1 Open House Wellesley Station Second Exit Construction Update and Public Art Concept YMCA 20 Grosvenor Street 1

2 Improvements coming to Wellesley Station Second Exit and Automatic Entrance Conceptual drawings of 17 Dundonald with Wellesley Station entance integration after construction is complete. 2

3 What are Second Exits? Second exits serve three functions: As a primary exit if the main exit is blocked in an emergency As an additional exit in an emergency As a convenience to customers Castle Frank Second Exit Dufferin Station Second Exit 3

4 Second Exits Considerations Effective second exits must provide: A fast way out of the station Convenience to encourage day-to-day use and familiarity in an emergency Integration into the neighbourhood Woodbine Station Second Exit (Under Construction) 4

5 Second Exits Background Most subway stations have more than one exit All new TTC stations are built with at least two exits 2002 Fire & Life Safety Assessment Study identified 14 priority stations needing a second exit TTC voluntary program retrofitting existing stations to provide an additional way out in case of emergency and to improve customer convenience 5

6 Status of Second Exit Program 14 stations identified as priority: Broadview complete Castle Frank complete Dufferin complete Pape complete Wellesley under construction 2017 Woodbine under construction to be planned: Chester, College, Donlands, Dundas, Dundas West, Greenwood, Museum and Summerhill 6

7 17 Dundonald Street Building an integrated second exit and automatic entrance within the new condominium development 17 Dundonald Station entrance integration 7

8 Construction Schedule Construction contract was awarded Fall 2014 Requires a road closure in front of 15 Dundonald Street to safely build (driveway access maintained) The project is scheduled to be completed in Spring

9 Construction Staging North Pedestrian Path Maintained Road Closure James Canning Gardens Southbound Tracks Below Grade Northbound Tracks Below Grade Outline of Concourse Level Below Grade Two-way traffic to Yonge Street during construction Outline of Construction Two-way traffic to Church Fence Dundonald Street Street during construction City Sidewalk Yonge Street Driveway Access to 15 Dundonald Maintained No street parking on Dundonald for duration of construction 15 Dundonald 17 Dundonald 19 Dundonald Back Laneway Maintained Southbound Tracks Below Grade Northbound Tracks Below Grade Platform Level Below Grade Pedestrian Walkway Closed Bus Driveway Wellesley Station Bus Driveway To Church Street Existing Main Entrance to Wellesley Station Wellesley Street East 9

10 What to expect during construction Work Hours Monday to Friday 7:00 am to 7:00 pm Saturday 9:00 am to 7:00 pm Work outside these hours is allowed with a permit or in cases of emergency Work will be sequenced in phases to reduce impact to the community Maintain accessible pedestrian access, some detours for safety Updates at projects.ttc.ca (see Station Improvements) 10

11 Construction Progress Crews working on the underground structure 11

12 Construction Progress Sidewalk paved with asphalt following underground utility work to be restored following construction project Hoarding to be installed on fencing Street cleaning 12

13 Rendering of project hoarding on construction fencing 13

14 What to expect For Pedestrians: Walkway between Wellesley and Dundonald closed For TTC Services: No impact to Wellesley Station subway or bus services Pathway on north side of Dundonald maintained Driveway Access to 15 Dundonald Maintained North pedestrian path maintained Road Closure For Vehicles: Dundonald St Street to be closed to traffic in front of 15 Dundonald Dundonald two-way street for Yonge Street Proposed Hoarding Construction Zone 15 Dundonald 17 Dundonald 19 Dundonald duration of project Street parking temporarily removed to accommodate two lanes of traffic Back Laneway Maintained Pedestrian Walkway Closed in each direction Laneway access west of 15 Wellesley Station Wellesley Street East Dundonald Street property will be maintained 14

15 Public Art Concept Station upgrade work is subject to TTC Public Art Policy Art will be an important component of the station improvements Art jury including a local representative reviewed proposals One artist selected to produce artwork Concept presented to community this evening at open house TTC Board approves concept Artist develops the artwork with the TTC Chief Architect and Easier Access Project team 15

16 Public Art Gisele Amantea - Artist s Statement The thematic of the artwork is movement and history The optical sense of movement created by the combination of line and colour is emphasized by the graceful physical undulation of the surface of the artwork The colours are based on the colour-set of the original glass tiling of the stations on the Yonge Street line My desire would be to create a work that has artistic integrity, that captures the imagination, is open to multiple interpretations and experiences 16

