1 DATE: September 4, 2009 TO: THRU: FROM: RE: Recreation and Park Commission Philip A. Ginsburg, General Manager Rhoda Parhams, Capital Program Manager Marvin Yee, Landscape Architect Commission Calendar Item Agenda Item Wording: Discussion and possible action to approve a conceptual improvement plan for the renovation of Cayuga Playground and Clubhouse Background/Description: Cayuga Playground and Clubhouse is located in District 11 at Cayuga and Naglee Streets. This acre site includes a 2,500 SF clubhouse, a play area, tennis and basketball courts, and grassy field for practice soccer play and T-ball. Elevated BART tracks skirt the northern edge of the site. More significantly, Cayuga Playground is known for its vast collection of hand-carved wooden sculptures that dot the landscape. The wooden sculptures are the innovations of Demetrios Braceros, a long-time Recreation and Park Department gardener who retired in Two unique thematic gardens, titled the Garden of Eden and the Trail of Hope, are incorporated into the landscape. The clubhouse was built in 1950 and last renovated in The mechanical and electrical systems are original to the building, and are past their useful life. The clubhouse does not contain a fire sprinkler system, nor is it wheelchair-accessible throughout. Storage space is woefully lacking. A 2008 condition assessment on the clubhouse determined that it would cost 64% more to repair the building than to build an exact replica. Therefore the recommendation is to replace the clubhouse and to redesign it to meet today s building codes and to better meet the needs of the operations and programming. As with all play areas built prior to 2000, the play equipment at Cayuga Playground does not comply with ADA nor playground safety guidelines. The tennis and basketball courts are in adequate condition, but require resurfacing. The grassy field exhibits poor drainage and the irrigation system is past its useful life. The first of the wooden sculptures was carved in wooden sculptures were documented through an inventory and condition assessment of them by the Arts Commission at the request of the Recreation and Park Department. Approximately half were determined to be in fair condition while the remainder was found to be in poor condition.
2 A portion of Cayuga Street extends westward beyond Naglee Street and then deadends into the park. This short section of Cayuga Street is reported by both residents and SFPD to be a problem area due to illegal drug dealings occurring there Parks Bond and BART Earthquake Safety Program (ESP): In 2008, voters approved the $185 million Clean and Safe Neighborhood Parks Bond. An intent of the 2008 Park Bond is to modernize and improve specific aging parks through repair and replacement. Cayuga Playground and Clubhouse is a recipient of the 2008 Parks Bond with an allocation of $7.3 million. Concurrently BART is planning seismic improvements under its Earthquake Safety Program (ESP). BART intends to occupy a portion of Cayuga Playground during its 11-month seismic retrofit work, and shall compensate the City for impacts to the Recreation and Park Department s bond project as approved by the Recreation and Park Commission on July 16, BART s monetary compensation to be added to the bond program budget for Cayuga Playground and Clubhouse is $1,355,676. Therefore, the total project budget to renovate Cayuga Playground and Clubhouse is $8,655,676. BART and the Recreation and Park Department is coordinating its respective projects to minimize the overall impacts to the community by tailgating the timelines of both projects. Planning Process and Proposal: The Recreation and Park Department assembled a Project Team consisting of RPD staff from Capital and Operations, architects, landscape architects, and representatives from the Cayuga Neighborhood Association (CIA). A series of 3 community meetings was held to develop a conceptual improvement plan that was supported by the community participants. The proposed conceptual plan depicts a reconfiguration of the recreational elements to improve pedestrian circulation. Specifically the play area and the basketball court have swapped locations to centralize the children s play area, while tucking the basketball court below the noisy BART tracks. The tennis court is maintained in its current location to take advantage of an opportune opening into the Garden of Eden to improve access and circulation. The tennis court will be resurfaced. The clubhouse will also remain in approximately its same location. The footprint of the clubhouse has increased from 2,500 SF to 3,400 SF to provide additional interior storage, to incorporate dedicated spaces for custodial and maintenance services, and for restroom wheelchair-accessibility. The restrooms may be accessed from the interior or the exterior. Building massing options were presented at the community meetings. The community meeting participants selected a scheme that depicts a series of sloping, living roofs that would emphasize the natural setting of the park. The living roof would contribute to mitigating the BART noise within the building as well as provide added insulation and extending the life of the roof. The proposed clubhouse would incorporate other green design principles to achieve a LEED rating equivalent to silver or better. The deadend section of Cayuga Street that is west of Naglee Street is proposed to be incorporated into Cayuga Playground via vacation and transfer to the Recreation and Park Department. This addition to the park would be designed as a welcoming entrance into the park.
