1 Section 4. Section 4(f) Resources, Uses, and 4.1 Parks and Recreational Section 4(f) Resources The Draft Section 4(f) Evaluation process for parks, recreation areas, and wildlife or waterfowl refuges involves the following steps: 1. Identifying publicly owned lands in the project area of potential effect (APE) that may be protected by Section 4(f) as parks, recreation areas, or wildlife or waterfowl refuges. 2. Evaluating the applicability of Section 4(f) to those lands. 3. Determining whether any of the alternatives would result in a use of Section 4(f) resources. 4. Evaluating avoidance alternatives and minimization/mitigation measures for any resources where a Section 4(f) use would occur. (Avoidance alternatives were discussed in Section 3.) Section 4(f) park and recreational resources inside the Sellwood Bridge Project APE are depicted on Figure The ensuing subsections provide the following information about each of these resources: Description Section 4(f) Use Determination Build Alternatives that Avoid Section 4(f) Use The No Build Alternative would have no impact on Section 4(f) resources Springwater Corridor Trail Description The Springwater Corridor Trail is a shared-use trail on a former rail line in southeast Portland. The paved surface is generally 12 feet wide with soft shoulders. The trail accommodates walkers, joggers, hikers, bicyclists, those in wheelchairs, and strollers. Inside the vicinity of the Sellwood Bridge Project, the trail is adjacent to an active (but lightly used) rail line, goes under the Sellwood Bridge, and terminates at SE Umatilla Street, where a gap in the trail exists. The Springwater Corridor Trail is the major southeast segment of the Portland Metro area s 40- Mile Loop trail system. The trail itself extends far beyond the boundaries of the Sellwood Bridge project area, connecting several parks and open spaces, including Tideman Johnson Natural Area, Beggars-Tick Wildlife Refuge, the I-205 Bike Path, Leach Botanical Garden, Powell Butte Nature Park, and Gresham s Main City Park. Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-41

2 Parks and Recreational Section 4(f) Resources Springwater Corridor Trail. Section 4(f) Use Determination All Build alternatives would result in a similar Section 4(f) use of this resource because of temporary occupation of the trail associated with construction. Under all Build alternatives, parts of the trail would close during rehabilitation of the main bridge and installation of the bicycle/pedestrian bridge structure that would go over the trail. The estimated duration for constructing the Build alternatives is 3 to 4 years. Sections of trail underneath the main bridge and the bicycle/pedestrian bridge would be closed for brief periods at sporadic times during the project when overhead construction was occurring. Although this impact would be temporary, it would constitute a Section 4(f) use because project actions (under all the Build alternatives) currently do not meet the Section 4(f) statute s fifth temporary occupation exception criterion (23 CFR [d]): There must be documented agreement of the appropriate Federal, State, or local officials having jurisdiction over the resource regarding the above conditions [a reference to the first four Section 4(f) temporary occupation exception criteria]. To satisfy this fifth criterion, the project would need to have documented agreement from Portland Parks and Recreation (PP&R) and Metro, the two public agencies that co-administer the Springwater Corridor Trail. To this end, communication has been initiated between the Sellwood Bridge project team, PP&R, and Metro regarding the issue of whether Build alternative impacts to the Springwater Corridor Trail are minor enough to meet the Section 4(f) temporary occupation exception criteria. Thus far, although neither PP&R nor Metro has determined that Build alternative impacts meet the temporary occupation exception criteria, they are open to future dialogue on this matter pending further project design details. Therefore, absent the aforementioned documented agreement, it is concluded presently that a Section 4(f) use of the Springwater Corridor Trail would occur under all Build alternatives. If PP&R and Metro concur at a later time that Build alternative impacts are minor enough to meet the temporary occupation exception criteria, there would be no Section 4(f) use at the Springwater Corridor Trail as a result of any Build alternative actions. Build Alternatives that Avoid Section 4(f) Use None. All Build alternatives would result in a Section 4(f) use of this resource. 4(f)-42 Sellwood Bridge Project Draft Section 4(f) Evaluation

3 Parks and Recreational Section 4(f) Resources Measures to minimize harm to the Springwater Corridor Trail under all Build alternatives would include, but would not be limited to, the following: Installing overhead containment structures over the Springwater Corridor Trail in the vicinity of bridge construction Preparing a detour plan in coordination with PP&R and Metro to address the manner in which Springwater Corridor Trail users would be rerouted during times of trail closure Providing a temporary detour for the Springwater Corridor Trail, to include the following elements, as necessary: Surfacing Signage Pavement markings Willamette Greenway Trail (East Bank) Description In 1988, the City of Portland adopted the Willamette Greenway Plan, whose stated goal was to protect, conserve, maintain, and enhance the scenic, natural, historical, economic, and recreational qualities of lands along the Willamette River. The Willamette Greenway Plan fulfilled the intentions of Oregon Planning Goal 15 (Willamette River Greenway). A primary objective of the Willamette Greenway Plan was to create a continuous recreational trail extending the full length on both sides of the Willamette River but not necessarily adjacent to the river for the entire length. As of 2007, a continuous Willamette Greenway Trail does not exist, but sections of the trail are in place, including sections located inside the project area. On the east side of the river inside the project area, a designated section of the Willamette Greenway Trail (East Bank) extends south from Sellwood Riverfront Park, passes under the Two views of the Willamette Greenway Trail (East Bank). Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-43

4 Parks and Recreational Section 4(f) Resources Sellwood Bridge, and terminates at SE Umatilla Street. While the sections of the trail south of SE Spokane Street are on private property, they are still a public recreational resource. The City of Portland has a trail easement to this section of trail and manages this section of trail as part of the overall public trail system. The Willamette Greenway Trail (East Bank) s primary use is as a recreational trail for walking and biking. Aside from the paved trail itself, the only trail-related improvements are the disabled-access public restrooms located in Sellwood Riverfront Park. Section 4(f) Use Determination All Build alternatives would result in a similar Section 4(f) use of this resource because of temporary occupation of the trail associated with construction. Under all Build alternatives, parts of the trail would close during rehabilitation of the main bridge and installation of the bicycle/pedestrian bridge structure that would go over the trail. The estimated duration for constructing the Build alternatives is 3 to 4 years. Sections of trail underneath the main bridge and the bicycle/pedestrian bridge would be closed for brief periods at sporadic times during the project when overhead construction was occurring. Although this impact would be temporary, it would constitute a Section 4(f) use because project actions (under all the Build alternatives) currently do not meet the Section 4(f) statute s fifth temporary occupation exception criterion (23 CFR [d]): There must be documented agreement of the appropriate Federal, State, or local officials having jurisdiction over the resource regarding the above conditions [a reference to the first four Section 4(f) temporary occupation exception criteria]. To satisfy this fifth criterion, the project would need to have documented agreement from Portland Parks and Recreation (PP&R), the agency that administers the Willamette Greenway Trail (East Bank). To this end, communication has been initiated between the Sellwood Bridge project team and PP&R regarding the issue of whether Build alternative impacts to the Willamette Greenway Trail (East Bank) are minor enough to meet the Section 4(f) temporary occupation exception criteria. Thus far, although PP&R has not determined that Build alternative impacts meet the temporary occupation exception criteria, it is open to future dialogue on this matter pending further project design details. Therefore, absent the aforementioned documented agreement, it is concluded presently that a Section 4(f) use of the Willamette Greenway Trail (East Bank) would occur under all Build alternatives. If PP&R concurs at a later time that Build alternative impacts are minor enough to meet the temporary occupation exception criteria, there would be no Section 4(f) use at the Willamette Greenway Trail (East Bank) as a result of any Build alternative actions. Build Alternatives that Avoid Section 4(f) Use None. All Build alternatives would result in a Section 4(f) use of this resource. Measures to minimize harm to the Willamette Greenway Trail (East Bank) under all Build alternatives would include, but would not be limited to, the following: Installing overhead containment structures over the Willamette Greenway Trail (East Bank) in the vicinity of bridge construction 4(f)-44 Sellwood Bridge Project Draft Section 4(f) Evaluation

