Lansing s Moores River Drive Regional Network Trail project extended the Lansing River Trail system to Waverly Road, and also included bike lane
|
|
- Benjamin Bruce
- 5 years ago
- Views:
Transcription
1 Lansing s Moores River Drive Regional Network Trail project extended the Lansing River Trail system to Waverly Road, and also included bike lane striping on W. Mount Hope Avenue. The boulevard on Moores River Drive between West Mount Hope Avenue and Waverly Road was removed, and the road reconstructed to include a travel lane in each direction and a separated pathway. The existing sea wall was removed and the shoreline softened to allow for water quality measures and improved habitat. Bioswales were constructed, including coir logs and native plants at the river's edge to assist in runoff absorption, as well as to hold soil from entering the river.
2 Fig 1: Mount Hope Avenue/Moores River Drive looking West: This is the point where the road began to separate from four lanes undivided to four lanes divided. Thee northern westbound lanes were removed and the curve was realigned to improve superelevation, pathh was installed and a non motorized crossing installed.
3 Fig 2: This is a close up of the non motorized crossing seen in figure 1.
4 Fig 3: Just west of the crossing in Fig 2. Looking west at the pathway where it crosses Moores River Drive.
5 Fig 4: Mount Hope Avenue/Moores River Drive intersection looking west. Pathway, ramp, curb, pavement markings and ADA domes installed. Looking west the curb on the north side was removed in order to properly install the pathway. Although not an item: LED lighting was installed throughout.
6 Fig 5: Just west of the intersection in Figure 4. This picture is looking north where the pathway was constructed to connect to the existing pathway leading to Frances Park.
7 Fig 6: Looking west from approximately same location as Fig 5. The overlook with benches, bike racks and fishing railing can be seen on the right side of the picturee and the ADAA compliant parking spaces with a lead walk to the path and fishing area can be seen in the upper left. Newly planted trees can be seen in both the left and right of the path.
8 Fig 7: Looking north from approximately where fig 6 was taken. A retaining wall which doubles as seating, ornamental fence (safety fence), and terminal pad/turnaround that will serve as future location for an ADA kayak launch were installed.
9 Fig 8: Looking just west of Figure seven. Note the fishing railing.
10 Fig 9: Close up of the first overlook and ADA compliant Fishing Area wheree the existing sea wall had to remain in order to have an ADA compliant walk to the future Kayak Area.
11 Fig 10: Close up of the parking area.
12 Fig 11: Bio Retention Basin D located on the East end of the project just east of the Turnaround/Kayak area.
13 Fig 12: Outfall from Basin D shown in Figure 11.
14 Fig 13: MNRTF Sign, safety railing, and sidewalk to fishing area.
15 Fig 14: Close up of the MNRTF sign
16 Fig 15: Wetland C. Retaining wall and safety rail was required in this area to make the transition from the existing seawall to sloping embakment.
17 Fig 16: Looking west showing the pathway and restoration adjacent Wetland C. A bench to the left of the picture can be seen in the distance.
18 Fig 17: Looking west at the pathway. Natural stone retaining wall was created to reflect elements used in the older section of pathway and to retain as much of a natural feel as possible. Standard turf grass was planted between the pathway and the road while native vegetation was planted along the shoreline.
19 Fig 18. Further west from fig 17. A bench for resting along the pathway was installed within the natural stone wall.
20 Fig 19: A picture looking at the shoreline from where fig 18 was taken. This picture shows the establishment of the native vegetation planted, rip rap, coir logs (brown area) and plantings as well as naturally transplanted vegetation at the river s edge.
21 Fig 20: Looking west along the pathway just east of Doral Road/Moores River Drive intersection. The natural stone wall ends here and a rest area/overlook created.
