1 I-485/ I-85 Interchange Charlotte, NC December 6, 2014
2 North Carolina
3 I-485/I-85 Interchange Charlotte Charlotte 485 Outer Loop
4 Partners The North Carolina Department of Transportation STV/Ralph Whitehead Associates The Lane Construction Corporation
5 1980 s 2003 constructed by Lane/Rea 1980 s-ncdot Original Design
6 RFP Design-4 Level Stack
7 High level, long span bridges 2M CY borrow for approach fills High MSE walls Detour I-85 traffic Icing Future widening RFP Design-4 Level Stack Challenges
8 Turbine Design Proposed as an alternate design Based on a European model Similar designs in FL and UK All left turning traffic - circles counter-clockwise around intersecting roads at relatively high speed Uses simple span, low level bridges, smaller structural members 2 level lower embankments, flatter roadway profiles Future widening easier, less costly
9 Thorpe, England, UK Tampa FL I-4 and I-75 Similar designs in service
10 Conceptual Rendering
11 Awarded September 2010 I-485 (Charlotte Eastern Outer Loop)/ I-85 NCDOT Project #: C202523, TIP Project R-2123CE Company Bid Price Score Adjusted Score The Lane Construction Corp. $92,162, $77,102,938 Engineer s Estimate $124,291,688 TOTAL SAVINGS: $32,129,438 Completion Date December 2014
12 Major Quantities Earthwork PCCP-Jointed Doweled Asphalt Pavement Drainage Structures Box Culvert Construction Sound wall 1,540,000 CY 196,000 SY 164,000 TN 29,400 LF 19 Bridges (1 Steel) 580 FT 2,040 LF
13 Cost Savings 2M CY borrow job became a balance job Low level, simple span bridges Minimized traffic control, temporary routes and closures Shared resources
14 Segment 1 Segment 3 Segment 2 Earthmoving confined within segments/no on-road hauling
15 Single spans
16 Simple span girder erection
17 Short duration night time closures
18 Awards Roads and Bridges 2012 Top 10 Roads - #1
19 October 2011
20 May 2012
21 January 2013 October Looking east from future 485
22 June 2013
23 January 2014
24 May 2014
25 October 2014
26 Concrete Paving
27 Concrete Plant
28 Concrete Plant
29 Concrete Pavers GZ 850 with DBI
30 Concrete Pavers GZ 850 with DBI
31 Concrete Pavers GZ 850 with DBI
32 Concrete Pavers GZ 600
33 Innovation Stringless Paving Next Generation Concrete Surface Slurry Disposal Line Laser Profiler/ProVAL MIT T2 to locate dowel array
34 Stringless Paving
35 Traditional Wireline
36 Stringless Paving Total stations backsight the control points and frontsight paver with x,y,z locations. On-board computer calculates a new frontsight to coincide with the model and instructs the paver to adjust steering and elevation accordingly. Control Pt. (3) Total Stations 3 rd UTS used to check behind paver
37 Control point Control point Optimal handoff distance between total stations Control point Control point Control point
38 UTS cluster configuration_check behind paver
39 Next Generation Concrete Surface
40 NGCS test section
41 NGCS-3 step process
42 Slurry disposal
43 Hydraulic filtering press
44 Lined evaporating basin
45 Liteweight Laser Profiler
46 Roline line laser
47 ProVAL ride quality reporting
48 MIT T2 device
49 Northbound Southbound I-85 added lanes
50
51
52 Low profile simple span bridges
53
54 Be Safe!
Constructing PCCP Under High Traffic Volume
Constructing PCCP Under High Traffic Volume THE LANE CONSTRUCTION CORPORATION Jim Seybert Casey Hurley PE, PLS November 18, 2016 Agenda Lane Experience Challenges Access Design Elements Staging of Construction
More informationRt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016
Rt. 29 Solutions Project Delivery Advisory Panel January 7, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Dec
More informationI-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING
I-66 EASTBOUND WIDENING INSIDE THE BELTWAY From the Dulles Connector Road (Route 267) to Fairfax Drive (Route 237) PARDON OUR DUST MEETING Bill Cuttler, PE (VDOT District Construction Engineer, Northern
More informationNorth Carolina Department of Transportation Project Development and Environmental Analysis Branch
North Carolina Department of Transportation Project Development and Environmental Analysis Branch Citizens Informational Workshop I-85, from I-485 to NC 73 Mecklenburg and Cabarrus Counties October 30,
More informationDowntown Redevelopment Project Update
Downtown Redevelopment Project Update The redevelopment project will begin the week of September 4, 2017. It is anticipated that construction will be approximately 565 days, depending on weather. 7-6-18
More informationProject Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.
