1 MUNICIPALITY OF CHATHAM-KENT INFRASTRUCTURE AND ENGINEERING SERVICES ENGINEERING AND TRANSPORTATION DIVISION TO: FROM: Mayor and Members of Council Nelson Cavacas, C.E.T. Manager, Infrastructure and Development Engineering DATE: June 6, 2014 SUBJECT: Tender Award: Contract #T14-105U, Urban Resurfacing RECOMMENDATIONS It is recommended that: 1. The 2014 Urban Resurfacing Program be approved. 2. The tender in the amount of $3,091, including HST for Urban Resurfacing be awarded to Coco Paving (1990) Incorporated. 3. Of the $3,091, amount noted in item 2 above, $88, for provisional spot utility repairs be funded from the approved Operational Budgets for the utility pavement repair costs associated with sewer and water repairs. BACKGROUND The 2014 roadway maintenance and construction needs were compiled by the Road Analytics Software Program and reviewed by Infrastructure and Engineering Services (IES). The IES Public Works Managers (North and South) along with the staff of Engineering and Transportation Division reviewed these sections of roadway identified for improvement. This review has confirmed the ratings, pavement type and features that affect their choice as proposed maintenance projects. Any conflicts with future bridge, water main and storm sewer improvements required to be completed prior to resurfacing were identified and the list adjusted accordingly. Road sections were inspected to confirm the ratings, geometrics and suitability of the improvements suggested. The attached 2014 Urban Resurfacing List (Appendix A) indicates the pavement sections. The expenditure of the works listed is within the budget amount set out in the Lifecycle Budget for the urban resurfacing.

2 Tender Award: Contract T14-105U, Urban Resurfacing 2 The contract in general provides for the supply, haul and placement of asphalt to be applied on various urban streets throughout Chatham-Kent. Tenders were called and received by the Purchasing Officer on Thursday, June 5, The results are as follows: TENDER: CONTRACT T14-105U URBAN RESURFACING Rank Tenderer Amount (incl. HST) Amount (excl. HST) 1 Coco Paving (1990) Inc. Windsor, ON $3,091, $2,735, Huron Construction Co. Ltd. Chatham, ON $3,193, $2,826, The Engineering and Transportation Division has reviewed the tenders and found them to be complete in all respects. COMMENTS Potential alternatives for Lifecycle Budget savings were assessed in efforts to balance budget within current funding. The updated current 2014 Lifecycle Budgets including this year s 1.3% allocation increase for lifecycle roads along with the available 2013 carry-over lifecycle funding is shown in the table below. Road Program Type Annual Required Budget Annual 2014 L/C Budget Annual Budget Deficit 2013 L/C Carry-Over Funding 2014 L/C Total Funding Asphalt Roads $12,000,000 $9,147,000 $2,853,000 $ 455,000 $ 9,602,000 Surface Treatment $1,000,000 $ 800,000 $200,000 $ 300,000 $ 1,100,000 Total Programs $13,000,000 $9,947,000 $3,053,000 $ 755,000 $10,702,000 Administration has also explored new technologies and cost savings measures to mitigate the current budget deficits. However, even with the adoption of these new initiatives, the Surface Distress Index (SDI) will drop from the current 7.85 to 6.85 over the next 10 years unless the budget deficit is eliminated. The result will be a general decline in overall quality of roads in Chatham-Kent. Similar to 2013 the following new technologies will continue to be employed by the Municipality considering a positive performance over this past winter season: 1) Increase the amount of Recycled Asphalt Pavement (RAP) material in design specification of new hot Mix Asphalt from 10% to 15%. 2) Increase/enhance road gravel shouldering activities by Public Works to improve roadside drainage and road structural integrity. 3) Incorporate pavement preservation technologies on 25% of the paved road resurfacing programs to extend the life of existing pavement.

3 Tender Award: Contract T14-105U, Urban Resurfacing 3 The adoption of some of the above strategies will result in a surface which is more textured (less smooth) compared to asphalt. However, it is felt the cost/benefit ratio will be favorable to the community. The budget estimate for the 2014 Urban program was set at $2,750,000 and funds were included in the 2014 Lifecycle Budget. Subsequent to finalizing the Urban program, suppliers were consulted by the Engineering and Transportation Division to identify possible cost increases prior to tendering. Two General Contractors submitted tenders for the job and bidding was an open competitive process. To optimize the Tender Call, resurfacing work has been divided into two contracts. One for Urban Works as noted on Appendix A (2014 Urban Resurfacing List), and the other for Rural Works. The tender documentation included a stipulation that the locations included in the tender were subject to Council approval. A list of road sections that have been put on the provisional list due to budget limitations is also attached as Provisional Urban Roads List (Appendix B). The first top three road sections that were included in the tender as provisional roads will be completed considering favorable pricing received allowing completion of these sections within budget allocations. Staff will monitor the project costs to determine if additional road sections can be completed from the provisional list. Maps and tables of the 2014 Urban Resurfacing Sites (Appendix C) are attached to assist Council in identifying these locations. The contract documentation contains the same provision for the oil price escalation clause that was included in last year s rural and urban resurfacing contracts to address the Asphalt Cement (AC) industry s issue with the price volatility on the AC product supplied to paving contractors. The contractor has the option to opt in or out of the agreement at the time of submitting their tender bid and cannot change once bids are received. The price escalation clause also remains unchanged with the stipulation that price adjustment is only applied if the AC price differs more than $20 per tonne either up or down from the price index for the month in which the tender closed. When the price index differential is less than $20 per tonne, there will be no payment adjustment for that month. The price index is published monthly in the MTO Contract Bulletin and for this tender the AC price index was published at $ per tonne establishing this rate from which all AC adjustments will be calculated. However, for this year s contract the low bidder has submitted their bid opting out of the AC index, resulting in the unit prices being fixed at the prices submitted with the tendered bid; therefore, the provision for the deletion of road resurfacing work to remain within budget allocations will not be required. The project breakdown is set out in the Financial Implications section of this report. A summary of the 2014 Roads Lifecycle Budget is provided in item (D) of the table in the Financial Implications section of this report. The $10,702,000 amount shown for the total roads Lifecycle Budget consists of the total budget for asphalt roads and the surface treatment maintenance resurfacing programs