22 Fig 21: Looking east from the overlook in Fig 20.
23 Fig 22: Looking west from the overlook in Fig 20. Notice the coir logs (brow area) adjacent the river area.
24 Fig 23: ADA crossing at Doral and Moores River Drive
25 Fig 24: ADA crossing across Doral.
26 Fig 25: Looking west along the pathway from Doral/Moores River Drive intersection. Waverly Road Bridge is seen in the distance.
27 Fig 26: Looking west at wetland B just west of Fig 25. The safety railing is required for all wetlands due to the proximity to the pathway.
28 Fig 27: Wetland B
29 Fig 28: Wetland B looking at natural stone rip rap required to keep the berm stable during heavy rainfall events.
30 Fig 29: Looking west just beyond wetland B at Waverly Road intersection.
31 Fig 30: Looking at the native vegetation plantings and rip rap almost completely overgrown within the first full season.
32 Fig 31: Looking west at the last rest area and Bike racks at Waverly road
33 Fig 32: Wetland a located at Waverly Road and Moores River Drive
34 Fig 33: Outfall for Wetland A.
35 Fig 34: Close up of the rest area and bike racks at Waverly Road.
36 Fig 35: Picture of trees planted at Waverly Road
37 Fig 36: Looking south from the Waverly Rd/Moores River Dr. intersection. New ADA compliantcrossings were installed.
38 Fig 37: Looking south along the pathway toward Cooley Drive.
39 Fig 38: Close up of the trees planted do to removals to fit the pathway in.
40 Fig 39: Close up of trees planted that were removed during construction.
41 Fig 40: looking south along Waverly Road at the pathway connection at Cooley Drive. This is where this project meets the Waverly Road pathway Project constructedd the prior year.
42 Fig 41: Close up of the Waverly road project connection point.
43 Fig 42: Looking north from the Waverly Road/Moores River Drive intersection. The sidewalk here meets up with Lansing Township. Future plans are to connect the recreational path to Lansing Road to meet up with both Lansing Township and Delta Township.
44 Fig 43: Looking southeast at the project site from the Waverly Road Bridge.
45 Fig 44: Clos up of Fig 43
46 Fig 45: Close up of Figure 43
47 Fig 46: Close up of Fig 43.
48 Fig 47: Close up of Fig 43.
49 Fig 48: Close up of Fig 43.
50 Fig 49: Picture taken from the fishing area looking west.
51 Fig 50: Picture taken from the fishing area looking east.
52 Fig 51: Prior to construction. This is the approximately location as Fig 49.
53 Fig 52: Prior to construction. Tthis is the approximately location as Fig 25 and Fig 20 below and next pg.
54
VEHICULAR AND PEDESTRIAN CIRCULATION
This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide
More informationReconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012
Reconnecting to a Forgotten River St. Cloud MN Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012 site context 2.5 Miles Sartell St. Cloud to Fargo 170 Miles (2 hrs 45 mins) Hwy 10 infrastructure
More informationKENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES
BIO-RETENTION FACILITIES (for all basins / BMPs) Annually Prepare Operation and Maintenance Plan. Clearly outline how vegetation in the facility and its buffer area will be managed or harvested in the
More informationPHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK
PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK Sheet List L1.0 L2.0 L3.0 L4.0 L5.0 L6.0 L7.0 L8.0 L9.0 L10.0 L11.0 L12.0 L13.0 L14.0 L15.0 L16.0 L17.0 L18.0 L19.0 L20.0 L21.0 L22.0 Cover Open Space Context
More informationCOLLIER BOULEVARD (CR 951) CORRIDOR
Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts
More informationThe open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..
