1 Engineering Engineering is responsible for water and sewer, transportation and environmental services., 2017
2 2016 Water and Sewer Combo Project The project is a combination of one water main installation, one storm main installation and five sewer main upgrades throughout Chilliwack that have been combined to increase scope and economy of scale. The proposed water main installation will increase supply, fire flow capacity and improve the water quality of the existing water system in the local area. The proposed sewer main replacements and upgrades will replace aging infrastructure and increase capacity to satisfy increased flow from new and future developments. The proposed storm main installation will convey storm water away from water supply production wells to protect the City s drinking water. The following table shows water, storm and sewer main installation and upgrade projects: Name of Project Contract Value Project Status Keith Wilson Road Water Main $840,130 Completed Watson Road Storm Main $808,389 Completed Watson Road Sanitary Main $82,147 Completed Watson Road Paving Works $315,384 Completed Evans Road Sanitary Main $348,242 Completed Vedder Road Sanitary Main $643,364 In Progress Cheam Avenue Sanitary Sewer $935,604 Completed Hodgins Avenue Sanitary Sewer $746,777 Completed Hodgins Avenue Paving Works $333,730 Completed Princess Avenue Sanitary Sewer $89,957 Completed The Sandpiper Contracting/Wedler Engineering Design-Build team is proceeding with design and construction of the project. This $5,143,724 overall project is scheduled to be completed in October Page 2
3 Well #5 Pilot Testing Study The objective of this project is to conduct a pilot testing study to determine the treatment requirements before Well #5 can be brought online. Associated Engineering is proceeding with designing the pilot testing study at present. This $250,000 study is scheduled to be completed in the Fall of Wastewater Treatment Plant High Strength Wastewater Pre-Treatment The PCL Constructors Westcoast Inc. (PCL) has been selected as the Construction Manager along with Associated Engineering (B.C.) Ltd. as the design consultant for this Construction Management Project. Global Water & Energy (GW&E) has been selected as the preferred vendor to supply an anaerobic wastewater treatment system for the pretreatment facility after successful completion of the Request for Proposal (RFP) process. PCL, AE and GW&E are currently in the process of completing detailed design work. The overall project is scheduled to be completed in December Page 3
4 Vedder Bridge Replacement Design-Build Project Chilliwack residents celebrated the new Vedder Bridge and said goodbye to the old bridge at the ribboncutting event on August 24 with food, live music, history and transportation displays, dignitary speeches and the opportunity to experience the new bridge before it was opened to vehicular traffic. By August 31, the bridge and roundabout were opened to all vehicle movements. The remaining curb, sidewalk, paving and utility works continued through September. The old bridge structure will be pulled to the south for deconstruction on the old Vedder Mountain Road approach in October. Final completion and landscape restoration will be completed in November Transportation Design-Build Combination Project Design-Build proposals were received from Eurovia BC Inc., Emil Anderson Construction Inc. and Jakes Construction Ltd. for the design and construction of the 2016 Transportation Design-Build Combination Project. Council accepted the proposal from the lead proponent, Eurovia BC Ltd., in the amount of $6,990, on July 4, This is made up of the eight different Transportation and Drainage projects listed below: Project Construction Completion Sardis Rail Trail Phase 1 Summer 2018 Promontory Road and Chilliwack River Intersection Fall 2018 Promontory-Teskey Pond Spring 2018 Evans and Stevenson Intersection Fall 2018 Pedestrial Signal in Yarrow Fall 2017 Portage Avenue Sidewalk Summer 2018 Selkirk Street Sidewalk Summer 2018 Cultus Lake and Vedder Mountain Road Roundabout Fall 2018 Page 4
5 Engineering Department 2017 Asphalt Rehabilitation and Shoulder Paving After a late start, B.A. Blacktop is making good progress. Project sites and current completion status are shown in the map as follows: Young Road at Creamery Road Yale Road at Quarry Road Page 5
6 2017 Transit Expansion Bus Route Additions and Bus Stop Improvements On September 5, Route #9 Industrial was initiated. Route #8 s western boundary shifted from Carter Road to Lindys Drive. Route #5 s weekday service was added and its circuit shortened. Page 6
7 Engineering Department Hard surfacing of new or improved bus stops was completed at the locations shown on the above site map Young Road south of Airport Road new bus stop with concrete pad Yale Road at O Connor RV new concrete pad and bus stop Yale Road at Banford Road Traffic Signal Upgrades Promontory at Thomas Video Detection Video detection was installed for all approaches in place of detection loops that had failed due to worn asphalt. The cameras provide the added feature of bicycle detection and some basic traffic count features. This system will eliminate the need for in-pavement detection loops and will provide continuous detection during reconstruction activities planned over the next few years. Page 7
