1 WATERTOWN CITY SCHOOL DISTRICT SCHOOL AND COMMUNITY WORKING TOGETHER SMART SCHOOLS PROJECT PROPOSED SCOPE OF WORK BCA PROJECT NO NOVEMBER 2, 2017 Prepared By: & 327 Mullin Street 2136 Five Mile Line Road Watertown, NY Penfield NY, Page 1 of 16

2 Table of Contents Purpose Pg Telephone System Pg Current Telephone System 1.2. Trunk & Station Cabling 1.3. Telephone Service 1.4. Recommendations 2. Network Assessment for VOIP & IP Security Pg Purpose 2.2. District Wide Area Network 2.3. Local Area Network / Network Switches 2.4. Uninterruptable Power Supplies (UPS) 3. Video Surveillance System Pg Current Video Surveillance System 3.2. Video Surveillance System Upgrade 4. Door Access Control Pg Current Door Access Control System 4.2. DAC Recommendations 5. Visitor Entrances Pg Visitor Sign-In & Badging Pg Automated Lockdown / Mass Notification Pg. 15 Appendix: Proposed Smart Schools Project Capital Construction Cost Analysis, dated November 2, 2017 Page 2 of 16

3 PURPOSE: WATERTOWN CITY SCHOOL DISTRICT Technology & Security Assessments are an important planning tool to understand and document the current state of various technology based building systems and end user equipment that supports the curriculum, administration, operations and safety. The New York State Smart Schools Bond was approved in November of 2014 and includes $3,663,924 in Smart Schools funding for the Watertown City School District. Technology Instructional Plans and Smart Schools Implementation Plans require school districts to submit a scope of work of proposed Technology and Security improvements that the Smart School funding will be utilized for. This assessment will provide a detail description of existing systems with recommendations and associated capital construction cost budgets that will support the Smart School Implementation Plan submission process. This assessment can also be utilized to augment the District s Building Condition Survey and Five-Year Plan. The majority of the recommendations for technology and security improvements can also access NYSED Capital Construction Aid, BOCES, E-rate and Operational funding. Each of these funding categories will be reviewed to determine the most beneficial manner in which to fund the various improvements. Facilities to be included in Assessment: High School Case Middle School Wiley Intermediate School, District Office and Storage Facility Knickerbocker ES North ES Ohio ES Sherman ES Starbuck ES Massey Maintenance Facility, Garage and Storage Building Page 3 of 16

4 1. District Telephone System WATERTOWN CITY SCHOOL DISTRICT 1.1 Current Telephone System The District is comprised of following facilities: High School Case Middle School Wiley Intermediate School, District Office and Storage Facility Knickerbocker ES North ES Ohio ES Sherman ES Starbuck ES Massey Maintenance Facility, Garage and Storage Building All facilities, except for the recently acquired Massey Maintenance facility, are part of the District Wide Nortel Telephone System. The Nortel telephone system very old and Nortel was acquired by Avaya many years ago. Parts are no longer available for the Nortel system and most repairs need to be accomplished by using salvaged parts. Nortel Digital Telephones are located in offices and standard analog telephones are installed in all classrooms and instructional spaces. The Massey Maintenance Facility has a newer ShoreTel VOIP Telephone system that is interconnected to the District Wide Nortel Telephone System with Shoretel VOIP Equipment that is located in the HS. Shoretel VOIP Telephones are installed in the offices. ShoreTel was just recent purchased by Mitel. Both of these telephone systems operate over the Campus and District Wide Area Network. 1.2 Telephone Cabling The current telephone systems in all of the facilities, except Massey Maintenance, utilizes non-data grade extension cabling that will not support Voice Over IP (VOIP) telephones. The existing telephone cabling appears to be in poor condition and should be removed in its entirety and a new house telephone cabling system should be installed to support the minimal analog circuits in many of the facilities. The only facilities in which the existing house telephone cabling should remain are Wiley, Case MS, Starbuck and Massey. If the District proceeds with a new VOIP / Unified Communications telephone system then the existing LAN cabling would be utilized to connect the new VOIP telephones. Any analog circuits to support elevators, fax machines, dialers or similar devices would have new cabling installed in most facilities to ensure system reliability. The current cabling for analog devices at Wiley, Case MS, Starbuck and Massey will be re-used. There are several layers of telephone cabling in most of the buildings as Centrex telephone services and previous telephone systems were cabled in most buildings. The demolition cost includes removing all of this unused and abandoned telephone equipment and cabling. Page 4 of 16

5 1.3 Telephone Services Verizon is the telephone service provider for the district facilities. 1.4 Recommendations: A. Install new VOIP telephone system, voice mail, unified communication and associated IP telephones for all district facilities. The new VOIP telephone system will be interconnected over the District s Campus IP network and WAN to outlying facilities. The majority of the telephones will be connected to the data cabling and there will be limited areas that will require the new LAN cabling to be installed to support VOIP telephones. All of the Classroom analog wall phones would be removed and new IP Desk Phones would be provided. B. Remove the old telephone cabling and multiple installation of Bell Telephone (now Verizon) Centrex telephone switches in the following facilities: 1. High School 2. Knickerbocker ES 3. North ES 4. Ohio ES 5. Sherman ES 2. Network Assessment for VOIP & IP Security 2.1 Purpose The computer network in all schools and the bus garage is now utilized for much more than transmitting administrative and educational data. These are very important applications and the network is also used for other applications that are associated with life safety. These include fire alarm, direct digital control, Emergency Alert, IP based Security and Surveillance Systems and VoIP telephones will use this same network. Therefore, it is important to review the overall network and determine if there are improvements that could be implemented to make it more reliable to support critical and potentially life safety applications. The existing network has been assessed to determine if the proper horizontal (copper) and backbone (fiber optic) cabling is in place plus all of the necessary network switches with Power over Ethernet (POE) capabilities. The network architecture is also reviewed to determine if there are multiple network segments, Virtual LANs (VLans), Quality of Service (QOS) and Routing features to provide the necessary bandwidth for each application and also have redundancy in the network. 2.2 District Wide Area Network: The Watertown City School District has three major facilities (HS, Case MS and Wiley) on a common campus which will have new Single Mode Fiber interconnecting all of the respective IP Networks. This will allow for 10 Gigabit Ethernet (10GE) backbone connections between that campus facilities that will support the future VOIP & IP Security improvements. The District has just entered into a contract with Westelcom for a 10GE Wide Area Network (WAN) for all of the off-campus facilities. Therefore, this new WAN upgrade will support the future VOIP & IP Security improvements. Page 5 of 16