The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance
More informationMCCOYS CREEK RESTORATION 30% DESIGN
MCCOYS CREEK RESTORATION 30% DESIGN THE MCCOYS CREEK RESTORATION PLAN The restoration plan aims to reduce flooding, restore ecosystem health, expand recreational opportunities along the creek, and connect
More informationPipeline Trail Master Plan Preliminary Concept Design. O Connor Mokrycke Consultants May 14, 2015 meeting
Pipeline Trail Master Plan Preliminary Concept Design O Connor Mokrycke Consultants May 14, 2015 meeting 1 Purpose of the Meeting: - Share information regarding traffic studies - Present ideas arising
More informationGreen Infrastructure in the Greater Lansing Area
Green Infrastructure in the Greater Lansing Area Friday May 9, 2014 David Christian, PE DC Engineering Lansing, MI Dan Christian, PE Tetra Tech Lansing, MI 1 2 Edgewood Village Center Cedar St School Harvesting
More information4.1 Build Alternative 1 Construction Phasing
SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th
More informationGYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015
GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin
More informationSTANDARD DETAILS QUICK REFERENCE
STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)
More informationYahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA
Yahoo! Inc. CO-7 Site Location: 701 First Avenue Sunnyvale, CA Rocky swales Multi-story buildings reduce building footprint Access to the Bay Trail open space area including parking available for visitors
More informationSTANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS
STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B
More informationWhitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018
Whitemarsh Comprehensive Plan Update: Housing & Land Use Public Workshop #3: September 20, 2018 Agenda Welcome Process Recap What We ve Heard The Plan Framework Review of Recommended Actions Land Use Housing
More informationSpring 2018 Construction Update
Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the
More informationOPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN
OPPORTUNITIES AT OXBOW EXISTING WETLANDS Site is undeveloped and we can design a park that works well from the start. SAND BEACH Potential to eliminate invasive species. DEBRIS (CONCRETE, OLD CARS) VEGETATION
More informationROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018
January 25, 2018 The Rome Waterfront Village project is intended to foster the revitalization of the area between South James Street and Erie Boulevard north of the Erie Canal as well as improve public
More informationRZC Public View Corridors and Gateways
RZC 21.42 Public View Corridors and Gateways 21.42.010 Purpose 21.42.020 Scope and Authority 21.42.030 Administration 21.42.040 Gateways Design 21.42.050 Unidentified Public Views 21.42.060 Identification
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES
01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2
More informationStream Restoration: Working with Nature?
Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability
More informationStream Restoration: Working with Nature? Greg Jennings, PhD, PE
Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability
More informationCleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009
Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009 Process for Aesthetics Subcommittee June 25, 2009 Kick off Meeting June 26, 2009 Gateway and Tremont Focus Groups
More informationSouth Waterfront Park
South Waterfront Park The South Waterfront Greenway Development Plan (GDP) has achieved an integrated and balanced design that fuses the goal of creating a new high-density urban community with the desire
More informationSALEM ST SAUGUS, MA THE CHANNEL 4-ACRE DEVELOPMENT
20 + 150 SALEM ST SAUGUS, MA 4-ACRE DEVELOPMENT GE Aviation 2,500 employees Average salary of $75,000.00 plus ROUTE 107 Wheelabrator 60 employees Availabity of Clean Energy Riverworks Station Public access
More informationADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS
ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213
More informationProject Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.
I-95 Avenue Interchange Project Status Construction is underway for Phase 3. Overall Project Area and Schedule Phase 0: Completed 2010 Section GR0: Completed in Fallin 2010 Phase 2: Completed Section GR2:
More informationalum creek park public workshop January 16, 2014
alum creek park public workshop January 16, 2014 brief History Schneider Park Early 2000 s - Clean Ohio Fund - Acquisition & Invasive Species Removal SWBMP - Capital University agrees to assist with land
More informationVISION PLAN PRESENTATION - SEPTEMBER 28, 2013
AREAS OF IMPROVEMENT E A POOL HOUSE POOL DECK B B MAIN BUILDING UPPER PLAZAS A D F G C MAJOR BLEACHERS DUGOUTS FIELD MAIN COURTYARD D REGGIE PARK C E SPORT COURT ADA RAMP H F G H TENNIS COURTS KITCHENETTE
More informationTentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total
HARLEM RIVER, EAST RIVER AND WESTERN LONG ISLAND SOUND PLANNING REGION Flushing Bay and Creek Ecosystem Restoration Source Feasibility Study Background Study Resolution (1994), Reconnaissance Report (1996),
More informationHighland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017
Village Board Meeting March 20, 2017 Agenda I. Public Meeting #1 Visioning Summary II. Public Meeting #2 Comment Summary III. IV. IV. Case Study: Milton Train Station Schematic Design Concepts Schedule/Next
More information30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN
LEGAL PROPERTY DESCRIPTION SEE NOTES SHEET FOR LEGAL PROPERTY DESCRIPTIONS THE CITY OF PLEASANT RIDGE GAINSBORO PARK IMPROVEMENT PROJECT CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN 4444 Second Avenue
More informationNeighborhood Infrastructures Blue Green Infrastructure
Neighborhood Infrastructures Blue Green Infrastructure Blue green infrastructure refers to the components of the neighborhood fabric that connect habitat, parks and open space while managing stormwater.
