1 Massachusetts Water Resources Authority Upper Neponset Valley Replacement Sewer Project Information

2 Purpose of Project To bring capacity of the 100+ year old sewers up to the level of service the MWRA provides to all member sewer communities.

3 Existing Upper Neponset Valley Sewers

4 Tributary Areas

5 Proposed Sewers

6 MEPA Process Executive Office of Environmental Affairs (EOEA) Environmental Impact Review (EIR) Process begun in 1999 Certificate obtained in 2003 Directed to avoid or minimize impact to trees Concerns voiced to minimize impacts to traffic and avoid detours through residential streets

7 The MWRA should pay particular attention to avoiding or minimizing impacts on mature shade trees and traffic flow along the VFW Parkway during construction Executive Office of Environmental Affairs October 15, 1999

8 Boston Redevelopment Authority September 28, 1999 Every effort must be made to protect and preserve the trees along the Parkway and to prevent damage to these significant arboreal resources and their root systems. Secondly, since the VFW Parkway is a major heavily traveled arterial, we would recommend that, to the extent possible, construction work and lane closures be limited to non-peak traffic hours to reduce disruption and potential congestion. Any detours, especially through residential streets, should be avoided.

9 Tree Protection Over 550 Mature Trees Along VFW Parkway DCR Jurisdiction

10 Proposed Construction - Proposed sewer will be installed toward the center of Northbound travel lanes of the Parkway to avoid damage to trees

11 Traffic Volumes Automatic traffic recorder and manual turning movement counts were performed to determine volumes along the VFW Parkway

12 Traffic Volumes Even distribution of traffic throughout the day

13 Proposed Construction - Typical construction work site will require a 25 foot wide work zone - Proposed Sewer Construction will require both Northbound lanes be closed to traffic

14 Construction Work Zones Police Detail Police Detail CHARLES Temporary Bidirectional Traffic Flow RIVER Temporary Bidirectional Traffic Flow A Merge 2 Lanes to 1 Merge 2 Lanes to 1 Barricades with limited access to local abutters and emergency vehicles Police Controlled Merge 2 Lanes to 1 VA Hospital Pipe Laying Operations A Barricades with limited access to local abutters and emergency vehicles Police Controlled Pipe Laying Operations A Merge 2 Lanes to 1 Traffic lane shift through existing median breaks

15 Traffic Volumes One lane for Northbound traffic and one for Southbound traffic will reduce capacity and cause significant backups for daytime construction

16 Noise Analysis Sound radiates from construction site Sound decreases with distance from construction Circle of sound moves at the rate of construction

17 ST. JOSEPH CEMETERY CITY TOWN OF OF BOSTON DEDHAM DCR BRYAN MEMORIAL RINK CHARLES PARK ROAD WEST ROXBURY HIGH SCHOOL VFW PARKWAY MBTA RAILROAD LINE BAKER STREET LAGRANGE STREET COREY STREET BRIDGE STREET BOSTON TRAILER PARK SPRING STREET SCALE GARDNER STREET VETERANS ADMINSTRATION MEDICAL CENTER 6 DRIVE/RECEIVING PITS 1,910 L.F. OF TUNNELING 14,590 L.F. OF CUT-AND-COVER PIPE Construction Techniques

18 ST. JOSEPH CEMETERY CITY TOWN OF OF BOSTON DEDHAM DCR BRYAN MEMORIAL RINK CHARLES PARK ROAD WEST ROXBURY HIGH SCHOOL VFW PARKWAY MBTA RAILROAD LINE BAKER STREET LAGRANGE STREET COREY STREET BRIDGE STREET BOSTON TRAILER PARK SPRING STREET GARDNER STREET VETERANS ADMINSTRATION MEDICAL CENTER SCALE AREAS OF ROCK Rock Excavations

19 ST. JOSEPH CEMETERY CITY TOWN OF OF BOSTON DEDHAM DCR BRYAN MEMORIAL RINK CHARLES PARK ROAD WEST ROXBURY HIGH SCHOOL VFW PARKWAY MBTA RAILROAD LINE BAKER STREET LAGRANGE STREET COREY STREET BRIDGE STREET BOSTON TRAILER PARK SPRING STREET GARDNER STREET VETERANS ADMINSTRATION MEDICAL CENTER PIPE INSTALLED IN 2005 PIPE INSTALLED IN SCALE PIPE INSTALLED IN 2007 Construction Schedule

Moving The Metro. A special construction update for the metro Omaha area.