3 Environmental Evaluation: This project is categorically exempt (pending) from the California Environmental Quality Act (CEQA) under Class 1. Sources of Funding and Project Budget: Source Amount 2008 Clean and Safe Neighborhood Parks Bond $7,300,000 BART ESP Impact Compensation $1,355,676 TOTAL $8,655,676 Estimated Project Schedule: Phase Start Finish Design 09/17/09 07/19/10 Bid/Award 07/20/10 12/19/10 Construction 01/01/11 02/29/12 * Close Out 03/11/12 06/30/12 * Open to the Public Supported By: Chris Dillon, President of the Cayuga Improvement Association (CIA) Barbara Fugate and Josie Porter of the Cayuga Improvement Association (CIA) General public support Opposed By: None known Recommendation: RESOLVED, That this Commission accepts the recommendation of the General Manager and Staff and hereby approves a conceptual improvement plan for the renovation of Cayuga Playground and Clubhouse People to Notify: Cayuga Playground and Clubhouse mailing list Attachments: 1. Location Map 2. Photos Existing Site Conditions and Various Wooden Sculptures 3. Proposed Conceptual Improvement Plan 4. Proposed Clubhouse Layout Plan 5. Proposed Clubhouse Exterior (Scheme B)
4 Location Map Cayuga Playground and Clubhouse
5 View from Cayuga and Naglee Streets (looking west) View of elevated BART tracks along edge of Cayuga Park (looking north) View of grassy field (looking west) Photos Existing Site Conditions
6 Photos Various Wooden Sculptures
7 Proposed Conceptual Improvement Plan
8 Proposed Clubhouse Floor Plan
9 Proposed Clubhouse Exterior (Scheme B)
Charles P. Johnson and Associates. Annapolis Landscape Architects
Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros
More informationPhilip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director
Date: March 7, 2018 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director Dan Mauer,
More informationLMS A NORTH BEACH BRANCH LIBRARY SCHEMATIC DESIGN IMAGES SAN FRANCISCO PUBLIC LIBRARY
LMS A SAN FRANCISCO PUBLIC LIBRARY NORTH BEACH BRANCH LIBRARY IMAGES APRIL 2009 NORTH BEACH BRANCH LIBRARY SAN FRANCISCO, CA LEDDY MAYTUM STACY Architects NORTH BEACH BRANCH LIBRARY PROJECT BACKGROUND
More informationMoreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551
Master Plan Architect School Name Moreno Valley College District Riverside Community College District Architecture and Urban Design 5898 Blackwelder Street Ground Floor Culver City, CA 90232 T: 310.559.5720
More informationMUSCO Sports Lighting, LLC Extension of Existing Service Contracts: Award of Sole Source Contract - Staff Report
Date September 6, 2018 To: Through: From: Subject: Recreation and Park Commission Philip A. Ginsburg, General Manager Dennis Kern, Operations Division Director Stephen Flannery, Infrastructure Manager,
More informationSAN FRANCISCO RECREATION + PARKS DEPARTMENT HYDE & TURK MINI PARK COMMUNITY PRESENTATION #2 WEDNESDAY,
SAN FRANCISCO RECREATION + PARKS DEPARTMENT HYDE & TURK MINI PARK COMMUNITY PRESENTATION #2 WEDNESDAY, 9.21.2016 Supervisor Jane Kim District 6 Project Manager Reem Assaf, P.E. Recreation and Parks Department
More informationRPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St
RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, 2015 Duncan St Supervisorial District 8 Supervisor Scott Wiener 1 Agenda Welcome & Introductions Purpose of Meeting Ground Rules Project
More informationSAN FRANCISCO RECREATION + PARKS DEPARTMENT MARGARET HAYWARD PLAYGROUND COMMUNITY WORKSHOP #1 WEDNESDAY, JANUARY 27, 2016
SAN FRANCISCO RECREATION + PARKS DEPARTMENT MARGARET HAYWARD PLAYGROUND COMMUNITY WORKSHOP #1 WEDNESDAY, JANUARY 27, 2016 Supervisor London Breed District 5 Project Managers Marien Coss Cara Ruppert Recreation
More informationOPERATING BUDGET
PUBLIC WORKS OPERATING BUDGET 2017-18 LARKSPUR CITY COUNCIL MEETING APRIL 19, 2017 UBLIC WORKS OPERATING BUDGET 2017-18 APRIL 19, 2017 PUBLIC WORKS ENGINEERING STREETS AND FACILITIES MAINTENANCE PARK MAINTENANCE
More informationA 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect
West Sunset Park A 2012 Clean and Safe Neighborhood Parks Bond Project Community Meeting #2 November 20, 2013 Katy Tang, District Supervisor Dan Mauer, Project Manager Jasmine Kaw, Landscape Architect
