PUBLIC ART PROGRAM ANNUAL REPORT 2008/2009

Size: px
Start display at page:

Download "PUBLIC ART PROGRAM ANNUAL REPORT 2008/2009"

Transcription

1 PUBLIC ART PROGRAM ANNUAL REPORT 2008/2009

2 Completed Projects Feather River Dog Park Joe Scarpa Sacramento, CA Iloilo Sister City Park Joe Kinkel

3 Completed Projects Michael Faklis Park Scott Runion- Stockton, CA Hammer Lane Phase III A Gary Carlos- Stockton, CA

4 Completed Projects Fire Station Number 7 Pauline Tolman - Sacramento Fire Station Number 13 Peig Fairbrook - Stockton

5 Completed Projects Arnold Rue Community Center Mary Josephson Highway 99 at Hammer Lane Brian Canevari

6 Completed Projects Stribley Community Center Tony Natsoulas Airport Way Gateway Sculpture Gateway Icon Roger Stoller

7 Completed Projects The Joan Darrah Promenade Project: Airborne Kinetic sculpture - Moto Ohtake Pavement enhancements - Dan Snyder

8 Completed Projects The Joan Darrah Promenade Project: Stair railings, camera covers and bike racks - Eric Powell 5 kinetic sculptures - Mark White

9 Projects In Progress Airport Way - Garfield School Gym Renovation Plaza Horace Washington: Circular mosaic tile insets into the entryway plaza will show waterway maps to the Delta between Stockton and San Francisco. Status: under construction, to be installed Winter/Spring 2010 El Dorado Bridge Railing Enhancements - Treasure Ships Susan Cooper: Phase II of the El Dorado Street Beautification project will include the replacement of the old chain link fence on the bridge, with a ship s prow designed railing, reminiscent of the shipping which predominated in the Delta history and the Gold Rush era. Status: Done and in storage. The Joan Darrah Promenade Project - Banners, Gateway Finials, and Benches Wayne Chabre: All art projects will be integrated with the design of the Marina and coordinated by Power Engineering, Gamboni Landscape Architects and the Public Art Manager. Status: pending

10 Projects In Progress Thornton Road Widening - Transcending Vessel Michael Clapper: Three vessels representing past, present and future Waterway travel of the Delta, will be mounted on tall Steel tule reeds and connected by a steel ribbon of water. These will be sited on the porkschop at Estate and Thornton. Status: Installations expected late 2010 Davis Road Bridge at Pixley Slough- Bridge Railings Eric Powell: Railings designs for the bridge over Pixley Slough will feature historic farm tools and implements used in this area. Status: Installation date to be determined I-5 French Camp Interchange Project Steven Weitzman: Design team commission for underpass and overpass art elements. Designs will include topographical Delta water way designs and regional flora and fauna designs on the wing walls. This project may include revolutionary wind turbine power generators, if the proposal is satisfactory to the COS. Status: Installation will occur late in construction phase

11 Projects In Progress North Stockton Railroad Underpass & Bridge Replacement Project Vicki Scuri: Design team commission for five individual projects within the design plan for the Eight Mile Road improvements. Design will be in development for approximately three years. Artists work will be integrated with engineering and landscape design. Status: Construction Documents Hammer Lane Improvement Phase IIIB- The Great Combine Wayne Chabre: A sculpture project representing a fantasy vehicle based on a fire engine, harvest combine, delta paddle boat. To be installed at the porkchop area of Alexandria and Hammer Lane. Contract completed January Status: Installation expected late 2010 early 2011.

12 2009/2010 Projects Decarli Plaza - Anchored

13 2009/2010 Projects Decarli Plaza - Anchored - In May 2004 council approved $125,000 request for artist proposal. Artist and concept selected however project did not move forward. - In 2009 PAAC issues a new RFP with revised budget of $225,000, twelve artist applied. Four finalist were selected to submit design proposals. After two rounds of proposals, the jury selected Diana Pumpelly Bates and Steve Petrushka as the artist for DeCarli Plaza. - PAAC has accepted the recommendation and has included this project in the 2009/2010 Annual Art Plan. - Action: Council to approve and accept both the Annual Art Plan and $225,000 contract for construction of Public Art installation at DeCarli Plaza. - Funding from Public Art Fund.

14 2009/2010 Projects Mural Project - Two Mural Projects not to exceed $100,000 - Murals will enhance underpasses which are now dark and prone to graffiti. - Underpass being considered by PAAC are Martin Luther King Jr. Blvd (between Stanislaus and Airport),Miner, and Wilson Way at Hazelton. - To be financed by the Public Art Pooled funds account. Status: Expected RFP to be issued summer Installation fall/winter 2010.