5 Parks and Recreational Section 4(f) Resources Preparing a detour plan in coordination with PP&R to address the manner in which Willamette Greenway Trail (East Bank) users would be rerouted during times of trail closure Providing a temporary detour for the Willamette Greenway Trail (East Bank), to include the following elements, as necessary: Surfacing Signage Pavement markings Willamette Greenway Trail (SE Spokane Street Section) Description SE Spokane Street from SE 17th Avenue to the Willamette River is designated as a Primary Greenway Trail on the City of Portland s Willamette Greenway Plan and as an Adopted Greenway in the Metropolitan Greenspaces Master Plan. This is an on-street section of the Willamette Greenway Trail with no improvements aside from standard sidewalks and a paved travel lane. The function of this section of the Willamette Greenway Trail is to provide a bicycle- and pedestrian-friendly connection to the main Willamette Greenway Trail (East Bank). Section 4(f) Use Determination No Section 4(f) use of the Willamette Greenway Trail (SE Spokane Street Section) would result from any Build alternative. No permanent incorporation of the Willamette Greenway Trail (SE Spokane Street Section) would result from any Build alternative. However, actions associated with Alternative B (with temporary detour bridge) would warrant further discussion. Under Alternative B, the detour bridge elevated structure would be located above a segment of SE Spokane Street between SE Grand Avenue and the Willamette River. Under Alternative E, a new Sellwood Bridge elevated structure would cross over a section of SE Spokane Street immediately west of SE Grand Avenue. During construction of both the Alternative B temporary detour bridge and the Alternative E bridge, users of the SE Spokane Street section of the Willamette Greenway Trail would be provided with an alternate route of travel outside, but adjacent to, the SE Spokane Street right-of-way. After completion of the temporary detour bridge, and for the time period the detour bridge was in use, bicyclists and pedestrians would be able to use the SE Spokane Street section of the Willamette Greenway Trail as they do currently. The SE Spokane Street section of the Willamette Greenway Trail would be closed a second time when the detour bridge was disassembled. During that time, users would again be provided with an alternate route outside, but adjacent to, the SE Spokane Street right-of-way. According to the following FHWA Section 4(f) Policy Paper (2005) guidance, the question of whether a Section 4(f) use was occurring at this resource because of the temporary occupancy noted previously would be based on the ability of the Build alternative to reasonably accommodate the continuity of the recreational trail in some other portion of the right-of-way or in another right-ofway. Question C: Are trails on highway rights-of-way, which are designated as scenic or recreational trails, subject to the requirements of Section 4(f)? Answer C: If the trail is simply described as occupying the rights-of-way of the highway and is not limited to any specific location within the right-of-way, a use of land would not occur Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-45

6 Parks and Recreational Section 4(f) Resources provided that adjustments or changes in the alignment of the highway or the trail would not substantially impair the continuity of the trail. In this regard, it would be helpful if all future designations including those made under the National Trails System Act describe the location of the trail only as generally in the right-of-way. (p.20) Because the continuity of bicycle and pedestrian movements along SE Spokane Street would be maintained throughout construction, it is concluded that a Section 4(f) use would not occur at the SE Spokane Street section of the Willamette Greenway Trail based on actions associated with the Alternative B temporary detour bridge or the Alternative E bridge. Build Alternatives that Avoid Section 4(f) Use All of the alternatives would avoid a Section 4(f) use of this resource. Not applicable. All of the alternatives would avoid a Section 4(f) use of this resource Sellwood Riverfront Park Description Sellwood Riverfront Park is an 8.75-acre park located at SE Spokane St and SE Oaks Park Way, just north of the Sellwood Bridge on the east bank of the Willamette River. Existing park facilities include a boat dock to the Willamette River, a disabled-access restroom, a dog off-leash area, paved walking paths (including the Willamette Greenway Trail [East Bank]), unpaved trails, picnic tables, a parking lot, and an outdoor stage used for summer concerts. Sellwood Riverfront Park (looking south toward Sellwood Bridge). Sellwood Riverfront Park is a hybrid park with both an open lawn and manicured section and a similarly sized natural area with a wooded section, pond, and trails. Sellwood Riverfront Park also 4(f)-46 Sellwood Bridge Project Draft Section 4(f) Evaluation

7 Parks and Recreational Section 4(f) Resources contains important visual resources, with expansive views to the river, west hills, and downtown skyline. Section 4(f) Use Determination Alternative A would result in a Section 4(f) use of Sellwood Riverfront Park. Approximately 10 of the park s parking stalls would be incorporated by the project to provide adequate space for the placement of bicycle/pedestrian bridge piers. Approximately two trees would also be removed. Build Alternatives that Avoid Section 4(f) Use Alternatives B, B (with temporary detour bridge), C, D, and E would avoid a Section 4(f) use of Sellwood Riverfront Park. Alternative E would install a new bridge structure immediately south of the Sellwood Riverfront Park property line. Although visual and noise impacts would exist at Sellwood Riverfront Park associated with Alternative E, these were not found to substantially impair the features, functions, or attributes of the park in accordance with the Section 4(f) statute. Therefore, these impacts were not considered a constructive use of the park. Measures to minimize harm to Sellwood Riverfront Park under Alternative A would include, but would not be limited to, the following: Purchasing right-of-way; Multnomah County real estate specialists would coordinate with PP&R to determine property needs and just compensation based on the fair market value Replacing parking spaces in the immediate vicinity of the park Assisting in re-vegetating the riparian zone with cottonwood trees (from the water line to the Willamette Greenway Trail [East Bank]) Oaks Pioneer Park Description Oaks Pioneer Park is a 3.85-acre park located at 455 SE Spokane Street. The park is the setting for Oaks Pioneer Church, which serves as an important location for weddings and other ceremonies. A large lawn area with mature trees and shrubs surround the church and a rental property to the north. The quiet setting for the church plays a pivotal role in its value as a popular wedding location. Weddings occur most often in the summer, although ceremonies take place at the church yearround. Recreational improvements are limited to paved walking paths. The primary function of the park is to provide a peaceful setting behind the Oaks Pioneer Church. Section 4(f) Use Determination Alternatives A and B (with temporary detour bridge) would result in a Section 4(f) use of Oaks Pioneer Park. Under Alternative A, approximately 0.12 acre of parkland would be converted to transportation use to accommodate right-of-way requirements associated with the installation of the bicycle/pedestrian Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-47

8 Parks and Recreational Section 4(f) Resources bridge. PP&R s maintenance access road at the park would be realigned and approximately two trees would be removed. Oaks Pioneer Church at Oaks Pioneer Park. Under Alternative B (with temporary detour bridge), park property would not be incorporated, but noise-related proximity impacts associated with the elevated detour bridge structure would result in a Section 4(f) use. This determination is based on analysis of relevant Section 4(f) statute sections 2 and is described in detail in the Sellwood Bridge Draft Environmental Impact Statement, Multnomah County, Oregon, Draft Section 4(f) Evaluation Technical Report (CH2M HILL, 2008a). Noise levels at Oaks Pioneer Church (with open doors and windows) are projected to be 54 decibels on an A- weighted scale (dba), which would exceed the applicable FHWA noise abatement criterion (NAC) of 52 decibels. Because this increase in projected noise level would be 4 decibels greater than the projected 50-decibel noise level inside the church (with open windows and doors) associated with the No Build Alternative, it is considered a perceptible increase. This perceptible increase is relevant because, according to Oaks Pioneer Church staff, church ceremonies frequently operate with the windows and front doors open. As noted in the description of this resource, Oaks Pioneer Church is a chief amenity of the park. The activities at the church, and in the park space behind the church, require an aesthetic setting that includes a level of quietude suitable for weddings and other similar formal ceremonies. The perceptible increase in noise associated with the temporary detour bridge would be a constructive use because it would substantially diminish the activities of the church. It is concluded, therefore, that a Section 4(f) use of Oaks Pioneer Park would occur under Alternative B (with temporary detour bridge). 2 See 23 CFR (e)(1)(iv); (f)(2) and (3) 4(f)-48 Sellwood Bridge Project Draft Section 4(f) Evaluation