More informationLong Branch-Wayne Local Park Renovation Project
Montgomery Parks Long Branch-Wayne Local Park Renovation Project Community Meeting #2 September 20, 2016 Oak View Elementary School 7:00-9:00 PM Welcome / Team Introductions M-NCPPC (Montgomery Parks)
More informationTown of Cornelius Bond Update August, 2017
Town of Cornelius Bond Update August, 2017 Referendum Results Roads, Intersections, & Sidewalks ($11.15 mil) Pass rate 81.38% in favor Parks and Recreation ($5.25 mil) Pass rate 72.09% in favor Town Center
More informationFebruary 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax
February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax Master Planning Charge Van Dyck Park s first Master Plan will provide the City with a road map as to how best incorporate
More informationREPORT TO COUNCIL City of Sacramento
REPORT TO COUNCIL City of Sacramento 915 I Street, Sacramento, CA 95814-2604' www.cityofsacramento.org CONSENT August 25, 2009 Honorable Mayor and Members of the City Council Title: Contract: Valley Hi
More informationSF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department
SF REC & PARK STANYAN STREET IMPROVEMENT PLANNING PRESENTATION WEDNESDAY, OCTOBER 19, 2016 Supervisor London Breed District 5 Project Manager Dan Mauer Recreation and Parks Department Design Team William
More informationMontana Rail Link Park
Montana Rail Link Park Neighborhood Open House A Missoula Community Partnership WITH LEADERSHIP FROM THE FRANKLIN TO THE FORT & SOUTHGATE TRIANGLE NEIGHBORHOODS Sovereign Hope Church, (1919 North Ave.)
More informationErrol Heights Park and Community Garden Frequently Asked Questions March 22, 2018
Errol Heights Park and Community Garden Frequently Asked Questions March 22, 2018 Question 1: What improvements are planned for Errol Heights Park? How will the community be engaged in the process to shape
More informationCity of Gainesville Parks, Recreation and Cultural Affairs Infrastructure Sales Tax City Commission Approved Project List
City of Gainesville Parks, Recreation and Cultural Affairs Infrastructure Sales Tax City Commission Approved Project List Alfred A. Ring Park Description: Boardwalk replacement, signage and general park
More informationSF RECREATION & PARK DEPARTMENT URBAN TRAILS PROGRAM
SF RECREATION & PARK DEPARTMENT URBAN TRAILS PROGRAM TRAIL IMPROVEMENTS October 5, 2011 TRAIL IMPROVEMENTS 6:30 8:00 p.m. AGENDA WELCOME & INTRODUCTION URBAN TRAILS PROGRAM OVERVIEW TRAIL IMPROVEMENTS
More information29 Bella Fontaine Park
29 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master Plan Planning Zone 2 Visit Date: July 2016 Page 1 129 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master
More informationENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS MASTER PLAN
ENVIRONMENTAL INITIAL STUDY FOR THE BERKELEY CITYWIDE POOLS MASTER PLAN CITY OF BERKELEY PARKS RECREATION AND WATERFRONT DEPARTMENT SEPTEMBER 1, 2009 ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS
More informationHonorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development
Office of the City Manager ACTION CALENDAR January 29, 2013 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Eric Angstadt, Director, Planning and
More informationPlacemaking is a multifaceted
Placemaking is a multifaceted approach to the planning, design and management of public spaces. Placemaking capitalizes on a local community's assets, inspiration, and potential, with the intention of
More informationLittleton Fields Master Plan
Town of Littleton Littleton Fields Master Plan September 25, 2017 Gale Associates, Inc. John M. Perry, P.E. Jeffrey F. Georges, MRLA About Gale Agenda Introduction and Purpose Background Investigation
More informationDecember 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation
December 1, 2014 (revised) TO: FROM: RE Arlington County Board Thomas Jefferson Site Evaluation Working Group by Carrie Johnson, Chair Preliminary Report -- Thomas Jefferson Site Evaluation The Thomas
More informationFair Oaks Ranch Homeowners Association Parks and Trails Master Plan & 2019 Budget Planning