15 Recommendations Adopt the Annual Public Art Plan prepared by the Public Art Advisory Committee and approved by the Stockton Arts Commission. Adopt a resolution awarding a contract in the amount of $225,000 to Diana Pumpelly Bates and Steve Petrushka to design, fabricate, and install the public art project at Dean DeCarli Plaza as recommended by the Public Art Advisory Committee.

Roosevelt Corridor. R e i n v e s t m e n t P l a n. Public Meeting Gilbert Elementary School May 12, :00 pm

Roosevelt Corridor. R e i n v e s t m e n t P l a n. Public Meeting Gilbert Elementary School May 12, :00 pm Roosevelt Corridor R e i n v e s t m e n t P l a n Public Meeting Gilbert Elementary School May 12, 2009 6:00 pm Agenda 6:00 6:10 6:25 6:40 6:55 7:00 Opening Comments Councilwoman Jennifer V. Ramos District

More information

PROJECTS AND THE PUBLIC ART MASTER PLAN

PROJECTS AND THE PUBLIC ART MASTER PLAN MEMO TO: PUBLIC ART STEERING COMMITTEE MEMBERS FROM: SHARI COOPER, DEVELOPMENT PROJECT COORDINATOR DATE: FEBRUARY 24, 2017 SUBJECT: AGENDA ITEM 5.A: PUBLIC ART PROJECT FOR 2017-18 BACKGROUND One of the

More information

Public Art Guidelines And Public Art Donation Program

Public Art Guidelines And Public Art Donation Program Public Art Guidelines And Public Art Donation Program Adopted by City Council Resolution No. 3787 October 12, 2004 Ordinance No. 557 October 26, 2004 Amended by City Council Resolution No. 4411 November

More information

Monday, September 14, :00 A.M. AV 201 Conference Room AGENDA

Monday, September 14, :00 A.M. AV 201 Conference Room AGENDA SAN JOAQUIN COUNTY MULTI-SPECIES HABITAT CONSERVATION AND OPEN SPACE PLAN HABITAT TECHNICAL ADVISORY COMMITTEE MEETING & HTAC FINANCIAL SUB-COMMITTEE MEETING San Joaquin Council of Governments Regional

More information

Main Street Conversion Site

Main Street Conversion Site Main Street Conversion Site Borough of Brooklyn, New York Preliminary Presentation Park Expansion Design & Development Committee 13 September 2012 Michael Van Valkenburgh Associates, Inc. Landscape Architects,

More information

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer DATE: January 19, 2016 TO: FROM: THROUGH: SUBJECT: WCA Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer Item 18: Consideration of a resolution to approve contract amendment

More information

Cultural Arts & Marketing Department of Economic & Workforce Development

Cultural Arts & Marketing Department of Economic & Workforce Development Cultural Arts & Marketing Department of Economic & Workforce Development ITEM VII AGENDA REPORT To: Public Art Advisory Committee Attn: Kevin Chen and Judy Moran, Co-chairs From: Steven Huss, Cultural

More information

CALL TO ARTISTS REQUEST FOR QUALIFICATIONS STart PUBLIC ART PROGRAM

CALL TO ARTISTS REQUEST FOR QUALIFICATIONS STart PUBLIC ART PROGRAM CALL TO ARTISTS REQUEST FOR QUALIFICATIONS STart PUBLIC ART PROGRAM DOWNTOWN TACOMA GATEWAY ARTWORK Sound Transit s Public Art Program (STart) is seeking an artist or artist team to create a site-responsive

More information

Call to Artists Public Art for Los Angeles Metro Stations

Call to Artists Public Art for Los Angeles Metro Stations Conceptual Design for Call to Artists Public Art for Los Angeles Metro Stations Artesia Transit Center Union Station/Patsaouras Transit Plaza Los Angeles County Metropolitan Transportation Authority February

More information

TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE

TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE BACKGROUND (DEVELOPMENT PROJECT OVERVIEW) The Treasure Island Development is an approved 405-acre redevelopment project on Treasure Island

More information

SMUD Utility Commissions Original Architect, Dreyfuss + Blackford, to Renovate and Expand Historic Sacramento Mid-Century Headquarters