Moving The Metro. A special construction update for the metro Omaha area. Moving The Metro A special construction update for the metro Omaha area. ebraska Department of Roads Spring/Summer 2017 I-80 / I-480 / US-75 Interchange The improvements on this project consist of bridge

More information

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING SEPTEMBER 18, 2014 JACKSON MANN COMMUNITY CENTER

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING SEPTEMBER 18, 2014 JACKSON MANN COMMUNITY CENTER I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING SEPTEMBER 18, 2014 JACKSON MANN COMMUNITY CENTER 1 Project Need Deteriorating viaduct requiring replacement All Electronic

More information

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge MEPA Meeting, EEA#14702 Wednesday, March 2, 2011 6:30 PM Dr. Martin Luther King, Jr. School 100 Putnam Avenue, Cambridge, MA Rendering by:

More information

The DCR Neponset River Trail Central Avenue to Mattapan Square

The DCR Neponset River Trail Central Avenue to Mattapan Square The DCR Neponset River Trail Central Avenue to Mattapan Square Photo Public Meeting Tuesday, August 30, 2011 7:30 pm 9:00 pm Foley Senior Residences Dining Room 249 River Street, Mattapan DCR MISSION STATEMENT

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

Canal Road City Limits (East of Van Dyke Ave) to Saal Road Canal Road City Limits (East of Van Dyke Ave) to Saal Road Construction Update 9/14/2018 The ashalt paving on the southside of Canal Road is expected to start Saturday, September 15 (weather permitting)

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in

More information

MARGARITA ROAD. Harveston Community 1,900 homes centered around Harveston Lake DATE STREET ±180,000 CPD. Future French Valley Overpass On/Off Ramp

MARGARITA ROAD. Harveston Community 1,900 homes centered around Harveston Lake DATE STREET ±180,000 CPD. Future French Valley Overpass On/Off Ramp 10.58 NET COMMERCIAL ACRES FOR SALE MURRIETA CREEKSIDE JACKSON AVE & ARBORETUM WAY MURRIETA, CA MURRIETA SPRINGS PLAZA MURRIETA TOWN CENTER SCGA Golf Course FEATURES: Excellent freeway visibility MURRIETA

More information

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project David R. Dysard, AICP District Two Deputy Director Theresa Pollick Public Information

More information

Massachusetts Water Resources Authority. Combined Sewer Overflow Control Plan. Annual Progress Report 2012

Massachusetts Water Resources Authority. Combined Sewer Overflow Control Plan. Annual Progress Report 2012 March 2013 MWRA Board of Directors Richard K. Sullivan, Jr., Chairman John J. Carroll, Vice- Chairman Joseph C. Foti, Secretary Joel A. Barrera Kevin L. Cotter Paul E. Flanagan Michael S. Gove Andrew M.

More information

Proposed Staging Plan For:

Proposed Staging Plan For: 701 Waterford Way, Suite 450, Miami, FL 33126 Suffolk Page 1 Proposed Staging Plan For: St aging Plan Includes: 1.0 Construction Site 2.0 MOT Traffic Circulation Plan 2.1.P1 MOT Road Closures (Alhambra)

More information

Preliminary Construction & Traffic Planning Intro to Shop Local/Shop Eglinton Initiative. June 27, 2012

Preliminary Construction & Traffic Planning Intro to Shop Local/Shop Eglinton Initiative. June 27, 2012 Preliminary Construction & Traffic Planning Intro to Shop Local/Shop Eglinton Initiative June 27, 2012 Agenda Introductions Project Update Preliminary Crosstown Construction & Traffic Planning Overview

