1 Pavement and Traffic Congestion Management Pavement Management and Traffic Congestion Management, though separate programs, share the City s transportation network and frequently certain funding sources. Both have involved an assessment of the City s entire pavement inventory as to condition and capacity. It is important to note that achievements in Congestion Management inherently improve the Pavement Management Program therefore the current projects are grouped for discussion. The Congestion Management Program deals primarily with roadways on the National Highway System (NHS) which are so designated by the Federal Highway Administration and eligible for state/federal funding. These roads experience higher traffic volumes and constitute the majority of the arterial and collector roadways in the City. This category is further divided into state or local priority. Bridges are generally a state priority and require no local funding. All others require a 10% funding match typically in the form of design and right-of-way acquisition costs. Analysis under this program has determined that four through lanes, two in each direction, are required from the Massachusetts Turnpike Interchange south to Park Square and east to the West Springfield town boarder. The severest congestion occurs where the requisite lanes are absent, most notably on the two bridges spanning the Westfield River, these being the Great River Bridge (Route 202) and County Bridge (Route 20). The expense associated with adding lanes to bridges and the former state policy of deferring infrastructure improvements to bridges has resulted in unresolved problems over an exorbitant period of time, which current projects will address. The City s Pavement Management Program in consideration of the discussed funding shortfalls separated the pavement inventory into categories of local funding responsibility. Roadways on the National Highway System (NHS) were not included in the discussed funding evaluation since State and/or Federal construction funding is applicable. Any roadway not on the NHS is considered a local road, however, local takes two forms. Accepted Public Streets and Unaccepted Private Streets. Private Streets were likewise excluded from the funding need s evaluation since they are not legally municipal responsibility. Any desired improvement to private streets requires funding in excess of that identified or application under another funding program. 1. State Funded State Priority Projects are as follows: o Route 20 Bridges o Southampton Road o Cowle s Bridge

2 2. State Funded Local Priority Projects are as follows: 3. Great River Bridge Traffic Improvement o Main St/Broad St/Park Square Traffic Improvement o Columbia Greenway Rail to Trail Conversion o Route 187 Traffic Improvement o Great River Traffic Improvement-Phase II o Western Avenue Traffic Improvement o East Silver Street/South Meadow Road Traffic Improvement 4. Locally Funded Projects include: 5. Root Road Reconstruction o City View Boulevard Reconstruction o Old Town Roadway Improvements including the following streets: Cortez Street Holcomb Street Perkings Street Hancock Street Pearl Street Fairview Street Oak Avenue Hedges Avenue West Street Bush Street Cherry Street o McKinley Terrace and South Street Improvements o Pochassic Road Reconstruction o West Road and Bayberry Lane Reconstruction Route 20 Bridge Replacements Funding: State Funded State Priority

3 Cost Estimate: $14,000,000 Ground Breaking: 2003 Final Acceptance: 2005 Location: East Main Street between little River Road and Union Street including Little River Rd. to the branch office of Woronoco Savings Bank and Springfield Rd. to the Professional #65. Description: The project involves construction of two new bridges immediately south (down stream)of the existing structures known locally as County Bridge (Route 20 over the Westfield River, bridge #W25-04) and the Frogs Hole Viaduct (Route 20 over Powdermill Brook, bridge #W25-03)through the former Roy Rogers Restaurant adding an additional center turning lane for traffic congestion relief. This is fully a Massachusetts Highway Dept. project. The project also involves general pavement rehabilitation, sidewalk extension and signal upgrades. Traffic management will be achieved through use of the existing bridges until the new structures are complete, then traffic will be diverted to the new layout while the old one is demolished. Cowle s Bridge Replacement Funding: State Funded State Priority Cost Estimate: $3,500,000 Ground Breaking: 2008 Final Acceptance: Unknown Location: South Maple Road over Little River including Southwick Road to Fowler Farms, South Maple Rd. to the Grange, Mill St. to Crane Ave. and City View Blvd. to top of hill. Description: This is a Massachusetts Highway Department Project. A new bridge is being proposed just east(down stream) of the existing. The curve on the South Meadow Rd. approach will be smoothed and the intersection with Mill St. shifted. Permanent traffic control signals will be installed at City View Blvd. and Mill St., the Mill St./Crane Ave. intersection will be adjusted with elimination of the traffic island. Southampton Road Reconstruction Funding: State Funded State Priority Cost Estimate: $3,600,000 Ground Breaking: 2008 Final Acceptance: November 2009 Location: Southampton Road from Turnpike Interchange to Town Line. Description: This is a Massachusetts Highway Department Project addressing traffic growth. Widening with traffic signal installation is included.

