1 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: 14TH ST MV Relocation PIR#UTL TH ST MV Relocation $40,000 UTL TH ST MV Relocation OPEN D. WELCH KIMBERLY A LEWIS / / $40,000 Grouped By: 2ND AVE OVERSS PIR#TRN ND AVE OVERSS $14,741,960 TRN ND AVE OVERSS DESIGN D. WELCH HILTON MCLAIN KIMBERLY A LEWIS / / $14,741,960 IN Grouped By: 2ND AVENUE REALIGNMENT AT MCCORVEY DRIVE PIR#TRN ND AVENUE REALIGNMENT AT MCCORVEY DRIVE $340,940 TRN ND AVENUE REALIGNMENT AT MCC CLOSE-OUT S. WALKER ELSIE SMITH N/A / / $340,940 Jun 15, % Grouped By: 4TH STREET EAST MV UPGRADES 2016 PIR#INF TH STREET EAST MV UPGRADES 2016 $625,326 INF TH STREET EAST MV UPGRADES 20 CLOSE-OUT D. WELCH TBD CINDY FOWLER N/A / / FINANCIAL AFFAIRS $625,326 IN Grouped By: 700 JOHNNY STALLINGS DR FIRE ALARM SYSTEM UPGRADE PIR# JOHNNY STALLINGS DR FIRE ALARM SYSTEM UPGRADE $24, JOHNNY STALLINGS DR FIRE ALA CLOSE-OUT C. PHILLIPS BILLY WILKINS SHERELL HARRISO UA PLANNING / / $24,800 IN 100% Grouped By: 923 Magnolia Dr Swing Space Improvements PIR# Magnolia Dr Swing Space Improvements $20, Magnolia Dr Swing Space Improvem DESIGN S. WEBSTER KIMBERLY A LEWIS / / $20,000

2 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: ACDP FY15 9TH AVE SANITARY SEWER RESTORATION ACDP FY15 9TH AVE SANITARY SEWER RESTORATION $990, ACDP FY15 9TH AVE SANITARY SEWE CLOSE-OUT D. WELCH KIMBERLY A LEWIS / / $990,217 May 23, 2017 Grouped By: ACDP FY15 WOODS HALL BALCONY CONCRETE & RAILINGS REIR ACDP FY15 WOODS HALL BALCONY CONCRETE & RAILINGS REIR $319, ACDP FY15 WOODS HALL BALCONY C CLOSE-OUT M. ERNST JON CHESNUT DEMON TRICK N/A / / WAR CONSTRUCTION $319,001 IN Dec 21, 2015 Nov 17, 2016 Dec 5, 2016 Aug 30, % Grouped By: ACDP FY18 Brewer Porch Domestic Hot Water System Repair PIR# ACDP FY18 Brewer Porch Domestic Hot Water System Repair $125, ACDP FY18 Brewer Porch Domestic Hot CONSTRUCTION C. PHILLIPS DEMON TRICK / / $125,000 Grouped By: ACDP FY18 Gallalee Hall Roof Replacement PIR# ACDP FY18 Gallalee Hall Roof Replacement $400, ACDP FY18 Gallalee Hall Roof Replacem ON HOLD A. FISHER SHERELL HARRISO / / $400,000 Grouped By: ACDP FY18 Peter Bryce Campus Medical Building Roof PIR# ACDP FY18 Peter Bryce Campus Medical Building Roof $350, ACDP FY18 Peter Bryce Campus Medic PROGRAMMING S. MERDO KIMBERLY A LEWIS / / FINANCIAL AFFAIRS $350,000 Oct 2, % Grouped By: ACDP FY18 Rowand Johnson Hall Switchgear Replacement PIR# ACDP FY18 Rowand Johnson Hall Switchgear Replacement $300, ACDP FY18 Rowand Johnson Hall Switc DESIGN C. PHILLIPS KIMBERLY A LEWIS / / $300,000 IN Sep 28, %

3 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: ACDP FY18 University Club Chiller Replacement PIR# ACDP FY18 University Club Chiller Replacement $150, ACDP FY18 University Club Chiller Repl DESIGN J. Whaley RAY BOSTICK DEMON TRICK / / DM HISTORY $150,000 IN Sep 29, 2017 Grouped By: ADAPTED LETICS FACILITY PIR# ADAPTED LETICS FACILITY $10,588, ADAPTED LETICS FACILITY CONSTRUCTION J. WICHITNAK JENNIFER WICHITN ELSIE SMITH LEAH SHEPHERD KPS GROUP, INC / / HARRISON C PRIVATE FUNDS $10,588,682 IN Jul 8, 2016 Dec 8, 2016 Dec 12, 2016 Oct 19, 2017 Dec 29, % Grouped By: ADAPTED LETICS FURNITURE PROJECT PIR# ADAPTED LETICS FURNITURE PROJECT $300, ADAPTED LETICS FURNITURE PR DESIGN J. WICHITNAK JENNIFER WICHITN ELSIE SMITH LEAH SHEPHERD UA PLANNING / / $300,000 IN Feb 8, 2017 Feb 9, 2017 Feb 10, 2017 Nov 2, % Grouped By: ADMH Warehouse Conversion PIR# ADMH Warehouse Conversion $1,696, ADMH Warehouse Conversion CONSTRUCTION D. MCDANIEL RAY BOSTICK DEMON TRICK WARD SCOTT ARCHITECTURE / / $1,696,066 Jul 12, 2017 Dec 18, 2017 Jan 15, 2018 May 1, % Grouped By: AIME BUILDING 221 & 222 HOOD INSTALLATIONS PIR# AIME BUILDING 221 & 222 HOOD INSTALLATIONS $175, AIME BUILDING 221 & 222 HOOD INST CLOSE-OUT M. ERNST JENNIFER WICHITN ELSIE SMITH / / BG WATKINS CONSTRUCTION $175,000 IN Jan 17, 2017 May 9, 2017 May 22, 2017 Aug 20, 2017 Dec 7, % Grouped By: AIME RENOVATION INSTALLATION ON ANECHOIC CHAMBER PIR# AIME RENOVATION INSTALLATION ON ANECHOIC CHAMBER $5,451, AIME RENOVATION INSTALLATION ON DESIGN D. Jones N/A SHERELL HARRISO N/A TREANORHL / / $5,451,626 IN 50%

4 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: ALPHA KAP ALPHA FIRE ALARM NETWORK CONNECTIVITY PIR# ALPHA KAP ALPHA FIRE ALARM NETWORK CONNECTIVITY $24, ALPHA KAP ALPHA FIRE ALARM NE CLOSE-OUT S. WEBSTER SHERELL HARRISO N/A UA PLANNING / / $24,500 IN Feb 16, 2018 Feb 16, 2018 Feb 19, % Grouped By: ALPHA OMICRON PI NEW CHAPTER HOUSE PIR# ALPHA OMICRON PI NEW CHAPTER HOUSE $16,000, ALPHA OMICRON PI NEW CHAPTER H CONSTRUCTION B. YOUNGBLOOD LEE ORR DEMON TRICK N/A BARGANIER DAVIS SIMS ARCHITE UA GREEK LOANS $16,000,000 IN Oct 1, 2015 Mar 21, 2017 Apr 10, 2017 Jul 6, % Grouped By: ALPHA TAU OMEGA KITCHEN RENOVATION & EXTERIOR IMPROVEMENTS PIR# ALPHA TAU OMEGA KITCHEN RENOVATION & EXTERIOR IMPROVEMENTS $226, ALPHA TAU OMEGA KITCHEN RENOV CONSTRUCTION B. YOUNGBLOOD N/A SHERELL HARRISO N/A SEAY, SEAY & LITCHFIELD, LLC / $226,890 IN Dec 13, 2017 Apr 24, % Grouped By: APH PITAL ASSET MANAGEMENT PLAN PIR#APH APH PITAL ASSET MANAGEMENT PLAN $125,000 APH APH PITAL ASSET MANAGEMENT P DESIGN D. MCDANIEL RAY BOSTICK ELSIE SMITH WARD SCOTT ARCHITECTURE / / $125,000 Jan 23, 2017 Mar 13, % Grouped By: ASB Installation of a Double Door at Mail Services PIR# ASB Installation of a Double Door at Mail Services $8, ASB Installation of a Double Door at Mai DESIGN N G. HATCHETT N/A DEMON TRICK N/A UA PLANNING / / ARTS & SCIENCES $8,015 IN May 24, 2016 Jun 1, 2017 Jun 19, 2017 Sep 1, 2017 Sep 1, 2018 Sep 1, %

5 Construction Administration s Report Grouped By: ASB LIGHTNING PROTECTION PLAN PIR# ASB LIGHTNING PROTECTION PLAN $53, ASB LIGHTNING PROTECTION PLAN CONSTRUCTION N L. Lucas KELTON KITE ELSIE SMITH N/A UA PLANNING / / FINANCIAL AFFAIRS $53,352 IN Feb 25, %

6 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: ASB/Marathon Two Ram Baler Install PIR# ASB/Marathon Two Ram Baler Install $30, ASB/Marathon Two Ram Baler Install CLOSE-OUT J. Whaley MIKE PITTS DEMON TRICK BORDEN MORRIS GARNER CONSU $30,303 IN 100% Grouped By: Adams Hall Fire Alarm Panel Fiber Networking PIR# Adams Hall Fire Alarm Panel Fiber Networking $26, Adams Hall Fire Alarm Panel Fiber Netw CONSTRUCTION C. PHILLIPS BILLY WILKINS DEMON TRICK / / SIMPLEX GRINNEL $26,000 IN May 1, 2018 Grouped By: Alpha Delta Pi Sorority Modification Food Servery PIR# Alpha Delta Pi Sorority Modification Food Servery $361, Alpha Delta Pi Sorority Modification Fo CLOSE-OUT B. YOUNGBLOOD LEE ORR DEMON TRICK N/A HENDON HUCKESTEIN ARCHITEC PRIVATE FUNDS $361,442 IN Feb 6, 2017 May 9, 2017 May 23, 2017 Aug 3, % Grouped By: Alpha Gamma Delta Kitchen & Den Expansions PIR# Alpha Gamma Delta Kitchen & Den Expansions $3,100, Alpha Gamma Delta Kitchen & Den Expa DESIGN S. WEBSTER KIMBERLY A LEWIS N/A HOLMES AND HOLMES ARCHITEC PRIVATE FUNDS $3,100,000 Jul 24, 2018 Sep 14, 2018 Jul 19, % Grouped By: Alsn Hall Fire Alarm System Upgrade PIR# Alsn Fire Alarm System Upgrade $70, Alsn Hall Fire Alarm System Upgrade CONSTRUCTION C. PHILLIPS BILLY WILKINS KIMBERLY A LEWIS N/A UA PLANNING / / SIMPLEX GRINN $70,000 IN 40% Grouped By: Aquatic Center Renovations PIR# Aquatic Center Renovations $21,000, Aquatic Center Renovations DESIGN D. COLLINS DEMON TRICK DAVIS ARCHITECTS, INC. / / $21,000,000

