RECAPP Facility Evaluation Report

Size: px
Start display at page:

Download "RECAPP Facility Evaluation Report"

Transcription

1 RECAPP Facility Evaluation Report Evergreen Catholic Separate Regional Division #2 St. Mary School B4244A Westlock Report run on: January 22, 27 2:4 PM

2 Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement Cost: Construction Year: Facility Details St. Mary School Street Westlock B4244A. $9,365,677 Evaluation Company: Evaluation Date: April Evaluator Name: Evaluation Details Stephens Kozak Carr and Brown Architects Eric Lumley Total Maintenance Events Next 5 years: $948,8 5 year Facility Condition Index (FCI): 1.13% General Summary: The building was originally constructed in, with additions in 1967, 1976, 1982 and. A major portion of the original building was modernized in. The building is generally in acceptable condition. Structural Summary: The and 1967 sections are concrete frame with loadbearing concrete block walls and concrete tees on the roof. The foundations appear to be foundation walls and strip footings, with a concrete slab-on-grade. The 1976, 1982 and sections are strip footings and foundation walls, with slab-on-grade, loadbearing concrete block walls, steel roof deck and steel joists. The structure is generally in acceptable condition. Envelope Summary: All roofs have SBS roofing. The exterior walls are facing brick and decorative stone panels. The windows are a mixture of anodized aluminum and steel. The exterior doors are aluminum and insulated hollow metal. The envelope is generally in acceptable condition. Interior Summary: Interior finished are generally the original, except for the modernization. Some minor repairs to flooring and plastic laminate vanities, otherwise the interior is generally in acceptable condition. Mechanical Summary: Original school built in with additions in 1967, 1976, 1982,. In major modernization of the original school, 1967, 1976 additions occurred. Heating system consists of six (6) hot water boilers, circulation pumps, distribution piping to terminal heating units. Plate heat exchanger provide glycol for two air system heating coils. Ventilation provided by two (2) indoor air systems and one (1) packaged rooftop air system. Supply air distribution is low velocity with corridor, ceiling and ducted return. Exhaust fans expel foul odors from school. Plumbing fixtures and brass are commercial quality. Fire protection consists of wet standpipe system and ABC fire extinguishers. Controls are pneumatic. BMCS installed. Mechanical systems are in fair to good condition. Items found during review: - Install deficient backflow prevention. - Janitor sink replacement. - Install kitchen make up air. - Install computer room air conditioning. - Install humidification. Electrical Summary: This building is serviced from a utility owned (size unknown) pad mount transformer with secondary's feeding a Commander 12amp 12/28volt 3phase 4wire MDP c/w an 8amp main breaker feeding entire school including subfeeding the () FPE 4amp 12/28volt 3phase 4wire fused disconnect feeding the original building. Interior lighting is Inefficient magnetic ballasts and T-12 lamps throughout, HPS high bay fixtures controlled by line and low voltage switching. Battery packs c/w integral and remote lamps, exit lights are incandescent style. Exterior fixtures consist of incandescent canopy fixtures and HPS wall packs controlled via time clock/photo cells. The fire alarm system is a Edwards 228 system c/w Manual pull stations,smoke/heat detectors, bell/strobes, the intrusion detection system is a Telsco c/w motion detectors an keypads. Clocks are ac/dc and manually adjusted, Norstar telephone system, a Telcor PSU paging/call/public address/music system. Supernet is installed, cat5 and 5e installed throughout c/w main server,data racks, patch panels. UPS protected main servers. Overall is Acceptable. Report run on: January 22, 27 2:4 PM Page 2 of 37

3 Guide Condition Performance 1 - Critical Unsafe, high risk of injury or critical system failure. 2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. 3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. 6 - Excellent As new/state of the art, meets present and foreseeable requirements. Report run on: January 22, 27 2:4 PM Page 3 of 37

4 S1 STRUCTURAL A11 Standard Foundations* All sections have concrete strip footings and foundation walls. 1 DEC-6 A13 Slab on Grade* All sections have concrete slab-on-grade. 1 DEC-6 B11.2 Structural Interior Walls Supporting Floors (or Roof)* All sections have concrete block loadbearing walls. 1 DEC-6 B11.7 Exterior Stairs** Site walkways have flights of three concrete stairs DEC-6 B12.1 Roof Structural Frame* 1976, 1982, 1976, 1982 and sections have OWSJ and steel roof deck DEC-6 B12.1 Roof Structural Frame*, 1967 Concrete Tees on loadbearing concrete block walls and a cast-in=place concrete frame. 1 DEC-6 B12.4 Canopies* Painted steel deck on cantilevered concrete beams. 5 DEC-6 Report run on: January 22, 27 2:4 PM Page 4 of 37

5 B12.4 Canopies*!993 section has steel framed canopy with painted cement plaster soffit. 5 DEC-6 Report run on: January 22, 27 2:4 PM Page 5 of 37

6 S2 ENVELOPE B Brick Masonry: Ext. Wall Skin* All sections have facing brick exterior skin. 75 DEC-6 B Stone Assemblies: Exterior Wall Skin* Decorative random stone panels to front of section. 75 DEC-6 B Metal Siding** Metal vertical siding to east face of upper walls of library, above adjacent roof level. Assumed to have been installed during modernization. 4 DEC-6 B Masonry Units: Ext. Wall Const.* All sections have concrete block inner wythe to exterior walls. 1 DEC-6 B Aluminum Windows (Glass & Frame)** All sections have clear and bronze anodized aluminum windows. 4 DEC-6 B22.3 Glazed Curtain Wall** South facade of addition has full height aluminum curtain wall system. 4 DEC-6 Report run on: January 22, 27 2:4 PM Page 6 of 37

7 B23.5 Other Exterior Doors** All sections have steel doors in steel frames. Main entrance and addition have aluminum doors in aluminum frames. 3 - Marginal DEC-6 Replace two sets of exterior double doors. Double exterior doors from gym are in marginal condition with damage and problematic hardware. Replace exterior doors and hardware to 1982 gymnasium. Consequences of Deferral: Door operation will remain problematic. Type Failure Replacement Year 27 Cost $4, Priority High : DEC-6 B Modified Bituminous Membrane Roofing (SBS)** All sections have 2 ply SBS roofing, with the, 67, 76 and 82 sections having been re-roofed within the last five years. 25 DEC-6 B Metal Gutters and Downspouts** All sections have missing downspouts. 2 - Poor 3 DEC-6 Replace missing downspouts Replace missing downspouts Type Failure Replacement Year 27 Cost $1, Priority High : DEC-6 B32.1 Skylights** Three acrylic skylights installed in main entrance corridor during modernization. 2 DEC-6 Report run on: January 22, 27 2:4 PM Page 7 of 37