SMUD Utility Commissions Original Architect, Dreyfuss + Blackford, to Renovate and Expand Historic Sacramento Mid-Century Headquarters SMUD Utility Commissions Original Architect, Dreyfuss + Blackford, to Renovate and Expand Historic Sacramento Mid-Century Headquarters Modernist landmark will be revised and preserved with progressive

More information

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ) Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ) The Project The Ashland Public Art Commission (PAC) seeks an artist, or artist team, to develop a site specific, permanent,

More information

Welcome to the Sellwood Bridge Project Pre-Construction Open House

Welcome to the Sellwood Bridge Project Pre-Construction Open House Welcome to the Sellwood Bridge Project Pre-Construction Open House 5:30 7:30 p.m. Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting

More information

7-PARKS, OPEN SPACE & PUBLIC ART

7-PARKS, OPEN SPACE & PUBLIC ART 7-s, Open Space & Public Art 7-PARKS, OPEN SPACE & PUBLIC ART This chapter provides recommendations for the expansion of new parks, plazas and open space that serve the many user groups targeted for downtown.

More information

Status Report for Parks and Recreation Capital Projects

Status Report for Parks and Recreation Capital Projects Attachment #2 Town of Chapel Hill Status Report for Parks and Recreation Capital Projects Prepared by Bill Webster, Assistant Director Chapel Hill Parks & Recreation Department March 19, 2009 1. Athletic

More information

Dequindre Cut Greenway Phase II North Strategic Plan. Executive Summary

Dequindre Cut Greenway Phase II North Strategic Plan. Executive Summary Dequindre Cut Greenway Phase II North Strategic Plan Executive Summary May 2009 Report prepared for: Economic Development Corporation of the City of Detroit Report funded by: Community Foundation for Southeastern

More information

Special Revenue Funds

Special Revenue Funds Special Revenue Funds Special Revenue Funds account for the proceeds of specific revenue sources (other than special assessments for major capital projects) that are legally restricted to expenditures

More information

City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21,

City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21, City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21, 2016 2016 2017 Activity Date March April May June July August September October November December

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

REVIEW AND APPROVAL OF FINAL ART PLAN FOR THE SIERRA MADRE VILLA CORRIDOR PUBLIC ART PROJECT

REVIEW AND APPROVAL OF FINAL ART PLAN FOR THE SIERRA MADRE VILLA CORRIDOR PUBLIC ART PROJECT TO: FROM: SUBJECT: Honorable Mayor and City Council Planning & Community Development Department REVIEW AND APPROVAL OF FINAL ART PLAN FOR THE SIERRA MADRE VILLA CORRIDOR PUBLIC ART PROJECT RECOMMENDATION:

More information

CONSENT CALENDAR September 27, 2005

CONSENT CALENDAR September 27, 2005 Office of the Executive Officer September 27, 2005 To: From: Submitted By: Subject: Honorable Chairperson and Members of the Redevelopment Agency Phil Kamlarz, Executive Officer Dan Marks, Director, Planning

More information

3.0 Cumulative Scenario and Methodology. 3.0 Cumulative Scenario and Methodology

3.0 Cumulative Scenario and Methodology. 3.0 Cumulative Scenario and Methodology 3.0 Cumulative Scenario and Methodology Under the CEQA Guidelines, a cumulative impact consists of an impact which is created as a result of the combination of the project evaluated in the environmental

More information

REPORT TO COUNCIL City of Sacramento

REPORT TO COUNCIL City of Sacramento REPORT TO COUNCIL City of Sacramento 5 9151 Street, Sacramento, CA 95814-2604 www.cityofsacramento.org CONSENT May 4, 2010 Honorable Mayor and Members of the City Council Title: Contract: Rea Park Improvements

More information

Public Art Component - Guildford Aquatic Centre. The Parks, Recreation and Culture Department recommends that Council:

Public Art Component - Guildford Aquatic Centre. The Parks, Recreation and Culture Department recommends that Council: NO: R225 COUNCIL DATE: October 22, 2012 REGULAR COUNCIL TO: Mayor & Council DATE: October 18, 2012 FROM: General Manager, Parks, Recreation and Culture FILE: 7800-01 SUBJECT: Public Art Component - Guildford

More information

Clarendon Park Framework Plan. Chicago Park District Department of Planning & Development June 7, 2008

Clarendon Park Framework Plan. Chicago Park District Department of Planning & Development June 7, 2008 Clarendon Park Framework Plan Chicago Park District Department of Planning & Development June 7, 2008 1 Table of Contents Framework Plan Purpose.3 Radius Map one mile.4 Aerial Map...5 Existing Park Layout.6

