1 Planning and New Starts Development Committee February 25, 2016
2 VB TRANSIT EXTENSION 2
3 Status of VBTES DEIS No Federal Environmental Decision Document Decision to build project with only State and City funds has led to cessation of NEPA process HRT completed draft MFR for responses to comments associated with LPA portion of DEIS as a courtesy. Final MFR will be released in March, FTA rescinded EIS NOI on February 5, 2016 on Federal Register State EIR regulations do not apply to local, non-highway construction projects VBTE will require completion of environmental permits during Design-Build process 3
4 VBTE Preliminary Engineering HRT completing Preliminary Engineering HRT contracted for 30% design and completion of environmental studies in July 2015 Award to HRT Light Rail Partners, a Joint Venture of RK&K and STV $10.5M Contract funded through RSTP dollars 15-month Schedule On Schedule and On/Under Budget for Sept 2016 completion 4
5 Proposed VBTE Design-Build City of Virginia Beach to award and manage Design- Build process Letter of interest released by City in October 2015 to contracting community RFQ / Prequalification of Design Build Teams: Spring 2016 RFP to Pre-Qualified Design Build Teams: Winter of 2016/17 City awards Design Build contract Spring/Summer 2017 D-B Optional Task may include design and construction of Shared-Use Path Proposed opening of LRT service by end of
6 VBTE Conceptual Schedule Action Schedule Completion of HRT Preliminary Engineering September 2016 Virginia Beach Design Build RFQ Spring 2016 Virginia Beach Design Build RFP Winter 2016 / Spring 2017 Virginia Beach award of D-B Contract Spring/Summer 2017 End of Construction Summer 2019 Safety Testing and Startup Fall / Winter 2019 Begin Revenue Service Winter
7 Newtown Road 7
8 Princess Anne Road / Freight Lane 8
9 Euclid Road 9
10 Kellam Road 10
11 Constitution Road 11
12 Witchduck Road 12
13 Independence Boulevard 13
14 Design / Construction Challenges Connection and station expansion at Newtown Road and impacts on the drainage swale. DVP transmission and distribution lines along corridor, including line crossings at DVP Substation and Witchduck Road Skewed grade crossings at Princess Anne and Euclid Roads Alignment and utility conflicts under existing and proposed I-264 Bridge 14
15 Design / Construction Challenges Long span crossings at Witchduck Road and Independence Boulevard Utility corridors at all major roadway crossings Signal work and The Tide Operations Control Center (OCC) retrofit to establish automatic train protection (ATP) capabilities Provisions for shared use pedestrian/bike path adjacent to light rail tracks 15
16 Vi i i B h T it E t i Virginia Beach Transit Extension Questions and Discussion
17 PENINSULA CORRIDOR STUDY 17
18 Peninsula Corridor Study Plan Three-phased approach to define the study area s transit mobility Purpose and Need and to identify Reasonable Alternatives 18
19 Initial Corridor Alternatives 19
20 Initial Technology Alternatives 20
21 Study Conclusions / Next Steps Complete corridor study and present recommendations to Commission and City Councils by mid-2017 Regional agreement on one project or multiple phased projects for advanced study and design Complimentary Commission, City, and Regional Resolutions Identification of funding sources for next study and design steps Federal, State, Regional, Local, or some combination 21
22 Peninsula Conceptual Schedule Action Begin Complete Award to NTP Feb 2015 Mar 2015 Purpose and Need Mar 2016 May 2016 Key Connections and Corridors May 2016 Jul 2016 Technical Analysis Jul 2016 Nov 2016 Draft Study Recommendations Nov 2016 Mar 2017 Final Study Recommendations Mar 2017 May 2017 Selection of Locally Preferred Corridor(s), Mode(s), and Phase(s) Jun 2017 Sep
23 P i l C id Peninsula Corridor Questions and Discussion
24 NORFOLK EXTENSION STUDY Higher Employment Higher Distribution Source: U.S. Census Longitudinal Employer Household Dynamics 24
25 Extension Purposes and Needs Provide improved transit service, possibly in the form of a light rail extension, from The Tide light rail system to, and possibly onto, Naval Station Norfolk in order to: 1. Develop Transit Connections to Many Points Within Norfolk 2. Address Heavy Traffic and Congestion 3. Reduce Travel Time 4. Increase Park and Ride Locations 5. Provide Better Interconnectivity of Transit Modes 6. Consider Connectivity for Future Light Rail System Expansion 25