7 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Aumotive Service Building Equipment Procurement PIR# Aumotive Service Building Additional Equipment Procurement $248, Aumotive Service Building Equipment P CLOSE-OUT C. PHILLIPS KIMBERLY A LEWIS / / $248,000 IN Sep 1, % Grouped By: Aumotive Services Building PIR# Aumotive Services Building $3,754, Aumotive Services Building CLOSE-OUT C. PHILLIPS KELTON KITE DEMON TRICK TRACEY CREEK CMH ARCHITECTS / / DUNN BUILD FINANCIAL AFFAIRS $3,754,280 IN Nov 21, 2016 Mar 9, 2017 Apr 4, 2017 Dec 3, 2017 Feb 26, % Grouped By: B.B. COMER HEAT PLANT BOILER MODIFITION (YEAR 1 OF 3) PIR# B.B. COMER HEAT PLANT BOILER MODIFITION (YEAR 1 OF 3) $350, B.B. COMER HEAT PLANT BOILER MO PROGRAMMING S. MERDO CINDY FOWLER / / FINANCIAL AFFAIRS $350,000 Oct 2, % Grouped By: BB COMER STEAM PLANT ABATE DECOMMISSIONED EQUIPMENT PIR# BB COMER STEAM PLANT ABATE DECOMMISSIONED EQUIPMENT $50, BB COMER STEAM PLANT ABATE DEC DESIGN M. ERNST ELSIE SMITH N/A / / PLANT FUNDS $50,000 Jun 15, 2016 Grouped By: BIDGOOD 249 BEHAVIORAL LAB PIR# BIDGOOD 249 BEHAVIORAL LAB $20, BIDGOOD 249 BEHAVIORAL LAB OPEN C. MCKINNEY SHERELL HARRISO / / $20,000 Grouped By: BIDGOOD HALL 149 PIR# BIDGOOD HALL 149 $94, BIDGOOD HALL 149 DESIGN M. ERNST JIMMY JENKINS SHERELL HARRISO / / $94,500

8 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: BIKE OPERATION CENTER DEMOLITION PIR# BIKE OPERATION CENTER DEMOLITION $70, BIKE OPERATION CENTER DEMOLITIO DESIGN B. COOK DAN BURK SHERELL HARRISO N/A UA PLANNING / / $70,246 IN Jun 10, 2017 Jun 1, 2018 Jun 10, 2018 Jul 20, 2018 Jul 20, 2018 Grouped By: BIOLOGY 3RD FLOOR RENOVATION PIR# BIOLOGY 3RD FLOOR RENOVATION $3, BIOLOGY 3RD FLOOR RENOVATION OPEN C. PHILLIPS SHERELL HARRISO / / $3,200 Grouped By: BIOLOGY BUILDING AUDITORIUM RENOVATION PIR# BIOLOGY BUILDING AUDITORIUM RENOVATION $550, BIOLOGY BUILDING AUDITORIUM REN CLOSE-OUT L. Lucas JON CHESNUT ELSIE SMITH TRACEY CREEK UA PLANNING / / ADEMIC AFFAIRS $550,000 IN Sep 1, 2016 May 18, 2017 May 22, 2017 Jul 21, 2017 Jul 31, % Grouped By: BLOUNT HALL COMMON AREA INT & RPET PIR#XX BLOUNT HALL COMMON AREA INT & RPET $119, BLOUNT HALL COMMON AREA INT CONSTRUCTION S. MERDO LANCE LUS SHERELL HARRISO UA PLANNING / / HRC $119,000 IN Dec 7, 2017 Mar 6, 2018 May 7, 2018 May 27, % Grouped By: BLOUNT LIVING CENTER REMOVE STEAM SYSTEM ADD BOILER PIR# BLOUNT LIVING CENTER REMOVE STEAM SYSTEM ADD BOILER $35, BLOUNT LIVING CENTER REMOVE ST DESIGN M. ERNST RAY BOSTICK ELSIE SMITH / / HRC $35,000 Jul 12, % Grouped By: BRYANT CONFERENCE CENTER RENOVATION AND ADDITION BRYANT CONFERENCE CENTER RENOVATION AND ADDITION $4,530, BRYANT CONFERENCE CENTER REN PROGRAMMING T. THORN JON CHESNUT KIMBERLY A LEWISMARY KRYN H LIVE DESIGN GROUP / / $4,530,000 IN 1%

9 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: BRYANT CONFERENCE RENOVATION & ADDITION - PROGRAMMING PIR# BRYANT CONFERENCE CENTER RENOVATION & ADDITION - PROGRAMMING $120, BRYANT CONFERENCE RENOVATION PROGRAMMING T. THORN JON CHESNUT CINDY FOWLER MARY KRYN H LIVE DESIGN GROUP / / $120,000 90% Grouped By: BRYANT DENNY EAST SKYBOX HVAC REPLACEMENT PHASE 2 PIR# BRYANT DENNY EAST SKYBOX HVAC REPLACEMENT PHASE 2 $280, BRYANT DENNY EAST SKYBOX HVAC CLOSE-OUT D. COLLINS MICHAEL SUMNER KIMBERLY A LEWIS SMITH, STEGALL & ASSOCIATES / $280,000 IN Mar 30, 2017 Mar 31, 2017 Aug 11, 2017 Jul 21, 2017 Aug 21, % Grouped By: BRYANT DENNY STADIUM - INSTALL CONDUIT FOR AT&T FIBER PIR# BRYANT DENNY STADIUM - INSTALL CONDUIT FOR AT&T FIBER $47, BRYANT DENNY STADIUM - INSTALL C CLOSE-OUT S. WEBSTER RAY BOSTICK KIMBERLY A LEWIS N/A BORDEN MORRIS GARNER CONSU PRIVATE FUNDS $47,645 IN Nov 17, 2017 Dec 11, 2017 Jan 5, 2018 Jan 5, 2018 Jan 5, % Grouped By: BRYCE ADULT PSYCHIATRIC HOSPITAL GREEN SCE FENCE PIR# BRYCE ADULT PSYCHIATRIC HOSPITAL GREEN SCE FENCE $337, BRYCE ADULT PSYCHIATRIC HOSPIT CONSTRUCTION D. MCDANIEL RAY BOSTICK KIMBERLY A LEWIS UA PLANNING / / $337,442 Jan 23, 2017 Jan 30, 2018 Feb 26, 2018 May 31, % Grouped By: BRYCE MPUS STRUCTURAL FILL AND UTILITY REMOVAL PIR#UTL BRYCE MPUS STRUCTURAL FILL AND UTILITY REMOVAL $749,000 UTL BRYCE MPUS STRUCTURAL FILL A CONSTRUCTION B. COOK DAN BURK CINDY FOWLER / / PRICE CONSTRUCTION CO. IN $749,000 IN Nov 3, 2016 Mar 22, 2017 Mar 27, 2017 May 17, 2017 May 16, %

10 Construction Administration s Report Grouped By: BRYCE HOSPITAL CONVERSION OF CCTV PIR# BRYCE HOSPITAL CONVERSION OF CCTV $583, BRYCE HOSPITAL CONVERSION OF C CONSTRUCTION D. MCDANIEL CINDY FOWLER UA PLANNING / / $583,985 IN Jul 10, 2017 Dec 6, 2017 Apr 15, %

11 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: BRYCE HOSPITAL WATTSTOPPER INTEGRATIONS PIR# BRYCE HOSPITAL WATTSTOPPER INTEGRATIONS $23, BRYCE HOSPITAL WATTSTOPPER INT CONSTRUCTION D. MCDANIEL SHERELL HARRISO / / $23,500 Nov 14, 2017 Jan 18, % Grouped By: BRYCE LAWN 508 PIR# BRYCE LAWN 508 $207, BRYCE LAWN 508 DESIGN S. WEBSTER TBD KIMBERLY A LEWIS WARD SCOTT ARCHITECTURE / / $207,000 IN Apr 26, 2018 May 7, 2018 Jul 31, % Grouped By: BRYCE LAWN 511 PIR# BRYCE LAWN 511 $78, BRYCE LAWN 511 DESIGN S. WEBSTER SHERELL HARRISO WARD SCOTT ARCHITECTURE / / $78,000 IN Apr 26, 2018 May 7, 2018 Jul 31, % Grouped By: BRYCE LAWN 607 PIR# BRYCE LAWN 607 $78, BRYCE LAWN 607 DESIGN S. WEBSTER SHERELL HARRISO WARD SCOTT ARCHITECTURE / / $78,000 Apr 26, 2018 Grouped By: BRYCE RK FOOD SERVICE PIR# BRYCE RK FOOD SERVICE $7,430, BRYCE RK FOOD SERVICE DESIGN B. COOK JON CHESNUT ELSIE SMITH MARY KRYN H GOODWYN, MILLS AND WOOD, $7,430,000 IN Feb 10, 2016 Sep 7, 2017 Nov 6, 2017 Sep 7, % Grouped By: BUILDING 500 BRYCE LAWN DRIVE PIR# BUILDING 384 AT 500 BRYCE LAWN DRIVE $207, BUILDING 500 BRYCE LAWN DR DESIGN S. WEBSTER TBD KIMBERLY A LEWIS WARD SCOTT ARCHITECTURE / / $207,000 IN Apr 26, 2018 May 7, 2018 Jul 31, %

12 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: BUSINESS ACTIVITIES RENOVATION-RTLOW MPUS BUSINESS ACTIVITIES RENOVATION-RTLOW MPUS $3,069, BUSINESS ACTIVITIES RENOVATION- CONSTRUCTION C. MCKINNEY KELTON KITE ELSIE SMITH JESSI OWENS WARD SCOTT ARCHITECTURE / / $3,069,406 IN Oct 16, 2014 Aug 18, 2015 Aug 28, 2015 Dec 1, 2016 Dec 1, 2016 Dec 1, % Grouped By: Bama Bound 2018 Directional Signage PIR# Bama Bound 2018 Directional Signage $6, Bama Bound 2018 Directional Signage OPEN C. ELLIOTT KIMBERLY A LEWIS / / $6,000 Grouped By: Barnwell Hall Renovation PIR# Barnwell Hall Renovation $11,153, Barnwell Hall Renovation ON HOLD S. WEBSTER SHERELL HARRISO GOODWYN, MILLS AND WOOD, $11,153,998 IN Apr 14, % Grouped By: Bevill Energy Building Fire Alarm Upgrade PIR# Bevill Energy Building Fire Alarm Upgrade $100, Bevill Energy Building Fire Alarm Upgrad DESIGN C. PHILLIPS BILLY WILKINS DEMON TRICK / / SIMPLEX GRINNEL $100,000 IN Grouped By: Biology Building New Data Closet PIR# Biology Building New Data Closet $107, Biology Building New Data Closet CLOSE-OUT C. PHILLIPS KIMBERLY A LEWIS / / $107,931 IN Aug 8, 2017 Jan 24, % Grouped By: Blount Living Learning Fire Alarm Network Connectivity PIR# Blount Living Learning Fire Alarm Network Connectivity $36, Blount Living Learning Fire Alarm Netwo CONSTRUCTION C. PHILLIPS BILLY WILKINS KIMBERLY A LEWIS N/A UA PLANNING / / SIMPLEX GRINN $36,425 IN May 1, %