More informationMIAMI 21 PUBLIC HEARING-FIRST READING 2009
General Principles Public access waterfront walkways shall: 1. Feel public. No one should feel as if he or she is intruding on private property. The public should feel welcome and at ease to move along
More informationHAYDEN ISLAND. Portland s Only Island Community. FINAL CONCEPT PLAN April 2008
HAYDEN ISLAND Portland s Only Island Community FINAL CONCEPT PLAN April 2008 Introduction Hayden Island is the only island neighborhood in Portland and it provides a unique setting to its residents and
More informationAlta Vista Transportation Corridor Environmental Study Report November 2005
Alta Vista Transportation Corridor Environmental Study Report November 2005 6.0 ALTERNATIVE DESIGNS The Preferred Solution to providing additional transportation system capacity through the AVTC study
More informationNew Berlin City Center Plan Commission Review PDQ Food Stores, Inc
March 2, 2017 City of New Berlin Planning Commission 3805 S Casper Dr New Berlin, WI 53151 RE: New Berlin City Center Plan Commission Review PDQ Food Stores, Inc Dear Plan Commission Members, On behalf
More informationFirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series
FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series Presented by Jason Williams, PLA, NCI February 19, 2017 Introduction Lakes (impoundments)
More informationPreliminary Sketch Plan for Fort Hunter Park
Preliminary Sketch Plan for Fort Hunter Park Public Presentation November 19, 2009 Dauphin County Parks and Recreation 100 Fort Hunter Road Harrisburg, PA 17110 (717) 599-5188 www.dauphinc.org THOMAS COMITTA
More informationAWR Engineering, LLC
AWR Engineering, LLC Alaska Water Resources Memorandum To: Kirsti Bischofberger, Watershed Manager, Municipality of Anchorage From: Janie Dusel, PE Date: February 3, 2017 Re: 2016 Low Impact Development/Green
More informationWAYNE GLEN (also known as the Richter Property) A model Low Impact Development (LID) community.