26 Preferred Corridors Study Identified Two Independent Corridors These figures illustrate possible representations of conceptual transportation corridors. No Corridor has been selected for advanced study at this time. 26
27 Resiliency and Flooding Resiliency Considerations 27
28 Norfolk Corridor(s): Next Steps Both Eastern and Western corridors will be advanced for additional study Potentially concurrent studies anticipated to begin in 2016 Regional and local studies underway will direct extension studies VDOT - Hampton Roads Crossing: Aid in development of logical termini near Naval Installation City of Norfolk - Resiliency Planning: Aid in development of corridor planning and phasing City of Norfolk - Military Circle Redevelopment: Aid in alignment options and connectivity on Eastern Alignment 28
29 N f lk T it E t i St d ( ) Norfolk Transit Extension Study(s) Questions and Discussion
30 Typical Conditions in Corridor Looking West at Greenwich Road 30
31 Western Corridor Opportunities i Most preferred conceptual corridor by public in attendance at public meetings and through social media Directly serves an existing dense population corridor/area Provides high capacity transit connectivity for Region to ODU and EVMS Provides direct connectivity from the Naval Installations to ODU, Ghent, and Downtown Norfolk 31
32 Western Corridor Challenges Route and technology options through/near Ghent highly controversial and largely undefined Likely would provide relatively slow travel times to connect to the Navy installations High Storm Surge and Flooding resiliency constraints 32
33 Western Corridor Challenges Highly constrained physical environment Potentially significant impacts and Right of Way concerns with local roads, utilities, and adjacent land uses Potential to be less supported at regional level compared to Eastern Corridor due to slower travel speeds to Naval installations 33
34 Eastern Corridor Opportunities i Second most preferred conceptual corridor by public in attendance at public meetings and through social media Less constrained physical environment with good potential for redevelopment opportunities. Great potential for TOD along key regional transportation corridors including Military Circle, Janaf Shopping Center, Military highway adjacent to the Airport, Southern Shopping Center, and Wards Corner Few Storm Surge and Flooding resiliency constraints 34
35 Eastern Corridor Opportunities i Potential to provide high capacity transit connectivity to Sentara Leigh Complex Provide better potential extension connectivity to Chesapeake, Virginia Beach, and the Peninsula Likely would provide better travel times to connect to the Navy Installations More likely to be highly supported at regional level due to faster potential travel speeds to Naval installations 35
36 Eastern Corridor Challenges Directly serves a smaller existing population corridor/area than western corridor Redevelopment opportunities rely on economic considerations for Joint TOD development and strategic partnerships that are unconfirmed Does not provide high capacity transit connectivity for Region to ODU and EVMS Provides less direct connectivity from the Naval Installations to Downtown Norfolk 36
37 I-264 Underpass 37
38 DVP Lines, Existing Tide Tracks DVP kv Distribution Lines Our Stuff DVP 230 kv Transmission Lines 38
Transportation Committee
Transportation Committee Business Item No. 2013-286SW Meeting date: October 14, 2013 For the Metropolitan Council meeting of October 16, 2013 Subject: Southwest Light Rail Transit (Green Line Extension):
More informationSoutheast Extension to RidgeGate Parkway Scoping Booklet
Southeast Extension to RidgeGate Parkway Scoping Booklet PUBLIC SCOPING MEETING SCHEDULE Public Scoping Meeting Wednesday, November 2, 2011 6:00pm to 7:30pm City of Lone Tree Recreation Center Willow Room
More informationBilling Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]
This document is scheduled to be published in the Federal Register on 12/18/2017 and available online at https://federalregister.gov/d/2017-27194, and on FDsys.gov Billing Code: 4210-67 DEPARTMENT OF HOUSING
More information4/8/2015 Item #10D Page 1
MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE
More informationLone Oak Road/ 70 th Street West. Efficient, Effective, Responsive. Preliminary Design Services (CP 26-54)
(CP 26-54) Dakota County Board of Commissioners September 12, 2017 Purpose of Request Award Design Contract to Kimley-Horn and Associates Approve Joint Powers Agreements with the Cities of Eagan and Inver
More informationRESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension
RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018
More information1.0 PROJECT PURPOSE AND NEED
1.0 PROJECT PURPOSE AND NEED The FasTracks Plan includes the extension of the Central Corridor from its current terminus at 30th/Downing to a connection to the East Corridor commuter rail service planned
More informationWelcome to the. Open House
Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect
More informationCorridor Management Committee. September 29, 2017
Corridor Management Committee September 29, 2017 1 Today s Topics Chair s Update Proposed Corridor Protection Wall Aesthetic Design Overview Public Outreach Environmental Review Civil Construction Update
More information1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project
1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA 1.1.1 Project Description The Trunk Highway (TH) 14 West Corridor is a two-lane roadway approximately 22 miles in length. Located in Nicollet County, the corridor
More informationStrategic Growth Area #1 Northampton Boulevard Corridor Area
Strategic Growth Area #1 Northampton Boulevard Corridor Area Description Strategic Growth Area #1 has established itself as a major employment center in Southside Hampton Roads. Opportunities exist to
More informationMilitary Circle / Military Highway Urban Development Area
TABLE OF CONTENTS Military Circle / Military Highway Urban Development Area A Vision for the Future December 8, 2016 City Planning Commission Public Hearing Draft i A note about the representation of light
More informationWelcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline
Welcome Green Line LRT Beltline Alignment Options Stay engaged! Follow the Green Line story at calgary.ca/greenline Green Line LRT Why are we here? Our Challenge Determine the best alignment in the Beltline.
More informationRiverside South. Rapid Transit Study. Riverside South. Value Planning Workshop
Riverside South Rapid Transit Study Peter Steacy, P. Eng. Program Manager Transportation Environmental Assessments City of Ottawa Value Planning Workshop Christopher Gordon, P. Eng. Project Manager Transportation
More informationGreen Line North Centre City Alignment
Project overview The Green Line will be an important piece of Calgary's transit network, adding 40 kilometres of track to the existing 59 kilometre LRT system. End-to-end, the line will connect North Pointe
More informationAtlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008
Atlanta BeltLine Corridor Environmental Study Scoping Meeting August 2008 What Will We Be Discussing Today? Study Overview - How Did We Get Here? - What Is the Study About? - Who Is Involved? - Where Is
More informationDallas CBD Second Light Rail Alignment (D2)
Dallas CBD Second Light Rail Alignment (D2) Subway Project Refinement Public Meetings January 19, 2017 Discussion Items Background Schedule Public/Stakeholder Involvement Subway Construction Overview Potential
More informationDallas CBD Second Light Rail Alignment (D2)
Dallas CBD Second Light Rail Alignment (D2) Subway Project Refinement City of Dallas Transportation and Trinity River Project Committee February 13, 2017 Discussion Items Background Schedule Public/Stakeholder
More informationRegional Transportation District
NORTHEAST AREA TRANSIT EVALUATION FINAL REPORT Prepared for: Regional Transportation District Prepared by: David Evans and Associates, Inc. URS, Corporation November 2007 LIST OF FIGURES Figure 1: Northeast
More informationD2 Subway Project Development. Public Meeting September 12, 2018
D2 Subway Project Development Public Meeting September 12, 2018 1 Agenda Project Background Process, Funding and Schedule Project Development (PD) Efforts Preliminary Engineering (PE) Environmental Impact
More information5 EIS Process, Content, and Exhibits
5 EIS Process, Content, and Exhibits 5.1 Draft and Final Environmental Impact Statements The recent SW LRT process began with a comprehensive analysis of alternative corridors, the results of which form