Fair Oaks Ranch Homeowners Association Parks and Trails Master Plan & 2019 Budget Planning Sticky Dot Voting Priorities Community Survey Results Board Title Votes Parks, Open Spaces, and Trails 328 Emergency
More informationBUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT
For meeting of: BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT TO: FROM: Honorable Chair and Planning Commissioners Jill Ekas, Community Development Director Brittney Cozzolino,
More informationAppendix E Section 4(f) Evaluation
Appendix E Section 4(f) Evaluation Appendix E Draft Section 4(f) Evaluation E.1 Introduction This appendix addresses a federal regulation known as Section 4(f), which protects parks, recreation areas,
More informationGO Bond March 2019 Regular City Commission Meeting December 5, 2018
GO Bond March 2019 Regular City Commission Meeting December 5, 2018 Agenda Overview of GO Bond Planning GO Bond Revised Project Recommendations Impact on tax (millage) rate GO Bond Ballot Questions GO
More informationI-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination
I-494 Rehabilitation Project SP 2785-330 (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination State Project Number 2785-330 Federal Project No. NHPP-I494 (002) Trunk Highway:
More informationSpecial Revenue Funds
Special Revenue Funds Special Revenue Funds account for the proceeds of specific revenue sources (other than special assessments for major capital projects) that are legally restricted to expenditures
More informationRecreation Facility Evaluation - Conclusions
2015 Parks Report Upon initial assessment of the Village parks it was evident that the inventory of the Village s park land, athletic fields, recreational facilities, playgrounds, trails, etc., was substantial,
More informationCITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development
CITY OF MANHATTAN BEACH STAFF REPORT TO: Planning Commission THROUGH: Marisa Lundstedt, Director of Community Development FROM: Tony Olmos, Director of Public Works DATE: April 29, 2015 SUBJECT: Determination
More informationADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN
TO: FROM: SUBJECT: Honorable Mayor and City Council Planning Department ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN RECOMMENDATION: It is recommended that the City Council:
More informationProposed Walkability Ordinance for City of Knoxville (6/16/17)
Proposed Walkability Ordinance for City of Knoxville (6/16/17) New or revised text is highlighted Section 1: Purpose The purpose of this ordinance is to set requirements for walkability and pedestrian
More informationCommunity Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project
Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project Community Meeting #2 September 22, 2010 District Supervisor Eric Mar Paulina Araica, Project Manager Andy Maloney, Architect
More informationPARK & RECREATION. Project Summaries
PARK & RECREATION Project Summaries 45 BEAVER ISLAND TRAIL EXTENSION - PHASE VIII - 60TH ST S TO CITY LIMITS Project Number: PK.19.01 Construction Year: 2019 quality services to area residents who utilize
More informationSITE FEASIBILITY TEST FIT LAYOUT NORTHERN AREA INTERNATIONAL SCHOOL DECEMBER 2016
SITE FEASIBILITY TEST FIT LAYOUT NORTHERN AREA INTERNATIONAL SCHOOL DECEMBER 2016 OWNER & DESIGN TEAM GENERAL BACKGROUND INFORMATION PGCPS received a Carnegie Corporation Opportunity by Design grant to
More informationFY Capital Improvement Program Parks and Landscaping. 8 - Summary
PARK PROJECTS FY 211-215 Capital Improvement Program Description FY 21 FY 211 FY 212 FY 213 FY 214 FY 215 1 Restroom Bldgs (Replace or Construct)-Jefferson, McDonald, 5,774,623 4,669,623 1,15, Allendale,
More informationSF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department
SF REC & PARK STANYAN STREET IMPROVEMENT COMMUNITY MEETING #3 THURSDAY, JANUARY 25 TH, 2018 Supervisor London Breed District 5 Project Manager Dan Mauer Recreation and Parks Department Design Team William
More informationThe site to the south of Tanana Loop, east of the Botanical Gardens was evaluated but deemed too small for the array size required.
