1 STREET IMPROVEMENT AND MAINTENANCE PROGRAMS Engineering Department Pamela S. Cooksey, City Engineer Public Works Department Jonathan Gano, Public Works Director April 2018 Attached for your information are planned Street Improvement and Maintenance Programs scheduled for the period April 2018 through June Distribution: X City Council X City Manager X Public Works Department X Neighborhood Associations

2 STREET IMPROVEMENT PROGRAMS INDEX PAGE Pavement Widening...1 Full Depth Reconstruction...1 Bridge Rehabilitation and Replacement...1 Pavement Rehabilitation...1 Streetscapes...1 HMA Residential Paving Program...1 Roadway Reconstruction Program Engineering...1 Gaming Funded Pavement Resurfacing Program...2 HMA Overlay Program HMA Residential Pavement Resurfacing Program...3 Roadway Reconstruction Program Public Works...3 Concrete Pavement Restoration Program...3 Slurry Seal Program...4 Curb Program...4

3 ENGINEERING DEPARTMENT ( ) Pavement Widening S.W. 34th Street and Lincoln Place Drive E. 42nd Street and Hubbell Avenue Intersection Improvements Hubbell Ave and Broadway Intersection Improvements (2019) Merle Hay Road and Hickman Road Intersection Improvements (2019) Full Depth Reconstruction SE 5th Street from Indianola Avenue to E. Park Avenue 31st Street Reconstruction from I-235 to University Avenue Hubbell Avenue Reconstruction from Euclid Avenue to east of E. 38th Street E. McKinley Avenue Reconstruction from S.E. 7th Street to S.E. 14th Street with Access Bridge Polk Boulevard Reconstruction from Grand Avenue to I-235 Bridge Rehabilitation and Replacement Court Avenue Bridge over the Des Moines River Rehabilitation Forest Avenue Bridge Rehabilitation McKinley Avenue Access Road Locust Street Bridge over the Des Moines River Replacement ( ) E. 30th Street over Union Pacific Railroad Bridge Rehabilitation (2019) Scott Avenue Bridge over the Des Moines River Rehabilitation (2019) Pavement Rehabilitation SW 9th Street from Wall Avenue to Army Post Road Rehabilitation Bennett Avenue - 27th Street to 30th Street Hickman Road Reconstruction at M.L.K. Jr. Parkway and at 30th Street Fleur Drive northbound lanes - Bell Avenue to Watrous Avenue (2019) Fleur Drive southbound lanes - Bell Avenue to Watrous Avenue (2020) Streetscapes 6th Avenue Streetscape - College Avenue to Hickman Road (2019) 2018 HMA Residential Paving Program SE 16th Street E. Army Post Road DE North SE 19th Street E. Army Post Road DE North E. 27th Street Easton Boulevard Guthrie Avenue 53rd Street Ovid Avenue Douglas Avenue Amick Avenue 28th Street 27th Street Denver Avenue 5th Street 6th Avenue Leado Avenue 34th Street 30th Street E. Marion Street Indianola Avenue DE East Ovid Avenue 50th Street 54th Street Roadway Reconstruction Program - Engineering Beckwith Avenue 5th Street 6th Avenue Gillette Street 16th Street 18th Street Jefferson Avenue 16th Street 13th Street Observatory Road Polk Blvd Parking Lot South Union Street E. Park Avenue E. Kirkwood Avenue 1