6 2.3 Local Area Networks / Network Switches: The Watertown City School District is implementing a $1M Network Switch Replacement project that will be complete by January of The new Cisco network switches will support 10GE switching capabilities between telecom closets and between buildings. The new switches include Power Over Ethernet (POE) on all switch ports that are required for a VOIP Telephone System and IP Security improvements. Therefore, the District will not have to improve the switches in most facilities. The following buildings still need new POE Switches to be purchased and installed to support VOIP & IP Security Improvements: 1. Starbuck ES (E-rate Funding will also be pursued for new switches at Starbuck ES) 2. Massey Maintenance facility (may re-located existing POE switches) 3. Massey Maintenance Garage 4. Massey Maintenance Storage Building (need to determine if VOIP Telephones or IP Security Devices will be installed in this facility 5. Wiley Storage Facility 2.4 Uninterruptable Power Supplies (UPS): The new VOIP Telephone System will require the network switches to be powered in the event of a power outage so that the telephone system will be available for a least a two-hour period. Therefore, new UPS s will be required at all network racks with associated battery back up to maintain the network for two (2) hours. This will also benefit other systems that also utilize the network, such as Video Surveillance and Door Access Control. UPS s will be connected to EM generators if they are available at any of the facilities. The District will file a 2018 E-rate Application to secure funding for the UPS s. However, the scope and cost of new UPS will also remain in the Smart Schools Funding application in the event that E-rate does not fund the UPS s. 2.5 Campus Fiber Backbones: Campus Fiber Backbones will need to be installed at the following facilities to connect these buildings to the IP Network: A. Massey Maintenance Garage: Re-terminate and test existing 62.5 Multi Mode Fiber and install new Wall Rack. B. Massey Maintenance Storage Building: Install new MMF between Garage and Storage Building and terminate in wall rack. C. Wiley Storage Building: Install new Single Mode Fiber in new underground conduits system between Wiley Intermediate School s main data rack and the Storage Building to serve new IP Network in Storage Facility. Install wall rack in storage building to house fiber terminations, copper patch panel, switch and UPS. Page 6 of 16

7 3. Video Surveillance: 3.1 Current Video Surveillance Systems Improvements WATERTOWN CITY SCHOOL DISTRICT The existing video surveillance system is based on a Pelco Analog Video Surveillance System with Digital Video Recorders (DVR) and analog cameras that are cables with coaxial cable and the associated power cabling. There are approximately 60 operating cameras in the overall system and the majority of them are at the HS / MS and Wiley Campus. Recently, the District has installed some inexpensive IP cameras in the Wiley facility. The other off-campus facilities have very few cameras. The District is currently implementing a $1.2M Security and Technology Project that includes approximately $600,000 in Video Surveillance and Door Access Control Improvements. The new project includes the installation of a new Avigilon Video Surveillance system with new High Definition (HD) IP cameras and new Network Video Recorders (NVR) / Servers. Listed below are the schools included in the 2016 CIP Tech & Security Project and the associated cameras to be installed. A. High School: 1. (30) interior cameras 2. (1) exterior cameras 3. (6) NVR / Servers B. Wiley Intermediate School, District Office: 1. (14) interior cameras 2. (2) exterior cameras C. Knickerbocker ES: 11 New IP Cameras 1. (7) interior cameras 2. (1) exterior cameras D. North ES: 1. (11) interior cameras 2. (3) exterior cameras E. Ohio ES: 1. (5) interior cameras 2. (3) exterior cameras. F. Sherman ES: 1. (13) interior cameras 2. (1) exterior cameras Page 7 of 16

8 Additional Interior & Exterior Cameras will be added to the six (6) schools listed above and funded by the 2014 CIP to complete all Video Surveillance requirements. The Avigilon Video Surveillance system will be expanded by installing additional interior and exterior high definition IP Cameras at District facilities. This improvement will also require the installation of additional NVR / Servers at the HS NOC to support the additional cameras. The District s new Video Surveillance requirements include video surveillance in the following locations: Corridors Stairwells Public spaces, such as auditoriums and gymnasiums Entrances Exterior Play Grounds Exterior driveways Exterior loading docks Exterior vandal prone areas Sports Fields Case Middle School will have all of the new interior and exterior high definition cameras installed in the current Case MS CIP project that is moving into the Bidding and Construction Phase. The camera improvements included in this project will complete the new camera requirements for this facility. A new NVR will also be provided as part of this project to support the (60) new interior and exterior cameras. 3.2 Video Surveillance Improvements proposed for the Smart Schools Project Expand the existing Avigilon Video Surveillance system by installing new interior and exterior cameras at the balance of the District s facilities that were not include in the current Capital Improvement Projects. Listed below are the facilities and associated number of new cameras. A. Starbuck ES: 1. (10) interior cameras 2. (6) exterior cameras B. Massey Maintenance Facility: 1. (9) interior cameras 2. (8) exterior cameras C. Massey Maintenance Garage: 1. (1) interior cameras 2. (3) exterior cameras D. Massey Maintenance Storage Building: 1. (1) interior cameras 2. (4) exterior cameras Page 8 of 16

9 E. Wiley Storage Facility: 1. (4) interior cameras 2. (4) exterior cameras WATERTOWN CITY SCHOOL DISTRICT F. HS Stadium: 1. (0) interior cameras 2. (5) exterior cameras 4. Door Access Control & Perimeter Monitoring: 4.1 Current Door Access Control (DAC) System: The District has just awarded a $1.2M Security and Technology Project that includes approximately $600,000 in Video Surveillance and Door Access Control Improvements. The new project includes the installation of a new Door Access Control Card Readers and Video Intercoms. Also, the District will be proceeding with a new Door Replacement Project for the schools that were included in the 2016 CIP that will also include Door Access Control and perimeter monitoring improvements. Therefore, all of the Door Access Control and perimeter monitoring improvements at the following schools will be completed by the 2016 CIP Tech & Security Project and the future Door Replacement project for the following facilities, which will then not require the use of Smart Schools funding to complete this work. A. High School: A. Wiley Intermediate School B. Knickerbocker ES C. North ES D. Ohio ES E. Sherman ES Case Middle School will have all of the door access control and perimeter monitoring improvements completed in the current Case MS CIP project that is moving into the Bidding and Construction Phase. Page 9 of 16

10 4.2 Door Access Control & Perimeter Monitoring proposed for the Smart Schools Project. The District s 2014 Proposition Vote did not include a few of the District s facilities so Door Access Control and Perimeter monitoring in these facilities will need to be completed as part of the Smart Schools Project. Listed below is the number of entrance doors that will have new Door Access Control in these specific facilities: A. Wiley Storage Facility: (1) Door will receive access control and all exterior doorways will have perimeter monitoring. B. Starbuck ES: Currently there are (4) exterior doors with Door Access Control. These DAC locations will be converted to the new Avigilon DAC system. Also, all exterior doors will have perimeter monitoring. The Main Entrance will also receive a new Video Intercom Station. C. Massey Maintenance Facility: (2) Doors will receive access control and all exterior doorways will have perimeter monitoring. The Main Entrance will also receive a new Video Intercom Station. D. Massey Maintenance Garage: (1) Door will receive access control and all exterior doorways will have perimeter monitoring. E. Massey Maintenance Storage Building: (1) Door will receive access control and all exterior doorways will have perimeter monitoring. Page 10 of 16