WAYNE GLEN (also known as the Richter Property) A model Low Impact Development (LID) community. Sketch Plan Submission Tredyffrin Planning Commission i Meeting January 17, 2013 114 Forrest Avenue, Suite
More informationUrban Stormwater Retrofit Program Highlights
Urban Stormwater Retrofit Program Highlights Delaware Estuary Environmental Summit 2007 Prepared and Presented by: Liz Feinberg Project Funding: William Penn Foundation PA Coastal Zone Management Program
More informationGlenn Highway MP DSR. Landscape Narrative
Glenn Highway MP 34-42 DSR Landscape Narrative Project Landscape Goals The Glenn Highway MP 34-42 Project extends through a variety of landscape types typical to the Matanuska-Susitna Valley. In general,
More informationDes Plaines River Watershed: Opportunity Areas North Community Cluster 1:80,000. Miles. Public Parks or Preserve. Wetland Area
Service Layer Credits: Harris Corp, Earthstar Geographics LLC Earthstar Geographics SIO 2015 Microsoft Corporation Des Plaines River Watershed: Opportunity Areas North Community Cluster SFR: Single Family
More informationEast Whiteland Township Current Land Development Projects
Current Land Development Projects A. Lincoln Court (Lancaster Avenue / Malin Road) Demolish existing 2 story brick and stucco structure Build onto existing 1 story masonry shopping center to add 8 new
More informationHidden Pointe Landscape Master Plan. June, archi terra
Hidden Pointe Landscape Master Plan June, 2006 t h e archi terra g r o u p 1 Table of Contents Background Purpose and Goals of the Master Plan Master Plan Process Existing Conditions Entrance Hidden Pointe
More informationCOMPLETE GREEN STREET CHECKLIST
COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationNew Berlin City Center Concept Review PDQ Food Stores, Inc
September 23, 2016 City of New Berlin Planning Commission 3805 S Casper Dr New Berlin, WI 53151 RE: New Berlin City Center Concept Review PDQ Food Stores, Inc Dear Plan Commission Members, On behalf of
More informationBerkshire Regional Planning Commission Clearinghouse Review Report
August 19, 2013 SUBJECT: Reconstruction of Housatonic Street, Dalton, MA EOEA#: 15083 LOCATION: Dalton ESTIMATED COST: $8.1 million REVIEW TYPE: ENF PROPONENT: MassDOT and Town of Dalton COMMENTS DUE:
More informationOpen House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK
Open House 10.12.16 RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK MEETING AGENDA Great Rivers Greenway and Project Partners River des Peres Greenway Overview Project
More informationRoute 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347
The GREENING of Route 347 The Greening of Route 347 The Greening of Route 347: History 3 The Greening of Route 347 4 The Greening of Route 347 5 The Greening of Route 347 Smith Haven Mall 6 The Greening
More informationKittson Parkway / Watershed Park Parking Lot
Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;
More informationI-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status
I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in
More informationFY Capital Improvement Program Arroyo Projects - Central Arroyo Summary
CENTRAL ARROYO FY 214-218 Capital Improvement Program Description FY 213 FY 214 FY 215 FY 216 FY 217 FY 218 1 Trail and Rubble Wall Restoration - Central Arroyo (77371) 1,94,66 543,848 55,812 2 Brookside
More informationEstimated Quantity. Description and Price. Estimated Cost. Item No General Conditions at the unit price of $ per LUMP SUM.
11 00-11 00-41 00-56 39-57 13-30 00-30 00-30 00-30 00-30 00-30 00-30 00-08 General Conditions Mobilization & Survey Demolition Tree Retention and Protection Erosion and Sedimentation Control Concrete Seat
More informationARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET
A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -
More informationWater Works: Downtown Minneapolis Riverfront Destination
Water Works: Downtown Minneapolis Riverfront Destination Previous conceptual design process for Water Works began in 2012 along with the Central Mississippi Riverfront Regional Park Master Plan Update
More informationRESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE
RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE DEVELOPMENT TEAM DONEGAL SOUTH Maple Grove, Minnesota March 27, 2017 Applicant/Developer/Builder:
More informationFall Creek Greenway. Indy Greenways Master Plan
Fall Creek Greenway 168 Indy Greenways Master Plan chapter four DESIGN STANDARDS DESIGN STANDARDS 169 chapter four DESIGN STANDARDS inside this chapter: INTRODUCTION..............................................