9 Parks and Recreational Section 4(f) Resources Build Alternatives that Avoid Section 4(f) Use Alternatives B, C, D, and E would avoid a Section 4(f) use of Oaks Pioneer Park. All Build alternatives would be the same as or increase noise levels compared to existing conditions. However, under Alternatives A, B, C, D, and E, this noise impact was not found to substantially impair the features, functions, or attributes of the park in accordance with the Section 4(f) statute. Therefore, the noise impact was not considered a constructive use of the park. Alternative E would install a new bridge structure immediately southwest of Oaks Pioneer Church. This would cause visual and noise impacts (with noise impacts greater than under Alternatives A, B, C, and D). Unlike Alternative B (with temporary detour bridge), these impacts were not found to substantially impair the features, functions, or attributes of the park in accordance with the Section 4(f) statute. Therefore, the visual and noise impacts were not considered a constructive use of the park. Measures to minimize harm to Oaks Pioneer Park under Alternative A would include, but would not be limited to, the following: Purchasing right-of-way; Multnomah County real estate specialists would coordinate with PP&R to determine property needs and just compensation based on the fair market value Planting trees and vegetation around the bridge structure and elsewhere in the park Measures to minimize harm to Oaks Pioneer Park under Alternative B (with temporary detour bridge) would include, but would not be limited to, the following: Relocating Oaks Pioneer Church to a new PP&R location or within Oaks Pioneer Park Sellwood Bridge Recreational Trail Description The Sellwood Bridge is designated as a recreational trail and is part of the Portland metropolitan area s 40-Mile Loop trail system. Recreational facilities are limited to a narrow (4-foot-wide) paved, raised sidewalk along the westbound travel lane of the bridge and a switchback bicycle/pedestrian ramp on the west side of the bridge. This resource serves as both a bikeway and a pedestrian path. Section 4(f) Use Determination Alternatives A, B, and C would result in a similar Section 4(f) use of this resource. Each of these three Build alternatives would close the existing bridge for 3 to 4 years during construction. According to the FHWA Section 4(f) Policy Paper (2005, p.20) guidance cited earlier in this Draft Section 4(f) Evaluation regarding trails on highway rights-of-way, the question of whether a Section 4(f) use is occurring at the Sellwood Bridge is based on the ability of the Build alternative to reasonably accommodate the continuity of the recreational trail in some other portion of the rightof-way or in another right-of-way. Alternatives A, B, and C would not provide right-of-way to accommodate the continuity of the Sellwood Bridge as a recreational trail during the construction period. This would leave a 3 to 4 year span in which this trail would have no river crossing continuity. Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-49

10 Parks and Recreational Section 4(f) Resources Although this impact would be temporary, it would constitute a Section 4(f) use because the project actions (of Alternatives A, B, and C) would not meet the Section 4(f) statute s third temporary occupation exception criterion (23 CFR [d][3]): nor will there be interference with the activities or purpose of the resource, on either a temporary or permanent basis. Closing the bridge without providing an alternate crossing for bicycles and pedestrians would interfere with the activities of the recreational trail. Therefore, it would be a Section 4(f) use (under Alternatives A, B, and C). In regard to Alternative A, the option of building the bicycle/pedestrian bridge before closing the Sellwood Bridge for construction (to provide a continuous bicyclist and pedestrian connection across the Willamette River) was considered during project planning. This scheme was determined to be inefficient, from both a cost and time perspective, because it would entail engaging in two separate periods of construction. Considering that, notwithstanding the Sellwood Bridge Recreation Trail, Alternative A would still impact many Section 4(f) resources and would therefore not be an avoidance alternative under Section 4(f) anyway, a determination was made not to pursue this option. Build Alternatives that Avoid Section 4(f) Use Alternatives B (with temporary detour bridge), D, and E would avoid a Section 4(f) use of this resource by providing continued bicycle/pedestrian connectivity over the Willamette River during bridge construction, according to the discussion regarding FHWA guidance (2005). Alternative B (with temporary detour bridge) would provide bicycle/pedestrian accommodations on the detour bridge. Alternative D would provide bicycle/pedestrian accommodations on the existing bridge through the first half of the construction period, and then on the first half of the new bridge structure during construction of the second half. Alternative E would continue to provide bicycle/pedestrian accommodations as they exist currently on the Sellwood Bridge while the new bridge was being constructed. Alternatives B (with temporary detour bridge), D, and E would each avoid a use of the Sellwood Bridge Recreational Trail under Section 4(f). However, Alternative E would have the least overall impact because it would not require bicyclists and pedestrians to use detours (from current travel patterns) or to travel through a construction zone. Measures to minimize harm to the Sellwood Bridge Recreational Trail under Alternatives A, B, and C would include, but would not be limited to, the following: Providing detour signage for bicyclists indicating the closest Willamette River crossing with bicycle accommodations Powers Marine Park Description Powers Marine Park is a acre linear park located in southwest Portland between OR 43 and the Willamette River for approximately 0.85 mile. 4(f)-50 Sellwood Bridge Project Draft Section 4(f) Evaluation

11 Parks and Recreational Section 4(f) Resources Powers Marine Park provides important natural resources and non-programmed recreational opportunities. The park is highly valued as a natural area. The South Portland Riverbank Project (a partnership of City of Portland and community organizations) is actively engaged in restoring riverbank conditions and enhancing the banks of the Willamette River at the park. Powers Marine Park (looking south). Section 4(f) Use Determination All Build alternatives would result in a Section 4(f) use of Powers Marine Park. As shown in Table 4.1-1, all Build alternatives would convert parkland to transportation use because of the installation/modification of Sellwood Bridge ramps and roadway connections and the modification of the interchange at OR 43. Alternatives A, B, D, and E would relocate the vehicular access to the park. Alternative C would close the vehicular access to the park (and adjacent boat ramp). TABLE Summary of Impact at Powers Marine Park Alternative Parkland Incorpora ted (acres) Parkland Incorporate d (percent of total) Area/Functions Impacted A Natural area land incorporated into project; relocation of vehicular access from OR 43 B Natural area land incorporated into project; relocation of vehicular access from OR 43 B/TDB Natural area land incorporated into project; relocation of vehicular access from OR 43 C Natural area land incorporated into project; closure of existing boat launch adjacent to park; closure of vehicular access from OR 43 D Natural area land incorporated into project; relocation of vehicular access from OR 43 E Natural area land incorporated into project; relocation of vehicular access from OR 43 B/TDB = Alternative B with temporary detour bridge Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-51

12 Parks and Recreational Section 4(f) Resources Build Alternatives that Avoid Section 4(f) Use None. All Build alternatives would result in a Section 4(f) use of this resource. Measures to minimize harm to Powers Marine Park under all the Build alternatives would include, but would not be limited to, the following: Purchasing right-of-way; Multnomah County real estate specialists would coordinate with PP&R to determine property needs and just compensation based on the fair market value Restoring fish habitat Stabilizing the river bank Removing invasive plants/planting native species Additional measures to minimize harm to Powers Marine Park under Alternative C would include, but would not be limited to, the following: Assisting with the construction of a non-motorized boat launch in the vicinity of Sellwood Riverfront Park Willamette Greenway Trail (West Bank) Description The Willamette Greenway Trail (West Bank) is a narrow, paved, shared-use path that follows the west bank of the Willamette River. Within the project area, the trail extends southward through Willamette Moorage Park; becomes a narrow paved sidewalk adjacent to OR 43 (separated by jersey barriers and a chain-link fence); connects to the northern end of Powers Marine Park through the parking lot adjacent to the Staff Jennings driveway; passes under the Sellwood Bridge; and eventually becomes a semi-improved trail (gravel/dirt) as it passes through Powers Marine Park. The primary use of the Willamette Greenway Trail (West Bank) is as an active recreational bikeway and pedestrian trail. The trail also provides users access to natural areas along the Willamette River and recreation sites to the north and south. 4(f)-52 Sellwood Bridge Project Draft Section 4(f) Evaluation