17 Jury s Statement "Gisele Amantea s proposed artwork for Wellesley Station is a low-relief sculptural mosaic, architecturally integrated into the station s curved wall, slated for reconstruction. The Jury felt that the location on the interior curved convex wall was preferable. Amantea s artwork will marry beautifully with the space, make the three-dimensional nature of the work read even more dynamically, and bring a high level of sophisticated beauty to the central core of the station. The mosaics sweeping, undulating patterns of intricate tilework with diverse, vibrant colouration will greatly enrich the experience of using the station." - Paul Raff, Juror and local representative 17

18 Public Art Low-relief sculptural mosaic, architecturally integrated into interior curved convex wall 18

19 TTC Project Schedule Fall 2014 Fall 2015 Spring 2017 Begin Construction Construction is ongoing Complete Construction 19

20 Contact Us Contact Us Web: projects.ttc.ca Phone: TTY: Fax: Mail: Denise Jayawardene Senior Community Liaison Officer Public Input Please fill out a comment sheet and provide us with your thoughts on the Wellesley Station Second Exit and Entrance Construction Update & Public Art Concept This presentation will be available at projects.ttc.ca Yonge Street Please submit your comments by Toronto, ON M4S 1Z2 October 14, 2015 to denise.jayawardene@ttc.ca Thank you for your participation! 20

21 Preliminary Easier Access Project Plan (Tentative Schedule ) Street Level Wellesley Street 21

22 Easier Access Project Platform Level 22

23 Elevator Cross Section Wellesley Street Street Level Elevator E1 Platform Elevator E2 Southbound Train Northbound Train 23

Coxwell Station Easier Access

Coxwell Station Easier Access Coxwell Station Easier Access Construction Update and Public Art Concept Danforth Mennonite Church 1 Coxwell Station Easier Access Strathmore Blvd Looking North Street Level Elevator E2 Concourse Outline

More information

Eglinton West/Allen Road Station Potential South Side Entrance Options. Online Consultation April 2 nd to April 16 th

Eglinton West/Allen Road Station Potential South Side Entrance Options. Online Consultation April 2 nd to April 16 th Eglinton West/Allen Road Station Potential South Side Entrance Options Online Consultation April 2 nd to April 16 th Eglinton West/Allen Road Station Consultation #1 Most common comment: south side entrance

More information

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier Mission We connect our communities Vision Getting you there better, faster and easier Values Play as a team Think forward Serve with passion 1 Metrolinx overview go transit, up express, presto Serve a

More information

Transit Terminal Design Surveillance Access Control - Territoriality. Ian Trites Supervisor Facilities and Architectural Design

Transit Terminal Design Surveillance Access Control - Territoriality. Ian Trites Supervisor Facilities and Architectural Design Transit Terminal Design Surveillance Access Control - Territoriality Ian Trites Supervisor Facilities and Architectural Design The public space is not kept primarily by the police, necessary as police

More information

Historic Yonge Street HCD Study Public Meeting #2

Historic Yonge Street HCD Study Public Meeting #2 Historic Yonge Street HCD Study Public Meeting #2 March 26, 2014 Archaeological Services Inc. Philip Goldsmith Architect Agenda: 7:00 p.m. Open House 7:30 p.m. Welcome and Presentation 8:00 p.m. Questions

More information

Preliminary Construction & Traffic Planning Intro to Shop Local/Shop Eglinton Initiative. June 27, 2012

Preliminary Construction & Traffic Planning Intro to Shop Local/Shop Eglinton Initiative. June 27, 2012 Preliminary Construction & Traffic Planning Intro to Shop Local/Shop Eglinton Initiative June 27, 2012 Agenda Introductions Project Update Preliminary Crosstown Construction & Traffic Planning Overview

More information

Reconfiguration of The Six Points Interchange. Community Update #2 June 18, 2014

Reconfiguration of The Six Points Interchange. Community Update #2 June 18, 2014 Reconfiguration of The Six Points Interchange Community Update #2 June 18, 2014 Outline 1. Project overview 2. How did we get here? 3. Etobicoke Centre 4. Existing and future road network 5. Design Update