4 Great River Bridge Traffic Improvement Project Cost Estimate: $55,000,000 Ground Breaking: 2006 Final Acceptance: 2009 Location: Elm St. and North Elm St., the Elm St. Spur, Union Avenue, Union Street, Meadow Street and Railroad Avenue within that area between Our Lady of the Blessed Sacrament Church on the North and the Holy Trinity Church on the South. Description: The Great River Bridge Project is a multi faceted effort encompassing bridge, park, traffic, utility and streetscape improvements to provide more than just a long term resolution of traffic congestion but also an urban renewal effort to reverse the industrial orientation toward the Westfield River, a designated wild and scenic waterway. Connections will be made to the proposed Columbia Greenway pedestrian and bicycle trail through Women s Temperance Park on the northwest and to the Westfield Dike Riverwalk through as proposed parking facility on the southeast. The project involves rehabilitation of the existing truss structure bridge, construction of a sister truss structure bridge connecting Union Avenue on the North with the Elm Street Spur on the South, replacing and raising the CSX Railroad Viaducts and replacing the Pochassic Street over Pioneer Valley RR Bridge with a three lane structure. Park enhancements include combining Kane and Wojtkiewicz Parks across that section of Meadow Street between Elm St. and the Spur which will be eliminated. Also relocation of Half Miles Falls Park from Depot Square to the north bank of the Westfield River between the new and existing Great River Bridges, opposite Wojtkiewicz Park. Main St./Broad St./ Park Square Traffic Improvement Cost Estimate: $7,200,000 Ground Breaking: 2006 Final Acceptance: 2007 Location: Main Street and Broad Street to their full extent from Little River to Park Square to the Silver Street intersection. Also South Broad Street to Ponders Hollow Road and those portions of Court Street and Elm Street along Park Square. In addition Free Street and Meadow Street to Williams Riding Way. Description: The Main Street/Broad Street/Park Square reconstruction Project seeks to address narrow lane widths, which become constricted with winter snow accumulation and traffic signal improvements to relieve congestion along the corridor. In conformance with current policy streetscape design is an essential element, since the work encompasses all roadways around Park Square the Green is included. The Park Square Green design incorporates several controversial proposals as

5 preliminarily identified by the Historical Commission and include expansion of the park by way of occupying the off-street parking on its north side. The green would be returned to a more historic layout of open lawn to accommodate modern usage with a gazebo structure, similar in appearance to that at Grand Mother s Garden, for concerts, speeches and glass enclosed in the winter to house Santa s visits. A fountain would remain though located further south together with an area for the multiple historical monuments and tablets housed on the Green. Relocation of the General Shepard Monument to this area of the green is under consideration. The move would allow the traveling public to pass in front of the symbol of the City of Westfield rather than have its back turned to them. Upon erection in 1919 the orientation facing down Broad Street was very controversial and intended to face the General toward his farm near the current Big Y, naturally the presence of affluent citizens along Broad Street at the time including the soon to be elected Governor Ely was pivotal. The proposed move does not change the orientation. The move would further bring the General back to the ground over which he reviewed his militia troops. Since the Town upon incorporation as a City in 1929 chose the statue as its sole symbol its location has taken on greater significance. The current locale was selected merely to balance the pre-existing Civil War Monument on a traffic island at the Court St./Elm St. intersection. Columbia Greenway Rail to Trail Conversion Cost Estimate: $7,800,000 Ground Breaking: 2007 Final Acceptance: 2008 Location: Description: The Columbia Geenway project utilizes the rail line bisecting the downtown to convey a bicycle/pedestrian corridor connecting Depot Square, north of the Westfield River, the multiple attractions of the downtown with the residential areas to the south as well as continuing a similar effort in the Town of Southwick and though the State of Connecticut to a major national eastern seaboard route. Again the City will incorporate streetscape issues as it seeks to design this route as a linear park. The numerous bridge crossings afford excellent vantage points for views, rest areas will be incorporated as well lighting in the urbanized areas. Route 187, Phases i, II & III Traffic Improvement Cost Estimate: Phase I $3,600,000 Phase II $3,800,000 Phase III $1,100,000 Ground Breaking: Phase III in 2006 Phase II in 2007 Phase I in 2008 Final Acceptance: 2009 Location: Little River Rd. and Feeding Hills Rd. to their full extent including Old Feeding Hills Rd. to to top of the hill, Pontoosic Rd. to the top of the hill, Shaker Rd. to