More informationComplete and Green Streets
Complete and Green Streets DANNIELLE GLAROS CHIEF OF STAFF, COUNCILMAN ERIC OLSON JIM WILSON DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION, PRINCE GEORGE S COUNTY What is a complete street? Complete streets
More informationDesign Considerations
Essential to the development of a successful Master Plan for the Park Complex is input from the community that the park will serve. The community outreach component of the planning process included numerous
More informationFall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More informationCity of Burlington Downtown Street Design & Construction Standards
City of Burlington Downtown Street Design & Construction Standards Adopted April 16, 2018 b City of Burlington Downtown Street Design Standards CITY OF BURLINGTON, VT The Great Streets Initiative is a
More informationBEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012
BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012 City Hall Conference Room 5:30 p.m. 1. CALL TO ORDER / ROLL CALL 2. REVIEW PARK PLANS FOR PAUL BUNYAN PARK, LIBRARY PARK AND SOUTH SHORE BAUER
More informationOlde Towne Vision Plan
Olde Towne Vision Plan Introduction In 2016, the City of Bellevue will complete its move of City offices from Olde Towne Bellevue to its new municipal complex on Wall Street. The City intends to sell its
More informationCITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details
CITY OF LATHROP Department of Public Works DESIGN & CONSTRUCTION Standard Details January 2014 General G-1A Signature Blocks G-1B Signature Blocks G-2 Drafting Standards G-3 Drafting Standards G-4 Drafting
More informationGPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts
Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS
More informationBRADENTON RIVERWALK EXPANSION MASTER PLAN
BRADENTON RIVERWALK EXPANSION MASTER PLAN INTRODUCTION & AGENDA Process Update Community Engagement Summary Center for Active Design (CfAD) Recommendations Context and Existing Conditions Master Plan Alternatives
More informationSan Francisco Bay Pilot: Sausal Creek Community Leader Charrette May 11, 2016 Marcus Griswold
San Francisco Bay Pilot: Sausal Creek Community Leader Charrette May 11, 2016 Marcus Griswold 1 Overview Project Overview Watershed Context Assets and Challenges Opportunities Green Streets Creek Access
More informationMendota Heights 2040 Comprehensive Plan Draft Vers
4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs
More informationVerona Area School District New High School Site Plan Review Written Description EUA Project No.:
January 31, 2018 Adam Sayre, AICP Director of Planning and Development City Of Verona 111 Lincoln Street Verona, Wisconsin Re: Verona Area School District New High School Site Plan Review Written Description
More informationPROJECTS UNDER CONSTRUCTION
Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction
More informationProposed Open Space, UNC-Chapel Hill. Polk Place and Surroundings, UNC-Chapel Hill
Composite McCorkle Place Formal Quad Polk Place Natural Pinetum Proposed Open Space, UNC-Chapel Hill Polk Place and Surroundings, UNC-Chapel Hill Open spaces on a campus are often the physical core around
More informationDesign Specifications & Requirements Manual
11 PARKS & OPEN SPACES 11.1 DEFINITIONS... 1 11.1.1 Neighbourhood Parks... 1 11.1.2 District Parks... 1 11.1.3. Sport Parks... 1 11.1.4 Urban Parks... 1 11.1.5 Civic Spaces... 1 11.1.6 Open Space System...
More informationLANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.
Landscape design is an integral component of Site Planning and Building. The current pattern of walkways, driveways and landscape elements such as fences, hedges, and retaining walls in the neighborhood
More information& SUSTAINABILITY PLAN
Chapter 6: IMPLEMENTATION, MANAGEMENT, & SUSTAINABILITY PLAN Overview The Oxbow Park and Zollman Zoo Master Plan presents a long-term vision for the park. While phasing of improvements is suggested, Olmsted
More informationWET PONDS INSPECTION & MAINTENANCE CHECKLIST
WET PONDS INSPECTION & MAINTENANCE CHECKLIST INTRODUCTION Once construction is completed, periodic site inspections are essential in order to monitor the effectiveness and to anticipate the maintenance
More informationCONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE
CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
More informationConstruction Engineering & Inspection
Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over
More informationApplication for Site Plan Review
Application for Site Plan Review City of Pontiac Office of Land Use and Strategic Planning 47450 Woodward Ave, Pontiac, MI 48342 T: 248.758.2800 F: 248.758.2827 Property/Project Address: Sidwell Number:
More informationPark Types and Attributes
02 APPENDIX B APPENDIX B s and s 194 APPENDIX B 04 Size Level of Service Any privately owned park, of any size, is a neighborhood park Primary Service Area - 1/2 mile or within 15 minutes walking distance
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,
More informationCHAPTER 8. Mrs. Zimman s Class - Central Elementary
SUSTAINABILITY CHAPTER 8 Mrs. Zimman s Class - Central Elementary 8.1 OVERVIEW Green infrastructure also known as low impact development (LID) and environmental or sustainable site design is an environmentally
More informationCity of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01
City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership
More informationUrban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.
