HIGHWAY PROJECTS - Upcoming Procurements

Size: px
Start display at page:

Download "HIGHWAY PROJECTS - Upcoming Procurements"

Transcription

1 HIGHWAY PROJECTS - Upcoming Procurements In the Period from April 1, 2012 to October 31, 2012 No. Hwy Bench? / Description Lead / Contracting / Limits / A&E Professional Services No SR-138 from I-5 to I- Roadway Widening (PR only) Teresa Fong 14 Roadway Widening (PR only) No Parkway Calabasas Re-design the Parkway Calabasas/US101 Ben Jong Calabasas US 101 in the City of Calabasas / US 101 SB southbound interchange for greater traffic Offramp flow and safety No Highway Program QA/QC Services General QA/QC Task Order Packages (3) to support 's Highway Program department and ensure conformance with standards throughout each project development phase. Michelle Smith Pending Submittal No Gateway Cities on On call support services to assist in the Steve Gota Gateway Cities Subregion Call ITS Services delivery and evaluation of Gateway Cities ITS initiatives No Aviation Boulevard Construct northbound right-turn lane. Fulgene Redondo Beach Aviation and Artesia Blvd. at Artesia Aviation Boulevard Phase 1: Intersection Intersections Boulevard in s Redondo Beach (NB Right turn lane) No Pacific Coast Highway from Anita Street to Palos Verdes Boulevard PCH Study Improvements: Implement PCH Study Recommendations (11) Fulgene Redondo Beach October 2012 Construction No HUNTINGTON DR Reinland Arcadia CAPACITY Jones No Traffic Signal Sync In the City of Glendale in the downtown area Tasha Higgins Glendale Clorado Street-San Fernando Brand/Colorado- along 3 major corridors. Work includes Road Corridor, Brand Boulevard Corridor, Glendale Avenue San installation of CCTV cameras at key Verdugo Road Corridor Fernando/Glendale- locations, communication infrastructure Verdugo upgrades, and traffic signal operational ** Range is the range of the project cost, may not necessarily be the contracted amount. Page 1 of 7 Highway s Upcoming Procurements - Revised: 4/3/2012 2:58:49 PM

2 / Description Lead / Contracting / Limits / No Widen intersection for left and right turm Ben Jong El Monte Intersection of Santa Anita Avenue Anita/Valley Blvd. pockets. Includes roadway widening, utility and Valley Boulevard. limits are approximately 300 feet from Intersection relocation, and right of way acquisition the intersection on all approaches Improvements No Highway 101 Park Ben Jong Westlake Village and Ride (Construction) No Route 101 / Lindero Cyn. Rd. Interchange Improvements - Phase 3A 3B and 4B Construction phases Widen Lindero Canyon Road to add additional travel lanes and widen and extent Route 101 / Lindero Canyon Road Interchange's ramp. Ben Jong Westlake Village s3 No I-5 South I-5 South Shoemaker - Rosecrans - Lucy Olmos Caltrans Shoemaker, Rosecrans, Bloomfield Shoemaker - Bloomfield Bridges Rosecrans - Bloomfield s4 No I-5 South Imperial I-5 South Imperial Hwy./Orr & Day Rd. Lucy Olmos Caltrans San Antonio/Imperial/Pioneer Hwy./Orr & Day Rd. Bridges No Inglewood Avenue Install eastbound right-turn arrow Fulgene Redondo Beach at Manhattan Beach Boulevard No ITS of I- 405, I-110, I-105, SR-91 Freeways Ramp/Arterial signalized Coordinate freeway ramp/arterial intersections with arterial corridors on I-405, I- 110, I-105, and SR-91 Fulgene Caltrans No ACE Phase II Construct grade separation Michelle Alameda Baldwin Avenue (7) Grade Separations, Smith Corridor East Baldwin Avenue No ACE Phase II Construct grade separation Michelle Alameda At UUP/Nogales in the City of Grade Separations, Smith Corridor East Industry Nogales Street No ACE Phase II Construction of the ACE San Gabriel trench Michelle Alameda San Gabriel Trench (7) Grade Separations, eliminates 4 at-grade railroad crossings in Smith Corridor East San Gabriel Trench the City of San Gabriel ** Range is the range of the project cost, may not necessarily be the contracted amount. Page 2 of 7 Highway s Upcoming Procurements - Revised: 4/3/2012 2:58:49 PM