8 S3 INTERIOR C11.1 Interior Fixed Partitions* All sections have painted concrete block partitions. 5 DEC-6 C11.5 Interior Windows* 1982 addition and modernization have steel framed interior windows with clear and georgian wired glass DEC-6 C12.1 Interior Swinging Doors** All sections have painted wood doors in steel frames DEC-6 Replace interior doors and 1967 sections. Doors in and 1967 sections have exceeded their theoretical design life. Replace doors in and 1967 sections. 25 $8 per door. Consequences of Deferral: Doors may deteriorate. Type Year Cost Priority Lifecycle Replacement 21 $2, Medium : DEC-6 C12.3 Interior Fire Doors* All mechanical rooms and storage rooms have steel rated doors in steel frames DEC-6 Report run on: January 22, 27 2:4 PM Page 8 of 37

9 C13.1 Visual Display Boards** All sections have whiteboards and tackboards. 2 DEC-6 Replace whiteboard and tackboard in 13 classrooms Whiteboards and tackboards in 13 classrooms (, 1967 and 1976 sections) have exceeded their theoretical design life. Replace whiteboards and tackboards in 13 classrooms. 13 $2 per room. Consequences of Deferral: Whiteboards and tackboards may deteriorate. Type Year Cost Priority Lifecycle Replacement 21 $26, Medium : DEC-6 C13.2 Fabricated Compartments(Toilets/Showers)** All washrooms have metal pre-finished toilet compartments DEC-6 C13.8 Interior Identifying Devices* Painted door signage throughout. 2 DEC-6 C13.1 Lockers** There are 136 full height metal lockers and 22 double tier metal lockers distributed throughout the corridors. 3 DEC-6 C13.12 Storage Shelving* Painted wooden shelving in storage and janitors rooms. 2 DEC-6 Report run on: January 22, 27 2:4 PM Page 9 of 37

10 C13.14 Toilet, Bath, and Laundry Accessories* All washrooms have soap dispensers, mirrors, waste receptacles, toilet tissue dispensers, paper towel dispensers. 2 DEC-6 C23.1 Ramp Construction* Concrete cast-in-place ramp to lower eating area in addition. 1 DEC-6 C23.2 Ramp Finishes* Studded rubber floor tile to surface of ramp. DEC-6 C23.3 Ramp Railings* Decorative metal railing with wooden handrail. 5 DEC-6 C31.2 Wall Paneling** Decorative wooden wall panelling in offices of modernized general administration area. 3 DEC-6 C31.4 Gypsum Board Wall Finishes* Gypsum board finish to non-loadbearing partitions in addition and modernization. 6 DEC-6 C31.6 Tile Wall Finishes** Ceramic wall tile to washrooms throughout. 4 DEC-6 Report run on: January 22, 27 2:4 PM Page 1 of 37

11 C31.9 Acoustical Wall Treatment** Stage drapery used as acoustic treatment to modernized music room DEC-6 C31.11 Interior Wall Painting** All areas repainted during modernization and addition. 1 DEC-6 Repaint all interior walls. Interior wall painting has exceeded its theoretical design life. Repaint all interior walls. Approximately 19,2 $2 per sq.m. Consequences of Deferral: Paint finish may deteriorate. Type Year Cost Priority Lifecycle Replacement 21 $384, Medium : DEC-6 C32.2 Tile Floor Finishes** Ceramic mosaic floor tile to all washrooms. Small section of ceramic mosaic floor tile in vestibule leading to courtyard (from modernized area). 5 DEC-6 C32.4 Wood Flooring** Resilient wood flooring in 1982 gymnasium DEC-6 Report run on: January 22, 27 2:4 PM Page 11 of 37

12 C32.7 Resilient Flooring** Resilient tile flooring in classrooms and corridor of 1976 addition. All other corridors and regular classrooms have resilient sheet flooring installed in DEC-6 Replace resilient flooring in 1976 section. Resilient flooring in 1976 section has exceeded its theoretical design life. Replace resilient flooring in 1976 section. Approximately 39 $6 per sq.m. Consequences of Deferral: Resilient flooring may deteriorate. Type Lifecycle Replacement Year 21 Cost $23,4 Priority Medium : DEC-6 C32.8 Carpet Flooring** Carpet in the administration area, the music room, the distance learning room and the computer rooms. All installed in. 15 DEC-6 Replace carpet. Carpet in selected areas was installed in and reaches the end of its theoretical design life in 28. Replace carpet in selected areas. (administration, music, library, distance learning room, computer rooms. Approximately 82 $6 per sq.m. Consequences of Deferral: Carpeting may deteriorate. Type Lifecycle Replacement Year 21 Cost $49,2 Priority Medium : DEC-6 C32.14 Other Floor Finishes** Unfinished concrete slabs in mechanical rooms. 2 DEC-6 Report run on: January 22, 27 2:4 PM Page 12 of 37

13 C33.1 Concrete Ceiling Finishes* Exposed concrete tees in janitor rooms and mechanical rooms. 1 DEC-6 C33.2 Ceiling Paneling (Wood)* Cedar strip ceiling in staff room of modernized area. 6 DEC-6 C33.4 Gypsum Board Ceiling Finishes* Gypsum board ceilings to entrance corridor, washrooms and storage rooms DEC-6 C33.6 Acoustic Ceiling Treatment (Susp.T-Bar)** T-bar ceiling system throughout all classrooms, corridors and administration areas DEC-6 Replace T-bar ceiling in 1976 section. T-bar ceiling in 1976 section has exceeded its theoretical design life. Replace t-bar ceiling in 1976 section. Approximately 37 $4 per sq.m. Consequences of Deferral: T-bar ceiling in 1976 section may deteriorate. Type Year Cost Priority Lifecycle Replacement 21 $15,6 Medium : DEC-6 Report run on: January 22, 27 2:4 PM Page 13 of 37

14 C33.7 Interior Ceiling Painting** Painted drywall ceilings in washrooms and storage rooms. Painted exposed steel deck in 1982 gymnasium DEC-6 Repaint drywall and steel deck ceilings in 1982 section. Painted drywall ceilings and exposed steel deck in the 1982 section has exceeded its theoretical design life. Repaint drywall ceilings and exposed steel deck in 1982 section. Approximately 7 $2 per sq.m. Consequences of Deferral: Paint finish to ceilings may deteriorate. Type Year Cost Priority Lifecycle Replacement 21 $14, Medium : DEC-6 C33.9 Other Ceiling Finishes* Stipple finish to drywall ceilings in entrance corridor and music room. 5 DEC-6 Report run on: January 22, 27 2:4 PM Page 14 of 37