Site Consideration This site was chosen for three main reasons: 1) The array is large and needed an accessible piece of land that could physically accommodate it; 2) The site is ideal for its gentle unobstructed
More informationPhilip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division
Date: May 3, 2017 To: Through: From: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division Brian Stokle, Planner,
More informationPhilip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects
Date August 5, 2015 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects Nicole Avril,
More information17 th and Folsom Future Park Community Meeting #1
17 th and Folsom Future Park Community Meeting #1 January 23, 2010 San Francisco Department of Public Works Agenda Background presentation Values discussion Breakout groups to design the park Report back
More informationFY Capital Improvement Program Arroyo Projects - Lower Arroyo Summary
LOWER ARROYO FY 214-218 Capital Improvement Program Description FY 213 FY 214 FY 215 FY 216 FY 217 FY 218 1 Bird Sanctuary Improvements (7749) 35, 225, 125, 2 Lower Arroyo - Implement Master Plan - Signage
More informationCITY OF SIMI VALLEY MEMORANDUM
CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. 9.1 May 18, 2016 TO: FROM: Planning Commission Department of Environmental Services SUBJECT: REVIEW OF POTENTIAL FISCAL YEAR (FY) 2016-17 CAPITAL IMPROVEMENT
More informationGENE FRIEND RECREATION CENTER Civic Design Review Concept Design DECEMBER14, 2015
GENE FRIEND RECREATION CENTER Civic Design Review Concept Design DECEMBER14, 2015 GENE FRIEND URBAN CONTEXT GENE FRIEND SITE CHARACTERISTICS NEIGHBORHOOD: HOWARD STREET 6 TH STREET IMPROVEMENTS FOLSOM
More informationREPORT TO COUNCIL City of Sacramento
REPORT TO COUNCIL City of Sacramento 915 I Street, Sacramento, CA 95814-2604 www. CityofSacramento.org 9 CONSENT February 12, 2008 Honorable Mayor and Members of the City Council Title: Park Name and Master
More informationARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET
A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -
More informationCITY OF ANN ARBOR // Parks + Recreation. Hillary Hanzel Park Planner + Landscape Architect
CITY OF ANN ARBOR // Parks + Recreation Hillary Hanzel Park Planner + Landscape Architect CITY OF ANN ARBOR // Parks + Recreation 1. Overview of Parks System 2. Recent + Upcoming Capital Projects 3. History
More informationSubject: 30 Otis Street, Evaluation of Shadow on Proposed 11th and Natoma Park
Date: September 5, 2018 To: Recreation and Park Commission Capital Committee Through: Philip A. Ginsburg, General Manager Toks Ajike, Director, Capital & Planning Division From: Brian Stokle, Planner,
More informationRECREATION AND OPEN SPACE ELEMENT
RECREATION AND OPEN SPACE ELEMENT Last amended August 19, 2008 Table of Contents Objective Page 5.1 Park system defined... 5-1 5.2 Access to parks and recreational facilities... 5-2 5.3 Recreation and
More informationMary Bradford, Director of Parks Mike Riley, Deputy Director of Parks John E. Hench, Ph.D., Chief, Park Planning & Stewardship Division