More information

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION CHAPTER 1 BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION 1.0 INTRODUCTION The Executive Office of Transportation and Public Works Office of Transportation Planning (Planning) initiated

More information

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012 MARINA BAY NEIGHBORHOOD PRESENTATION City of Richmond Officer Bradley A. Moody Memorial Underpass April 11, 2012 TEAM INTRODUCTIONS Project Oversight and Approval City of Richmond Formally Richmond Community

More information

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier Mission We connect our communities Vision Getting you there better, faster and easier Values Play as a team Think forward Serve with passion 1 Metrolinx overview go transit, up express, presto Serve a

More information

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES 4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES The following sections discuss the impacts associated with environmental resources for the tunneling method Alternatives A and B. The construction

More information

Downtown Redevelopment Project Update

Downtown Redevelopment Project Update Downtown Redevelopment Project Update The redevelopment project will begin the week of September 4, 2017. It is anticipated that construction will be approximately 565 days, depending on weather. 7-6-18

More information

Silver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA

Silver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA Silver Line Gateway Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston Public Informational Meeting Chelsea, MA August 18, 2014 Introduction / Design Process Design Team Joe Pavao,

More information

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016 FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 2 June 16, 2016 ACCESSIBILITY Under the Accessibility Standards 2015 for

More information

Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017

Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017 Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition June 2017 OVERVIEW Today s board action will provide for the construction of improvements to the Wollaston

More information

B. DESCRIPTION OF THE PROPOSED ACTION

B. DESCRIPTION OF THE PROPOSED ACTION Executive Summary A. INTRODUCTION Metro-North Commuter Railroad Company ( Metro-North or the Project Sponsor ) is proposing the construction of a new, expanded parking garage at 50 Haarlem Avenue (formerly

More information

Chesterfield County Project Update

Chesterfield County Project Update Chesterfield County Project Update SOUTHEAST HIGH SPEED RAIL TIER II ENVIRONMENTAL IMPACT STATEMENT RICHMOND, VA, TO RALEIGH, NC CHESTERFIELD COUNTY, VA OFFICIALS BRIEFING February 2013 Federal Railroad

More information

MWRA COMPLETED CSO PROJECTS Updated November 2, 2011

MWRA COMPLETED CSO PROJECTS Updated November 2, 2011 MWRA COMPLETED CSO PROJECTS Updated November 2, 2011 www.mwra.com 1. SOMERVILLE BAFFLE MANHOLE SEPARATION Alewife Brook, Upper Mystic River 1996 $400,000 Separated common manholes connecting local sewer

More information

WELCOME NEIGHBORS! April 11, 2019

WELCOME NEIGHBORS! April 11, 2019 District of Columbia Water and Sewer Authority David L. Gadis, CEO and General Manager Clean Rivers Project Northeast Boundary Tunnel Tunnel Forum Meeting WELCOME NEIGHBORS! April 11, 2019 0 Welcome! 1

More information

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement (blank page) WestConnex New M5 5-42 (blank page) WestConnex New M5 5-44 5.5 Tunnels 5.5.1 Main alignment tunnels The main alignment tunnels would be about nine kilometres long, with the western tunnel

More information

I-485/ I-85 Interchange Charlotte, NC December 6, LANE The Lane Construction Corporation, 90 Fieldstone Court Cheshire, CT 06410

I-485/ I-85 Interchange Charlotte, NC December 6, LANE The Lane Construction Corporation, 90 Fieldstone Court Cheshire, CT 06410 I-485/ I-85 Interchange Charlotte, NC December 6, 2014 North Carolina I-485/I-85 Interchange Charlotte Charlotte 485 Outer Loop Partners The North Carolina Department of Transportation STV/Ralph Whitehead

