WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm
|
|
- Derrick Norman
- 5 years ago
- Views:
Transcription
1 WELCOME 50 street cp rail grade separation + road widening public information session #1 June 26, pm to 8 pm
2 session purpose To provide residents, businesses, and users of 50 Street with the opportunity to view the project information and discuss interests and concerns with project staff.
3 project purpose To provide efficient and safe movement of people, goods and services. The following will be included in the plan: A grade separation at the existing CP Railway crossing north of Sherwood Park Freeway Widening 50 Street to a six-lane divided roadway from 76 Avenue to 90 Avenue Replacement and widening of Sherwood Park Freeway bridge Addition of active modes infrastructure (such as a shared use pathway) Relocation of overhead and underground utilities
4 study area ottewell 90 avenue lambton industrial kenilworth cp lambton park yard 84 avenue 82 avenue morris road gainer industrial cp rail tracks 50 street morris industrial sherwood park freeway weir industrial 76 avenue davies industrial
5 public engagement to date The project team has begun gathering input through stakeholder meetings with: Directly adjacent residents Business owners Commercial property owners Community leagues CP Rail and utility companies
6 what we heard Stakeholders have shared local knowledge about how they currently use 50 Street and how they see 50 Street being used in the future, as well as their interests and concerns. The project team is examining these elements and will report back on how they have been addressed. Potential traffic calming in Kenilworth Addition of possible noise wall around Kenilworth homes Reduced waiting and travel time Inclusion of shared use path and sidewalk extension south of CP Rail tracks Closeness of road to private property Detours during construction Increased traffic Noise during construction Access closures
7 history of 50 street 1943 Two-lane gravel road 1965 Two-lane paved road 1978 Four-lane paved road Images courtesy of the City of Edmonton Archives As the City of Edmonton continues to grow, 50 Street will continue to play a key role for transportation in southeast Edmonton.
8 project timeline WE ARE HERE 2008 Rail grade crossing assessment and feasibility study is completed 2017 City of Edmonton submits final application to National Trade Corridors Fund SPRING 2018 Stakeholder engagement begins SUMMER 2018 Public Information Session # Utility and detour work expected to begin 2023 Anticipated construction completion JAN 2018 SPRING 2018 MAY 2018 SUMMER 2018 FALL Functional planning study for 50 Street widening from Whitemud Drive to 90 Avenue is completed JAN 2018 City initiates planning and design study in anticipation of funding approval MAY 2018 Funding provided for CP Rail grade separation and 50 Street widening at Sherwood Park Freeway to 90 Avenue FALL 2018 City Council to consider funding the Sherwood Park Freeway bridge replacement and 50 Street widening to 76 Avenue 2020 Construction expected to begin
9 FUNDING Rail Grade Separation & Road Widening between Sherwood Park Freeway and 90 Avenue Funded by all orders of government: Government of Canada: $39.8 million Government of Alberta: up to $28.3 million City of Edmonton: $18.5 million Sherwood Park Freeway Bridge Replacement and Widening A funding request will be made as part of the City of Edmonton Capital Budget for: Sherwood Park Freeway bridge replacement and widening 50 Street between 76 Avenue and Sherwood Park Freeway If funding is approved, construction would coincide with the railway grade separation work. (l-r) The Honourable Amarjeet Sohi, Minister of Infrastructure and Communities, The Right Honourable Justin Trudeau, Prime Minister of Canada, The Honourable Marc Garneau, Minister of Transport, and Councillor Ben Henderson, Councillor for Ward 8.