13 Parks and Recreational Section 4(f) Resources Willamette Greenway Trail (West Bank). Section 4(f) Use Determination All Build alternatives would result in a similar Section 4(f) use of the Willamette Greenway Trail (West Bank). All alternatives would convert approximately 0.30 linear miles of the trail to transportation use because of the wider interchange footprint. Build Alternatives that Avoid Section 4(f) Use None. All Build alternatives would result in a Section 4(f) use of this resource. Measures to minimize harm to the Willamette Greenway Trail (West Bank) would include, but would not be limited to, the following: Constructing a new trail segment along side the reconstructed Willamette Shoreline Trolley track system Willamette Moorage Park Description Willamette Moorage Park is an 8.92-acre park that is bordered by the Willamette River on the east, OR 43 on the west, Butterfly Park on the north, and the Staff Jennings marina property on the south. Willamette Moorage Park functions primarily as an open natural area intended to bolster the health of the Willamette River ecosystem. The park is the location of the Stephens Creek Confluence Habitat Enhancement Project a partnership effort between the City of Portland and community groups to restore habitat for fish listed as threatened under the federal Endangered Species Act. This linear park provides some non-programmed recreational opportunities along with river access and some beach recreation. Existing park facilities include a boat dock (a public transient dock shared with the Macadam Bay Club), a parking lot, and a hiking trail (the Willamette Greenway Trail [West Bank]). Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-53

14 Parks and Recreational Section 4(f) Resources Willamette Moorage Park (looking north). Section 4(f) Use Determination All Build alternatives would result in a Section 4(f) use of Willamette Moorage Park. As shown in Table 4.1-2, all Build alternatives would convert parkland to transportation use because of the installation/modification of Sellwood Bridge ramps and roadway connections and the modification of the interchange at OR 43. All Build alternatives would relocate the vehicular access to the park and impact wetlands. TABLE Summary of Impact at Willamette Moorage Park Alternative Parkland Incorporated (acres) Parkland Incorporated (percent of total) Area/Functions Impacted A Natural area land incorporated into project; relocation of existing vehicular access from OR 43; wetland impact B Natural area land incorporated into project; relocation of existing vehicular access from OR 43; wetland impact B/TDB Natural area land incorporated into project; relocation of existing vehicular access from OR 43; wetland impact C Undeveloped natural area land incorporated into project; relocation of existing vehicular from OR 43; wetland area impact 4(f)-54 Sellwood Bridge Project Draft Section 4(f) Evaluation

15 Historic and Archaeological Resources TABLE Summary of Impact at Willamette Moorage Park Alternative Parkland Incorporated (acres) Parkland Incorporated (percent of total) Area/Functions Impacted D Natural area land incorporated into project; relocation of existing vehicular access from OR 43; wetland impact E Natural area land incorporated into project; relocation of existing vehicular access from OR 43; wetland impact B/TDB = Alternative B with temporary detour bridge Build Alternatives that Avoid Section 4(f) Use None. All Build alternatives would result in a Section 4(f) use of this resource. Measures to minimize harm to Willamette Moorage Park under all Build alternatives would include, but would not be limited to, the following: Purchasing right-of-way; Multnomah County real estate specialists would coordinate with PP&R to determine property needs and just compensation based on the fair market value Restoring fish habitat Enhancing wetlands Removing invasive plants/planting native species 4.2 Historic and Archaeological Resources Section 4(f) applies to historic properties and archaeological sites that are listed in or are eligible for listing on the National Register. Section 106 is the process that identifies listed and eligible historic and archaeological resources. Section 4(f) applies to listed or eligible sites if preservation in place is warranted. For this project, efforts were made to avoid or minimize use of Section 4(f) historic resources. Currently, no archaeological sites are known to exist in the project APE. Therefore, it was not possible to assess specific archaeological impacts under Section 106. Alternative E, because it would be constructed on a footprint not already deeply disturbed by previous bridge construction, is marginally the most likely to affect currently undetected archaeological deposits. Subsurface archaeological investigations would be conducted after selection of the preferred alternative to determine if such deposits exist. If archaeological deposits exist, potential impacts would be assessed and, if necessary, a mitigation plan would be developed. Section 4(f) does not apply to those archaeological sites that are determined to be important chiefly because of what can be learned by data recovery and have minimal value for preservation in place. Within the APE of this project, one property is already listed on the National Register and four properties are eligible for the National Register. The Oregon State Historic Preservation Office (SHPO) was consulted and, on July 31, 2008, concurred with these conclusions. These resources are Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-55

16 Historic and Archaeological Resources protected by Section 4(f). A detailed discussion of each of these historic properties is included in Chapter 3 of the Sellwood Bridge Project DEIS. Section 4(f) historic resources inside the Sellwood Bridge Project APE are depicted on Figure The ensuing subsections provide the following information about each of these resources: Description Section 4(f) Use Determination Build Alternatives that Avoid Section 4(f) Use The No Build Alternative would have no impact on these historic resources Oaks Pioneer Church Description The Oaks Pioneer Church, formerly St. John s Episcopal Church, was listed on the National Register in St. John s Church is the first Episcopal church in the Oregon country and is one of the oldest intact church buildings in Oregon. In 1851, when Lot Whitcomb (a pioneer operator of steamboats on the Willamette River) donated the property, it was a partially completed double house outside the town of Milwaukie. (Whitcomb had founded Milwaukie in the 1840s as a cooperative colony, but it had largely dissolved with the general exodus of the colonists to the California gold fields in 1849.) Appropriate alterations were made and the building was completed as a church. According to the National Register nomination, the areas of significance are for architecture and religion/philosophy. Under Criterion A, the period of significance would span 1851 (founding of the church) to 1961 (end of era as St. John s Episcopal Church). The church is important for its association with events relating to the establishment of the Episcopal Church in western Oregon. Originally located in Milwaukie, it served as a house of worship, as well as being used as the cathedral seat for the Episcopal Diocese of Oregon for a while. It should be noted that the building is no longer in use as an Episcopal Church, and no longer owned by the Episcopal Church or any other religious organization. It is a community facility where hundreds of weddings occur each year. It is operated by the Sellwood Moreland Improvement League (SMILE), the local neighborhood association, and located at the Oaks Pioneer Church & Park, which is administered by the City of Portland Parks & Recreation Bureau. The church s period of significance is between 1883 (Neo-Gothic architectural style) and 1928 (new foundation and basement). The church is an excellent example of this style of architecture. The building has suffered some loss of integrity because of changes it has experienced over time, though these changes occurred before the building was listed on the National Register. The Section 106 Determination of Eligibility (DOE) Form for Oaks Pioneer Church is provided in Attachment 1 of this Draft Section 4(f) Evaluation. Section 4(f) Use Determination No Section 4(f) use of Oaks Pioneer Church would result from any Build alternative. None of the alternatives would incorporate property from this site. The Section 106 process for all the Build alternatives concluded with an effect finding of no adverse effect for this property. Constructive use does not occur when the Section 106 effect finding is no 4(f)-56 Sellwood Bridge Project Draft Section 4(f) Evaluation

17 Historic and Archaeological Resources adverse effect (23 CFR [f][1]). Although noise would impact the Oaks Pioneer Church under the Build alternatives, the Section 106 analysis found that this impact would not affect the status derived from its architectural and historical significance. Build Alternatives that Avoid Section 4(f) Use All of the alternatives would avoid a Section 4(f) use of this resource. Not applicable. All of the alternatives would avoid a Section 4(f) use of this resource River View Cemetery Description River View Cemetery is located on the west side of the Willamette River, approximately 3 miles south of downtown Portland. The cemetery is roughly 310 acres in size and is bounded on the north by SW Taylors Ferry Road and on the east by OR 43. The cemetery has three entrances one located off OR 43, just a few feet from the western end of the Sellwood Bridge, another on SW Taylors Ferry Road, and a third access off SW Palatine Hill Road. The cemetery, established in 1882, is situated on the eastern face of the hill. The cemetery exhibits elements of late-19th-century rural cemetery design, as suggested by the narrow road system that ascends gradually, following the natural ridges and curves of the land; the variety of large and small trees and shrubs, which may have been selectively planted; and the use of its location to provide views across the river towards Sellwood and neighboring communities. Most of the burials are located on the hillside above OR 43, with the oldest ones located towards the center of the cemetery, near the mausoleum. A Spanish-American War memorial is located in a section near the SW Taylors Ferry Road entrance. The cemetery, which is considered locally significant, was entered into the City of Portland Historic Resource Inventory (HRI) circa It was given a Rank III code that, according to the City of Portland Historic Resource Protection Overlay Zone ordinance ( ), signifies that the resource may be eligible for listing on the National Register as part of a Historic District. The HRI entry identifies the areas of significance as Social and Landscape Architecture. According to the inventory form, Members of many of Portland s leading families were buried in River View Cemetery. This cemetery was among those developed during the rural cemetery movement for which landscaping was very important. The cemetery is eligible for the National Register under Criteria A and C. The DOE form for River View Cemetery is provided in Attachment 1 of this Draft Section 4(f) Evaluation. Section 4(f) Use Determination All Build alternatives would result in a Section 4(f) use of River View Cemetery. As shown in Table 4.2-1, all Build alternatives would convert property from the site to transportation use because of the modification of the interchange at OR 43. Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-57