More information

Landscaping Conceptual Design of 94 Northcliffe Boulevard, Toronto

Landscaping Conceptual Design of 94 Northcliffe Boulevard, Toronto STAFF REPORT INFORMATION ONLY Landscaping Conceptual Design of 94 Northcliffe Boulevard, Toronto Date: March 11, 2014 To: From: Wards: City Council President, Toronto Parking Authority Ward 17 - Davenport

More information

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript

More information

2

2 CROSSTOWN LRT 2 3 4 5 6 Construction of the Eglinton Crosstown LRT Line Background In September 2008, Metrolinx launched a regional transportation plan a 25-year, $50 billion plan -- to coordinate and

More information

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework Welcome Community Consultation Meeting November 28, 2016 Why Are We Here Today? Review and discuss the Bathurst Quay Neighbourhood Plan Framework Review and discuss an Action Plan for Implementation Next

More information

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017 GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017 Glen Road Pedestrian Bridge Class Environmental Assessment 1 WELCOME! Welcome to the second Public

More information

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit Public Information Centres February 2016 Transportation Planning Section City Planning Division Toronto

More information

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ) Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ) The Project The Ashland Public Art Commission (PAC) seeks an artist, or artist team, to develop a site specific, permanent,

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 18, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

Relief Line Project Assessment

Relief Line Project Assessment 6/9/2015 Relief Line Project Assessment Stakeholder Advisory Meeting #2 June 9, 2015 Meeting Purpose Report on the Evaluation Results for Potential Station Locations Seek your Input on Potential Corridors

More information

Maple Leaf Square 15 York Street Public Art Plan

Maple Leaf Square 15 York Street Public Art Plan STAFF REPORT ACTION REQUIRED Maple Leaf Square 15 York Street Public Art Plan Date: December 17, 2007 To: From: Wards: Toronto East York Community Council Robert Freedman, Director, Urban Design Ward 28

More information

PLZ HD Broker/Floorplan BrochureReV3.indd 1-2

PLZ HD Broker/Floorplan BrochureReV3.indd 1-2 PLZ 31538 HD Broker/Floorplan BrochureReV3.indd 1-2 This is Plaza Midtown THIS IS PLAZA MIDTOWN. Much like the area itself, Plaza Midtown is a bit of everything for everyone. Its modular, Rubik s cube

More information

Shell Beach Road Streetscape Frequently asked Questions

Shell Beach Road Streetscape Frequently asked Questions Shell Beach Road Streetscape Frequently asked Questions General What is the Shell Beach Road Streetscape Improvements Project? The overall goal of the Shell Beach Road Streetscape Improvement project is

More information

Chapter 15. Public Art Guidelines 15.2 GENERAL DESIGN OBJECTIVES 15.1 INTRODUCTION AND PURPOSE 15.3 PUBLIC ART GUIDELINES

Chapter 15. Public Art Guidelines 15.2 GENERAL DESIGN OBJECTIVES 15.1 INTRODUCTION AND PURPOSE 15.3 PUBLIC ART GUIDELINES Chapter 15 Public Art Guidelines 15.1 INTRODUCTION AND PURPOSE Public art contributes significantly to the public identity of a place. Public art can stimulate creativity, imagination and add a unique

More information

Yonge Street Zoning Amendment Application - Preliminary Report

Yonge Street Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 341-355 Yonge Street Zoning Amendment Application - Preliminary Report Date: March 24, 2011 To: From: Wards: Reference Number: Toronto and East York Community Council Director,

More information

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report Attachment 1 TOWN OF NEW TECUMSETH Manual for the Preparation of an Urban Design Report July 2010 TABLE OF CONTENTS Background, Policy Framework and the Preparation of Urban Design Reports 1. Introduction

More information

Century Park to Ellerslie Road Preliminary Engineering

Century Park to Ellerslie Road Preliminary Engineering Century Park to Ellerslie Road Preliminary Engineering South LRT Extension Stakeholder Information Panel Brochure March 2010 www.edmonton.ca/lrtprojects LRT Station (left) and Transit Centre Architectural

More information

2

2 CROSSTOWN LRT 2 3 4 5 6 Construction of the Eglinton Crosstown LRT Line Background In September 2008, Metrolinx launched a regional transportation plan a 25-year, $50 billion plan -- to coordinate and

More information

Glen Road Pedestrian Bridge Environmental Assessment

Glen Road Pedestrian Bridge Environmental Assessment Glen Road Pedestrian Bridge Environmental Assessment Presentation to Design Review Panel July 18, 2017 Glen Road Pedestrian Bridge Class Environmental Assessment STUDY AREA Bloor Street East Streetscape