13 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Bruno Business Library Fire Alarm System Upgrade PIR# Bruno Business Library Fire Alarm System Upgrade $70, Bruno Business Library Fire Alarm Syste CLOSE-OUT J. Whaley BILLY WILKINS KIMBERLY A LEWIS / / SIMPLEX GRINNEL $70,000 IN 95% Grouped By: Bryant Conference Center Birmingham-Central Room PIR# Bryant Conference Center Birmingham-Central Room $480, Bryant Conference Center Birmingham-C OPEN D. Jones DEMON TRICK / / $480,000 Grouped By: Bryant Conference Center Miscellaneous Renovation PIR# Bryant Conference Center Miscellaneous Renovation $43, Bryant Conference Center Miscellaneous OPEN D. RYE DEMON TRICK / / $43,703 Grouped By: Bryant Conference Center Sellers Audirium PIR# Bryant Conference Center Sellers Audirium $725, Bryant Conference Center Sellers Audi OPEN D. RYE DEMON TRICK / / $725,000 Grouped By: Bryant Denny Stadium Domestic Water Study PIR# Bryant Denny Stadium Domestic Water Study $1,285, Bryant Denny Stadium Domestic Water S CLOSE-OUT D. WELCH DEMON TRICK / / $1,285,582 Sep 23, 2017 Sep 26, 2017 Grouped By: Bryant Denny Stadium East Skybox HVAC Renovation- Phase III PIR# Bryant Denny Stadium East Skybox HVAC Renovation- Phase III $350, Bryant Denny Stadium East Skybox HVA CONSTRUCTION D. COLLINS JIMMY JENKINS KIMBERLY A LEWIS SMITH, STEGALL & ASSOCIATES / LETICS $350,000 IN Apr 5, 2018 Apr 23, 2018 Jul 31, 2018

14 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Bryant Denny Stadium East Tower Elevars Renovation PIR# Bryant Denny Stadium East Tower Elevars Renovation $900, Bryant Denny Stadium East Tower Eleva CONSTRUCTION J. Whaley BILLY WILKINS SHERELL HARRISO BORDEN MORRIS GARNER CONSU $900,000 IN Jul 11, 2017 Aug 10, % Grouped By: Bryant Denny Stadium Verizon DAS Head End Room PIR# Bryant Denny Stadium Verizon DAS Head End Room $25, Bryant Denny Stadium Verizon DAS Hea CONSTRUCTION D. COLLINS DEMON TRICK DAVIS ARCHITECTS, INC. / / $25,000 Grouped By: Bryant Museum Exhibit Programming Study PIR# Bryant Museum Exhibit Programming Study $10, Bryant Museum Exhibit Programming Stu OPEN D. RYE KIMBERLY A LEWIS / / $10,000 Grouped By: Bryce Campus Utility Enhancements PIR#UTL Bryce Campus Utility Enhancements $567,760 UTL Bryce Campus Utility Enhancements CLOSE-OUT M. ERNST RAY BOSTICK DEMON TRICK N/A MCGIFFERT & ASSOCIATES, LLC / $567,760 IN Jul 14, 2017 Sep 7, 2017 Sep 8, 2017 Nov 2, 2017 Nov 2, 2017 Nov 2, % Grouped By: Bryce Hospital 2nd Floor Water Damage Repair PIR# Bryce Hospital 2nd Floor Water Damage Repair $180, Bryce Hospital 2nd Floor Water Damage CONSTRUCTION D. MCDANIEL KIMBERLY A LEWIS / / $180,000 Jan 29, % Grouped By: Bryce Hospital Sentinel Reduction Door PIR# Bryce Hospital Sentinel Reduction Door $125, Bryce Hospital Sentinel Reduction Door CONSTRUCTION D. MCDANIEL DEMON TRICK UA PLANNING / / $125,000 Nov 14, 2017 Feb 13, %

15 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Bryce Hospital Shower Pan Replacements PIR# Bryce Hospital Shower Pan Replacements $100, Bryce Hospital Shower Pan Replacemen CONSTRUCTION D. MCDANIEL KIMBERLY A LEWIS / / $100,000 Feb 7, % Grouped By: Bryce Lawn 422 PIR# Bryce Lawn 422 $168, Bryce Lawn 422 DESIGN S. WEBSTER KIMBERLY A LEWIS WARD SCOTT ARCHITECTURE / / $168,000 IN Apr 26, % Grouped By: Bryce Lawn 423 PIR# Bryce Lawn 423 $207, Bryce Lawn 423 DESIGN S. WEBSTER KIMBERLY A LEWIS WARD SCOTT ARCHITECTURE / / $207,000 IN Apr 26, % Grouped By: Bryce Lawn 601 PIR# Bryce Lawn 601 $78, Bryce Lawn 601 DESIGN S. WEBSTER SHERELL HARRISO WARD SCOTT ARCHITECTURE / / $78,000 IN Apr 26, 2018 May 7, 2018 Jul 31, % Grouped By: MPUS - VERIZON WIRELESS MPUS BUILDOUT TO IMPROVE MOBILE WIRELESS COVERAGE PIR# MPUS - VERIZON WIRELESS MPUS BUILDOUT TO IMPROVE MOBILE WIRELESS COVERAGE $479, MPUS - VERIZON WIRELESS MP CONSTRUCTION D. COLLINS MIKE PITTS CINDY FOWLER N/A / / TCO ELECTRIL CONTRAC PUBLIC SAFETY $479,956 IN Feb 24, 2016 Sep 15, 2016 Sep 15, 2017 Grouped By: MPUS DRIVE UAPD RADIO SYSTEM TOWER PIR# MPUS DRIVE UAPD RADIO SYSTEM TOWER $6,250, MPUS DRIVE CLOSE-OUT D. COLLINS KELTON KITE DEMON TRICK / / MIDSOUTH BONDS $6,250,000 IN Jul 17, 2014 Jul 30, 2014 Oct 30, 2014 Apr 29, %

16 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: MPUS DRIVE MASTER PLAN PIR#PLN MPUS DRIVE MASTER PLAN $123,000 PLN MPUS DRIVE MASTER PLAN PROGRAMMING D. WELCH ELSIE SMITH / / $123,000 Grouped By: MPUS MASTER PLAN PIR# MPUS MASTER PLAN $402, MPUS MASTER PLAN ON HOLD M. SKINNER CINDY FOWLER / / $402,628 Grouped By: PITAL HALL COLLABORATIVE COMM ENGAGEMENT AREA RENV PIR# PITAL HALL COLLABORATIVE COMM ENGAGEMENT AREA RENV $749, PITAL HALL COLLABORATIVE COM DESIGN C. PHILLIPS ELSIE SMITH TRACEY CREEK STUDIO 2H DESIGN, LLC / / ADEMIC AFFAIRS $749,000 IN Sep 8, % Grouped By: PITAL HALL FIRE ALARM NEL UPGRADE PIR# PITAL HALL FIRE ALARM NEL UPGRADE $339, PITAL HALL FIRE ALARM NEL UP CONSTRUCTION C. PHILLIPS BILLY WILKINS KIMBERLY A LEWIS N/A HAYS CHEATWOOD CONSULTING 31M DEFERRED MAIN $339,850 IN Oct 15, 2015 Jan 11, 2018 Jan 15, 2018 Jun 29, % Grouped By: PITAL HALL MODIFITION FOR ADDITIONAL OFFICES PIR# PITAL HALL MODIFITIONS FOR ADDITIONAL OFFICES $250, PITAL HALL MODIFITION FOR AD DESIGN C. PHILLIPS KIMBERLY A LEWIS TRACEY CREEK TRI ARCHITECTURE / / $250,000 IN Jul 21, 2017 Feb 27, % Grouped By: PSTONE COLLEGE OF NURSING ADDITION PIR# PSTONE COLLEGE OF NURSING ADDITION $250, PSTONE COLLEGE OF NURSING A ON HOLD S. WEBSTER TBD ELSIE SMITH TBD TURNER BATSON ARCHITECTS / $250,000 IN

17 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: PSTONE RKING DECK AND PEDESTRIAN BRIDGE PIR# PSTONE RKING DECK AND PEDESTRIAN BRIDGE $22,039, PSTONE RKING DECK AND PED ON HOLD D. Jones JON CHESNUT KIMBERLY A LEWIS TRACEY CREEK EVAN TERRY ASSOCIATES, P.C. / BONDS $22,039,350 Jun 30, 2019 Grouped By: PSTONE VILLAGE ARTMENT 209 PIR# PSTONE VILLAGE ARTMENT 209 $29, PSTONE VILLAGE ARTMENT 209 CONSTRUCTION A. FISHER KELTON KITE SHERELL HARRISO / / $29,825 Grouped By: PSTONE VILLAGE ARTMENT 213 PIR# PSTONE VILLAGE ARTMENT 213 $29, PSTONE VILLAGE ARTMENT 213 CONSTRUCTION A. FISHER KELTON KITE SHERELL HARRISO / / $29,325 Grouped By: PSTONE VILLAGE ARTMENT 307 PIR# PSTONE VILLAGE ARTMENT 307 $35, PSTONE VILLAGE ARTMENT 307 CLOSE-OUT A. FISHER KELTON KITE SHERELL HARRISO / / $35,490 Grouped By: PSTONE VILLAGE ARTMENT 324 PIR# PSTONE VILLAGE ARTMENT 324 $34, PSTONE VILLAGE ARTMENT 324 CLOSE-OUT A. FISHER KELTON KITE SHERELL HARRISO / / $34,490 95% Grouped By: PSTONE VILLAGE ARTMENT 333 PIR# PSTONE VILLAGE ARTMENT 333 $35, PSTONE VILLAGE ARTMENT 333 CONSTRUCTION A. FISHER KELTON KITE SHERELL HARRISO / / $35,490

18 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: PSTONE VILLAGE ARTMENT 403 PIR# PSTONE VILLAGE ARTMENT 403 $28, PSTONE VILLAGE ARTMENT 403 CLOSE-OUT A. FISHER KELTON KITE SHERELL HARRISO / / $28,825 95% Grouped By: PSTONE VILLAGE FRONT ENTRY/FOYER IMPROVEMENT PROJECT PIR# PSTONE VILLAGE FRONT ENTRY/FOYER IMPROVEMENT PROJECT $28, PSTONE VILLAGE FRONT ENTRY/F DESIGN A. FISHER SHERELL HARRISO / / $28,800 Grouped By: PSTONE VILLAGE GARDEN HOME 677 PIR# PSTONE VILLAGE GARDEN HOME 677 $35, PSTONE VILLAGE GARDEN HOME CLOSE-OUT A. FISHER KELTON KITE SHERELL HARRISO / / $35,490 IN 95% Grouped By: PSTONE VILLAGE MISCELLANEOUS RENOVATION OF S, KITCHEN, AND PRIVATE DINING PIR# PSTONE VILLAGE MISCELLANEOUS RENOVATION OF S, KITCHEN, AND PRIVATE DINING $111, PSTONE VILLAGE MISCELLANEOU CLOSE-OUT A. FISHER KELTON KITE DEMON TRICK JESSI OWENS UA PLANNING / / $111,501 IN Feb 22, % Grouped By: CDRC Honor Wall Renovation PIR# CDRC Honor Wall Renovation $15, CDRC Honor Wall Renovation OPEN D. COLLINS DEMON TRICK UA PLANNING / / $15,000 IN Grouped By: CENTRAL MPUS THERMAL ENERGY CONNECTIONS PIR#UTL CENTRAL MPUS THERMAL ENERGY CONNTECTIONS $20,974,000 UTL CENTRAL MPUS THERMAL ENERG CONSTRUCTION S. MERDO RAY BOSTICK CINDY FOWLER N/A / / BRADLEY PLUMBING BONDS $20,974,000 IN Jun 16, 2016 Apr 1, 2017 May 2, 2017 Mar 20, 2018 Mar 21, 2018 Mar 21, %