8 Back to School This year s Back to School enforcement and education project was another success. The Safer City team attended 18 schools enforcing and educating drivers on 30 km/h school zones. StarFM and Safer City partnered to reward good driver behaviour in school zones. The first event occurred at Bernard Elementary on the first day of school. Good driver behaviour was identified by the RCMP and each of those drivers received a gift bag and words of thanks from the Safer City team. The team then redeployed to McCammon Elementary the following week and rewarded good driving behaviour in the Hamilton Road school zone. The local business community donated advertising space on their roadside advertising boards in an effort to collectively raise awareness that school was back in session. Reminders were also provided through social media, website tips, newspaper and radio ads. School Bus safety was also highlighted through a full page reminder in the Fall/Winter edition of the Leisure Guide. School Zone Traffic Information In September, a radar traffic data collector was installed across from Vedder Elementary School on Promontory Road to gather detailed information on traffic speed, volume and type of vehicle. Lindell Road First Avenue Page 8
9 Roadside Delineators The intersection of Tyson and Evans Road saw the installation of bike lane delineators to protect the bike lane and slow northbound traffic by narrowing the road width. Motorists were cutting across the cycling path as you can see by the worn bicycle stencil and diamond stencil when travelling along the curved portion of the roadway. Keith Wilson and Lindys Drive also saw the installation of roadside delineators to help provide temporary pedestrian refuge for the crosswalk at this intersection. Cyclists and pedestrians are already voicing their appreciation for the new protective measures. Lark Road Lark Road in the Sardis area saw roadway improvements this summer including additional drainage improvements, the addition of a garden and the installation of stalls and arrows. This little hub is very popular with local residents who visit the garden and local merchants. City of Chilliwack and Stó:lō Nation Partner for Public Art Project The City of Chilliwack is pleased to announce a public art partnership with Stó:lō Nation for the Vedder Road Roundabout Art Project to celebrate the history of the Ts'elxwéyeqw Tribe and Stó:lō Nation. The City s budget for the project is $180,000, which is included in the overall budget for the Vedder Bridge Replacement Project. The artwork was designed by Squiala First Nation Chief David Jimmie and Bonny Graham, Coast Salish Aboriginal artist, in consultation with the Stó:lō Nation Chiefs Council and Ts elxwéyeqw Tribe. The artwork will be located at the roundabout at the northern end of the new Vedder Bridge. The artwork will feature a traditional Stó:lō / Coast Salish canoe on top of an upper ring, on which Ey kwesé é mi with its English translation It s good that you are here welcome will be embossed with a salmon and wave design. Eight paddles will encase the supporting posts for this structure. Seven of the paddles will hold emblems that represent the seven Ts'elxwéyeqw communities and one will hold the City of Chilliwack crest. Recirculating water will flow from the upper ring, giving the artistic impression of the canoe over the water and the surrounding landscape will reflect the natural Vedder River vegetation. The artwork will be scaled to suit the centre button area of the roundabout and will be proportioned to maximize the artistic statement. Construction of the public art project at the new roundabout on Vedder Road is scheduled to be completed by the end of Spring Page 9
10 Fall City-Wide Garage Sale Garage Sale Garage Sale The semi-annual City-Wide Garage Sale took place on September 23. This event, which promotes waste reduction through reuse, continues to be a community favourite with approximately 135 residences taking part. Garage sale hosts with left-over items were encouraged to donate them to local charities or thrift stores to keep them out of the landfill. Adopt-A-River The BC Rivers Day Adopt-A-River event took place on September 24. Approximately 250 volunteers came out to help clean up the Chilliwack/ Vedder River, removing 2,820 kg of garbage and 720 kg of metal. The City supports the cleanup events by providing free disposal at the landfill and funding assistance to the Chilliwack-Vedder River Cleanup Society, which organizes the events. Environmental Services staff was on-hand to promote the City s environmental programs. Green Cart Exchanges Since late June, Emterra Environmental has been processing Green Cart size exchanges. Approximately 775 Green Carts had been exchanged by the end of September. While still ongoing, the number of exchange requests has now decreased significantly. Most residents requesting a cart exchange have wanted to upsize their carts, which contributes to the success of the compostables diversion program. Over 70% of the exchange requests were for 240L or 360L carts. Page 10