More information

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room PROJECT SHOWING AGENDA I. Welcome A. Sign In Sheet; Non-Disclosure Agreement

More information

Davie Village Public Space Improvements

Davie Village Public Space Improvements Davie Village Public Space Improvements Phase 2: April 2015 Conceptual Design Options Questionnaire Summary Background In April 2015, City of Vancouver staff, with design consultant PFS Studio, hosted

More information

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project PennDOT Public Meeting S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project Mt Lebanon Township, Allegheny County Mt Lebanon Township Municipal Building November 6, 2014 1 Project

More information

Chesterfield County Project Update

Chesterfield County Project Update Chesterfield County Project Update SOUTHEAST HIGH SPEED RAIL TIER II ENVIRONMENTAL IMPACT STATEMENT RICHMOND, VA, TO RALEIGH, NC CHESTERFIELD COUNTY, VA OFFICIALS BRIEFING February 2013 Federal Railroad

More information

Yonge-Summerhill: Urban Square Design (Midtown)

Yonge-Summerhill: Urban Square Design (Midtown) Yonge-Summerhill: Urban Square Design (Midtown) (City Council on April 11, 12 and 13, 2000, adopted this Clause, without amendment.) The Toronto Community Council recommends the adoption of the following

More information

QUESTION 8: What are your Public Realm priorities for implementation? What would you like to see happen first? TELL US WHAT YOU THINK

QUESTION 8: What are your Public Realm priorities for implementation? What would you like to see happen first? TELL US WHAT YOU THINK Public Realm Plan How will the Public Realm Plan be implemented? The Public Realm Plan document will set out a vision for the next 30 years. Over time, Plan elements and aspects can be implemented as opportunities

More information

Relief Line Project Assessment

Relief Line Project Assessment Relief Line Project Assessment Public Information Centre April 5, 2017 Tonight s Meeting PURPOSE To review the preferred alignment for the Local Segment. AGENDA 6:30 Open House 7:00 Presentation / Discussion

More information

Ashbridges Bay TTC Maintenance and Storage Facility

Ashbridges Bay TTC Maintenance and Storage Facility Ashbridges Bay TTC Maintenance and Storage Facility September 8, 2010 Presented to Government Review Team 1 Presentation Overview Overview of the Project Status of Transit Project Assessment Process Potential

More information

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in

More information

CROSSTOWN LRT Central Open House March 21, 2018

CROSSTOWN LRT Central Open House March 21, 2018 CROSSTOWN LRT Central Open House March 21, 2018 Metrolinx was created in 2006 by the Province of Ontario to improve the coordination and integration of all modes of transportation in the Greater Toronto

More information

South Yonge Street Corridor

South Yonge Street Corridor South Yonge Street Corridor Streetscape Master Plan Study Draft Final Report Phase 3: Streetscape Master Plan and Pre-Subway Plan May 2011 Prepared by: In Partnership with: South Yonge Street Corridor

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 23, 2019

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 23, 2019 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of February 23, 2019 DATE: February 15, 2019 SUBJECT: Amendment to the Master Transportation Plan (MTP) Map to add a new section of North Kansas

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

112 College Street Zoning Amendment Application Preliminary Report

112 College Street Zoning Amendment Application Preliminary Report ~TORONTO REPORT FOR ACTION 112 College Street Zoning Amendment Application Preliminary Report Date: January 25, 2019 To: Toronto and East York Community Council From: Director, Community Planning, Toronto

More information

GUIDELINES REGARDING PERMANENT ARTWORK IN PUBLIC SPACES

GUIDELINES REGARDING PERMANENT ARTWORK IN PUBLIC SPACES GUIDELINES REGARDING PERMANENT ARTWORK IN PUBLIC SPACES The Folsom City Council and the Folsom Arts and Cultural Commission (FACC) have determined that the expansion of arts and cultural activities within

More information

Toronto Transit Consultation Meetings June 2 nd, 2016 Highlights Report

Toronto Transit Consultation Meetings June 2 nd, 2016 Highlights Report Toronto Transit Consultation Meetings June 2 nd, 2016 Highlights Report This concise Highlights Report has been prepared to provide the City of Toronto, TTC, Waterfront Toronto and Metrolinx with a snapshot

