
CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. 9.1 May 18, 2016 TO: FROM: Planning Commission Department of Environmental Services SUBJECT: REVIEW OF POTENTIAL FISCAL YEAR (FY) 2016-17 CAPITAL IMPROVEMENT
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 17, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,
More informationMIXED-USE ZONING DISTRICT DESIGN GUIDELINES
MIXED-USE ZONING DISTRICT DESIGN GUIDELINES In addition to the development regulations contained in the Mixed-Use Zoning District, design guidelines are presented here to provide an added level of definition
More informationNote: Staff reports can be accessed at Special Permit Application No.
The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.
More informationMASTER PLAN IMPLEMENTATION COSTS. Appendix A
Appendix A MASTER PLAN IMPLEMENTATION COSTS Town of Bradford West Gwillimbury HENDERSON COMMUNITY PARK MASTER PLAN IMPLEMENTATION COSTS Draft Order of Magnitude Costing Revised 5/27/2014 ITEM DESCRIPTION
More informationA RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
RESOLUTION NO. A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SIGNAL HILL, CALIFORNIA, RECOMMENDING CITY COUNCIL ADOPTION OF ZONING ORDINANCE AMENDMENT 16-03, A REQUEST TO AMEND THE OFFICIAL ZONING
More informationDIVISION 32 EXTERIOR IMPROVEMENTS
A. Standard DIVISION 32 EXTERIOR IMPROVEMENTS PARKING LOTS Layout: Layout parking lots with nine by eighteen foot (9 x18 ) stall perpendicular to the drive lane. Widths of all drive lanes will be twenty-four
More information