4 Tender Award: Contract T14-105U, Urban Resurfacing 4 including all associated Gas Tax funding and carry-forward funding balance from the prior year. COUNCIL DIRECTIONS The recommendations in this report support the following Council Directions: JOBS: Everyone in Chatham-Kent who wants to work is able to work in meaningful employment PEOPLE: Chatham-Kent is a welcoming community where people choose to live, learn, work, and play HEALTH: Chatham-Kent is a healthy, active, safe, accessible community within a healthy natural and built environment FINANCIAL SUSTAINABILITY: The Corporation of the Municipality of Chatham-Kent is financially sustainable CONSULTATION Has the potential to support all Council Directions Neutral issues (does not support negatively or positively) The Tenders were opened by the Purchasing Officer and reviewed by the Tendering Committee which includes the Purchasing Officer, Corporate Services, the Acting Director, Financial Services/Treasurer, Corporate Services and the Manager, Infrastructure and Development Engineering, Infrastructure and Engineering Services. The Managers of Public Works (North and South) were also consulted on the road listing. FINANCIAL IMPLICATIONS The project is being funded from the 2014 Roads Lifecycle Budget, which includes funds under the Association of Municipalities of Ontario (AMO)/Federal Transfers of Federal Gas Tax Funding Agreement.

5 Tender Award: Contract T14-105U, Urban Resurfacing 5 The project is summarized in the following table: (A) Budget Estimate (B) Project Costs (C) Project Funding (D) Lifecycle and Provincial Grant Update Summary CONTRACT T14-105U, URBAN RESURFACING DESCRIPTION TOTAL Lifecycle for Urban Resurfacing $ 2,750, Operational Budget (Utility Cuts) $ 100, Total $ 2,850, DESCRIPTION TOTAL Low Tender $ 3,091, Engineering & Material Testing $ 50, Less HST Rebate 11.24% -$ 307, Total $ 2,833, Lifecycle for Urban Resurfacing $ 2,745, Operational Budget (Utility Cuts) $ 88, Funding Totals $ 2,833, Roads Lifecycle Budget $ 10,702, Previously Approved -$ 5,458, Current Project -$ 2,745, Balance Remaining $ 2,497, The remaining roads Lifecycle Budget in the amount of $2,497, is committed to other road program projects that have not been tendered to date. Some of these other committed projects include the following: Surface Treatment, Road Sub-drainage, Concrete Curb Repairs, Crack Sealing, Mechanized Spray Patching, Alternative Pavement Preservation Technologies and Railway Asphalt Road Approach Repairs. Prepared by: Reviewed by: Nelson Cavacas, C.E.T. Manager, Infrastructure and Development Engineering Thomas Kelly, P. Eng., MBA General Manager, Infrastructure and Engineering

6 Tender Award: Contract T14-105U, Urban Resurfacing 6 c. Purchasing Officer, Financial and Performance Services Acting Director, Financial Services/Treasurer, Corporate Services Manager, Public Works North Manager, Public Works South Attachments: Appendix A - Chatham-Kent 2014 Urban Resurfacing List Appendix B - Provisional Urban Roads List Appendix C - Urban Resurfacing paving sites-rural, map. 2 pages (RTC:\Infrastructure & Engineering\I&ES\2014\ 3663 Tender Award: T14-105U, Urban Resurfacing