3 / Description Lead / Contracting / Limits / No Sepulveda Add westbound dual left turns Fulgene Manhattan Boulevard at Beach Marine Avenue No BELLFLOWER BL AT IMPERIAL HWY Lucy Olmos Downey No SOUTH STREET PEDESTRIAN, BIKEWAY AND TRANSIT IMPROVEMENT Lucy Olmos Artesia No PARAMOUNT BL AT FIRESTONE BL Lucy Olmos Downey No NORWALK/SANTA FE SPRINGS TRANSPORTATIO N CENTER Lucy Olmos Santa Fe Springs No Las Virgenes Widen the Las Virgenes Road Scenic Ben Jong Calabasas Scenic Corridor Corridor in order to improve traffic flow and Widening safety No GRANDVIEW AV MODIFICATIONS WITHIN THE CITY OF GLENDALE Widening on Grandview Avenue between Air Roberto Machuca Glendale Along Grandview Avenue Way and San Fernando Road will increase curb radii to facilitate truck movements and lengthening of right-turn lanes for truck storage. approximately 500 feet west of Air Way to approximately 500 feet east of San Fernando Road, and on San Fernando Road approximately 300 feet north and south of the No Grandview and Provides grade separation of Fairmont Tasha Higgins Glendale Grandview Ave and Air Way in the Sonora Avenue At- Avenue over San Fernando Road and City of Glendale Grade Rail Crossing Imp. includes construction of a Park-and-Ride facility No WASHINGTON BLVD. WENING AND RECONSTRUCTIO N PROJECT Lucy Olmos Commerce No Palo Comado Complete interchange improvements along Ben Jong Agoura Hills Interchange Palo Comado Canyon Road, the intersection of Driver Avenue and Chesebro Road. ** Range is the range of the project cost, may not necessarily be the contracted amount. Page 3 of 7 Highway s Upcoming Procurements - Revised: 4/3/2012 2:58:49 PM

4 / Description Lead / Contracting / Limits / No Paddison Avenue Rehabilitate Paddison Ave. from Union St. to Firestone Blvd No Union Street Rehabilitate Union Street from Paddison Ave. to San Antonio Drive No Firestone South Cap area with 2" overlay only No Telegraph Rd. From I-605 to Pioneer Blvd No Truck-Impacted Intersections - Phase 2 resurfacing on Florence Ave. between the S.G. River and I-5 overpass bridges, Studebaker Rd. between Florence Ave. and the I-605 ramps, I-605 S/B on-ramp between Florence Ave. and Little Lake Rd No Stage Rd. grind and cap with 2" ahrm and reconstruct various subgrade failure No Pacific Coast Add northbound right-turn lane Fulgene Redondo Beach Highway at Torrance Boulevard No ORR and Day Rd. From Florence Ave to Telegraph Rd No Pioneer Blvd. in Santa Fe Springs Rehabilitate Pioneer Blvd.from Lakeland Rd.to Telegraph Rd No Rosecrans Ave. Rehabilitate Rosecrans Ave. from I-5 to Carmenita Rd. ** Range is the range of the project cost, may not necessarily be the contracted amount. Page 4 of 7 Highway s Upcoming Procurements