More information

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,

More information

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004. CITY CLERK Consolidated Clause in Report 8, which was considered by City Council on October 26, 27 and 28, 2004. 28 Request for Direction Report - Site Plan Approval Application 03 200020 NNY 24 SA - Marek

More information

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016 FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for

More information

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1 1 Adelaide Street / Canadian Pacific Railway (CPR) Why Are We Here? 2 The purpose of Public Information Centre (PIC) #1 is to: Introduce the study Provide the study background and context Identify the

More information

A 25-YEAR PLAN FOR DOWNTOWN

A 25-YEAR PLAN FOR DOWNTOWN A 25-YEAR PLAN FOR DOWNTOWN The Downtown Secondary Plan will provide policy direction to shape future growth and link that growth to the provision of infrastructure for liveability 1. BALANCING GROWTH

More information

St. Clair Avenue West Area Transportation Master Plan

St. Clair Avenue West Area Transportation Master Plan 1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present

More information

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION 7:00 P.M. TO 8:30 P.M. NOVEMBER 21 st, 2017 PENETANGUISHENE MEMORIAL COMMUNITY CENTRE BRIAN ORSER HALL (61 Maria Street) 1.

More information

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

2900 Steeles Avenue East at Don Mills Road in the Town of Markham STAFF REPORT INFORMATION ONLY 2900 Steeles Avenue East at Don Mills Road in the Town of Markham Date: January 23, 2008 To: From: Wards: Reference Number: North York Community Council Director, Community

More information

TABLE OF CONTENTS 1.0 INTRODUCTION... 3

TABLE OF CONTENTS 1.0 INTRODUCTION... 3 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1. BACKGROUND... 3 1.2. THE PROPOSAL... 5 2.0 EXISTING POLICY FRAMEWORK... 5 2.1. PROVINCIAL POLICY STATEMENT (PPS)... 5 2.2. CITY OF LONDON OFFICIAL PLAN (OP)...

More information

Toronto and East York Community Council. Robert Freedman, Director, Urban Design

Toronto and East York Community Council. Robert Freedman, Director, Urban Design 56 Blue Jays Way - Public Art Plan STAFF REPORT ACTION REQUIRED Date: September 14, 2011 To: From: Wards: Reference Number: Toronto and East York Community Council Robert Freedman, Director, Urban Design

More information

Downtown Brampton Capital Project

Downtown Brampton Capital Project Downtown Brampton Capital Project BIA Update November 1 st, 2017 Anthony Parente, Director, Wastewater Region of Peel Public Works 1 Agenda Why Now? Design Update Construction Sequencing Traffic Management

More information

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from

More information

Yonge Eglinton Centre Urban Design Guidelines

Yonge Eglinton Centre Urban Design Guidelines Yonge Eglinton Centre Urban Design Guidelines City Planning Urban Design January 2009 YONGE EGLINTON CENTRE INTRODUCTION.................................................... 1 GENERAL SITE PLAN OBJECTIVES......................................

More information

Posted by Calgary Public Library on November 1, 2012

Posted by Calgary Public Library on November 1, 2012 Call to Artists for Signal Hill Library Public Art Project Posted by Calgary Public Library on November 1, 2012 Eligibility This project is open to local and regional artists. Emerging and established

More information

Burloak Drive Grade Separation

Burloak Drive Grade Separation Burloak Drive Grade Separation Transit Project Assessment Process Public Meeting #1 March 30, 2017 GO Lakeshore West Service Plan Weekday Rush Hour 15-minute, two-way service between Aldershot* and Union

More information

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY MAIN STREET ECONOMIC DEVELOPMENT STRATEGY A PATHWAY TO A BETTER POUGHKEEPSIE DRAFT Working Paper #2: Planning Strategies Submitted December 1 st, 2015 to the City of Poughkeepsie LAND USE LAW CENTER PACE

More information

Phase I Redevelopment Plan. First Community Meeting

Phase I Redevelopment Plan. First Community Meeting Hoboken Terminal and Yard Phase I Redevelopment Plan First Community Meeting May 31, 2011 One Hudson Place Phase I Redevelopment Plan Redevelopment Plan First Community Meeting Agenda 1. Redevelopment

More information

50 Wellesley Street East and Dundonald Street Official Plan Amendment and Zoning Amendment Applications Request for Direction Report