More information

STATUS REPORT ENVIRONMENTAL REVIEW FOR IMPROVED ACCESS. at the NORTH WHITE PLAINS STATION

STATUS REPORT ENVIRONMENTAL REVIEW FOR IMPROVED ACCESS. at the NORTH WHITE PLAINS STATION STATUS REPORT ENVIRONMENTAL REVIEW FOR IMPROVED ACCESS at the NORTH WHITE PLAINS STATION May 2009 Status Report- Environmental Review for Improved Access at the North White Plains Station A. INTRODUCTION

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 18, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

North Carolina Department of Transportation Project Development and Environmental Analysis Branch North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,

More information

RIVERSIDE, Newton MA June 9, 2011

RIVERSIDE, Newton MA June 9, 2011 June 9, 2011 TONIGHT S AGENDA: 1.Project Update (5 min.) 2.Master Plan Update (10 min.) 3.Environmental Update (5 min.) 4.Traffic Plan Update (25 min.) Questions PROJECT STATUS UPDATE Responding / Clarifying

More information

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

WHAT IS THE PURPOSE OF THE OPEN HOUSE? WHAT IS THE PURPOSE OF THE OPEN HOUSE? OPEN HOUSE PURPOSE The purpose of the open house is to provide an update on the study process and introduce the preliminary concept alternatives. The open house provides

More information

Case 1:85-cv RGS Document 1769 Filed 06/15/12 Page 1 of 13. UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS

Case 1:85-cv RGS Document 1769 Filed 06/15/12 Page 1 of 13. UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS Case 1:85-cv-00489-RGS Document 1769 Filed 06/15/12 Page 1 of 13 UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS UNITED STATES OF AMERICA, Plaintiff, CIVIL ACTION v. No. 85-0489-RGS METROPOLITAN

More information

Station Expansion Project

Station Expansion Project Streetsville Reservoir and Pumping Station Expansion Project Public Information Centre Paul Dagenais, P.Eng. AECOM September 23, 2010 Erin Meadows Community Centre Purpose of Tonight s Meeting Update residents

More information

Appendix C Agency Correspondence

Appendix C Agency Correspondence Appendix C Agency Correspondence Appendix C: Correspondence TRAFFIC From: The City of White Plains, Department of Traffic To: Metro-North Railroad Date: March 3, 2009 Subject: Describes the basis for determining

More information

Victoria Bridge Municipal Class EA Civic Works Committee

Victoria Bridge Municipal Class EA Civic Works Committee Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction

More information

1.0 INTRODUCTION & BACKGROUND

1.0 INTRODUCTION & BACKGROUND 1.0 INTRODUCTION & BACKGROUND 1.1 GENERAL The Consulting Team was retained by the City of Edmonton in 2010 to complete a for the replacement of the Walterdale Bridge and the approach roads, as required,

More information

Prince William Street Project (Grant Avenue to Wellington Road)

Prince William Street Project (Grant Avenue to Wellington Road) Prince William Street Project (Grant Avenue to Wellington Road) 1 Goals Improve pedestrian and bike traffic safety Improve street drainage with curb & gutter Upsize water mains Enhance overall street appearance

More information

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015 AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department

More information

The Van Ness Campus. Weekly Construction Bulletin #259

The Van Ness Campus. Weekly Construction Bulletin #259 The Van Ness Campus Weekly Construction Bulletin #259 Construction Update Week of September 24, 2018 The Van Ness Campus Weekly Bulletins are intended to help inform members of the community about upcoming

More information

Environmental: Urban land..51 acre wet (.30%); 1.01 acres/.59% within a 100 year floodplain; no other environmental indicators limit development.