19 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: CHILD DEVELOPMENT CENTER FIRE ALARM SYSTEM UPGRADE PIR# CHILD DEVELOPMENT CENTER FIRE ALARM SYSTEM UPGRADE $21, CHILD DEVELOPMENT CENTER FIRE CLOSE-OUT C. PHILLIPS BILLY WILKINS SHERELL HARRISO UA PLANNING / / SIMPLEX GRINN $21,200 IN 100% Grouped By: CLARK HALL RENOVATION OF REAR ENTRANCE PIR# CLARK HALL RENOVATION OF REAR ENTRANCE $327, CLARK HALL RENOVATION OF REAR CLOSE-OUT A. FISHER JON CHESNUT KIMBERLY A LEWIS TBD BIRCHFIELD PENUEL & ASSOC AIA ARTS & SCIENCES $327,831 IN Jul 13, 2015 Nov 15, 2016 Nov 28, 2016 Jan 31, 2017 Jun 28, % Grouped By: COLONIAL DR UTILITIES & INFRASTRUCTURE & DEMO PHASE 2 PIR#UTL COLONIAL DR UTILITIES & INFRASTRUCTURE & DEMO PHASE 2 $1,727,331 UTL COLONIAL DR UTILITIES & INFRASTR CLOSE-OUT S. WEBSTER LEE ORR KIMBERLY A LEWIS N/A / / PRICE CONSTRUCTION CO. IN PLANT FUNDS $1,727,331 IN May 2, 2016 Dec 6, 2016 Dec 12, 2016 Apr 15, 2017 Jul 1, % Grouped By: COLONIAL DR. WATER LINE IMPROVEMENTS PIR#UTL COLONIAL DR. WATER LINE IMPROVEMENTS $664,817 UTL COLONIAL DR. WATER LINE IMPROVE CLOSE-OUT S. WEBSTER RAY BOSTICK CINDY FOWLER N/A MCGIFFERT & ASSOCIATES, LLC / PLANT FUNDS $664,817 IN May 22, 2017 May 30, 2017 Aug 6, 2017 Aug 8, 2017 Aug 8, % Grouped By: COTTAGE 7 RENOVATION FOR EHS PIR# COTTAGE 7 RENOVATION FOR EHS $2,280, COTTAGE 7 RENOVATION FOR EHS PROGRAMMING J. Buck KELTON KITE SHERELL HARRISO STUDIO 2H DESIGN, LLC / / TBD $2,280,491 IN Jun 7, 2018

20 Construction Administration s Report Grouped By: COTTAGE 9 RENOVATION FOR TEMPORARY OCCUTION BY CONSTRUCTION ADMINISTRATION PIR# COTTAGE 9 RENOVATION FOR TEMPORARY OCCUTOIN BY CONSTRUCTION ADMINISTRATION $304, COTTAGE 9 RENOVATION FOR TEMP CONSTRUCTION C. MCKINNEY KELTON KITE CINDY FOWLER SARAH LINDSAY K STUDIO2HDESIGN / / $304,102 IN Mar 14, 2017 Apr 28, 2017 Apr 26, 2017 Apr 26, %

21 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: CYBER HALL 3RD FLOOR FF&E PIR# CYBER HALL 3RD FLOOR FF&E $1,104, CYBER HALL 3RD FLOOR FF&E CONSTRUCTION M. ERNST DAN BURK CINDY FOWLER JESSI OWENS UA PLANNING / / ENGINEERING $1,104,126 Feb 7, % Grouped By: CYBER HALL RENOVATION OF 3RD FLOOR PIR# CYBER HALL RENOVATION OF 3RD FLOOR $2,800, CYBER HALL RENOVATION OF 3RD F CONSTRUCTION M. ERNST DAN BURK CINDY FOWLER JESSI OWENS WARD SCOTT ARCHITECTURE / / ENGINEERING $2,800,000 IN Feb 7, 2017 Jun 29, 2017 Jul 17, 2017 Nov 17, % Grouped By: Campus-wide Install Power/ Fiber for AT&T Small Cell Sites PIR# Campus-wide Install Power/Fiber for AT&T Small Cell Sites $875, Campus-wide Install Power/Fiber for AT& CONSTRUCTION L. Lucas RAY BOSTICK DEMON TRICK N/A BORDEN MORRIS GARNER CONSU $875,000 IN Aug 1, 2017 Dec 14, 2017 Dec 19, 2017 May 23, % Grouped By: Capital Hall 1st Floor NE Wing- Additional Testing Laboraries PIR# Capital Hall 1st Floor NE Wing- Additional Testing Laboraries $150, Capital Hall 1st Floor NE Wing- Additiona DESIGN C. PHILLIPS KIMBERLY A LEWIS / / $150,000 IN Feb 27, 2018 Grouped By: Capital Hall Elevar Upgrades PIR# Capital Hall Elevar Upgrades $225, Capital Hall Elevar Upgrades CONSTRUCTION C. PHILLIPS DEMON TRICK TRACEY CREEK / / DIVERSIFIED ELEVATOR $225,000 IN Aug 1, 2017 Sep 20, 2017 Jan 31, % Grouped By: Capsne Village - Paint Light Poles, Sign Posts & Shutters PIR# Capsne Village - Paint Light Poles, Sign Posts & Shutters $30, Capsne Village - Paint Light Poles, Sig OPEN A. FISHER KELTON KITE DEMON TRICK / / $30,300

22 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Capsne Village Apt 108 PIR# Capsne Village Apt 108 $32, Capsne Village Apt 108 CLOSE-OUT A. FISHER KIMBERLY A LEWIS / / $32,724 Grouped By: Capsne Village Apt 308 PIR# Capsne Village Apt 308 $29, Capsne Village Apt 308 CONSTRUCTION A. FISHER KELTON KITE KIMBERLY A LEWIS / / $29,825 Grouped By: Capsne Village Apt 313 PIR# Capsne Village Apt 313 $31, Capsne Village Apt 313 CLOSE-OUT A. FISHER KELTON KITE KIMBERLY A LEWIS / / $31,791 Grouped By: Capsne Village Apt. 112 PIR# Capsne Village Apt. 112 $29, Capsne Village Apt. 112 CONSTRUCTION A. FISHER KELTON KITE DEMON TRICK / / $29, % Grouped By: Capsne Village Fire Alarm Cellular Dialer Installation PIR# Capsne Village Fire Alarm Cellular Dialer Installation $1, Capsne Village Fire Alarm Cellular Dia CLOSE-OUT A. FISHER KELTON KITE KIMBERLY A LEWIS / / $1, % Grouped By: Capsne Village Garden Home 615 PIR# Capsne Village Garden Home 615 $32, Capsne Village Garden Home 615 CLOSE-OUT A. FISHER KELTON KITE DEMON TRICK / / $32,224 95%

23 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Carmichael Hall Fire Alarm System Upgrade PIR# Carmichael Hall Fire Alarm System Upgrade $70, Carmichael Hall Fire Alarm System Upgr CONSTRUCTION C. PHILLIPS BILLY WILKINS DEMON TRICK N/A UA PLANNING / / SIMPLEX GRINN $70,000 IN 40% Grouped By: Civil Issue in front of Clark, Garland & Manly PIR#LAN Civil Issue in front of Clark, Garland & Manly $300,000 LAN Civil Issue in front of Clark, Garland & Ma CONSTRUCTION D. WELCH KIMBERLY A LEWIS / / $300,000 Grouped By: Cottage 1 - Delivery Services Renovation PIR# Cottage 1 - Delivery Services Renovation $2,390, Cottage 1 - Delivery Services Re PROGRAMMING C. MCKINNEY SHERELL HARRISO / / $2,390,085 Grouped By: Cottage 5 Renovation for OIT PIR# Cottage 5 Renovation for OIT $1,361, Cottage 5 Renovation for OIT CONSTRUCTION N J. Buck KELTON KITE DEMON TRICK TRACEY CREEK STUDIO2HDESIGN / / SNOW-BLAK FINANCIAL AFFAIRS $1,361,073 IN Oct 24, 2016 Nov 30, 2017 Apr 30, 2018 Apr 6, % Grouped By: Culverhouse College of Business Campus Utilization & Master Planning PIR#PLN Culverhouse College of Business Campus Utilization & Master Planning $275,000 PLN Culverhouse College of Business Campu PROGRAMMING S. COLEMAN N/A DEMON TRICK MARY KRYN H WILLAMS BLACKSTOCK / / C&BA $275,000 Feb 1, 2018 Grouped By: Culverhouse New Classroom & Collaboration Building PIR# Culverhouse New Classroom & Collaboration Building $60,000, Culverhouse New Classroom & Collabor DESIGN N S. COLEMAN TBD KIMBERLY A LEWISMARY KRYN H WILLAMS BLACKSTOCK / / C&BA $60,000,000 Nov 1, 2016

24 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Cyber Hall Wings Year Two s PIR# Cyber Hall Wings Year Two s $19, Cyber Hall Wings Year Two s CONSTRUCTION M. ERNST KIMBERLY A LEWIS JESSI OWENS / / $19,920 50% Grouped By: DELTA ZETA NEW CHAPTER HOUSE PIR# DELTA ZETA NEW CHAPTER HOUSE PIR# $17,000, DELTA ZETA NEW CHAPTER HOUSE CONSTRUCTION B. YOUNGBLOOD LEE ORR KIMBERLY A LEWIS N/A COLE AND COLE ARCHITECTS INC UA GREEK LOANS $17,000,000 IN Sep 1, 2015 Mar 7, 2017 Apr 10, 2017 Jul 15, % Grouped By: DESIGN & ENGINEERING BUILDING - COTTAGE 4 PIR# DESIGN & ENGINEERING BUILDING - COTTAGE 4 $2,439, DESIGN & ENGINEERING BUILDING - PROGRAMMING N C. MCKINNEY KELTON KITE ELSIE SMITH TBD / / FINANCIAL AFFAIRS $2,439,171 Jan 20, % Grouped By: DESIGN SERVICES FOR 14TH ST DEMO & APCO CONVERSION PIR# DESIGN SERVICES FOR 14TH ST DEMO & APCO CONVERSION $100, DESIGN SERVICES FOR 14TH ST DEM DESIGN D. WELCH SHERELL HARRISO / / $100,000 Grouped By: DEVELOPMENT OF A SHOOTING SPORTS FACILITY PIR# DEVELOPMENT OF A SHOOTING SPORTS FACILITY $16, DEVELOPMENT OF A SHOOTING SPO DESIGN S. MERDO CINDY FOWLER N/A / / ARTS & SCIENCES $16,500 IN May 23, % Grouped By: DOSTER HALL WINDOW REIRS AND FAN COIL REPLACEMENT PIR# DOSTER HALL WINDOW REIRS AND FAN COIL REPLACEMENT PIR# $900, DOSTER HALL WINDOW REIRS AN CLOSE-OUT D. COLLINS KIMBERLY A LEWIS WILLAMS BLACKSTOCK / / MBE $900,000 IN May 4, 2017 May 5, 2017 Aug 11, 2017 Aug 10, 2017 Aug 10, %