11 McGillivray Pump Station Upgrade Design-build proposals were received from three (3) selected proponent teams following the public Request for Expression of Interest process. The proposal submitted by the design-build team of Gerry Enns Contracting Ltd. / Urban Systems Ltd in the amount of $4,522,052 was accepted by Council at their regular meeting of August 15, Contract documents have been executed and the final engineering design is under way. The pump station upgrade will increase capacity to accommodate a 1:100 year return period rainfall flood event and will benefit over 750 hectares of agricultural land, plus associated homes and outbuildings. Construction will commence in early 2018 with completion by December Page 11
Fall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More informationInform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;
WELCOME The intent of today s Open House is to: Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass; Review highway crossing locations, future access closures
More informationMaplewood Avenue Downtown Complete Street Project
Maplewood Avenue Downtown Complete Street Project Second Public Meeting January 24, 2018 Welcome and Introduction of Project Team City Planning and Public Works Staff City of Portsmouth Juliet Walker Planning
More informationJohnson Street Bridge Public Realm Update
Johnson Street Bridge Public Realm Update August 20, 2015 Background Johnson Street Bridge Replacement Project impacts a diverse range of stakeholders In addition to a new bridge, the project also includes
More informationTown of Yucca Valley Capital Improvement Projects Report July 24, 2014
Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,
More informationOlde Towne Vision Plan
Olde Towne Vision Plan Introduction In 2016, the City of Bellevue will complete its move of City offices from Olde Towne Bellevue to its new municipal complex on Wall Street. The City intends to sell its
More informationPeople who are members of historically disenfranchised racial, ethnic, cultural, and other identity groups are encouraged to apply.
CALL TO ARTISTS REQUEST FOR QUALIFICATIONS CITY OF TACOMA MUNICIPAL ART PROGRAM East 64 th Streetscape, Tacoma, WA APPLICATION DEADLINE October 10, 2018, 11:59pm BUDGET $72,000, all-inclusive SUMMARY The
More informationIOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014
IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational
More informationFigure 3-1: Public Realm Plan
3 Public Realm Figure 3-1: Public Realm Plan 3.1 Public Realm Concept The public realm concept for the Little Mountain site integrates a clear and accessible movement network with public spaces for social
More informationMain Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre
Main Street Reconstruction From Ninth Line to Stouffer Street Town of Whitchurch-Stouffville Public Information Centre November 23, 2016 4:30 to 6:00 pm & 7:00 to 8:00 pm 6240 Main Street, Stouffville
More informationBOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers
BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, 2017 5:00 PM City Hall - Council Chambers I. CALL TO ORDER II. WORK SESSION ITEMS 1. Interim Changes (10 mins) Presenter: Brent Davis, Finance and
More informationA larger version of this map is located on the last page of this PDF.
MAP Committee Input McLoughlin Area Draft Vision Map A larger version of this map is located on the last page of this PDF. 1. The map above is intended to portray a vision for the McLoughlin area. It highlights
More informationPublic input has been an important part of the plan development process.
Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the
More informationDundas Place Flexible Street Public Information Centre
WELCOME TO THE DUNDAS PLACE DESIGN REVEAL Dundas Place Flexible Street Public Information Centre November 8, 2017 This project is funded by the City of London with support from the Government of Canada
More informationMPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals
MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals Purpose: The Midlothian Road entrance to Mundelein Park & Recreation District s (MPRD s) Keith Mione (Community) Park would
More informationNuts and Bolts (or Gravel and Asphalt) of the Main Street Project
Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project What is the Main Street Project? The Main Street Project is a roadway project that addresses pavement, infrastructure and safety issues
More informationLand Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC
2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationFOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?
FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,
More informationCottage Grove Road Reconstruction. City of Madison Engineering
Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs
More informationMonroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018
Monroe Street Reconstruction Public Preconstruction Meeting February 21, 2018 Thank you to Edgewood College! Tonight s Agenda 1. Project Overview 2. Initial project schedule and phasing 3. Expectations
More informationSpeedway Mall Project Frequently Asked Questions
Speedway Mall Project Frequently Asked Questions These FAQs will continue to be updated as new questions arise. Purpose of the Project and Uses of the Mall Q: Why is this project being done? A: The 1999
More informationEngineering Department
Engineering Department Department Mission It is the mission of the Engineering Department to protect and enhance the public health, safety and welfare by reviewing, inspecting and maintaining documentation
More informationTRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES
TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future
More informationPublic Works Project Delivery Report
Public Works Project Delivery Report May 2017 San Gabriel Public Works delivers reliable infrastructure & welcoming public spaces by designing, constructing, operating & maintaining the City s streets,
More informationTRANSPORTATION COMMITTEE
TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island
More informationProject will Replace: Utilities Curb Pavement Lighting. City of Madison
Project will Replace: Utilities Curb Pavement Lighting Replace sanitary sewer main & laterals Winnebago: Existing 8 main, 1905 Linden: Existing 6 main, 1915, upsize to 8 main Atwood: Existing 12 main,
More informationVictoria Bridge Municipal Class EA Civic Works Committee
Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction
More informationSpring 2018 Construction Update
Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the
More informationinclude playgrounds, sports fields, community gardens and picnic areas.
DEVELOPMENT PLAN OPEN SPACE SYSTEM OPEN SPACE SYSTEM The neighborhood provides for a range of open space types. The Village Square is an important open space in the neighborhood. It serves as a gathering
More informationPROJECTS UNDER CONSTRUCTION
Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction
More informationPARKLET PROPOSAL PACKAGE & PROCESS
500.3 I PARKLETS The term parklet refers to a small temporary constructed seating or community gathering area over an on-street parking space or an extension of the sidewalk into the operating State highway
More informationMUNICIPALITY OF ANCHORAGE
MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-38 DATE: June 4, 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Monique Anderson, Parks Superintendent PRC 08-38 Creekside
More informationWelcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework
Welcome Community Consultation Meeting November 28, 2016 Why Are We Here Today? Review and discuss the Bathurst Quay Neighbourhood Plan Framework Review and discuss an Action Plan for Implementation Next
More informationDerby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]
nhancements [1] STATUS OF PROJECT: The project has recently moved from the Preliminary Design Phase to the Final Design Phase following the most recent Public Involvement Meeting held on January 9, 2019
More informationPrince William Street Project (Grant Avenue to Wellington Road)
Prince William Street Project (Grant Avenue to Wellington Road) 1 Goals Improve pedestrian and bike traffic safety Improve street drainage with curb & gutter Upsize water mains Enhance overall street appearance
More informationPhilip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director
Date: March 7, 2018 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director Dan Mauer,
More informationStreet Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017
Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationPotential Green Infrastructure Strategies May 6, 2015 Workshop
Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National
More informationWest Loop. Neighborhood Plan. Prepared by: Neighbors of West Loop, Chicago, IL August 14, 2018
West Loop Neighborhood Plan Prepared by: Neighbors of West Loop, Chicago, IL August 14, 2018 Introduce Neighbors of West Loop (NoWL) Present the draft Neighborhood Plan Gather your input Identify ways
More information2040 Long Range Transportation Plan
2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)
More informationSt. Clair Avenue West Area Transportation Master Plan
1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present
More informationRed Fox Commercial Outline Plan
Red Fox Commercial Outline Plan City of Cold Lake, Alberta Prepared by Durrance Projects Ltd and Ross W. Sharp & Associates Ltd October 2014 Rupert 1 Table of Contents 1. PURPOSE...3 1.1. Location...4
More information2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015
AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department
More informationFifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design
1 Fifth and Detroit Street Design May 2017 Capital Improvements Committee Agenda 2 Review Street Configuration Prior Meeting Review Outreach Synopsis Functional Street Design Refinements Curb Edge, Turning
More informationPRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016
PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS
More informationGREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle
GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration
More information1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier
Mission We connect our communities Vision Getting you there better, faster and easier Values Play as a team Think forward Serve with passion 1 Metrolinx overview go transit, up express, presto Serve a
More informationKittson Parkway / Watershed Park Parking Lot
Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;
More information8 October 14, 2015 Public Hearing
8 October 14, 2015 Public Hearing APPLICANT & PROPERTY OWNER: PRICE S HOLDINGS, LLC STAFF PLANNER: Karen Lasley REQUEST: A. Conditional Use Permit (Automobile Repair Garage) B. Change in Nonconforming
More informationJohn M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference
Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street
More informationVolume 2: Implementation Plan
Volume 2: Implementation Plan February 25 th 2002 Implementation Introduction This document outlines the steps that should be taken to implement the Washington Heights Neighborhood Plan. The City Council
More information4.1 Build Alternative 1 Construction Phasing
SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th
More information2007 TAC SUSTAINABLE URBAN TRANSPORTATION AWARD SUBMISSION. Bridge Over Highway 401 for Pedestrians and Cyclists in Waterloo Region
2007 TAC SUSTAINABLE URBAN TRANSPORTATION AWARD SUBMISSION Bridge Over Highway 401 for Pedestrians and Cyclists in Waterloo Region Project Partners: City of Cambridge City of Kitchener Region of Waterloo
More informationCity of Toronto. Emery Village Transportation Master Plan
City of Toronto Emery Village Transportation Master Plan May 2009 Emery Village Transportation Master Plan Toronto, ON May 2009 Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel:
More information2 ALTERNATIVES AND OPTIONS
2 ALTERNATIVES AND OPTIONS This chapter documents the process used to develop improvement concepts for Oregon Avenue and describes the resulting project alternatives and options, which were developed in
More informationWelcome to the. Open House
Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect
More informationTERMS OF REFERENCE. General
General TERMS OF REFERENCE City of Guelph is inviting experienced, professional artists or a team of artists to prequalify for the opportunity to develop new public art work. The total all-inclusive budget
More informationWelcome to the Public Consultation Exhibition
Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised
More informationOP Council Resolution June 16, Planning and Development Services
OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership
More informationSTANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS
STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B
More informationShell Beach Road Streetscape Frequently asked Questions
Shell Beach Road Streetscape Frequently asked Questions General What is the Shell Beach Road Streetscape Improvements Project? The overall goal of the Shell Beach Road Streetscape Improvement project is
More informationMAIN STREET ECONOMIC DEVELOPMENT STRATEGY
MAIN STREET ECONOMIC DEVELOPMENT STRATEGY A PATHWAY TO A BETTER POUGHKEEPSIE DRAFT Working Paper #2: Planning Strategies Submitted December 1 st, 2015 to the City of Poughkeepsie LAND USE LAW CENTER PACE
More informationPennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project
PennDOT Public Meeting S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project Mt Lebanon Township, Allegheny County Mt Lebanon Township Municipal Building November 6, 2014 1 Project
More informationMINUTES FROM THE SEVENTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN City of Markham Canada Room - Civic Centre. September 17, 2014
MINUTES FROM THE SEVENTH MEETING OF THE MAIN STREET MARKHAM COMMITTEE IN 2014 City of Markham Canada Room - Civic Centre Members Councillor Campbell Councillor Moretti Phil Howes Jonathon Mingay Dianne
More informationPublic Information Centre. Welcome
Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff
More informationFOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?
FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,
More informationMississippi Drive Corridor Revitalization. A DestinationTransportation Project...
Mississippi Drive Corridor Revitalization A DestinationTransportation Project... Mississippi Drive Corridor Revitalization Welcome! Tonight s Agenda: Further define the Scope of the Project Discuss the
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 6 Date: 7.22.13 Bethesda Purple Line Station Minor Master Plan Amendment, Scope of Work Elza
More informationFocus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.
Focus Group First Meeting Belfountain Community Centre 7:00 p.m. to 9:00 p.m. Mississauga Road/Old Main Street and Bush Street, from Olde Base Line Road to Winston Churchill Boulevard Environmental Assessment
More informationPublic may provide comments on the GDP within the next two weeks (December 24)
25/70 General Development Plan (GDP) Public Meeting Wednesday, December 10, 2014 6:00 8:00 P.M. District 1 Police Station Community Room 1311 W 46th Ave, Denver, CO 80211 Council Woman Montero: This particular
More informationMount Dennis Mobility Hub Study Public Meeting December 12 th, :30pm 9:30pm York Memorial Collegiate, Cafeteria 2690 Eglinton Avenue West
Mount Dennis Mobility Hub Study Public Meeting December 12 th, 2012 6:30pm 9:30pm York Memorial Collegiate, Cafeteria 2690 Eglinton Avenue West MEETING SUMMARY On December 12 th, 2012, over 89 people participated
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationPROJECT SHOWING MINUTES