Environmental: Urban land..51 acre wet (.30%); 1.01 acres/.59% within a 100 year floodplain; no other environmental indicators limit development. A N DOV ER Downtown: Designated a State PDA Land Use: Downtown Andover (171.61 acres) is the Town s traditional central business district. It consists of offices, shops, restaurants, civic and institutional

More information

7.5 Impacts on the Section 4(f) Properties

7.5 Impacts on the Section 4(f) Properties constructive use, such as noise, air quality and visual impacts were also assessed. It was determined that this project would not introduce changes of an external nature that would affect the recreational

More information

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting Rosecrans/Marquardt Grade Separation Project Community Open House Meeting October 17, 2017 Rosecrans/Marquardt Presentation Agenda 1. Welcome Remarks & Introductions 2. Community Outreach 3. Project Goals

More information

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016 Rt. 29 Solutions Project Delivery Advisory Panel January 7, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Dec

More information

LFR - Code 3 Fire Report

LFR - Code 3 Fire Report LFR - Code 3 Fire Report May 2017 Kudos to South Metro Fire Rescue and CDOT crews for their response to the tanker fire on I-25 Wednesday, May 31, 2017 that closed the highway in both directions. They,

More information

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme Welcome We would like to welcome you to our start of works exhibition for the. On display you will see information about what is currently taking place and what will be happening during the coming months

More information

RE: Comments on the Environmental Notification Form (ENF) for the I 90 Allston Interchange Project MEPA #15278

RE: Comments on the Environmental Notification Form (ENF) for the I 90 Allston Interchange Project MEPA #15278 December5,2014 SecretaryMaeveVallelyBartlett ExecutiveOfficeofEnergyandEnvironmentalAffairs(EEA) 100CambridgeSt.,Suite900 BostonMA02114 RE:CommentsontheEnvironmentalNotificationForm(ENF)fortheI 90AllstonInterchangeProject

More information

Rose Kennedy Greenway Ramp Parcels Study

Rose Kennedy Greenway Ramp Parcels Study Rose Kennedy Greenway Ramp Parcels Study Public Meeting #1 June 26, 2014 Consultants: HDR Utile, Inc. MassDOT & Boston Redevelopment Authority Rose Kennedy Greenway Ramps Parcels Study Public Meeting #1

More information

Bexar County Public Works Department Flood Control Program

Bexar County Public Works Department Flood Control Program Bexar County Public Works Department Flood Control Program Bulverde Rd. at Mud Creek Trib. A (SC-27) February 23 rd, 2016 Agenda Introductions Bexar County Flood Control (Engineering and PR) Office of

More information

Transportation Improvements

Transportation Improvements Transportation Improvements 0 0 Volume II of the Final EIS for the DHS Headquarters consolidation at St. Elizabeths includes analysis to transportation improvements for the DHS Headquarters Consolidation

More information

CITY OF VISALIA. Parks & Urban Forestry Guidelines. Street Tree Standards For Residential And Commercal Development

CITY OF VISALIA. Parks & Urban Forestry Guidelines. Street Tree Standards For Residential And Commercal Development CITY OF VISALIA Parks & Urban Forestry Guidelines Street Tree Standards For Residential And Commercal Development City of Visalia Street Tree Development Standards 2 These guidelines have been established

More information

PROPOSED IMPROVEMENTS

PROPOSED IMPROVEMENTS IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways

More information

Town Center Master Plan

Town Center Master Plan Town Center Master Plan 2014 Town Center Master Plan 1926 Draper Master Plan Town Center Master Plan 1926 Draper Business Center Plan 1926 Draper Bird s Eye View Town Center Master Plan 2011 Chimney Rock

More information

DRAW SEVEN PARK RENOVATION PROJECT SOMERVILLE, MASSACHUSETTS

DRAW SEVEN PARK RENOVATION PROJECT SOMERVILLE, MASSACHUSETTS DRAW SEVEN PARK RENOVATION PROJECT SOMERVILLE, MASSACHUSETTS DCR Public Meeting Monday, February 5th 6:30pm-8:30pm East Somerville Community School 50 Cross Street, Somerville, MA, 02145 Commonwealth of

More information

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report City of Edmonton Final Report Walterdale Bridge Replacement and Approach Roads Evaluation April, 2011 Walterdale Bridge Replacement and Approach Roads Evaluation Final Report April 2011 Acknowledgement

