1 RECAPP Facility Evaluation Report Edmonton School District No. 7 Clara Tyner Elementary School B375A Edmonton Report run on: March 16, 212 2:11 PM

2 Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement : Construction : Facility Details Clara Tyner Elementary Scho 942 Ottewell Road Edmonton B375A 1,921. $5,392, Edmonton - Clara Tyner Elementary School (B375A) Evaluation Company: Evaluation Date: October Evaluator Name: Evaluation Details Asset Evolution Incorporated (AEI) Mario Plastina Total Maintenance Events Next 5 years: $1,778,9 5 year Facility Condition Index (FCI): 32.99% General Summary: Clara Tyner Elementary School is a one-storey school built in with a total building area is 1921m2. The one storey school comprises of 7 classrooms, a gymnasium, a library, a music room and an ancillary room. The 211 student enrollment is 161 children. Structural Summary: The foundations consist of cast-in-place concrete grade beams and spread footings. The original building has cast-inplace concrete slabs-on-grade with conventional steel reinforcement. The majority of the structural interior walls comprise of concrete block masonry walls and concrete columns & beams. Glulam beams with a sealed and/or painted wood deck supported by exterior & interior walls. Overall, where visible the structure of the building is in acceptable condition. Envelope Summary: The exterior cladding consists primarily of exterior brick. Metal siding is located along the upper portion of the exterior walls around the gymnasium. Wood siding is located along the upper portion of the exterior walls around the perimeter of the school. The exterior wood siding has a paint finish.sealant is located around all windows, doors and brick cladding assembly. The interior face of the exterior walls have a concrete block wall assembly. An exterior painted wood soffit is located around the perimeter of the school. The windows throughout the school have an aluminum frame assembly with a combined fixed glazed portion, metal louvre and an operable awning unit. The main entrances (F1 - F6) have painted steel doors with painted steel frames and GWG inserts. Metal screens have been fastened to several of the doors for safety concerns. Secondary entrance/exit doors have insulated hollow metal exterior doors, single leaf, complete with closures, panics, thresholds, push plates pull handles, locksets and weatherstripping. The original building has a modified bituminous membrane roofing (SBS) assembly. Access to the roof is provided by a roof hatch. Overall, the envelope of the building is in acceptable condition. Recommendations: -Replace exterior windows - 14 Windows -Replace complete SBS roof assembly ( Area -24m2) -Replace roof access hatch Interior Summary: Interior partitions typically consist of painted masonry block walls, painted plaster partitions and interior brick walls. A operable folding partition is located between classroom 2 and 4. The interior swing doors generally consist of solid core painted wood doors in painted metal frames. Vestibule doors at the main entrance to the building consist of paint finished metal doors & frames. The majority of the doors are rated and labeled. Tackboards, sliding chalkboards and whiteboards are located in each classroom area. Prefinished metal washroom partitions are located in each boy's & girls washroom. The washrooms are equipped with typical washroom accessories: Paper towel dispensers, toilet paper dispensers, hand-soap dispensers, waste bins and mirrors. The majority of the demising walls in the building consist of painted plaster walls. The interior walls in the washrooms have a ceramic tile wall finish. Acoustical wall panels are located throughout the gymnasium & in the music room. The interior partitions throughout the school have a paint finish. Painted/sealed concrete floors are located in the boiler room and custodial rooms. Ceramic tile floors are located in the washroom areas. Hardwood flooring is located in the gymnasium. Sheet Vinyl is located throughout the Report run on: March 16, 212 2:11 PM Page 2 of 42

3 Edmonton - Clara Tyner Elementary School (B375A) majority of the corridors and in some classrooms. Vinyl tiles flooring is located in classroom 2 and isolated washrooms. Carpeting is located in several classrooms, office area, music room and library. The main corridor to the gym and the office area have a 61mm x 122mm suspended acoustical tile ceiling. Acoustical tiles (3mmx3mm) are located in the washrooms and in several corridors. The structural wood deck is painted and exposed in the majority of the classrooms. The wood beams are exposed with a stained finish in the main entrance area. Overall, the interior finishes are in acceptable condition. Recommendations: -Replace sheet vinyl in classrooms and corridors (Area - 7m2) -Replace all original VAT tile ( Area - 2m2) -Replace carpeting (Area - 8m2) -Replace 3mm x3mm acoustical ceiling tiles. ( Area 4 m2) -Provide a handicap parking space with signage -Provided power operators for barrier free access at two entrances -Provide a barrier free unisex washroom Mechanical Summary: MECHANICAL SUMMARY (October 211) The building is heated by hot water which is supplied from two natural gas fired hot water boilers to the building heating terminal units (force flow convection cabinets, finned tube radiation cabinets, a unit heater, and unit ventilators), and to the air handling unit heating coil (for the gymnasium air handling unit). Ventilation for the building is provided by 13 unit ventilators and by the gymnasium air handling unit. Fresh air supplied to the building by the unit ventilators and the the gymnasium air handling unit is balanced by the exhaust flow from 11 general and sanitary exhaust fans (ten roof mounted exhaust fans and one interior exhaust fan). Building HVAC equipment actuators and thermostats are generally pneumatic (electric controls are used for the force flow convection heaters and the unit heater), and the control air supply system for the building consists of an air compressor mounted on an air receiver tank. A Barber Colman Network 8 building management and control system provides monitoring and control for the main HVAC equipment located in the boiler room. Washroom plumbing fixtures include toilets, lavatories and urinals. There are 12 toilets, six urinals, and 13 lavatories in the building. Other plumbing fixtures in the building include drinking fountains (three wall mounted units and five sink mounted units), and various sinks (1). One natural gas fired domestic hot water heater provides domestic hot water for the building lavatories and sinks. Fire protection for the building consists of a standpipe system feeding standard fire hose cabinets and fire extinguishers located on wall mount brackets and in the fire hose cabinets. Current mechanical system requirements include the replacement of one toilet and lavatory, replacement of the domestic water distribution system valves, the need for a backflow prevention device for the domestic water supply system, replacement of the domestic hot water circulation pump, replacement of the boiler room sump pump, replacement of the original roof mounted exhaust fans, and replacement of the unit ventilators. Overall, the building mechanical equipment and systems are in acceptable condition. Electrical Summary: Clara Tyner Elementary School is fed from an EPCOR padmounted transformer located on the school grounds. The main switchboard is rated at 4A, 12/28V. New branch circuit panelboards were installed in 199 but many of the panels within the school appear to be from the original construction. There are individual motor starters for the major mechanical equipment. The wiring in the building is typically standard wiring in conduit. The interior fluorescent lighting fixtures have been retrofitted with high efficiency T-8 lamps and electronic ballasts. The exit lighting in the building consists of metal units that have been retrofitted with LED lamps. The emergency lighting consists of dual head battery operated units and remote lamps. The exterior lighting consists of wall mounted H.I.D fixtures and recessed incandescent fixtures in the canopies. The building is equipped with an Edwards 6616 system. Detection and end devices include, smoke and heat Report run on: March 16, 212 2:11 PM Page 3 of 42