More information

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018 Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting El Paso, TX April 11, 2018 Coalition Key Stakeholders Texas Department of Transportation New Mexico Department of Transportation

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

Wilmington Waterfront Overview

Wilmington Waterfront Overview Agenda Introduction Wilmington Waterfront Overview and Objectives Avalon Promenade & Gateway Project Description Site Layout Project Components Entry Plaza Avalon Promenade and Open Space Pedestrian Bridge

More information

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1 W&OD PARK MASTER PLAN Adopted XXX-XX-XXXX The City s Greenest Street DRAFT W&OD Trail Master Plan v4.docx Page 1 Introduction and Purpose The Washington & Old Dominion Railroad Regional Park (W&OD) (which

More information

Greenway. Two Rivers. Design Guidelines and Signage Plan. Broome County. Tioga County. Prepared For: The Binghamton Metropolitan Transportation Study

Greenway. Two Rivers. Design Guidelines and Signage Plan. Broome County. Tioga County. Prepared For: The Binghamton Metropolitan Transportation Study Broome County Two Rivers Greenway Design Guidelines and Signage Plan Tioga County Prepared For: The Binghamton Metropolitan Transportation Study Prepared By: 2012 This project is included in the 2011-2012

More information

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1] nhancements [1] STATUS OF PROJECT: The project has recently moved from the Preliminary Design Phase to the Final Design Phase following the most recent Public Involvement Meeting held on January 9, 2019

More information

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 6 400 EAST WILLIAM STREET DELAWARE, OHIO 43015 800.372.7714 Columbus City Council City Hall 90 West Broad Street Columbus, OH 43215-9015 RE: I-70/71 Columbus

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) REQUEST FOR PROPOSAL (RFP) Title Outdoor Sculpture of Saint Rose Philippine Duchesne Organization Society of the Sacred Heart Closing Date January 10, 2017 Location Jubilee Prayer Garden at the Cathedral

More information

CITY of WILMINGTON North Carolina

CITY of WILMINGTON North Carolina Item PH4 CITY of WILMINGTON North Carolina P.O. BOX 1810 28402 OFFICE OF THE CITY MANAGER (910) 341-7810 FAX (910) 341-5839 TDD (910) 341-7873 04/20/2010 City Council City Hall Wilmington, North Carolina

More information

I-5 Willamette River Bridge Project Design Enhancement Steering Committee

I-5 Willamette River Bridge Project Design Enhancement Steering Committee I-5 Willamette River Bridge Project Design Enhancement Steering Committee Meeting Summary - DRAFT April 29, 2013 2:00 5:00 p.m. CAWOOD conference room, 1200 High Street, Suite 200 Attendance: Charlotte

More information

2nd - 4th Ave South Underpass Skate Park

2nd - 4th Ave South Underpass Skate Park 2nd - 4th Ave South Underpass Skate Park I T P u fo b u T c in d a a in Existing Conditions Interstate Overpasses The arrival of interstates 40, 65 and 24 reshaped Nashville s urban core beginning 50 years

More information

REQUEST FOR QUALIFICATIONS Entrance: Entertainment and Sports Center

REQUEST FOR QUALIFICATIONS Entrance: Entertainment and Sports Center CITY OF SACRAMENTO SACRAMENTO METROPOLITAN ARTS COMMISSION Art in Public Places Program REQUEST FOR QUALIFICATIONS Sacramento Entertainment and Sports Center Entrance: Entertainment and Sports Center Entertainment

More information

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

City of Tulsa BEAUTIFICATION TASK FORCE

City of Tulsa BEAUTIFICATION TASK FORCE City of Tulsa BEAUTIFICATION TASK FORCE Submitted: November 29, 2012 at a meeting of the City Council with Mayor Dewey Bartlett Jr. Rationale Beautify Tulsa Statement: The Mayor and the Council share a

More information

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors. (ROS) Goal Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors. OBJECTIVE ROS.01 The County shall acquire,

More information

Corridor Enhancements

Corridor Enhancements Corridor Enhancements Safety is MoDOT s first priority in widening and rebuilding I-70 across the state of Missouri. MoDOT also understands that the interstate - and its interchanges and overpasses - are

More information

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY MAIN STREET ECONOMIC DEVELOPMENT STRATEGY A PATHWAY TO A BETTER POUGHKEEPSIE DRAFT Working Paper #2: Planning Strategies Submitted December 1 st, 2015 to the City of Poughkeepsie LAND USE LAW CENTER PACE