10 project scope Intersection reconfiguration Sidewalk (west side) Shared use pathway (east side) 84 Avenue proposed intersection closure 82 Avenue proposed intersection closure CP Rail grade separation Widening to six lanes Bridge replacement and widening Intersection reconfiguration Intersection reconfiguration Intersection reconfiguration Widening to six lanes FUNDED PENDING FUNDING
11 project scope: cp rail underpass option 63 Avenue and Gateway Boulevard 137 Avenue and 142 Street Shared use path feature 13 Avenue and Parsons Road
12 project scope: cp rail overpass option 23 Avenue and Gateway Boulevard 50 Street and Manning Drive Anthony Henday Drive and Parsons Road 156 Street and Yellowhead Trail
13 what factors are involved in this decision? stormwater management CONSTRUCTION COSTS NOISE IMPACTS visual impacts conditions for transit access conditions for goods movement (trucks) CONDITIONS FOR WALKING AND CYCLING construction detours RAILWAY IMPACTS OPERATIONAL AND COMMUNITY SAFETY utilities MAINTENANCE COSTS LAND IMPACTS GEOTECHNICAL CONDITIONS constructability
14 WHYTE (82) AVE 76 AVE 72A AVE 53 AVE 51 AVE 74 AVE 68 AVE 68 AVE 67 AVE 59 AVE 54 ST 54 ST 52 ST 8 84 AVE WHYTE (82) AVE 76 AVE 72A AVE 51 AVE DESIGN SP 50 km/h 53 AVE 90A AVE 49 ST 72 AVE 76 AVE WHYTE (82) AVE 76 AVE 72A 48 ST 55 AVE 52 AVE AVE 53 AVE 51 AVE 52 ST 74 AVE 72 AVE 68 AVE 68 AVE 67 AVE 59 AVE 44A ST WHITEMUD DR 74 AVE 68 AVE 68 AVE 67 AVE 59 AVE 84 AVE 54 ST 54 ST 52 ST 90A AVE 72 AVE 49 ST 54 ST 54 ST 76 AVE 55 AVE 52 AVE 48 ST 84 AVE DES 90A AVE 49 ST R1R11 76 AVE 48 ST 55 AVE 52 AVE CN SPUR LINE 44A ST WHITEMUD DR 44A ST WHITEMUD DR PAV R AVENUE PAVEMENT REMOVAL R60 20m BAY 55m BAY REET REET 30m TAPER P R200 30:1 TAPER 65m BAY 80m BAY 70m BAY 40m BAY 3.0m MULTI-USE TRAIL 3.0m MULTI-USE TRAIL REET 3.0m MULTI-USE TRAIL R 3.0m MULTI-USE TRAIL m MULTI-USE TRAIL 20m 20m BAY BAY PAVEMENT REMOVAL ECT ST. project history: 2010 concept plan EX. GAS R15 82 AVE ROPER RD ROPER RD R2 R15 CP RAIL LINE LIMIT O R17 EXISTING BRIDGE TO BE WIDENED; DETAILS TO BE ADDRESSED DURING PRELMINARY DESIGN PROPOSED BUS STOP (NUMBER TO BE ASSIGNED BY ETS) EXISTING WEST PROPERTY LINE LIMIT OF PROJE VARIES PROPOSED ROAD WIDENING BETWEEN SHERWOOD PARK FREEWAY AND 90TH AVENUE IS SUBJECT TO GRADE SEPARATION REQUIREMENTS FOR THE CPR LINE. REFER TO "REET RAILWAY GRADE SEPARATION CONCEPTUAL PLANNING REPORT, 2009" BY ISL FOR MORE INFORMATION. R80 R11 R11 R35 R5 R5 R5 R5 R AVE MORRIS ROAD RELOCATED BUS STOP 2331 SIGN STRUCTURE AND PANELS TO BE RELOCATED (PROTECTION IS REQUIRED) R2.8 60m TAPER 55m BAY 40m BAY SIGN LOCATIONS TO BE