More informationPanama City Beach Community Redevelopment Agency ON THE MOVE IN PCB
Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Program Goals, Activities and Accomplishments I. Beach Front Multi-modal Transportation, Aesthetic and Parking Improvements III. Connector
More informationRoute 110 Alternatives Analysis
Route 110 Alternatives Analysis Public Meeting #1 December 15, 2014 Source: Town of Babylon Agenda Welcome/Introduction Hon. Antonio A. Martinez Deputy Supervisor, Town of Babylon Update on East Farmingdale
More informationKnoxville Area Transit (KAT) Transit Development Plan Corridor Analysis
Knoxville Area Transit (KAT) Transit Development Plan Submitted to: Knoxville-Knox County Metropolitan Planning Commission Submitted by: PB Americas, Inc. Under contract to: The Corradino Group, Inc. October
More informationMississippi Skyway Preliminary Engineering Report
EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge
More informationProject Overview. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationQUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project
QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project PROJECT OVERVIEW Windsor Woods, Princess Anne Plaza and The Lakes are neighborhoods located in what was once
More informationStreet Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017
Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background
More informationNew Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012
New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012 The City is preparing a strategy for parking in Downtown New Westminster. The study team and a group of key stakeholders
More informationScope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan
Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity
More informationRelief Line Project Assessment
Relief Line Project Assessment Stakeholder Advisory Meeting #4 May 30, 2016 Tonight s Meeting PURPOSE To present and discuss: Results of the evaluation of potential alignments Emerging preferred alignment
More informationKING GEORGE COUNTY BOARD OF SUPERVISORS. Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018
KING GEORGE COUNTY BOARD OF SUPERVISORS Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018 Tonight s Goals Project Design and Schedule Update Noise Analysis Results Determine
More informationSOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE
WELCOME! SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE Monday, November 18, 2013 3:30 to 5:30PM and 7:00 to 9:00PM Tuesday, November 19, 2013 3:30 to 5:30PM and 7:00 to 9:00PM Welcome to the Southwest
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT DATE: January 26, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the
More informationGhent Neighborhood League Briefing Living at Sea Level & Flooding Risks
Ghent Neighborhood League Briefing Living at Sea Level & Flooding Risks Tuesday, August 11, 2015: Chrysler Museum Presentation by: Tom 757-761-0676 tom@mcneilan.com The Virginia Tidewater For 400+ years,
More informationVDOT s HRTAC and Mega- Projects Program
VDOT s HRTAC and Mega- Projects Program November 18, 2015 James W. Long, III, P.E., DBIA District Major Projects Delivery Director Hampton Roads District Agenda 1. Hampton Roads Transportation Accountability
More informationDowntown Area. Draft Vision and Strategies. February 24, 2015 Public Meeting
Downtown Area Draft Vision and Strategies February 24, 2015 Public Meeting 1 SEA District North Beach Sea and Sky 3 Uptown Opportunity Neighborhoods Hillcrest Assist owner-occupants in negotiating fair
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016
Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest
More informationPROJECT BACKGROUND. Preliminary Design Scope and Tasks
PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2 DATE: January 27, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the
More informationTOWN OF NEW CASTLE - Master Plan Update
Our Presentation Today (1) Recap the Master Planning Process To Date (2) Present the Outline of the Master Planning Work Plan (3) Present the Calendar for the Master Plan (4) Outline the scope of a Downtown
More informationTOWN COUNCIL / PLANNING COMMISSION
Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.
