6 PORTLAND RETIREMENT RESIDENCE
7 Approved Development 2 Congregate Care Facility 150 Suite (4 story) Retirement Residence 3 - Garage buildings & accessory buildings (one story) 102 Parking spaces 84%+ Landscape and Open Space
8 Revisde Color Site Plan - Replace 3 Lenity Architecture, Inc.
9 Revised Site Plan 4 Lenity Architecture, Inc.
10 Site Design Features 5 Building Changes The building has been located in the flatter portion of the site Finished floor elevation has been set so that the highest points of the structure would be roughly about the height of the natural vegetation. Building site grade will be cut to this elevation and keeps the height of the structure below the tree canopies to the west. Building location was chosen to maximize the separation from the existing surrounding developments and to minimize the amount of material that would need to excavated and potentially blasted onsite. Lenity Architecture, Inc.
11 Site Design Features 6 Site Changes Careful consideration was given to the on-site natural resources, minimizing the amount of land necessary for the development to only 4.93 acres of developed area utilized (less than 50% of the R-5A portion of the property) Site design also avoids impacts to any of the on-site wetlands leaving a large portion of the undeveloped R-5A zone area contiguous with the preserved area within the R-OS zone. The developer has coordinated with Portland Trails to execute an easement allowing public access through the developed port of the property to existing trails with the R-OS area. The location of the 3, one story garage structures have been reconfigured with one in the northerly parking lot, the second at the southerly end of the site and the third at the rear of the building on the southwesterly end of the site. The project will require a booster pump system to ensure that fire protection flows are met. Lenity Architecture, Inc.
12 Site Design Features 7 Stormwater The stromwater design maintains the natural drainage course through the development site, draining the western portion of the property and some areas from the adjacent Ocean Ridge Condominiums. This design has avoided using the main section of the drainage course for discharge of the site. We have chosen to use an underground sub surface sand filter for the southern portion of the development. This system will discharge closer to the section of the drainage course that flows to the east to Ocean Avenue. No wet pond needed, in its place we have proposed an under drained soil filter in lieu of discharges to the natural drainage course through the middle of the site. So, discharge will be managed via a spreader swale down slope of the access roadway. This will reduce the amount of flow that was previously designed to flow in the drainage course upslope and in back of the residences that front of Ocean Avenue. Lenity Architecture, Inc.
13 Site Design Features 8 Off Site Improvements This project will complete the missing link of sidewalk along Ocean Avenue from just north of Ashley Lane to sidewalk opposite the Ocean Ridge Condominiums, GAS SERVICE - We have coordinated with Unitil relative to the extension of the gas main that exists to the south on Ocean Avenue to determine the feasibility to extend the main to serve this project. We have also coordinated with some of the neighbors relative to this extension as many of the existing developments would also like the ability to be served by Unitil. Lenity Architecture, Inc.
14 Topographic Site Section 9 Lenity Architecture, Inc.
15 Entrance View from Ocean Ave 10
16 View to Entry 11
17 Front View - Open 12
18 Front View from Ocean Ave 13
19 South Side View - Open 14
20 South Side View 15
21 North Side View - Open 16
22 North Side View 17
23 Exterior Colors and Materials 18
24 Exterior Elevations 19
25 Exterior Details 20
26 Exterior Details 21
27 Exterior Details 22
28 Exterior Details 23
29 Site Plan Process for 802 Ocean Ave 24 Site Plan (Building Design) Meetings and Hearings: Staff Review Neighborhood Meeting 10/8/15 Planning Board Workshop 10/27/15 Planning Board Public Hearing and Vote Date TBD Lenity Architecture, Inc.