4 PUBLIC WORKS DEPARTMENT ( ) Gaming Funded Pavement Resurfacing Program 2018 Expanded Street Resurfacing Program - Contract 1 3rd Street New York Avenue Corning Avenue 4th Street New York Avenue Corning Avenue 5th Street Douglas Avenue Euclid Avenue E. 10th Street Madison Avenue Jerlynn Avenue E. 12th Street Thompson Avenue Washington Avenue E. 13th Street Arthur Avenue Hull Avenue E. 19th Street Cleveland Avenue Washington Avenue E. 30th Street Jefferson Avenue Easton Boulevard E. 38th Street Easton Boulevard E. Douglas Avenue E. 39th Court Mattern Avenue Easton Boulevard E. 39th Street Mattern Avenue Easton Boulevard E. 40th Court Mattern Avenue Easton Boulevard E. 40th Street Mattern Avenue Easton Boulevard E. 41st Street Mattern Avenue Easton Boulevard Cleveland Avenue E. 14th Street York Street E. Seneca Avenue E. 14th Street E. 10th Street HMA Overlay Program HMA Pavement Scarification and Resurfacing SE 5th Street E McKinley Avenue E. Philip Street E. 9th Street Garfield Avenue University Avenue SW 14th Street (DMWW) Burnham Avenue West Street 16th Street Locust Street 15th Street 22nd Street Lincoln Avenue Washington Avenue 32nd Street University Avenue Forest Avenue E. 36th Court Hull Avenue Arthur Avenue E. 37th Street Easton Boulevard E. Sheridan Avenue 39th Street Hickman Road 40th Street 43rd Street University Avenue Forest Avenue 45th Place Chamberlain Avenue Waveland Avenue 47th Street Euclid Avenue Amick Avenue 58th Street University Avenue Kingman Boulevard Beaver Avenue 41st Street south 300 ' Beaver Avenue Forest Avenue Clark Street Boulevard Place Polk Boulevard 45th Place Boyd Street E. 9th Street North Union Street Cherry Street 5th Street 12th Street Country Club Boulevard Ingersoll Avenue Grand Avenue Country Club Boulevard Waterbury Road Ingersoll Avenue Creston Avenue SW 9th Street DE East Grandview Avenue E. 27th Street E. 25th Street Guthrie Avenue E. 31st Street E. 32nd Street Guthrie Avenue York Street E. 13th Street High Street 8th Street 10th Street Ovid Avenue 2nd Avenue 1st Street Rose Avenue SW 2nd Street SW 3rd Street School Street 9th Street 12th Street 2

5 PUBLIC WORKS DEPARTMENT ( ) HMA Pavement Scarification and Resurfacing (cont'd) Shriver Avenue Country Club Boulevard 56th Street Wallace Lane Ashby Avenue Ashby Avenue Waveland Court Polk Boulevard 45th Place Westover Boulevard Hickman Road Holcomb Avenue Westover Boulevard Robin Drive Urbandale Avenue Windsor Drive 58th Street 59th Street Woodland Avenue 10th Street 12th Street York Street Arthur Avenue Guthrie Avenue HMA Residential Pavement Scarification and Resurfacing 59th Street Grand Avenue DE South 59th Street Grand Avenue Waterbury Road Glenview Drive 42nd Street Woodlawn Drive Guthrie Avenue E. 17th Street West of Viaduct Roadway Reconstruction Program - Public Works IP SE 7th Street E. Lacona Avenue E. Bell Avenue IP E. Broad Street SE 5th Street SE 7th Street IP Hillside Avenue SW 9th Street Bancroft Street IP King Avenue SE 14th St SE 8th Ct IP Kirkwood Avenue South Union Street Indianola Avenue IP Palmer Place Courtland Avenue DE West IP 3" mill and overlay Concrete Pavement Restoration Program City-Wide SE 8th Street Hartford Avenue Pioneer Road E. 25th Street E. Euclid Avenue E. Ovid Avenue E. 26th Street Euclid Avenue E. Douglas Avenue E. 29th Street E. Douglas Avenue E. Euclid Avenue 35th Street St Johns Road John Lynde Road E. 37th Street Indianapolis Avenue University Avenue 50th Street Twana Drive Bel Aire Road 50th Street Woodland Avenue Pleasant Street 51st Street Aurora Avenue Twana Drive 52nd Street Madison Avenue Aurora Avenue 57th Street Hickman Road New York Avenue George Flagg Parkway Fleur Drive PCC Indiana Avenue 2nd Avenue 3rd Street E. Jefferson Avenue E. 33rd Street DE East Lyon Street Pennsylvania Avenue E. 9th Street Madison Avenue 51st Street 52nd Street Milton Avenue E. 14th Street Glenbrook Drive Sheridan Avenue 27th Street 25th Street Wedgewood Road E. 29th Street E. 26th Street 3