15 S4 MECHANICAL D21.1 Water Closets** Floor, flush valve (8) DEC-6 Replace water closets Type Lifecycle Replacement Year 21 Cost $1, Priority Low : DEC-6 D21.1 Water Closets** Floor, flush valve (1). 35 DEC-6 Replace water closets Type Lifecycle Replacement Year 21 Cost $12, Priority Low : DEC-6 D21.1 Water Closets** Floor, flush valve DEC-6 D21.2 Urinals** Wall, flush tank (7). 35 DEC-6 Replace urinals Type Lifecycle Replacement Year 21 Cost $7, Priority Low : DEC-6 Report run on: January 22, 27 2:4 PM Page 15 of 37

16 D21.2 Urinals** Stall, flush valve DEC-6 D21.2 Urinals** Stall, flush valve (3) DEC-6 Replace urinals Type Year Cost Priority Lifecycle Replacement 21 $6, Low : DEC-6 D21.3 Lavatories** Porcelain on steel, time delay brass DEC-6 D21.3 Lavatories** Stainless steel bowls, time delay mixing faucet. 35 DEC-6 D21.4 Sinks** Stainless steel, various sizes, swing spout DEC-6 D21.4 Sinks** Stainless steel, various sizes, swing spout. 3 DEC-6 Report run on: January 22, 27 2:4 PM Page 16 of 37

17 D21.5 Showers** Institutional head, central mix valve. 3 DEC-6 D21.8 Drinking Fountains / Coolers** Wall, refrigerated. 35 DEC-6 D21.8 Drinking Fountains / Coolers** Wall, one non refrigerated. 35 DEC-6 Replace drinking fountains Type Year Cost Priority Lifecycle Replacement 21 $1,6 Low : DEC-6 D21.9 Other Plumbing Fixtures** Barrier free water closet and lavatory. Dishwasher in kitchen. 3 DEC-6 Report run on: January 22, 27 2:4 PM Page 17 of 37

18 D21.9 Other Plumbing Fixtures** Raised cast iron sink in janitor room. No vacuum breaker on brass. 3 - Marginal DEC-6 Install floor janitor sink. Difficult to empty buckets into raised sink. Install floor janitor sink (1). Type Year Operating Efficiency Upgrade 28 Cost $3, Priority High : DEC-6 D Pipes and Tubes: Domestic Water* Copper piping and fittings (all phases). 4 DEC-6 D Valves: Domestic Water** Gate and ball valves. 4 DEC-6 Replace domestic water valves Type Lifecycle Replacement Year 21 Cost $4, Priority Low : DEC-6 D Valves: Domestic Water** Gate valves DEC-6 Report run on: January 22, 27 2:4 PM Page 18 of 37

19 D Valves: Domestic Water** Ball valves. 4 DEC-6 D Piping Specialties (Backflow Preventors)** Backflow installed on heating system make up line. Vacuum breakers on lab brass. 2 DEC-6 D Piping Specialties (Backflow Preventors)** No backflow preventor installed on fire line. 3 - Marginal 2 DEC-6 Install approved backflow preventor. No backflow prevention installed on fire line. Install deficient backflow preventor. Type Year Cost Priority Code Upgrade 27 $8, Unassigned : DEC-6 D Plumbing Pumps: Domestic Water** Inline hot water recirc pump. 2 DEC-6 D Domestic Water Heaters** Jetglass, natural draft, 25, BTU/hr input. 2 DEC-6 Report run on: January 22, 27 2:4 PM Page 19 of 37

20 D Domestic Water Heaters** Bradford White with motorized flue damper. 199, BTU/hr input DEC-6 D22.3 Water Supply Insulation: Domestic* Majority of hot, cold, recirculation piping insulated (all phases). 3 DEC-6 D23.1 Waste and Vent Piping* Cast iron, copper, plastic (all phases). 5 DEC-6 D23.2 Waste Piping Specialties* Bottle traps in science room. 5 DEC-6 D24.1 Rain Water Drainage Piping Systems* Storm discharges to grade (all phases). 5 DEC-6 D Roof Drains** Full flow, cast and plastic domes. 4 DEC-6 D31.2 Gas Supply Systems* Gas piping to heating boilers, domestic hot water heaters, gym gas fired air system (all phases). 6 DEC-6 Report run on: January 22, 27 2:4 PM Page 2 of 37

21 D Heating Boilers and Accessories: H.W.** Raypak, natural draft, coppertube boiler complete with flow switch, low water cut off, relief valve, spark ignition. 1,642,95 BTU/hr input. 35 DEC-6 D Heating Boilers and Accessories: H.W.** Two section Hydrotherm boiler, natural draft, standing pilot complete with low water cut off, relief valve, flow switch. 6, BTU/hr input. 35 DEC-6 Replace boilers and accesories Type Year Cost Priority Lifecycle Replacement 21 $1, Low : DEC-6 D Heating Boilers and Accessories: H.W.** Four (4) cast iron sectional boilers, natural draft, spark ignition complete with low water cut off, relief valve, flow switch. 35, BTU/hr input each DEC-6 D Chimneys (&Comb. Air): H.W. Boiler** Class B chimney. Insulated combustion air. 3 DEC-6 D Water Treatment: H. W. Boiler* Chemical pot feeder, side stream filter. 3 DEC-6 D32.5 Auxiliary Equipment: Heat Generation* Air cushion expansion tank. 3 DEC-6 Report run on: January 22, 27 2:4 PM Page 21 of 37

22 D Air Handling Units: Air Distribution** Built up air system complete with motorized fresh, return, exhaust air dampers, filter section, glycol heating coil, supply fan, return fan, low velocity supply air ductwork. 3 DEC-6 D Air Handling Units: Air Distribution** Ventilates gym. Custom gas fired rooftop unit complete with motorized fresh, return, exhaust air dampers, filter section, stainless steel heat exchanger, supply fan, return fan, two (2) speed motors, low velocity ductwork distribution DEC-6 D Air Handling Units: Air Distribution** Ventilates addition. Custom packaged indoor unit complete with motorized fresh, return, exhaust air dampers, glycol heating coil, filter section, supply fan, return fan, low velocity supply air ductwork. 3 DEC-6 D Fans: Air Distribution* Circulation fans installed in several rooms. 3 DEC-6 D Air Cleaning Devices:Air Distribution* 5 mm throw away media (all phases). 3 DEC-6 D Ducts: Air Distribution* Low velocity, above ground, galvanized to air outlets (all phases). 5 DEC-6 D Air Outlets & Inlets:Air Distribution* Vary as to type and year installed. Sidewall double deflection, square diffusers, round diffusers, egg crate, linear bar return (all phases). 3 DEC-6 Report run on: January 22, 27 2:4 PM Page 22 of 37