4 Edmonton - Clara Tyner Elementary School (B375A) detectors, bells and pull stations. The various communications and security systems within the school include; a Magnum Alert security system that monitors motion detectors, a Bogen Multicom 2 P.A. system and a Norstar/Meridian telephone system. Cable TV and data systems are installed within the school. It is recommended, as routine maintenance, that a program for annual examination of major electrical components be instituted. Maintenance should include thermographic scans for hot spots and power shut down to allow examination of interior components for accumulated debris and signs of corrosion. The main concerns for Clara Tyner School are: - The main switchboard is aged - no surge protection has been provided. - The original branch circuit panels are aged - replacement parts are not readily available. - Emergency lighting battery units are aged. Reliability is questionable. - Exterior incandescent lighting is not energy efficient. Fixtures are in poor condition. - Exterior HPS fixtures are aged. - The fire alarm system is aged - replacement parts are not available. Overall the electrical components for Clara Tyner Elementary School are in acceptable condition. Guide Condition Performance 1 - Critical Unsafe, high risk of injury or critical system failure. 2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. 5 - Good Meets all present requirements. No deficiencies. 6 - Excellent As new/state of the art, meets present and foreseeable requirements. Report run on: March 16, 212 2:11 PM Page 4 of 42

5 S1 STRUCTURAL Edmonton - Clara Tyner Elementary School (B375A) A11 Standard Foundations* The foundations consist of cast-in-place concrete grade beams and spread footings. AUG-6 A13 Slab on Grade* The building has cast-in-place concrete slabs-on-grade with conventional steel reinforcement. AUG-6 B11.2 Structural Interior Walls Supporting Floors (or Roof)* The majority of the structural interior walls comprise of concrete block masonry walls and concrete columns & beams. AUG-6 B11.9 Floor Construction Fireproofing* Floor Construction Fireproofing - Not visible during site visit B11.1 Floor Construction Firestopping* Fire-stopping observed only in the mechanical and electrical utility rooms. B12.1 Roof Structural Frame* Glulam beams with a sealed and/or painted wood deck supported by exterior & interior walls. B12.6 Roof Construction Fireproofing* Roof Construction Fire-proofing - Not visible during site visit Report run on: March 16, 212 2:11 PM Page 5 of 42

6 S2 ENVELOPE Edmonton - Clara Tyner Elementary School (B375A) B Brick Masonry: Ext. Wall Skin* The exterior cladding consists primarily of exterior brick. B Metal Siding** Metal siding is located along the upper portion of the exterior walls around the gymnasium. 4 Replace metal gym ( Area - 15m2) 215 $15, : B Wood Siding** Wood siding is located along the upper portion of the exterior walls around the perimeter of the school. 4 Replace wood siding ( Area - 15m2) 215 $35, : B Joint Sealers (caulking): Ext. Wall** Sealant is located around all windows, doors and brick cladding assembly. Replace sealant during the window replacement. 2 Replace building sealant - 14 Windows 215 $7,5 : Report run on: March 16, 212 2:11 PM Page 6 of 42

7 Edmonton - Clara Tyner Elementary School (B375A) B Paints (& Stains): Ext. Wall** The exterior wood siding has a paint finish Repaint exterior wood siding ( Area - 15m2) 215 $25, : B Masonry Units: Ext. Wall Const.* The interior face of the exterior walls have a concrete block wall assembly. B21.3 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* Exterior Wall Vapor Retarders, Air Barriers, and Insulation - Not visible during site visit AUG-6 B21.9 Exterior Soffits* An exterior painted wood soffit is located around the perimeter of the school. AUG-6 Report run on: March 16, 212 2:11 PM Page 7 of 42

8 B Aluminum Windows (Glass & Frame)** Edmonton - Clara Tyner Elementary School (B375A) The windows throughout the school have an aluminum frame assembly with a combined fixed glazed portion, metal louvre and an operable awning unit. 4 Replace exterior windows - 14 Windows The awning windows are not operable in all locations and the metal screens are deteriorating. Replace all windows throughout the school. Failure Replacement 213 $42, Low : Typical window assembly B Steel-Framed Storefronts: Doors** The main entrances (F1 -F6) have painted steel doors with painted steel frames and GWG inserts. Metal screens have been fastened to several of the doors for safety concerns. 3 Replace main entrance assembly F1 - F6 - (13 doors, sidelights c/w hardware) 215 $78, : Report run on: March 16, 212 2:11 PM Page 8 of 42

9 Edmonton - Clara Tyner Elementary School (B375A) B23.2 Exterior Utility Doors** - Section Secondary entrance/exit doors have insulated hollow metal exterior doors, single leaf, complete with closures, panics, thresholds, push plates pull handles, locksets and weatherstripping. 4 Replace steel framed doors & hardware assembly (3 doors) 215 $9, : B31.1 Deck Vapour Retarder and Insulation* Deck Vapor Retarder and Insulation - Not Visible B Modified Bituminous Membrane Roofing (SBS)** The original building has a modified bituminous membrane roofing (SBS) assembly Replace complete SBS roof assembly ( Area - 24m2) Ponding and several blisters were observed in numerous locations. Replace complete SBS roof assembly ( Area -24m2) Failure Replacement 213 $4, Medium : Several blisters observed throughout the roof assembly. Report run on: March 16, 212 2:11 PM Page 9 of 42

10 B32.2 Other Roofing Openings (Hatch, Vent, etc)* Access to the roof is provided by a roof hatch. Edmonton - Clara Tyner Elementary School (B375A) Replace roof access hatch A roof hatch is deteriorated and the hardware is aged and loose. Replace roof access hatch Failure Replacement 213 $2,5 Low : Deteriorated roof access hatch Report run on: March 16, 212 2:11 PM Page 1 of 42

11 S3 INTERIOR Edmonton - Clara Tyner Elementary School (B375A) C11.1 Interior Fixed Partitions* Interior partitions typically consist of painted masonry block walls, painted plaster partitions and interior brick walls. C11.3 Interior Operable Folding Panel Partitions** A operable folding partition is located between classroom 2 and Replace Operable Folding Panel Partitions - 1 Panel 215 $15, : C11.7 Interior Partition Firestopping* Where visible, it appears that piping and conduit have been penetrations of fire separations have been sealed with fire rated materials. C12.1 Interior Swinging Doors (& Hardware)* The interior swing doors generally consist of solid core painted wood doors in painted metal frames. C12.3 Interior Fire Doors* Vestibule doors at the main entrance to the building consist of paint finished metal doors & frames. The majority of the doors are rated and labeled. AUG-6 Report run on: March 16, 212 2:11 PM Page 11 of 42

12 Edmonton - Clara Tyner Elementary School (B375A) C13.1 Visual Display Boards** Tackboards, sliding chalkboards and whiteboards are located in each classroom area. 2 Replace Visual Display Boards - (Based on the 1 teaching rooms) 215 $1, : C13.2 Fabricated Compartments (Toilets/Showers)** Prefinished metal washroom partitions are located in each boy's & girls washroom. 3 Replace washroom partitions - 1 Stalls 215 $15, : C13.8 Interior Identifying Devices* The room number or room name is painted on the interior doors. AUG-6 C13.12 Storage Shelving* Clear finish plywood storage shelving throughout. AUG-6 C13.14 Toilet, Bath, and Laundry Accessories* The washrooms are equipped with typical washroom accessories: Paper towel dispensers, toilet paper dispensers, handsoap dispensers, waste bins and mirrors. AUG-6 Report run on: March 16, 212 2:11 PM Page 12 of 42