25 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Doster Hall Environmental Chamber 002A PIR# Doster Hall Environmental Chamber 002A $56, Doster Hall Environmental Chamber 002 CONSTRUCTION D. COLLINS KIMBERLY A LEWIS UA PLANNING / / $56,234 IN Grouped By: Doster Hall Fire Alarm Panel Fiber Networking PIR# Doster Hall Fire Alarm Panel Fiber Networking $26, Doster Hall Fire Alarm Panel Fiber Netwo CONSTRUCTION C. PHILLIPS BILLY WILKINS DEMON TRICK / / SIMPLEX GRINNEL $26,000 IN Grouped By: Establish Fire Alarm Moniring Fiber Loop 5 PIR# Establish Fire Alarm Moniring Fiber Loop 5 $75, Establish Fire Alarm Moniring Fiber Loo CLOSE-OUT J. Collins BILLY WILKINS KIMBERLY A LEWIS N/A UA PLANNING / / SIMPLEX GRINN $75,000 IN Jan 5, % Grouped By: FERGUSON CENTER PURCHASE & INSTALL GRAPHICS PKG PIR# FERGUSON CENTER PURCHASE & INSTALL GRAPHICS PKG $113, FERGUSON CENTER PURCHASE & IN CONSTRUCTION J. Whaley N/A ELSIE SMITH MARY KRYN H / / $113,868 IN Jul 15, % Grouped By: FERGUSON RKING DECK COATING PIR# FERGUSON RKING DECK COATING $629, FERGUSON RKING DECK COATING CONSTRUCTION D. WELCH SHERELL HARRISO / / $629,505 Jun 15, 2018 Grouped By: FRANK MOODY MUSIC BUILDING ADDITION AND EXTERIOR RENOVATION PIR# FRANK MOODY MUSIC BUILDING ADDITION AND EXTERIOR RENOVATION $14,268, FRANK MOODY MUSIC BUILDING ADD CONSTRUCTION D. RYE JON CHESNUT CINDY FOWLER LEAH SHEPHERD TURNER BATSON ARCHITECTS / BONDS $14,268,179 IN Nov 1, 2014 Mar 23, 2017 May 2, 2017 Jan 1, %

26 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: FRESH FOOD 2ND FLOOR ENTERPRISE OFFICE FITOUT PIR# FRESH FOOD 2ND FLOOR ENTERPRISE OFFICE FITOUT` $749, FRESH FOOD 2ND FLOOR ENTERPRI CLOSE-OUT A. FISHER JENNIFER WICHITN KIMBERLY A LEWISMARY KRYN H CMH ARCHITECTS / / $749,819 IN Nov 10, 2015 Feb 23, 2017 Feb 27, 2017 Jun 12, 2017 Jun 26, % Grouped By: FRESH FOOD CO EMERGENCY GREASE DUCT REPLACEMENT PIR# FRESH FOOD CO EMERGENCY GREASE DUCT REPLACEMENT $748, FRESH FOOD CO EMERGENCY GREA OPEN B. COOK ELSIE SMITH / / $748,636 IN Jul 23, 2017 Jul 28, 2017 Grouped By: FRESHMAN RESIDENCE HALL C STORE FIT OUT PIR# FRESHMAN RESIDENCE HALL C STORE FIT OUT $579, FRESHMAN RESIDENCE HALL C STOR OPEN S. WALKER SHERELL HARRISO / / $579,928 Grouped By: FRESHMAN RESIDENCE HALL FURITURE CKAGE PIR# FRESHMAN RESIDENCE HALL FURITURE CKAGE $1,703, FRESHMAN RESIDENCE HALL FURITU OPEN S. WALKER SHERELL HARRISO / / $1,703,317 Grouped By: FRESHMAN RESIDENTIAL HOUSING PIR# FRESHMAN RESIDENTIAL HOUSING $53,243, FRESHMAN RESIDENTIAL HOUSING CONSTRUCTION S. WALKER JON CHESNUT ELSIE SMITH WILLAMS BLACKSTOCK / / HRC $53,243,501 IN Jun 16, 2016 May 25, 2017 Jun 15, 2018 Jun 15, % Grouped By: FY17 MPUS SMALL SIGNAGE PROJECTS PIR# FY17 MPUS SMALL SIGNAGE PROJECTS $5, FY17 MPUS SMALL SIGNAGE PROJ CONSTRUCTION M. GALLOWAY ELSIE SMITH / / $5,000

27 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: FY17 Campus Traffic Consulting PIR# FY17 Campus Traffic Consulting $5, FY17 Campus Traffic Consulting CONSTRUCTION M. GALLOWAY DEMON TRICK / / $5,000 Grouped By: FY17 UA GOLF COURSE MASTER PLAN PIR# FY17 UA GOLF COURSE MASTER PLAN $5, FY17 UA GOLF COURSE MASTER PLA CONSTRUCTION M. GALLOWAY CINDY FOWLER / / $5,000 Grouped By: FY18 ANNUAL HANDIP ACCESSIBILITY UPGRADES PIR# FY18 ANNUAL HANDIP ACCESSIBILITY UPGRADES PIR# $1,014, FY18 ANNUAL HANDIP ACCESSIBIL CONSTRUCTION M. GALLOWAY ELSIE SMITH / / $1,014,969 Grouped By: FY18 Annual Campus Life Safety Upgrades PIR# FY18 Annual Campus Life Safety Upgrades $73, FY18 Annual Campus Life Safety Upgrad CONSTRUCTION M. GALLOWAY DEMON TRICK / / $73,423 Grouped By: FY18 Annual Central Campus Sanitary Sewer Resration PIR#UTL FY18 Annual Central Campus Sanitary Sewer Resration $400,000 UTL FY18 Annual Central Campus Sanitary S OPEN D. WELCH DEMON TRICK / / $400,000 Grouped By: FY18 Campus Wide Street & Parking Lot Repairs PIR#TRN FY18 Campus Wide Street & Parking Lot Repairs $500,000 TRN FY18 Campus Wide Street & Parking Lo DESIGN D. WELCH KIMBERLY A LEWIS / / $500,000

28 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Farrah Hall Restroom Fixture Analysis PIR# Farrah Hall Restroom Fixture Analysis $15, Farrah Hall Restroom Fixture Analysis CLOSE-OUT J. Collins TBD DEMON TRICK N/A EVAN TERRY ASSOCIATES, P.C. / $15,000 IN Aug 29, 2017 Oct 16, 2017 Nov 16, 2017 Nov 16, % Grouped By: GORGAS LIBRARY PROGRAMMING AND SCHEMATIC PLAN DEVELOPMENT FOR RENOVATION PIR# GORGAS LIBRARY PROGRAMMING AND SCHEMATIC PLAN DEVELOPMENT FOR RENOVATION $315, GORGAS LIBRARY PROGRAMMING A DESIGN J. Whaley KELTON KITE CINDY FOWLER N/A SHEPLEY BULFINCH / / LIBRARIES $315,000 IN Aug 1, % Grouped By: GORGAS LIBRARY SLIS 5TH FLOOR RENOVATIONS PIR# GORGAS LIBRARY SLIS 5TH FLOOR RENOVATIONS $577, GORGAS LIBRARY SLIS 5TH FLOOR R CLOSE-OUT J. Whaley KELTON KITE ELSIE SMITH LEAH SHEPHERD UA PLANNING / / FINANCIAL AFFAIRS $577,181 IN Apr 1, 2016 Jul 8, 2016 Jul 13, 2016 Jan 20, 2017 Nov 1, % Grouped By: GORGAS LIBRARY/ RENOVATION OF PUBLIC RESTROOMS/FLOOR 2 PIR# GORGAS LIBRARY/RENOVATION OF PUBLIC RESTROOMS/FLOOR 2 $150, GORGAS LIBRARY/RENOVATION OF P ON HOLD J. Whaley KELTON KITE CINDY FOWLER LEAH SHEPHERD UA PLANNING / / FINANCIAL AFFAIRS $150,000 IN Aug 1, % Grouped By: GRADUATE HALL EXTERIOR STABILIZATION GRADUATE HALL EXTERIOR STABILIZATION $591, GRADUATE HALL EXTERIOR STABILIZ CONSTRUCTION S. MERDO DAN BURK KIMBERLY A LEWIS N/A WILLAMS BLACKSTOCK / / NC MO FINANCIAL AFFAIRS $591,442 IN Aug 8, 2014 Oct 18, 2016 Oct 20, 2016 Mar 9, 2017 Jan 31, 2018 Feb 29, % Grouped By: GREEK HOUSING STUDY PIR#PLN GREEK HOUSING STUDY $83,000 PLN GREEK HOUSING STUDY OPEN T. THORN KIMBERLY A LEWIS / / $83,000

29 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: Garland Hall Fire Alarm System UA Fiber Network PIR# Garland Hall Fire Alarm System UA Fiber Network $20, Garland Hall Fire Alarm System UA Fibe CLOSE-OUT C. PHILLIPS BILLY WILKINS DEMON TRICK N/A UA PLANNING / / SIMPLEX GRINN $20,000 IN May 1, % Grouped By: HANK CRISP INDOOR FACILITY MERA PLATFORMS PIR# HANK CRISP INDOOR FACILITY MERA PLATFORMS $100, HANK CRISP INDOOR FACILITY ME CONSTRUCTION D. COLLINS SHERELL HARRISO N/A N/A / / $100,000 IN Grouped By: HARPER CENTER - JOINT COMMISSIONING PIR# HARPER CENTER - JOINT COMMISSIONING $740, HARPER CENTER - JOINT COMMISSIO CONSTRUCTION D. MCDANIEL KIMBERLY A LEWIS WARD SCOTT ARCHITECTURE / / $740,970 Apr 20, 2017 Nov 20, 2017 Dec 6, 2017 Feb 20, % Grouped By: HARPER CENTER CCTV PIR# HARPER CENTER CCTV $380, HARPER CENTER CCTV CONSTRUCTION D. MCDANIEL SHERELL HARRISO / / $380,000 Nov 21, 2017 Dec 6, 2017 Mar 15, % Grouped By: HARPER CENTER GENERATOR REPLACEMENT PIR# HARPER CENTER GENERATOR REPLACEMENT $790, HARPER CENTER GENERATOR REPL OPEN D. MCDANIEL SHERELL HARRISO / / $790,155 Grouped By: HARRIS HALL CELLULAR MONTIORING OF THE FIRE ALARM NEL PIR# HARRIS HALL CELLULAR MONTIORING OF THE FIRE ALARM NEL $2, HARRIS HALL CELLULAR MONTIORIN CLOSE-OUT J. Collins BILLY WILKINS SHERELL HARRISO N/A UA PLANNING / / SIMPLEX GRINN $2, %