DATE: September 18, 2009 MCPB Item # # 10 Date: 09/24/09 TO: VIA: FROM: RE: Montgomery County Planning Board Mary Bradford, Director of Parks Mike Riley, Deputy Director of Parks John E. Hench, Ph.D.,
More informationPARTF Scoring System for Grants
PARTF Scoring System for Grants The members of the N.C. Parks and Recreation Authority use the PARTF scoring system as one of several tools to select grant recipients. Please provide all of the information
More informationWard Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres
Ward Park Park Location: 1000 SW 22 nd St Park Land Established: 1979-80 Park Size: 13 acres Developed Acres: 9 acres Undeveloped Acres: 4 acres Park Type: Neighborhood Park Amenities: 2 Shelters, tennis
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 17, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,
More informationMADISON MANOR PARK RENOVATIONS
MADISON MANOR PARK RENOVATIONS COMMUNITY KICK-OFF MEETING MINUTES To: Wilfredo Calderon, Steven Torgerson (AMT), Tom Mitchler, Kevin Stalica, Vincent Verweij, Greg Anselene, Chris Willett, Peter Alchin,
More informationDATE: October 25, Park, Recreation and Open Space Advisory Committee (PROSAC) Jordan Harrison, Planner III, RPD Planning Division
DATE: October 25, 2016 TO: FROM: RE: Park, Recreation and Open Space Advisory Committee (PROSAC) Jordan Harrison, Planner III, RPD Planning Division Possible Action on Potential Acquisition at Potrero
More informationADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS
ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213
More informationPLANNING COMMISSION STAFF REPORT
OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 (408) 777-3308 FAX (408) 777-3333 planning@cupertino.org PLANNING COMMISSION STAFF REPORT Agenda Item No. Agenda Date:
More informationDesign Considerations
Essential to the development of a successful Master Plan for the Park Complex is input from the community that the park will serve. The community outreach component of the planning process included numerous
More informationLIVE OAK LIBRARY ANNEX PROJECT COUNTY OF SANTA CRUZ. October 22, 2018 COMMUNITY MEETING #2
LIVE OAK LIBRARY ANNEX PROJECT COUNTY OF SANTA CRUZ October 22, 2018 COMMUNITY MEETING #2 Capitola Measure S Planned library Improvements in Capitola and Live Oak part of the 10-branch Santa Cruz Public
More informationFY Capital Improvement Program Parks and Landscaping - Park Projects
PARK PROJECTS FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 11 12 13 14 15 16 17 Robinson Park - Recreation Center Renovation Project (7843) Desiderio
More informationCity of Yorba Linda Memorandum
City of Yorba Linda Memorandum Date: June 15, 2011 Date: To: From: Honorable Chairman and Members of the Parks and Recreation Commission Mike Kudron, Acting Director of Parks and Recreation SUBJECT: BACKGROUND
More informationSouthward Community Recreation and Sports Park Southward Community Recreation and Sports Park Concept Design Images and Information.