13 Edmonton - Clara Tyner Elementary School (B375A) C31.3 Plaster Wall Finishes (Unpainted)* The majority of the demising walls in the building consist of painted plaster walls. It was noted that asbestos may be contained in the plaster walls. AUG-6 C31.6 Tile Wall Finishes** The interior walls in the washrooms have a ceramic tile wall finish. 4 Replace ceramic wall tile (Area - 4m2) 215 $4, : C31.9 Acoustical Wall Treatment** Acoustical wall panels are located throughout the gymnasium & in the music room 2 Replace Acoustical Wall Treatment - Area -2m2 215 $4, : C31.11 Interior Wall Painting* The interior partitions throughout the school have a paint finish C Painted Concrete Floor Finishes* Painted/sealed concrete floors are located in the boiler room and custodial rooms. Report run on: March 16, 212 2:11 PM Page 13 of 42

14 Edmonton - Clara Tyner Elementary School (B375A) C32.2 Tile Floor Finishes** Ceramic tile floors are located in the washroom areas. 5 Replace ceramic floor tile (Area - 1m2) 216 $8, : C32.4 Wood Flooring** Hardwood flooring is located in the gymnasium. 3 Replace wood flooring in gym (Area - 25m2) 215 $6, : Report run on: March 16, 212 2:11 PM Page 14 of 42

15 Edmonton - Clara Tyner Elementary School (B375A) C32.7 Resilient Flooring** - Sheet Vinyl Sheet Vinyl is located throughout the majority of the corridors and in some classrooms. 2 Damaged sheet vinyl at threshold to washroom. Replace sheet vinyl in classrooms and corridors (Area - 7m2) Overall the sheet vinyl is in fair condition, however several seams have been taped. Replace sheet vinyl in the corridors & classrooms Failure Replacement 213 $6, Low : Original Sheet Vinyl flooring in classrooms Report run on: March 16, 212 2:11 PM Page 15 of 42

16 Edmonton - Clara Tyner Elementary School (B375A) C32.7 Resilient Flooring** - VT Vinyl tiles flooring is located in classroom 2 and isolated washrooms. 2 Replace all original VAT tile ( Area - 2m2) Overall, the vinyl tile is in fair condition, however the VAT is worn and deteriorated. Replace all original VAT tile ( Area - 2m2) Failure Replacement 213 $2, Low : C32.8 Carpet Flooring** Carpeting is located in several classrooms, office area, music room and library Replace carpeting (Area - 8m2) Overall the carpet is aged and worn throughout the school. Potential tripping hazard in several areas. Replace all carpeting throughout the school Failure Replacement 213 $9, Low : Worn carpet in classroom areas. Report run on: March 16, 212 2:11 PM Page 16 of 42

17 C33.6 Acoustic Ceiling Treatment (Susp. T-Bar)** Edmonton - Clara Tyner Elementary School (B375A) The main corridor to the gym and the office area have a 61mm x 122mm suspended acoustical tile ceiling Replace acoustical tile ceiling - (Approx Area - 3m2) 215 $3, : C33.7 Interior Ceiling Painting* The structural wood deck is painted and exposed in the majority of the classrooms. The wood beams are exposed with a stained finish in the main entrance area AUG-6 C33.9 Other Ceiling Finishes* - 3mm x3mm Acoustical tiles 3mm x3mm are located in the washrooms and in several corridors. Replace 3mm x3mm acoustical ceiling tiles. ( Area 4 m2) Overall, several of the tiles have been replaced. Some of the tiles are stained and broken. Asbestos may be contained in the ceiling tiles, therefore the cost is included in the removal. Replace acoustical tile ceiling in the corridors Failure Replacement 212 $3, Medium : Stained ceiling tiles in washroom area. Report run on: March 16, 212 2:11 PM Page 17 of 42

18 S4 MECHANICAL Edmonton - Clara Tyner Elementary School (B375A) D21.4 Sinks** - c. Original c. sinks in the building include two enameled cast iron custodian sinks and six general purpose single bowl stainless steel sinks. 3 Replace the original c. sinks (two service sinks and six general purpose sinks) 215 $13, : D21.4 Sinks** - c.1991 There is one c.1991 general purpose single bowl stainless steel sink located in the copy room (room 31) Replace the c.1991 general purpose sink in the copy room (room 31) 221 $1,5 : D21.4 Sinks** - c.27 There is one c.27 general purpose double bowl stainless steel sink located in the staff room (room 32). 5 - Good 27 3 Replace the c.27 general purpose sink in the staff room (room 32) 237 $1,5 : Report run on: March 16, 212 2:11 PM Page 18 of 42

19 Edmonton - Clara Tyner Elementary School (B375A) D21.8 Drinking Fountains/Coolers** There are three wall mounted vitreous china drinking fountains located in the building corridors (one of the three units is a double drinking fountain). In addition, some of the general purpose stainless steel sinks located in the classrooms are equipped with drinking fountain attachments (five total). 35 Replace the drinking fountains (three wall mounted units and five sink mounted units) 215 $7, : D21.1 Washroom Fixtures (WC, Lav, Urnl)** - c. - Boy's and Girl's Washrooms Original c. washroom plumbing fixtures in the boy's and girl's washrooms include floor mounted vitreous china flush valve type toilets (8) and floor mounted vitreous china flush valve type urinals (6). 35 Replace the c. washroom plumbing fixtures in the boy's and girl's washrooms (8 toilets and 6 urinals) 215 $28, : D21.1 Washroom Fixtures (WC, Lav, Urnl)** - c. - Custodian's Office Original washroom plumbing fixtures in the custodian's office include one floor mounted vitreous china tank type toilet and one wall mounted enameled steel lavatory. 35 Replace the washroom plumbing fixtures in the custodian's office (one toilet and one lavatory) The washroom plumbing fixtures in the custodian's office are in marginal condition due to age, wear and corrosion. Replace the washroom plumbing fixtures in the custodian's office (one toilet and one lavatory). Failure Replacement 212 $3,5 Medium : IMG_417.JPG Report run on: March 16, 212 2:11 PM Page 19 of 42

20 D21.1 Washroom Fixtures (WC, Lav, Urnl)** - c.27 Edmonton - Clara Tyner Elementary School (B375A) Washroom plumbing fixtures replaced in c.27 include three floor mounted vitreous china tank type toilets and 12 counter mounted stainless steel lavatories. 5 - Good Replace the c.27 washroom plumbing fixtures (3 toilets and 12 lavatories) 242 $24, : D Pipes and Tubes: Domestic Water* There is one municipal water supply to the building which feeds the building domestic water distribution system and the building fire protection system (1 mm diameter). There is a water meter for the building domestic water distribution system (5 mm diameter). The municipal water supply enters the building in the boiler room (room 28). The domestic water distribution system piping in the buildings is copper. The water main to the building was replaced in c.1999 (PVC water supply line to the building). D Valves: Domestic Water** Domestic water distribution system valves include the domestic water supply main isolation valves, the domestic water distribution system zone isolating valves, and plumbing fixture isolating valves. The main isolation valves are gate type valves. 4 Replace the domestic water distribution system valves (1,921 SM GFA) The domestic water distribution valves are in marginal condition due to seizure and inadequate sealing. Replace the domestic water distribution system valves. Failure Replacement 214 $12, Low : Report run on: March 16, 212 2:11 PM Page 2 of 42