30 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: HM COMER DESIGN AND CONSTRUCTION OF MAJOR BUILDING RENOVATION PIR# HM COMER DESIGN AND CONSTRUCTION OF MAJOR BUILDING RENOVATION $24,400, HM COMER DESIGN AND CONSTRUC CONSTRUCTION D. RYE JON CHESNUT CINDY FOWLER JESSI OWENS KPS GROUP, INC / / BAILEY-HARR BONDS $24,400,000 IN Mar 1, 2016 Apr 6, 2017 Apr 19, 2017 Jun 2, % Grouped By: HR Latham Building Renovation PIR# HR Latham Building Renovation $2,565, HR Latham Building Renovation CONSTRUCTION A. FISHER KELTON KITE DEMON TRICK JESSI OWENS HENDON HUCKESTEIN ARCHITEC $2,565,000 Oct 19, 2017 Nov 6, 2017 May 31, % Grouped By: HUMAN RESOURCES FURNITURE CKAGE PIR# HUMAN RESOURCES FURNITURE CKAGE $513, HUMAN RESOURCES FURNITURE CONSTRUCTION A. FISHER KELTON KITE SHERELL HARRISO JESSI OWENS / / $513, HUMAN RESOURCES FURNITURE CONSTRUCTION A. FISHER KELTON KITE SHERELL HARRISO JESSI OWENS / / $513,000 Grouped By: Hardaway Hall Programming Study PIR# Hardaway Hall Programming Study $50, Hardaway Hall Programming Study ON HOLD J. Whaley DEMON TRICK TRACEY CREEK KPS GROUP, INC / / ENGINEERING $50,000 IN May 1, 2016 Dec 11, % Grouped By: Hillel Student Activity Center Addition PIR# Hillel Student Activity Center Addition $750, Hillel Student Activity Center Addition CONSTRUCTION S. WEBSTER JENNIFER WICHITN KIMBERLY A LEWIS BRITTANY KYLES WARD SCOTT ARCHITECTURE / / PRIVATE FUNDS $750,000 IN Jan 9, 2018 Feb 1, 2018 Jul 31, %

31 Construction Administration s Report Grouped By: JUDY BONNER DR ADDRESS CHANGE PIR# JUDY BONNER DR ADDRESS CHANGE $3, JUDY BONNER DR ADDRESS CHANG CLOSE-OUT S. WEBSTER N/A KIMBERLY A LEWIS N/A UA PLANNING / / $3,739 IN Jul 14, 2017 Jul 14, %

32 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: KAP ALPHA NEW FRATERNITY HOUSE PIR# KAP ALPHA NEW FRATERNITY HOUSE PROGRAMMING $8,417, KAP ALPHA NEW FRATERNITY HOU CLOSE-OUT N B. YOUNGBLOOD JON CHESNUT DEMON TRICK N/A FITTS ARCHITECT / / AMASON AN BONDS $8,417,262 IN Jan 14, 2015 May 14, 2015 Jun 24, 2015 Jul 23, 2016 Aug 10, 2016 Aug 10, % Grouped By: KAP ALPHA THETA NEW HOUSE PIR# KAP ALPHA THETA NEW HOUSE $15,665, KAP ALPHA THETA NEW HOUSE DESIGN S. WEBSTER LEE ORR CINDY FOWLER N/A COLE AND COLE ARCHITECTS INC UA GREEK LOANS $15,665,000 IN Feb 6, 2017 Mar 1, 2018 Apr 29, % Grouped By: LAKESIDE DINING RENOVATION PIR# LAKESIDE DINING RENOVATION PIR# $7,000, LAKESIDE DINING RENOVATION CONSTRUCTION N M. ERNST EARL WYATT KIMBERLY A LEWIS JESSI OWENS CMH ARCHITECTS / / HARRISON AUXILIARY $7,000,000 IN Sep 15, 2017 Feb 8, 2018 Mar 12, 2018 Jul 20, % Grouped By: LAKESIDE WEST CODE REQUIRED LIFE SAFETY UPGRADES PIR# LAKESIDE WEST CODE REQUIRED LIFE SAFETY UPGRADES $27, LAKESIDE WEST CODE REQUIRED LI CONSTRUCTION C. PHILLIPS BILLY WILKINS SHERELL HARRISO N/A UA PLANNING / / SIMPLEX GRINN $27,000 IN 20% Grouped By: LAW SCHOOL ROOFTOP TERRACE PIR# LAW SCHOOL ROOFTOP TERRACE $20, LAW SCHOOL ROOFTOP TERRACE PROGRAMMING S. MERDO SHERELL HARRISO KPS GROUP, INC / / LAW SCHOOL $0 Feb 1, % Grouped By: LAW SCHOOL ROOMS 187/188 PIR# LAW SCHOOL ROOMS 187/188 $175, LAW SCHOOL ROOMS 187/188 CONSTRUCTION S. MERDO SHERELL HARRISO JESSI OWENS UA PLANNING / / BG WATKINS CO LAW SCHOOL $175,000 Feb 1, 2018 Mar 29, 2018 May 7, 2018 Jul 6, %

33 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: LITTLE HALL RENOVATION PIR# LITTLE HALL RENOVATION $9,672, LITTLE HALL RENOVATION CLOSE-OUT C. MCKINNEY MICHAEL SUMNER ELSIE SMITH KRISTIE BROWN YNE DESIGN GROUP / / BAILEY $9,672,172 OVER Sep 25, 2015 Aug 3, 2016 Aug 8, 2016 Jul 25, 2017 Aug 9, % Grouped By: Lakeside East Code Required Life Safety Upgrades PIR# Lakeside East Code Required Life Safety Upgrades $27, Lakeside East Code Required Life Safety CONSTRUCTION C. PHILLIPS BILLY WILKINS DEMON TRICK N/A UA PLANNING / / SIMPLEX GRINN $27,000 IN May 1, % Grouped By: Latham Training Center Furniture Package PIR# Latham Training Center Furniture Package $200, Latham Training Center Furniture Packag CONSTRUCTION A. FISHER KELTON KITE DEMON TRICK JESSI OWENS / / $200,000 Grouped By: Law Center Beam Detecr Replacement PIR# Law Center Beam Detecr Replacement $10, Law Center Beam Detecr Replacemen CONSTRUCTION C. PHILLIPS BILLY WILKINS KIMBERLY A LEWIS / / $10,000 IN Grouped By: MAGNOLIA DRIVE ENHANCEMENTS PIR#TRN MAGNOLIA DRIVE ENHANCEMENTS $50,000 TRN MAGNOLIA DRIVE ENHANCEMENTS ON HOLD S. WEBSTER SHERELL HARRISO / / $50,000 Grouped By: MARTHA RHAM & MARY BURKE CTES PIR# MARTHA RHAM & MARY BURKE CTES $229, MARTHA RHAM & MARY BURKE CT DESIGN S. MERDO RAY BOSTICK ELSIE SMITH N/A / / HRC $229,231 IN Mar 2, %

34 Construction Administration s Report No/ Name Status CO Manager Field Coord. or Bid_ Complete Grouped By: M LAB PROGRAM STUDY PIR#PLN M LAB PROGRAM STUDY $31,000 PLN M LAB PROGRAM STUDY OPEN T. THORN SHERELL HARRISO / / $31,000 Grouped By: MITCHELL JOHNSTON CEMETERY ENCLOSURE PIR# MITCHELL JOHNSTON CEMETERY ENCLOSURE $150, MITCHELL JOHNSTON CEMETERY EN ON HOLD D. COLLINS CINDY FOWLER UA PLANNING / / $150,000 May 23, 2017 Grouped By: MOUNDVILLE RIVER BANK STABILIZATION MOUNDVILLE RIVER BANK STABILIZATION $308, MOUNDVILLE RIVER BANK STABILIZA PROGRAMMING R. POWELL DEMON TRICK / / $308,000 Grouped By: Mail Services Post Move-In Interior Modifications PIR# Mail Services Post Move-In Interior Modifications $236, Mail Services Post Move-In Interior Modi CLOSE-OUT D. RYE JENNIFER WICHITN DEMON TRICK LEAH SHEPHERD DESIGNFORM INCORPORATED / PLANT FUNDS $236,273 IN Nov 2, 2016 Dec 20, 2016 Jan 9, 2017 Feb 27, 2017 Apr 20, % Grouped By: Mal Moore Athletic Facility Recruiting Room Upgrades PIR# Mal Moore Athletic Facility Recruiting Room Upgrades $2,062, Mal Moore Athletic Facility Recruiting Ro CONSTRUCTION J. Whaley MICHAEL YSON DEMON TRICK N/A DAVIS ARCHITECTS, INC. / / HARR $2,062,233 IN Feb 20, 2018 Apr 24, 2018 Jul 18, % Grouped By: Mal Moore Dining Facility Construction PIR# Mal Moore Dining Facility Construction $15,151, Mal Moore Dining Facility Construction CONSTRUCTION J. Whaley MICHAEL YSON DEMON TRICK N/A DAVIS ARCHITECTS, INC. / / HARR BONDS $15,151,451 IN May 1, 2016 Apr 20, 2017 May 15, 2017 May 23, %

Fire Safety Systems of On-Campus Student Housing Facilities Fire Detection

Fire Safety Systems of On-Campus Student Housing Facilities Fire Detection Type of Residential Facility Residential Facility Fire Alarm Monitoring Done On Site (by UAPD) or by Outside Monitoring Company Sprinkler System Standpipe Fire Alarm System 405 Bryce 405 Bryce Lawn 411

More information

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017 Projects Completed FY14, FY15 and FY16 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Akers Hall Renovations

More information

WLAC Facilities Committee Meeting. September 18, 2017

WLAC Facilities Committee Meeting. September 18, 2017 Campus Program Report WLAC Facilities Committee Meeting September 18, 2017 Page 1 DSA approved the plans on May 15, 2017. Notice to Proceed was issued June 8, 2017 and the project remains on schedule for

More information

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015 "The beginning is the most important part of the work." Plato, The Republic MASTER PLAN KICK-OFF Open House #1A, April 28, 2015 YOUR CAMPUS PLANNING TEAM Campus Planners Landscape Architects Urban Designers

More information

CRA Five Year Capital Improvement Plan. September 2, 2015

CRA Five Year Capital Improvement Plan. September 2, 2015 CRA Five Year Capital Improvement Plan September 2, 2015 Downtown CRA Recap Introduction Downtown Capital Improvement Projects: $2.6M available for FY 2016. Includes the recent loan of $2.0M. DOWNTOWN