7 Appendix A Chatham-Kent 2014 Urban Resurfacing Program List Community Location Description Street Name Segment Start Segment End 1 BLENHEIM Cathcart Street Story Street 90 degree bend 2 BLENHEIM Talbot Street Pook Road Forsyth Drive 3 BLENHEIM Talbot Street Chatham Street Hall Street 4 BLENHEIM Talbot Street Mountford Street Marlborough Street 5 BOTHWELL Main Street Chestnut Street Cherry Street 6 BOTHWELL Elm Street Catherine Street Main Alley 7 CHATHAM Jasper Avenue Dunvegan Drive 50m east of Lincoln 8 CHATHAM Mercer Street John Street Park Lane 9 CHATHAM Spencer Avenue Lacroix Street Raleight Street 10 CHATHAM Lacroix Street King Street CPR crossing 11 CHATHAM Jeffrey Street Cross Street Richmond Street 12 CHATHAM McNaughton Avenue East Victoria Avenue Given Road 13 CHATHAM Grand Avenue East Joseph Street Taylor Avenue 14 CHATHAM Suger Maple Run Norway Maple Drive St. Clair Street 15 CHATHAM Burton Avenue Tweedsmuir Avenue Tweedsmuir Avenue 16 CHATHAM Gregory Drive West St. Clair Street Red Maple Mile 17 CHATHAM Gregory Drive East St. Clair Street 125m East of Victoria 18 CHATHAM Campus Parkway Collegate Drive South Grand Avenue West 19 CHATHAM Campus Parkway University Drive North University Drive South 20 CHATHAM Couture Drive Semenyn Avenue Woods Street 21 CHATHAM Ardleigh Drive Victoria Avenue North Limit 22 CHATHAM Orangewood Boulevard Oxley Drive Paxton Road 23 CHATHAM Balmoral Road Baldoon Road Garden Path East 24 CHATHAM Montgomery Drive Woods Street Sandys Street 25 CHATHAM Monarch Drive Blossom Place Viscount Road 26 CHATHAM Jupiter Avenue John Street Dunvegan Drive 27 DRESDEN Lindsley Street St. George Street Metcalfe Avenue E 28 DRESDEN North Street 150m N Community Road CSX Crossing 29 ERIEAU Ross Lane Erieau West Limits 2 nd Street 30 RIDGETOWN Cecil Steet Main Street Jane Street 31 RIDGETOWN Marsh Street Main Street David Street 32 THAMESVILLE London Road Anna Street Wallace Street 33 THAMESVILLE London Road Priscilla Street Alice Street 34 TILBURY Tilbury Street Canal Street Mill Street West 35 TILBURY Bonniface Street Canal Street Crawford Avenue 36 TILBURY Canal Street Ella Street Tilbury Street 37 TILBURY Ella Street Canal Street Henderson Street 38 WALLACEBURG McNaughton Avenue Lord Selkirk Bridge CSX Railway Crossing 39 WALLACEBURG Bridlepath Road Murray Street Reaume Avenue Appendix A, Chatham-Kent 2014 Rural Resurfacing List - Report No.3663

8 Appendix B Provisional Urban Resurfacing Program List Community Location Description Provisional Roads Included In Contract 40 WHEATLEY Bruce Crescent Hillcrest Drive George Avenue 41 WHEATLEY Elm Street West Erie Street Hillcrest Street 42 WHEATLEY Hillcrest Drive Elm Drive North End Provisional Roads NOT Included In Contract 1 CHATHAM Pavey Street Tissman Avenue Freeland Avenue 2 TILBURY Lyon Street Superior Street Canal Street 3 CHATHAM Victoria Avenue Amelia Street Forest Street Appendix B, 2014 Provisional Urban Resurfacing List - Report No.3663

9 2014 Urban Resurfacing Sites CHATHAM 7. JASPER STREET DUNVEGAN DR. to 50m east of LINCOLN RD. 18. CAMPUS PARKWAY COLLEGIATE DR. S. to GRAND AVE. W. 8. MERCER STREET JOHN ST. to PARK LANE 19. CAMPUS PARKWAY UNIVERSITY DR. N. to UNIVERSITY DR. S. 9. SPENCER AVENUE LACROIX ST. to RALEIGH ST. 20. COUTURE DRIVE SEMENYN AVE. to WOODS ST. 10. LACROIX STREET KING ST. to CPR RWY. 21. ARDLEIGH DRIVE VICTORIA AVE. to north limit JEFFREY STREET CROSS ST. to RICHMOND ST. RICHMOND ST. to south limit McNAUGHTON AVE.E. VICTORIA AVE. to GIVEN RD. GRAND AVENUE E. SUGAR MAPLE RUN BURTON AVENUE JOSEPH ST. to TAYLOR AVE. NORWAY MAPLE DR. to ST. CLAIR ST. TWEEDSMUIR AVE. to TWEEDSMUIR AVE. 22. ORANGEWOOD BLVD. OXLEY DR. to PAXTON DR. 23. BALMORAL ROAD BALDOON RD. to GARDEN PATH E. 24. MONTGOMERY DR. WOODS ST. to SANDYS ST. 25. MONARCH DRIVE BLOSSOM PLACE to VISCOUNT RD. 26. JUPITER DRIVE JOHN ST. to DUNVEGAN DR GREGORY DRIVE W. GREGORY DRIVE E. ST.CLAIR ST.to RED MAPLE MILE ST.CLAIR ST.to 125m east of VICTORIA AVE. Municipality of Chatham-Kent Infrastructure and Engineering Services Engineering and Transportation Division 1. No. JUNE 2014 DATE ISSUED FOR TENDER ISSUANCE 2014 URBAN RESURFACING HOT MIX PAVING SITES URBAN MUNICIPALITY OF CHATHAM KENT REPORT NUMBER 3663 APPENDIX C T14.105U Sheet No. 1 of 2

10 Urban Resurfacing Sites BLENHEIM CATHCART ST. STORY ST. to 90 degree bend TALBOT ST. POOK RD. to FORSYTH ST. TALBOT ST. CHATHAM ST.to HALL ST. TALBOT ST. MOUNTFORD ST.to MARLBOROUGH ST BOTHWELL MAIN ST. ELM ST. CHESTNUT ST. to CHERRY ST. CATHERINE ST. to MAIN ALLEY DRESDEN LINDSLEY ST. NORTH ST. ERIEAU ROSS LANE RIDGETOWN CECILE ST. MARSH ST. THAMESVILLE LONDON RD. LONDON RD. ST. GEORGE ST.to METCALFE AVE. E. 150m north of COMMUNITY RD. TO CSX RAILWAY west limits ERIEAU to 2ND ST. MAIN ST. to JANE ST. MAIN ST. to DAVID ST. ANNA ST. to WALLACE ST. PRISCILLA ST. to ALICE ST. TILBURY 34. TILBURY ST. CANAL ST. to MILL ST. WEST 35. BONNIFACE ST. CANAL ST. to CRAWFORD AVE. 36. CANAL ST. ELLA ST. to TILBURY ST. 37. ELLA ST. CANAL ST. to HENDERSON ST. WALLACEBURG 38. McNAUGHTON AVE. LORD SELKIRK BRIDGE to CSX RWY. 39. BRIDLE PATH RD. MURRAY ST. to REAUME AVE. WHEATLEY (PROVISIONAL) 40. BRUCE CRES. HILLCREST DR. to GEORGE AVE. 41. ELM ST. WEST ERIE ST. to HILLCREST DR. 42. HILLCREST DR. ELM ST. to north end Municipality of Chatham-Kent Infrastructure and Engineering Services Engineering and Transportation Division 1. No. JUNE 2014 DATE ISSUED FOR TENDER ISSUANCE 2014 URBAN RESURFACING HOT MIX PAVING SITES URBAN MUNICIPALITY OF CHATHAM KENT REPORT NUMBER 3663 APPENDIX C T14.105U Sheet No. 2 of 2