11 5. Visitor Entrances: 5.1 Ohio Street Elementary School Existing conditions The existing visitor entrance is located on the south side of the building off of Ohio Street. There is a standalone video intercom system that ties into an electric door strike for access control. Currently there is no vestibule interlock to contain visitors prior to verifying their credentials. While the main office is adjacent to the main entrance, there is no mechanism to force visitors into the main office. Once a visitor is buzzed in they have complete access to the school. Recommendation: Modify the existing main visitor entrance by creating a vestibule interlock area where visitors can present the required credentials and go through the proper sign-in procedure prior to entering the building. This newly created interlock vestibule will have a secure window to allow direct viewing by office staff while maintaining physical separation from the main. This will require renovations to the main office area. Re-arrange the main office and nurse s suite so that the receptionist/main office is adjacent to the main entrance, the nurse is in the center section and the principal is to the far right of this space. Estimated Cost - $159, North Elementary School Existing Conditions The existing visitor entrance is located on the south side of the building off of the bus loop. There is a standalone video intercom system that ties into an electric door strike for access control. As with Ohio Elementary School, there is no vestibule interlock area to contain visitors prior to verifying their credentials. While the main office is adjacent to the main entrance, there is no mechanism to force visitors into the main office. Once a visitor is buzzed in, they have complete access to the school. Recommendation The existing main entrance is not handicap accessible. A ramp on the exterior of the building will be required. The main entrance is approximately 14 above the sidewalk, requiring a ramp length of Due to the short distance between the main entrance and the bus loop sidewalk, the ramp will have to be a switch back ramp off to the side of the main entrance. Immediately upon entering the building, there is a step up to the main floor of approximately 6 which would have to be infilled to match the existing main floor elevation. An interlock vestibule would be created by installing a wall adjacent to the stair to the second floor and providing a door to the newly created space. In order to meet the NYS Building Code for required egress width, the existing wall separating the corridor and the main entrance will have to be relocated, thus reducing the space of the main entrance by approximately 3-0 and the main office will need to be reconfigured to accommodate this change. The newly created interlock will have a secure window to allow direct viewing by office staff while maintaining physical separation from the main office. Estimated Cost - $92,960 Page 11 of 16

12 5.3 Sherman Elementary School Existing Conditions The existing visitor entrance is located on the east side of the building in the south corner. This entrance is not handicap accessible. Due to the interior stair location and construction as well as the elevation change between the main floor elevation and grade, the cost to make this entrance handicap accessible would be exorbitant. There is a standalone video intercom system that ties into an electric door strike for access control. As with the other elementary schools, there is no vestibule interlock area to contain the visitors as they enter the building. Compounding the issue, the main entrance is not adjacent to or near the main office. Recommendation The main entrance should be relocated to the center of the building and enter into the main office area. An exterior handicap ramp would be required starting at the bus loop sidewalk. The main office suite (including the copy room and nurse s office) would need to be completely renovated including electrical and heating systems. This would allow visitors to enter directly into the main office area prior to entering the remaining portion of the building. Also, this new entrance would be ADA compliant and the district would no longer need to rely on the door by the elevator in the back of the building. Estimated Cost - $190, Starbuck Elementary School Existing Conditions The existing visitor entrance is located on the north side of the building facing East Hoard Street. There is a standalone video intercom system that ties into an electric door strike for access control. Currently, there is an existing vestibule, however, it the vestibule is an air lock type only and not being utilized as a security measure. While the main office is adjacent to the main entrance, there is no mechanism to force visitors into the main office. Once a visitor is buzzed in they have complete access to the school. Recommendation: Modify the existing main visitor entrance by replacing the interior set of vestibule doors to doors that lock. One door shall have an electric strike that is tied into a buzzer in the main office to allow entry. This newly created interlock vestibule will have a secure operable window to allow direct viewing by office staff while maintaining physical separation from the main office. This will require the renovation of the office and nurse s suite. Re-arrange the main office and nurse s suite so that the receptionist/main office is adjacent to the main entrance, the nurse is in the center section and the principal is to the far right of this space. Estimated Cost - $91,305 Page 12 of 16

13 5.5 Knickerbocker Elementary School WATERTOWN CITY SCHOOL DISTRICT Existing Conditions The existing visitor entrance is located on the northeast side of the building facing Knickerbocker Drive. There is a standalone video intercom system that ties into an electric door strike for access control. Currently, there is an existing vestibule, however, it the vestibule is an air lock type only and not being utilized as a security measure. While the main office is adjacent to the main entrance, there is no mechanism to force visitors into the main office. Once a visitor is buzzed in they have complete access to the school. Recommendation: Modify the existing main visitor entrance by replacing the interior set of vestibule doors to doors that lock. One door shall have an electric strike that is tied into a buzzer in the main office to allow entry. This newly created interlock vestibule will have a secure operable window to allow direct viewing by office staff while maintaining physical separation from the main office. This will require the renovation of the office and nurse s suite. Re-arrange the main office and nurse s suite so that the receptionist/main office is adjacent to the main entrance, the nurse is in the center section and the principal is to the far left of this space. Estimated Cost - $90, Wiley Intermediate School Existing Conditions The existing visitor entrance is located on the southwest side of the building facing the upper parking lot. Currently there is a receptionist that sits at a desk in the lobby area. Upon entering the building, the visitor must present their credentials to the receptionist before moving into the rest of the building. There are no physical barriers to stop someone once they have entered the building. Also, there is a double set of doors in the air lock vestibule that enter into Area C. A visitor could go through that set of doors and by-pass the receptionist altogether. Recommendation: Replace the interior vestibule doors with new wall and a set of vestibule doors that lock. The new wall would have a security window at the receptionist desk for the receptionist can safely review the credentials of the visitors before they are buzzed into the school. Replace the hardware on the double set of doors that enter into Area C with a hardware group that is always locked from the vestibule side, but will allow egress from Area C in the event of an emergency. Estimated Cost - $20, Case Middle School Existing Conditions The existing visitor entrance is located on the west side of the building overlooking the field hockey field and the corner of Washington Street and Green Street. There is a standalone video intercom system that ties into an electric door strike for access control. Currently, there is an existing vestibule, however, the vestibule is an air lock type only and not being utilized as a security measure. While the main office is adjacent to the main entrance, there is no mechanism to force visitors into the main office. Once a visitor is buzzed in they have complete access to the school. Page 13 of 16