DETERMINED AT PRELIMINARY DESIGN 90 AVE 90 AVE 56 AVE 56 AVE WHITEMUD DR WHITEMUD DR ROPER RD 90 AVE 56 AVE WHITEMUD DR CLOSE EXISTING ACCESS 46 STREET CP RAIL MORRIS ROAD 46 STREET CP RAIL MORRIS ROAD ELENIAK RD ELENIAK RD EX. EX. R18 R11 R5 SHERWOOD PK FWY SHERWOOD PK FWY 46 STREET CP RAIL MORRIS ROAD ELENIAK RD R11 SHERWOOD PK FWY N.T.S. 90 AVENUE N.T.S. PROPOSED RETAINING WALL (LT) CLOSE EXISTING ACCESS TO 82 AVENUE PROPERTY ACQUISITION REQUIRED 60m TAPER 40m TAPER RELOCATED ACCESS 40m TAPER 30:1 TAPER 40m TAPER R8.5 R25 PROPOSED RETAINING WALL (RT) PROPOSED BRIDGE LIMITS REFER TO "REET RAILWAY GRADE SEPARATION CONCEPTUAL PLANNING REPORT, 2009" FOR MORE INFORMATION PROPOSED RETAINING WALL (BRIDGE) m TAPER50m BAY R15 R15 PAVEMENT REMOVAL 5.0 MIN RELOCATE E SERVICE ROAD ACCESS (SEE E NOTE #3) PROP. BUS STOP (NUMBER TO BE ASSIGNED BY ETS) SIGN LOCATION TO BE DETERMINED AT PRELIMINARY DESIGN RELOCATED BUS STOP 2194 EXISTING ACCESSES TO REMAIN A B 6.00 EX. CLOSE EX. ACCESS EX. 60m TAPER 30m TAPER 35m BAY 90m BAY R :1 TAPER PROPOSED RETAINING WALL RELOCATED BUS STOP 2783 REMOVE EXISTING SIDEWALK R15 60m TAPER R SERVICE ROAD R3 R11 90A AVE R11 B REMOVE EX. SERVICE ROAD RELOCATE SERVICE ROAD ACCESS (SEE NOTE #3) REMOVE EXISTING SIDEWALK AND BUS STOP 2135 R AVENUE POSSIBLE CLOSE EXISTING ACCESS POSSIBLE RELOCATED ACCESS (DIRECTLY ACROSS FROM EX. ACCESS TO NORTH) R12 R14 PROPOSED RELOCATED SERVICE ROAD ACCESS (SEE NOTE #3) PROPOSED TURN-AROUND REMOVE EXISTING PAVEMENT 6.00 R60 C RELOCATED FENCE LINE R MIN. REMOVE EXISTING WALK RELOCATED BUS STOP m BAY R25 R5 R5 40m TAPER R20 EX. TAPER EX. TAPER R5 R MIN. LIMIT OF PROJE CLOSE EXISTING ACCESSES & CONSTRUCT PROPOSED JOINT ACCESS (CROSS LOT AGREEMENT REQ'D; SEE NOTE #3) RELOCATED BUS STOP 2802 R100 CLOSE EXISTING ACCESS R100 R25 R MIN MIN. R25 60m TAPER EX. TAPER R35 35m BAY 50m TAPER 7.65 R25 R MIN. REMOVAL CLOSE EXISTING ACCESS RELOCATED BUS STOP 2239 Possible west N.T.S. sidewalk to be reviewed at next stage of design 30m BAY PAVEMENT R MIN. R25 C 84 Avenue access to be reviewed at next stage of design SHERWOOD PARK FREEWAY 76 AVENUE The 2010 concept plan shows at-grade road widening of 50 Street and the CP Rail underpass option. SUBJECT TO PRELIMINARY DESIGN TE PROPOSED TURN-AROUND 82 Avenue access to be reviewed at next stage of design
15 next steps We will continue stakeholder outreach We will continue to work with CP Rail and utility companies We will continue to evaluate design options that fit within the scope of the project Next public information session anticipated for: early 2019 Please fill out the event evaluation form.