30 PORTLAND RETIREMENT RESIDENCE
Urban Planning and Land Use
Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning
More informationTown of Windham. Planning Department 8 School Road Windham, ME voice fax
Town of Windham Planning Department 8 School Road Windham, ME 04062 voice 207.864-5960 fax 207.892.1916 MEMO DATE: TO: Staff Review Committee FROM: Amanda Lessard, Planner Cc: Ellen Rathbone, St. Germain
More information9 th Street Sub Area Plan
9 th Street Sub Area Plan In the 1990 s, when the Township prepared the last Master Plan, the 9 th Street corridor was studied as part of a larger 9 th Street Focus Area that included the West Main Street
More informationOPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN
OPPORTUNITIES AT OXBOW EXISTING WETLANDS Site is undeveloped and we can design a park that works well from the start. SAND BEACH Potential to eliminate invasive species. DEBRIS (CONCRETE, OLD CARS) VEGETATION
More informationAsbury Chapel Subdivision Sketch Plan
Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential
More informationMarch 15, 2017 Project:
March 15, 2017 Project: 161.06121 Maureen O Meara, Town of Cape Elizabeth 320 Ocean House Road P.O. Box 6260 Cape Elizabeth, Maine 04107 SUBJECT: Maxwell Woods Condominium Development Major Subdivision
More informationMcDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014
Introduction / Written Statement McDonald s Restaurant - Purcellville McDonald s Corporation is proposing to redevelop the existing McDonald s eating establishment with a drive-through located at 121 N
More informationADMINISTRATION RECOMMENDATION(S) 2016 November 03. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.
Page 1 of 7 EXECUTIVE SUMMARY This Land Use Amendment application seeks to redesignate a portion of the parcel from Industrial General (I-G) District to Special Purpose City and Regional Infrastructure
More informationNORTH BETHANY ELEMENTARY SCHOOL SITE ASSESSMENT
NORTH BETHANY ELEMENTARY SCHOOL SITE ASSESSMENT Prepared for: Prepared by: October 10, 2014 Page 2 Introduction and Purpose This report provides an assessment of two potential sites for a new elementary
More informationCity of Lafayette Study Session Staff Report Design Review Commission
++ City of Lafayette Study Session Staff Report Design Review Commission Meeting Date: January 08, 2018 Staff: Subject: Chris Juram, Planning Technician SS12-17 Miramar Homebuilders, R-20 Zoning: Request
More informationIV. Development Standards
IV. Development Standards Seattle Children s proposes development standards to govern physical development within the MIO boundaries. As a supplement to the proposed development standards, Children s proposes
More informationAMEND DMENT H HOSPITAL
AMEND DMENT TO LAND USE PLAN ELEMENT VILLAGE OF RIDGEWOOD MASTER PLAN H HOSPITAL ZONE DISTRICT Village of Ridgewood Planning Board February 28, 2014with technical revisions from June 9, 2014 Planning Board
More informationCity of Lafayette Study Session Staff Report Design Review Commission
City of Lafayette Study Session Staff Report Design Review Commission Meeting Date: April 24, 2017 Staff: Payal Bhagat, Senior Planner Subject: HDP18-15 & HDP31-15 Ramesh Patel & Melcor Development (Owners),
More informationPHASE III DRAINAGE REPORT
PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village
More informationVISION AND GUIDING DESIGN PRINCIPLES
pleasure point commercial corridor VISION AND GUIDING DESIGN PRINCIPLES Public Draft November 26, 2018 County of Santa Cruz with assistance from MIG CONTENTS PART I: INTRODUCTION AND VISION... 3 Community
More informationProposed Walkability Ordinance for City of Knoxville (6/16/17)
Proposed Walkability Ordinance for City of Knoxville (6/16/17) New or revised text is highlighted Section 1: Purpose The purpose of this ordinance is to set requirements for walkability and pedestrian
More informationCivic Center District
Civic Center District The Civic Center district is the civic and social heart of Warrenville, containing such public buildings as the City Hall, Warrenville Public Library, Police Station, Park District
More informationThe transportation system in a community is an
7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons
More informationSECTION 39. Title V, Chapter 6, Article 2, added to the Zoning Code of Sacramento County shall read as follows: GREENBACK LANE SPECIAL PLANNING AREA
SECTION 39. Title V, Chapter 6, Article 2, added to the Zoning Code of Sacramento County shall read as follows: GREENBACK LANE SPECIAL PLANNING AREA 506-20. INTENT. It is the intent of the Board of Supervisors
More informationResponse to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo)
Environmental Science & Assessment, LLC MEMORANDUM DATE: August 13, 2010 TO: Oregon City Planning CC: Jill Long Lane Powell FROM: RE: Jack Dalton Response to Comments (July 28, 2010 Oregon City Determination
More informationI. VISUAL/AESTHETICS/NEIGHBORHOOD CHARACTER. b. Existing Conditions Views from Kimball Avenue
I. VISUAL/AESTHETICS/NEIGHBORHOOD CHARACTER 1. Existing Conditions a. View Of The Site From Area Roads Figures IV.I-2, I-3 and I-4 depict existing views from the Cross County Parkway, Central Park Avenue,
More informationErrol Heights Park and Community Garden Frequently Asked Questions March 22, 2018
Errol Heights Park and Community Garden Frequently Asked Questions March 22, 2018 Question 1: What improvements are planned for Errol Heights Park? How will the community be engaged in the process to shape
More informationThird Ave CSO Integrated Green Infrastructure