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT 7 August 13, 2009 TO: FROM: Mayor and Council City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT The Director of Public Works and his fine staff prepared and submitted to you a good overview

More information

II PREVIOUS REPORTS PERTINENT TO THIS MATTER II

II PREVIOUS REPORTS PERTINENT TO THIS MATTER II ~ ~~ ~~~ ~ ~~ ~ ~~~~ ~ ~~ ~~ ~~~~ ~ Agenda Item # Page # TO: FROM: -..-.-I- 3UBJCL I CHAIR AND MEMBERS ENVIRONMENT AND TRANSPORTATION COMMITTEE MEETING ON OCTOBER 17,2005 DAVID A. LECKIE, P. ENG DIRECTOR

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

20 & 50 Ashtonbee Road, 1920 & 1940 Eglinton Avenue East, and 880, 890 & 900 Warden Avenue Zoning Amendment Application Final Report

20 & 50 Ashtonbee Road, 1920 & 1940 Eglinton Avenue East, and 880, 890 & 900 Warden Avenue Zoning Amendment Application Final Report STAFF REPORT ACTION REQUIRED 20 & 50 Ashtonbee Road, 1920 & 1940 Eglinton Avenue East, and 880, 890 & 900 Warden Avenue Zoning Amendment Application Final Report Date: August 16, 2012 To: From: Wards:

More information

Roads Plan

Roads Plan Roads Plan 2019-2023 Background Road conditions have been a problem for Painesville City over the past decade. Between 2009 and 2013, the city was only able to dedicate $1.9 million in total road repairs

More information

DATE: June 17, 2013 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ x ]

DATE: June 17, 2013 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ x ] PUBLIC WORKS COMMISSION DATE: June 17, 2013 REPORT NO. PW2013-044 TO: FROM: Chair and Members Committee of the Whole Operations and Administration Geoff Rae, MBA, P.Eng. General Manager, Public Works Commission

More information

Item No Halifax Regional Council February 7, 2017

Item No Halifax Regional Council February 7, 2017 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.1.3 Halifax Regional Council February 7, 2017 TO: Mayor Savage and Members of Halifax Regional Council SUBMITTED BY: Jacques Dubé, Chief Administrative

More information

Public Information Centre. Welcome

Public Information Centre. Welcome Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff

More information

2017 Capital Improvements Report

2017 Capital Improvements Report 2017 Capital Improvements Report March 20, 2017 Board of County Commissioners Butler County Government Services Center 315 High Street Hamilton, Ohio 45011-2759 RE: 2017 Capital Improvements Report Board

More information

Local Municipal Forecast. OPAC Partners in Quality Road Tour Ottawa April 19, 2018

Local Municipal Forecast. OPAC Partners in Quality Road Tour Ottawa April 19, 2018 Local Municipal Forecast OPAC Partners in Quality Road Tour Ottawa April 19, 2018 1 2018 Tonnage Survey 2 Survey - Background 2018 Municipal Asphalt Paving Tonnage Survey Circulated to all Ontario municipalities

More information

Local Municipal Forecast. OPAC Partners in Quality Road Tour Sudbury April 17, 2018

Local Municipal Forecast. OPAC Partners in Quality Road Tour Sudbury April 17, 2018 Local Municipal Forecast OPAC Partners in Quality Road Tour Sudbury April 17, 2018 1 2018 Tonnage Survey 2 Survey - Background 2018 Municipal Asphalt Paving Tonnage Survey Circulated to all Ontario municipalities

More information

STREET IMPROVEMENT AND MAINTENANCE PROGRAMS

STREET IMPROVEMENT AND MAINTENANCE PROGRAMS 2018-2019 STREET IMPROVEMENT AND MAINTENANCE PROGRAMS Engineering Department Pamela S. Cooksey, City Engineer Public Works Department Jonathan Gano, Public Works Director April 2018 Attached for your information

More information

University Park Subdivision Street Assessment Report

University Park Subdivision Street Assessment Report University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:...