South Platte River Meeting Comments & s #1 I am a huge fan of river areas and would love the Platte and surrounding waterways to improve to allow habitat for wildlife and recreation opportunities for citizens.
More information900 Innes & India Basin Shoreline Park
India Basin Waterfront Study Task Force A. Philip Randolph Institute Golden Gate Audubon Society Bay Institute Aquarium Foundation Build Inc. Five Points Green Action for Health and Environmental Justice
More informationCAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013
Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN
More informationThe Tollgate Drain as built was $6.2 Million
Case Studies Traditional Options Option 1 Take storm water to the south and outlet to the Red Cedar River. Cost about 23 million dollars. Option 2 Take storm water to the west and outlet to the Grand River.
More informationTo qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:
Eligibility Requirements To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements: 1) Relate to surface transportation and 2) Be one of the 12 designated
More informationDesign Specifications & Requirements Manual
11 PARKS & OPEN SPACES 11.1 DEFINITIONS... 1 11.1.1 Neighbourhood Parks... 1 11.1.2 District Parks... 1 11.1.3. Sport Parks... 1 11.1.4 Urban Parks... 1 11.1.5 Civic Spaces... 1 11.1.6 Open Space System...
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationALTERNATIVE STATION AREA -
ALTERNATIVE STATION AREA - THE 10 TH STREET GARDEN STATION Two alternative land use scenarios and designs are illustrated here: Scheme A - Transit-Oriented Development High to Mid-Density Residential /Office
More informationLandscape and Streetscape Design 2.5
Landscape and Streetscape Design 2.5 2.5.1 Goals 2.5.2 Planting 2.5.3 Sidewalks and Pavement 2.5.4 Furnishings 2.5.5 Walls 2.5.6 Lighting 2.5.7 Stormwater 2.5.8 Street Cross Sections 2.5 LANDSCAPE AND
More informationAPPENDIX C Township 9 Consistency with Applicable Plans
Township 9 Consistency with Applicable Plans 1985 American River Parkway Plan Policies Project Consistency Policy 4.14: The following activities and facilities, which are incompatible with the Parkway,
More informationWELCOME PG&E HUNTERS POINT COMMUNITY OPEN HOUSE THANK YOU FOR COMING PG&E
WELCOME PG&E HUNTERS POINT COMMUNITY OPEN HOUSE THANK YOU FOR COMING NEWHALL ST JENNINGS ST B SHORELINE I SHORELINE EVANS AVE J C/D MIDDLE POINT ROAD OPERATING SUBSTATION A SHORELINE H Remediation Complete
More information3.0 master plan concept
3.0 master plan concept 3.1 introduction The purpose of the Huron Church Road Master Plan Concept is to provide an overview of the Master Plan design process, identify preliminary streetscape installations
More informationPlay areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.
City of Thornton Parks & Open Space Cherrywood Park Thornton, CO Architect: Design Concepts Construction of this seven-acre City park, located adjacent to Adams Twelve Five Star Prairie Hills Elementary
More informationMission Bay Park Master Plan Update: Fiesta Island Amendment (Information) Mission Bay Park Committee October 3, 2017
Mission Bay Park Master Plan Update: Fiesta Island Amendment (Information) Mission Bay Park Committee October 3, 2017 Tonight s Agenda Introduction & Project Overview Proposed Circulation Changes Overview
More informationStorm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.
September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements
More information