More informationLake Oswego to Portland Transit Project. Lessons Learned. John Cullerton Senior Project Manager, URS 2012 APTA/TRB Light Rail Conference
Lake Oswego to Portland Transit Project Lessons Learned John Cullerton Senior Project Manager, URS 2012 APTA/TRB Light Rail Conference Overview Project Location and Context Corridor History and Project
More informationRappahannock- Rapidan Regional Commission
Rappahannock- Rapidan Regional Commission Last Updated July 2008 RAPPAHANNOCK-RAPIDAN REGIONAL TRANSPORTATION PLAN The Virginia Department of Transportation (VDOT) and the Rappahannock-Rapidan are partnering
More informationSH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017
Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year
More informationPublic input has been an important part of the plan development process.
Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the
More informationBurton Station Village Community Meeting February 26, 2014
February 26, 2014 SGA Plan Overview Recent announcements by the City of Norfolk regarding the closure of Lake Wright Golf Course and retail development proposals Update on infrastructure improvement plans
More informationLongmeadow Parkway Fox River Bridge Corridor. August 6, 2015
Longmeadow Parkway Fox River Bridge Corridor August 6, 2015 Longmeadow Parkway Bridge Corridor 5.6 miles from Huntley Road to IL 62 Unique municipal/county/state/federal partnership Links Randall Road
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 5H From: Date: Subject: Staff October 17, 2008 Council Meeting Local Government Comprehensive Plan Review Draft
More informationPublic Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table
Public Open House Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table The Grand Avenue Extension Location and Environmental Study will determine the location of the extension of
More informationOctober 28, Mr. Jack Hornbeck President & CEO Hampton Roads Chamber of Commerce 500 East Main Street, Suite 700 Norfolk, VA 23510
October 28, 2010 Mr Jack Hornbeck President & CEO Hampton Roads Chamber of Commerce 500 East Main Street, Suite 700 Norfolk, VA 23510 Dear Mr Hornbeck: On September 29,2010, the Hampton Roads Crossing
More informationD2 Subway Project Development. Interagency Meeting July 27, 2018
D2 Subway Project Development Interagency Meeting July 27, 2018 1 Agenda Welcome and Introductions Project Background D2 Project Overview Project Development (PD) Efforts Preliminary Engineering (PE) Environmental
More informationLOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)
CE OF PREPARAT LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT STATEMENT (E1S)lENVIRONMENTAL IMPACT REPORT (EIR) TO: AGENCIES, ORGANIZATIONS
More informationThe transportation system in a community is an
7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons
More informationAppendix E Preliminary Location Hydraulic Study
Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally
More informationAlaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016.
B-001-001 The use of Columbia Street for two-way transit was a decision made by King County Metro as part of its Southwest Transit Pathway evaluation. This project is separate from AWPOW. B-001-002 Modeling
More informationMassDOT Highway ACEC State Markets Conference April 4, Jonathan Gulliver, Highway Administrator
MassDOT Highway ACEC State Markets Conference April 4, 2019 Jonathan Gulliver, Highway Administrator About MassDOT Highway 9,561 Lane Miles of Interstate, Numbered Routes, and Toll Roads 60% of all trips
More informationMayor Dave Netterstrom and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services
CITY COMMISSION BRIEFING & DOWNTOWN COCOA BEACH COMMUNITY REDEVELOPMENT AGENCY Planning Board and Landscape Committee Report For Meeting Scheduled for February 7, 2013 Minutemen Causeway Low Impact Design
More informationExpo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011
Expo Line Community Meeting Phase 2 Design Update November 2011 Meeting Agenda Phase 2 Design Update Meeting Meeting Purpose and Format Project Status Update Overview of Design Progress Next Steps Open
More informationPublic Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018
Public Open House Overview of the Downtown Plan Official Plan Amendment April 23, 2018 1 A 25-Year Plan for Downtown To ensure growth contributes positively to Toronto s Downtown as a great place to live,
More informationTRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES
TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future
More informationI. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...
PROJECT COMMITMENTS SUMMARY... S-1 1. Type of Action... S-1 2. Description of Action... S-1 3. Summary of Purpose and Need... S-1 4. Alternatives Considered... S-2 5. NCDOT Alternatives Carried Forward...