14 Recommendation: Relocate and replace the interior set of vestibule doors. The new location would be to the southeast of their current position, or towards the main office door. The new interior set of vestibule doors would be lockable and tied into an electric strike and buzzer from the main office. The existing glass block window from the main office that looks into the corridor would now be located in the secure vestibule. Replace the glass block window with a security window that would allow visitors to present credentials to the main office staff prior to being buzzed in. This would require minor alterations to the principal s office by relocating the door around the corner to allow for a counter top to be installed at the new security window. Estimated Cost - $45, Watertown High School Existing Conditions The existing visitor entrance is located on the west side of the building overlooking bus loop and Washington Street. This building does not have a camera/buzzer system like many of the other District educational buildings. Currently, there is an existing vestibule, however, the vestibule is an air lock type only and not being utilized as a security measure. There is a desk with a receptionist located in the main lobby to check visitors in, but no physical separation to stop visitors from bypassing the receptionist and moving to other sections of the building. The main office is located on the opposite side of the main lobby from the main entrance, making a connection between the main entrance and main office difficult at best without relocating the main office suite. Recommendations The main lobby is large enough so that a new security office can be constructed. The new security office would be constructed directly adjacent to the existing vestibule. One of the vestibule doors would be removed and replaced with a security window to allow visitors to present their credentials to district staff prior to being buzzed in. The hardware on the remaining interior vestibule doors shall be replaced with lockable hardware with one door that is equipped with an electric strike to allow access from either a buzzer located in the security office or from card access. Estimated Cost - $26, District Wide Modifications: With over 220 exterior doors throughout all of the facilities, there are many locations where people have access to each of the buildings. Over the years, many master keys have been handed out to individuals. While many master keys were accounted for as they were assigned to different people and groups and have been returned when no longer needed, there are a certain number that have not been accounted for over the years. It is recommended that the District - re-core all exterior doors with a new master keying system so that all previous master keys will no longer function in the exterior doors. Estimated Cost - $29,040 Page 14 of 16

15 6. Visitor Sign-in & Badging: Visitor Sign-in and Badging is achieved by the use of paper logs and visitor passes. Recommendation: Install a new Visitor Sign-in and badging system that utilizes a police database to determine if the visitor may be a threat. These systems require an annual subscription of $480.00/Raptor system, after the first year. See the following product: Raptor: 7. Automated Lockdown & Sound Systems: The Mass Notification System used by the District is the main Sound System in the school facilities. If there is a Lockdown implemented an Administrative Assistant makes an ALL-Call announcement. Staff and students then follow the District s Lockdown Procedures. Recommendations: A. The lockdown process should be automated by the installation of an emergency communications module would allow for a pre-recorded message to be communicated once a Lockdown event is initiated. All District Facilities would receive this improvement and the Automated lockdown system also has the ability to implement a Campus (HS & MS) plus a District Wide Automated Lockdown. B. The Rauland Telecenter Universe product is recommended and included in the capital construction cost budget. The Rauland Emergency Communications module would launch the following lockdown features: a. Automated paging of Lockdown Message b. Turn on new Blue Strobe Lights for alerting occupants c. Call Monitoring agency or 911 d. Launch alert over Text messaging e. Disable Card Access to all entry doors f. Release magnetic hold opens for smoke and security doors C. The existing Sound Systems (Public Address systems) in all of the District s facilities are beyond their useful life and should be replaced. The new sound systems will serve as the Mass Notification system and be interfaced to the new Automated Lockdown System. Local sound systems in Auditoriums, Gymnasiums and Cafeterias will be maintained and interfaced to the new Sound Systems. D. Starbuck s sound system was recently replaced with a Simplex sound system and included new wiring and speakers. It is recommended to re-use the speakers and associated cabling but the replace the Simplex head end with a Rauland Telecenter Universe system for consistency in the district and better integration to the Rauland Lockdown system. Page 15 of 16

16 Automated Lockdown & Sound Systems (continued): E. Install new Rauland TCU Emergency Lockdown Module, Software and associated servers and interface to Fire Alarm, Door Access Control and new sound systems. F. Install panic buttons in main offices and at visitor entrance monitoring locations. Additional panic buttons could also be located in the Principals and other administration offices. The panic button would launch the Lockdown message, activate the blue lights and dial a 911 call to local police. **Refer to Proposed Smart Schools Project Capital Construction Cost Analysis, dated November 2, 2017** End of Report Page 16 of 16