5 / Description Lead / Contracting / Limits / No Alondra pavement grind and cap with 2" ahrm and reconstruct rehabilitation from various subgrade failure Heron to Stage Rd No Pioneer Blvd. in Norwalk Rehabilitate Pioneer Blvd. from Lakeland Rd.to Imperial Hwy No Florence Ave. Rehabilitate Florence Ave. from I-5 / Orr & Day Rd. to Norwalk Blvd No Trojan Way grind and cap with 2" ahrm and reconstruct pavement various subgrade failure rehabilitation No Bloomfield Ave. and Signal Modifications and Rehabilitate Bloomfield Ave. from Rosecrans Ave. to Imperial Hwy. and modify signal at Bloomfield Ave. and Civic Center Dr No Lakewood Boulevard Improvements Boulevard pavement rehabilitation, traffic signal modifications, median island extensions, street and pedestrian lighting No Firestone Blvd. Rehabilitate existing pavement between Lakewood Blvd. and the east city limit Reahbilitation No Norwalk Blvd./San Antonio Drive and Signal Modifications Rehabilitate Norwalk Blvd./San Antonio Dr. from Florence Ave. to Rosecrans Ave.. Modify Signal at San Antonio and Foster No I-10 HOV Lanes Construct concurent flow HOV lanes on I-10 Ben Jong Caltrans From Puente Ave to Citrus Ave from Puente Av to Citrus Av No I-5 HOV Constructs one HOV lane in each direction Teresa Fong Caltrans Empire Ave Interchange Empire/Burbank Bl from south of Empire Av to just north of Modification and Burbank Blvd Reconstruction and Interchange Interchange Buena Vista St in Burbank. Realignment and Modification Modification elevation of the adjacent railroad tracks for the freeway widening and for grade ** Range is the range of the project cost, may not necessarily be the contracted amount. Page 5 of 7 Highway s Upcoming Procurements

6 / Description Lead / Contracting / Limits / No CHERRY AVENUE WENING PROJECT Last Property acquisition completed Jan 2012, court judgement to be finalized Feb Construction RFP expected out by Aug with a 6 month construction duration. Adrian Alvarez Signal Hill No Ernesto Caltrans Specific limits TBD; generally October 2012 congestion areas on I-605 at: SR-60, SR-91, Chaves along 605, 91, 405 wthin Gateway Cities I-5, and I-405. Study Report to analyze improvement alternatives for these Motorist Services No Temp Labor Contract clerical support for FSP data Steve Services collection. Schupak No Freeway Beautification - Graffiti abatement, debris removal General freeway roadside maintenance Iain Fairweather No Technical support Kali Fogel LA SAFE for MATIS No 511 Technical Technical systems support to assist with the Maura LA SAFE Systems Support on-going development and management of Arteago No FSP for the Provide Freeway Service Patrol services to Iain Express Lnaes the ExpressLanes demonstration Fairweather project No Freeway Beautification - Landscape Maintenance General freeway roadside maintenance Iain Fairweather No ITS Regional Review and update of the LA County regional Kali Fogel Architecture ITS Architecture Review/Update No New data communication system for FSP Hardware procurement Kali Fogel ** Range is the range of the project cost, may not necessarily be the contracted amount. Page 6 of 7 Highway s Upcoming Procurements

7 / Description Lead / Contracting / Limits / Yes Planning FTA/VA One Click Professional services Kali Fogel One Call 511 Enhancements No Torrance Regional Transit Center at 465 Crenshaw Boulevard Construct a regional Transit Center including an 8 bus berth transit center building, a kissn-ride passenger drop-off, and a park-andride vehicle lot for 250 vehicles for the initial parking space provision Fulgene Torrance Yes Planning RIITS O&M Operations and Maintenance contract for Kali Fogel LA SAFE Contract for FY12 RIITS in 2012 ** Range is the range of the project cost, may not necessarily be the contracted amount. Page 7 of 7 Highway s Upcoming Procurements

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name Project # PROJECT NAME PAGE 2134 2119 PR-1109 Clayton Road (Market Street to Oakland Avenue) Sidewalk Repair 911 System Replacement and Dispatch Room Remodel ADA Barrier

More information

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development CITY OF MANHATTAN BEACH STAFF REPORT TO: Planning Commission THROUGH: Marisa Lundstedt, Director of Community Development FROM: Tony Olmos, Director of Public Works DATE: April 29, 2015 SUBJECT: Determination