23 D Hot Water Distribution Systems** Two (2) inline pumps circulate heated water via black iron piping to radiation, radiant panels, fan coil units, unit heaters. 4 DEC-6 D34.4 Special Exhaust Systems Kitchen range hood exhaust. 3 - Marginal 3 DEC-6 Install make up air. No make up air. Install make up air. Type Year Cost Priority Code Upgrade 28 $6, Unassigned : DEC-6 D Fans: Exhaust** Roof mounted dome fans. 3 DEC-6 D Ducts: Exhaust* Low velocity, galvanized to exhaust grilles and fans (all phases). 5 DEC-6 D Air Outlets and Inlets: Exhaust* Egg crate, linear bar (all phases). 3 DEC-6 Report run on: January 22, 27 2:4 PM Page 23 of 37

24 D34.5 Heat Exchangers** Two (2) plate heat exchangers. Each exchanger located in separate mechanical rooms provides heated glycol to air system heating coil. Each system complete with two inline circulation pumps, expansion tank, side stream filter, chemical pot feeder, glycol charging tank. 3 DEC-6 D Computer Room Air Conditioning Units** Room temperatures excessive. 3 - Marginal 3 DEC-6 Install air conditioning. Excessive room temperatures. Install air conditioning (2 rooms). Type Year Cost Priority Operating Efficiency Upgrade 27 $7, Unassigned : DEC-6 D Computer Room Air Conditioning Units** - Server Room Server room air conditioned DEC-6 Report run on: January 22, 27 2:4 PM Page 24 of 37

25 D35.3 Humidifiers** Evaporative pad humidifier in two indoor air systems. 3 - Marginal 25 DEC-6 Install humidifier and water softener No humidification. Evaporative pad humidifier de-energized due to high maintenance costs. Air system internals coated with mineral deposits. Aseptic condition poor. Install indoor gas fired humidifier and water softener (2). Type Indoor Air Quality Upgrade Year 28 Cost $7, Priority High : DEC-6 D35.3 Humidifiers** No humidification gym air system. 3 - Marginal 25 DEC-6 Install humidifier and water softener. No humidification. Install outdoor gas fired humidifier and water softener. Type Indoor Air Quality Upgrade Year 28 Cost $4, Priority High : DEC-6 D Convectors** in hallway DEC-6 Report run on: January 22, 27 2:4 PM Page 25 of 37

26 D Fan Coil Units** Ceiling fan coil unit at entrance. 3 DEC-6 D Fan Coil Units** Ceiling fan coil unit. 3 DEC-6 Replace fan coil unit. Type Lifecycle Replacement Year 21 Cost $3, Priority Low : DEC-6 D Fan Coil Units** Wall fan coil unit DEC-6 Replace fan coil unit. Type Lifecycle Replacement Year 21 Cost $3, Priority Low : DEC-6 D Finned Tube Radiation** Perimeter radiation DEC-6 Replace radiation. Type Lifecycle Replacement Year 21 Cost $18, Priority Low : DEC-6 Report run on: January 22, 27 2:4 PM Page 26 of 37

27 D Unit Heaters** Horizontal unit heater. 3 DEC-6 D Radiant Heating (Ceiling & Floor)** Ceiling radiant panels. 35 DEC-6 D Electric and Electronic Controls** Electric thermostat cycles fan coil fan. 3 DEC-6 Replace electronic controls. Type Lifecycle Replacement Year 21 Cost $3, Priority Low : DEC-6 D Pneumatic Controls** Duplex air compressor, refrigerated dryer, auto drain, pneumatic room thermostats, control valves, damper motors. 4 DEC-6 Replace pneumatic controls. Type Lifecycle Replacement Year 21 Cost $18, Priority Low : DEC-6 D Pneumatic and Electric Controls Transducers to integrate pneumatic components with BMCS. 4 DEC-6 Report run on: January 22, 27 2:4 PM Page 27 of 37

28 D Building Systems Controls (BMCS, EMCS)** Siemens BMCS. 25 DEC-6 D42 Standpipes* Wet standpipe to fire hose cabinets. Cabinets complete with valve, hose, fire extinguisher (all phases). 6 DEC-6 D43.1 Fire Extinguisher, Cabinets and Accessories** ABC fire extinguishers in cabinets and on wall hooks. 3 DEC-6 D49 Other Fire Protection Systems* Range hood complete with fire suppression. Fire blanket in science room. 3 DEC-6 Report run on: January 22, 27 2:4 PM Page 28 of 37

29 S5 ELECTRICAL D51.1 Main Electrical Transformers** Utility owned (size unknown) pad mount transformer DEC-6 Capacity Size Capacity Unit Unknown kva D51.3 Main Electrical Switchboards (Main Distribution)** () Commander 12amp 12/28volt 3phase 4wire MDP c/w an 8amp main breaker feeding entire school including sub-feeding the () FPE 4amp 12/28volt 3phase 4wire fused disconnect feeding the original building. 4 DEC-6 Capacity Size Capacity Unit 12 amps D51.5 Electrical Branch Circuit Panelboards (Secondary Distribution)** (),() A combination of Commander and FPE 1-225amp 12/28volt branch circuit panels controlling lighting and power loads throughout the school. 3 DEC-6 D Motor Starters and Accessories** A combination of Telemechenique and Commander loose wall mounted starters controlling all motor loads. 3 DEC-6 D52.1 Electrical Branch Wiring* (),() Copper conductors installed in a flexible and metallic conduit system. 5 DEC-6 D Lighting Accessories (Lighting Controls)* (),() Line voltage switching located throughout school. 3 DEC-6 Report run on: January 22, 27 2:4 PM Page 29 of 37