More information

Station Area Plan Introduction & Draft Alternatives Review

Station Area Plan Introduction & Draft Alternatives Review Station Area Plan Introduction & Draft Alternatives Review City Council Meeting - February 22, 2016 Project Background: California High-Speed Rail San Jose to San Fernando Valley Segment CHSRA will select

More information

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017 East Midtown Greenway East 53 rd 61 st Street Community Board 8 Project Introduction November 16, 2017 Agenda Overview - Development of the East Midtown Waterfront Esplanade Current East Midtown Greenway

More information

ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS MASTER PLAN

ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS MASTER PLAN ENVIRONMENTAL INITIAL STUDY FOR THE BERKELEY CITYWIDE POOLS MASTER PLAN CITY OF BERKELEY PARKS RECREATION AND WATERFRONT DEPARTMENT SEPTEMBER 1, 2009 ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS

More information

Juri Commons Design Review

Juri Commons Design Review Juri Commons Design Review Agenda INTROS PROJECT INFO RECAP DESIGN CONCEPT DISCUSSION 1 Intros Who you are Why you re here Thank yous Juri Commoners San Francisco Parks Alliance 2 Meeting Agreements Listen

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

Johnson Street Bridge Public Realm Update

Johnson Street Bridge Public Realm Update Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes

More information

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation

City of Jersey City. Department of Administration Division of Engineering Traffic and Transportation Division of Engineering Traffic and Transportation : Duncan Avenue Road Program Bergen Avenue Road Program PSE&G Gas System Modernization Program NJDOT Municipal Aid FY2015 Road Program Ogden Dog Park

More information

In March 2012, the County of Yolo was awarded a grant from the California State Department of Parks

In March 2012, the County of Yolo was awarded a grant from the California State Department of Parks Request for Proposals (RFP) Deadline for Submittal: January 23, 2019 The County of Yolo wishes to expand the public s experience with the visual arts; to make available artwork of the highest quality to

More information

ATTACHMENT A BUCKLEY COVE BOAT LAUNCH AND PARKING, PARK A. BUCKLEY COVE BOAT LAUNCH AND PARKING B. BUCKLEY COVE PARK

ATTACHMENT A BUCKLEY COVE BOAT LAUNCH AND PARKING, PARK A. BUCKLEY COVE BOAT LAUNCH AND PARKING B. BUCKLEY COVE PARK BUCKLEY COVE BOAT LAUNCH AND PARKING, PARK A. BUCKLEY COVE BOAT LAUNCH AND PARKING B. BUCKLEY COVE PARK BUCKLEY COVE PARK maintenance includes all area of park, including roadways and to the water s edge.

More information

CALL TO ARTISTS Expression of Interest (EOI)

CALL TO ARTISTS Expression of Interest (EOI) City of Mississauga Culture Division 201 City Centre Drive, Ste 202 MISSISSAUGA ON L5B 2T4 mississauga.ca CALL TO ARTISTS Expression of Interest (EOI) Public Artwork for Mavis Road Bridge Submission Deadline:

More information

The Atlanta BeltLine. Quarterly Briefing March @atlantabeltline. Reynoldstown Senior Affordable Housing

The Atlanta BeltLine. Quarterly Briefing March  @atlantabeltline. Reynoldstown Senior Affordable Housing The Atlanta BeltLine Quarterly Briefing March 30, 2017 @atlantabeltline @atlantabeltline @atlantabeltline Reynoldstown Senior Affordable Housing Framework for a multi-use and transit corridor in the heart

More information

COLLIER BOULEVARD (CR 951) CORRIDOR

COLLIER BOULEVARD (CR 951) CORRIDOR Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts

More information

TEMPLE MEDICAL & EDUCATION DISTRICT

TEMPLE MEDICAL & EDUCATION DISTRICT City of Temple, Texas TEMPLE MEDICAL & EDUCATION DISTRICT 1 Description. The City of Temple joined in partnership with key public and private entities to jointly promote education and medical activities

More information

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013 CRCOG Transportation Committee Meeting Monday, December 9, 2013 Introduction Why the Project was Initiated About Downtown New Britain Master Plan Goals Master Plan Overview Master Plan Study Areas and

More information

Sign Here: Syracuse. Request for Proposals. Call to Artists

Sign Here: Syracuse. Request for Proposals. Call to Artists Request for Proposals Sign Here: Syracuse Location: Connective Corridor - Syracuse, NY Funding: $150,000 for an estimated five to six installations Submission Deadline: March 1, 2015 by 11:59 p.m. EST.