PROJECT SHOWING MINUTES North Lynn Street Esplanade Improvements Project No. 0029-000-859, C501, B605 UPC No. 109813 November 1, 2017 10:00 a.m. 1911 North Ft. Myer Drive, LL-10, Arlington, VA Overview
More informationThe Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass
The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn
More informationProject Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006
Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and
More informationRecommendation for the Creative Enhancement of a Concrete Barrier Wall in Bear Creek Area
NO R250: COUNCIL DATE: December 18, 2017 REGULAR COUNCIL TO: Mayor & Council DATE: December 14, 2017 FROM: General Manager, Parks, Recreation & Culture FILE: 7800-01 SUBJECT: Recommendation for the Creative
More information1 Welcome! UBC Okanagan Master Plan Update - Open House
1 Welcome! UBC Okanagan Master Plan Update - Open House UBC is updating the Master Plan for the Okanagan Campus. The purpose of today s Open House is to: Present the draft 2015 Master Plan Answer any questions
More informationProject Output Indicators for Federal Gas Tax Investments
Municipalities are required to report results achieved through the investment of federal Gas Tax funds under the Municipal Funding Agreement. AMO uses the indicators listed below to capture the outputs
More informationBUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5
VISION STATEMENT 3 UTILIZATION OF THE GUIDELINES 3 IMPLEMENTATION 3 PROCEDURES FOR DESIGN REVIEW 3 LAND USE AND ZONING 4 LAND USE 4 ELEMENTS:... 4 ZONING 4 ELEMENTS:... 4 BUILDING SCALE AND SETBACKS 5
More informationLITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION
LITTLE ELM 2009-2014 CAPTIAL IMPROVEMENT BOND STREET PRESENTATION Denton Frisco Little Elm Lewisville Legacy Southlake Grapevine Addison DENTON COUNTY & LEWISVILLE LAKE MATCHING FUNDS DENTON COUNTY BOND
More informationProject purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept
Project purpose owns Road Beaumaris Road The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept + Guide Rehabilitation of Landscape and Community
More informationPortage Parkway Environmental Assessment Public Information Centre No. 1
City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces
More informationJenifer Street Reconstruction Neighborhood Engagement Meeting November 4, 2015
Jenifer Street Reconstruction Neighborhood Engagement Meeting November 4, 2015 Hosted by the Marquette Neighborhood Association Facilitated by Urban Assets Funded in part by the City of Madison Neighborhood
More informationVALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION
MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...
More informationTOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,
TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights
More informationFANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016
FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for
More informationTransportation Systems and Utility Infrastructure
77 Audience Local and regional units of government, Landowners and developers, Community and citizen organizations, and Transportation/utility planners and engineers. Overview Transportation systems and
More informationOVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS
OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS Caldwell County Pathways along with our co-partners City of Lenoir, Town of Gamewell,
More informationMunicipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights
ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey
More informationCity of Grande Prairie Development Services Department
City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose
More informationBostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London
Bostwick Road Municipal Class Environmental Assessment Public Information Centre #2 June 14, 2017 Welcome! Welcome to the 2 nd Public Information Centre for the. Representatives from the and the consulting
More informationOutline Plan in Belvedere (Ward 9) at Street SE, LOC (OP)
2018 October 04 Page 1 of 12 EXECUTIVE SUMMARY This outline plan application was submitted by B&A Planning Group on 2016 July 15, on behalf of Tristar Communities Inc. for 50.14 hectares (123.89 acres)
More informationCanal Road City Limits (East of Van Dyke Ave) to Saal Road
Canal Road City Limits (East of Van Dyke Ave) to Saal Road Construction Update 9/14/2018 The ashalt paving on the southside of Canal Road is expected to start Saturday, September 15 (weather permitting)
More informationThe Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies
Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural
More informationGreen Line North Centre City Alignment
Project overview The Green Line will be an important piece of Calgary's transit network, adding 40 kilometres of track to the existing 59 kilometre LRT system. End-to-end, the line will connect North Pointe
More informationBuilding Great Neighbourhoods. Strathcona
Building Great Neighbourhoods Strathcona March 21, 2018 Becky Redford Project Manager, Planning & Design Building Great Neighbourhoods Integrated Infrastructure Services Welcome and Purpose To provide
More informationBerkshire Regional Planning Commission Clearinghouse Review Report
August 19, 2013 SUBJECT: Reconstruction of Housatonic Street, Dalton, MA EOEA#: 15083 LOCATION: Dalton ESTIMATED COST: $8.1 million REVIEW TYPE: ENF PROPONENT: MassDOT and Town of Dalton COMMENTS DUE:
More informationUAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose
UAA School of Engineering Parking Garage Master Plan Amendment 1. Purpose Since the UAA campus master plan was drafted in 2003, adopted in 2004, and amended in 2009 a number of significant changes regarding