6 Cardinal Lane and Ridgecrest Dr. to the top of the reverse curve. Description: The project involves relocation of Sherman s Mill Bridge (Little River Rd over Great Brook) to the north straightening the curve at this location and extending Pontoosic to the new location, similarly the curve at the Shaker Rd. intersection will be further smoothed out. Permanent traffic control signals will be installed at Shaker Rd. and Pontoosic Rd. Sidewalks will be installed throughout in addition to streetscape improvements in the form of street trees, retaining walls and possible fountain at Shaker Rd. Down Town Traffic Improvement of 2010 Cost Estimate: $6,500,000 Ground Breaking: 2010 Final Acceptance: Unknown Location: Elm Street from Rte. 20 (Franklin St.) to Holy Trinity and North Elm St. from Union St. to Notre Dame St. Description: The project involves installation of four through travel lanes throughout the location. This will involve removal of on-street parking along Elm St. with associated replication off-street. In addition a center turning lane at the Notre Dame St. intersection will be designed. The replication of off-street parking presents opportunities to undertake additional urban renewal along the lines of the 2001 Concept Plan for Westfield Riverfront Revitalization by Thompson and Brestrup wherein an open air market and multi use facilities were incorporated into the off-street parking scheme. Western Avenue Traffic Improvement Cost Estimate: $6,500,000 Ground Breaking: Unknown Final Acceptance: Unknown Location: Western Avenue in its entirety including Court St. between High St. and West Silver St. Description: The project involves the installation of a new traffic control signal at Lloyds Hill, upgrade to the Court St./High St./Mill St. signal, replacement of sidewalks and pavement throughout as well as streetscape and drainage improvements where applicable. East Silver Street/South Meadow Road Traffic Improvement Cost Estimate: $Unknown Ground Breaking: Unknown Final Acceptance: Unknown

7 Location: East Silver St. and South Meadow Rd. in their entirety. Description: The project intends to shift industrial truck traffic from East Silver St. to South Meadow Rd. by improving the latter to an industrial caliber with general pavement and sidewalk improvements to East Silver St. Old Town Roadway Improvement of 2005 Funding: Locally Funded Cost Estimate: $450,000 Ground Breaking: 2004 Final Acceptance: 2005 Location: Cortez St., Holcomb St., Perkins St., Hancock St., Pearl St., Fairview St., Oak Ave., Hedges Ave., West St., Bush St. and Cherry St. in their entirety. Description: In an effort to address deteriorating infrastructure and infuse new vitality to the city s oldest neighborhoods the City is attempting a comprehensive approach involving aesthetic as well as functional elements. This project will involve pavement and sidewalk replacement with concrete curbing installation, street tree and drainage improvement as appropriate. Old Town Roadway Reconstruction of 2006 Funding: Locally Funded Cost Estimate: $500,000 Ground Breaking: 2006 Final Acceptance: 2007 Location: Full reconstruction Linden Ave., Dudley Ave., Murray Ave., Collins Ave., Foss Ave.; Treebelt reconstruction Montgomery St. (to Prospect), Pochassic Street, East Silver St., Meadow St. Description: This effort is a continuation of the Old Town 2005 with many of the same features. The project will involve pavement and sidewalk replacement with concrete curbing installation, street tree, drainage and water main improvement as appropriate. Significant realignment of Montgomery Street at the Crown Street intersection is included. Gas Light District Funding: Locally Funded Cost Estimate: $5,000,000 Ground Breaking: 2012 Final Acceptance: 2013