50 Wellesley Street East and Dundonald Street Official Plan Amendment and Zoning Amendment Applications Request for Direction Report STAFF REPORT ACTION REQUIRED 50 Wellesley Street East and 31-35 Dundonald Street Official Plan Amendment and Zoning Amendment Applications Request for Direction Report Date: November 2, 2015 To: From:

More information

Option A FINAL AESTHETIC SIGNATURE BRIDGE PROPOSAL. SR 836/I-395/I-95 Project

Option A FINAL AESTHETIC SIGNATURE BRIDGE PROPOSAL. SR 836/I-395/I-95 Project ELECTRONIC COPY AESTHETIC VOLUME 2 2.28.17 APPROVED SIGNATURE BRIDGE PACKAGE, APTES, AND SIGNATURE BRIDGE RELATED ATCS SR 836/I-395/I-95 Project Florida Department of Transportation District 6 & Miami-Dade

More information

VAUGHAN METROPOLITAN CENTRE STATION

VAUGHAN METROPOLITAN CENTRE STATION VAUGH VAUGH METROPOLIT STATION Located South West of 407 ETR and Jane Street intersection Five Level intermodal line station 600 Bay Commuter Parking Lot Passenger Pick-Up and Drop-Off (PPUDO) 18 bay Bus

More information

Cypress High School Site Improvement Project

Cypress High School Site Improvement Project Memorandum Date: March 8, 2018 To: From: Subject: Cypress High School Community Patricia Neely Director, Facilities Planning, Design, Construction Measure H Cypress High School Site Improvement Project

More information

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

Canal Road City Limits (East of Van Dyke Ave) to Saal Road Canal Road City Limits (East of Van Dyke Ave) to Saal Road Construction Update 9/14/2018 The ashalt paving on the southside of Canal Road is expected to start Saturday, September 15 (weather permitting)

More information

Public Art Component - Guildford Aquatic Centre. The Parks, Recreation and Culture Department recommends that Council:

Public Art Component - Guildford Aquatic Centre. The Parks, Recreation and Culture Department recommends that Council: NO: R225 COUNCIL DATE: October 22, 2012 REGULAR COUNCIL TO: Mayor & Council DATE: October 18, 2012 FROM: General Manager, Parks, Recreation and Culture FILE: 7800-01 SUBJECT: Public Art Component - Guildford

More information

Highway 417 Expansion East

Highway 417 Expansion East Highway 417 Expansion East Nicholas Street to Ottawa Road 174 GWP 4091-07-00 & GWP 4320-06-00 Outline Project Overview Highway 417 Widening Bridge Rapid Replacements Traffic & Incident Management Project

More information

PILOT PROJECT TO INTERRUPT INDIVIDUAL CAR TRAFFIC ON THE VOIE AVENUE CAMILLIEN-HOUDE/CHEMIN REMEMBRANCE ROADWAY

PILOT PROJECT TO INTERRUPT INDIVIDUAL CAR TRAFFIC ON THE VOIE AVENUE CAMILLIEN-HOUDE/CHEMIN REMEMBRANCE ROADWAY MOVING TOWARDS A NEW PARK LANE PILOT PROJECT TO INTERRUPT INDIVIDUAL CAR TRAFFIC ON THE VOIE AVENUE CAMILLIEN-HOUDE/CHEMIN REMEMBRANCE ROADWAY In a spirit of urban modernity and in the interest of protecting

More information

To submit comments: Public Art Installation // Fairport Public Art Trail

To submit comments: Public Art Installation // Fairport Public Art Trail Public Art Installation // Fairport Public Art Trail Public Review Period January 14-25, 2019 In November a Jury selected three Artists to submit a proposal for the First Art Installation for the Fairport

More information

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015 St. Laurent Transit Improvements Innes / Industrial to Smyth Public Information Session December 2, 2015 Agenda Introduction Project Background Preliminary Design Widening for transit lanes Roadway resurfacing

More information

Historic Yonge Street HCD Plan Community Consultation October 14, 2015

Historic Yonge Street HCD Plan Community Consultation October 14, 2015 Historic Yonge Street HCD Plan Community Consultation October 14, 2015 Archaeological Services Inc. Philip Goldsmith Architect BRAY Heritage Historic Yonge Street HCD Plan Agenda: 6:30 Open House 7:30

More information

It is recommended that the Commission receive this report on subway garbage disposal and recycling and note the following:

It is recommended that the Commission receive this report on subway garbage disposal and recycling and note the following: MEETING DATE: FEBRUARY 27, 2001 SUBJECT: Subway Garbage Disposal RECOMMENDATION It is recommended that the Commission receive this report on subway garbage disposal and recycling and note the following:

More information

The Phibbs Bus Exchange Redesign: From Concrete and Asphalt to Raingardens and Bridges!