I-95 Avenue Interchange Project Status Construction is underway for Phase 3. Overall Project Area and Schedule Phase 0: Completed 2010 Section GR0: Completed in Fallin 2010 Phase 2: Completed Section GR2:
More informationProject Purpose. Project Need
Project Purpose The purpose of the project is to implement a bridge improvement solution that corrects the existing safety problem at the Strasburg Pike Bridge. The project will provide a structurally
More informationROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES
ROAD CONSTRUCTION 36 June 2014 ROADS&BRIDGES Young is full of life Recent expansion completes continuous, multilane arterial By Donald Hammack, P.E. Contributing Author The Florida Department of Transportation
More informationConstruction Engineering & Inspection
Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over
More informationRt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015
Rt. 29 Solutions Project Delivery Advisory Panel December 3, 2015 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Nov
More informationWELCOME TO OPEN HOUSE TWO November 28, 2018
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting
More informationFall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More informationI-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status
I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in
More informationMoving The Metro. A special construction update for the metro Omaha area.
Moving The Metro A special construction update for the metro Omaha area. ebraska Department of Roads Spring/Summer 2017 I-80 / I-480 / US-75 Interchange The improvements on this project consist of bridge
More informationTechnical Bullet Series on Clay Brick Pavers
2701 Shorefair Drive, Winston-Salem, NC 27105 pinehallbrick.com 1-800-334-8689 Technical Bullet Series on Clay Brick Pavers #4 Designing For Heavy Vehicular Traffic Abstract This Tech Bullet focuses on
More informationCanal Road City Limits (East of Van Dyke Ave) to Saal Road
Canal Road City Limits (East of Van Dyke Ave) to Saal Road Construction Update 9/14/2018 The ashalt paving on the southside of Canal Road is expected to start Saturday, September 15 (weather permitting)
More informationPROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES
CITY OF LARKSPUR PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES PRESENTED BY Julian Skinner Larkspur Public Works Director DATE July 13, 2016 Bon Air Bridge
More informationSFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE
SFMTA Municipal Transportation Agency Image: a bus in front of the Palace of the Legion of honor SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN AVENUE @ OCEAN AVENUE Community Meeting May 23, 2012 San Francisco,
More informationI-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280
I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange THIRD
More informationJOB CREATION PROJECTS
SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each
More informationDESIGN CRITERIA PACKAGE
RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA
More information23 EA , , , , , , , LF , , ,596.
Mast Arm Traffic Signals at Central Ave. 5th, 6th, 8th & 31st St. Engineering & Capital Improvements Department, City of St. Petersburg, FL Project No.: 11027-112 Bid date: January 10, 2012 Item Description
More informationPlease see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015
Project Title Campus Beautification Projects Volunteer Blvd Ph 1 540/009-08-2015 Institution Description UT Knoxville This project will improve Volunteer Boulevard from West Cumberland Ave. to East Cumberland
More informationFHWA INVEST. And the Harbor Bridge Project
FHWA INVEST And the Harbor Bridge Project FHWA s Sustainable Highways Initiative The Sustainable Highways Initiative supports programs and activities conducted across the Federal Highway Administration
More informationPrince William Street Project (Grant Avenue to Wellington Road)
Prince William Street Project (Grant Avenue to Wellington Road) 1 Goals Improve pedestrian and bike traffic safety Improve street drainage with curb & gutter Upsize water mains Enhance overall street appearance
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).