Concept Design Images and Information Please note that this information is concept only at this point. These are not engineered drawings and the project has not yet gone to tender. The intention of this
More informationClarendon Park Framework Plan. Chicago Park District Department of Planning & Development June 7, 2008
Clarendon Park Framework Plan Chicago Park District Department of Planning & Development June 7, 2008 1 Table of Contents Framework Plan Purpose.3 Radius Map one mile.4 Aerial Map...5 Existing Park Layout.6
More informationWARM SPRINGS PARK MASTER PLAN
TABLE OF CONTENTS page 1.0 Introduction and Overview 1 2.0 Information Gathering 2 3.0 Conceptual Alternative Development 8 4.0 Master Plan Development 14 5.0 Construction Cost Estimates 19 LIST OF FIGURES
More informationDATE: May 25, Watershed Conservation Authority Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer
DATE: May 25, 2017 TO: FROM: THROUGH: SUBJECT: Watershed Conservation Authority Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer : Consideration of a resolution to approve
More informationCONSENT CALENDAR September 27, 2005
Office of the Executive Officer September 27, 2005 To: From: Submitted By: Subject: Honorable Chairperson and Members of the Redevelopment Agency Phil Kamlarz, Executive Officer Dan Marks, Director, Planning
More informationBENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)
BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION) COUNTY BOARD MEETING DECEMBER 16, 2017 County Board Consideration: Adopt the Benjamin Banneker Park Framework Plan and Design Guidelines Framework
More informationLELAND & VISITACION PARK COMMUNITY MEETING
LELAND & VISITACION PARK COMMUNITY MEETING July 16th, 2016 SAN FRANCISCO RECREATION AND PARK GLS LANDSCAPE ARCHITECTURE BAYSIDE DEVELOPMENT LLC MEETING OBJECTIVES 1. FEEDBACK ON LELAND / BAYSHORE CORNER
More informationBROADVIEW PARK. Projects Status Update February Estimated Investment. Project Status Update Agency Anticipated Completion
BROADVIEW PARK Projects Status Update February 2017 Project Status Update Agency Anticipated NEW Minor Home Repair Assistance Applications on first come, first qualified basis. Eligibility process underway
More informationBlue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres
Blue Springs Park Park Location: 2204 SW South Ave. Park Land Established: 1975 Park Size: 14 acres Developed Acres: 12 acres Undeveloped Acres: 2 acres Park Type: Neighborhood Park Amenities: Softball
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 12-10-15 Leisure World Clubhouse II Addition Fitness Center, Limited Site Plan Amendment
More informationTown Centre Park Master Plan Update - Terms of Reference
CoQuitlam For Committee Our File: 12-6100-20/14-001/1 Doc#: 2176441.V7 To: From: Subject: For: City Manager General Manager Parks, Recreation & Culture Services Town Centre Park Master Plan Update - Terms
More informationCITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G. 1 STAFF REPORT August 4, Staff Contact: Tricia Shortridge (707)
CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G. 1 STAFF REPORT August 4, 2009 Staff Contact: Tricia Shortridge (707) 449-5140 TITLE: REQUEST: LONGS / CVS DRIVE-THRU PHARMACY & REMODEL TIME EXTENSION
More informationLittle Neck Planning Area
Little Neck Planning Area Current Reality The Little Neck Planning Area is characterized by established residential neighborhoods, Town Center and Pembroke. The Eastern and Western Branches of the Lynnhaven
More informationPlanning Commission Staff Report Project Plan Approval Hearing Date: June 14, 2017
Planning Commission Staff Report Project Plan Approval Hearing Date: June 14, 2017 ITEM 3 Peter Matson requests Project Plan Approval for an 80-acre mixed-use plan that includes 220 residential units and
More informationSOUTHEAST SPORTS COMPLEX MASTER PLAN
REPORT TO SOUTHGATE NEIGHBORHOOD COUNCIL APRIL 13, 2016 Visioning Process April 30: Stakeholder Meeting with Sports Groups May 5: Stakeholder Meeting with Southgate Land Use Committee May 13: SNC Meeting
More informationProvide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.
(ROS) Goal Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors. OBJECTIVE ROS.01 The County shall acquire,
More informationAvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation
AvalonBay Communities + BRIDGE Housing Mission Housing Habitat for Humanity Pacific Union Development Corporation Tonight s Agenda Recap of discussion from last CAC meeting Updates on meetings with Stakeholders
More information(Exhibit A) Site Plan Adoption Detail and Support Information
McCormick Park Master Site Plan (Exhibit A) Site Plan Adoption Detail and Support Information July, 2003 McCormick Park Site Plans.... 2-3 McCormick Park Site Plan Comparison... 4 Basic Assumptions about
More informationOxford Hills School District Capital Renewal Plan Updated March 2017
Color Coding Guide Recently Completed In Progress FY 2017 Budget in FY 2018 Future Budgets/Projects 3/20/17 Capital Renewal Plan Updated March 2017 Capital Renewal Plan - Harrison Elementary Harrison add
More informationSMEDLEY TRACT MASTER SITE PLAN Draft Master Plan Presentation
SMEDLEY TRACT MASTER SITE PLAN Draft Master Plan Presentation Public Meeting #3 03.16.2010 Middletown Township, Pennsylvania MEETING AGENDA Project Schedule Site Analysis Site Concepts Draft Master Site
More informationMeeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.
Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Board 1: Welcome Welcome to the Wilson Transfer Station Project Public Hearing. The purpose
More informationCaroline Freeland Park Facility Plan Project
Montgomery Parks Caroline Freeland Park Facility Plan Project Community Meeting #1 November 6, 2013 Bethesda Library 7:00-9:00 PM Welcome / Team Introductions Parker Rodriguez, Incorporated (Landscape
More informationBurrus Old Mill Park
Burrus Old Mill Park Park Location: 112 NW Woods Chapel Rd. Park Land Established: 1969 Park Size: 14 acres Developed Acres: 14 acres Undeveloped Acres: 0 acres Park Type: Neighborhood Park Amenities:
More informationSBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I
SBCAG STAFF REPORT SUBJECT: Cabrillo-UPRR Bridge Project MEETING DATE: March 17, 2016 AGENDA ITEM: 5I STAFF CONTACT: Fred Luna RECOMMENDATION: Authorize the chair to sign a Memorandum of Understanding
More informationFY Capital Improvement Program Arroyo Projects
FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 Hahamongna - Implement Master Plan - Oak Grove Area Improvements (7756) Hahamongna - Implement Master
More informationWoods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.
Woods Chapel Park Park Location: 3925 NW Dogwood Park Land Established: 1979 Park Size: 10 acres Developed Acres: 6 acres Undeveloped Acres: 4 acres Park Type: Neighborhood Park Amenities: Playground,
More informationCITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020
CITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020 A BLUE PRINT FOR THE NEXT 20 YEARS The PRCA Vision 2020 Master Plan, adopted in November 2012, addresses the current state
More informationMUNICIPALITY OF ANCHORAGE
MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION April 10, 2007 Dear Community Council Member: The Anchorage Parks and Recreation Department requests your help in assessing the needs of parks and
More informationJordan Harrison, Planner III, San Francisco Recreation and Park Department
Date December 8, 2015 To: Through: From: Subject: Recreation and Park Commission Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division Jordan Harrison, Planner III,
More informationKASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016
KASPER City of Georgetown, Texas PUD Planned Unit Development December 30, 2015 Revised January 27, 2016 Applicant: Sentinel Land Company, LLC 4910 Campus Drive Newport Beach, CA Prepared by: SEC Planning
More informationParks & Recreation. Michael Versen & Associates Landscape Architecture Land Planning
Michael Versen & Associates Landscape Architecture Land Planning 299 N. Weisgarber Road Suite 201 Knoxville, TN. 37919 website: www.versenassociates.com telephone: 865-588 588-1331 fax: 865-251 251-4086
More informationUpdate for City Council 7 Years of Progress. May 2013
Update for City Council 7 Years of Progress May 2013 Setting the Stage Needs Assessment 2006 City of Charlottesville Inventory National Guideline Service Level School Sites Inventory Total Current Inventory
More informationRenovation Project Presentation Public Meetings
Renovation Project Presentation Public Meetings SWBR Architects and Tappé Associates made a formal presentation to both the Board and Public in early February of a conceptual design of a proposed renovation
More informationPark Types and Attributes
02 APPENDIX B APPENDIX B s and s 194 APPENDIX B 04 Size Level of Service Any privately owned park, of any size, is a neighborhood park Primary Service Area - 1/2 mile or within 15 minutes walking distance
More informationChapter Purpose and Intent. 7.2 Applicability. 7.3 General Provisions RECREATIONAL OPEN SPACE
Chapter 7. RECREATIONAL OPEN SPACE 7.1 Purpose and Intent The intent of this Chapter is to provide for centrally located, unencumbered land as neighborhood recreational open space and not to permit the
More informationOPEN SPACE TYPES. SIZE 8 acres. SIZE 20 acres. SIZE 1 acre
TYPICAL CHARACTERISTICS OPEN SPACE TYPES OPEN SPACE TYPES The neighborhood contains an extensive variety of open space types. Most of these spaces incorporate multiple uses and activities, so that each
More information