21 D Piping Specialties (Backflow Preventers)** Edmonton - Clara Tyner Elementary School (B375A) There is one 63 mm diameter backflow prevention device located in the boiler room for the standpipe system and one 19 mm diameter backflow prevention device located in the boiler room for the make-up water supply to the heating system. There is no backflow prevention device for the domestic water supply to the building Install a backflow prevention device on the domestic water supply to the building (5 mm diameter) The domestic water supply to the building is not protected from potential backflow from the building. Install a backflow prevention device on the domestic water supply to the building (5 mm diameter). Code Upgrade 212 $5, Low : Replace the c.1997 backflow prevention devices (one at 63 mm diameter and one at 19 mm diameter) 217 $5,5 : D Plumbing Pumps: Domestic Water** Domestic water plumbing pumps include the domestic hot water circulation pump located in the boiler room. 2 Replace the domestic hot water circulation pump The domestic hot water circulation pump is in marginal condition due to age and wear. Replace the domestic hot water circulation pump. Failure Replacement 213 $2, Low : Report run on: March 16, 212 2:11 PM Page 21 of 42

22 Edmonton - Clara Tyner Elementary School (B375A) D Domestic Water Heaters** One storage tank type natural gas fired domestic hot water heater is located in the boiler room. The domestic hot water heater is a John Wood model JW4S34FV-4 with an input heating capacity of 38, Btu/h (11.14 kw) and a volume capacity of 4 US gallons (151 L) Capacity Size 189 Capacity Unit litre Replace the domestic hot water heater (11.14 kw) 228 $1,8 : D22.3 Water Supply Insulation: Domestic* Where visible, the domestic cold water piping is insulated to prevent condensation and the domestic hot water piping is insulated to reduce heat loss. D23.1 Waste and Vent Piping* Visible waste and vent piping is generally copper in smaller diameters and cast iron in larger diameters. The building sanitary drainage system discharges to the municipal combined storm and sanitary sewer main on Ottewell Road. D Floor Drains* Floor drains are used in the building in various areas including the washrooms. The floor drains discharge to the building sanitary drainage system. Report run on: March 16, 212 2:11 PM Page 22 of 42

23 Edmonton - Clara Tyner Elementary School (B375A) D23.3 Waste Piping Equipment* There is a drainage sump (located in the boiler room) equipped with a single vertical sump pump. Replace the sump pump located in the boiler room The sump pump is in marginal condition due to age and wear. Replace the sump pump located in the boiler room. Failure Replacement 214 $4,5 Medium : D24.1 Rain Water Drainage Piping Systems* The flat roof areas of the building drain via roof drains and internal storm drainage piping. The storm water drainage piping in the building is generally cast iron. The building storm water drainage system discharges to the municipal combined storm and sanitary sewer main on Ottewell Road. D Roof Drains* Storm water drainage for the building flat roof areas is via roof drains with internal drainage piping. The roof drains are equipped with metal strainers and flow control weirs. D31.2 Gas Supply Systems* The natural gas supply to the building is underground to the boiler room (room 28) where the pressure reducing station and meter are located. The natural gas supply line is a 32 mm diameter line. Natural gas in the building is supplied to the two heating boilers and the domestic hot water heater. Report run on: March 16, 212 2:11 PM Page 23 of 42

24 D Heating Boilers and Accessories: H.W.** Edmonton - Clara Tyner Elementary School (B375A) There are two natural gas fired hot water heating boilers located in the boiler room which provide hot water for building heating. Each boiler is a Weil-McLain model 8 series 1 number BG-88C boiler with an input heating capacity of 1,82, Btu/h ( kw). 5 - Good Capacity Size 246 Capacity Unit kw Replace the two hot water heating boilers ( kw each) 244 $64, : D Chimneys (& Comb. Air): H.W. Boiler** The combustion gases from the two hot water boilers discharge through a common B-vent stack which penetrates the roof above the boiler room. There is an insulated combustion air supply duct equipped with motorized dampers which provides combustion air to the boiler room. The combustion gas discharge ducts inside the boiler room are insulated. 5 - Good Replace the combustion gas discharge stack for the hot water boilers (8 m) and replace the combustion air supply duct 244 $8, : D Water Treatment: H. W. Boiler* Water treatment for the hot water boilers consists of manual chemical addition via a pot feeder and sidestream filtration in parallel with the circulation pumps. 5 - Good 29 Report run on: March 16, 212 2:11 PM Page 24 of 42

25 D Air Handling Units: Air Distribution** - Gymnasium Edmonton - Clara Tyner Elementary School (B375A) An original constant volume air handling unit (AHU) equipped with a hot water heating coil provides ventilation for the gymnasium. Fresh air is introduced into the ventilation system via a fresh air duct from the roof. The air handling unit is a Trane Torrivent model T14-HF-THD. The estimated air handling unit flow capacity is 4, cfm (1,888 L/s). 3 Replace the c. gymnasium air handling unit (1,888 L/s) 215 $26, : D Air Cleaning Devices: Air Distribution* The gymnasium air handling unit is equipped with filters. D Ducts: Air Distribution* The air distribution ducts include the fresh air, return air, and supply air duct systems for the gymnasium air handling unit. The duct systems include associated components not specifically listed elsewhere, including duct insulation, turning vanes, dampers, mixing boxes, etc. The duct systems are original (c.). D Air Outlets & Inlets: Air Distribution* Air outlets and inlets include the supply air diffusers and return air grilles for the air distribution systems associated with the gymnasium air handling unit. The gymnasium supply air diffusers are duct mounted round cone type diffusers, and the gymnasium return air inlet consists of a grille mounted on the open end of the return air duct. Report run on: March 16, 212 2:11 PM Page 25 of 42

26 Edmonton - Clara Tyner Elementary School (B375A) D Hot Water Distribution Systems** The building is heated with a hot water heating system. The hot water heating system provides hot water to the hydronic terminal units (including finned tube radiation cabinets, force flow convectors, unit ventilators, and a unit heater), and to the air handling unit heating coil (for the gymnasium air handling unit). There are two boiler hot water circulation pumps and three hot water loop circulation pumps. The hot water distribution system includes all components of the closed loop hot water heating system including piping, valves, piping insulation, piping specialties, circulation pumps, and the expansion tank. The circulation pumps and the expansion tank are located in the boiler room and were replaced in c Replace the hot water distribution system (1,921 SM GFA) 215 $18, : D Fans: Exhaust** - c. There are ten original c. roof mounted exhaust fans for the building providing general and sanitary exhaust. 3 Replace the c. roof mounted exhaust fans (1) roof mounted exhaust fans for the building. Replace the c. roof mounted exhaust fans. Failure Replacement 214 $23, Low : D Fans: Exhaust** - c.26 There is one interior exhaust fan for the server room Replace the server room exhaust fan 236 $2, : Report run on: March 16, 212 2:11 PM Page 26 of 42