More information

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting Rosecrans/Marquardt Grade Separation Project Community Open House Meeting October 17, 2017 Rosecrans/Marquardt Presentation Agenda 1. Welcome Remarks & Introductions 2. Community Outreach 3. Project Goals

More information

Streetscape Advisory Committee

Streetscape Advisory Committee City Council Work Session Update January 17, 2016 Beautification is Economic Development Update Outline: I. Advisory Summary and Update II. Commercial Landscape Compliance III. Emerald Ash Bore Infestation

More information

TOWN COUNCIL / PLANNING COMMISSION

TOWN COUNCIL / PLANNING COMMISSION Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.

More information

Chris Gent Landscape Studio

Chris Gent Landscape Studio Projects, Landscaped Medians Design Lead: Creation of standards for the City of Chicago s new median program Development of the city s first salt tolerant plant list Supervision of staff and consultants

More information

PUBLIC ART CALL LIONS GATE COMMUNITY CENTRE. For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive)

PUBLIC ART CALL LIONS GATE COMMUNITY CENTRE. For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive) LIONS GATE COMMUNITY CENTRE PUBLIC ART CALL For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive) LGCC EOI 1 LIONS GATE COMMUNITY CENTRE (LGCC) PUBLIC ART CALL

More information

How can landscape architects aide in transportation planning process? John Dempsey, PLA Toole Design Group July 24, 2015

How can landscape architects aide in transportation planning process? John Dempsey, PLA Toole Design Group July 24, 2015 How can landscape architects aide in transportation planning process? John Dempsey, PLA Toole Design Group July 24, 2015 What is Landscape Architecture? Landscape Architecture 1863 What is Landscape Architecture?

More information

RESOURCE PACKET River Crossing

RESOURCE PACKET River Crossing RESOURCE PACKE River Crossing Overall Project Focus: "River Crossing" project is funded through an NEA Our own grant that provides a comprehensive plan for public art and arts experiences that will connect

More information

Revised Long Range Transportation Plan

Revised Long Range Transportation Plan Revised Long Range Transportation Plan Auburn, Alabama Prepared for: City of Auburn, Alabama Prepared by: Skipper Consulting, Inc. June 2006 Revised Long Range Transportation Plan City of Auburn, Alabama

More information

Historic Ottawa Beach Waterfront Walkway Park Township

Historic Ottawa Beach Waterfront Walkway Park Township Historic Ottawa Beach Waterfront Walkway Park Township Project Description: Public access improvements to the shoreline of Lake Macatawa are the final steps in completing the park master plan for the Historic

More information

VERSION 2018 ACTION PLAN WITH THE INTENT OF INTRODUCING BEAUTIFICATION AND MONUMENTAL GRANDEUR IN OUR CITY PUBLIC ARTS COMMISSION

VERSION 2018 ACTION PLAN WITH THE INTENT OF INTRODUCING BEAUTIFICATION AND MONUMENTAL GRANDEUR IN OUR CITY PUBLIC ARTS COMMISSION VERSION 2018 ACTION PLAN WITH THE INTENT OF INTRODUCING BEAUTIFICATION AND MONUMENTAL GRANDEUR IN OUR CITY 17-073 PUBLIC ARTS COMMISSION WHAT IS PAC? PAC leads a community-wide coalition in the development

More information

CALL FOR ARTIST QUALIFICATIONS SUBMISSIONS. DIA Urban Arts Projects Phase One

CALL FOR ARTIST QUALIFICATIONS SUBMISSIONS. DIA Urban Arts Projects Phase One CALL FOR ARTIST QUALIFICATIONS SUBMISSIONS DIA Urban Arts Projects Phase One ART IN PUBLIC PLACES City of Jacksonville, Florida Submissions Due March 31, 2016, midnight MST Through CAFÉ: callforentry.org

More information

The Emerging Language of Highway Removals

The Emerging Language of Highway Removals The Emerging Language of Highway Removals This page intentionally left blank. Introduction The Interstate Highway System, comprised of more than 46,876 miles of highways, provides connections to population

More information

Memorandum CITY OF DALLAS

Memorandum CITY OF DALLAS Memorandum DATE September 23, 2016 CITY OF DALLAS TO The Honorable Members of the Transportation and Trinity River Project Committee: Lee M. Kleinman (Chair), Deputy Mayor Pro Tem Erik Wilson (Vice-Chair),