More informationMETRO Gold Line BRT CBAC Meeting. August 23, 2018
METRO Gold Line BRT CBAC Meeting August 23, 2018 1 Today s Topics Introductions Corridor Management Committee Update Public Engagement Update History of Alignment Project Scope Discussions Upcoming CBAC
More informationSouth of Eastern Strategic Direction Status Update
STAFF REPORT ACTION REQUIRED South of Eastern Strategic Direction Status Update Date: July 10, 2014 To: From: Planning and Growth Management Committee Chief Planner and Executive Director, City Planning
More informationREVIEW AND EVALUATION OF REGIONAL LAND USE
REVIEW AND EVALUATION OF REGIONAL LAND USE AND TRANSPORTATION SCENARIOS #220831 Environmental Justice Task Force October 7, 2014 VISION 2050 Process Development of Guiding Vision for Land Use and Transportation
More informationPD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222
PD&E STUDY SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # 435808-1-22-02 ETDM 14222 WELCOME TO THE KICK-OFF MEETING May 24, 2016 1 1 2 3 4 5 6 PLANNING PROJECT DEVELOPMENT AND ENVIRONMENT
More informationCITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA
CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James
More informationBeltLine Corridor Environmental Study
BeltLine Corridor Environmental Study Joint TAC and SAC Meeting December 8, 2008 What We Will Discuss Today Outreach and Agency Coordination Scoping Results Existing Conditions Historical and Archeological
More informationDOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE
DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE Overview I. Draft Plan Process II. Draft Plan Overview a. Market Analysis b. Master Land Use Plan
More informationPlace and Opportunity: An Equity Assessment of the Twin Cities Region (www.metrocouncil.org/
1 Purpose and Need This chapter gives an overview of the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project, including its location and setting within the local communities and the region,
More informationES.0 Introduc on. Execu ve Summary. ES.1 Purpose and Need for the Project (Chapter 1) ES.2 Project Alterna ves (Chapter 2)
ES.0 Introduc on The (VBTES) is a mul year study evalua ng the range of alterna ves for extending The Tide light rail transit (LRT) east into the City of Virginia Beach. The VBTES Corridor is centered
More informationTransit Implementation Strategy Westside Study Group Meeting
Westside Study Group Meeting February 27, 2012 The Portland Streetcar Passing Through a Park Near Portland State University Westside Study Group Meeting February 27, 2012 1. TIA Update 2. TIS Process To-Date
More informationQUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project
QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project Project Overview... 2 Thalia Creek (Windsor Woods) Tide Gate... 6 Club House Road Drainage Project... 9 Updated
More informationCOMMUNITY OPEN HOUSE. March 28, 2012
COMMUNITY OPEN HOUSE March 28, 2012 THE CASE FOR URBAN INVESTMENT One of the best things that cities can do to create jobs especially in the private sector is to improve the quality of life of their inhabitants.
More information7.0 DRAFT SECTION 4(f) EVALUATION
7. DRAFT SECTION 4(f) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects on parks, recreation areas, wildlife and waterfowl
More informationWELCOME TO OPEN HOUSE TWO November 28, 2018
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting
More informationWLAC Facilities Committee Meeting. September 18, 2017
Campus Program Report WLAC Facilities Committee Meeting September 18, 2017 Page 1 DSA approved the plans on May 15, 2017. Notice to Proceed was issued June 8, 2017 and the project remains on schedule for
More informationPLAN ELEMENTS WORKSHOP. April 5, 2016
PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly
More informationTOWN OF WHITBY REPORT RECOMMENDATION REPORT
TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Council REPORT NO: PL 95-09 DATE OF MEETING: October 13, 2009 PREPARED BY: Planning/Public Works Joint Report FILE NO(S): N/A LOCATION: N/A REPORT
More informationD-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017
D-O LRT Zoning Discussion Chapel Hill Boards & Commissions October 16, 2017 Update on Overall D-O LRT Station Area Initiative Objectives Design and educate on principles of Good Transit-Oriented Development
More information2007 Fhwa Geotechnical Technical Guidance Manual
2007 Fhwa Geotechnical Technical Guidance Manual Highway Administration (FHWA) to identify research Guidance for the reuse of foundations is needed geotechnical issues in a holistic manner. Technical drivers.