6 PUBLIC WORKS DEPARTMENT ( ) Slurry Seal Program 10th Street Aurora Avenue Shawnee Avenue SW 12th Street Havens Avenue Amos Avenue 14th Street Forest Avenue College Avenue 17th Street Day Street University Avenue 18th Street Forest Avenue Carpenter Avenue 25th Street Forest Avenue Clark Street E. 28th Street Guthrie Avenue Wisconsin Avenue 40th Street 39th Street Hickman Road SE 40th Street (striping) Evergreen Avenue SE Hart Avenue E Aurora Avenue E. 29th Street E. 30th Street SW Broad Avenue SW 5th Street SW 9th Street Center Street 15th Street 20th Street Clark Street 60th Street 63rd Street Enos Avenue 12th Street 13th Street Filmore Street Penn Avenue E. 9th Street Leland Avenue SW 9th Street SW 12th Street Loomis Avenue SW 4th Street SW 7th Street Mahaska Avenue E. 37th Street Williams Street Mattern Avenue E 39th Street E 42nd Street Park's Parking Lot Chamberlain Road DE West SE Pine Avenue SE 45th Street CBL East Seneca Avenue 15th Street 16th Street Curb Program City-Wide 22nd Street Lincoln Avenue Washington Avenue 37th Street th Street Crocker Street 43rd Street University Avenue Forest Avenue 50th Street Douglas Avenue Ovid Avenue Boyd Street E 9th Street North Union Street Dean Avenue E 32nd Street E 34th Street Forest Drive Zwart Road Park Place Guthrie Avenue E. 31st Street E. 32nd Street Ingersoll Avenue 41st Street 42nd Street Thomas Beck Road (median) SW 9th Street (underpass) SW 9th Street (underpass) Welker Drive 4001 Welker Drive SW 39th Street York Street Cleveland Avenue Washington Avenue 4

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

Permits Issued from 3/1/2018 to 3/31/2018 PLM

Permits Issued from 3/1/2018 to 3/31/2018 PLM Page 1 of 18 Permit # 2018-00568 Primary Name / Project Description Site Address BACKHOE SERVICES 2525 COUNTY LINE RD LOT 210 Issued Valuation 2018-00569 BACKHOE SERVICES 6000 TONKA AVE 2018-00570 BACKHOE

More information

Permits Issued from 12/1/2018 to 12/31/2018

Permits Issued from 12/1/2018 to 12/31/2018 Page 1 of 15 Permit # Primary Name / Project Description Site Address Issued Valuation 2018-03736 4475 SE 17TH ST SW Disconnect- sent for review (case originally opened as Stop Box Repair and changed)

More information

Permits Issued from 11/1/2017 to 11/30/2017 PLM

Permits Issued from 11/1/2017 to 11/30/2017 PLM from to Page 1 of 18 Permit # 2017-02038 Primary Name / Project Description WAYNE RHINER PLUMBING LLC Site Address 2904 SW 18TH ST Issued 11/3/2017 Valuation New 2nd meter 2017-02376 THE PLUMBING COMPANY

More information

Permits Issued from 7/1/2018 to 7/31/2018

Permits Issued from 7/1/2018 to 7/31/2018 from 7/1/2018 to Page 1 of 25 Permit # Primary Name / Project Description Site Address Issued Valuation 2016-03091 212 UNIVERSITY AVE Disconnect Mercy 2018-01621 AM PM PLUMBING 1412 SOUTHLAWN DR New 2nd

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change* 12/6/2017 3012115-03 Northwood Dr NE, Glass to s/o Brookland $980,000.00 J. 4/16/2018 12/13/2017 3012121-02 O Ave NW, 16th to Ellis $4,065,000.00 Tippe; Lee J. 3/19/2018 Collins Rd NE from E of Northland

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

2017 General Obligation Bond

2017 General Obligation Bond 2017 General Obligation Bond Presentation of Public and Council Projects to the Transportation & Mobility Stakeholder Committee April 13, 2017 Agenda Deferred Maintenance Project Development Process Projects