27 Edmonton - Clara Tyner Elementary School (B375A) D Ducts: Exhaust* Exhaust duct systems include the collection ducts associated with the ten roof mounted building exhaust fans, and the discharge duct associated with the server room exhaust fan. This element includes all components of the exhaust duct systems not specifically covered under other elements, including ducts, duct supports, dampers, insulation, etc. D Air Outlets and Inlets: Exhaust* Exhaust air inlets include the inlet grilles associated with the exhaust system collection ducts. Wall mounted air transfer grilles are located in the classrooms to allow the fresh air supplied by the unit ventilators to be balanced by air flow from the classrooms into the corridors where it is exhausted by the general exhaust fans. D Convectors** - Force Flow Heaters Hot water force flow convectors are used in high heating load areas including the building entrance vestibules (six force flow heaters total). 4 Replace the force flow convection heaters (6) 215 $24, : D Finned Tube Radiation** Hot water finned tube radiation cabinets provide perimeter heating for some areas of the building including the computer room, the library and the washrooms. 4 Replace the finned tube radiation cabinets (2 m) 215 $1, : Report run on: March 16, 212 2:11 PM Page 27 of 42

28 Edmonton - Clara Tyner Elementary School (B375A) D Unit Heaters** One hot water unit heater is located in the boiler room. 5 - Good 29 3 Replace the hot water unit heater in the boiler room 239 $4, : D Unit Ventilators** Original Dunham Bush unit ventilators at the perimeter wall provide heating and ventilation for most of the building rooms. Each unit ventilator is equipped with a hot water heating coil, a circulation fan, and an outside air damper. There are a total of 13 unit ventilators. 3 Replace the c. unit ventilators (13) The unit ventilators are in marginal condition due to wear and obsolescence. Replace the unit ventilators (13). Failure Replacement 213 $13, Medium : D Electric and Electronic Controls** The force flow convection heaters and the unit heater are controlled by electric thermostats. 3 Replace the electric controls for the unit heater and the force flow heaters (7) 215 $2,1 : Report run on: March 16, 212 2:11 PM Page 28 of 42

29 Edmonton - Clara Tyner Elementary School (B375A) D Pneumatic Controls** - c. The building HVAC system controls and actuators are generally pneumatic (electric controls are used for the force flow convection heaters and the unit heater). The control air supply system is located in the boiler room (the control air supply system is covered under a separate element). Pneumatic controls include pneumatic thermostats, control valves for the heating terminal units (finned tube radiation cabinets and unit ventilators), control valves for the air handling unit hot water heating coil, and damper actuators. This element includes the control air distribution system and components. 4 Replace the pneumatic controls excluding the control air supply system (1,921 SM GFA) 215 $1, : D Pneumatic Controls** - c.2 The control air supply system consists of an air compressor mounted on an air receiver tank (located in the boiler room). 2 4 Replace the control air supply system (air compressor and receiver tank) 24 $2, : D Building Systems Controls (BMCS, EMCS)** A Barber Colman building management and control system provides monitoring and control for the main HVAC equipment located in the boiler room Replace the Barber Colman Network 8 building management and control system (1,921 SM GFA) 223 $15, : D42 Standpipes* The building is equipped with a standpipe system which feeds standard fire hose cabinets. Report run on: March 16, 212 2:11 PM Page 29 of 42

30 D43.1 Fire Extinguisher, Cabinets and Accessories* Edmonton - Clara Tyner Elementary School (B375A) ABC type fire extinguishers are located throughout the building in the fire hose cabinets and on wall mounted brackets. Report run on: March 16, 212 2:11 PM Page 3 of 42

31 S5 ELECTRICAL Edmonton - Clara Tyner Elementary School (B375A) D Main Electrical Transformers (Utility Owned)* The incoming hydro service to Clara Tyner Elementary School is a 12/28V, 3-phase, 4-wire service from an exterior padmounted transformer located on the North side of the school property. The padmounted transformer is owned and maintained by EPCOR. The EPCOR meter is located in a section of the main switchboard. 4 JUN-11 D51.3 Main Electrical Switchboards (Main Distribution)** The main electrical switchboard is a Canadian Westinghouse switchboard rated at 4A, 12/28V, 3-phase, 4-wire. The switchboard has a main breaker and a distribution section with moulded case breakers feeding the fire alarm panel and branch circuit panels within the school. The main electrical switchboard, located in the boiler room, is original equipment that was installed when the school was constructed. 4 Replace Main Switchboard (4A, 12/28V - 7 branch breakers) The main switchboard is original equipment installed in. Replacement breakers are no longer available for the switchboard. Infra-red scanning should be undertaken annually to ensure that there are no problems with the connections or contacts. Replace the main switchboard with a new 4A, 12/28V switchboard c/w moulded case branch circuit breakers. Consequences of Deferral: A failure of the main breaker or main bussing would shut down power for the entire school. A replacement for the main switchboard would typically be a minimum of 6 to 8 weeks for manufacture and delivery. 4A, 12/28V main switchboard. Failure Replacement 212 $17, High : Report run on: March 16, 212 2:11 PM Page 31 of 42

32 D51.5 Electrical Branch Circuit Panelboards (Secondary Distribution)** - Edmonton - Clara Tyner Elementary School (B375A) The majority of the electrical branch circuit panelboards are Westinghouse panels that were installed when the building was originally constructed. There are five original Westinghouse panels. 3 Replace Branch Circuit Panels (5 panels) The original branch circuit electrical panels () have exceeded their life expectancy. Over the life of the panel, breaker contacts become worn and the breakers will no longer operate correctly and may trip unnecessarily. Older panels do not readily accept newer style breakers. Replace aged panelboards and reconnect branch circuit wiring. Consequences of Deferral: Deferring replacement could lead to partial power outages and intermittent tripping of breakers as well as potential difficulties obtaining replacement components. Failure Replacement 212 $25, Medium : D51.5 Electrical Branch Circuit Panelboards (Secondary Distribution)** Panel B1 is a Westinghouse panel that is subfed from original Westinghouse panel B. Original 12/28V Westinghouse branch circuit panel Replace Branch Circuit Panel (1 panel) 22 $5, : Report run on: March 16, 212 2:11 PM Page 32 of 42

33 D51.5 Electrical Branch Circuit Panelboards (Secondary Distribution)** - 2 Edmonton - Clara Tyner Elementary School (B375A) Panels A1 and C1 are Federal Pioneer panels that were installed to accommodate additional building loads. 2 3 Replace Branch Circuit Panels (2 panels) 23 $1, : D Motor Starters and Accessories** The motor starters within the school are individual motor starters (Westinghouse) or motor rated starter switches (typically Westinghouse or Allen Bradley) Replace Motor Starters (2 motor starters, 1 motor rated switches) 215 $9, : D52.1 Electrical Branch Wiring* The majority of the cabling is standard building wire in EMT conduit. Arnoured cable has been provided, in selected locations, for final connections to mechanical and miscellaneous equipment. AUG-6 D Lighting Accessories: Interior (Lighting Controls)* Lighting is typically controlled by individual 12V switches within the individual rooms. 199 D Interior Incandescent Fixtures* Incandescent downlights have been installed in the General Office. AUG-6 Report run on: March 16, 212 2:11 PM Page 33 of 42