18 Historic and Archaeological Resources TABLE Summary of Land Incorporated at River View Cemetery Alternative Cemetery Incorporated (acres) Cemetery Incorporated (percent of total) A B C D E Build alternatives would have other impacts in addition to the Section 4(f) use of River View Cemetery property. Additional impacts under Alternatives A, B, D, and E are as follows: Incorporation of 8 parking spaces (out of the existing 12) Relocation of the cemetery gates Realignment of the access road from OR 43 to the Superintendent s House Additional impacts under Alternative C are as follows: Relocation of the cemetery gates Closure of the access road from OR 43 to the cemetery and Superintendent s House FHWA Section 4(f) Policy Paper (2005) guidance relevant to the determination of Section 4(f) use at River View Cemetery reads as follows: When a project permanently incorporates land of an historic site, with or without an adverse effect [under Section 106], Section 4(f) applies. (p.15) Based on this FHWA guidance, it is concluded that a Section 4(f) use of the River View Cemetery would result from all Build alternatives. Build Alternatives that Avoid Section 4(f) Use None. All Build alternatives would result in a Section 4(f) use of this resource. Measures to minimize harm to the River View Cemetery under all Build alternatives would include, but would not be limited to, the following: Constructing retaining walls adjacent to OR 43 in the interchange area to minimize the amount of right-of-way needed for transportation improvements Purchasing right-of-way; Multnomah County real estate specialists would coordinate with PP&R to determine property needs and just compensation based on the fair market value Following Historic American Building Survey/Historic American Engineering Record (HABS/HAER) Level III documentation standards for River View Cemetery 4(f)-58 Sellwood Bridge Project Draft Section 4(f) Evaluation

19 Historic and Archaeological Resources River View Cemetery Superintendent s House Description The River View Cemetery Superintendent s House (or Caretaker s Cottage), located at 8421 SW Macadam Avenue, was designed by Ellis F. Lawrence and constructed in The Neo-Georgianstyle structure replaced a 19th century building in the Gothic Revival style. The Superintendent s House was designed by Ellis F. Lawrence, a prominent and prolific architect from Eugene, Oregon, who practiced his craft in Portland in the early decades of the 20th century. The Superintendent s House is considered locally significant and is eligible for the National Register under Criterion C as representing a stylistic achievement by Lawrence. The Superintendent s House also is considered a contributing feature of National Register-eligible River View Cemetery. The DOE form for the River View Cemetery Superintendent s House is provided in Attachment 1 of this Draft Section 4(f) Evaluation. Section 4(f) Use Determination No Section 4(f) use of the River View Cemetery Superintendent s House would result from any Build alternative. Alternatives A, B, D, and E would result in a realignment of the access road to the Superintendent s House from OR 43 as well as the widening of the OR 43 interchange footprint, which would bring the road closer to the historic property. Under Section 106, these actions would have an adverse effect because of a change in physical features within the property s setting that contribute to its historic significance. Alternative C would eliminate the cemetery s entrance road from OR 43 leading to the Superintendent s House. Under Section 106, this would be an adverse effect as it would change physical features within the property s setting, such as the location of the entrance columns and the road itself, that contribute to the historic significance of the Superintendent s House. River View Cemetery (Superintendent's House on right). Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-59

20 Historic and Archaeological Resources FHWA Section 4(f) Policy Paper (2005) guidance relevant to the determination of Section 4(f) use at the River View Cemetery Superintendent s House reads as follows: Answer B: FHWA's determination of adverse effect under 36 CFR ( does not mean that Section 4(f) automatically applies, nor should it be presumed that the lack of an adverse effect finding (no historic properties adversely affected) means that Section 4(f) will not apply. When a project permanently incorporates land of an historic site, with or without an adverse affect, Section 4(f) applies. However, if a project does not physically take (permanently incorporate) historic property but causes an adverse effect, one must assess the proximity impacts of the project in terms of the potential for constructive use (see also Question 1 B). This analysis must determine if the proximity impact(s) will substantially impair the features or attributes that contribute to the National Register eligibility of the historic site or district. If there is no substantial impairment, notwithstanding an adverse effect determination, there is no constructive use and Section 4(f) requirements do not apply. Substantial impairment should be determined in consultation with the SHPO and/or THPO and thoroughly documented in the project record. The determination of Section 4(f) applicability is ultimately FHWA s decision. (p.15) Because none of the alternatives would incorporate property from the Superintendent s House site, a determination of Section 4(f) use is based on whether the proximity of respective alternative actions would result in a substantial impairment of the features or attributes that qualify the Superintendent s House for protection under Section 4(f), notwithstanding the Section 106 preliminary finding of adverse effect already noted. As referenced in Chapter 3 of the Sellwood Bridge Project DEIS, the historical significance of the Superintendent s House is based on its architectural style. The realignment of the access road leading to the Superintendent s House and the closer proximity of OR 43 to the house associated with Alternatives A, B, D, and E would not substantially diminish, under Section 4(f), the architectural properties of the structure. Public access to the historic resource would be maintained. Therefore, it is concluded that there is no Section 4(f) use of the River View Cemetery Superintendent s House resulting from Alternative A, B, D, or E actions. In regard to Alternative C, the closure of the access road leading to the Superintendent s House from OR 43, and the closer proximity of OR 43 to the house associated with Alternative C actions would also not substantially diminish the architectural properties of the structure. Public access to the historic resource would still be available via the cemetery s main entrance on SW Taylors Ferry Road. Therefore, it is concluded that there is no Section 4(f) use of the River View Cemetery Superintendent s House resulting from Alternative C actions. Build Alternatives that Avoid Section 4(f) Use All of the alternatives would avoid a Section 4(f) use of this resource. Not applicable. All of the alternatives would avoid a Section 4(f) use of this resource. 4(f)-60 Sellwood Bridge Project Draft Section 4(f) Evaluation