16 thank you for attending stay informed on the project by visiting: edmonton.ca/50streetwidening if you have additional comments or questions about the project, please contact: Sidd Masand city of edmonton
Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session
Manning Freeway to Whitemud Drive Welcome to this Construction Information Session Purpose To inform interested residents and businesses about the plans accommodation. Background: The Government of Alberta
More informationInform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;
WELCOME The intent of today s Open House is to: Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass; Review highway crossing locations, future access closures
More informationMill Woods Town Centre Proposed Rezoning LDA
Mill Woods Town Centre Proposed Rezoning LDA15 0649 The City of Edmonton has received an application for rezoning and an amendment to the Mill Woods Station Area Redevelopment Plan (ARP) for the Mill Woods
More informationAdelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3
1 Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Study Process and Purpose of PIC 3 2 Study Commencement February 2016 Phase 1: Problem and Opportunity Identify problems and opportunities
More informationBurloak Drive Grade Separation
Burloak Drive Grade Separation Transit Project Assessment Process Public Meeting #1 March 30, 2017 GO Lakeshore West Service Plan Weekday Rush Hour 15-minute, two-way service between Aldershot* and Union
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationEdmonton s LRT Setting the Stage for Heading Further South
4 Capital Projects Project Updates Edmonton s LRT Setting the Stage for Heading Further South Art Washuta, P.Eng. AECOM Canada Ltd. Edmonton, Alberta Carole Cej, P.Eng. City of Edmonton Edmonton, Alberta
More information2017 Canadian Consulting Engineering Awards
2017 Canadian Consulting Engineering Awards Northeast Anthony Henday Drive DBFO Edmonton, Alberta Four years of detours, traffic snarls, varying speed limits, and stop-and-start driving has come to an
More informationSt. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015
St. Laurent Transit Improvements Innes / Industrial to Smyth Public Information Session December 2, 2015 Agenda Introduction Project Background Preliminary Design Widening for transit lanes Roadway resurfacing
More informationWELCOME TO OPEN HOUSE TWO November 28, 2018
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting
More informationStrachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit
Strachan Ave. Overpass Community Design Update October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit Welcome Program Overview 6:30 8:30 p.m.: Storyboard Review Project
More informationThe Project. In 2013, construction was completed between 100 Street and 102 Street.
The Project Jasper Avenue New Vision (JANV) is a major catalyst project identified in the Capital City Downtown Plan (2010) between 92 Street and 109 Street, including the streets half a block north and
More informationNORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY
WELCOME Northeast River Crossing Functional Planning Study Phase 2 Public Meeting 4 to 8 PM Informal drop-in format and discussion tables Meeting Purpose Introduce the Northeast River Crossing Functional
More information2018 Priority Regional Transportation Projects. Integrated Regional Transportation Master Plan
2018 Priority Regional Transportation Projects June 14, 2018 Table of Contents 1.0 INTRODUCTION 3 1.1 BACKGROUND 3 1.2 OBJECTIVES 3 2.0 METHODOLOGY 4 2.1 OVERVIEW OF EVALUATION PROCESS 4 2.2 PROJECT LIST
More informationCHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018
TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER ADELAIDE STREET
More informationSH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017
Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year
More informationCAPITAL LINE SOUTH LRT EXTENSION INTRODUCTION
INTRODUCTION What: The 2010 preliminary design for the Capital Line South LRT Extension will run from the Century Park Station to Ellerslie Road. It will connect to the Heritage Valley Park and Ride located
More informationCapital Projects in and near Odenton Town Center
Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately
More informationFifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design
1 Fifth and Detroit Street Design May 2017 Capital Improvements Committee Agenda 2 Review Street Configuration Prior Meeting Review Outreach Synopsis Functional Street Design Refinements Curb Edge, Turning
More informationRapid Transit Implementation Working Group September 14, 2017
Rapid Transit Implementation Working Group September 14, 2017 BACKGROUND Council approved the Rapid Transit Master Plan and Updated Business Case on July 25, 2017. Approval of the RTMP confirmed the BRT
More informationCity of London Adelaide Street North - Canadian Pacific Railway Grade Separation Class Environmental Assessment Study Report
Executive Summary ES1 Introduction The City of London has completed a Class Environmental Assessment (Class EA) study for the Adelaide Street North - Canadian Pacific Railway Grade Separation. While the