More information

Community Development Rezoning Report REZ14-006

Community Development Rezoning Report REZ14-006 Community Development Rezoning Report REZ14-006 Planning Commission Board of Supervisors March 4, 2014 March 26, 2014 Applicant M & N Real Estate, LLC Tax Map Id 125-(A)- L20E,125-(A)- L20E1, portion of

More information

Route 29 Project Delivery Advisory Panel September 11, 2014 Meeting Minutes

Route 29 Project Delivery Advisory Panel September 11, 2014 Meeting Minutes Route 29 Project Delivery Advisory Panel Meeting Minutes Meeting 5 of the Route 29 Project Delivery Advisory Panel (PDAP) was held at the Virginia Center for Transportation Innovation and Research in Charlottesville,

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

Town of Arlington Alewife Brook outfalls.

Town of Arlington Alewife Brook outfalls. BIBLIOGRAPHY Alewife/Mystic River Advocates and Friends of the Mystic River. 1997. Comprehensive Report of the Lower Mystic River Watershed: Shoreline Survey Results and Analysis for Mystic River, Alewife

More information

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Heritage Road Improvements from Steeles Avenue to Rivermont Road The Corporation of the City of Brampton Heritage Road Improvements from Steeles Avenue to Rivermont Road Class Environmental Assessment Study (Schedule C) September 19, 2013 The Corporation of the City

More information

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK Open House 10.12.16 RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK MEETING AGENDA Great Rivers Greenway and Project Partners River des Peres Greenway Overview Project

More information

Citizen Concerns I-16/I-75 Interchange Design

Citizen Concerns I-16/I-75 Interchange Design Citizen Concerns I-16/I-75 Interchange Design Project # NH-IM-16-1(92), NH-IM-16-1(131), NH-IM-75-2(177), & NM-16-1(104) P.I. # 311000, 311005, 311400, & 311410 Shirley Hills & North Highlands Neighborhood

More information

Goals for Tonight s Meeting

Goals for Tonight s Meeting South Anthony Boulevard Railroad Grade Separation Study Report to Community November 30, 2011 Andorfer Commons Theatre Indiana Tech University Goals for Tonight s Meeting Recap of the meeting from last

More information

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date HILLSBOROUGH COUNTY Greenways and Trails Plan Update Executive Summary Date PURPOSE AND PROJECT OVERVIEW The Hillsborough County Greenways Master Plan (1995) and the City of Tampa s Greenways and Trails

More information

ATTACHMENT A SCOPE OF SERVICES

ATTACHMENT A SCOPE OF SERVICES ATTACHMENT A SCOPE OF SERVICES AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN VANASSE HANGEN BRUSTLIN, INC. AND THE EXECUTIVE OFFICE OF TRANSPORTATION AND PUBLIC WORKS / MASSACHUSETTS HIGHWAY DEPARTMENT OFFICE

More information

Rethinking the MIT Campus Transportation System

Rethinking the MIT Campus Transportation System Rethinking the MIT Campus Transportation System Recommendations on Accessibility and Land Uses Policies Recommendations edited from class discussions and reports written by: Dan Amano Cornelia Hersfeld

More information

Advisory Group Meeting 16 November 2010

Advisory Group Meeting 16 November 2010 Advisory Group Meeting 16 November 2010 City of Boston Thomas M. Menino Mayor Tonight s Topics Residential Districts Industrial Districts Commercial Districts Open Space Transportation Other 4. Require

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING 4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING 4.7.1 INTRODUCTION The following analysis discusses the consistency of the Proposed Project with the corresponding land use and zoning designations

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

MARINA BAY. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 14, 2010

MARINA BAY. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 14, 2010 MARINA BAY NEIGHBORHOOD G O OO PRESENTATION S O City of Richmond Officer Bradley A. Moody Memorial Underpass April 14, 2010 TEAM INTRODUCTIONS Project Oversight and Approval City of Richmond Richmond Community

More information

HOT SPRINGS COMPREHENSIVE PLAN OUTLINE

HOT SPRINGS COMPREHENSIVE PLAN OUTLINE HOT SPRINGS COMPREHENSIVE PLAN OUTLINE 7/28/2015 Draft outline - Hot Springs Comprehensive Plan Draft outline of topics to be discussed at public hearings and in planning sessions. Order and topics and