Third Ave CSO Integrated Green Infrastructure Neil Myers Williams Creek Consulting OWEA Annual Conference June 2013 For growing municipalities to be perceived as world class communities, each must move
More informationPRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS
This checklist must accompany your submittal as the cover page. CONDITIONAL USE Application Submittal Checklist for PRELIMINARY AND FINAL APPROVAL Per Winter Park Land Development Code Sec. 58-90 PRELIMINARY
More informationTen Mile Creek Planning Area
PLANNING AREA POLICIES TEN MILE CREEK Ten Mile Creek Planning Area Location and Context The Ten Mile Creek Planning Area ( Ten Mile Creek area ) is located south of the current Boise AOCI, generally south
More informationA P P E N D I X D. Project Stormwater Plan Worksheets
A P P E N D I X D Worksheets for Section 1: Basic Project Information This worksheet must be filled out for all projects required to implement the 2015 Post- Construction Stormwater Standards Manual. A
More information124 Subarea Visions. Vision Plan. A. Nelessen Associates, INC I Visioning I Planning I Urban Design
Subareas 124 Subarea Visions The next seven sections describe specific recommendations tailored to each subarea. Each subarea is discussed separately except for certain aspects of 95th Street and Antioch
More informationHarmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021
ITEM NO FDP #130021 MEETING DATE July 23, 2013 STAFF Pete Wray ADMINISTRATIVE TYPE I HEARING STAFF REPORT PROJECT: APPLICANT: OWNER: Harmony Technology Park Third Filing, Second Replat Custom Blending,
More informationR E S O L U T I O N. 2. Development Data Summary:
R E S O L U T I O N WHEREAS, the Prince George s County Planning Board has reviewed Departure from Design Standards DDS-631 requesting a departure to allow the loading space and the driveway to the loading
More informationPLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017
PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017 DEVELOPMENT NAME LOCATION Mobile Christian School 5900 Cottage Hill Road (North side of Cottage Hill Road, 230 ± West of Freemont Drive
More informationPlay areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.
City of Thornton Parks & Open Space Cherrywood Park Thornton, CO Architect: Design Concepts Construction of this seven-acre City park, located adjacent to Adams Twelve Five Star Prairie Hills Elementary
More information2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan
DRAFT Gerald Richards & Pleasantview Park Master Plan 19 Historic Features According to the National Register of Historic Places and the National Historic Landmarks Program, there is nothing of national
More informationWESTERN ILLINOIS UNIVERSITY
WESTERN ILLINOIS UNIVERSITY Quad Cities Riverfront Campus Master Plan March 1, 2006 Preliminary Master Plan Total Site Build Out Western Illinois University Quad Cities Municipal Park Mississippi River
More informationCity of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01
City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership
More informationF. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and
1102 DESIGN REVIEW 1102.01 PURPOSE AND APPLICABILITY Section 1102 is adopted to provide standards, criteria, and procedures under which design review may be approved. Design review is required for: A.
More informationCONSENT CALENDAR CITY PLANNING COMMISSION AGENDA ITEM NO: A.1, A.2 STAFF: LARRY LARSEN
Page 8 CONSENT CALENDAR CITY PLANNING COMMISSION AGENDA ITEM NO: A.1, A.2 STAFF: LARRY LARSEN FILE NO: CPC PUZ 14-00013 - QUASI-JUDICIAL FILE NO: CPC PUD 14-00014 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER:
More informationDescription of Preferred Alternative
Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative
More informationIntroduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management
Introduction to Low Impact Development Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management http://hawaii.gov/dbedt/czm/resource/publication.php A Comprehensive
More informationRoute 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347
The GREENING of Route 347 The Greening of Route 347 The Greening of Route 347: History 3 The Greening of Route 347 4 The Greening of Route 347 5 The Greening of Route 347 Smith Haven Mall 6 The Greening
More informationARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)
ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) Preliminary Design Report February 2015 Prepared For: City of Inver Grove Heights Dakota County Prepared By: Kimley-Horn and Associates,
More informationSUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing
SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY Board of County Commissioners Public Hearing March 20, 2018 Presentation Overview Study Overview Existing Conditions Project Development Plan Public Involvement
More informationNORTH DISTRICT. Description
VI plan and major recommendations district plans north disrict NORTH DISTRICT Description The North District comprises approximately 105 acres and is bounded by two important bio-habitats and corridors
More information14 October 10, 2012 Public Hearing APPLICANT: MPB, INC
14 October 10, 2012 Public Hearing APPLICANT: MPB, INC PROPERTY OWNER: MUNDEN & ASSOCIATES, LP STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-1 & AG-2 to Conditional O-2) ADDRESS
More informationGarden edges provide vertical plantings to buffer the neighbors from the building facilities around the entire campus.