17 Watertown City School District Proposed Smart Schools Project Capital Construction Cost Analysis Date: November 2, 2017 A B D E F G H I J K L M N O P Q Visitor Badging Telephone System Replacement Cost & Assoc Network Upgrades for VOIP Network Upgrades Video Surveillance Door Access Control Visitor Entrances Systems Lockdown / Blue Lights Sound / PA Systems Site District Wide Telephone System - DEMOLITION New VOIP Telephone System Equipment & Installation Uninterruptable Power Systems to Support VOIP Additional Cat 6 Cable for VOIP Telephones New Telephone Copper Backbone Infrastructure Network Switch Replacement Telecom Room Construction & Wire Management Fiber Backbone Interior & Exterior Cameras Door Access Control Perimeter Monitoring of Ext. Doors Cat 6 cabling for DAC and Device Installation Visitor Entrances Visitor Badging Systems Lockdown / Blue Lights Sound / PA Systems Subtotal High School $ 44,625 $ 157,500 $ 7,875 $ 40,250 $ 26,950 $ 2,000 $ 30,150 $ 165,660 $ 475,010 BDF - Book Reserve RM 225 $ 10,000 $ 10,000 IDF-2 Mech Rm 110 $ 3,500 $ 3,500 IDF-3 Mech Rm 234 $ 2,000 $ 2,000 IDF-4 Mech Rm 212 IDF-5 Fan Rm 314 $ 1,500 $ 1,500 IDF-6 Clock Tower $ 3,500 $ 3,500 DANC Electrical Rm 164 Case Middle School $ 9,840 $ 54,000 $ 3,960 $ 45,650 $ 2,000 $ 14,250 $ 129,800 $ 259,500 BDF Data Rm 228 $ 5,000 $ 5,000 Wiley Intermediate School & District Office $ 13,250 $ 81,000 $ 7,875 $ 20,085 $ 2,000 $ 25,500 $ 121,350 $ 271,060 BDF-1 Data Rm 115 $ 4,500 $ 4,500 IDF-2 Ensemble Rm B005 IDF-3 $ 1,500 $ 1,500 IDF-4 Data Rm C113 IDF-5 Data Rm A111 Dank Room $ 1,500 $ 1,500 Wiley Storage Building $ 225 $ 450 $ 24,800 $ 7,500 $ 6,700 $ 500 NA NA $ 1,500 $ 1,500 $ 43,175 Future Wall Rack $ 750 $ 5,000 $ 15,500 $ 21,250 Knickerbocker Elementary $ 13,685 $ 40,500 $ 3,015 $ 10,500 $ 90,390 $ 2,000 $ 11,100 $ 70,360 $ 241,550 BDF Library General Storage $ 3,500 $ 3,500 IFD-2 Mech Rm 117 $ 2,000 $ 2,000 North Elementary $ 24,015 $ 27,000 $ 3,375 $ 15,750 $ 92,960 $ 2,000 $ 14,500 $ 89,460 $ 269,060 New BDF Book Rm 218 $ 3,500 $ 3,500 New IDF-2 Basement Elec. Rm 016 $ 3,500 $ 3,500 DANC Closet Janitor Rm 131 Ohio Elementary $ 12,035 $ 22,500 $ 1,665 $ 19,250 $ 159,070 $ 2,000 $ 9,750 $ 75,290 $ 301,560 BDF Rm 130 $ 3,500 $ 3,500 IDF-1 Rm 152B IDF-2 Rm 172 DANC Telco Rack Rm 107B $ 1,500 $ 1,500 Sherman Elementary $ 12,420 $ 27,000 $ 1,980 $ 10,500 $ 190,725 $ 2,000 $ 10,950 $ 69,025 $ 324,600 BDF Rm 110 $ 3,500 $ 3,500 IDF-2 Rm 209 Starbuck Elementary $ 6,650 $ 18,000 $ 1,575 $ 47,700 $ 11,500 $ 5,400 $ 2,000 $ 91,305 $ 2,000 $ 6,400 $ 31,750 $ 224,280 BDF Boiler Rm B001 $ 1,500 $ 5,000 $ 6,500 IDF-2 in Teacher Rm 119 $ 3,500 $ 35,000 $ 38,500 Massey Maintenance Facility $ 22,500 $ 1,530 $ 1,000 $ 54,250 $ 16,500 $ 5,800 $ 1,000 NA NA $ 6,050 $ 41,700 $ 152,830 TR Rm $ 10,000 $ 1,500 $ 14,000 Massey Maintenance Garage $ 225 $ 450 $ 14,250 $ 7,500 $ 5,900 $ 500 NA NA $ 3,500 $ 34,825 Future Wall Rack $ 750 $ 5,000 $ 1,500 $ 1,000 $ 8,250 Massey Storage Building $ 225 $ 450 $ 18,275 $ 7,500 $ 1,800 $ 500 NA NA $ 1,500 $ 1,500 $ 31,750 Future Wall Rack $ 750 $ 500 $ 3,750 HS Stadium $ 49,300 NA $ 49,300 Press Box IDF District Wide (Re-keying) $ 29,040 NA $ 29,040 Subtotal $ 139,020 $ 450,675 $ 86,250 $ 34,200 $ 96,250 $ 60,000 $ 3,500 $ 20,000 $ 208,575 $ 79,540 $ 25,600 $ 4,500 $ 717,135 $ 16,000 $ 135,150 $ 799,895 $ 2,876,290 Costs do not include Construction Contingency and Incidental costs. Notes: 1. New Network Switches are based on Cisco 4500X / 2960X architecture with 10GE backbones between closets and buildings. 2. HS / Wiley / Knick / North / Ohio / Sherman - Network Switches, Video Surveillance, Door Access Control and Perimeter Monitoring will be part of 2016 Tech & Security CIP. 3. Case MS - Network Switches, Video Surveillance, Door Access Control and Perimeter Monitoring will be part of 2017 Case MS CIP. Smart Schools Capital Construction Cost: $ 2,876, District will submit a 2018 E-rate Application to sucure Funding for UPS at all schools and network switches at Starbuck. These item will be also include in Smart Schools Funding request. 5% Construction Contingency: $143,815 Subtotal: $ 3,020,105 20% Incidental Costs $604,021 Total Project Costs $ 3,624,125 Watertown CSD Smart Schools Allocation $3,663,924 Balance $39,799

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. The present fire alarm system manufactured by Gamewell was installed with the 1982 renovation. It is a non addressable, zoned system. It includes

More information

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. Description of the building system The school is equipped with a hard wired fire alarm control panel, and automatic dialer. The fire alarm

More information

Draft. Security Study. Germantown School District Germantown, WI. PRA Project # February 2014

Draft. Security Study. Germantown School District Germantown, WI. PRA Project # February 2014 Draft Security Study Germantown School District Germantown, WI PRA Project # 114440 February 2014 February 2014 Germantown School District Facilities Security Study Page 1 Facilities Security Study Page

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

Attendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes

Attendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes MEMORANDUM To: From: Attendees/Absentees Derek Gallagher DG Date: June 14, 2016 Comm. No: 152235 Subject: Independent School District #879 Delano Secondary School Additions and Renovations June 6, 2016

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

Telecommunications Survey

Telecommunications Survey Victor Valley College Telecommunications Survey Victor Valley College 18422 Bear Valley Road Victorville, CA 92395 November 30, 2010 Submitted by P2S Engineering, Inc. Executive Summary Background and

More information

BSD Technical Standard. Division 28: Electronic Safety & Security

BSD Technical Standard. Division 28: Electronic Safety & Security Division 28: Electronic Safety & Security I. PURPOSE This Technical Standard is a narrative describing Beaverton School District s (BSD s) basis of design for electronic safety and security in BSD facilities.

More information

Safety & Security. Plainview-Old Bethpage Central School District

Safety & Security. Plainview-Old Bethpage Central School District Safety & Security Plainview-Old Bethpage Central School District Agenda Security Enhancements 2017/2018 School Year Emergency Drill Requirements, Training & Expectations In-Progress Security Enhancements

More information

RFP Addendum 2 March 31, 2016

RFP Addendum 2 March 31, 2016 RFP Addendum 2 March 31, 2016 For Best Value Procurement Option Three Security Upgrades Ph 1 UT Health Science Center SBC No. 540/013-04-2015 This Addendum forms a part of the Request for Proposals (RFP)

More information

About IntraLogic. In Business since 2004 Over 55 Full time employees

About IntraLogic. In Business since 2004 Over 55 Full time employees Security Services In Business since 2004 Over 55 Full time employees About IntraLogic National & State Contracts including OGS / GSA Our sales & system design team all have security backgrounds Clients

More information

Electronic Safety and Security

Electronic Safety and Security 28 Electronic Safety and Security NOTE: This is a new section, which includes content from previous sections of the KU Design Standards, along with appropriate revisions and updates. Significant revisions

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

Cedar Grove Public Schools Voter Referendum. October 2, PM 8 PM

Cedar Grove Public Schools Voter Referendum. October 2, PM 8 PM Cedar Grove Public Schools Voter Referendum October 2, 2018 2 PM 8 PM We Did Our Homework Consulted extensively with the Cedar Grove Police Department Consulted with multiple law enforcement agents from

More information

AlertWave Smart Wireless Solutions for Today s Campus Whether you are a large university

AlertWave Smart Wireless Solutions for Today s Campus Whether you are a large university Introduction AlertWave Smart Wireless Solutions for Today s Campus Whether you are a large university seeking a comprehensive packaged solution or a community college looking for a detailed solution on

More information

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 WHAT IS A BOND ELECTION? Provide communities an opportunity to vote to give the Board of Trustees authority

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Longleaf Elementary 1.78

More information

E-SPLOST V. Facts and Information. August 2018

E-SPLOST V. Facts and Information. August 2018 E-SPLOST V Facts and Information August 2018 Education Special Purpose Local Option Sales Tax What is E-SPLOST? It is a one penny sales tax that allows for shared contribution to education, including visitors

More information

For Dealers / Integrators / Architects. IS Series. Video Intercom. Building Communication. Controlling Security.