More information

Section 4.11 Traffic and Transportation 4.11 TRAFFIC AND TRANSPORTATION

Section 4.11 Traffic and Transportation 4.11 TRAFFIC AND TRANSPORTATION 4.11 TRAFFIC AND TRANSPORTATION The following sections summarize the evaluation of the potential traffic/transportation impacts of the San Gabriel River Corridor Master Plan. First, the analysis methodology

More information

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017 Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017 Purpose of Tonight s Meeting Recap of Board motion (2014) and technical study process Provide update on

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

Welcome to the. Open House

Welcome to the. Open House Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and

More information

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the

More information

PROPOSED IMPROVEMENTS

PROPOSED IMPROVEMENTS IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

DRAFT Civic Center Station Area Plan. Executive Summary

DRAFT Civic Center Station Area Plan. Executive Summary DRAFT Civic Center Station Area Plan Executive Summary This project is funded in part through the Metropolitan Transportation Commission s Station Area Planning Program. The preparation of this report

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018 I-4 Beyond the Ultimate Florida Transportation Builders Association February 9, 2018 FDOT: Improving Mobility & Safety in Central Florida FDOT is Designing and building a better I-4 through Central Florida

More information

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County Exhibit A SH 161 RTC Work Program of New Projects Collin County 0918-24-969 N/A 0918-24-970 N/A 0918-24-973 N/A 2351-01-020 N/A 2679-03-010 N/A On Exchange Parkway from US 75 to Allen Heights On Country

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects 69th Street Bridge 02311 02311 A grade separation at 69th Street would eliminate the current at-grade crossing which causes frequent automobile delays due to long freight trains moving through this area.

More information

Subject: 2014 Regional Transportation Plan Amendment No. 1

Subject: 2014 Regional Transportation Plan Amendment No. 1 Agenda Item: 6 Memorandum To: Board of Directors From: Grant Leonard, Transportation Planner Meeting Date: April 27, 2016 Subject: 2014 Regional Transportation Plan Amendment No. 1 RECOMMENDED ACTIONS

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name 2062 1701 & 1711 Concord Avenue Purchase and Demolition of Structures 85 1279 1024 UF-802 UF-803 Affordable Housing 77 Annual CIP/TIP Management Program 105 Arnold Industrial

More information

Project Facts about the I-710 Corridor Project and RDEIR/SDEIS

Project Facts about the I-710 Corridor Project and RDEIR/SDEIS Project Facts about the I-710 Corridor Project and RDEIR/SDEIS What is the I-710 Corridor Project? The Interstate 710 (I-710) Corridor Project proposes to improve I-710 from Ocean Boulevard in the City

More information

The Ambassador Bridge/ Gateway Project

The Ambassador Bridge/ Gateway Project The Ambassador Bridge/ Gateway Project Connecting Neighbors & Driving the Economy 2008 Ohio Conference on Freight Given by the Toledo Metropolitan Area Council of Governments, National Association of Regional

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

Debra Larson and Director Malcolm Dougherty

Debra Larson and Director Malcolm Dougherty District 5 District Director Timothy Gubbins Looking south at US 101/San Juan Road interchange in Monterey County Provide a safe, sustainable, integrated and efficient transportation system to enhance

More information

4/8/2015 Item #10D Page 1

4/8/2015 Item #10D Page 1 MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE

More information

Project facts that will help me to understand the I-710 Corridor Project and DEIR/EIS

Project facts that will help me to understand the I-710 Corridor Project and DEIR/EIS Project facts that will help me to understand the I-710 Corridor Project and DEIR/EIS What is the I-710 Corridor Project? The Interstate 710 (I-710) Corridor Project proposes to improve I-710 from Ocean

More information

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I SBCAG STAFF REPORT SUBJECT: Cabrillo-UPRR Bridge Project MEETING DATE: March 17, 2016 AGENDA ITEM: 5I STAFF CONTACT: Fred Luna RECOMMENDATION: Authorize the chair to sign a Memorandum of Understanding