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Route 1&9, County Road 99380 99380 Improvements are planned at the Route 1&9, County Road intersection to address operational and safety issues in the vicinity of Manhattan Avenue and County Road. COUNTY:

More information

Special Revenue Funds

Special Revenue Funds Special Revenue Funds Special Revenue Funds account for the proceeds of specific revenue sources (other than special assessments for major capital projects) that are legally restricted to expenditures

More information

Metro Center. Urban Renewal Project

Metro Center. Urban Renewal Project Restated Urban Renewal Plan for the Metro Center Urban Renewal Project Des Moines, Ia. [Up to and including the 12 th Amendment] Approved by City Council Resolution No. 13-- on. 2013 Metro Center Urban

More information

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation Division of Engineering Traffic and Transportation : Duncan Avenue Road Program Bergen Avenue Road Program PSE&G Gas System Modernization Program NJDOT Municipal Aid FY2015 Road Program Ogden Dog Park

More information

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK Open House 10.12.16 RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK MEETING AGENDA Great Rivers Greenway and Project Partners River des Peres Greenway Overview Project

More information

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

Moving The Metro. A special construction update for the metro Omaha area.

Moving The Metro. A special construction update for the metro Omaha area. Moving The Metro A special construction update for the metro Omaha area. ebraska Department of Roads Spring/Summer 2017 I-80 / I-480 / US-75 Interchange The improvements on this project consist of bridge

More information

2017 Asphalt Contractors Association of Florida Pavement Awards

2017 Asphalt Contractors Association of Florida Pavement Awards 2017 Asphalt Contractors Association of Florida Pavement Awards Special Projects Any project of a special or unique nature requiring specialized equipment, techniques, materials, time restrictions, or

More information

Sacramento County - Department of Transportation

Sacramento County - Department of Transportation Sacramento County - Department of Transportation Proposed Projects to be Funded with Road Maintenance and Rehabilitation Account Funding FY 2017-18 Project Description AC Overlay Projects - Federal: Rehabilitate

More information

Reconnecting New Haven: Downtown Crossing

Reconnecting New Haven: Downtown Crossing Reconnecting New Haven: Downtown Crossing Phase 2 Update Introduction to Phase 3 November 16, 2017 City of New Haven, Connecticut Toni N. Harp, Mayor Reconnecting New Haven Introduction Project Overview

More information

Grand Rounds History

Grand Rounds History Grand Rounds History 1883 Plan for Minneapolis Park System prepared by Landscape Architect Horace W. S. Cleveland. The system of connecting parks and parkways was first called the Grand Rounds by William

More information

Const. ROADS - Description

Const. ROADS - Description Road Projects make up the bulk of the capital expenditures for the township. For the term of this CIP, road projects total $9,843,000 or 72.0% of the total capital expenditures for all capital projects

More information

COMMERCIAL CORRIDOR PLANNING SW 9 TH STREET CORRIDOR NE CORRIDOR MARKET DISTRICT KEO WAY CORRIDOR

COMMERCIAL CORRIDOR PLANNING SW 9 TH STREET CORRIDOR NE CORRIDOR MARKET DISTRICT KEO WAY CORRIDOR COMMERCIAL CORRIDOR PLANNING SW 9 TH STREET CORRIDOR NE CORRIDOR MARKET DISTRICT KEO WAY CORRIDOR Council Workshop July 29, 2013 SW 9 th Street Corridor Plan What is this initiative? A PUBLIC-PRIVATE pilot-partnership

More information

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects 2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects Preservation / Structural Improvement Projects in 2018 Ravine

More information

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project David R. Dysard, AICP District Two Deputy Director Theresa Pollick Public Information

More information

Interstate Traffic Interruptions Weekend of Oct 9, 2015-Oct 12, 2015

Interstate Traffic Interruptions Weekend of Oct 9, 2015-Oct 12, 2015 Interstate Traffic Interruptions Weekend of Oct 9, 2015-Oct 12, 2015 District 1 10/9/15 10/12/15 D Gwinnett/Hall I-985 NB MP 0 (I-85) 9pm 5am 1 right lane of 2 458462 to MP 20 (SR 60) ROLLING CLOSURE 10/9/15

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects 69th Street Bridge 02311 02311 A grade separation at 69th Street would eliminate the current at-grade crossing which causes frequent automobile delays due to long freight trains moving through this area.