More information

16E. 24 th Street Corridor. A. Background

16E. 24 th Street Corridor. A. Background A. Background The 24 th Street corridor plan includes both 24 th Street and 2550 South from 1900 West to Washington Boulevard, as shown in Map 1. 1. Development History The 24 th Street Corridor has been

More information

PARTF Scoring System for Grants

PARTF Scoring System for Grants PARTF Scoring System for Grants The members of the N.C. Parks and Recreation Authority use the PARTF scoring system as one of several tools to select grant recipients. Please provide all of the information

More information

TRANSPORTATION & STREET DESIGN

TRANSPORTATION & STREET DESIGN TRANSPORTATION & STREET DESIGN Review of Goals Connect neighborhoods to Square Enable access to the river Improve pedestrian environment Reorient road network to local use Three Specific Areas of Intervention

More information

Indian River Town Meeting Held June 6, 2017 The following are responses to issues, grouped under headings, raised at the Indian River Town Meeting.

Indian River Town Meeting Held June 6, 2017 The following are responses to issues, grouped under headings, raised at the Indian River Town Meeting. Indian River Town Meeting Held June 6, 2017 The following are responses to issues, grouped under headings, raised at the Indian River Town Meeting. Atlantic Coastal Pipeline/Southside Connector Distribution

More information

Speedway Mall Project Frequently Asked Questions

Speedway Mall Project Frequently Asked Questions Speedway Mall Project Frequently Asked Questions These FAQs will continue to be updated as new questions arise. Purpose of the Project and Uses of the Mall Q: Why is this project being done? A: The 1999

More information

Sacramento County - Department of Transportation

Sacramento County - Department of Transportation Sacramento County - Department of Transportation Proposed Projects to be Funded with Road Maintenance and Rehabilitation Account Funding FY 2017-18 Project Description AC Overlay Projects - Federal: Rehabilitate

More information

Recommendation for 2019 Public Art Street Banners. The Parks, Recreation & Culture Department recommends that Council:

Recommendation for 2019 Public Art Street Banners. The Parks, Recreation & Culture Department recommends that Council: CORPORATE REPORT NO: R261 COUNCIL DATE: December 17, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: December 13, 2018 FROM: General Manager, Parks, Recreation & Culture FILE: 7800-01 SUBJECT: Recommendation

More information

Creating Complete Roadway Corridors:

Creating Complete Roadway Corridors: Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee

More information

BAY AREA PARKS & RECREATION

BAY AREA PARKS & RECREATION BAY AREA PARKS & RECREATION ALCATRAZ ISLAND CLIFF STABILIZATION Alcatraz Island San Francisco Bay California National Park Service Wiss Janney Elstner Associates Geologic Hazards Geotechnical Site/Civil

More information

Planning Commission Report

Planning Commission Report Planning Commission Report To: From: Subject: Planning Commission Meeting: January 6, 2016 Agenda Item: 8-B Planning Commission David Martin, Planning & Community Development Director Introduction to the

More information

EcoVerde MADISON TO DOWNTOWN TO BEACH. Legend Highway Major Connection Major Street Local Street Proposed Access. Response to Tropicana Field RFP

EcoVerde MADISON TO DOWNTOWN TO BEACH. Legend Highway Major Connection Major Street Local Street Proposed Access. Response to Tropicana Field RFP EcoVerde TO BEACH 275 16th Street North 16th Street South 13th Street North 13th Street South 11th Street North 11th Street South 1st Avenue North Central Avenue 1st Avenue South TO DOWNTOWN 2nd Avenue

More information

City of Ashland. Attn: Laura Loucks; Sustainability Intern 601 Main Street West Ashland, WI

City of Ashland. Attn: Laura Loucks; Sustainability Intern 601 Main Street West Ashland, WI City of Ashland REQUEST FOR PROPOSALS RFP #18-01 Artistic Solar Public Art Project April 4, 2018 The City of Ashland, Wisconsin will be receiving proposals for the above noted project until Friday, June

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

MetroParks Board Meeting 2018 Capital Improvement Projects

MetroParks Board Meeting 2018 Capital Improvement Projects MetroParks Board Meeting 2018 Capital Improvement Projects Stephen L. Avery Planning & Operations Director Last Edited: 3.12.18 Presentation Outline MetroParks Mission Statement Strategic Master Plan MetroParks

More information

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility. SUMMARY THE I-69 LOCATION STUDY The proposed I-69 Location Study from El Dorado to McGehee, Arkansas, represents one section (Section of Independent Utility No. 13) of the nationally designated I-69 Corridor