More information

Re-Engineering Votey Hall:

Re-Engineering Votey Hall: Re-Engineering : Investment of Deferred Maintenance $$ into an aged Engineering Building by: Lynn Wood Retro-Commissioning Engineer Physical Plant Department New Construction: STEM $104M Central Campus

More information

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

30% Design Community Meeting

30% Design Community Meeting Monday, September 17, 2018 30% Design Community Meeting Site 85-E-W-4 Please sign in on your mobile device: http//communitymeeting.ocps.net/ Site 85-E-W-4 Meeting Agenda September 17, 2018, 6:45PM Welcome

More information

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016 Facilities Planning & Construction Report 2016 17 2 nd Quarter Ending December 31, 2016 Overview District SRID Spending (MG100) Summary By College By Site District Program Overview Construction Design

More information

Auburn University Basketball Arena:

Auburn University Basketball Arena: Auburn University Basketball Arena: How Building Data Analytics Achieved Energy and O&M Savings While Improving Comfort and Sustainability Eric Moore, PE, CEM, Auburn University Hadas Webb, CEM, Cimetrics

More information

UNCW CAMPUS MASTER PLAN

UNCW CAMPUS MASTER PLAN UNCW CAMPUS MASTER PLAN JULY 27, 2017 MASTER PLAN FRAMEWORK RECOMMENDATIONS BOARD OF TRUSTEES PRESENTATION UNCW Campus Master Plan Update Board of Trustees Presentation July 27, 2017 The attached Campus

More information

Warren County Schools Plant and Operations

Warren County Schools Plant and Operations Warren County Schools Plant and Operations Buildings/Facilities/Energy Strategic Plan September 28, 2017 (Updated January 18, 2018) Donnie Caldwell; Facilities Director One Team, One Goal, High Levels

More information

WLAC Facilities Committee Meeting. May 15, 2017

WLAC Facilities Committee Meeting. May 15, 2017 Campus Program Report WLAC Facilities Committee Meeting May 15, 2017 Page 1 DSA completed the initial review June 24, 2016 and the Design Builder is proceeding through the back check process. DSA reports

More information

Design Presentation. Chief Operations Officer Willie Burroughs

Design Presentation. Chief Operations Officer Willie Burroughs Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community

More information

Access. Chapel Parking & Entry Loop Snowbridge Square Skier/Visitor Parking. Dumpster Access. 3 Entry Monument Future Chapel Park

Access. Chapel Parking & Entry Loop Snowbridge Square Skier/Visitor Parking. Dumpster Access. 3 Entry Monument Future Chapel Park EXHIBIT 1.1: RENDERED PLAN & CHARACTER Surrounding landscape patterns reach into the site connecting the new hotel to the surrounding resort. Guests are lead towards the hotel entry via the aspen wave

More information

Brown University: Institutional Master Plan Amendment #2. CPC Meeting: December 1, 2009

Brown University: Institutional Master Plan Amendment #2. CPC Meeting: December 1, 2009 Brown University: Institutional Master Plan Amendment #2 CPC Meeting: December 1, 2009 Jewelry District Planning Background Studies Goals Strong transportation links Streets for people Significant open

More information

Achieving a Vision. Master Plan 2009 Belknap Campus August 10 11, UofL Belknap Campus Master Plan Update

Achieving a Vision. Master Plan 2009 Belknap Campus August 10 11, UofL Belknap Campus Master Plan Update Achieving a Vision Master Plan 2009 Belknap Campus August 10 11, 2009 Consultant Team The Campus Studio Ann Arbor Michigan Team Leader Campus Planning Site Design JRA Architects Louisville Kentucky Assistant

More information

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL

More information

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering AGENDA 1. Project Scope & Schedule 2. Steering Committee & Community

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

Fires in On-Campus Housing Facilities 2009

Fires in On-Campus Housing Facilities 2009 s in On-Campus Facilities 2009 Outside 2/9/2009 2/9/2009 2:38pm 4/4/2009 4/4/2009 11:30pm of Time of Cause of Explanation (does not meet criteria for Arson) in Pine Straw Near Trash Receptacle Someone

More information

Ohlone College Measure G Project Scope Revisions

Ohlone College Measure G Project Scope Revisions Scope Revisions Current Title Revised Title Current Scope Revised Scope 6101 Relocated Baseball Field Athletic Fields Create new sustainable baseball field with synthetic turf, bleacher seating and batting

More information

SCHEMATIC DESIGN PRESENTATION

SCHEMATIC DESIGN PRESENTATION August 5, 2014 SCHEMATIC DESIGN PRESENTATION ADDITIONS & RENOVATIONS Greenville Independent School District Acknowledgments 2 Narrative 3-6 Crockett Elementary School 7-12 L.P. Waters Early Childhood Center

More information

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Year Opened 1971 Current Square Footage 175,743 Site Acreage (included in CCHS) 87.22 campus.cherrycreekschools.org $2,441,170

More information

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Longleaf Elementary 1.78

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Cherry Hill Public Schools BUILDING A SOLID FUTURE Cherry Hill Public Schools BUILDING A SOLID FUTURE Who We Are The Cherry Hill School District is the 12 th largest in the state, serving 11,500 students 19 Locations 2 High Schools, 3 Middle Schools, 12

More information

CONSTRUCTION DOCUMENTS CHECKLIST

CONSTRUCTION DOCUMENTS CHECKLIST CONSTRUCTION DOCUMENTS CHECKLIST To be completed by the Designer and reviewed for accuracy by the UNC Planning Manager. for PROJECT: PREPARED BY: date: (name of Designer) phone no. (name of Design firm)

More information

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department SF REC & PARK STANYAN STREET IMPROVEMENT COMMUNITY MEETING #3 THURSDAY, JANUARY 25 TH, 2018 Supervisor London Breed District 5 Project Manager Dan Mauer Recreation and Parks Department Design Team William

More information

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Continuous Commissioning: A Valuable Partner to Retrofit Projects Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

CITIZEN BOND OVERSIGHT COMMITTEE MEETING

CITIZEN BOND OVERSIGHT COMMITTEE MEETING CITIZEN BOND OVERSIGHT COMMITTEE MEETING Date Wednesday November 8, 006 Time 6:30pm 8:30pm Location Lounge Meeting Room 830 N. Capitol Avenue San Jose, CA 9533 EAST SIDE UNION HIGH SCHOOL DISTRICT MEASURE

More information

M A L L R E N O V A T I O N S C H E M A T I C D E S I G N

M A L L R E N O V A T I O N S C H E M A T I C D E S I G N M A L L R E N O V A T I O N S C H E M A T I C D E S I G N M A L L R E N O V A T I O N S C H E M A T I C D E S I G N ( R e v. 0 2 ) Ridgeland, MS August 28, 2017 100% Schematic Design Rev. 02 August 28,

More information

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Williams Elementary 1.40

More information

ESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization

ESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization James Lick Track & Field Improvements Bleacher Replacement Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization Design Mt Pleasant Bleacher Replacement New Performing

More information

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0. Branham High School Budget Remaining 1 906030 Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765,473.00 $635,342.00 $635,342.00 $130,131.00 $0.00 2 970205 Branham Interim Housing - 12 Portable

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT

Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.com Gary Klein, 2012 Efficiency

More information

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE 18422 Bear Valley Road Victorville, CA 92395 Date 25 September 2012 dha Job No. 12155 TABLE OF CONTENTS I. Purpose.... Page 1 II. Existing

More information

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department SF REC & PARK STANYAN STREET IMPROVEMENT PLANNING PRESENTATION WEDNESDAY, OCTOBER 19, 2016 Supervisor London Breed District 5 Project Manager Dan Mauer Recreation and Parks Department Design Team William

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Mobile home became 50 Non-Work

Mobile home became 50 Non-Work 07/10/2017 (died on the 19th Oct) Restaurant Male (56) Work Cleaning in Restaurant. Accessible part became live. 230 V 1st March 2016 Outdoor Farm Male 50 (32) Work Tree-Felling- Wet rope touched OH Line

More information

Comprehensive Inspection Agency (CIA) RESIDENTIAL & COMMERCIAL FEE SCHEDULE

Comprehensive Inspection Agency (CIA) RESIDENTIAL & COMMERCIAL FEE SCHEDULE (CIA) RESIDENTIAL & COMMERCIAL FEE SCHEDULE Phone: 570-573-28251 Fax: 570-385-3010 Page 1 of 7 Phone: 570-573-2825 CIA Fax: 570-385-3010 RESIDENTIAL FEES BUILDING / MISCELLANEOUS Plan Review $ 0 New Construction,

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE Palatine, Illinois Grumman/Butkus Associates Energy Efficiency Consultants and Sustainable Design Engineers 820 Davis Street, Suite 300 Evanston, Illinois

More information

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM NASSAU COMMUNITY COLLEGE Garden City, New York 11530 Capital Committee Meeting January 12, 2016 5:00 PM 1. Review and Approval of December 8, 2015 minutes: Chair: Do I have a motion to approve the minutes

More information

West Hartford Public School District

West Hartford Public School District West Hartford Public School District Agenda Item: Adoption of Capital Improvement Plan for 2018-19 Meeting Date: February 6, 2018 From: Through: Andy Morrow, Assistant Superintendent for Administration

More information

5 Year Capital Improvement Plan Update

5 Year Capital Improvement Plan Update 5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John

More information

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction Summer 2012 Large and small construction projects were completed during the summer 2012 construction season.

More information

Kingsborough Community College

Kingsborough Community College Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2014-15 through FY 2018-19 Project Funding Type Five - Year Request Total ( $ 000 s ) Fire Alarm Rehab

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

EDGEMOOR GRAND OPENING SEPTEMBER 19, 2015

EDGEMOOR GRAND OPENING SEPTEMBER 19, 2015 EDGEMOOR GRAND OPENING SEPTEMBER 19, 2015 WHY WAS THE RENOVATION NECESSARY? Expand the common areas to meet the educational and social needs of today s students Improve the Dining Room and the self-serve

More information

Forest Hills Facilities Plan

Forest Hills Facilities Plan Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation

More information

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

MassDOT Highway ACEC State Markets Conference April 4, Jonathan Gulliver, Highway Administrator

MassDOT Highway ACEC State Markets Conference April 4, Jonathan Gulliver, Highway Administrator MassDOT Highway ACEC State Markets Conference April 4, 2019 Jonathan Gulliver, Highway Administrator About MassDOT Highway 9,561 Lane Miles of Interstate, Numbered Routes, and Toll Roads 60% of all trips

More information

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,

More information

Angela M. Bollinger. architecture & interior design project management facilities management PORTFOLIO

Angela M. Bollinger. architecture & interior design project management facilities management PORTFOLIO Angela M. Bollinger architecture & interior design project management facilities management PORTFOLIO 2016 Outdoor Recreation Sport Complex Create a new Outdoor Recreation Sports Complex for NIU Campus

More information

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015 Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

Capital Improvement Program Monthly Status Report

Capital Improvement Program Monthly Status Report James Lick High School Building 900 Student Center & Quad Modernization Modernization of Building 900 and the adjacent quad will create campus facilities to support James Lick s transformation into a New

More information

MH Non-Residential Permit Fees All Commercial Permit fees require a 3% BBS State Tax and are subject to a plan review and base fee.