More information

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Campbell County

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Campbell County I-75 No Projects Under Development in Campbell County PIN: 115778.00 TRUCK CLIMBING LANE, MP 135.5 TO MP 140.1(NBL) Length - 4.6 (Widen) The right-of-way and/or utility process is underway. I-75 PIN: 115778.01

More information

Whitehurst Freeway Deconstruction Feasibility Study

Whitehurst Freeway Deconstruction Feasibility Study Whitehurst Freeway Deconstruction Feasibility Study Draft Existing Conditions Report Prepared By: For: District Department of Transportation District of Columbia October 2005 TABLE OF CONTENTS 1. INTRODUCTION...1-1

More information

Massachusetts Water Resources Authority. Combined Sewer Overflow Control Plan. Annual Progress Report 2014

Massachusetts Water Resources Authority. Combined Sewer Overflow Control Plan. Annual Progress Report 2014 March 2015 MWRA Board of Directors Matthew A. Beaton, Chair John J. Carroll, Vice-Chair Joseph C. Foti, Secretary Joel A. Barrera Austin F. Blackmon Kevin L. Cotter Paul E. Flanagan Andrew M. Pappastergion

More information

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I SBCAG STAFF REPORT SUBJECT: Cabrillo-UPRR Bridge Project MEETING DATE: March 17, 2016 AGENDA ITEM: 5I STAFF CONTACT: Fred Luna RECOMMENDATION: Authorize the chair to sign a Memorandum of Understanding

More information

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room PROJECT SHOWING AGENDA I. Welcome A. Sign In Sheet; Non-Disclosure Agreement

More information

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES ROAD CONSTRUCTION 36 June 2014 ROADS&BRIDGES Young is full of life Recent expansion completes continuous, multilane arterial By Donald Hammack, P.E. Contributing Author The Florida Department of Transportation

More information

Welcome to the Public Consultation Exhibition

Welcome to the Public Consultation Exhibition Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island

More information

Conceptual Design Meeting. River Street and Western Avenue Bridge Rehabilitation Project

Conceptual Design Meeting. River Street and Western Avenue Bridge Rehabilitation Project Monday, 6:30 PM - 8:00 PM Honan-Allston Branch Library 300 North Harvard Street Allston, MA Patrick-Murray Accelerated Bridge Program 2009 Program Overview Authorization: Chapter 233 of the Acts of 2008

More information

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Meeting Purpose: Date and Time: Location: Attendance: Handouts: Meeting Purpose: Date and Time: Location: Attendance: Handouts: PA Turnpike / I-95 Interchange Project Design Advisory Committee (DAC)/Public Officials Meeting #8 April 12, 2012 at 1:30 p.m. Project Office,

More information

Introduction to the Project

Introduction to the Project Chapter 1 Introduction to the Project 1.1 Project Introduction The New Hampshire Department of Transportation (NHDOT) and the Federal Highway Administration (FHWA) have prepared this Environmental Assessment/Draft

More information

Charles River Reservation Footbridge Projects/Trail Corridor Proposal. May 7, 2009, 6:30 8:00 pm Newton-Wellesley Hospital Auditorium, Newton

Charles River Reservation Footbridge Projects/Trail Corridor Proposal. May 7, 2009, 6:30 8:00 pm Newton-Wellesley Hospital Auditorium, Newton Charles River Reservation Footbridge Projects/Trail Corridor Proposal May 7, 2009, 6:30 8:00 pm Newton-Wellesley Hospital Auditorium, Newton Commonwealth of Massachusetts Governor Deval L. Patrick Lieutenant

More information

Market/Octavia - Octavia Boulevard Enhancement Project

Market/Octavia - Octavia Boulevard Enhancement Project Market/Octavia - Octavia Boulevard Enhancement Project Hayes Valley Neighborhood Association April 23, 2015 Octavia Boulevard Enhancement Project Enhancement Project Goals Improve comfort & safety for