More information

Board of County Commissioners Agenda Request

Board of County Commissioners Agenda Request Board of County Commissioners Agenda Request Date of Meeting: October 16, 2017 Date Submitted: October 13, 2017 To: From: Subject: Honorable Chairman and Members of the Board David Edwards, County Administrator

More information

World-Class. Solutions

World-Class. Solutions World-Class Solutions at a local level SM From One Level to the Next. When Jack Euratte and Richard Bedwell built an asphalt plant adjacent to a stone quarry in Muncie, Indiana in 1967, they likely weren

More information

2018 Capital Improvements Report

2018 Capital Improvements Report 2018 Capital Improvements Report March 19, 2018 Board of County Commissioners Butler County Government Services Center 315 High Street Hamilton, Ohio 45011-2759 RE: 2018 Capital Improvements Report Board

More information

Item No. 5 Halifax Regional Council August 4, 2015

Item No. 5 Halifax Regional Council August 4, 2015 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 5 Halifax Regional Council August 4, 2015 TO: Mayor Savage and Members of Halifax Regional Council SUBMITTED BY: Bruce Fisher, Acting Director

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

JOB CREATION PROJECTS

JOB CREATION PROJECTS SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each

More information

Const. ROADS - Description

Const. ROADS - Description Road Projects make up the bulk of the capital expenditures for the township. For the term of this CIP, road projects total $9,843,000 or 72.0% of the total capital expenditures for all capital projects

More information

Farmersville Parkway Phase III

Farmersville Parkway Phase III Farmersville Parkway Phase III Application to the TIGER VI Discretionary Grant Program April 2014 Submitted By: City of Farmersville 205 South Main Street Farmersville, Texas 75442 972-782-6151 TABLE OF

More information

Building Great Neighbourhoods LAURIER HEIGHTS

Building Great Neighbourhoods LAURIER HEIGHTS Building Great Neighbourhoods LAURIER HEIGHTS Building Great Neighbourhoods Building Great Neighbourhoods (BGN) is a longterm framework that coordinates and integrates the efforts of three City of Edmonton

More information

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018 Transportation Projects Quarterly Report Morrisville Planning Department May 22, 2018 Transportation Improvements Most Common Ways the Town secures transportation improvements: 1. Development 2. Grant

More information

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No )

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No ) AGENDA REPORT Meeting of the San Marcos City Council MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No. 88165) Recommendation Staff recommends the City Council adopt

More information

UNIVERSITY OF NORTHERN IOWA

UNIVERSITY OF NORTHERN IOWA UNIVERSITY OF NORTHERN IOWA Municipal Separate Storm Sewer System September 2008 Report Permit Number 07-09-0-04 August 2008 Prepared by: University of Northern Iowa Environmental Health and Safety Office

More information

Eco-Roof Incentive Program application: 77 Glen Rush Boulevard

Eco-Roof Incentive Program application: 77 Glen Rush Boulevard PG25.3 REPORT FOR ACTION Eco-Roof Incentive Program application: 77 Glen Rush Boulevard Date: December 19, 2017 To: Planning and Growth Management Committee From: Director, Environment and Energy Division

More information

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015 Longmeadow Parkway Fox River Bridge Corridor August 6, 2015 Longmeadow Parkway Bridge Corridor 5.6 miles from Huntley Road to IL 62 Unique municipal/county/state/federal partnership Links Randall Road

More information

Request for Decision. Review - Garbage Collection Policies. Resolution. Presented: Monday, Feb 01, Report Date Wednesday, Jan 20, 2016

Request for Decision. Review - Garbage Collection Policies. Resolution. Presented: Monday, Feb 01, Report Date Wednesday, Jan 20, 2016 Presented To: Operations Committee Request for Decision Review - Garbage Collection Policies Presented: Monday, Feb 01, 2016 Report Date Wednesday, Jan 20, 2016 Type: Managers' Reports Resolution Resolution

More information

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL The following is a list of conditions requiring completion to the City s Satisfaction prior to Site Plan Approval being granted

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON Report To: From: Date: January 27, 2014 Report No: Subject: Recommendation: Mayor G.A. Krantz & Members of Council Linda Leeds, Director, Corporate Services and Treasurer Renewal of RFP 12-051 Professional

More information

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016 DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016 Welcome & Introduction Michael J. Finn, P.E. City Engineer Summary of Public Outreach to Date Ground the work in established principles December 2015

More information

AGENDA ITEM # 13A/B. AGENDA ITEM EXECUTIVE SUMMARY Village Board Meeting December 10, 2018

AGENDA ITEM # 13A/B. AGENDA ITEM EXECUTIVE SUMMARY Village Board Meeting December 10, 2018 AGENDA ITEM # 13A/B AGENDA ITEM EXECUTIVE SUMMARY Village Board Meeting December 10, 2018 Item Title: Main Street Parking Improvements Parking Lot Project Change Order #2 and Final Pay Request Staff Contact:

More information

VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL MEETING SEPTEMBER 10, 2013 AGENDA

VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL MEETING SEPTEMBER 10, 2013 AGENDA VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL MEETING SEPTEMBER 10, 2013 AGENDA ITEM BID 00-05329 SUBJECT: TYPE: SUBMITTED BY: Bid: 2013 Fall Roadway Patching Project (CIP Project ST-004D-13)

More information

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY: AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 7, 2016 AGENDA ITEM: Consideration of approval of a resolution approving Engineering Services Amendment No. 1 with

More information

Public Works Project Delivery Report

Public Works Project Delivery Report Public Works Project Delivery Report May 2017 San Gabriel Public Works delivers reliable infrastructure & welcoming public spaces by designing, constructing, operating & maintaining the City s streets,

More information

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001 City Center Specific Plan Amendments And Background Report City of Richmond PLANNING COMMISION FINAL DRAFT January, 2001 TABLE OF CONTENTS Page LIST OF TABLES... LIST OF FIGURES... INDEX... OVERVIEW...