More informationJohnson Street Bridge Public Realm Update
Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes
More informationCommissioners Road West Realignment Environmental Assessment
City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 1 March 30, 2017 Welcome to the Public Information Centre This first Public Information Centre
More informationGorman Neighbourhood Structure Plan LDA WELCOME RESIDENTS. edmonton.ca/gormanneighbourhoodplan. CITY OF EDMONTON Sustainable Development
Gorman Neighbourhood Structure lan WELCOME RESIDENTS Gorman Neighbourhood Structure lan AGENDA & CONTACT INFO Tonight s Agenda City of Edmonton File lanner Information Sarah Ramey, File lanner Registration
More informationBuilding Great Neighbourhoods. Strathcona
Building Great Neighbourhoods Strathcona March 21, 2018 Becky Redford Project Manager, Planning & Design Building Great Neighbourhoods Integrated Infrastructure Services Welcome and Purpose To provide
More informationEmery Village Road 2A Municipal Class Environmental Assessment Study
PW12.11 STAFF REPORT ACTION REQUIRED Emery Village Road 2A Municipal Class Environmental Assessment Study Date: March 30, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More information2040 Long Range Transportation Plan
2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)
More informationSoutheast Extension to RidgeGate Parkway Scoping Booklet
Southeast Extension to RidgeGate Parkway Scoping Booklet PUBLIC SCOPING MEETING SCHEDULE Public Scoping Meeting Wednesday, November 2, 2011 6:00pm to 7:30pm City of Lone Tree Recreation Center Willow Room
More informationWelcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline
Welcome Green Line LRT Beltline Alignment Options Stay engaged! Follow the Green Line story at calgary.ca/greenline Green Line LRT Why are we here? Our Challenge Determine the best alignment in the Beltline.
More informationCity of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report
City of Edmonton Final Report Walterdale Bridge Replacement and Approach Roads Evaluation April, 2011 Walterdale Bridge Replacement and Approach Roads Evaluation Final Report April 2011 Acknowledgement
More informationCity of Toronto. Emery Village Transportation Master Plan
City of Toronto Emery Village Transportation Master Plan May 2009 Emery Village Transportation Master Plan Toronto, ON May 2009 Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel:
More informationWelcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework
Welcome Community Consultation Meeting November 28, 2016 Why Are We Here Today? Review and discuss the Bathurst Quay Neighbourhood Plan Framework Review and discuss an Action Plan for Implementation Next
More informationGoals for Tonight s Meeting
South Anthony Boulevard Railroad Grade Separation Study Report to Community November 30, 2011 Andorfer Commons Theatre Indiana Tech University Goals for Tonight s Meeting Recap of the meeting from last
More informationLand Use & Planning Committee. Agenda
1. Call to Order Mayor Tom Flynn, Chair 2. Chair Opening Remarks Agenda Thursday, April 28, 2016 9:00 a.m. 11:00 a.m. La Cite Francophone Hall Jean-Louis Dentinger 8627 rue-marie-gaboury (91 Street), Edmonton
More informationI-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status
I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in
More informationShift Rapid Transit Public Participation Meeting May 3, 2017
Shift Rapid Transit Public Participation Meeting May 3, 2017 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public
More informationCapital Projects impacting Odenton Town Center
Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000
More informationUpcoming Projects and Emerging Issues
Upcoming Projects and Emerging Issues Strathcona County Working Together With The Consulting Engineers of Alberta http://www.strathcona.ca CEA Partnering with Industry Symposium January 18, 2018 Presentation
More informationGOLD BAR WASTEWATER TREATMENT PLANT OPERATIONS CENTRE PROJECT AND REZONING NOTIFICATION
GOLD BAR WASTEWATER TREATMENT PLANT OPERATIONS CENTRE PROJECT AND REZONING NOTIFICATION We are proposing to construct a new Operations Centre, surface parking lot and an elevated employee walkway at the
More informationAdelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1
1 Adelaide Street / Canadian Pacific Railway (CPR) Why Are We Here? 2 The purpose of Public Information Centre (PIC) #1 is to: Introduce the study Provide the study background and context Identify the
More informationPortage Parkway Environmental Assessment Public Information Centre No. 1
City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces
More informationSOUTH UNIVERSITY Street Design Alternatives in Progress
1 Alternatives in Progress 2016.01.20 Meeting Agenda 2 1. Progress & Schedule 2. Utilizing the Street Design Manual 3. Site Characteristics and Input Received 4. Street Geometry What can we accomplish
More informationWelcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.