The Phibbs Bus Exchange Redesign: From Concrete and Asphalt to Raingardens and Bridges! The Phibbs Bus Exchange Redesign: From Concrete and Asphalt to Raingardens and Bridges! Michelle Babiuk, Project Manager, Infrastructure and Network Management, TransLink Bernard Abelson, Transportation

More information

Today We re Talking About:

Today We re Talking About: Today We re Talking About: 4 Street S.E. to Highfield 160 AVENUE N Station (Above Grade and 144 AVENUE N At Grade Stations) NORTH POINTE 4 Street S.E. in the Beltline TUSCANY 96 AVENUE N BEDDINGTON SADDLETOWNE

More information

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background TRAINING SESSION 1: The Urban Design Streetscape Manual is a reference tool developed to help implement City policy and guide the design, construction and maintenance of streetscape improvements in Toronto.

More information

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012 MARINA BAY NEIGHBORHOOD PRESENTATION City of Richmond Officer Bradley A. Moody Memorial Underpass April 11, 2012 TEAM INTRODUCTIONS Project Oversight and Approval City of Richmond Formally Richmond Community

More information

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study Public Drop-in Event 1 Thursday, October 12, 2017 6:00 p.m. to 8:00 p.m. Humbercrest United Church Welcome Welcome to

More information

New York City Transit

New York City Transit 2 Broadway Veronique Hakim New York, NY 10004-2207 President 646 252-5800 Tel 646252-5815 Fax New York City Transit May 17,2016 Ms. Diane Barlow Murray Hill neighborhood Assoc. P.O.Box 1897 New York, NY

More information

St. Clair Avenue West Transit Improvements. Class Environmental Assessment. Urban Design Summary

St. Clair Avenue West Transit Improvements. Class Environmental Assessment. Urban Design Summary St. Clair Avenue West Transit Improvements Class Environmental Assessment Urban Design Summary September 2004 Table of Contents 1 URBAN DESIGN PURPOSE & OBJECTIVES... 1 2 ST. CLAIR WEST URBAN DESIGN CONTEXT...

More information

Authority: Toronto and East York Community Council Item 26.14, as adopted by City of Toronto Council on October 8, 9, 10 and 11, 2013 CITY OF TORONTO

Authority: Toronto and East York Community Council Item 26.14, as adopted by City of Toronto Council on October 8, 9, 10 and 11, 2013 CITY OF TORONTO Authority: Toronto and East York Community Council Item 26.14, as adopted by City of Toronto Council on October 8, 9, 10 and 11, 2013 CITY OF TORONTO BY-LAW No. 1507-2013 To adopt Amendment No. 183 to

More information

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC) Update JANUARY 2010 Neighbourhood Advisory Committee (NAC) ARTS AND CULTURE Gas Station Theatre BUSINESS Osborne Village BIZ Downtown BIZ COMMERCIAL PROPERTY OWNER Great-West Life COMMUNITY ORGANIZATIONS

More information

City of La Palma Agenda Item No. 5

City of La Palma Agenda Item No. 5 City of La Palma Agenda Item No. 5 MEETING DATE: August 21, 2018 TO: FROM: SUBMITTED BY: CITY COUNCIL CITY MANAGER Laurie A. Murray, City Manager AGENDA TITLE: Kennedy High School Site Improvement Project

More information

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street

More information

Metrogate Agincourt Redevelopment

Metrogate Agincourt Redevelopment Toronto Urban Design Guidelines Metrogate Agincourt Redevelopment City Planning Urban Design September 2008 METROGATE AGINCOURT REDEVELOPMENT TABLE OF CONTENTS 1.0 INTRODUCTION......................................................