Open Space Existing Open Space Children s intends to maintain the landscape as a garden around the campus to help children heal while providing spaces for visitors, caregivers, staff and neighbors. Children
More informationAWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT
AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT MAY 8, 2014 The Planning and Development Department hereby forwards to the Planning
More informationCITY OF CLEVELAND GREEN DESIGN GUIDELINES
CITY OF CLEVELAND GREEN DESIGN GUIDELINES SEPTEMBER 18, 2008 PROJECT COMPLIANCE PATH: 1. Approved master plan 2. Approved design district boundaries 3. Approved district design guidelines, Green design
More informationNotice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project
of an Environmental Impact Report and Scoping Meeting for the As the Lead Agency, the County of San Mateo (County) will prepare an Environmental Impact Report (EIR) for the (project), and would like your
More informationHEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT
INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.
More informationCentury Highfield Sub Area Plan
Century Highfield Sub Area Plan The Century Highfield Sub Area Plan provides an opportunity to re evaluate the vision that was set forth for this area when the Township conducted a similar planning exercise
More information1. Golf Course Residential Single Family and Townhome Community
DEIS Section II Project Description II. Project Description A. Location The Villages of Chestnut Ridge Project is being proposed on a 198.3 acre site within the Village of Bloomingburg in the Town of Mamakating,
More information14825 Fruitvale Ave.
REPORT TO THE PLANNING COMMISSION Meeting Date: August 26, 2015 Application: PDR14-0017 Location/APN: 14825 Fruitvale Ave. / 397-18-028 Applicant/Owner: Staff Planner: Sin Yong Michael Fossati 14825 Fruitvale
More informationTENTATIVE MAP CHECKLIST
Business License 707.648.4357 www.cityofvallejo.net Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Building 707.648.4374 Planning 707.648.4326 TENTATIVE MAP CHECKLIST Public Works/Engineering
More informationOP Council Resolution June 16, Planning and Development Services
OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership
More informationEXISTING COMPREHENSIVE PLAN
EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an
More informationRESIDENTIAL GUIDELINES CHECKLIST
RESIDENTIAL GUIDELINES CHECKLIST The following checklist was created to provide you with an easy way to ensure that your project complies with the Residential Design Guidelines. RESIDENTIAL DESIGN GUIDELINES
More informationLogan Square Open Space Plan. Recommendations: 1. New Campus Parks TBD Mozart Elementary School Drummond Elementary School
Key Recommendations Recommendations: New Open Spaces Acres 1. New Campus Parks TBD Mozart Elementary School Drummond Elementary School 2. Improve and Expand Palmer Square 0.5 3. New Logan Gateway Parks
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION William H. Farquhar Middle School Modernization MCPB Item No. 10 Date: 09-18-2014 Description Summary Fred
More informationCITY OF DAYTON Meeting Date: PLANNING COMMISSION
CITY OF DAYTON Meeting Date: 3-8-18 PLANNING COMMISSION Item: B ITEM: Application by North Diamond Investment, LLC. for Concept Plan Review - Cloquet Island Estates APPLICANTS/PRESENTERS: North Diamond
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward
More informationREQUEST FOR COUNCIL ACTION 6A AGENDA ITEM
DATE REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL Community Development PUD Concept & Development Stage Plan Preliminary Plat & Final Plat PREVIOUS
More informationLong Branch-Wayne Local Park Renovation Project
Montgomery Parks Long Branch-Wayne Local Park Renovation Project Community Meeting #2 September 20, 2016 Oak View Elementary School 7:00-9:00 PM Welcome / Team Introductions M-NCPPC (Montgomery Parks)
More informationSTORMWATER - GENERAL NOTES
STORM DRAINAGE CONSTRUCTION NOTES. All storm sewer pipe shall be reinforced concrete. 2. Storm drainage pipes shall be a minimum of fifteen (5) inch diameter (5" for short lateral runs only - up to 75
More informationParker Pine Curve Master Plan January 28th, 2009, Public Workshop Comments