Welcome Public Information Centre No.2 City of Burlington, City of Hamilton, Region of Halton Waterdown Road Widening Detailed Design Craven Avenue to Mountain Brow Road Date: Thursday March 2, 2017 Time:
More informationUS 95 Phase 2B/5 Open House
US 95 Phase 2B/5 Open House www.us95nw.com Wednesday, Mountain Crest Community Center 4701 N Durango Drive Las Vegas, NV 89129 Brian Sandoval Governor Rudy Malfabon Director Nevada Department of Transportation
More informationWELCOME CPT CORRIDOR AREA PROJECT BACKGROUND BROOKSIDE BLVD. The objectives of the CPT Functional Design Study included:
1 WELCOME Welcome to the Public Information Session for the Functional Design Study of the Chief Peguis Trail Extension West from Main Street to Brookside Boulevard PROJECT BACKGROUND The objectives of
More informationMURRAY CENTRAL STATION MASTER PLAN Central Station Area of Influence and Site Analysis
CENTRAL STATION MASTER PLAN Central Station Area of Influence and Site Analysis OVERVIEW Planned Fire Station TAYLORSVILLE A thorough Site Analysis was conducted to ensure planning and design concepts
More informationPotential Green Infrastructure Strategies May 6, 2015 Workshop
Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National
More informationFANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016
FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for
More informationCity of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street
Welcome City of Cornwall Municipal Class Environmental Assessment Proposed Improvement and Extension of Lemay Street Redevelopment and Design of the Municipal Works Yard Public Information Centre #1 Thursday,
More informationTOWN OF WHITBY REPORT RECOMMENDATION REPORT
TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Council REPORT NO: PL 95-09 DATE OF MEETING: October 13, 2009 PREPARED BY: Planning/Public Works Joint Report FILE NO(S): N/A LOCATION: N/A REPORT
More informationIOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014
IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational
More informationFort Edmonton Footbridge and Trails Project Design Phase
WELCOME TO Fort Edmonton Footbridge and Trails Project Design Phase OPEN HOUSE #2 Wednesday, November 21, 2007 4:00pm to 8:00pm Westridge Wolf Willow Community League Hall 505 Wolf Willow Road, Edmonton
More informationBURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING
BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING 1 PRESENTATION OUTLINE History of the Burton Station SGA Plan Changes since the Plan Adoption City Infrastructure Projects
More informationKankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016
Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment May 5, 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationWaverley West B Secondary Planning Process. Open House South Pointe School April 25, 2018
averley est B Secondary Planning Process South Pointe School April 25, 2018 averley est B Secondary planning process open house Please review the boards and provide your feedback. 1 The Role of a Secondary
More informationedmonton.ca/ribbonofgreen #ribbonofgreen
WHAT IS THE RIBBON OF GREEN? The Ribbon of Green is Edmonton s entire river valley and ravine system. The Ribbon of Green (2018) Project will provide strategic guidance for the southwest and northeast
More information112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH
112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG060310124909PGH C ontents Introduction 1 Project Overview 1 Public Involvement and Technical Coordination 4 Description
More informationWest Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons
West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project
More informationln the North Saskatchewan River Valley and Ravine System
ln the North Saskatchewan River Valley and Ravine System December 2000 Environmental Planning Corporate Planning and Policy Section Planning and Policy Services Branch RIVER VALLEY ENVIRONMENTAL REVIEW
More informationOpen Space Planning Capital Project Update
Information Report Service Area Public Services Date Friday, September 9, 2016 Subject Report Number Open Space Planning Capital Project Update PS-16-22 Executive Summary Purpose of Report The Parks and
More informationValley Line LRT. Project Update & Citizen Working Groups Overview Public At Large Recruitment Meeting Citizen Working Group A Downtown
Valley Line LRT Project Update & Citizen Working Groups Overview Public At Large Recruitment Meeting Citizen Working Group A Downtown Agenda Welcome & meeting purpose Project overview & status update Citizen
More informationProject Overview. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationTransportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018
Transportation Projects Quarterly Report Morrisville Planning Department May 22, 2018 Transportation Improvements Most Common Ways the Town secures transportation improvements: 1. Development 2. Grant