21 Historic and Archaeological Resources Sellwood Bridge Description The Sellwood Bridge (Bridge No. 6879), designed by Gustav Lindenthal, is located at river mile 16.5 on the Willamette River. The Sellwood Bridge was officially dedicated on December 15, The bridge was the first built in Portland without a moveable span and was also the first bridge in Portland to be designed without trolley tracks. The bridge was originally designed to carry 15,000 cars per day; however, it did not reach that capacity until the 1960s. Current average daily traffic counts are 30,500 cars (Wortman, 2006). The Sellwood Bridge is eligible for listing on the National Register under Criterion C because it is a rare bridge type both at the local level and within the state. It is the only four span continuous-deck truss in Oregon, as well as one of just a handful of continuous deck trusses in the state. The other four bridges in Oregon are either two- or three-span continuous through trusses, which makes the Sellwood Bridge significant amongst this type of bridge design. Additionally, the other continuoustruss bridges were built between 1929 and 1950, making the Sellwood Bridge the oldest of this type of construction. It demonstrates the application of a common bridge type in an unusual way, increasing the number of spans from two or three to four, to achieve an artistic effect. The Sellwood Bridge is also eligible for listing under National Register Criterion C as a work of a master, Gustav Lindenthal. The legacy of Lindenthal as one of the most significant bridge engineers of the late 19th and early 20th centuries has been established. The Sellwood Bridge was designed less than 10 years after Lindenthal erected the Sciotoville Bridge in Ohio, his first continuous-span bridge. He prepared design plans for five Portland-area bridges in less than 5 years. However, the Sellwood Bridge was his first, and it is the longest and the only four-span truss bridge he designed in Portland. The DOE form for the Sellwood Bridge is provided in Attachment 1 of this Draft Section 4(f) Evaluation. Section 4(f) Use Determination All Build alternatives would result in a Section 4(f) use of this historical resource. Alternatives C, D, and E would demolish the existing bridge; this is an adverse effect under Section 106 because it would cause the physical destruction of a historic property. FHWA Section 4(f) Policy Paper (2005) guidance related to historic bridges notes the following: FHWA determined that Section 4(f) would apply only when an historic bridge or highway is demolished, or if the historic quality for which the facility was determined to be eligible for the National Register is adversely affected by the proposed improvement. The determination of adverse effect under 36 CFR is made by FHWA in consultation with the SHPO and/or THPO. Where FHWA determines that the facility will not be adversely affected, the SHPO/THPO must concur with the determination or FHWA must seek further input from the ACHP. (p.15) Based on this FHWA guidance and the Section 106 findings, it is concluded that there would be a Section 4(f) use of the Sellwood Bridge historic resource under Alternatives C, D, and E. Alternatives A, B, and B (with temporary detour bridge) would rehabilitate the existing bridge. The rehabilitation would require replacing the deck with a widened deck and deck support, adding two shadow trusses, adding to the size of the piers to support the additional trusses, and adding new Sellwood Bridge Project Draft Section 4(f) Evaluation 4(f)-61

22 Historic and Archaeological Resources approach spans. This would be an adverse effect under Section 106 because the changes are so extensive that it would result in the physical destruction of a historic property in a manner inconsistent with The Secretary of the Interior s Standards for the Treatment of Historic Properties (36 CFR part 68). A preliminary engineering analysis of the standards indicates that the rehabilitation associated with Alternatives A and B could not be done in accordance with The Secretary of the Interior s Standards for the Treatment of Historic Properties numbered 1, 2, and 6. Therefore, Alternatives A and B would have an adverse effect under Section 106. Based on FHWA guidance and the Section 106 findings of adverse effect, it is concluded that there would be a Section 4(f) use of the Sellwood Bridge historic resource under Alternatives A, B, and B (with temporary detour bridge). Build Alternatives that Avoid Section 4(f) Use None. All Build alternatives would result in a Section 4(f) use of this resource. Measures to minimize harm to the Sellwood Bridge historical site under all Build alternatives would include, but would not be limited to, the following: Salvaging materials from the Sellwood Bridge and preserving dedication plaques for reinstallation at a later time Willamette Shoreline Trolley Description The Southern Pacific Railroad Red Electric Eastside Line (also known as the Jefferson Street Line) is part of a railroad corridor in the Willamette Valley, located between Portland and St. Joseph. It comprises the east side of a loop that ran on the west bank of the Willamette River from Union Station in downtown Portland and south along SW 4th Avenue before heading east on SW Jefferson Street to a levee at the Willamette River. From there, it ran south to Oswego (now known as Lake Oswego). Then, the line turned west towards Newberg and on to the communities of St. Joseph and McMinnville. The line returned to Portland on the west side, traveling north toward Forest Grove before turning east to Hillsboro, Beaverton, and Bertha (now Hillsdale), before arriving back at Portland Union Station. Two views of Willamette Shoreline Trolley Line. The extant portion of the old Jefferson Street Line still lies between OR 43 and the Willamette River in the mixed commercial/residential neighborhood of southwest Portland. When it leaves the 4(f)-62 Sellwood Bridge Project Draft Section 4(f) Evaluation

Appendix E Section 4(f) Evaluation

Appendix E Section 4(f) Evaluation Appendix E Section 4(f) Evaluation Appendix E Draft Section 4(f) Evaluation E.1 Introduction This appendix addresses a federal regulation known as Section 4(f), which protects parks, recreation areas,

More information

Welcome to the Sellwood Bridge Project Pre-Construction Open House

Welcome to the Sellwood Bridge Project Pre-Construction Open House Welcome to the Sellwood Bridge Project Pre-Construction Open House 5:30 7:30 p.m. Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting

More information

7.5 Impacts on the Section 4(f) Properties

7.5 Impacts on the Section 4(f) Properties constructive use, such as noise, air quality and visual impacts were also assessed. It was determined that this project would not introduce changes of an external nature that would affect the recreational

More information

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina 1.0 INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 U.S.C. 303, requires that prior to

More information

7.0 SECTION 4(F) EVALUATION

7.0 SECTION 4(F) EVALUATION Chapter 7 Section 4(f) Evaluation 7.0 SECTION 4(F) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects to parklands and

More information

7.0 DRAFT SECTION 4(f) EVALUATION

7.0 DRAFT SECTION 4(f) EVALUATION 7. DRAFT SECTION 4(f) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects on parks, recreation areas, wildlife and waterfowl

More information

Page. I. Introduction 1. II. Project Purpose and Need 1. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) Property 3

Page. I. Introduction 1. II. Project Purpose and Need 1. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) Property 3 TABLE OF CONTENTS Programmatic Section 4(f) Evaluation for Use of a Public Park Replacement of Route 30/130 Bridge over the Cooper River Structure No. 0405-153 City of Camden, Township of Pennsauken Camden

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

DRAFT SECTION 4(F) EVALUATION KOLLINER PARK

DRAFT SECTION 4(F) EVALUATION KOLLINER PARK DRAFT SECTION 4(F) EVALUATION I. DESCRIPTION OF SECTION 4(F) RESOURCE The Section 4(f) resource potentially affected by the proposed action is Kolliner Park. The Alternative B-1 and C bridge crossings

More information

Right-of-Way Acquisitions and Relocations Technical Memorandum

Right-of-Way Acquisitions and Relocations Technical Memorandum Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional

More information

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination I-494 Rehabilitation Project SP 2785-330 (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination State Project Number 2785-330 Federal Project No. NHPP-I494 (002) Trunk Highway:

More information

Mendota Heights 2040 Comprehensive Plan Draft Vers

Mendota Heights 2040 Comprehensive Plan Draft Vers 4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs

More information

Pennsy Greenway Trail

Pennsy Greenway Trail Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad

More information

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run Project Background The Yadkin River Greenway Feasibility Study is a joint project with the Village of Clemmons, the Town of Bermuda

More information

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3 Table of Contents Programmatic Section 4(f) Evaluation for use of a Historic Bridge Replacement of Route 30/130 Bridge over the Cooper River Structure No. 0405-153 City of Camden, Borough of Collingswood,

More information

Pinellas County Greenways

Pinellas County Greenways Pinellas County Greenways USING GREENWAYS TO LINK OPEN SPACES The Florida Greenways Commission has defined a greenway as...a corridor of protected open space that is managed for conservation and/or recreation.