More information

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK Welcome! The purpose today is to: Present the Study Background; Describe Alignment Alternatives Analyzed; Present the Evaluation of

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

Visual and Aesthetics

Visual and Aesthetics Such a connection could accommodate timed transfers and improve connections between local transit service and Presidio Shuttle service. Level of Service The results of the analysis are provided on a route-by-route

More information

3.5 VISUAL AND AESTHETIC QUALITIES

3.5 VISUAL AND AESTHETIC QUALITIES 3.5 VISUAL AND AESTHETIC QUALITIES 3.5.1 Introduction to Analysis 3.5.1.1 Summary of Results The Preferred Alternative would represent a minimal change to the visual character of the existing rail corridor.

More information

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project Project Overview... 2 Thalia Creek (Windsor Woods) Tide Gate... 6 Club House Road Drainage Project... 9 Updated

More information

7 June 13, 2012 Public Hearing

7 June 13, 2012 Public Hearing 7 June 13, 2012 Public Hearing REQUEST: Conditional Use Permit (Childcare) APPLICANT: BASILEIA EMPOWERING MINISTRIES PROPERTY OWNER: CONNEMARA ASSOCIATES, LLC STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:

More information

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT PUBLIC INFORMATIONAL MEETING TUESDAY, APRIL 27, 2010 AT NEWBURYPORT CITY HALL, AUDITORIUM 60 PLEASANT STREET NEWBURYPORT, MASSACHUSETTS 6:00 8:00 PM FOR THE PROPOSED WHITTIER BRIDGE / I-95 IMPROVEMENTS

More information

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry 2.0 PURPOSE AND NEED Taking into consideration agency and public input, the purpose and need for the Project was identified early in Project planning. As noted in Appendix A, for purposes of meeting the

More information

WELCOME TO OPEN HOUSE # 3

WELCOME TO OPEN HOUSE # 3 Bayview Avenue Class Environmental Assessment Study Steeles Avenue to Elgin Mills Road WELCOME TO OPEN HOUSE # 3 Please sign in and join our mailing list Why Are We Here Tonight? Study Process and Purpose

More information

October 26,2006 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFAIRS ON THE ENVIRONMENTAL NOTIFICATION FORM

October 26,2006 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFAIRS ON THE ENVIRONMENTAL NOTIFICATION FORM - - Mil7 ROMNEY GOVERNOR KERRY HEALEY LIEUTENANT GOVERNOR Tel. (617) 626-1000 Fax. (617) 626-1 181 http://www.mass.govlenvir ROBERT W. GOLLEDGE, JR. SECRETARY October 26,2006 CERTIFICATE OF THE SECRETARY

More information

Design Public Hearing. River Street and Western Avenue Bridge Rehabilitation Project

Design Public Hearing. River Street and Western Avenue Bridge Rehabilitation Project Tuesday, 7:00 P.M. Morse Elementary School 40 Granite Street Cambridge, MA Patrick-Murray Accelerated Bridge Program Authorization: Chapter 233 of the Acts of 2008 Program to be complete by 2016 Program

More information

THE STILLWATER BRIDGE STORY

THE STILLWATER BRIDGE STORY THE STILLWATER BRIDGE STORY 1931 Stillwater Bridge Part I: The Backstory Behind the Bridge Undoubtedly the highest profile road project in Minnesota is the new bridge at Stillwater, the St. Croix Crossing.

More information

Emergency Services Response Times

Emergency Services Response Times Emergency Services Response Times The Emergency Services Response Times report is a component of the Brice Prairie Capacity Analysis Report, which considers development capacity based on environmental,

More information

State Project No Heroes Tunnel

State Project No Heroes Tunnel Public Scoping Meeting State Project No. 167-108 Bridge No. 00773 Heroes Tunnel Route 15 Wilbur Cross Parkway Through West Rock Ridge Towns of Hamden, Woodbridge City of New Haven Agenda Show Project Location

More information