More informationUpdate. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)
Update JANUARY 2010 Neighbourhood Advisory Committee (NAC) ARTS AND CULTURE Gas Station Theatre BUSINESS Osborne Village BIZ Downtown BIZ COMMERCIAL PROPERTY OWNER Great-West Life COMMUNITY ORGANIZATIONS
More informationMunicipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study
Reconstruction of Regional Road 45 (Creek Road) Between Regional Road 27 (River Road) and Regional Road 63 (Canborough Road) in the Township of Wainfleet Municipal Class EA Study Public Information Centre
More informationWELCOME TO OPEN HOUSE # 3
Bayview Avenue Class Environmental Assessment Study Steeles Avenue to Elgin Mills Road WELCOME TO OPEN HOUSE # 3 Please sign in and join our mailing list Why Are We Here Tonight? Study Process and Purpose
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationExpo Line Transit Project. Project Status Update Meeting West End Corridor Segment C
Exposition Light Rail Transit Project Project Status Update Meeting West End Corridor Segment C Culver City Senior Center November 18, 2010 Phase 1 Project Description Phase 1 from Downtown Los Angeles
More informationWelcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m.
Welcome Mill Creek Ravine Pedestrian Bridges Rehabilitation Public Information Session #1 Thursday, October 27, 2016 5:00 8:00 p.m. Tonight you can: Learn about the rehabilitation of 5 pedestrian bridges
More informationSR-2 Freeway Terminus Improvement Project
SR-2 Freeway Terminus Improvement Project Welcome! Public Hearing, Mayberry Elementary June 16, 2009, 6:30 p.m. 8:30 p.m. Agenda 6:30 PM 6:50 PM Registration and Open House 6:50 PM 7:00 PM Welcome and
More informationRight-of-Way Acquisitions and Relocations Technical Memorandum
Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional
More information7.4 Maintenance and Storage Facility
Region of Waterloo Rapid Transit Project 7.4 Maintenance and Storage Facility A Maintenance and Storage Facility is required to support the LRT component of the RT system. These facilities typically include
More informationMinto In Kensington Open House. Thursday March 23, pm Hillhurst Sunnyside Community Association Ave NW
Minto In Kensington Open House Thursday March 23, 2017 6-8 pm Hillhurst Sunnyside Community Association 1320 5 Ave NW Project Background & Timeline Background Project Highlights Minto Communities continues
More informationWelcome to the. Open House
Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect
More informationFROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!
FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW Welcome! Meeting Agenda 6:00 PM Open House 6:30 PM Presentation 7:00 PM Open House / Q&A at the Boards Project Design Team Connecticut Avenue, NW Project
More informationNorthwest LRT Downtown to. Northwest Edmonton Study. Public Workshops
Northwest LRT Downtown to Northwest Edmonton Study Public Workshops March 23 & 24, 2010 Welcome Thank you all for attending Welcome Introductions Welcome Our Team s Commitment to You for Tonight To provide
More informationThe purpose of tonight s PIC is to:
The purpose of tonight s PIC is to: Provide an overview of the work completed to date and a summary of the Class EA process being followed; Provide a summary of public input received so far, including
More informationFDOT D4 Complete Streets
FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,
More informationInfrastructure Engineering Planning Construction Suite 300 Minneapolis, MN Tel: Fax:
Infrastructure Engineering Planning Construction 701 Xenia Avenue outh uite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 Memorandum To: Minnehaha Creek Watershed District Board From: Tony
More informationThe transportation system in a community is an
7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons
More informationMavis Road Class Environmental Assessment
Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in
More informationRidgewood Precinct Plan
June 20, 2011 PUBLIC OPEN HOUSE - COMMENT FORM RESULTS A public open house and workshop session were held on June 20, 2011 at the Charleswood United Church at 4820 Roblin Avenue. Approximately 400-500
More informationPort of Seattle Street Vacations Summary April, 2016
Port of Seattle Street Vacations Summary April, 2016 Since the question of street vacations provided to the Port was raised at the April 19 Sustainability and Transportation Committee, the Port is providing
More informationCOUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK
COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK Welcome! The purpose today is to: Present the Study Background; Describe Alignment Alternatives Analyzed; Present the Evaluation of
More informationWHAT IS THE PURPOSE OF THE OPEN HOUSE?