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

Bexar County Public Works Department Flood Control Program

Bexar County Public Works Department Flood Control Program Bexar County Public Works Department Flood Control Program Bulverde Rd. at Mud Creek Trib. A (SC-27) February 23 rd, 2016 Agenda Introductions Bexar County Flood Control (Engineering and PR) Office of

More information

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016 FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects 30 130 Collingswood/Pennsauken ( B) 155C Vicinity of Cooper River Bridge at Park Drive to 200 feet north of PATCO Railroad Bridge This project may provide for the construction of a proposed new bridge

More information

Crenshaw Transit Corridor Alternatives Analysis/EIS/EIR

Crenshaw Transit Corridor Alternatives Analysis/EIS/EIR Crenshaw Transit Corridor Alternatives Analysis/EIS/EIR Working Group Meetings South Corridor Meeting Darby Park Wednesday, September 17, 2008 6:30 8:30 PM Mid-Corridor Meeting Leimert Park Community Build

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

2014 UTILITY ASSISTANCE PROGRAM EAF AND GAF AGENCIES

2014 UTILITY ASSISTANCE PROGRAM EAF AND GAF AGENCIES 2014 UTILITY ASSISTANCE PROGRAM EAF AND GAF AGENCIES FRESNO AGENCIES Number Hours APPTS. 1102 GAF Kingsburg Community Assistance Program 1139 Draper Street Kingsburg 93631 Fresno (559) 897-7961 Mon. -

More information

2017 General Obligation Bond

2017 General Obligation Bond 2017 General Obligation Bond Presentation of Public and Council Projects to the Transportation & Mobility Stakeholder Committee April 13, 2017 Agenda Deferred Maintenance Project Development Process Projects

More information

SR 483 Clyde Morris Boulevard FDOT District 5

SR 483 Clyde Morris Boulevard FDOT District 5 This project occurs on a 3.0 mile section of SR 483 (Clyde Morris Blvd.) south of Beville Road (SR 400) to north of International Speedway Boulevard (SR 600). Ghyabi is providing project management and

More information

Moving The Metro. A special construction update for the metro Omaha area.

Moving The Metro. A special construction update for the metro Omaha area. Moving The Metro A special construction update for the metro Omaha area. ebraska Department of Roads Spring/Summer 2017 I-80 / I-480 / US-75 Interchange The improvements on this project consist of bridge

More information

UPDATE ON: Water Quality Enhanced BMPs / Landscaping. January 2017

UPDATE ON: Water Quality Enhanced BMPs / Landscaping. January 2017 UPDATE ON: Water Quality Enhanced BMPs / Landscaping January 2017 Technical Studies in Preparation Water Quality Assessment Report Hydrology Study Storm Water Data Report Flood Control Facilities Report

More information

Highway 417 Expansion East

Highway 417 Expansion East Highway 417 Expansion East Nicholas Street to Ottawa Road 174 GWP 4091-07-00 & GWP 4320-06-00 Outline Project Overview Highway 417 Widening Bridge Rapid Replacements Traffic & Incident Management Project

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project David R. Dysard, AICP District Two Deputy Director Theresa Pollick Public Information

More information

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

WHAT IS THE PURPOSE OF THE OPEN HOUSE? WHAT IS THE PURPOSE OF THE OPEN HOUSE? OPEN HOUSE PURPOSE The purpose of the open house is to provide an update on the study process and introduce the preliminary concept alternatives. The open house provides

More information

Public Works Project Delivery Report

Public Works Project Delivery Report Public Works Project Delivery Report May 2017 San Gabriel Public Works delivers reliable infrastructure & welcoming public spaces by designing, constructing, operating & maintaining the City s streets,

More information

APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS-HANDWORK

APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS-HANDWORK APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS-HANDWORK TABLE OF CONTENTS Exhibits Page 1 Map to 12300 Lower Azusa Road, Arcadia... 1 2 Weed Abatement Zones Map... 2 3 Weed Abatement Zones, Area Listing...