More information

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Campbell County

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Campbell County I-75 No Projects Under Development in Campbell County PIN: 115778.00 TRUCK CLIMBING LANE, MP 135.5 TO MP 140.1(NBL) Length - 4.6 (Widen) The right-of-way and/or utility process is underway. I-75 PIN: 115778.01

More information

Table of Contents. Appendices Appendix A.2. Public Hearing Summary. Appendix A.3. Public Correspondence

Table of Contents. Appendices Appendix A.2. Public Hearing Summary. Appendix A.3. Public Correspondence Condensed Final EIS Table of Contents Executive Summary...ES-1 1.0 Purpose and Need...1-1 1.1 Project Overview... 1-1 1.2 Proposed Action... 1-3 1.3 Purpose and Need of Proposed Action... 1-3 2.0 Alternatives

More information

Waukee. City of. The Key to Good Living

Waukee. City of. The Key to Good Living Waukee City of The Key to Good Living City of Waukee FY15 - FY20 CIP Project Summary FY2015 FY2018 Parks Windfield Park Improvements Parks Centennial Park Amphitheater Parks Grant Park Improvements Parks

More information

Pavement and Traffic Congestion Management

Pavement and Traffic Congestion Management Pavement and Traffic Congestion Management Pavement Management and Traffic Congestion Management, though separate programs, share the City s transportation network and frequently certain funding sources.

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL MEETING SEPTEMBER 10, 2013 AGENDA

VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL MEETING SEPTEMBER 10, 2013 AGENDA VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL MEETING SEPTEMBER 10, 2013 AGENDA ITEM BID 00-05329 SUBJECT: TYPE: SUBMITTED BY: Bid: 2013 Fall Roadway Patching Project (CIP Project ST-004D-13)

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,

More information

Roads Plan

Roads Plan Roads Plan 2019-2023 Background Road conditions have been a problem for Painesville City over the past decade. Between 2009 and 2013, the city was only able to dedicate $1.9 million in total road repairs

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

Catalyst For Economic Development Washington Park Chicago IL

Catalyst For Economic Development Washington Park Chicago IL Catalyst For Economic Development Washington Park Chicago IL Masters Project Joel Burkhart Advisors Dirk Denison Patrick Papczun Elevator Statement I propose to develop a comprehensive master plan that

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on

More information

GREEN CORRIDORS. Greening Downtown 2. MOVEMENT

GREEN CORRIDORS. Greening Downtown 2. MOVEMENT SW 3RD ST SE 6TH ST OP I-235 WEST I-235 EAST OP C ML PS CS CENTER STREET C PS GRAND AVE CS ML NP LOCUST ST WALNUT ST MS GP MS GP CH MK CH NP MK COURT AVE LQ UNION RAILROAD UNION RAILROAD LQ FLEUR DR FLEUR

More information

SIX YEAR COMPREHENSIVE TRANSPORTATION IMPROVEMENT PROGRAM AMENDED 2012 &

SIX YEAR COMPREHENSIVE TRANSPORTATION IMPROVEMENT PROGRAM AMENDED 2012 & SIX YEAR COMPREHENSIVE TRANSPORTATION IMPROVEMENT PROGRAM AMENDED 2012 & 2013-2018 Tacoma City Council Public Hearing Adopted December 18, 2012 Ordinance No. 28122 i Acknowledgements: Richard E. McKinley,

More information

Corridor Investment Projects (FY FY2012)

Corridor Investment Projects (FY FY2012) City of Long Beach, California Department of Development Services Corridor Investment Projects (FY1980 - FY2012) Building A Better Long Beach North Long Beach Corridor Investments Bixby Knolls on Long

More information

From local initiatives to some of the largest and most complex projects, KOA leads the field in:

From local initiatives to some of the largest and most complex projects, KOA leads the field in: Krech Ojard & Associates offers a highly capable multidisciplined team that provides the professional services needed to deliver successful transportation facility improvements. Our team provides multidisciplinary

More information

YORK COUNTY GOVERNMENT

YORK COUNTY GOVERNMENT YORK COUNTY GOVERNMENT Planning & Development Services MEMORANDUM TO: FROM: RE: DATE: May 9, 2016 York County Council York County Planning Commission Eddie Moore, Development Services Manager PROPOSED

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name Project # PROJECT NAME PAGE 2134 2119 PR-1109 Clayton Road (Market Street to Oakland Avenue) Sidewalk Repair 911 System Replacement and Dispatch Room Remodel ADA Barrier

More information

Knoxville Area Transit (KAT) Transit Development Plan Corridor Analysis

Knoxville Area Transit (KAT) Transit Development Plan Corridor Analysis Knoxville Area Transit (KAT) Transit Development Plan Submitted to: Knoxville-Knox County Metropolitan Planning Commission Submitted by: PB Americas, Inc. Under contract to: The Corradino Group, Inc. October

More information

Planned Washington Boulevard Bus Stop Improvements

Planned Washington Boulevard Bus Stop Improvements Planned Washington Boulevard Bus Stop Improvements Last Revised on April 25 th 2018 Guide Summary: The following document details the bus stop improvement recommendations on Washington Boulevard as part

More information

INTEGRATION PLAN. Harvard Gulch

INTEGRATION PLAN. Harvard Gulch INTEGRATION PLAN Harvard Gulch August 31, 2016 Related Projects and Partners Tonight s Agenda 1. Welcome & Meeting Purpose 2. Other Project Updates Floodplain Study Urban Waterways Study 3. Purpose of

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions Bridge Rehabilitation Burlington County Bridge Commission Burlington-Bristol Bridge This project includes the replacement of the existing span decks, repairs to the existing walkway, railing and ladder

More information

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals ABOUT US Creative Engineering Group Inc, (Creative) is a Construction Engineering and Inspection (CEI) firm established in 2006 by two Principals Rick Estripeaut & Sri Mavanur. In the last decade Creative

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the

More information

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases. I-95 Avenue Interchange Project Status Construction is underway for Phase 3. Overall Project Area and Schedule Phase 0: Completed 2010 Section GR0: Completed in Fallin 2010 Phase 2: Completed Section GR2:

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

Engineering Department

Engineering Department Engineering Department Department Mission It is the mission of the Engineering Department to protect and enhance the public health, safety and welfare by reviewing, inspecting and maintaining documentation

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

Completing the Vision:

Completing the Vision: Completing the Vision: North A1A-Lane Reconfiguration TDLC-Transportation Design for Liveable Communities Surf Rd. Redirection of Traffic Phase III Streetscape October 30, 2012 1 Project Overview District

More information

METRO Gold Line BRT CMC Meeting

METRO Gold Line BRT CMC Meeting METRO Gold Line BRT CMC Meeting April 26, 2018 Today s Topics Welcome and Introductions Project Overview CMC Roles and Responsibilities Current Project Baseline: Scope and Cost Estimate Overview Municipal

More information

MUNICIPALITY OF CHATHAM-KENT INFRASTRUCTURE AND ENGINEERING SERVICES ENGINEERING AND TRANSPORTATION DIVISION

MUNICIPALITY OF CHATHAM-KENT INFRASTRUCTURE AND ENGINEERING SERVICES ENGINEERING AND TRANSPORTATION DIVISION MUNICIPALITY OF CHATHAM-KENT INFRASTRUCTURE AND ENGINEERING SERVICES ENGINEERING AND TRANSPORTATION DIVISION TO: FROM: Mayor and Members of Council Nelson Cavacas, C.E.T. Manager, Infrastructure and Development

More information

7:15 AM 7:25 AM 7:35 AM

7:15 AM 7:25 AM 7:35 AM High School - AM PP Point of Pines 7:10 AM 1. Riverside Along Mills Ave 2. Pines Fire Station 3. Along Revere Beach Blvd 4. Kelley s Roast Beef 5. Bianchi s Pizza NR North Revere 7:05 AM 1. McCoba St &