34 Edmonton - Clara Tyner Elementary School (B375A) D Interior Fluorescent Fixtures** The fluorescent lighting fixtures within the school were upgraded in 25. The typical classroom lighting consists of continuous wrap-around, two lamp fluorescent fixtures, surface mounted on the ceiling. Two lamp fluorescent fixtures with wire guards have been provided in the gymnasium. T8 lamps and electronic ballasts have been installed in the fluorescent lighting fixtures Replace Interior Fluorescent Fixtures (1921 m2 gfa) 235 $119, : D Emergency Lighting Battery Packs** The emergency lighting in the building is provided by battery powered emergency lighting units and remote emergency lighting heads Replace Emergency Lighting Battery Packs (8 units) The emergency lighting battery packs are aged. Units may no longer be able to maintain the emergency lighting for the required 3 minute period. Some units were not operational. Replace emergency battery units with new units to current code requirements. Failure Replacement 212 $8,8 High Emergency battery unit in custodian room - not operational. : D Exit Signs* The majority of the exit signs are metal, stencil faced exit signs that have been retrofitted with LED lamps AUG-6 Report run on: March 16, 212 2:11 PM Page 34 of 42

35 Edmonton - Clara Tyner Elementary School (B375A) D Exterior Incandescent Fixtures* Incandescent recessed lighting fixtures are installed in some entrance canopies. Replace Exterior Incandescent Lighting (8 fixtures) The exterior incandescent lighting is not energy efficient. Some fixtures are in poor condition. Replace incandescent exterior lighting with new energy efficient exterior lighting fixtures. Failure Replacement 213 $4, Low : Exterior incandescent lighting fixture at entrance. D Exterior H.P. Sodium Fixtures* H.P.S wallpack fixtures have been provided on the exterior walls along the West side of the building. 198 Replace Exterior HPS Fixtures (4 Fixtures) The exterior HPS fixtures are aged. Light output has diminished. Replace exterior HPS lighting with new vandalproof, energy efficient lighting. Failure Replacement 213 $4, Low : Aged exterior HPS lighting fixture. D Lighting Accessories: Exterior (Lighting Controls)* Timers have been provided for exterior lighting control. 198 Report run on: March 16, 212 2:11 PM Page 35 of 42

36 Edmonton - Clara Tyner Elementary School (B375A) D53.1 Detection and Fire Alarm** The fire alarm system control panel is an Edwards 6616 panel with 6 active zones and 1 spare zones. The control panel is located in the general office and there is a remote annunciator at the North entrance. The audible devices within the school are 1" dia. Bells. Strobes have not been installed. A duct mounted smoke detector has been provided in the return air ductwork of the gymnasium air handling unit Replace Fire Alarm System (1921 sq. m. gfa) Existing Edwards 6616 fire alarm panel is no longer manufactured and repair parts no longer available. Fire devices are aged and may no longer be reliable. There are no strobes in the school. Provide new addressable fire alarm system to current code requirements. Provide strobe coverage throughout. Failure Replacement 212 $5, High Edwards 6616 fire alarm control panel. : D Intrusion Detection** The Magnum Alert 3 security system panel is located in the general office storage room. A security system keypad has been located in the custodian room. PIR motion detectors have been provided throughout the school Replace Intrusion Detection System (Panel, 12 motion detectors) 225 $14, : D Video Surveillance** An exterior camera has been provided at the main entrance. The camera is monitored in the general office. 5 - Good Replace Video Surveillance System (1 exterior camera and monitor) 233 $5, : Report run on: March 16, 212 2:11 PM Page 36 of 42

37 Edmonton - Clara Tyner Elementary School (B375A) D53.3 Clock and Program Systems* LaCrosse radio controlled clocks have been installed in the school. The clocks are battery operated. 5 - Good 28 D Telephone Systems* The telephone system is a Norstar Meridian system. Nortel handsets are located in the classrooms and selected areas such as the general office. The main telephone equipment is located in the general office storage room. 21 D Data Systems* The data system server is located in the general office storage room. The network wiring within the school is typically Cat. 5 or better. Supernet has been installed in the school. Some of the network switches have been upgraded. 22 D53.5 Public Address and Music Systems** The public address system is a Bogen Multicom 2 system. Existing speaker enclosures were reused with the new P.A. system. The Bogen unit is located in the general office storage room. A separate sound system has been provided for the gymnasium with wall mounted speakers on both sides of the stage. The program bells are initiated from the Bogen P.A. system Replace P.A. System (Head-end equipment and 15 classrooms) 221 $25, : D53.6 Television Systems* Coaxial cable for television systems has been brought into the school. A Cable TV outlet has been provided in the library. 199 Report run on: March 16, 212 2:11 PM Page 37 of 42

38 D53.7 Other Communications and Security Systems* Edmonton - Clara Tyner Elementary School (B375A) FM transmitters and associated speakers have been provided in the classrooms for the voice amplification systems used by the teachers. 2 AUG-6 Report run on: March 16, 212 2:11 PM Page 38 of 42

39 Edmonton - Clara Tyner Elementary School (B375A) S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION E19.4 Residential Equipment* The staff room and ancillary rooms are equipped with refrigerators, dishwasher, range, small appliances and microwaves. E19.7 Athletic, Recreational, and Therapeutic Equipment* Basketball hoops are located in the gymnasium. A climbing apparatus is also located in the gym area. AUG-6 E21.2 Fixed Casework** Each classroom is equipped with custom wood open faced and/or painted cabinet units. The library has fixed and moveable wood shelving casework. The washrooms have plastic laminate counter-tops. Glass display cabinets are located in the main entrance area and in the corridors. 35 Replace all millwork (Based per 1921 m2 of building area) 215 $18, : E Blinds** A variety of metal blinds are located in most classrooms & in the administration office areas Replace blinds (14 windows) 22 $1, : E Furniture* Chairs, desks and tables are located in all the classrooms, library and administration areas. 28 Report run on: March 16, 212 2:11 PM Page 39 of 42

40 S8 SPECIAL ASSESSMENT Edmonton - Clara Tyner Elementary School (B375A) K41.1 Barrier Free Route: Parking to Entrance* A designated handicap parking space is not provided in the main parking area. Provide a handicap parking space with signage A designated handicap parking space is not provided in the main parking area. Signage for the designated handicap parking space is provided. Provide a handicap parking space with signage Barrier Free Access Upgrade 212 $5, Low : K41.2 Barrier Free Entrances* Power assist doors are not provided throughout the entire school. Provided power operators for barrier free access at two entrances No automatic access is currently provided from any exterior entrance doors. Provided power operators for barrier free access at two west entrances Barrier Free Access Upgrade 212 $1, Low : K41.3 Barrier Free Interior Circulation* The majority of the building is accessible to all areas. Report run on: March 16, 212 2:11 PM Page 4 of 42