WHAT IS THE PURPOSE OF THE OPEN HOUSE? OPEN HOUSE PURPOSE The purpose of the open house is to provide an update on the study process and introduce the preliminary concept alternatives. The open house provides
More informationGuiding Principles for the SR 520 Replacement Project
Guiding Principles for the SR 520 Replacement Project Presentation to the Board of Regents Theresa Doherty Assistant Vice President for Regional Affairs May 18, 2006 F-14 The University of Washington is
More informationARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)
ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) Preliminary Design Report February 2015 Prepared For: City of Inver Grove Heights Dakota County Prepared By: Kimley-Horn and Associates,
More informationSOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE
WELCOME! SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE Monday, November 18, 2013 3:30 to 5:30PM and 7:00 to 9:00PM Tuesday, November 19, 2013 3:30 to 5:30PM and 7:00 to 9:00PM Welcome to the Southwest
More information14 October 10, 2012 Public Hearing APPLICANT: MPB, INC
14 October 10, 2012 Public Hearing APPLICANT: MPB, INC PROPERTY OWNER: MUNDEN & ASSOCIATES, LP STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-1 & AG-2 to Conditional O-2) ADDRESS
More informationNew York Avenue Streetscape and Trail Project Public Meeting #1 Summary
New York Avenue Streetscape and Trail Project Public Meeting #1 Summary I. King Jordan Student Academic Center (SAC) Gallaudet University, Washington, DC February 23, 2017 Table of Contents 1.0 Introduction...
More informationCentury Park to Ellerslie Road Preliminary Engineering
Century Park to Ellerslie Road Preliminary Engineering South LRT Extension Stakeholder Information Panel Brochure March 2010 www.edmonton.ca/lrtprojects LRT Station (left) and Transit Centre Architectural
More informationTONIGHT S PURPOSE INFORMATION SESSION CANORA & WEST JASPER PLACE SIDE STREETS CONCEPT PLANNING STUDY. Share draft side streets concept plan
TONIGHT S PURPOSE Share draft side streets concept plan INFORMATION SESSION Share information and answer questions Tuesday, December 1, 2015 Drop-In 5:30 8:00 PM West Jasper/Sherwood Community Hall TONIGHT
More informationCOMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING
COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,
More informationMARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012
MARINA BAY NEIGHBORHOOD PRESENTATION City of Richmond Officer Bradley A. Moody Memorial Underpass April 11, 2012 TEAM INTRODUCTIONS Project Oversight and Approval City of Richmond Formally Richmond Community
More informationPIKE PINE RENAISSANCE: ACT ONE. October 19, 2017
PIKE PINE RENAISSANCE: ACT ONE October 19, 2017 WATERFRONT SEATTLE PROGRAM PROJECT INTRODUCTION Pike and Pine streets, between First and Melrose avenues Pedestrian and streetscape improvements Budget:
More informationExecutive Summary. NY 7 / NY 2 Corridor
Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions
More informationPublic Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table
Public Open House Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table The Grand Avenue Extension Location and Environmental Study will determine the location of the extension of
More informationTRANSPORTATION & STREET DESIGN
TRANSPORTATION & STREET DESIGN Review of Goals Connect neighborhoods to Square Enable access to the river Improve pedestrian environment Reorient road network to local use Three Specific Areas of Intervention
More informationHolloway Green Street
Holloway Green Street SSIP Phase 1: Green Infrastructure Projects Presentation for the CAC Bicycle Subcommittee Thursday, August 22, 2013 Saed Toloui SSIP Green Infrastructure Project Manager 1 Sewer System
More information