More information

SMSHE Southeastern Michigan Society for Healthcare Engineering

SMSHE Southeastern Michigan Society for Healthcare Engineering SMSHE Southeastern Michigan Society for Healthcare Engineering Presentation on: Pavement Management and Preservation: The Right Fix at the Right Time PRESENTATION OVERVIEW Asset Evaluation (Management)

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016 DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016 Welcome & Introduction Michael J. Finn, P.E. City Engineer Summary of Public Outreach to Date Ground the work in established principles December 2015

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

I-70/71 Innerbelt Project

I-70/71 Innerbelt Project I-70/71 Innerbelt Project Project Progress Meeting and Design Enhancement Update November 9, 2009 Ohio Department of Transportation MS Consultants MSI Design Overview of Presentation 1. Recap Recent Project

More information

North Macadam Transportation Development Strategy Summary of Past Studies DRAFT

North Macadam Transportation Development Strategy Summary of Past Studies DRAFT North Macadam Transportation Development Strategy Summary of Past Studies DRAFT Several previous studies were reviewed to gain an understanding and document the recent transportation issues in the North

More information

Marion Street Green Infrastructure Project. Whittier Neighborhood Community Meeting April 18, 2018

Marion Street Green Infrastructure Project. Whittier Neighborhood Community Meeting April 18, 2018 Marion Street Green Infrastructure Project Whittier Neighborhood Community Meeting April 18, 2018 Agenda Water quality and green infrastructure Overview: Marion Street stormwater project Green infrastructure

More information

CITY OF VALPARAISO STORMWATER MASTER PLAN

CITY OF VALPARAISO STORMWATER MASTER PLAN CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August

More information

Pine Avenue Improvement Project

Pine Avenue Improvement Project Seaside Way to ocean Boulevard ocean Boulevard to 7 th Street 7 th Street to anaheim Street L O ng BeACh DeveLOpment ServiC e S Building a Better long Beach Pine Avenue Improvement Project Seaside Way

More information

SR 483 Clyde Morris Boulevard FDOT District 5

SR 483 Clyde Morris Boulevard FDOT District 5 This project occurs on a 3.0 mile section of SR 483 (Clyde Morris Blvd.) south of Beville Road (SR 400) to north of International Speedway Boulevard (SR 600). Ghyabi is providing project management and

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County Exhibit A SH 161 RTC Work Program of New Projects Collin County 0918-24-969 N/A 0918-24-970 N/A 0918-24-973 N/A 2351-01-020 N/A 2679-03-010 N/A On Exchange Parkway from US 75 to Allen Heights On Country

More information

B. DESCRIPTION OF THE PROPOSED ACTION

B. DESCRIPTION OF THE PROPOSED ACTION Executive Summary A. INTRODUCTION Metro-North Commuter Railroad Company ( Metro-North or the Project Sponsor ) is proposing the construction of a new, expanded parking garage at 50 Haarlem Avenue (formerly

More information

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11 What s Up Next In The Seattle Squeeze PSRC Transportation Policy Board April 11 1 Current construction Alaskan Way Viaduct removal Removes the viaduct (including foundations and ramps) and restores the

More information

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion: 3.0 SURVEY 3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects A. Prior to construction: 1. Public survey records are to be researched for the location of all possible survey

More information

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that

More information

WHAT MAKES A GREAT PLACE?

WHAT MAKES A GREAT PLACE? ARCHITECTURAL QUALITY ARCHITECTURAL QUALITY IN THE CORRIDOR ARCHITECTURAL QUALITY The Potential of a Multimodal Terminal Would bring provide alternate forms of transportation to Atlanta s major destinations

More information

fast forward spokane Chapter 3

fast forward spokane Chapter 3 fast forward spokane Chapter 3 VISION, GOALS AND CONCEPT C H A P T E R T H R E E Vision Goals and Concept I N T H I S C H A P T E R v i s i o n o f d o w n t o w n s p o k a n e g o a l s a n d o b j