For Dealers / Integrators / Architects. IS Series. Video Intercom. Building Communication. Controlling Security. For Dealers / Integrators / Architects IS Series Video Intercom Building Communication. Controlling Security. IS Series helps save money Control multiple functions from any location to help reduce overall

More information

University Design Standard Fire Alarm Systems

University Design Standard Fire Alarm Systems 1.0 Overview University Design Standard Fire Alarm Systems This document provides Virginia Tech s standards for the design and installation of fire alarm systems and equipment in new construction, retrofit

More information

"VOICE OF SECURITY: Trends In Intercom, Public Address, and Mass Notification Emergency Communications

VOICE OF SECURITY: Trends In Intercom, Public Address, and Mass Notification Emergency Communications "VOICE OF SECURITY: Trends In Intercom, Public Address, and Mass Notification Emergency Communications ASIS Houston Chapter Luncheon May 21, 2014 Paul Rux Director of Sales Mexico / South Central Region

More information

LONG-RANGE PLANNING COMMITTEE

LONG-RANGE PLANNING COMMITTEE 2018-2019 Improvements of Campus Facilities Current/In Progress: Improvements began with the 2014 Bond Program: Security vestibules at front entries with video cameras and buzzer door releases Reinforced/bullet-resistant

More information

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

PASS Security Plan Checklist

PASS Security Plan Checklist [School District Name] PASS Security Plan Checklist SCHOOL DISTRICT INFORMATION Address: Telephone Number: Fax Number: Number of Employees: Number of Students: School Resource Officer: TIER CONTINUUM:

More information

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky

More information

USD 380 Centralia, Frankfort & Vermillion

USD 380 Centralia, Frankfort & Vermillion PROJECT MANUAL District Wide Security Upgrade Project Software and Hardware Specifications Covering Locking Hardware Access Control Software & Hardware Video Software & Hardware January 30, 2018 USD 380

More information

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

DIVISION 28 ELECTRONIC SAFETY AND SECURITY DIVISION 28 ELECTRONIC SAFETY AND SECURITY CENTRALLY MANAGED ELECTRONIC ACCESS CONTROL, VIDEO SURVEILLANCE, AND INTRUSION ALARM SYSTEMS 1. All questions on equipment approvals in this section shall be

More information

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

School Property REVIEWING YOUR BUILDINGS & GROUNDS

School Property REVIEWING YOUR BUILDINGS & GROUNDS School Property REVIEWING YOUR BUILDINGS & GROUNDS Risk Management CHECKLIST Instructions: Use this checklist to record issues that may affect your school s security and safety. Check needs attention and

More information

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE The University of Arizona has implemented a Keyless Access and Security System program to provide a cost effective, efficient, and maintainable means

More information

Total Unified Solution for Building Integration: Communications, Access Control, Video Surveillance and Fire

Total Unified Solution for Building Integration: Communications, Access Control, Video Surveillance and Fire ISC West 2013 Product Showcase Total Unified Solution for Building Integration: Communications, Access Control, Video Surveillance and Fire www.mircomgroup.com [TX3] Unified Solution Our unified solution

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

CX/CXB Self-Managed Ethernet Switches N-664 Network Appliance Data and Alarm I/O Device MX Series Multi-Port Switches

CX/CXB Self-Managed Ethernet Switches N-664 Network Appliance Data and Alarm I/O Device MX Series Multi-Port Switches integrate everything only afi delivers comprehensive security network infrastructure The network appliances typically deployed in security networks were most likely manufactured for general network connectivity

More information

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the

More information

The WAVE Plus Instant Notification System for Schools and Colleges

The WAVE Plus Instant Notification System for Schools and Colleges Instant Notification System for Schools and Colleges Duress alarm has been activated in the School of Engineering! Schools strive to provide a safe environment for students and teachers. In an emergency,

More information

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Garfield Elementary School Feasibility Study for New Library Building Project Number A C Larry Teixeira Selma Unified School District 3036 Thompson Avenue Selma, CA 93662 Subject: Feasibility Study for New Library Building Project Number A 12-8581.00 C Dear Mr. Teixeira: At your request, we

More information

Board of Education Meeting

Board of Education Meeting Geneva Community Unit School District #304 Operations and Maintenance-Security 7 Year Capital Improvement Plans Board of Education Meeting December 8 th, 2014 O&M-Security 7 Year Capital Improvement Plans

More information

Your partner for security solutions

Your partner for security solutions Your partner for security solutions Allegion: Your partner for security solutions Classroom security There are a number of areas within a school that are vital to protect. While technology, administrative

More information

The OmniPro II EN50131 and PD6662 Compliant Controller

The OmniPro II EN50131 and PD6662 Compliant Controller The OmniPro II EN50131 and PD6662 Compliant Controller omni APPLICATION The OmniPro II is the flagship security & automation controller. Designed for large residential and commercial installations, the

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

Security Considerations for Secure Workplaces

Security Considerations for Secure Workplaces Security Considerations for Secure Workplaces Mitchell Factor HMA Consulting, Inc. USA Canada UK UAE Overview Security Risk Assessment The Process Security Design Process Technology Updates & Design Considerations

More information

AMENDMENT NO.: III INVITATION FOR BID NO.: GPA FOR

AMENDMENT NO.: III INVITATION FOR BID NO.: GPA FOR January 26, 2018 AMENDMENT NO.: III TO INVITATION FOR BID NO.: GPA-022-18 FOR PHYSICAL SECURITY AND ACCESS CONTROL SYSTEM (ACS) REPAIR AND UPGRADE AT VARIOUS GPA LOCATIONS Prospective Bidders are hereby

More information

Home Automation. Product info. Marketed By: BlueSilica Technologies For further details write to

Home Automation. Product info. Marketed By: BlueSilica Technologies   For further details write to Home Automation Product info Marketed By: BlueSilica Technologies www.bluesilica.com For further details write to bluesilica@gmail.com Home Automation Home automation is the latest in a high-tech world