More information

11 CONTRACT AWARD FOR SECURITY SERVICES

11 CONTRACT AWARD FOR SECURITY SERVICES 11 CONTRACT AWARD FOR SECURITY SERVICES The Finance and Administration Committee recommends the adoption of the recommendations contained in the following report dated November 3, 2011, from the Commissioner

More information

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land. BYLAW NO. 3549/2015 Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land. 1 WHEREAS pursuant to provisions of Section 648 of the Municipal

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

Revised Long Range Transportation Plan

Revised Long Range Transportation Plan Revised Long Range Transportation Plan Auburn, Alabama Prepared for: City of Auburn, Alabama Prepared by: Skipper Consulting, Inc. June 2006 Revised Long Range Transportation Plan City of Auburn, Alabama

More information

Proposed Brampton Fire & Emergency Services Training Campus

Proposed Brampton Fire & Emergency Services Training Campus F 1-1 Proposed Brampton Fire & Emergency Services Training Campus Williams Parkway / Chrysler Drive June 10, 2015 F 1-2 Outline Current Situation: Statement of Need Existing Facilities Current Land Use

More information

UNIVERSITY OF NORTHERN IOWA

UNIVERSITY OF NORTHERN IOWA UNIVERSITY OF NORTHERN IOWA Municipal Separate Storm Sewer System September 2011 Report Permit Number 07-09-0-04 August 2011 Prepared by: Environmental Health and Safety Office and Facilities Services

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

The Commissioner of Engineering and Public Works, the Director of Public Works and the Director of Development / Transportation Engineering recommend:

The Commissioner of Engineering and Public Works, the Director of Public Works and the Director of Development / Transportation Engineering recommend: COMMITTEE OF THE WHOLE JUNE 16, 2008 WATER FOUNTAINS AND AERATION DEVICES IN STORM WATER MANAGEMENT FACILITIES Recommendations The Commissioner of Engineering and Public Works, the Director of Public Works

More information

Pre-Qualification of Contractors for Road Pavement Rehabilitation Program

Pre-Qualification of Contractors for Road Pavement Rehabilitation Program CORPORATE REPORT NO: R025 COUNCIL DATE: FEBRUARY 24, 2014 REGULAR COUNCIL TO: Mayor & Council DATE: February 18, 2014 FROM: Acting General Manager, Engineering FILE: 0520-30(PQ) SUBJECT: Pre-Qualification

More information

City Commission Agenda Cover Memorandum

City Commission Agenda Cover Memorandum City Commission Agenda Cover Memorandum Originating Department: Engineering Services (ENG) Meeting Type: Regular Agenda Date: 02/27/2017 Advertised: Required?: Yes No ACM#: 21260 Subject: Presentation

More information

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...

More information

City of Sacramento City Council 915 I Street, Sacramento, CA,

City of Sacramento City Council 915 I Street, Sacramento, CA, City of Sacramento City Council 915 I Street, Sacramento, CA, 95814 www.cityofsacramento.org 7 Meeting Date: 3/22/2011 Report Type: Consent Title: Contract: Power Inn Streetscape Project (T15078000) Report

More information

13 Extending the Esri Enterprise Licence Agreement

13 Extending the Esri Enterprise Licence Agreement Clause 13 in Report No. 10 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 21, 2015. 13 Extending the Esri Enterprise

More information

THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH. CENOTAPH COMMITTEE - 4:00 PM Wednesday, October 12, 2016 Council Chambers AGENDA

THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH. CENOTAPH COMMITTEE - 4:00 PM Wednesday, October 12, 2016 Council Chambers AGENDA THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH CENOTAPH COMMITTEE - 4:00 PM Wednesday, October 12, 2016 Council Chambers AGENDA 1. CALL TO ORDER 2. APPROVAL OF AGENDA 3. ADOPTION OF MINUTES 3.1. Draft

More information

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT DATE: April 29, 2013 STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT 1100 Patricia Boulevard, Prince George, B.C., V2L 3V9 TO: FROM: SUBJECT: MAYOR AND COUNCIL JESSE DILL, PLANNER Development Variance

More information

8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report

8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report STAFF REPORT ACTION REQUIRED 8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report Date: July 26, 2010 To: From: Wards: Reference Number: Scarborough Community Council Director, Community

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON Report to: From: Chair & Members of the Administration & Planning Standing Committee W.F. Mann, Director of Planning and Development Date: April 16, 2012 PD 022-12 (Z19/11) Subject: Technical Report Proposed

More information

A G E N D A Council Update Training Room September 26, :45 p.m.

A G E N D A Council Update Training Room September 26, :45 p.m. CITY OF THORNTON CITY MANAGER S OFFICE A G E N D A Council Update Training Room September 26, 2017 5:45 p.m. A. Boards and Committees Reports (Estimated 20 Minutes) 1. Rangeview Library District Meeting

More information

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

2900 Steeles Avenue East at Don Mills Road in the Town of Markham STAFF REPORT INFORMATION ONLY 2900 Steeles Avenue East at Don Mills Road in the Town of Markham Date: January 23, 2008 To: From: Wards: Reference Number: North York Community Council Director, Community

More information

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS What is Stormwater? Stormwater is water that falls to the ground during a precipitation event. When land is undeveloped or covered with vegetative surface,

More information

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October HARBOR BRIDGE Randall C. Grones, PE - SPD US 181 Harbor Bridge October October 13, 13, 2015 2015 Project Scope Develop, design, construct and maintain a total project length of 6.44 miles. Base scope New

More information

From: Director, Community Planning, Scarborough District. Ward 40 Scarborough-Agincourt

From: Director, Community Planning, Scarborough District. Ward 40 Scarborough-Agincourt STAFF REPORT ACTION REQUIRED 2967 Sheppard Ave E - Zoning Amendment Application - Preliminary Report Date: July 18, 2014 To: Scarborough Community Council From: Director, Community Planning, Scarborough

More information

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation Division of Engineering Traffic and Transportation : Duncan Avenue Road Program Bergen Avenue Road Program PSE&G Gas System Modernization Program NJDOT Municipal Aid FY2015 Road Program Ogden Dog Park

More information

UNIVERSITY OF NORTHERN IOWA

UNIVERSITY OF NORTHERN IOWA UNIVERSITY OF NORTHERN IOWA Municipal Separate Storm Sewer System 2015/2016 Report Permit Number 07-09-0-04 August 2016 Prepared by: Environmental Health and Safety Office University of Northern Iowa 8628

More information

City Council Special Meeting AGENDA ITEM NO. C.