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Route 1&9, County Road 99380 99380 Improvements are planned at the Route 1&9, County Road intersection to address operational and safety issues in the vicinity of Manhattan Avenue and County Road. COUNTY:

More information

SR-2 Freeway Terminus Improvement Project

SR-2 Freeway Terminus Improvement Project SR-2 Freeway Terminus Improvement Project Welcome! Public Hearing, Mayberry Elementary June 16, 2009, 6:30 p.m. 8:30 p.m. Agenda 6:30 PM 6:50 PM Registration and Open House 6:50 PM 7:00 PM Welcome and

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,

More information

Blue Line LRT Extension

Blue Line LRT Extension v e Noble Pkwy Noble Pkwy Xerxes Ave N Shingle Creek Penn Ave N Penn Ave N Fremont Ave N Lyndale Ave N S Washington Ave University Ave NE Blue Line LRT Extension LIGHT RAIL PLATFORM AND STATION DESIGN

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the

More information

Call to Artists Public Art for Los Angeles Metro Stations

Call to Artists Public Art for Los Angeles Metro Stations Conceptual Design for Call to Artists Public Art for Los Angeles Metro Stations Artesia Transit Center Union Station/Patsaouras Transit Plaza Los Angeles County Metropolitan Transportation Authority February

More information

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting Rosecrans/Marquardt Grade Separation Project Community Open House Meeting October 17, 2017 Rosecrans/Marquardt Presentation Agenda 1. Welcome Remarks & Introductions 2. Community Outreach 3. Project Goals

More information

CITY OFLOS ANGELES CALIFORNIA

CITY OFLOS ANGELES CALIFORNIA BOARD OF PUBLIC WORKS MEMBERS KEVIN JAMES PRESIDENT HEATHER MARIE REPENNING VICE PRESIDENT MICHAEL R. DAVIS PRESIDENT PRO TEMPORE JOEL F. JACINTO COMMISSIONER VACANT COMMISSIONER FERNANDO CAMPOS EXECUTIVE

More information

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency CHAPTER 4: CIRCULATION ELEMENT ISSUE #1: MAJOR THOROUFARES AND TRANSPORTATION ROUTES A balanced transportation system for Fontana is provided that meets the mobility needs of current and future residents

More information

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH 112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG060310124909PGH C ontents Introduction 1 Project Overview 1 Public Involvement and Technical Coordination 4 Description

More information

Attachment D Eastside Transit Corridor Phase 2 Technical Study Route Options Screening Analysis and Community Outreach Executive Summary April 2017

Attachment D Eastside Transit Corridor Phase 2 Technical Study Route Options Screening Analysis and Community Outreach Executive Summary April 2017 Attachment D Eastside Transit Corridor Phase 2 Technical Study Route Options Screening Analysis and Community Outreach Executive Summary April 2017 Technical Study Scope Nov 2014: Board-directed Technical

More information

New Stanton Project Update July 3, 2012

New Stanton Project Update July 3, 2012 New Stanton Project Update July 3, 2012 The Needs BACKGROUND INFO I-70 Geometric Concerns Substandard Horizontal & Vertical Clearance at Center Ave. Bridge (The Center Avenue Bridge is Replaced in all

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING City of Alhambra October 10, 2017 Development Services Department 111 South First Street Alhambra, CA 91801 NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING CASE NO.: Residential

More information

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

North Carolina Department of Transportation Project Development and Environmental Analysis Branch North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,

More information

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016 Rt. 29 Solutions Project Delivery Advisory Panel January 7, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Dec

More information

RUTHERFORD NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

RUTHERFORD NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER RUTHERFORD NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 5307 Urban Operating for Rover Public Transit - Relax & Ride Service TIP # 2005-006 Transit Operations Murfreesboro Public Transit

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018 Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting El Paso, TX April 11, 2018 Coalition Key Stakeholders Texas Department of Transportation New Mexico Department of Transportation