30 D Interior Incandescent Fixtures* Upgraded to compact PL lamps. 3 DEC-6 D Interior Florescent Fixtures** (,77) Inefficient magnetic ballasts and T-12 lamps throughout. 3 - Marginal 3 DEC-6 Upgrade lighting Excessive maintenance costs. Upgrade existing fluorescent fixtures and incandescent lighting to electronic ballasts/t-8 lamps and compact PL lamps. Consequences of Deferral: Higher maintenance and utility power costs. Type Year Cost Priority Energy Efficiency Upgrade 27 $85, High : DEC-6 D Interior Metal Halide Fixture* Upgraded to 35watt pulse start metal halide high bay fixtures located in the gymnasiums. 3 DEC-6 D Emergency Lighting Battery Packs** (),(), Wall mounted battery packs c/w integral and remote lamps throughout. Scheduled testing and battery replacement when necessary. 2 DEC-6 Report run on: January 22, 27 2:4 PM Page 3 of 37

31 D Exit Signs* Old technology/inefficient incandescent style ceiling/wall mount fixtures. 3 - Marginal 3 DEC-6 Replace exit lights Excessive maintenance costs. Upgrade to energy efficient LED style fixtures. Consequences of Deferral: Higher maintenance and utility power costs. Type Year Cost Priority Energy Efficiency Upgrade 27 $11, High : DEC-6 D Exterior Metal Halide Fixtures* 15 watt MH pole mount standards in courtyard. 3 DEC-6 D Exterior H.P. Sodium Fixtures* 1watt wall mount HPS wall packs. 3 DEC-6 D Lighting Accessories: Exterior (Lighting Controls)* Time clock and photo cells controlling exterior lighting. 3 DEC-6 Report run on: January 22, 27 2:4 PM Page 31 of 37

32 D53.1 Detection and Fire Alarm** Edwards 228 FACP c/w manual pull stations, heat/smoke detectors and some upgraded firebell/strobes. 3 - Marginal DEC-6 Replace fire alarm system Fire alarm failure, replacement parts not available. Replace fire alarm system with current technology and codes. Consequences of Deferral: Unscheduled replacement of fire alarm control panel if a failure occurs as system cannot be replaced. Type Year Cost Priority Failure Replacement 28 $55, High : DEC-6 D Intrusion Detection** Out dated, old technology Telsco alarm system c/w keypad and motion detectors. 25 DEC-6 D Security Access** Partner keypad located at main entrance. 25 DEC-6 D53.3 Clock and Program Systems** Ac/Dc manually adjusted clocks throughout. 25 DEC-6 D Telephone Systems** Nortel - Norstar phone system 25 DEC-6 Report run on: January 22, 27 2:4 PM Page 32 of 37

33 D Call Systems** Telcor PSU system. 25 DEC-6 D Data Systems** Main server c/w patch panels, data racks, routers, modems DEC-6 D Local Area Network Systems (),(22) Cat-5 and Cat-5e cabling installed throughout DEC-6 D53.5 Public Address and Music Systems** Telcor PSU system. 2 DEC-6 D53.6 Television Systems* Cable into building. 2 DEC-6 D53.7 Other Communications and Security Systems* Supernet installed. 6 - Excellent 25 2 DEC-6 D59.1 Uninterruptible Power Supply Systems** UPS consists of 3 APC 3va and 2 APC 7va protecting the servers DEC-6 Report run on: January 22, 27 2:4 PM Page 33 of 37

34 S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION E19.3 Food Service Equipment* Kitchen in addition is equipped with a commercial dishwasher, gas griddle and stove, refridgerator, chest freezer, reach-in cooler, food warmer and food warming trays. There is a fire suppression exhaust hood over the griddle and stove. 25 DEC-6 E19.4 Residential Equipment* Staff room equipped with microwave, fridge/freezer and coffee maker. 25 DEC-6 E19.7 Athletic, Recreational, and Therapeutic Equipment* Two main court sideswing glass basketball backstops. Four wooden sideswing sidecourt practice basketball backstops DEC-6 E21.2 Fixed Casework** Millwork counters and cupboards throughout addition and modernized area.. 35 DEC-6 E Blinds** Venetian blinds in classrooms. Vertical louvre blinds in administration area. 3 DEC-6 E22 Moveable Furnishings* Classroom and office furniture and equipment throughout. 2 DEC-6 F Grandstands and Bleachers** 1982 Retractible bleacher seating in 1982 gymnasium DEC-6 Report run on: January 22, 27 2:4 PM Page 34 of 37

35 F22.1 Asbestos* None apparent. DEC-6 F22.4 Mould* None apparent. DEC-6 Report run on: January 22, 27 2:4 PM Page 35 of 37

36 S8 FUNCTIONAL ASSESSMENT K41.1 Barrier Free Route: Parking to Entrance Ramp provided to negotiate curb in parking lot. DEC-6 K41.2 Barrier Free Entrances Barrier free power assist doors not provided. 3 - Marginal DEC-6 Provide power assist doors at entrance. No power assist doors provided. Install power assist doors at main entrance and interior vestibule doors. $4, each. Consequences of Deferral: Barrier free access will remain compromised. Type Year Cost Priority Barrier Free Access Upgrade 27 $8, Medium : DEC-6 K41.3 Barrier Free Interior Circulation Barrier free interior circulation provided. DEC-6 Report run on: January 22, 27 2:4 PM Page 36 of 37

37 K41.4 Barrier Free Washrooms Barrier free washrooms provided, but no grab bars installed. 3 - Marginal DEC-6 Provide grab bars in barrier free washrooms. Barrier free washrooms do not have grab bars installed. Install grab bars in barrier free washrooms. $1 each (including backing) Consequences of Deferral: Barrier free access to washrooms will remain compromised. Type Year Cost Priority Barrier Free Access Upgrade 27 $2, Medium : DEC-6 Report run on: January 22, 27 2:4 PM Page 37 of 37

38 RECAPP Facility Evaluation Report St. Mary School S4244 Westlock Report run on: January 26, 27 1:11 AM

39 Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement Cost: Construction Year: St. Mary School Westlock S4244. $ Evaluation Company: Evaluation Date: June Evaluator Name: Stephens Kozak Carr and Brown Architects Eric Lumley 5 year Facility Condition Index (FCI): % General Summary: The site is generally slightly sloping to the north. Parking is off a side lane. Sports fields and playground equipment are located to the east and north of the building. There are ornamental lawns and mature trees to the south of the school. The site is generally in acceptable condition. Structural Summary: Facility Details Westlock - St. Mary School (S4244) Evaluation Details Total Maintenance Events Next 5 years: $185,1 Envelope Summary: Interior Summary: Mechanical Summary: Electrical Summary: Guide Condition Performance 1 - Critical Unsafe, high risk of injury or critical system failure. 2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. 3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. 6 - Excellent As new/state of the art, meets present and foreseeable requirements. Report run on: January 26, 27 1:11 AM Page 2 of 8