More information

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in

More information

Por favor, levanten la mano si necesita traduccion en espanol Please raise your hand if you need Spanish translation

Por favor, levanten la mano si necesita traduccion en espanol Please raise your hand if you need Spanish translation FEDERAL BOULEVARD CORRIDOR WIDE STUDY PUBLIC MEETING #1 APRIL 27, 2016 Por favor, levanten la mano si necesita traduccion en espanol Please raise your hand if you need Spanish translation HDR DESIGN WORKSHOP

More information

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS Projects with Prior City Commission Authorization (No Changes) Downtown Canopy PW17B4CIP Prior Authorizing Ordinance: Ordinance No. 9428 Estimated Total

More information

Visual and Aesthetics

Visual and Aesthetics Such a connection could accommodate timed transfers and improve connections between local transit service and Presidio Shuttle service. Level of Service The results of the analysis are provided on a route-by-route

More information

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS 56TH STREET AND 17TH AVENUE IMPROVEMENTS FUNDING: Bonded ESTIMATED COST: $3,885,000 COMPLETION DATE: Fall 2018 SCOPE OF PROJECT: Widening of 56th Street from 6th Avenue to 19th Avenue, and widening 17th

More information

Public Works Project Delivery Report

Public Works Project Delivery Report Public Works Project Delivery Report May 2017 San Gabriel Public Works delivers reliable infrastructure & welcoming public spaces by designing, constructing, operating & maintaining the City s streets,

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Route 18, South of Texas Road to Rues Lane, Pavement Project ID Numbers: 11408 / 114080 Initiated from the Pavement Management System, this project will rehabilitate pavement within the project limits.,

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

John Portman Boulevard Corridor

John Portman Boulevard Corridor Corridor Multi-use Path + Streetscape Improvements February 8, 13 SOUTH SIDE BLOCK IMPROVEMENT NOTES: Consolidation of Utility/Sign Locations Remove Existing Trees Centennial Olympic Park Drive Planter

More information

HIGHWAY PROJECTS - Upcoming Procurements

HIGHWAY PROJECTS - Upcoming Procurements HIGHWAY PROJECTS - Upcoming Procurements In the Period from April 1, 2012 to October 31, 2012 No. Hwy Bench? / Description Lead / Contracting / Limits / A&E Professional Services 1 12001 No SR-138 from

More information

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. SR-37 No Projects US-19E Under Development in Carter County

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. SR-37 No Projects US-19E Under Development in Carter County CARTER COUNTY SR-37 No Projects US-19E Under Development in Carter County PIN: 125256.00 AT LM 8.7 (ROCKFALL MITIGATION) Length - 0.0 (Mitigation - Rockfall) CARTER COUNTY SR-91EXT PIN: 043975.01 FROM

More information

Los Angeles Department of City Planning RECOMMENDATION REPORT

Los Angeles Department of City Planning RECOMMENDATION REPORT Los Angeles Department of City Planning RECOMMENDATION REPORT CULTURAL HERITAGE COMMISSION HEARING DATE: April 3, 2014 TIME: 10:00 AM PLACE: City Hall, Room 1010 200 N. Spring Street Los Angeles, CA 90012

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

[Leveraging & Improving Neighborhood Connections] Area A Riverfront

[Leveraging & Improving Neighborhood Connections] Area A Riverfront Community Charrette LINC Dallas [Leveraging & Improving Neighborhood Connections] Area A Riverfront 06.02.12 LINC Workshop Area A PDs 774 and 784 cover the majority of Area A employing a form based code

More information

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project... Mississippi Drive Corridor Revitalization A DestinationTransportation Project... Mississippi Drive Corridor Revitalization Welcome! Tonight s Agenda: Further define the Scope of the Project Discuss the

More information

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration

More information

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION LITTLE ELM 2009-2014 CAPTIAL IMPROVEMENT BOND STREET PRESENTATION Denton Frisco Little Elm Lewisville Legacy Southlake Grapevine Addison DENTON COUNTY & LEWISVILLE LAKE MATCHING FUNDS DENTON COUNTY BOND

More information