MH Non-Residential Permit Fees All Commercial Permit fees require a 3% BBS State Tax and are subject to a plan review and base fee. BUILDING New Building $.45 per sq ft $3,500 Min $.40 per sq ft $1,000 Min $.20 per sq ft $250 Min Demolition $.10 per sq ft $150 Min Accessory Structure (over 200 sq ft) $.40 per sq ft $750 Min Retaining

More information

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 28, 2017

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 28, 2017 Hydraulic Planning Advisory Panel September 28, 2017 Agenda Item 1: Introductions Hydraulic Planning Advisory Panel members Technical Team members 2 Agenda item 2: Public Interaction and Feedback Live

More information

Welcome to the. Open House

Welcome to the. Open House Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 3 Page 1 of 6 I. PURPOSE This policy establishes the steps required for performing the monthly fixed systems inspections and the semi-annual systems testing. Fixed systems include; wet chemical

More information

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls

More information

242 neighborhoods NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR

242 neighborhoods NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR Aerial View of Jordan Avenue Corridor EXISTING CHARACTER The Jordan Avenue Corridor is the portion of North Jordan Avenue that extends north from East Third Street

More information

Spencer J Nickel, RLA, ASLA. Landscape Architecture

Spencer J Nickel, RLA, ASLA. Landscape Architecture Spence is a landscape architect, designer and campus planner whose diverse set of creative and technological skills allow him to bring passion, meaning and artistic sensibility to the design of broad,

More information

Maintenance Road Show

Maintenance Road Show Maintenance Road Show What does it take to maintain a campus? What are the costs? Buildings: 267 Campus Sq. Feet: 3,470,408 GSF Roads: 8.28 miles Walkways: 8.81 miles Exterior lights: 1,000 Exterior stairways:

More information

SCHOOLS + COMMUNITY rehabs, renovations, new construction

SCHOOLS + COMMUNITY rehabs, renovations, new construction OCV HAS A WEALTH OF EXPERIENCE HELPING S AND COMMU- NITY CENTERS BUILD, MODERNIZE + EXPAND THEIR FACILITIES, PROVIDING THE RIGHT ENVIRONMENT FOR GROWTH 2015 SMILOW CLUBHOUSE, MADISON SQUARE BOYS & GIRLS

More information

Measure R Measure R Interest Measure R Refunding

Measure R Measure R Interest Measure R Refunding Measure R Measure R Measure R Interest Measure R Refunding Expenditures thru 6/30/15 15/16 Expenditures thru 6/30/15 15/16 Expenditures thru 6/30/15 15/16 Measure R Project 1 ScienceLocal Portion 770010

More information

NEIGHBORHOOD 8: NORTHEAST AREA

NEIGHBORHOOD 8: NORTHEAST AREA NEIGHBORHOOD 8: NORTHEAST AREA Carillon Tower Aerial View of Northeast Area Northeast Area Map 288 neighborhoods NEIGHBORHOOD 8: NORTHEAST AREA Campus View Apartments Student Recreational Sports Center

More information

NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence

NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence Meeting Minutes April 9, 2014 Lawrence Campus Backfill Subcommittee Updates Martha Leavitt/Dick Goulet Revised goal

More information

Type Permit Description Permits Fee Collected Valuation Units Bldgs

Type Permit Description Permits Fee Collected Valuation Units Bldgs City of Laredo Monthly Report for February Type Permit Description Permits Fee Collected Valuation Units Bldgs HOUSEKEEPING BUILDING 101 *Single Family Detached 95 $ 67,309.50 $ 14,682,859.00 95 102 *Single

More information

campus master plan VIRGINIA STATE UNIVERSITY

campus master plan VIRGINIA STATE UNIVERSITY campus master plan VIRGINIA STATE UNIVERSITY agenda 01 INTRODUCTION & GENERAL OVERVIEW 02 03 04 LAND USE CONCEPT PROGRAM ACCOMMODATION MAXIMIZE EXISTING INFRASTRUCTURE SUMMARY AND NEXT 05 STEPS agenda

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

210 PART 2 LANDSCAPE DESIGN GUIDELINES AND PRECINCT PLANS

210 PART 2 LANDSCAPE DESIGN GUIDELINES AND PRECINCT PLANS Appendix The consolidated development parameters matrix contains key development guidelines for all potential building sites identified in the plan. It prescribes the following: total area of each development

More information

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the

More information

Chabot College: Plan Kickoff and Visioning Session with Student Senate

Chabot College: Plan Kickoff and Visioning Session with Student Senate Facilities Master Plan 2017 Chabot College: Plan Kickoff and Visioning Session with Student Senate February 05, 2018 Key issues, challenges and opportunities: Need more information on the projects that

More information

Academics Efficient use of space will be used to enhance investments in new pedagogies such as active learning classrooms.

Academics Efficient use of space will be used to enhance investments in new pedagogies such as active learning classrooms. Goals and Assumptions Physical Planning Goals and Objectives The guiding principles of this Master Plan were developed in consultation with various constituencies that make up the NMSU community and were

More information

The Ed Roberts Campus Berkeley, CA

The Ed Roberts Campus Berkeley, CA The Ed Roberts Campus Berkeley, CA Anderson Clemenceau Mechanical Option Penn State A.E. Senior Thesis April 14, 2015 Leddy Maytum Stacy Architects, Photo by Tim Griffith ASHRAE Climate Zone 3C 99.6% Heating

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

ACKNOWLEDGEMENTS PROJECT TEAM

ACKNOWLEDGEMENTS PROJECT TEAM ACKNOWLEDGEMENTS La Trobe University proudly acknowledges the Dja Dja Wurrung people, the traditional custodians of the land upon which the Bendigo Flora Hill campus is located. We recognise that Indigenous

More information

State College Area School District Office of Physical Plant Ed Poprik, Director

State College Area School District Office of Physical Plant Ed Poprik, Director State College Area School District Office of Physical Plant Ed Poprik, Director VI-B To: From: RE: Board of School Directors Ed Poprik High School project 30% document review Date: October 13, 2014 Attached

More information

Remodeling Market. Kermit Baker. Remodeling Futures Conference November 9, Harvard University JOINT CENTER FOR HOUSING STUDIES

Remodeling Market. Kermit Baker. Remodeling Futures Conference November 9, Harvard University JOINT CENTER FOR HOUSING STUDIES Remodeling Market Trends and Update Kermit Baker Remodeling Futures Conference November 9, 2010 Remodeling Market Trends 1. Remodeling spending saw significant decline during recession; greatest fall-off

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

CENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment

CENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment CENTRAL GEORGIA TECHNICAL COLLEGE Maintenance, Custodial & Operation Plan Facilities & Equipment Central Georgia Technical College Maintenance, Custodial and Operation Plan In order that Central Georgia

More information

Memorandum CITY OF DALLAS

Memorandum CITY OF DALLAS Memorandum CITY OF DALLAS DATE: October 7, 2016 TO: SUBJECT: Honorable Members of the Public Safety Committee: Adam Medrano (Chair), B. Adam McGough (Vice Chair), Sandy Greyson, Tiffinni A. Young, Jennifer

More information

STUDIO 01 KIRAN RAI PORTFOLIO

STUDIO 01 KIRAN RAI PORTFOLIO STUDIO 01 KIRAN RAI PORTFOLIO table of contents PROJECT 2: PRECEDENT HOUSE PROJECT 3A: SITE ANALYSIS project 3b: EXPERIENTIAL PLATFORM PROJECT 4: HOUSE DESIGN PROJECT 2: precedent house For this project,

More information

COMMUNITY OPEN HOUSE. March 28, 2012

COMMUNITY OPEN HOUSE. March 28, 2012 COMMUNITY OPEN HOUSE March 28, 2012 THE CASE FOR URBAN INVESTMENT One of the best things that cities can do to create jobs especially in the private sector is to improve the quality of life of their inhabitants.

More information

ROAD PAVING VARIOUS LOCATIONS LANE KM

ROAD PAVING VARIOUS LOCATIONS LANE KM ROAD PAVING VARIOUS LOCATIONS 9.317 LANE KM $1,465,200 General: $1,465,200 BASED ON CONDITION ASSESSMENTS OF THE ENTIRE ROAD NETWORK; USING ASSET MANAGEMENT PRINCIPLES, ROADS THAT ARE SUITABLE FOR REPAVING

More information

Agenda Parks Committee CITY of ROELAND PARK Wednesday, February 13th, 2019; 6:00pm-8:00pm Roeland Park City Hall

Agenda Parks Committee CITY of ROELAND PARK Wednesday, February 13th, 2019; 6:00pm-8:00pm Roeland Park City Hall Agenda Parks Committee CITY of ROELAND PARK Wednesday, February 13th, 2019; 6:00pm-8:00pm Roeland Park City Hall Committee: Cory Coe Emily Hage Jared Luebe Jennifer Provyn Kathleen Whitworth Laura Yankoviz

More information

IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report. East Liberty Presbyterian Church East Liberty Presbyterian Church

IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report. East Liberty Presbyterian Church East Liberty Presbyterian Church IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report East Liberty Presbyterian Church 14 009 For: By: East Liberty Presbyterian Church Jeffery Ison, James Construction Date: October

More information

NEIGHBORHOOD 7: FEE LANE AREA. Aerial View of Briscoe and McNutt Dormitories

NEIGHBORHOOD 7: FEE LANE AREA. Aerial View of Briscoe and McNutt Dormitories NEIGHBORHOOD 7: FEE LANE AREA Aerial View of Briscoe and McNutt Dormitories Fee Lane Area Map Briscoe Dormitory 278 neighborhoods NEIGHBORHOOD 7: FEE LANE AREA EXISTING CHARACTER The Fee Lane Area neighborhood

More information

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES for Williams Fieldhouse - Phase I 2007-2009 August 2007 DSF # 07E2H TABLE OF CONTENTS Scope of

More information

Capital Improvement Program Monthly Status Report

Capital Improvement Program Monthly Status Report James Lick High School Building 900 Student Center & Quad Modernization Modernization of Building 900 and the adjacent quad will create campus facilities to support James Lick s transformation into a New

More information

Community Response Buchanan Elementary. December 13, 2016

Community Response Buchanan Elementary. December 13, 2016 Community Response Buchanan Elementary December 13, 2016 SITE EVALUATION FOLLOWING INITIAL COMMUNITY INPUT BUCHANAN ELEMENTARY SCHOOL Design Concepts for the new Buchanan Elementary School have been shared

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

3 CUMULATIVE METHODS AND PROJECTS

3 CUMULATIVE METHODS AND PROJECTS 3 CUMULATIVE METHODS AND PROJECTS 3.1 INTRODUCTION This chapter is an introduction to the cumulative impacts analysis contained within each respective environmental impact category subsection of Chapter

More information