More information

PROJECTS AND THE PUBLIC ART MASTER PLAN

PROJECTS AND THE PUBLIC ART MASTER PLAN MEMO TO: PUBLIC ART STEERING COMMITTEE MEMBERS FROM: SHARI COOPER, DEVELOPMENT PROJECT COORDINATOR DATE: FEBRUARY 24, 2017 SUBJECT: AGENDA ITEM 5.A: PUBLIC ART PROJECT FOR 2017-18 BACKGROUND One of the

More information

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Metro Orange Line Extension Four Years Early and $61 Million Under Budget White Paper: Metro Orange Line Extension Four Years Early and $61 Million Under Budget July 2013 Innovation for better mobility Metro Orange Line Extension Iteris, Inc. was the prime consultant leading

More information

SYSTEM EXPANSION. Sound Transit system expansion will:

SYSTEM EXPANSION. Sound Transit system expansion will: SYSTEM EXPANSION Sound Transit system expansion will: Expand Sounder south line capacity and service, including longer trains (to accommodate 40 percent more passengers) and the potential for more daily

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in

More information

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) CE OF PREPARAT LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT STATEMENT (E1S)lENVIRONMENTAL IMPACT REPORT (EIR) TO: AGENCIES, ORGANIZATIONS

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

NORTH, NORTH REDWOOD BOULEVARD CORRIDOR STUDY

NORTH, NORTH REDWOOD BOULEVARD CORRIDOR STUDY BOULEVARD CORRIDOR STUDY Southern Central Northern STUDY AREA OPPORTUNITIES AND CONSTRAINTS BOULEVARD CORRIDOR WORKSHOP Constraints Wetlands For illustrative purposes only BINFORD RD RUSH LANDING RD BOULEVARD

More information

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm WELCOME 50 street cp rail grade separation + road widening public information session #1 June 26, 2018 5 pm to 8 pm session purpose To provide residents, businesses, and users of 50 Street with the opportunity

More information

Existing Transportation System 5-1

Existing Transportation System 5-1 5-1 The Jackson County transportation system is served by several modes of transportation including streets and highways, multi-modal, non-motorized, rail, and aviation. While the focus of the transportation

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

Regional Transportation District

Regional Transportation District NORTHEAST AREA TRANSIT EVALUATION FINAL REPORT Prepared for: Regional Transportation District Prepared by: David Evans and Associates, Inc. URS, Corporation November 2007 LIST OF FIGURES Figure 1: Northeast

More information

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015 St. Laurent Transit Improvements Innes / Industrial to Smyth Public Information Session December 2, 2015 Agenda Introduction Project Background Preliminary Design Widening for transit lanes Roadway resurfacing

More information

APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS

APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS APPENDIX C STATEMENT OF WORK TECHNICAL EXHIBITS TABLE OF CONTENTS Exhibits Page 1 Map to 12300 Lower Azusa Road, Arcadia...1 2 Weed Abatement Zones Map...2 3 Weed Abatement Zones, Area Listing...3 4 Sample

More information

I-95 Interchange & Ellis Road PD&E Study

I-95 Interchange & Ellis Road PD&E Study I-95 Interchange & Ellis Road PD&E Study Brevard County, Florida Presentation to the Space Coast TPO October 14, 2010 The Project Provide a New Interchange with I-95 Using the Ellis Road Corridor, Extend

More information

Florence-Firestone Community Plan

Florence-Firestone Community Plan Florence-Firestone Transit- Oriented Development Evaluation Prepared by: June 2010 i Table of Contents 1.0 INTRODUCTION... 1-1 2.0 BACKGROUND... 2-1 2.1 PLAN AREA... 2-1 2.2 ADOPTED TRANSIT-ORIENTED DISTRICT

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES ROAD CONSTRUCTION 36 June 2014 ROADS&BRIDGES Young is full of life Recent expansion completes continuous, multilane arterial By Donald Hammack, P.E. Contributing Author The Florida Department of Transportation

More information

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280 I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange THIRD

More information

Asheville Design Center March 2010

Asheville Design Center March 2010 Community-Based Design Update Asheville Design Center March 2010 www.ashevilledesigncenter.org 1 introduction contents 1. Introduction 2. Background 3. ovember Design Charrette 4. January Work Session