8 Location: Central St., School St., Church St., Arnold St., Summer St. and Spring St. Description: This project seeks to establish a streetscape atmosphere similar to Boston s Beacon Hill conducive to arts and entertainment while addressing aging infrastructure issues. The project area includes off-street parking facilities and will augment the Multi Modal Center and Westfield State University initiatives. Work will involve pavement and sidewalk replacement with brick sidewalks and some textured pavements as well as concrete curbing installation, street tree, storm water, sanitary sewer and water main replacement.

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on

More information

2017 General Obligation Bond

2017 General Obligation Bond 2017 General Obligation Bond Presentation of Public and Council Projects to the Transportation & Mobility Stakeholder Committee April 13, 2017 Agenda Deferred Maintenance Project Development Process Projects

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

III - design standards

III - design standards III - design standards The Circulation Classification and Character section of the Design Standards chapter prescribes the types of circulation routes, the location of the circulation routes, the connections

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects 69th Street Bridge 02311 02311 A grade separation at 69th Street would eliminate the current at-grade crossing which causes frequent automobile delays due to long freight trains moving through this area.

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

Olde Towne Vision Plan

Olde Towne Vision Plan Olde Towne Vision Plan Introduction In 2016, the City of Bellevue will complete its move of City offices from Olde Towne Bellevue to its new municipal complex on Wall Street. The City intends to sell its

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Route 1&9, County Road 99380 99380 Improvements are planned at the Route 1&9, County Road intersection to address operational and safety issues in the vicinity of Manhattan Avenue and County Road. COUNTY:

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects 30 130 Collingswood/Pennsauken ( B) 155C Vicinity of Cooper River Bridge at Park Drive to 200 feet north of PATCO Railroad Bridge This project may provide for the construction of a proposed new bridge

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2. Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General

More information

City of Meriden Harbor Brook Flood Control Project Overview

City of Meriden Harbor Brook Flood Control Project Overview City of Meriden Harbor Brook Flood Control Project Overview Updated August 2013 OVERVIEW The center of Meriden, including the HUB site is the low point of the town which is ringed by basalt ridges. Running

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Town Center. Block 5 Existing multifamily residential units are expected to remain. Area Guidelines Germantown s districts should be developed as distinct communities with unique features that are supported through the guidelines. The guidelines not only help distinguish these districts

More information

Plan Policies. Introduction

Plan Policies. Introduction Plan Policies Introduction The purpose of the Plan Policies section is to identify the various Governing Body and Planning Commission land use related policy resolutions for use in evaluating development

More information

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor CHAPTER 5 Figure 5.23 The Road Corridor Road will develop as a mixed-use corridor, emphasizing regional retail, west of the river and mixed-use development east of the river. KEY RECOMMENDATIONS 1. High

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

2010 Tentative Enhancement Program Allocations (FY11)

2010 Tentative Enhancement Program Allocations (FY11) Bristol 10011 Buchanan County Buchanan County project cost $1,190,332 Bull Creek Trail - construction of a pedestrian/bicycle trail along abandoned request amount $240,323 railroad right of way. allocation

More information

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary Executive Summary Background As congestion continues to affect mobility in the region, the Ozarks Transportation Organization (OTO) is particularly concerned with traffic movement. The North-South Corridor

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

DESIGN PUBLIC HEARING APRIL 24, 2018 MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING APRIL 24, 2018 MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DESIGN PUBLIC HEARING APRIL 24, 2018 AT MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ROUTE 32/32A GILBERTVILLE VILLAGE RECONSTRUCTION PROJECT Roadway Project Management Section