More information

Rights-of-Way Preservation Guidelines

Rights-of-Way Preservation Guidelines Rights-of-Way Preservation Guidelines Summary of Policy The purpose of the Rights-of-Way Preservation Guidelines is to help staff make decisions about preserving rights-ofway for future transportation

More information

DRAFT SECTION 4(F) EVALUATION STILLWATER MUNICIPAL BARGE FACILITY

DRAFT SECTION 4(F) EVALUATION STILLWATER MUNICIPAL BARGE FACILITY DRAFT SECTION 4(F) EVALUATION I. DESCRIPTION OF SECTION 4(F) RESOURCE The Section 4(f) resource discussed in this evaluation is known as the Stillwater Municipal Barge Facility property, known previously

More information

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN OPPORTUNITIES AT OXBOW EXISTING WETLANDS Site is undeveloped and we can design a park that works well from the start. SAND BEACH Potential to eliminate invasive species. DEBRIS (CONCRETE, OLD CARS) VEGETATION

More information

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,

More information

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement Durham-Orange Light Rail Transit Project October 2016 1. Introduction The Combined FEIS/ROD summarizes the effects of the D-O LRT

More information

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m. Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)

More information

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies Draft Stillwater 2030 Comprehensive Plan- Goals and Policies Instructions- Review each goal and policy and discuss with group any changes, deletions for additions to the list using your groups pen. Keep

More information

Berkshire Regional Planning Commission Clearinghouse Review Report

Berkshire Regional Planning Commission Clearinghouse Review Report August 19, 2013 SUBJECT: Reconstruction of Housatonic Street, Dalton, MA EOEA#: 15083 LOCATION: Dalton ESTIMATED COST: $8.1 million REVIEW TYPE: ENF PROPONENT: MassDOT and Town of Dalton COMMENTS DUE:

More information

I-70 Corridor Enhancement Plan

I-70 Corridor Enhancement Plan i - Table of Contents Table of Contents Chapter I Overview Chapter II Bridge and Roadway Improvements Chapter III Landscape Enhancements Chapter IV Riparian Corridors Chapter V Showcase Missouri Plan Chapter

More information

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK St. John s River & Its Tributaries Issue Summary: The St. Johns River is an important

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar

More information

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014. Board 1: Welcome Welcome to the Wilson Transfer Station Project Public Hearing. The purpose

More information

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 SOUTHWEST CORRIDOR EXTENSION Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 AGENDA I. Welcome/Introductions II. Project Review and Status III. Environmental

More information

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016 Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment May 5, 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service

More information

Reclaiming Old West Broad Street: I-16 Ramp Removal Study

Reclaiming Old West Broad Street: I-16 Ramp Removal Study Reclaiming Old West Broad Street: I-16 Ramp Removal Study Community Meeting Summary July 15, 2014 The first community meeting for Phase II of the I-16 Ramp Removal Study was held on July 15, 2014, at the

More information

Northern Branch Corridor SDEIS March 2017

Northern Branch Corridor SDEIS March 2017 Northern Branch Corridor SDEIS March 2017 15. 15.1. Chapter Overview 15.1.1. Introduction This chapter discusses changes to the Preferred Alternative resulting in the potential for project improvements

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016 KASPER City of Georgetown, Texas PUD Planned Unit Development December 30, 2015 Revised January 27, 2016 Applicant: Sentinel Land Company, LLC 4910 Campus Drive Newport Beach, CA Prepared by: SEC Planning

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

PARTF Scoring System for Grants

PARTF Scoring System for Grants PARTF Scoring System for Grants The members of the N.C. Parks and Recreation Authority use the PARTF scoring system as one of several tools to select grant recipients. Please provide all of the information

More information

Northeast Quadrant Plan

Northeast Quadrant Plan Northeast Quadrant Plan Northeast Quadrant Distinctive Features Land Use The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Rezoning Transportation Analysis Petition Number: General Location Identifier: From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Kory Hedrick, PE, PMP Khedrick@charlottenc.gov 704-432-6511 CDOT s review of this rezoning petition is intended to

More information

5.8 Visual Resources and Aesthetic Qualities

5.8 Visual Resources and Aesthetic Qualities I-70 East Supplemental Draft EIS 5.8 Visual Resources and Aesthetic Qualities 5.8 Visual Resources and Aesthetic Qualities This section discusses the visual resources and aesthetic qualities of the study

More information

Visual and Aesthetics

Visual and Aesthetics Such a connection could accommodate timed transfers and improve connections between local transit service and Presidio Shuttle service. Level of Service The results of the analysis are provided on a route-by-route

More information

Draft Environmental Assessment

Draft Environmental Assessment Draft Environmental Assessment CASCADE PARK Orem City, Utah A conversion of land protected under Section 6(f)(3) of the Land and Water Conservation Fund Act, Public Law 108-98 September 2017 For information,

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

A. INTRODUCTION B. NO ACTION ALTERNATIVE

A. INTRODUCTION B. NO ACTION ALTERNATIVE Chapter 19: Alternatives A. INTRODUCTION Over the years a variety of potential developments for the East River waterfront in Lower Manhattan have been considered. Some of these plans were very ambitious

More information

This page intentionally blank.

This page intentionally blank. This page intentionally blank. Parks, Recreation, and Open Space Chapter Relationship to Vision Vision Parks, Recreation and Open Space Chapter Concepts County Government. County government that is accountable

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 704 RIVER AND STREAM CONSERVATION AREA (RSCA) 704.01 PURPOSE Section 704 is adopted to: A. Maintain the integrity of the rivers and streams in the County by minimizing erosion, promoting bank stability,

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

Technical Memorandum 5

Technical Memorandum 5 Technical Memorandum 5 Environmental Resources August 2015 PREPARED BY AECOM Table of Contents Introduction... 3 Natural Features... 6 Watersheds... 6 Rivers, Lakes, Creeks... 6 Wetlands... 8 Floodplains...

More information

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF. Overall Map Summit Chicago Bloomington-Normal Lincoln New Station Planned New Station Planned Dwight Pontiac Joliet Pedestrian overpass and second platform planned Higher speed service began in this section

More information

Venice Pumping Plant Dual Force Main Project Draft EIR

Venice Pumping Plant Dual Force Main Project Draft EIR City of Los Angeles 5.9 LAND USE PLANS 5.9.1 Environmental Setting Venice Pumping Plant Dual Force Main Project Draft EIR The Project lies within the bounds of Los Angeles County and the City of Los Angeles.

More information

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio SR 46 (Niles Cortland Road) and SR 82 Proposed Improvements Howland Township, Trumbull County, Ohio

More information

The following principles guide the development of goals and strategies to protect and promote these amenities:

The following principles guide the development of goals and strategies to protect and promote these amenities: OPEN SPACE/PARKS/TRAILS/RECREATION GOALS/STRATEGIES Cherry Hills Village is a living environment that offers low density development, open areas, public scenic vistas, public trails and public parks. This

More information

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Public Meeting US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Mark Leiferman Chief Road Design Engineer April 28, 2014 Why

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213

More information

Minto-Brown Island. November 18, City of Salem, Parks & Transportation Services

Minto-Brown Island. November 18, City of Salem, Parks & Transportation Services Minto-Brown Island Park Master Plan Public Meeting #1 November 18, 2014 City of Salem, Parks & Transportation Services Division, i i Public Works Welcome... and thanks for participating in the master planning

More information

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH 112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG060310124909PGH C ontents Introduction 1 Project Overview 1 Public Involvement and Technical Coordination 4 Description

More information

CENTERTON ROAD BRIDGE REPLACEMENT

CENTERTON ROAD BRIDGE REPLACEMENT CENTERTON ROAD BRIDGE REPLACEMENT FEASIBILITY STUDY BURLINGTON COUNTY BRIDGE C4.4 OVER RANCOCAS CREEK TOWNSHIPS OF MOUNT LAUREL, WESTAMPTON & WILLINGBORO 1 prepared for: BOARD OF CHOSEN FREEHOLDERS BURLINGTON

More information

ORDINANCE NO WHEREAS, the recommendations from the Pinellas County Local Planning Agency have been received and considered.

ORDINANCE NO WHEREAS, the recommendations from the Pinellas County Local Planning Agency have been received and considered. ORDINANCE NO. 16-55 AN ORDINANCE OF THE COUNTY OF PINELLAS, AMENDING THE FUTURE LAND USE AND QUALITY COMMUNITIES ELEMENT OF THE PINELLAS COUNTY COMPREHENSIVE PLAN TO ADOPT THE CRYSTAL BEACH COMMUNITY OVERLAY;

More information

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION County: Linn County, IA GREEN SHEET Location: IA 100, from its terminus at Edgewood Rd. to US 30 southwest of Cedar Rapids Route: IA 100 Extension Project No.: NHS-100-1(36) 19-57 OLE Project Managers:

More information

Open Space and Recreational Facilities

Open Space and Recreational Facilities Chapter 5: Open Space and Recreational Facilities A. INTRODUCTION According to the guidelines of the 2001 New York City Environmental Quality Review (CEQR) Technical Manual, an open space analysis is necessary

More information

Section 4(f) Evaluation

Section 4(f) Evaluation 5 Section 4(f) Evaluation 5.1 Introduction Under Section 4(f) of the Department of Transportation Act as amended by the Federal-Aid Highway Act of 1968 (Public Law 90-495, 49 USC 1653), the Secretary of

More information

1.0 Circulation Element

1.0 Circulation Element 5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT

MONTGOMERY COUNTY PLANNING DEPARTMENT MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No.: Date: 5-03-18 Pike and Rose, Phase I: Site Plan Amendment No. 82012002D Rhoda Hersson-Ringskog,

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

1. Lenox Dale Community Character Strengths and Opportunities Identified by Residents: Strong neighborhood identity and sense of community.