More information

The Lincoln Neighborhood Corridor Plan. The LiNC

The Lincoln Neighborhood Corridor Plan. The LiNC October 1, 2014 Planning Commission Study Session The Lincoln Neighborhood Corridor Plan The LiNC Purpose of Tonight s Meeting Introduction to The LiNC Review of Existing Conditions and Community Identified

More information

March 1, PWG Meeting #4

March 1, PWG Meeting #4 March 1, 2013 PWG Meeting #4 1 Meeting Agenda 2 History & Overview Circle Interchange was built in the late 1950 s and early 1960 s, and the facility is in need of major repair or reconstruction. 3 History

More information

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 Sponsored by: The Ohio Department of Transportation and The City of Defiance Project

More information

METRO Gold Line BRT CMC Meeting

METRO Gold Line BRT CMC Meeting METRO Gold Line BRT CMC Meeting April 26, 2018 Today s Topics Welcome and Introductions Project Overview CMC Roles and Responsibilities Current Project Baseline: Scope and Cost Estimate Overview Municipal

More information

City of Los Angeles C ALIFORNIA

City of Los Angeles C ALIFORNIA DEPARTMENT OF CITY PLANNING - CITY PLANNING COMMISSION DAVID H. J. AMBROZ PRESIDENT RENEE DAKE WILSON VICE-PRESIDENT ROBERT L. AHN CAROLINE CHOE RICHARD KATZ JOHN W. MACK SAMANTHA MILLMAN VERONICA PADILLA-CAMPOS

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

PLANNING COORDINATING COMMITTEE

PLANNING COORDINATING COMMITTEE PLANNING COORDINATING COMMITTEE Fall Meeting/Luncheon Welcome! October 16, 2009 PLANNING COORDINATING COMMITTEE Fall Meeting/Luncheon WELCOME! WELCOME! October 16, 2009 October 16, 2009 Agenda I. Lunch/Socialize

More information

4. INITIAL CONCEPT DEVELOPMENT AND SCREENING

4. INITIAL CONCEPT DEVELOPMENT AND SCREENING 4. INITIAL CONCEPT DEVELOPMENT AND SCREENING A coordinated effort by the project team and members of the three oversight committees (Citizen Advisory, Technical Advisory, and Steering) led to 17 initial

More information

Kurt G. Larson, PE, PTOE

Kurt G. Larson, PE, PTOE Kurt G. Larson, PE, PTOE Summary With more than 20 years of experience, Mr. Larson has a well-rounded technical career with roadway/geometric design, intelligent transportation systems, traffic signal

More information

Reconnecting New Haven: Downtown Crossing

Reconnecting New Haven: Downtown Crossing Reconnecting New Haven: Downtown Crossing Phase 2 Update Introduction to Phase 3 November 16, 2017 City of New Haven, Connecticut Toni N. Harp, Mayor Reconnecting New Haven Introduction Project Overview

More information

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA FINANCIAL PROJECT ID NUMBER 411189-2-22-01 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 4 Prepared

More information

STREET IMPROVEMENT AND MAINTENANCE PROGRAMS

STREET IMPROVEMENT AND MAINTENANCE PROGRAMS 2018-2019 STREET IMPROVEMENT AND MAINTENANCE PROGRAMS Engineering Department Pamela S. Cooksey, City Engineer Public Works Department Jonathan Gano, Public Works Director April 2018 Attached for your information

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

SUBJECT: Comments on Del Mar Fairgrounds Master Plan Draft Environmental Impact Report

SUBJECT: Comments on Del Mar Fairgrounds Master Plan Draft Environmental Impact Report Dustin Fuller, Sr. Environmental Planner 22 nd District Agricultural Association Del Mar Fairgrounds 2260 Jimmy Durante Boulevard Del Mar, CA 92014-2216 February 5, 2010 SUBJECT: Comments on Del Mar Fairgrounds

More information