City Council Special Meeting AGENDA ITEM NO. C. City Council Special Meeting AGENDA ITEM NO. C. DATE: 01/04/2019 TO: Honorable Mayor and City Council Members SUBJECT: Transit Villages Specific Plan project Study Session (Development Services Director

More information

CITY OF SIMI VALLEY MEMORANDUM

CITY OF SIMI VALLEY MEMORANDUM CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. Consent (3) August 15, 2016 TO: FROM: City Council Department of Public Works SUBJECT: ADOPTION OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO SOLICIT CONSTRUCTION

More information

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals Purpose: The Midlothian Road entrance to Mundelein Park & Recreation District s (MPRD s) Keith Mione (Community) Park would

More information

7.4 Maintenance and Storage Facility

7.4 Maintenance and Storage Facility Region of Waterloo Rapid Transit Project 7.4 Maintenance and Storage Facility A Maintenance and Storage Facility is required to support the LRT component of the RT system. These facilities typically include

More information

Engineering Department

Engineering Department Engineering Department Department Mission It is the mission of the Engineering Department to protect and enhance the public health, safety and welfare by reviewing, inspecting and maintaining documentation

More information

Pre-Qualification of Contractors for Road Paving Construction Work

Pre-Qualification of Contractors for Road Paving Construction Work CORPORATE REPORT NO: R048 COUNCIL DATE: March 14, 2011 REGULAR COUNCIL TO: Mayor & Council DATE: March 9, 2011 FROM: General Manager, Engineering FILE: 0520-30(PQ) SUBJECT: Pre-Qualification of Contractors

More information

Attachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15

Attachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15 Attachment 5 -- PowerPoint Page 1 of 15 Sausalito Dunphy Park Status Update and Authorize Consulting Contract Amendments March 27, 2018 Page 2 of 15 Summary Current Status October 2017 bidders thanked,

More information

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS Recommendation The Commissioner of Planning recommends: THAT

More information

REPORT TO COUNCIL City of Sacramento

REPORT TO COUNCIL City of Sacramento REPORT TO COUNCIL City of Sacramento 9 I Street, Sacramento, CA 94-604 www. CityofSacramento.org 6 CONSENT October, 00 Honorable Mayor and, Members of the City Council Title: Contract: 00 Speed Humps Project

More information

COMMUNITY SERVICES DIVISION Parks and Recreation Department. Chair and Members of the Community and Corporate Services Committee

COMMUNITY SERVICES DIVISION Parks and Recreation Department. Chair and Members of the Community and Corporate Services Committee Pg 1 of Report PR 33-09 COMMUNITY SERVICES DIVISION Parks and Recreation Department TO: SUBJECT: Chair and Members of the Community and Corporate Services Committee Naval Memorial Monument Report Number:

More information

NEWS 10 November 2009

NEWS 10 November 2009 NEWS 10 November 2009 WESFARMERS APPROVES EXPANSION OF CURRAGH MINE Export metallurgical coal production capacity from the Wesfarmers-owned Curragh mine in Queensland s Bowen Basin, will increase to up

More information

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DESIGN PUBLIC HEARING MAY 10, 2018 AT GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Reconstruction of Granby Road/West State Street (Route

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session Oconee Rivers Greenway Project Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11 Mayor & Commission Work Session February 13, 2018 North Oconee River Greenway 1 Project # 05 - Oconee Rivers Greenway

More information

AASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance.

AASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance. AASHTO Board of Directors Executive Committee Standing Committees (Modal): Aviation Standing Committees (Functional Areas): Environment Special Committees: Intermodal and Economic Expansion Highways Finance

More information

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Audit & Finance Standing Committee November 28, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Audit & Finance Standing Committee November 28, 2018 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 12.4.1 Audit & Finance Standing Committee November 28, 2018 TO: SUBMITTED BY: Chair and Members of the Audit & Finance Standing Committee Original

More information

Procedure. Procedures

Procedure. Procedures Procedure Naming of Development Areas, Roads, Parks and Public Facilities Procedure for Reviewing Naming of Development Areas, Roads, Parks and Public Facilities Procedures 1. Commemorative Name Registry

More information

RESOLUTIO REGARDI G A THREE YEAR MOWI G SERVICES AGREEME T FOR THE HARTFORD LA DFILL

RESOLUTIO REGARDI G A THREE YEAR MOWI G SERVICES AGREEME T FOR THE HARTFORD LA DFILL RESOLUTIO REGARDI G A THREE YEAR MOWI G SERVICES AGREEME T FOR THE HARTFORD LA DFILL RESOLVED: That the President is hereby authorized to execute an agreement with Earthcare Service to provide mowing services