1. Lenox Dale Community Character Strengths and Opportunities Identified by Residents: Strong neighborhood identity and sense of community. LENOX DALE ISSUES AND OPPORTUNITIES -- EIGHT CATEGORIES: Concerns and opportunities identified by Lenox residents and in previous Community Surveys, along with thought-starter suggestions on possible Town

More information

Preliminary Sketch Plan for Fort Hunter Park

Preliminary Sketch Plan for Fort Hunter Park Preliminary Sketch Plan for Fort Hunter Park Public Presentation November 19, 2009 Dauphin County Parks and Recreation 100 Fort Hunter Road Harrisburg, PA 17110 (717) 599-5188 www.dauphinc.org THOMAS COMITTA

More information

Staff Report CONDITIONAL USE

Staff Report CONDITIONAL USE Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission Daniel Echeverria, (801) 535-7165, daniel.echeverria@slcgov.com Date: May 21, 2015 Re: PLNPCM2015-00139

More information

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004)

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363 4210 Fax: (916) 363 4230 M e m o r a n d u m To: Julie Myrah, Branch Chief Date: May 5, 2017 California Department of Transportation

More information

D1 September 11, 2013 Public Hearing APPLICANT:

D1 September 11, 2013 Public Hearing APPLICANT: D1 September 11, 2013 Public Hearing APPLICANT: BEACH MUNICIPAL FEDERAL CREDIT UNION PROPERTY OWNER: SISTERS II, LLC STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-2 Agriculture

More information

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study Reconstruction of Regional Road 45 (Creek Road) Between Regional Road 27 (River Road) and Regional Road 63 (Canborough Road) in the Township of Wainfleet Municipal Class EA Study Public Information Centre

More information

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM Identification Historic Name Nicollet Avenue Bridge Current Name Nicollet Avenue Bridge Field # Address Nicollet Avenue over Minnehaha Creek City/Twp Minneapolis SHPO Inventory Number Review and Compliance

More information

Commercial Development Standards. City of Homestead

Commercial Development Standards. City of Homestead Commercial Development Standards City of Homestead Presentation Outline Introductions Purpose and Intent Objectives Administrative Process Established Districts Design Standards Purpose and Intent Supplement

More information

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region National Capital Region DRAFT Environmental Impact Statement PUBLIC HEARING Matthews Memorial Baptist Church Washington, DC October 18, 2007 Introduction Welcome and team introduction Hearing procedures

More information

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date HILLSBOROUGH COUNTY Greenways and Trails Plan Update Executive Summary Date PURPOSE AND PROJECT OVERVIEW The Hillsborough County Greenways Master Plan (1995) and the City of Tampa s Greenways and Trails

More information

PROPOSED IMPROVEMENTS

PROPOSED IMPROVEMENTS IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways

More information

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 7 To provide park facilities, recreation programs, and open space resources that are safe, adequate, and accessible to all City residents,

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

MCCOYS CREEK RESTORATION 30% DESIGN

MCCOYS CREEK RESTORATION 30% DESIGN MCCOYS CREEK RESTORATION 30% DESIGN THE MCCOYS CREEK RESTORATION PLAN The restoration plan aims to reduce flooding, restore ecosystem health, expand recreational opportunities along the creek, and connect

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

DRAFT Amsterdam/Churchill Community Plan (4/17/08) Adopted By the Gallatin County Commission

DRAFT Amsterdam/Churchill Community Plan (4/17/08) Adopted By the Gallatin County Commission DRAFT Amsterdam/Churchill Community Plan (4/17/08) Adopted By the Gallatin County Commission Table of Contents Acknowledgements Chapter 1: Introduction A Brief History What s Next Authority Organization

More information

APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS CARRBORO DEVELOPMENT GUIDE APPENDIX A

APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS CARRBORO DEVELOPMENT GUIDE APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS Conceptual Preliminary Guide/Checklist for Major Subdivisions Page 1 FORM: REVIEW DATE: CONCEPTUAL PLAN REVIEW 2000 REVIEWED BY:

More information

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA 1 1 Purpose of Public Information Centre #2 To provide interested and/or potentially affected stakeholders with an opportunity to participate in the planning and decision-making process for this Municipal

More information

Pedestrian Trails Within Regulated Areas

Pedestrian Trails Within Regulated Areas New Jersey Department of Environmental Protection Pedestrian Trails Within Regulated Areas Joslin Tamagno, Environmental Specialist Division of Land Use Regulation, Bureau of Inland Regulation www.nj.gov/dep/landuse

More information

4.1 LAND USE AND HOUSING

4.1 LAND USE AND HOUSING 4.1 This section provides a project-level analysis of potential impacts to land use, Shorelines of the State (shorelines), and housing. The study area for the land use and housing analysis in the Final

More information

Issues Requiring Future Study

Issues Requiring Future Study Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem

More information

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES CHAPTER 1 GENERAL DESIGN GUIDELINES 1.0 INTRODUCTION This Publication has been developed to provide current, uniform procedures and guidelines for the application and design of safe, convenient, efficient

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT TRANSPORTATION ELEMENT GOAL I: To create and maintain a safe, efficient and aesthetic transportation system that encourages multi-modal transportation and promotes the mobility strategies of the Ocala

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

DRAFT ALDER CREEK FARM MASTER PLAN

DRAFT ALDER CREEK FARM MASTER PLAN DRAFT ALDER CREEK FARM MASTER PLAN Lower Nehalem Community Trust Mission: To preserve land and nurture conservation values in partnership with an engaged community in the Nehalem region of the Oregon Coast

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

ENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F)

ENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F) ENVIRONMENTAL REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS: SECTION 106 AND SECTION 4(F) Oklahoma Association of County Engineers November 8, 2016 Law and Regulatory Requirements: Section 106 National Historic

More information

RIVER ARTS DISTRICT TRANSPORTATION PROJECT

RIVER ARTS DISTRICT TRANSPORTATION PROJECT RIVER ARTS DISTRICT TRANSPORTATION PROJECT A section of the Public Meeting #3 December 6, 2012 The RiverWay Plan The Wilma Dykeman RiverWay is a 17 mile corridor along the French Broad and Swannanoa Rivers.

More information

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement October 12, 2006 CEQR No.: TO COME ULURP Nos.: TO COME Lead Agency: Lower Manhattan Development Corporation

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails Appendix A: Park Classifications The intent of parks and recreation classifications is to aid in making acquisition and design decisions for park sites, facilities and the organization of recreation space

More information

4.1 AESTHETICS AND VISUAL QUALITY

4.1 AESTHETICS AND VISUAL QUALITY SCOPE AND METHODOLOGY 4.1 AESTHETICS AND VISUAL QUALITY This section evaluates the potential impacts to aesthetics and visual quality. Aesthetics refers to visual resources and the quality of what can

More information

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM Identification Historic Name Dean Parkway Bridge Current Name Bridge 90661 Field # Address Midtown Greenway over Dean Parkway City/Twp Minneapolis County Hennepin Legal Desc. Twp 29N Range 24W Sec 32 QQ

More information

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities Case Studies Michigan Coastal Community Working Waterfronts { Summary of Tools, Strategies and from 11 Michigan Case Study Communities Table of Contents Zoning...2 Community and Stakeholder Collaboration

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

Comanche Creek Greenway IMPROVEMENT PROJECT

Comanche Creek Greenway IMPROVEMENT PROJECT Comanche Creek Greenway IMPROVEMENT PROJECT City of Chico 2012 INTRODUCTION The City of Chico owns approximately 20 acres along Comanche Creek between Midway and the Union Pacific Railroad line, referred

More information