40 S7 SITE Westlock - St. Mary School (S4244) G13 Site Earthwork (Site Grading)* The site is graded to generally slope away from the building DEC-6 G Flexible Paving Parking Lots(Asphalt)** Asphalt paved parking off side lane. 1 DEC-6 Provice asphalt topping to parking lot. Asphalt paving to parking lot has exceeded its theoretical design life. Provide asphalt topping to parking lot. Approximately 8 $5 per sq.m. Type Year Cost Priority Lifecycle Replacement 21 $4, Medium : DEC-6 G22.5 Parking Lot Curbs and Gutters* 25 DEC-6 G Parking Bumpers* Precast concrete wheel stops at each parking stall. 25 DEC-6 Report run on: January 26, 27 1:11 AM Page 3 of 8

41 Westlock - St. Mary School (S4244) G Asphalt Pedestrain Pavement** Section of asphalt sidewalk adjacent to 1976 addition. Appears to be about 1 years old DEC-6 Replace asphalt sidewalks. Asphalt sidewalks have exceeded their theoretical design life. Replace asphalt sidewalks. Approximately 45 $8 per sq.m. Type Lifecycle Replacement Year 21 Cost $3,6 Priority Medium : DEC-6 G23.3 Pedestrian Unit Pavers** Decorative pedestrian pavers on pathway in courtyard. 2 DEC-6 Replace unit pavers. Type Lifecycle Replacement Year 213 Cost $4, Priority Low : DEC-6 G23.4 Rigid Pedestrian Pavement (Concrete)** Concrete sidewalks adjacent to the and 1967 sections. 15 DEC-6 Replace concrete sidwalks. Concrete sidewalks have exceeded their theoretical design life. Replace concrete sidewalks. Approximately 25 $8 per sq.m. Type Lifecycle Replacement Year 21 Cost $2, Priority Medium : DEC-6 Report run on: January 26, 27 1:11 AM Page 4 of 8

42 Westlock - St. Mary School (S4244) G23.6 Exterior Steps and Ramps* Series of steps in concrete sidewalk to north of 1982 addition DEC-6 G24.2 Fences and Gates** Perimeter of site has 12mm high chain link fence. Approximately 3m in need of repair. 2 - Poor 3 DEC-6 Repair chain link fence A 3m section of chain link fence is in need of repair. Repair approximately 3m of chain link fence. 5 per m. Type Repair Year 27 Cost $1,5 Priority Unassigned : DEC-6 Replace chain link fence Chain link fencing has exceeded its theoretical design life. Replace chain link fencing. Approximately $15 per m. Type Lifecycle Replacement Year 21 Cost $12, Priority Medium : DEC-6 Report run on: January 26, 27 1:11 AM Page 5 of 8

43 Westlock - St. Mary School (S4244) G24.3 Athletic and Recreational Surfaces** Asphalt basketball court with two outdoor backstops. 25 DEC-6 Replace asphalt basketball court. Asphalt basketball court has exceeded its theoretical design life. Replace asphalt basketball court. Approximately 33 $8 per sq.m. Type Year Cost Priority Lifecycle Replacement 218 $26,4 Medium : DEC-6 G24.5 Site and Street Furnishings* Painted wooden bench seating on precast concrete supports. 15 DEC-6 G24.6 Exterior Signs* Freestanding wooden school sign with metal letters adjacent to main entrance. Metal lettering school name signage wall mounted at secondary entrances DEC-6 G24.8 Flagpoles* One aluminum flagpole adjacent to main entrance DEC-6 G25.4 Lawns and Grasses* Ornamental lawn to front of school. Grass playing fields. 15 DEC-6 Report run on: January 26, 27 1:11 AM Page 6 of 8

44 Westlock - St. Mary School (S4244) G25.5 Trees, Plants and Ground Covers* Mature deciduous and evergreen trees to front of school. 1 DEC-6 G31.2 Site Domestic Water Distribution* 1mm main replaced in Excellent 25 5 DEC-6 G31.3 Site Fire Protection Water Distribution* Town fire hydrant within 45m of main entrance. 5 DEC-6 G32.1 Sanitary Sewage Collection* 1mm sanitary line to municipal line DEC-6 G33.1 Storm Water Collection* Storm drainage to grade from original school and additions. 5 DEC-6 G36.1 Gas Distribution* Natural gas to exterior meter. 5 DEC-6 G41.2 Electrical Power Distribution Lines* Underground feed from utility owned pole to utility owned pad mount transformer, size unknown. Underground feed from transformer to building. 5 DEC-6 Report run on: January 26, 27 1:11 AM Page 7 of 8

45 Westlock - St. Mary School (S4244) G41.3 Electrical Power Distribution Equipment* Pad mounted utility owned transformer, size unknown. 5 DEC-6 G41.4 Car Plugs-ins* 15 duplex receptacles with weatherproof covers serve 34 parking stalls. Receptacles mounted on C channels. Timer and contactor controlled. 3 - Marginal DEC-6 Add new car plug-ins. Insufficient number of car park plug-ins. Add 7 additional car park duplex receptacle plug-ins. Connect to existing plug-in controls. Type Year Cost Priority Program Functional Upgrade 27 $9,75 Medium : DEC-6 G42.1 Area Lighting* - surface mounted incandescent fixtures at entrances. - 1 Watt wall mount HPS wall packs. 15 Watt pole mount standard in courtyard. All controlled by timers and photo cells. 25 DEC-6 Report run on: January 26, 27 1:11 AM Page 8 of 8

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Parkland School Division #7 Meridian Heights School B9397A Stony Plain Report run on: January 22, 27 2:45 PM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Parkland School Division #7 Duffield School B938A Duffield Report run on: May 11, 26 4:38 PM Duffield - Duffield School (B938A) Facility Details Building Name: Duffield

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Wild Rose School Div #66 Pioneer School B3972A Rocky Mountain House Report run on: March 26, 213 9:48 AM Building Name: Address: Location: Building Id: Gross Area (sq.