More information

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012 Welcome Comprehensive Plan & Transportation Plan Open House November 7, 2012 Agenda Proposed future land use plan Comprehensive Plan strategies Traffic forecasts Future traffic operations Possible future

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning Today Land & People Employment Major employers include Saint Alphonsus, the College of Western Idaho, the Auto Mall, Sorrento Lactalis and Walmart. 3,004 jobs in 2010 (COMPASS-CIM 2040 TAZ data) 4,345

More information

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DESIGN PUBLIC HEARING MAY 10, 2018 AT GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Reconstruction of Granby Road/West State Street (Route

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

[Leveraging & Improving Neighborhood Connections] Area A Riverfront

[Leveraging & Improving Neighborhood Connections] Area A Riverfront Community Charrette LINC Dallas [Leveraging & Improving Neighborhood Connections] Area A Riverfront 06.02.12 LINC Workshop Area A PDs 774 and 784 cover the majority of Area A employing a form based code

More information

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

North Carolina Department of Transportation Project Development and Environmental Analysis Branch North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,

More information

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM Identification Historic Name Dean Parkway Bridge Current Name Bridge 90661 Field # Address Midtown Greenway over Dean Parkway City/Twp Minneapolis County Hennepin Legal Desc. Twp 29N Range 24W Sec 32 QQ

More information

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,

More information

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville

More information

The Turtle Creek Master Plan- A Summary. July 7, 2011

The Turtle Creek Master Plan- A Summary. July 7, 2011 The Turtle Creek Master Plan- A Summary July 7, 2011 Background During 2004, TCA commissioned highly regarded Antonio Di Mambro & Associates to create a Master Plan for the Turtle Creek Corridor. The resulting

More information

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES In This Chapter Goals & Strategies 182 Project List 183 Future Land Use 186 11 IMPLEMENTATION STRATEGIES NORTH AUGUSTA, SC 2017 COMPREHENSIVE PLAN 179 Individual commitment to a group effort that is what

More information

Transforming the Downtown Riverfront. Your Presenters. Mark Kelsey, Esq., Director, Ann Aubry, P.E., Deputy Director,

Transforming the Downtown Riverfront. Your Presenters. Mark Kelsey, Esq., Director, Ann Aubry, P.E., Deputy Director, How to Herd Cats: Coordinating City Departments and Private Partnerships to Transform the Downtown Riverfront Your Presenters Mark Kelsey, Esq., Director, City of Columbus, Department of Public Service

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES CHAPTER 1 GENERAL DESIGN GUIDELINES 1.0 INTRODUCTION This Publication has been developed to provide current, uniform procedures and guidelines for the application and design of safe, convenient, efficient

More information

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

Abingdon Urban Path System

Abingdon Urban Path System Abingdon Urban Path System Transportation Enhancement Program Application (FY 2012-2013) Submitted by: Town of Abingdon,Virginia P. O. Box 789 133 West Main Street Abingdon, VA, 24212 November 1, 2011

More information

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals. CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES Introduction The Greensburg Comprehensive Plan is intended as a working community document. A combination of long and short-term goals, this document is intended

More information

Berkshire Regional Planning Commission Clearinghouse Review Report

Berkshire Regional Planning Commission Clearinghouse Review Report August 19, 2013 SUBJECT: Reconstruction of Housatonic Street, Dalton, MA EOEA#: 15083 LOCATION: Dalton ESTIMATED COST: $8.1 million REVIEW TYPE: ENF PROPONENT: MassDOT and Town of Dalton COMMENTS DUE:

More information

FOSTER COMPREHENSIVE PLAN UPDATE CIRCULATION

FOSTER COMPREHENSIVE PLAN UPDATE CIRCULATION 5.8.1 INTRODUCTION CIRCULATION The Circulation Element of the Comprehensive Plan studies the routes and modes of travel. The circulation network of the town affects the ease of movement through Foster

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,

More information

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1 Implementation 10 Implementation This chapter overviews how to use the comprehensive plan as a land use and programming tool for the Town of Bloomsburg and recommends annual review of the plan by the Town

More information

TABLE OF CONTENTS INTRODUCTION PLAN CONCEPT... 3

TABLE OF CONTENTS INTRODUCTION PLAN CONCEPT... 3 TABLE OF CONTENTS BY-LAW NO. Z-1 INTRODUCTION... 1 1.0 PLAN CONCEPT... 3 1.1 Mission... 3 1.2 A Future Vision for Fredericton... 3 1.3 Growth Strategy Goals... 5 National Context... 5 Provincial Context...