41 Edmonton - Clara Tyner Elementary School (B375A) K41.4 Barrier Free Washrooms* The current washroom areas do not provide a barrier free accessible compartment. Provide a barrier free unisex washroom No barrier free washroom is provided. Provide barrier free unisex washroom Barrier Free Access Upgrade 212 $4, Low : K43.1 Asbestos* Suspected asbestos-containing materials observed in the building include vinyl tile flooring in the school corridors, classrooms, texture coated ceilings, gymnasium wallboard and piping insulation. All presently encapsulated. AUG-6 K43.4 Mould* No mould known or reported. AUG-6 K43.9 Other Hazardous Materials* No other hazardous material known or reported. AUG-6 Report run on: March 16, 212 2:11 PM Page 41 of 42

42 Edmonton - Clara Tyner Elementary School (B375A) K51.2 Building Documentation* The evaluation was conducted on October 18, 211, by Asset Evolution Inc. Clara Tyner Elementary School is a one-storey school built in with a total building area is 1921m2. The one storey school comprises of 7 classrooms, a gymnasium, a library, a music room and an ancillary room. Clara Tyner ES - Site Plan Report run on: March 16, 212 2:11 PM Page 42 of 42

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Calgary RCSSD #1 Ecole St. Matthew Elementary / French Immersion Jr. High School B2614A Calgary Report run on: March 25, 2010 10:11 AM Building Name: Address: Location:

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Bishop Savaryn Catholic Elementary School B58A Edmonton Report run on: July 10, 2008 3:31 PM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Our Lady Of The Prairies Catholic Elementary School B3241A Edmonton Report run on: July 17, 2008 4:00 PM Building Name: Address: Location: Building Id:

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Stratford Academic High School B3336A Edmonton Report run on: April 3, 29 1:6 AM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Calgary School District #19 John G Diefenbaker High School B2686A Calgary Report run on: January 1, 28 9:31 AM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Cardinal Leger Catholic Junior High School B371A Edmonton Report run on: April 3, 29 1:1 AM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Sir John Thompson Catholic Junior High School B3275A Edmonton Report run on: March 5, 29 1:43 AM Building Name: Address: Location: Building Id: Gross

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Coronation Elementary School B381A Edmonton Report run on: January 22, 27 11:33 AM Building Name: Address: Location: Building Id: Gross

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Bishop Savaryn Catholic Elementary School B358A Edmonton Report run on: March 11, 213 5:9 PM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Calgary School District #19 Queen Elizabeth Junior / Senior High School B2745A Calgary Report run on: March, 2010 10:02 AM Building Name: Address: Location: Building Id:

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton RCSSD #7 Blessed Kateri School B36A Edmonton Report run on: April 3, 29 1:1 AM Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Harry Ainlay Composite High School B3145A Edmonton Report run on: March 2, 27 3:27 PM Building Name: Address: Location: Building Id: Gross

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Canadian Rockies Reg Div #12 Exshaw School B3390A Exshaw Report run on: March 26, 2010 9:29 AM Building Name: Address: Location: Building Id: Gross Area (sq. m): Replacement

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Calgary School District #19 Sir William Van Horne High School B2852A Calgary Report run on: March 25, 2010 10:19 AM Building Name: Address: Location: Building Id: Gross

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Wild Rose School Div #66 Pioneer School B3972A Rocky Mountain House Report run on: March 26, 213 9:48 AM Building Name: Address: Location: Building Id: Gross Area (sq.

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Alberta Health Services-Central Breton Health Centre B999A Breton Report run on: March 7, 214 11:1 AM Building Name: Address: Location: Building Id: Gross Area (sq. m):

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Alberta Health Services-Edmonton Glenrose Energy Centre B25I Edmonton Report run on: February 15, 213 1:9 AM Building Name: Address: Location: Building Id: Gross Area

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Lakeland Roman Catholic Separate School District No. 1 Ecole Notre Dame High School B266A Bonnyville Report run on: January 26, 2 : PM Bonnyville - Ecole Notre Dame High

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Evergreen Catholic Separate Regional Division #2 St. Mary School B4244A Westlock Report run on: January 22, 27 2:4 PM Building Name: Address: Location: Building Id: Gross

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Alberta Health Services-Edmonton Strathcona County Health Centre B1421A Sherwood Park Report run on: March 18, 214 1:22 PM Building Name: Address: Location: Building Id:

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Prairie Land Regional Div #25 Berry Creek Community School B2933A Cessford Report run on: March 21, 213 9:46 AM Building Name: Address: Location: Building Id: Gross Area

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report East Central Health Viking Community Health Services B1178A Viking Report run on: March 22, 21 9:58 AM Building Name: Address: Location: Building Id: Gross Area (sq. m):

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Parkland School Division #7 Meridian Heights School B9397A Stony Plain Report run on: January 22, 27 2:45 PM Building Name: Address: Location: Building Id: Gross Area

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#58619/Page 1/November 1, 2017 PLUMBING Executive Summary: Presently, the Plumbing Systems serving the building are cold water, hot water, sanitary, waste and vent system, storm drain piping, and natural

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

Library stacks and records storage 150 LB/SF live load

Library stacks and records storage 150 LB/SF live load SPACE TYPE: LIBRARY Construction Criteria The unit costs for Library space types are based on the construction quality and design features in the following table. This information has been generally organized

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1 L21366/101 090 00.00/Page 1 HVAC EXECUTIVE SUMMARY The North Middlesex Regional High School has received average maintenance of the HVAC systems over its occupied years. Even with adequate maintenance,

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report E Central Francophone Ed Reg# Ecole Du Sommet School B89A St. Paul Report run on: January 26, 2 :28 PM St. Paul - Ecole Du Sommet School (B89A) Facility Details Building

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Alberta Health Services-Edmonton Capital Care - Norwood - North Pavilion B25A Edmonton Report run on: March 12, 214 12:41 PM Building Name: Address: Location: Building

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Parkland School Division #7 Duffield School B938A Duffield Report run on: May 11, 26 4:38 PM Duffield - Duffield School (B938A) Facility Details Building Name: Duffield

More information

S AGE E NGINEERING A SSOCIATES, LLP

S AGE E NGINEERING A SSOCIATES, LLP S AGE E NGINEERING A SSOCIATES, LLP 1211 Western Avenue Albany, NY (518) 453 6091 F (518) 453 6092 Kingston Library Mechanical and Electrical Systems Field Report Date of Visits: Mechanical - September

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

Massachusetts School Building Authority

Massachusetts School Building Authority Massachusetts School Building Authority School District Revere District Contact Paul Dakin TEL: (781) 286-8226 Name of School Submission Date 3/6/2007 The following Priorities have been included in the

More information

CONNECTICUT. Downloaded

CONNECTICUT. Downloaded Housekeeping/Laundry/Maintenance J. Laundry. CONNECTICUT Downloaded 01.15.11 (1) This service, if provided, shall be used exclusively for laundry and shall be remote from resident and food service areas,

More information

Ashland School District Facility & Capacity Assessment Report 2005

Ashland School District Facility & Capacity Assessment Report 2005 Ashland School District Facility & Capacity Assessment Report 2005 Briscoe Elementary School (Closed Facility) Address: 265 N Main Street Area: 33,980 square feet Buildings: Original Building 1948 Music