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Coronation Elementary School B381A Edmonton Report run on: January 22, 27 11:33 AM Building Name: Address: Location: Building Id: Gross

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Bishop Savaryn Catholic Elementary School B58A Edmonton Report run on: July 10, 2008 3:31 PM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Lakeland Roman Catholic Separate School District No. 1 Ecole Notre Dame High School B266A Bonnyville Report run on: January 26, 2 : PM Bonnyville - Ecole Notre Dame High

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Graminia School B451A Spruce Grove Report run on: January 3, 26 1:36 PM Facility Details Building Name: Graminia School Address: 5111 R. R. 271 Location: Spruce Grove

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Our Lady Of The Prairies Catholic Elementary School B3241A Edmonton Report run on: July 17, 2008 4:00 PM Building Name: Address: Location: Building Id:

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Calgary RCSSD #1 Ecole St. Matthew Elementary / French Immersion Jr. High School B2614A Calgary Report run on: March 25, 2010 10:11 AM Building Name: Address: Location:

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Stratford Academic High School B3336A Edmonton Report run on: April 3, 29 1:6 AM Building Name: Address: Location: Building Id: Gross Area

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Greater St. Albert Catholic Regional Division No. 29 Vincent J. Maloney School B484A St. Albert Report run on: June 16, 26 2:24 PM St. Albert - Vincent J. Maloney School

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Calgary School District #19 John G Diefenbaker High School B2686A Calgary Report run on: January 1, 28 9:31 AM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Clara Tyner Elementary School B375A Edmonton Report run on: March 16, 212 2:11 PM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Harry Ainlay Composite High School B3145A Edmonton Report run on: March 2, 27 3:27 PM Building Name: Address: Location: Building Id: Gross

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report E Central Francophone Ed Reg# Ecole Du Sommet School B89A St. Paul Report run on: January 26, 2 :28 PM St. Paul - Ecole Du Sommet School (B89A) Facility Details Building

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Bishop Savaryn Catholic Elementary School B358A Edmonton Report run on: March 11, 213 5:9 PM Building Name: Address: Location: Building Id: Gross Area

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Calgary School District #19 Queen Elizabeth Junior / Senior High School B2745A Calgary Report run on: March, 2010 10:02 AM Building Name: Address: Location: Building Id:

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Cardinal Leger Catholic Junior High School B371A Edmonton Report run on: April 3, 29 1:1 AM Building Name: Address: Location: Building Id: Gross Area

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Sir John Thompson Catholic Junior High School B3275A Edmonton Report run on: March 5, 29 1:43 AM Building Name: Address: Location: Building Id: Gross

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Canadian Rockies Reg Div #12 Exshaw School B3390A Exshaw Report run on: March 26, 2010 9:29 AM Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Blessed Kateri School B36A Edmonton Report run on: April 3, 29 1:1 AM Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Calgary School District #19 Sir William Van Horne High School B2852A Calgary Report run on: March 25, 2010 10:19 AM Building Name: Address: Location: Building Id: Gross

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Alberta Health Services-Edmonton Glenrose Energy Centre B25I Edmonton Report run on: February 15, 213 1:9 AM Building Name: Address: Location: Building Id: Gross Area

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Alberta Health Services-Central Breton Health Centre B999A Breton Report run on: March 7, 214 11:1 AM Building Name: Address: Location: Building Id: Gross Area (sq. m):

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report East Central Health Viking Community Health Services B1178A Viking Report run on: March 22, 21 9:58 AM Building Name: Address: Location: Building Id: Gross Area (sq. m):

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Alberta Health Services-Edmonton Capital Care - Norwood - North Pavilion B25A Edmonton Report run on: March 12, 214 12:41 PM Building Name: Address: Location: Building

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

Estimated Repair, Replacement, and Upgrade Costs

Estimated Repair, Replacement, and Upgrade Costs Description Electrical Attic ventilator-mechanical $250 Baseboard heater (4') $150-$400 Ceiling fan $200 Doorbell system $80-$100 Dryer duct $100-$150 Hardwired smoke detector $60-$120 Exhaust Fan-Bathroom

More information

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com Residential Construction and Remodeling Estimates compliments of STRUCTURE/EXTERIOR Structure > addition (foundation to roof) $95 $130/sq.ft. > basement entrance $5250 $10500 > basement main beam $2100

More information

George B Swift Elementary Specialty School

George B Swift Elementary Specialty School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DeWitt Clinton Elementary School

DeWitt Clinton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Sidney Sawyer Elementary School

Sidney Sawyer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Alberta Health Services-Edmonton Strathcona County Health Centre B1421A Sherwood Park Report run on: March 18, 214 1:22 PM Building Name: Address: Location: Building Id:

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Prairie Land Regional Div #25 Berry Creek Community School B2933A Cessford Report run on: March 21, 213 9:46 AM Building Name: Address: Location: Building Id: Gross Area

More information

Design Standards Manual

Design Standards Manual Design Standards Manual Table of Contents: Part III (Divisions 1-32) Section No. Title Revision DIVISION 1: GENERAL REQUIREMENTS 01524 Construction Waste Management 05/07 01815 HVAC Commissioning Requirements

More information

Axiom Property Inspections

Axiom Property Inspections Cover Page Axiom Property Inspections Property Inspection Report 868 Wally Avenue, Henderson NV, 89178 Inspection prepared for: John Doe Agent: David Lawson - Axiom Inspection Date: 8/12/2010 Time: 2:30

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

Canadian Property Inspections

Canadian Property Inspections Cover Page Canadian Property Inspections Home Inspection Report L9Z-1K4 Inspection prepared for: K.C. Pitman Date of Inspection: 3/6/2017 Time: 3pm Age of Home: 42 Size: 500-1000 Weather: Cloudy, cool.

More information

REPAIR ESTIMATE GUIDE

REPAIR ESTIMATE GUIDE REPAIR ESTIMATE GUIDE STRUCTURE Foundation Addition (foundation to roof)... $125 - $170/sq.ft. Basement entrance... $6485 - $13690 Basement main beam... $2740 Basement support post/foundation... $650 -

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

RW West Consultants. Property Inspection Report

RW West Consultants. Property Inspection Report Cover Page RW West Consultants Property Inspection Report 98122 Inspection prepared for: Faira Date of Inspection: 4/27/2017 Time: 9:00 AM Age of Home: 1992 Size: 3000 Weather: Cloudy 45 degrees Order

More information

Camden. Included Features. Prices are non-negotiable. Continued on Back ATTRACTIVE INTERIORS:

Camden. Included Features. Prices are non-negotiable. Continued on Back ATTRACTIVE INTERIORS: Camden Included Features ATTRACTIVE INTERIORS: Satin Nickel Door Hardware Shed Resistant, Continuous Filament Carpet with Stainguard 1/2 -Inch, 6-Pound Nominal Carpet Pad Crown Molding in 1st Story Entry,