More information

Relief Line Project Assessment Phase 4 Stakeholder Advisory Group (SAG) Meeting #4

Relief Line Project Assessment Phase 4 Stakeholder Advisory Group (SAG) Meeting #4 Relief Line Project Assessment Phase 4 Stakeholder Advisory Group (SAG) Meeting #4 Monday, May 30, 2016 6:00 8:00 pm Church of the Holy Trinity 19 Trinity Square Meeting Summary Participants John Burt

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

This appendix discusses some of the key

This appendix discusses some of the key Appendix C: The Nuts and Bolts of Stormwater Management Strategies for Streets and Parking Lots This appendix discusses some of the key design considerations to keep in mind when implementing green streets

More information

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm Community Engagement Committee Meeting #1 December 10, 2014 6:30pm-8:30pm Welcome and Introductions Dana Murdoch Minneapolis Park and Recreation Board Project Manager Ryan French Walker Art Center Director

More information

Taché Promenade Tuesday, October 17, 2017

Taché Promenade Tuesday, October 17, 2017 Welcome to the Public Information Session for the City of Winnipeg s Taché Promenade Tuesday, October 17, 2017 We want to hear from you. Please participate today by: Viewing the recommended design and

More information

THE MARINER. Presented by NS LTD. The Mariner 592 Bedford Highway June 12, 2017

THE MARINER. Presented by NS LTD. The Mariner 592 Bedford Highway June 12, 2017 THE MARINER Presented by 3247003 NS LTD 592 BEDFORD HIGHWAY Location of 592 Bedford Highway Project Team Project Responsibility Contact Name Contact Information 3247003 NS Ltd. Developer Karim J Barghouti

More information

M4-M5 Link Rozelle Interchange factsheet 2017

M4-M5 Link Rozelle Interchange factsheet 2017 M4-M5 Link Rozelle Interchange factsheet 017 WestConnex is part of the ustralian and NSW governments vision for supporting Sydney s growing population and keeping our economy strong. The M4-M5 Link is

More information

Introduction. Community Outreach Approach. Sacramento Valley Station Master Plan. Online Questionnaire Summary of Feedback.

Introduction. Community Outreach Approach. Sacramento Valley Station Master Plan. Online Questionnaire Summary of Feedback. Introduction Located in the northwest sector of downtown Sacramento, the Sacramento Valley Station (SVS) is the primary rail station in northern California and the seventh busiest station in the country.

More information

Allen Road-Eglinton West Station Public Consultation Report Open House & Online Consultation #1

Allen Road-Eglinton West Station Public Consultation Report Open House & Online Consultation #1 Allen Road-Eglinton West Station Public Consultation Report Open House & Online Consultation #1 March 2, 2012 2 Allen Road Eglinton West Station Consultation Table of Contents 1. Executive Summary... 4

More information

NO: R166 COUNCIL DATE: July 24, Recommendation for Port Kells Community Hall Public Art Project

NO: R166 COUNCIL DATE: July 24, Recommendation for Port Kells Community Hall Public Art Project CORPORATE REPORT NO: R166 COUNCIL DATE: July 24, 2017 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2017 FROM: General Manager, Parks Recreation & Culture FILE: 2320-02 SUBJECT: Recommendation for

More information

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers Redevelopment of Ajax Plaza Area Why is the redevelopment of the Ajax Plaza important to the revitalization

More information

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018 Monroe Street Reconstruction Public Preconstruction Meeting February 21, 2018 Thank you to Edgewood College! Tonight s Agenda 1. Project Overview 2. Initial project schedule and phasing 3. Expectations

More information

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011 Expo Line Community Meeting Phase 2 Design Update November 2011 Meeting Agenda Phase 2 Design Update Meeting Meeting Purpose and Format Project Status Update Overview of Design Progress Next Steps Open

More information

On behalf of Metrolinx, in coordination with the City of Mississauga. and Presentation Materials (draft)

On behalf of Metrolinx, in coordination with the City of Mississauga. and Presentation Materials (draft) On behalf of Metrolinx, in coordination with the City of Mississauga Port Credit GO Station Area Master Plan Study Advisory Panel Meeting #3 Handouts and Presentation Materials (draft) June 10, 2015 Agenda

More information

5.15 AESTHETIC RESOURCES

5.15 AESTHETIC RESOURCES 5.15 AESTHETIC RESOURCES 5.15.1 Introduction This section assesses the potential visual impacts of the proposed South Ferry Terminal Project in the visual context and character of the southern tip of Lower

More information

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN) Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Business License Building Fire Prevention Planning Public Works 707.648.4310 707.648.4374 707.648.4565 707.648.4326 707.651.7151 PLANNED DEVELOPMENT

More information