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

5 Year Capital Improvement Plan Update

5 Year Capital Improvement Plan Update 5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John

More information

Emergency Guidelines Part II. North Campus

Emergency Guidelines Part II. North Campus Emergency Guidelines Part II North Campus Revised Spring, 2015 1 EMERGENCY PROCEDURES MANUAL PART II NORTH CAMPUS 8701 PERRY HIGHWAY MCCANDLESS, PA 15237 SWITCHBOARD 412-366-7000 BUSINESS OFFICE 412-369-3629

More information

The Leaders in Security and Life Safety Communications

The Leaders in Security and Life Safety Communications The Leaders in Security and Life Safety Communications K 12 SECURITY & LIFE SAFETY COMMUNICATIONS SOLUTIONS SAFETY FOR YOUR SCHOOL INSIDE AND OUT When it comes to school facilities and campuses, nothing

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

Comprehensive Solutions for School Communication Amplified Learning Public Address Emergency Notification Intercom Bell Schedule Clock

Comprehensive Solutions for School Communication Amplified Learning Public Address Emergency Notification Intercom Bell Schedule Clock Comprehensive Solutions for School Communication Amplified Learning Public Address Emergency Notification Intercom Bell Schedule Clock Synchronization Innovative Electronic Designs - Over 30 Years of Mass

More information

Oxford Hills School District Capital Renewal Plan Updated March 2017

Oxford Hills School District Capital Renewal Plan Updated March 2017 Color Coding Guide Recently Completed In Progress FY 2017 Budget in FY 2018 Future Budgets/Projects 3/20/17 Capital Renewal Plan Updated March 2017 Capital Renewal Plan - Harrison Elementary Harrison add

More information

Design Presentation. Chief Operations Officer Willie Burroughs

Design Presentation. Chief Operations Officer Willie Burroughs Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community

More information

ADDENDUM/AMENDMENT NUMBER 5 (October 7, 2016) Fire/Security Alarm-Intercom/Clock/Bells-Audio/Video Systems

ADDENDUM/AMENDMENT NUMBER 5 (October 7, 2016) Fire/Security Alarm-Intercom/Clock/Bells-Audio/Video Systems ADDENDUM/AMENDMENT NUMBER 5 (October 7, 2016) RIO RANCHO PUBLIC SCHOOLS PURCHASING DEPARTMENT 500 LASER ROAD NE RIO RANCHO, NEW MEXICO 87508 REQUEST FOR PROPOSALS: RFP#2017-002-IT TITLE: Fire/Security

More information

SMART. FLEXIBLE. RELIABLE.

SMART. FLEXIBLE. RELIABLE. SMART. FLEXIBLE. RELIABLE. Life Safety Communications for Education, Healthcare, Correctional, and Industrial/Commercial Applications. WWW.CAREHAWK.COM THE CH1000(LT) PLATFORM The CH1000(LT), a life safety

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 56 - STATEN ISLAND, 250 KRAMER AVE., New York, 10309 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-20

More information

TrueCom. Building Communications Systems 5115-Series , Area of Rescue Communications System. Description

TrueCom. Building Communications Systems 5115-Series , Area of Rescue Communications System. Description TrueCom Building Communications Systems 5115-Series 5115-9001, -9002 Area of Rescue Communications System Description The Simplex 5115-9001 and -9002 Area of Rescue Communications System provides buildings

More information

NJASA SCHOOL SECURITY CONFERENCE

NJASA SCHOOL SECURITY CONFERENCE NJASA SCHOOL SECURITY CONFERENCE The foundation of every state is the education of it s youth. - Diogenes Laertius Greek Philosopher New Jersey Association of School Administrators 3/13/13 Slide 2 What

More information

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat, University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE - 711 FIRE - 711 MEDICAL EMERGENCY - 711 Anyone discovering excessive heat, smoke, or fire inside your building will immediately

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

TELECOMMUNICATION. Telecommunication. Wireless Phone

TELECOMMUNICATION. Telecommunication. Wireless Phone TELECOMMUNICATION Telecommunication Wireless Phone Talkback System CCTV PAGA TV Distribution LAN / WAN System 25 Telecommunication Telecommunication projects in the Oil & Gas industry are often large,

More information

Intrusion Detection Measures Against Insider Threats In Al-Tuwaitha Nuclear Site

Intrusion Detection Measures Against Insider Threats In Al-Tuwaitha Nuclear Site Intrusion Detection Measures Against Insider Threats In Al-Tuwaitha Nuclear Site 1 Contents Description of Al-Tuwaitha Site. Potential threats inside the site. The responsibilities of the Nuclear Security

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Access Control for. Part 3 of 4. Brought to You by. Presented by Video Security Consultants

Access Control for. Part 3 of 4. Brought to You by. Presented by Video Security Consultants 2008 Video Security Consultants Brought to You by Presented by Part 3 of 4 A1 Part 3 of 4 Taking a Hard Look at Software The essential function of an electronic access control system (EACS) is to control

More information

UK Police. University Senate Council 2/10/2016. Authorized by KRS Now considered the 11 th largest police department in Kentucky.

UK Police. University Senate Council 2/10/2016. Authorized by KRS Now considered the 11 th largest police department in Kentucky. University Senate Council Update on Campus Security 2/8/20156 1 UK Police Authorized by KRS 164.950 Now considered the 11 th largest police department in Kentucky. Largest University Police in Kentucky

More information

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 Buildings and Grounds Committee Minutes March 20, 2017 The meeting was called to order at 6:30 p.m. PRESENT: Board Members, Mr. Jeffrey A.

More information

Campus Emergency Response Plan Standard Operating Procedure

Campus Emergency Response Plan Standard Operating Procedure Campus Emergency Response Plan Standard Operating Procedure August 2015 Austin Campus Brownsville Campus Corpus Christi Campus Harlingen Campus Pharr Campus San Antonio South Campus San Antonio North Campus

More information

Oconomowoc Area School District Facility Construction Update August 25, 2017

Oconomowoc Area School District Facility Construction Update August 25, 2017 Oconomowoc Area School District Facility Construction Update August 25, 2017 IXONIA ELEMENTARY SCHOOL Ixonia Elementary is getting ready for the start of the new school year! Interior cleaning and classroom

More information

Safety & Security update April 2014

Safety & Security update April 2014 Safety & Security update April 2014 Corridor Locks New locks installed on every classroom door that allow the doors to be locked from the inside with a push button. Completed in August 2013. In-House project

More information

The purpose of this addendum is to further clarify the requirements of the plans and specifications.