More information

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016 FOOD SERVICE May 6, 2016 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype requirements

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

Inspection Report 123 My Street Midland, GA

Inspection Report 123 My Street Midland, GA Buying, Selling or Building Your Home Inspection Company ROFESSIONAL INSPECTION SERVICES, LLC P.O. Box 9774 Columbus, GA 31908 706-565-0333 1-866-298-4251 Inspection Report 123 My Street Midland, GA This

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

AVS. Asset Assessment Report. Cold Lake Health Centre B1012A

AVS. Asset Assessment Report. Cold Lake Health Centre B1012A AVS Asset Assessment Report Cold Lake Health Centre B1012A Page 1 of 117 Asset ID Asset Name Location Address B1012A Cold Lake Health Centre Cold Lake 314-25 Street Verification Audit Maintenance Costs

More information

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60'

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60' ±60' Lease Line Lease Outline Drawing Needles Towne Center 1004 E. Broadway St.,, Needles, CA 92363 ± 900 SF Width ± 15' Depth ± 60' Plans produced by: ID Plans 6/16/2017 (813) 657-2545 C 2017 Site map

More information

FAIRA TRANSPARENCY REPORTS. November 21, 2016

FAIRA TRANSPARENCY REPORTS. November 21, 2016 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 7307 22 nd Ave NW, Seattle, WA

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

FAIRA TRANSPARENCY REPORTS Country Club Dr, B-203, Mill Creek, WA April 5 th, 2017

FAIRA TRANSPARENCY REPORTS Country Club Dr, B-203, Mill Creek, WA April 5 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 15433 Country Club Dr, B-203, Mill Creek, WA 98012 Thank you for your interest in this Faira

More information

Safe at Home. Suggestions for Homeowner Created in partnership with the Administration on Aging. Assessor: Assessor: Homeowner Name: Address:

Safe at Home. Suggestions for Homeowner Created in partnership with the Administration on Aging. Assessor: Assessor: Homeowner Name: Address: Assessor: Assessor: 1. EXTERIOR ENTRANCES AND EXITS Do you any difficulty getting in and out of your home? Which entrance(s) do you use the most? Have you had any falls or safety concerns? I want you to

More information

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesarstone countertop. 2. 4 x 16 ceramic tile backsplash.

More information

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1 L21366/101 090 00.00/Page 1 HVAC EXECUTIVE SUMMARY The North Middlesex Regional High School has received average maintenance of the HVAC systems over its occupied years. Even with adequate maintenance,

More information

Brookstone Collection. Included Features

Brookstone Collection. Included Features ATTRACTIVE INTERIORS: Brookstone Collection Satin Nickel Door Hardware Shed Resistant, Continuous Filament Carpet with Stainguard 1/2 -Inch, 6-Pound Nominal Carpet Pad Crown Molding in 1st Story Entry,

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

Inspecta-Homes 2469 University Avenue West St. Paul MN Ph#: (651)

Inspecta-Homes 2469 University Avenue West St. Paul MN Ph#: (651) Page 1 Doc #: Inspector: Date: Dwelling Address: Client Name: Client's Agent: Real Estate Company: Please refer to the General Home Inspection Contract. Thank you for using Minnesota and Western Wisconsin's

More information

Classic Collection Features

Classic Collection Features Classic Collection Features KITCHEN: Built-In Appliance Package Stainless Steel Dishwasher 30 Stainless Steel Self-Cleaning Double Oven 36 Stainless Steel Gas Cooktop with Sealed Burners Stainless Steel

More information

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on HOME PROPERTY SCAN INSPECTIONS The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on January 11, 2010 and

More information

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly Collect & properly dispose of recycling as needed Dust, or wipe all

More information

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE SCHEDULE OF S Penalty Fees. The fee for construction work performed before securing permit(s), where required, may be charged a fee of TWO TIMES THE COST OF THE PERMIT (S). Building Fee Schedule Residential

More information

room data sheet CORDOVA RESIDENCE 1/11 54 EAST CORDOVA STREET, VANCOUVER, BC RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

room data sheet CORDOVA RESIDENCE 1/11 54 EAST CORDOVA STREET, VANCOUVER, BC RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT RESIDENTIAL ROOM Window Provide an operable window New pressed metal door, 20 min. FPR, in new metal buck or existing wood frame, made good Proximity access control technology door hardware, closer in

More information

Vanilla Box Design Criteria

Vanilla Box Design Criteria Description: 1. Floor: 2. Walls: 3. Ceiling: A. Finished and sealed 4 thick concrete slab on 10 mil poly vapor barrier on 4 of crushed stone throughout, including toilets. A. Interior gypsum board walls

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

Proudly made in Canada. to Canadian Standards. The Statesman Series. 16 Wide Single Section Homes

Proudly made in Canada. to Canadian Standards. The Statesman Series. 16 Wide Single Section Homes Proudly made in Canada to Canadian Standards The Statesman Series 16 Wide Single Section Homes Standards and Specifications Statesman Series, 16 Wide Single Section Homes Exterior Maintenance Free Vinyl

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

AFFORDABLE CANADIAN HOME INSPECTIONS

AFFORDABLE CANADIAN HOME INSPECTIONS AFFORDABLE CANADIAN HOME INSPECTIONS Al Wright Hamilton, Ontario Cell: 905-730-9300 Expectancy of Household Components Appliances Compactors 7-12 Dishwashers 9-16 Disposal, Food Waste 11-16 Dryers 11-16

More information

AGING IN PLACE CHECKLIST Use this checklist to identify fall hazards and accessibility for the homeowner and family members.

AGING IN PLACE CHECKLIST Use this checklist to identify fall hazards and accessibility for the homeowner and family members. AGING IN PLACE CHECKLIST Use this checklist to identify fall hazards and accessibility for the homeowner and family members. EXTERIOR ENTRANCES AND EXITS: Note condition of walk and drive surface; existence

More information

QUALITY FEATURES Trent 24 7 & ascot semi-detached

QUALITY FEATURES Trent 24 7 & ascot semi-detached QUALITY FEATURES Trent 24 7 & ascot 27 10 semi-detached and elevations, loose precast concrete steps will be used when grading requires less than three (3) steps. windows with pre-finished white or coloured

More information

Classic Collection Features

Classic Collection Features Classic Collection Features KITCHEN: Built-In Appliance Package Stainless Steel Dishwasher 30 Stainless Steel Self-Cleaning Double Oven 36 Stainless Steel Gas Cooktop with Sealed Burners Stainless Steel

More information