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

Comprehensive Development Guide

Comprehensive Development Guide INDUSTRIAL ELEMENT Comprehensive Development Guide 1 Industrial Element 7.1 Hardin County Industrial Overview BG PKWY Fort Knox Industrial Corridor Comprised of 11 parcels totaling 720 acres of land 68

More information

Location. Served. Category. Units Start Year. Previous Appropriations

Location. Served. Category. Units Start Year. Previous Appropriations 20142018 CAPITAL IMPROVEMENT PLAN ($ Thouss) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: TC Jester: Washington to I 10 N100002 Paving Drainage Project Description Project provides for the design

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements: Eligibility Requirements To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements: 1) Relate to surface transportation and 2) Be one of the 12 designated

More information

Cottage Grove Road Reconstruction. City of Madison Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs

More information

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period. Definitions Access Management: A combination of physical techniques and transportation policies used to control the flow of traffic between roads and the surrounding lands. Alternative City Form Scenarios:

More information

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1 1.0 Introduction The Town of Castle Rock is situated between the metropolitan areas of Denver and Colorado Springs, amidst a unique terrain of rolling hills, mesas, ravines, and waterways. Like many Front

More information

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background Windsor Locks Transit-Oriented Development Planning Grant Request Project Background Downtown Windsor Locks runs along Main Street in the vicinity of the intersection of Routes 159 and 140. The current

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

Access Management: An Overview

Access Management: An Overview Figures 1-5 Below Evolution of development along a highway. In the early stages, land along the road is used for farming with little traffic generated. As time passes, the highway corridor becomes a de

More information

Environmental: Urban land..51 acre wet (.30%); 1.01 acres/.59% within a 100 year floodplain; no other environmental indicators limit development.

Environmental: Urban land..51 acre wet (.30%); 1.01 acres/.59% within a 100 year floodplain; no other environmental indicators limit development. A N DOV ER Downtown: Designated a State PDA Land Use: Downtown Andover (171.61 acres) is the Town s traditional central business district. It consists of offices, shops, restaurants, civic and institutional

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

Improve Neighborhood Design and Reduce Non Point Source Water Pollution

Improve Neighborhood Design and Reduce Non Point Source Water Pollution HOW TO Planning Guide Improve Neighborhood Design and Reduce Non Point Source Water Pollution This document was funded by a grant from the New Hampshire Coastal Program with funding from the National Oceanic

More information

November 15, Dear Ms. Jacobs:

November 15, Dear Ms. Jacobs: November 15, 2013 One Campbell Plaza St. Louis, Missouri 63139 T. 314 781 7770 F. 314 781 9075 www.cdgengineers.com Ms. Mary Ann Jacobs Local Programs Administrator MISSOURI DEPARTMENT OF TRANSPORTATION

More information

Reconnecting New Haven: Downtown Crossing

Reconnecting New Haven: Downtown Crossing Reconnecting New Haven: Downtown Crossing Phase 2 Update Introduction to Phase 3 November 16, 2017 City of New Haven, Connecticut Toni N. Harp, Mayor Reconnecting New Haven Introduction Project Overview

More information

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program 1Pursue Minnehaha-Hiawatha Community Works Project Minnehaha-Hiawatha Community Works is a project within the Hennepin Community Works (HCW) program. The mission of the HCW program is to enhance how the

More information

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program BEST PRACTICES FOR PROJECT NOMINATIONS 2017 TA Set-Aside Program Focus of this presentation Photos Public Support Maps & Exhibits Proposed Budget Design Details Project Evaluation & Selection Criteria

More information

1. Lenox Dale Community Character Strengths and Opportunities Identified by Residents: Strong neighborhood identity and sense of community.