More information112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH
112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG060310124909PGH C ontents Introduction 1 Project Overview 1 Public Involvement and Technical Coordination 4 Description
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationGLX Project Green Line Extension Project GLX WORKING GROUP PRESENTATION OCTOBER 2, 2014
GLX Project Green Line Extension Project 1 Agenda Welcome GLX Sustainability Project Overview & Updates Upcoming Public Meetings Station Meeting Lechmere Station Meeting Union Sq. & Washington St. Working
More informationCenterville SGA. virginia beach, va. Prepared for the City of Virginia Beach February,
Centerville SGA virginia beach, va Phase 3 presentation Prepared for the City of 12-13 February, 2013 www.vbgov.com/centervilleplan urban design associates miles agency, rclco, urs, vhb & wpl A Three Phase
More informationIntroduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1
Chapter 1 Introduction Lakewood 2025: Moving Forward Together Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1 Purpose of the Comprehensive Plan The Comprehensive
More informationSHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm
SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, 2010 6:00 pm - 8:00 pm 1 Project Area 2 Sheridan Parking Structure RTD Ownership 3 Project Elements Structure and amenities include: 1.
More informationI-84 Hartford Project Open Planning Studio #12. April 25, 2017
I-84 Hartford Project Open Planning Studio #12 April 25, 2017 Meeting Agenda 1. I-84 Hartford Project alternatives update 2. Multimodal station area planning 3. I-84 / I-91 Interchange Study coordination
More informationDumbarton Rail Corridor. Project Scoping Meeting Nov 15, :15 PM City of Newark Nov 16, :15 PM City of Menlo Park
Dumbarton Rail Corridor Project Scoping Meeting Nov 15, 2006 7:15 PM City of Newark Nov 16, 2006 7:15 PM City of Menlo Park 1 Presentation Overview I. Introduction History of the Project II. III. Purpose
More informationSBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I
SBCAG STAFF REPORT SUBJECT: Cabrillo-UPRR Bridge Project MEETING DATE: March 17, 2016 AGENDA ITEM: 5I STAFF CONTACT: Fred Luna RECOMMENDATION: Authorize the chair to sign a Memorandum of Understanding
More informationVirginia Beach and Sea Level Rise: Where Do We Go From Here?
Virginia Beach and Sea Level Rise: Where Do We Go From Here? Clay Bernick City of Virginia Beach Environment & Sustainability Office Bayfront Advisory Committee Presentation July 19, 2012 Five Items to
More informationRailyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014
Railyard Alternatives and I-280 Boulevard Feasibility Study MTA Board Meeting May 6, 2014 Planned Infrastructure Major pieces of new infrastructure are planned including: Downtown Rail Extension (DTX)
More informationIOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014
IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational
More information9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED
9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following
More informationTyvola & Archdale Transit Station Area Plan. May 15, 2008
Tyvola & Archdale Transit Station Area Plan First Public Meeting May 15, 2008 Presentation Outline 1. Purpose and Process 2. Station Area Overview 3. Plan Recommendations Vision Land Use Transportation
More informationSECTION 4(f) DE MINIMIS DOCUMENTATION
SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)
More informationSouthern Gateway Project and Public Green
Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)
More informationStafford County Strategic Plans
Stafford County Strategic s Strategic Department Description Date Adopted Board of Supervisors Priorities Fiscal Responsibility Education Public Safety Infrastructure Economic Development Service Excellence
More informationThe Atlanta BeltLine. Quarterly Briefing March @atlantabeltline. Reynoldstown Senior Affordable Housing
The Atlanta BeltLine Quarterly Briefing March 30, 2017 @atlantabeltline @atlantabeltline @atlantabeltline Reynoldstown Senior Affordable Housing Framework for a multi-use and transit corridor in the heart
More informationNorthwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS
4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations
More information