The purpose of this addendum is to further clarify the requirements of the plans and specifications. ADDENDUM #2 PROJECT: OWNER: ARCHITECT: Door Access Control System for Campus Trigg County Schools Cadiz, KY 42211 Trigg County Board of Education 202 Main Street Cadiz, KY 42211 JKS Architects & Engineers

More information

Property REVIEWING YOUR BUILDINGS & GROUNDS

Property REVIEWING YOUR BUILDINGS & GROUNDS Property REVIEWING YOUR BUILDINGS & GROUNDS Ministry Risk Management CHECKLIST Instructions: Use this checklist to record issues that may affect your ministry s security and safety. Check needs attention

More information

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

DIVISION 28 ELECTRONIC SAFETY AND SECURITY 281300 - ACCESS CONTROL A. General DIVISION 28 ELECTRONIC SAFETY AND SECURITY At the beginning of the project, schedule a meeting with the Facilities Access/Maintenance Coordinator with questions and concerns.

More information

SECTION INTERCOMMUNICATION SYSTEM 1. GENERAL 1.1 DESCRIPTION

SECTION INTERCOMMUNICATION SYSTEM 1. GENERAL 1.1 DESCRIPTION SECTION 27 51 23 INTERCOMMUNICATION SYSTEM 1. GENERAL 1.1 DESCRIPTION A. The requirements of the contract documents, including the General and Supplementary General Conditions and Division 1 - General

More information

Innovative protection that combines power and flexibility

Innovative protection that combines power and flexibility Innovative protection that combines power and flexibility Desigo Fire Safety Modular outpaces industry standards and includes cutting-edge detection and communication capabilities usa.siemens.com/desigo-fs-modular

More information

GMS GRAPHICAL MANAGEMENT SYSTEM

GMS GRAPHICAL MANAGEMENT SYSTEM GMS GRAPHICAL MANAGEMENT SYSTEM 1 GMS Security management system for multi-site organizations. PACOM Graphical Management System (GMS) is the modular client-server application that integrates all of PACOM

More information

Robert Horne, RCDD. Sylvain Charuest, RCDD

Robert Horne, RCDD. Sylvain Charuest, RCDD Networking for Healthcare Robert Horne, RCDD Dave Hanson, RCDD Sylvain Charuest, RCDD Introduction Agenda State of healthcare IT today Integration or segregation? Breakdown by discipline Where does the

More information

Securing your school. Door hardware solutions for primary education

Securing your school. Door hardware solutions for primary education Securing your school Door hardware solutions for primary education Security at every layer Successful school operation combines a safe and secure environment with the freedom needed to focus on education.

More information

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

DIVISION 28 ELECTRONIC SAFETY AND SECURITY DESIGN CONSIDERATIONS DIVISION 28 ELECTRONIC SAFETY AND SECURITY The Consultant shall provide a written description of how the entire system is designed to operate. This Basis of Design (BOD) narrative

More information

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. 2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is

More information

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD PART 1 - GENERAL PURPOSE This Standard is intended to assure that fire detection/alarm systems at The University of Texas at Austin provide the highest level of fire safety possible. SCOPE This standard

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT MAHID APPAREL LTD ACCORD ID: 11956 NOWPARA, MADHABDI, NARSINGDI, DHAKA-1604 OTHER FACTORIES: NONE February 20, 2015 Page 2 SUMMARY was surveyed for fire safety on 2/20/2015

More information

School Paging. IP/SIP Intercom and Paging. Prepared by: John Vellone

School Paging. IP/SIP Intercom and Paging. Prepared by: John Vellone School Paging IP/SIP Intercom and Paging OVERVIEW Perform point to point or campus wide communication with controlled evacuation via pre-recorded messages and/or via emergency microphones using the Fonica

More information

Physical Plant Division s University Access Control, Video Surveillance and Security Support Model, January, 2016

Physical Plant Division s University Access Control, Video Surveillance and Security Support Model, January, 2016 Physical Plant Division s University Access Control, Video Surveillance and Security Support Model, January, 2016 The Physical Plant Division s Access Control, Video Surveillance, and Security (AVS) Group

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: HS OF AMERICAN STUDIES - BRONX, 2925 GOULDEN AVENUE, New York, 10468 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Cherry Hill Public Schools BUILDING A SOLID FUTURE Cherry Hill Public Schools BUILDING A SOLID FUTURE Who We Are The Cherry Hill School District is the 12 th largest in the state, serving 11,500 students 19 Locations 2 High Schools, 3 Middle Schools, 12

More information

Appendix B JPPSS Emergency Management Plan Template for Schools (Please type all information)

Appendix B JPPSS Emergency Management Plan Template for Schools (Please type all information) Appendix B JPPSS Emergency Management Plan Template for Schools (Please type all information) Directions for the Site Administrator/Principal This Emergency Management Plan must be completed at the beginning

More information

Keys to an Effective School Lockdown

Keys to an Effective School Lockdown Keys to an Effective School Lockdown Door locks and hardware play an important role in a school lockdown and must be carefully considered to ensure the safety of students and faculty. The recommended safety

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction Chapter 1 provides an overview of the fundamental aspects of the industries that influence electronic safety and security (ESS) design. Table of Contents Introduction to Safety

More information

Pre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m.

Pre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m. Attendees: Pre-Bid Meeting Minutes 2018 A & E RFP February 6, 2019 10:00 a.m. Anthony Shomin Sue Martin Architectural & Engineer Professionals KCKHA Modernization Coordinator KCKHA Modernization Admin.

More information

DIVISION 14 - CONVEYING SYSTEMS. 1. Passenger Elevators 2. Vertical Platform and Inclined Wheelchair Lifts.

DIVISION 14 - CONVEYING SYSTEMS. 1. Passenger Elevators 2. Vertical Platform and Inclined Wheelchair Lifts. DIVISION 14 - CONVEYING SYSTEMS I. GENERAL A. This division contains: 1. Passenger Elevators 2. Vertical Platform and Inclined Wheelchair Lifts. B. Elevators in schools are for the disabled, furniture

More information

ELECTRONICACCESS ANDELECTRONICSECURITY BUDGETPRESENTATION

ELECTRONICACCESS ANDELECTRONICSECURITY BUDGETPRESENTATION ELECTRONICACCESS ANDELECTRONICSECURITY BUDGETPRESENTATION University of Florida Physical Plant Division February 19 th, 2013 AGENDA Overview Strategic Value Complexity of Management Governance & Staffing

More information

MiraCosta College Security Master Plan

MiraCosta College Security Master Plan Security Master Plan Security Facilities Master Plan Security Facilities Master Plan Executive Summary Mira Costa Community College District currently lacks effective an electronic security system ESS

More information

March 11, 2013 ADDENDUM #1. RFP-DEM-12/ FDEM Facility Security System Replacement

March 11, 2013 ADDENDUM #1. RFP-DEM-12/ FDEM Facility Security System Replacement STATE OF FLORIDA DIVISION OF EMERGENCY MANAGEMENT RICK SCOTT Governor BRYAN W. KOON Director March 11, 2013 ADDENDUM #1 RFP-DEM-12/13-015 FDEM Facility Security System Replacement The Division is issuing

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 174 - QUEENS, 65-10 DIETERLE CRESCENT, New York, 11374 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-01-25

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information