1. Lenox Dale Community Character Strengths and Opportunities Identified by Residents: Strong neighborhood identity and sense of community. LENOX DALE ISSUES AND OPPORTUNITIES -- EIGHT CATEGORIES: Concerns and opportunities identified by Lenox residents and in previous Community Surveys, along with thought-starter suggestions on possible Town

More information

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects Gessner Widening: T-1701 What: Widen the road from a six-lane divided boulevard to an eight-lane divided boulevard street section, increase turn lanes, update traffic signal system, improve drainage by

More information

5-Year Street Reconstruction Plan ( )

5-Year Street Reconstruction Plan ( ) 5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek

More information

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

Goals for Tonight s Meeting

Goals for Tonight s Meeting South Anthony Boulevard Railroad Grade Separation Study Report to Community November 30, 2011 Andorfer Commons Theatre Indiana Tech University Goals for Tonight s Meeting Recap of the meeting from last

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name Project # PROJECT NAME PAGE 2134 2119 PR-1109 Clayton Road (Market Street to Oakland Avenue) Sidewalk Repair 911 System Replacement and Dispatch Room Remodel ADA Barrier

More information

I-70/71 Innerbelt Project

I-70/71 Innerbelt Project I-70/71 Innerbelt Project Project Progress Meeting and Design Enhancement Update November 9, 2009 Ohio Department of Transportation MS Consultants MSI Design Overview of Presentation 1. Recap Recent Project

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose

More information

Section4 Design Vision & Implementation Plan

Section4 Design Vision & Implementation Plan Section4 Design Vision & Implementation Plan W Woodschurch Rd 4.1 Design Focus Areas The Framework Plan is simply the starting point for directing the design and implementation of a wide range of transportation

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Route 18, South of Texas Road to Rues Lane, Pavement Project ID Numbers: 11408 / 114080 Initiated from the Pavement Management System, this project will rehabilitate pavement within the project limits.,

More information

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1] nhancements [1] STATUS OF PROJECT: The project has recently moved from the Preliminary Design Phase to the Final Design Phase following the most recent Public Involvement Meeting held on January 9, 2019

More information

Our Legacy Projects DOWNTOWN JACKSONVILLE MASTER PLAN

Our Legacy Projects DOWNTOWN JACKSONVILLE MASTER PLAN DOWNTOWN JACKSONVILLE MASTER PLAN A major component of our master plan is the creation of a strong and accessible open space and recreation system. The four most vital links in that system are our legacy

More information

The GATEWAYS Sub Area Master Plan. City of Walker

The GATEWAYS Sub Area Master Plan. City of Walker The GATEWAYS Sub Area Master Plan City of Walker Introduction: The Walker City Commission and Planning Commission decided in 2011 to create a sub-area master plan for the Remembrance Road and Wilson Avenue

More information

Hockessin Community Redevelopment Plan

Hockessin Community Redevelopment Plan Hockessin Community Redevelopment Plan 3.1 Introduction The Community Redevelopment Plan for the Village of Hockessin is the result of the people s vision for a distinct village center that serves as the

More information

1.0 Circulation Element

1.0 Circulation Element 5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and

More information

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION June 15, 2015 Revised: August 1, 2016 I. VISION Brookhill is a proposed community based upon the principles of Albemarle County

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

UNIVERSITY OF MICHIGAN:

UNIVERSITY OF MICHIGAN: Chapter Eight UNIVERSITY OF MICHIGAN: North Campus I. Introduction The University of Michigan currently owns approximately 800 acres of land in the northeast section of Ann Arbor. North Campus refers to

More information

Transportation Committee

Transportation Committee Transportation Committee Business Item No. 2013-286SW Meeting date: October 14, 2013 For the Metropolitan Council meeting of October 16, 2013 Subject: Southwest Light Rail Transit (Green Line Extension):

More information

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 EXHIBIT A Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 1 As amended by Resolution No. 2008-02-001(TR1R) of the Tax Increment Reinvestment Zone No.1, and approved to

More information