More information

City of Ketchum P.O. Box East Ave. N. Ketchum, ID 83340

City of Ketchum P.O. Box East Ave. N. Ketchum, ID 83340 City of Ketchum P.O. Box 2315 480 East Ave. N. Ketchum, ID 83340 June 10, 2015 Mayor Jonas and City Councilors City of Ketchum Ketchum, Idaho Mayor Jonas and City Councilors: Sidewalk Discussion Introduction/History

More information

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street Welcome City of Cornwall Municipal Class Environmental Assessment Proposed Improvement and Extension of Lemay Street Redevelopment and Design of the Municipal Works Yard Public Information Centre #1 Thursday,

More information

Glenmont III Parking Garage: Approval of Supplemental Public Hearing Staff Report and Staff Recommendations

Glenmont III Parking Garage: Approval of Supplemental Public Hearing Staff Report and Staff Recommendations Planning and Development Committee Board Action Item II-A September 21, 2006 Glenmont III Parking Garage: Approval of Supplemental Public Hearing Staff Report and Staff Recommendations Washington Metropolitan

More information

OPERATING BUDGET

OPERATING BUDGET PUBLIC WORKS OPERATING BUDGET 2017-18 LARKSPUR CITY COUNCIL MEETING APRIL 19, 2017 UBLIC WORKS OPERATING BUDGET 2017-18 APRIL 19, 2017 PUBLIC WORKS ENGINEERING STREETS AND FACILITIES MAINTENANCE PARK MAINTENANCE

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

Rapid Transit Implementation Working Group September 14, 2017

Rapid Transit Implementation Working Group September 14, 2017 Rapid Transit Implementation Working Group September 14, 2017 BACKGROUND Council approved the Rapid Transit Master Plan and Updated Business Case on July 25, 2017. Approval of the RTMP confirmed the BRT

More information

foi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7

foi#'.w County Road Needs Report i*-is;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7 FLOOD PLAIN SERVICES County Road Needs Report County udges' Association of Arkansas 20L7 Annual Winter Meeting Thomas F. Black, P.E., CFM shsl201-7 i*"-i"s;a,i=?;;,#'1 tta le0isrtnet foi"#'.w Flood Plain

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014 Item 6, Report No. 21, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on May

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

1071 King Street West Zoning Amendment Application - Preliminary Report

1071 King Street West Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1071 King Street West Zoning Amendment Application - Preliminary Report Date: August 9, 2012 To: From: Wards: Reference Number: Toronto and East York Community Council Director,

More information

Tolland Turnpike Manchester Q1 final design submission re-scheduled from 7/31/2017 to 10/27/2017

Tolland Turnpike Manchester Q1 final design submission re-scheduled from 7/31/2017 to 10/27/2017 241 Main Street / Hartford / Connecticut / 06106 Phone (860) 522-2217 / Fax (860) 724-1274 www.crcog.org To: From: Cost Review Subcommittee Sotoria Montanari, Program Manager Date: November 3, 2017 c:

More information

PG18.2 REPORT FOR ACTION. Eco-Roof Incentive Program application: 50 Drummond Street SUMMARY

PG18.2 REPORT FOR ACTION. Eco-Roof Incentive Program application: 50 Drummond Street SUMMARY PG18.2 REPORT FOR ACTION Eco-Roof Incentive Program application: 50 Drummond Street Date: January 31, 2017 To: Planning and Growth Management Committee From: Chief Corporate Officer Wards: All SUMMARY

More information

Queens Quay East & Lake Shore Boulevard East & 26 Richardson Street Public Art Plan

Queens Quay East & Lake Shore Boulevard East & 26 Richardson Street Public Art Plan STAFF REPORT ACTION REQUIRED 130-132 Queens Quay East & 143-177 Lake Shore Boulevard East & 26 Richardson Street Public Art Plan Date: April 20, 2016 To: From: Toronto East York Community Council Director,

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects 2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects Preservation / Structural Improvement Projects in 2018 Ravine

More information

Yonge-Summerhill: Urban Square Design (Midtown)

Yonge-Summerhill: Urban Square Design (Midtown) Yonge-Summerhill: Urban Square Design (Midtown) (City Council on April 11, 12 and 13, 2000, adopted this Clause, without amendment.) The Toronto Community Council recommends the adoption of the following

More information

Eco-Roof Incentive Program application: 6 Curity Avenue

Eco-Roof Incentive Program application: 6 Curity Avenue PG18.1 REPORT FOR ACTION Eco-Roof Incentive Program application: 6 Curity Avenue Date: January 31, 2017 To: Planning and Growth Management Committee From: Chief Corporate Officer Wards: All SUMMARY Green

More information

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m. Welcome Public Information Centre No.2 City of Burlington, City of Hamilton, Region of Halton Waterdown Road Widening Detailed Design Craven Avenue to Mountain Brow Road Date: Thursday March 2, 2017 Time:

More information

Bloor St. W. Rezoning - Preliminary Report

Bloor St. W. Rezoning - Preliminary Report STAFF REPORT ACTION REQUIRED 1638-1644 Bloor St. W. Rezoning - Preliminary Report Date: April 1, 2008 To: From: Wards: Reference Number: Toronto and East York Community Council Acting Director, Community

More information

OF AIRPORT COMMISSIONERS

OF AIRPORT COMMISSIONERS OY i -401 0*11 oir". 4Los Angeles World Airports REPORT TO THE BOARD. OF AIRPORT COMMISSIONERS Meeting Date: Gvt A. Approved by: Aura Moor Chief In ormation Officer c -A/ / v Reviewed by: Samson Mengistu,

More information