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Unit # H ± 2,000 SF Width ± 25' Depth ± 80'

Unit # H ± 2,000 SF Width ± 25' Depth ± 80' ±80' Lease Line Lease Outline Drawing Sunnymead Plaza 24907 Sunnymead Blvd., Unit # H, Moreno Valley, CA 92553 Unit # H ± 2,000 SF Width ± 25' Depth ± 80' Unit # H Plans produced by: ID Plans 6/13/2017

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

Vanilla Box Design Criteria

Vanilla Box Design Criteria Description: 1. Floor: 2. Walls: 3. Ceiling: A. Finished and sealed 4 thick concrete slab on 10 mil poly vapor barrier on 4 of crushed stone throughout, including toilets. A. Interior gypsum board walls

More information

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for

More information

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60'

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60' ±60' Lease Line Lease Outline Drawing Needles Towne Center 1004 E. Broadway St.,, Needles, CA 92363 ± 900 SF Width ± 15' Depth ± 60' Plans produced by: ID Plans 6/16/2017 (813) 657-2545 C 2017 Site map

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line ± 4' ± 13' ± 72' Lease Line ± 6' ± 7' Plot # R019A ± 18' Lease Line Site N o : Site N ame: Lo catio n: Submitted B y: D rawn by D ate: 991 Santee Trolley Square Santee, CA ID Plans 11/10/2016 This drawing

More information

Unit # E ± 1,200 SF Width ± 20' Depth ± 60'

Unit # E ± 1,200 SF Width ± 20' Depth ± 60' Lease Outline Drawing ±60' Lease Line Sunnymead Plaza 24907 Sunnymead Blvd., Unit # E, Moreno Valley, CA 92553 Unit # E ± 1,200 SF Width ± 20' Depth ± 60' Plans produced by: ID Plans 6/13/2017 (813) 657-2545

More information

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms $4,013,500.00 $4,013,500.00 $ 1,155,000.00 $ 1,000,000.00 $ 205,000.00 $ 275,000.00 $ 300,000.00 $ 360,000.00 $ 438,500.00 $ 280,000.00 School Status Item HS Boilers boiler controls replaced 2017 2002

More information

Appendix E: Photo Documentation

Appendix E: Photo Documentation Appendix E: Photo Documentation Brown County Library Central Branch Building Assessment Appendix E: Photo Documentation Architectural and Structural Brown County Library Central Branch Building Assessment

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CMHC HOME MAINTENANCE CHECKLIST

CMHC HOME MAINTENANCE CHECKLIST Make sure air vents indoors and outdoors (intake, exhaust and forced air) are not blocked by snow or debris. Check and clean range hood filters on a monthly basis. Test ground fault circuit interrupter(s)

More information

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN 04.13.2017 1 MONTICELLO INTERIOR FINISHES PAINT MOULDING WALLS ACCENT DOORS DOOR TRIM/STAIRS

More information

Electrical Information

Electrical Information Electrical Information Breaker Panel 1: Service Type: Unreadable Panel Type: Unreadable Panel Number: Unreadable Manufacturer: Unreadable Amps: Unreadable Location: Storage Room Notes: Exterior Disconnect

More information

Electrical Inspection Service & Distribution

Electrical Inspection Service & Distribution 0911 Distribution Panels & Switchgear Equipment, conduit, feeders, and grounding 480 Volt Switchboard: This switchboard contains the utility meter and two main, service, circuit breakers. One circuit breaker

More information

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting PROJECT MANAGEMENT AGENDA Project: George Keverian School Feasibility Study Project No.: 16049 Re: School Building Committee Meeting Meeting Date: 3/22/2017 Meeting Location: Mayor s Conference Room, City

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesarstone countertop. 2. 4 x 16 ceramic tile backsplash.

More information

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS EXISTING MECHANICAL CONDITIONS SUMMARY The items listed below are based on our site visit on Nov 10, 2016. Our review is based on current conditions and anticipated future use of these building. In the

More information

DRAFT. Widen Elementary School Site Summary 74,523 SF. Introduction

DRAFT. Widen Elementary School Site Summary 74,523 SF. Introduction 1 Widen Elementary School Site Summary Address 5605 Nuckols Crossing Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 1986 Total Campus Building Area (combined) 74,523

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SPACE TYPE: CHILD CARE

SPACE TYPE: CHILD CARE SPACE TYPE: CHILD CARE Construction Criteria The unit costs for Child Care Center space types are based on the construction quality and design features in the following table. This information has been

More information

RESERVE DATA ANALYSIS est.1983

RESERVE DATA ANALYSIS est.1983 RESERVE DATA ANALYSIS est.1983 Office (866) 574-5115 227 Bellevue Way NE, #483, Bellevue, WA 98004 SAMPLE MUSEUM Level 1 Full Reserve Study (With Site-Visit) Prepared For Fiscal Year 1/86 Contents 1 Title

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Graminia School B451A Spruce Grove Report run on: January 3, 26 1:36 PM Facility Details Building Name: Graminia School Address: 5111 R. R. 271 Location: Spruce Grove

More information

Unit HH Gregg. ± 30,000 SF Width ±26' Lakeland Retail Center. Lease Outline Drawing. Unit HH Gregg. Depth ± 145' HVAC Units & Information

Unit HH Gregg. ± 30,000 SF Width ±26' Lakeland Retail Center. Lease Outline Drawing. Unit HH Gregg. Depth ± 145' HVAC Units & Information Lease Outline Drawing Lakeland Retail Center 4000 US Hwy. 98, Unit HH Gregg, Lakeland, FL 33809 ±26' ±200' Lease Line Unit HH Gregg ±46' Lease Line ±21' Unit HH Gregg ±145' Lease Line ± 30,000 SF Width

More information

Extra Mile Inspection, Inc.

Extra Mile Inspection, Inc. Cover Page Property Inspection Report Inspection prepared for: Jerry and Lynne Richardson Real Estate Agent: Polly Richardson - BHKR Lake Forest Date of Inspection: 3/13/2017 Time: 12 pm Age of Home: built

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania Project Determination Report Major Renovation October 26, 2018

James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania Project Determination Report Major Renovation October 26, 2018 EXHIBIT A James Rhoads Elementary School 4901 Parrish Street Philadelphia, Pennsylvania 19139 Project Determination Report Major Renovation October 26, 2018 School District of Philadelphia Office of Capital

More information

Axiom Property Inspections

Axiom Property Inspections Cover Page Axiom Property Inspections Property Inspection Report 868 Wally Avenue, Henderson NV, 89178 Inspection prepared for: John Doe Agent: David Lawson - Axiom Inspection Date: 8/12/2010 Time: 2:30

More information

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on HOME PROPERTY SCAN INSPECTIONS The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on January 11, 2010 and

More information

Page 1 of General

Page 1 of General Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors

More information

Inspecta-Homes 2469 University Avenue West St. Paul MN Ph#: (651)

Inspecta-Homes 2469 University Avenue West St. Paul MN Ph#: (651) Page 1 Doc #: Inspector: Date: Dwelling Address: Client Name: Client's Agent: Real Estate Company: Please refer to the General Home Inspection Contract. Thank you for using Minnesota and Western Wisconsin's

More information