Group 1 Big Ideas Pedestrian friendly within and to development - bridge over Main Street from downtown. Campus feel. Parking garage like Castle Rocks - Taj garage may be tucked in hillside. Large (big
More informationEXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS
EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS Name of Project: Poulsbo Meadows; A Planned Residential Development (PRD)/Plat Applicants Name: PBH Group LLC/Byron Harris PO Box 1010 Silverdale, WA 98038 Description
More informationPlanning Commission Staff Report Project Plan Approval Hearing Date: June 14, 2017
Planning Commission Staff Report Project Plan Approval Hearing Date: June 14, 2017 ITEM 3 Peter Matson requests Project Plan Approval for an 80-acre mixed-use plan that includes 220 residential units and
More informationGeneral Location Courtyard at LMH Final Development Plan and Final Plat
R-1 LEYDEN RIDGE LOMA RIDGE LOBDELL R-3 MILLER PARKWAY LAUSSAC Subject Property R-3 LOCHENSHIRE LESMER R General Location Courtyard at LMH Final Development Plan and Final Plat ¹ 230 115 0 230 Feet Airport
More information4 LAND USE DESIGNATIONS
4 LAND USE DESIGNATIONS Chapter 4 describes the land use designations and densities that will implement the development vision for North Burlingame outlined in Chapter 3. Land use densities are described
More information2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:
Lakeside Business District Lakeside Business District Land Use Categories: Campus Commercial Campus Commercial means a mixture of uses which includes corporate offices, office parks, hotels, commercial,
More informationThe subject site plan amendment proposes the following revisions to the approved site plan:
PROPOSED AMENDMENT The subject site plan amendment proposes the following revisions to the approved site plan: 1. The building footprint was modified to accommodate the revised architectural design. 2.
More informationNeighborhood One. Location. Existing Land Use
Neighborhood One Location Neighborhood One is bounded by Route 29 North on the east, Hydraulic Road on the south, (and a small area to the south of Hydraulic Road), the South Fork Rivanna River reservoir
More informationE. RURAL COMMERCIAL/INDUSTRIAL PARK MODEL
E. RURAL COMMERCIAL/INDUSTRIAL PARK MODEL 1. PURPOSE The purpose of the Rural Commerce/Industrial Park Model is to provide parameters within which a grouping of business buildings with parking, loading
More informationMEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan
Department of Community Planning & Economic Development 50 South 4th Street, Room 300 Minneapolis, MN 5545-385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,
More informationCITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To: From:
CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM To: From: Subject: Date: Planning Board Juliet T.H. Walker, Planning Director Jillian Harris, Planner 1 Staff Recommendations for the August 23, 2018 Planning
More informationTransportation. Strategies for Action
Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;
More informationGold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan
Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated
More informationPLANNING COMMISSION REPORT Public Hearing Item FINAL DEVELOPMENT PLAN FOR BAUER FARM; XPRESS WELLNESS URGENT CARE; 4700 OVERLAND DR (MKM)
PC Staff Report 06/22/15 FDP-15-00108 Item No. 6-1 PC Staff Report 06/22/2015 ITEM NO. 6 PLANNING COMMISSION REPORT Public Hearing Item FINAL DEVELOPMENT PLAN FOR BAUER FARM; XPRESS WELLNESS URGENT CARE;
More informationBOULEVARD AND PARKWAY STANDARDS
88-323 BOULEVARD AND PARKWAY STANDARDS 88-323-01 PURPOSE Considerable public and private investment exists and is expected to occur adjacent to boulevards and parkways within the city. The following standards
More informationRESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE
RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE DEVELOPMENT TEAM DONEGAL SOUTH Maple Grove, Minnesota March 27, 2017 Applicant/Developer/Builder:
More informationSHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm
SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, 2010 6:00 pm - 8:00 pm 1 Project Area 2 Sheridan Parking Structure RTD Ownership 3 Project Elements Structure and amenities include: 1.