More information

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No Committee Report Business Item No. 2017-21 Community Development Committee For the Metropolitan Council meeting of January 25, 2017 Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan

More information

Dumbarton Rail Corridor. Project Scoping Meeting Nov 15, :15 PM City of Newark Nov 16, :15 PM City of Menlo Park

Dumbarton Rail Corridor. Project Scoping Meeting Nov 15, :15 PM City of Newark Nov 16, :15 PM City of Menlo Park Dumbarton Rail Corridor Project Scoping Meeting Nov 15, 2006 7:15 PM City of Newark Nov 16, 2006 7:15 PM City of Menlo Park 1 Presentation Overview I. Introduction History of the Project II. III. Purpose

More information

POPS Advisory Committee Meeting May 31, 2018

POPS Advisory Committee Meeting May 31, 2018 POPS Advisory Committee Meeting May 31, 2018 NOTE: This presentation is a working document, and some recommendations or ideas may have evolved or changed based on continued discussions and additional analyses.

More information

STRIP PORTALS. Concept Plan. December 2008 page 1. PFAFFMANN + ASSOCIATES 223 Fourth Avenue Pittsburgh, PA

STRIP PORTALS. Concept Plan. December 2008 page 1. PFAFFMANN + ASSOCIATES 223 Fourth Avenue Pittsburgh, PA Concept Plan PFAFFMANN + ASSOCIATES 223 Fourth Avenue Pittsburgh, PA 15222 412.471.2470 December 2008 page 1 Concept Plan Project Summary Project Team Neighbors in the Strip 1212 Smallman Street Pittsburgh,

More information

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design INTRODUCTION The City of Langley, WA is soliciting submissions from qualified designers/design teams for a design to improve the

More information

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan Date: August 17, 2016 To: From: Subject: Management Committee Dan Cloak, Consultant Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan Recommendation: Receive the

More information

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park Planning Stage Long Term Project Planning Stage Project Underway Mosaic Park Restoration of 4 Mile Run Herndon and 13 th Clarendon Central Park Arlington County Parks, Recreation and Cultural Resources

More information

Luminous Bodies and the Corridor of Light for Lynn Street Rosslyn

Luminous Bodies and the Corridor of Light for Lynn Street Rosslyn Luminous Bodies and the Corridor of Light for Lynn Street Rosslyn Artist & landscape architect Cliff Garten, Venice, CA selected Harbor View, Long Beach, CA Avenue of Light, Fort Worth, TX The project

More information

Action Item Recommend Initiation of Public Art Project at Bishop Arts Station. Kay Kallos, Public Art Program Manager

Action Item Recommend Initiation of Public Art Project at Bishop Arts Station. Kay Kallos, Public Art Program Manager Action Item Recommend Initiation of Public Art Project at Bishop Arts Station COMMITTEE: Cultural Affairs Commission MEETING DATE: March 22, 2018 COUNCIL DISTRICT(S): DEPARTMENT: STAFF: MAPSCO: FUNDING

More information

Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting

Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting BACKGROUND The San Francisco Public Utilities Commission

More information

Highway & Bridge Capabilities

Highway & Bridge Capabilities Highway & Bridge Capabilities Part of a diversified family of solutions www.jmt.com An Employee Owned Company I-95/I-295/I-495 Interchange, Woodrow Wilson Memorial Bridge, Prince George s County, MD Our

More information

A larger version of this map is located on the last page of this PDF.

A larger version of this map is located on the last page of this PDF. MAP Committee Input McLoughlin Area Draft Vision Map A larger version of this map is located on the last page of this PDF. 1. The map above is intended to portray a vision for the McLoughlin area. It highlights

More information

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018 Transportation Projects Quarterly Report Morrisville Planning Department May 22, 2018 Transportation Improvements Most Common Ways the Town secures transportation improvements: 1. Development 2. Grant

More information

Lakefront Downtown Action Plan Phase I June 2008

Lakefront Downtown Action Plan Phase I June 2008 Lakefront Downtown Action Plan Phase I June 2008 Downtown Development Authority City of Lake Charles Lakefront Overview DDA Chairman Rick Richard DPZ Lakefront Plan May 5 th 2007 $18.5M City Bond Issue

More information

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer DATE: January 9, 0 TO: FROM: THROUGH: SUBJECT: WCA Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer : Consideration of a resolution to authorize Executive Officer, or

More information