More informationCASE STUDIES IN C3 PROJECT MANAGEMENT. Mike Campbell, AICP, CPSWQ
CASE STUDIES IN C3 PROJECT MANAGEMENT Mike Campbell, AICP, CPSWQ Presentation Agenda Presidio El Camino C.3 Design Concept Architectural Issues Landscape Integration/Adaptation Samaritan Medical Office
More informationREQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)
Rezoning Petition 2016-117 Zoning Committee Recommendation January 4, 2017 REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional) LOCATION
More informationPennsy Greenway Trail
Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad
More informationPreservation & Design Awards
EVANSTON PRESERVATION COMMISSION Preservation & Design Awards 2018 Nomination Form The Evanston Preservation Commission is pleased to call for nominations for the 2018 Evanston Preservation & Design Awards.
More informationC-I-10. The effect of establishing a comprehensive site review as follows will: B. Reduce the cluttered aspects of current development by:
C-I-10 PART C SECTION I ARTICLE 10 GENERAL REGULATIONS PROJECT SITE REVIEW I. Purpose The effect of establishing a comprehensive site review as follows will: A. Protect streetscapes from projects that
More informationA G E N D A Council Update Training Room September 26, :45 p.m.
CITY OF THORNTON CITY MANAGER S OFFICE A G E N D A Council Update Training Room September 26, 2017 5:45 p.m. A. Boards and Committees Reports (Estimated 20 Minutes) 1. Rangeview Library District Meeting
More informationCase Martin Luther King Drive and 212 and 216 North 6 th Street
Case 93 Applicant: Owner: Request: Location: Zoning: Stable Family Investment, LLC Same Site Plan Approval for the District on Martin Luther King a 6 unit, 4-bed residential condominium development 35
More informationBASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016
Background BASMAA Development Committee Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program s May 6, 2016 In the recently reissued Municipal Regional Stormwater
More informationA. OVERVIEW OF ENVIRONMENTAL SETTING
IV. A. OVERVIEW OF The proposed site is comprised of three parcels totaling approximately 4.24 acres, situated southwesterly of the intersection of Weyburn and Tiverton Avenues. Parcel A is 2.72 acres
More informationGrand River Ravines Georgetown Township
Grand River Ravines Georgetown Township Project Description: The Grand River Ravines County Park property is composed of the 68-acre former Fillmore at the Bend Open Space purchased in 1999 and two more
More informationAvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation
AvalonBay Communities + BRIDGE Housing Mission Housing Habitat for Humanity Pacific Union Development Corporation Tonight s Agenda Recap of discussion from last CAC meeting Updates on meetings with Stakeholders
More informationNew High School Concept
Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide
More informationChapter 3 Site Planning and Low Impact Development
CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),
More informationCHEBOYGAN COUNTY PLANNING COMMISSION
CHEBOYGAN COUNTY PLANNING COMMISSION 870 SOUTH MAIN ST. PO BOX 70 CHEBOYGAN, MI 49721 PHONE: (231)627-8489 FAX: (231)627-3646 CHEBOYGAN COUNTY PLANNING COMMISSION MEETING & PUBLIC HEARING WEDNESDAY, NOVEMBER
More informationAWR Engineering, LLC
AWR Engineering, LLC Alaska Water Resources Memorandum To: Kirsti Bischofberger, Watershed Manager, Municipality of Anchorage From: Janie Dusel, PE Date: February 3, 2017 Re: 2016 Low Impact Development/Green
More informationMASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS
MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct
More informationRiver Corridor Overlay Zone (RCOZ) Article 5
River Corridor Overlay Zone (RCOZ) Article 5 The site is in one of two designated districts. The first is the CBD (central business district) River District, which recognizes the urban character and unique
More informationImportance of Master Planning Marcy Colclough
Importance of Master Planning Marcy Colclough Senior Planner Southwest Michigan Planning Commission WHERE and HOW we develop Land affects Water Quality! 43.2 Acres total 20 Homes 35.8 Acres of open space
More informationVintage at Kings Canyon Conceptual PUD. Prepared by:
Vintage at Kings Canyon Conceptual PUD Prepared by: June 7, 2016 Vintage at Kings Canyon Conceptual PUD Prepared for: Vintage at Kings Canyon, LP Prepared by: Rubicon Design Group, LLC 100 California Avenue,
More informationRe: Application Type: Proposed Highlands Redevelopment Area Designation
CHRIS CHRISTIE Governor KIM GUADAGNO Lt. Governor State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205
More informationSTORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO
STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me
More information