III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the
More informationRFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015
RFP 2018-02 DRAINAGE OUTFALL DESIGN AND PERMITTING Mandatory Meeting for Proposers August 15, 2015 IMPORTANT DATES August 15 th, 2:00pm August 17 th, 5:00pm August 22 nd, 5:00pm September 5 th, 2:00pm
More informationVictoria Bridge Municipal Class EA Civic Works Committee
Municipal Class EA John Pucchio, P. Eng., Project Manager June 19 2018 Introduction Existing Conditions Municipal Class EA Proposed Bridge Proposed Road Reconstruction Proposed Improvements Construction
More informationMiddlebury RS 0174(8)
Middlebury RS 0174(8) Preferred Alternative Meeting VT 125 Bridge #13 over Middlebury River August 6, 2012 Presented to Presented by Town of Middlebury VTrans & VHB Introductions: Jennifer Fitch VTrans
More informationTransportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018
Transportation Projects Quarterly Report Morrisville Planning Department May 22, 2018 Transportation Improvements Most Common Ways the Town secures transportation improvements: 1. Development 2. Grant
More informationBucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010
PRESENTED BY: Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010 Matthew Smeltzer, P.E. Deputy Director of Engineering, DOT Supervisor Ray Nutting El Dorado County, District
More information2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director
2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that
More informationCreative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals
ABOUT US Creative Engineering Group Inc, (Creative) is a Construction Engineering and Inspection (CEI) firm established in 2006 by two Principals Rick Estripeaut & Sri Mavanur. In the last decade Creative
More informationLOCATION At the corner of Brawley School Road & Williamson Road in Mooresville, North Carolina
Locator Map Architecture LOCATION At the corner of Brawley School Road & Williamson Road in Mooresville, North Carolina Description DEVELOPMENT PLAN 250,000 square foot Lifestyle Center anchored by Lowes
More informationAASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance.
AASHTO Board of Directors Executive Committee Standing Committees (Modal): Aviation Standing Committees (Functional Areas): Environment Special Committees: Intermodal and Economic Expansion Highways Finance
More information7.5 Impacts on the Section 4(f) Properties
constructive use, such as noise, air quality and visual impacts were also assessed. It was determined that this project would not introduce changes of an external nature that would affect the recreational
More informationChesterfield County Project Update
Chesterfield County Project Update SOUTHEAST HIGH SPEED RAIL TIER II ENVIRONMENTAL IMPACT STATEMENT RICHMOND, VA, TO RALEIGH, NC CHESTERFIELD COUNTY, VA OFFICIALS BRIEFING February 2013 Federal Railroad
More informationWHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area
City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the
More informationStart of works exhibition
Start of works exhibition Find out about the work that Highways England are undertaking to create a new interchange junction 700 metres east of junction 10 over the M20, a dual carriageway link road to
More informationNAPA COUNTY PUBLIC WORKS Standards & Specifications
Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6
More informationGPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts
Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS
More informationSevern River Sub-Watershed: BMP 09-Retrofit
Project ID: BMP_09 Total Treated Drainage Area: 4.57 acres Total Treated Impervious Area: 2.9 acres Total Water Quality Volume (WQv): ~10,300 cubic feet; 0.236 acre-foot Rainfall Depth Treated (Pe): 1
More informationEdmonton s LRT Setting the Stage for Heading Further South
4 Capital Projects Project Updates Edmonton s LRT Setting the Stage for Heading Further South Art Washuta, P.Eng. AECOM Canada Ltd. Edmonton, Alberta Carole Cej, P.Eng. City of Edmonton Edmonton, Alberta
More informationTRANSPORTATION COMMITTEE
TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island
More informationBexar County Public Works Department Flood Control Program
Bexar County Public Works Department Flood Control Program Bulverde Rd. at Mud Creek Trib. A (SC-27) February 23 rd, 2016 Agenda Introductions Bexar County Flood Control (Engineering and PR) Office of
More informationTown of Yucca Valley Capital Improvement Projects Report July 24, 2014
Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,
More informationAPPENDIX G: TOWN ORDINANCE REVIEW
APPENDIX G: TOWN ORDINANCE REVIEW TYLin (225740) Woodard & Curran SWMP January 2013 Stormwater LID strategies, ranked for Zoning Bylaw and Site Plan Review Standards Dimensional Requirements Permit the
More informationFOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?
FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,
More informationMassachusetts Water Resources Authority
Massachusetts Water Resources Authority Upper Neponset Valley Replacement Sewer Project Information Purpose of Project To bring capacity of the 100+ year old sewers up to the level of service the MWRA
More informationSH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017
Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year
More informationDaniel J. Sporik, P.E. Civil Engineer
Daniel J. Sporik, P.E. Civil Engineer Work Experience Areas of Expertise Transit Planning and Design Highway Design Stormwater Management Hydraulics and Hydrology Erosion and Sediment Control Years of
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on
More informationSpring 2018 Construction Update
Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the
More informationFairfax County Parkway (Route 286) Widening Project
Fairfax County Parkway (Route 286) Widening Project Route 29 (Lee Highway) to Route 123 (Ox Road) State Project No. 0286-029-259, P101; UPC 107937 Fairfax Station HOA Meeting January 30, 2018 7:00 to 9:00
More informationWelcome to the Sellwood Bridge Project Pre-Construction Open House
Welcome to the Sellwood Bridge Project Pre-Construction Open House 5:30 7:30 p.m. Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting
More informationSR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING JUNE 16, 2015
PUBLIC MEETING JUNE 16, 2015 AGENDA PROJECT HISTORY NORTHERN SECTION UPDATE SOUTHERN SECTION OVERVIEW INTERCHANGES PROJECT SCHEDULE UPCOMING ACTIVITIES OPEN DISCUSSION & GROUP QUESTIONS ONE-ON-ONE QUESTIONS
More information1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier
Mission We connect our communities Vision Getting you there better, faster and easier Values Play as a team Think forward Serve with passion 1 Metrolinx overview go transit, up express, presto Serve a
More informationPROPOSED IMPROVEMENTS
IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways
More informationCURRICULUM VITAE REZA MARSHAL, MECE, PE, PTOE
CURRICULUM VITAE REZA MARSHAL, MECE, PE, PTOE SPECIALIZATION Traffic Engineering & Highway Design Traffic Signal Analysis & Design MUTCD/Design Standards Traffic Signal Warrant Investigation AASHTO/Design
More informationUniversity Park Subdivision Street Assessment Report
University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:...
More informationII PREVIOUS REPORTS PERTINENT TO THIS MATTER II
~ ~~ ~~~ ~ ~~ ~ ~~~~ ~ ~~ ~~ ~~~~ ~ Agenda Item # Page # TO: FROM: -..-.-I- 3UBJCL I CHAIR AND MEMBERS ENVIRONMENT AND TRANSPORTATION COMMITTEE MEETING ON OCTOBER 17,2005 DAVID A. LECKIE, P. ENG DIRECTOR
More informationPromoting Low Impact Development Sustainable Stormwater Management
Design I Protect I Sustain Promoting Low Impact Development Sustainable Stormwater Management Anthony Kendrick, ENV SP Director, Green Infrastructure I Stormwater Low Impact Development Exceeds Local
More informationFOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?
FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,
More informationCleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009
Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009 Process for Aesthetics Subcommittee June 25, 2009 Kick off Meeting June 26, 2009 Gateway and Tremont Focus Groups
More informationOpen House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK
Open House 10.12.16 RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK MEETING AGENDA Great Rivers Greenway and Project Partners River des Peres Greenway Overview Project
More informationFOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?
FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,
More informationCity of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report
City of Edmonton Final Report Walterdale Bridge Replacement and Approach Roads Evaluation April, 2011 Walterdale Bridge Replacement and Approach Roads Evaluation Final Report April 2011 Acknowledgement
More informationGYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015
GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin
More informationA Connected Region for Our Future. Tampa Bay Regional Planning Council
A Connected Region for Our Future Tampa Bay Regional Planning Council TBARTA Vision A world class transportation network for the Tampa Bay region that will connect people and places, move goods and services,
More information4.1 Build Alternative 1 Construction Phasing
SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th
More informationPUBLIC MEETING NO. 4 OCTOBER 29, 2013
PUBLIC MEETING NO. 4 OCTOBER 29, 2013 Arizona Canal Multi-use Path Public Process Current Design Process Public Meeting #1 - December 6, 2012 Public Meeting #2 - May 1, 2013 Public Meeting #3 September
More informationSpreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev
Spreadsheet Report Page 1 Phase I Wickenburg, AZ SD Estimate Rev 0 9-29-11 Project name Estimator Labor rate table Equipment rate table Job size Duration Wickenburg AZ Hal White Denver Denver 121 ac 9
More informationIII - design standards
III - design standards The Circulation Classification and Character section of the Design Standards chapter prescribes the types of circulation routes, the location of the circulation routes, the connections
More informationConcluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).
Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking
More informationProject will Replace: Utilities Curb Pavement Lighting. City of Madison
Project will Replace: Utilities Curb Pavement Lighting Replace sanitary sewer main & laterals Winnebago: Existing 8 main, 1905 Linden: Existing 6 main, 1915, upsize to 8 main Atwood: Existing 12 main,
More informationApplication Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)
STAFF REPORT Town of Clayton Planning Department 111 E. Second Street, Clayton, NC 27520 P.O. Box 879, Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 Planning Board May 22, 2017 Application Number:
More information2017 Canadian Consulting Engineering Awards
2017 Canadian Consulting Engineering Awards Northeast Anthony Henday Drive DBFO Edmonton, Alberta Four years of detours, traffic snarls, varying speed limits, and stop-and-start driving has come to an
More informationLOCATION AND DESIGN DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Landscape Architecture Program NUMBER: SPECIFIC SUBJECT: Integration of Landscape
More informationExpo Line Transit Project. Project Status Update Meeting West End Corridor Segment C
Exposition Light Rail Transit Project Project Status Update Meeting West End Corridor Segment C Culver City Senior Center November 18, 2010 Phase 1 Project Description Phase 1 from Downtown Los Angeles
More informationHARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October
HARBOR BRIDGE Randall C. Grones, PE - SPD US 181 Harbor Bridge October October 13, 13, 2015 2015 Project Scope Develop, design, construct and maintain a total project length of 6.44 miles. Base scope New
More informationMARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012
MARINA BAY NEIGHBORHOOD PRESENTATION City of Richmond Officer Bradley A. Moody Memorial Underpass April 11, 2012 TEAM INTRODUCTIONS Project Oversight and Approval City of Richmond Formally Richmond Community
More informationLow Level Road Project. Canadian Consulting Engineers Award 2016
Low Level Road Project Canadian Consulting Engineers Award 2016 A local resident enjoys a forested section of the Spirit Trail, which connects to Moodyville Park near the east abutment of the Woodland
More informationSTANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS
STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B
More informationOpen House Wellesley Station Second Exit Construction Update and Public Art Concept
Open House Wellesley Station Second Exit Construction Update and Public Art Concept YMCA 20 Grosvenor Street 1 Improvements coming to Wellesley Station Second Exit and Automatic Entrance Conceptual drawings
More informationUS 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007
US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 Sponsored by: The Ohio Department of Transportation and The City of Defiance Project
More information2 ALTERNATIVES AND OPTIONS
2 ALTERNATIVES AND OPTIONS This chapter documents the process used to develop improvement concepts for Oregon Avenue and describes the resulting project alternatives and options, which were developed in
More informationWestern Belfast Bypass almost finished
ROADS OF NATIONAL SIGNIFICANCE CHRISTCHURCH MOTORWAYS Western Belfast Bypass PROJECT UPDATE October 2017 Western Belfast Bypass almost finished The Western Belfast Bypass (WBB) project is 95 per cent complete
More informationGarver Feed Mill Timeline
Garver Feed Mill Timeline 1) 1989 Garver Feed Mill is designated as a CDA Redevelopment Project 2) 1991 Olbrich Botanical Gardens opens Bolz Conservatory, Schumacher Library, and associated buildings 3)
More informationStreet Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017
Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background
More informationCity of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21,
City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21, 2016 2016 2017 Activity Date March April May June July August September October November December
More informationTOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,
TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights
More informationPROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY
PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY BACKGROUND INFORMATION AND INVITATION TO PARTICIPATE IN AN ENVIRONMENTAL AUTHORISATION
More informationEARTH STABILIZATION GEOSYNTHETIC SOLUTIONS
EARTH STABILIZATION GEOSYNTHETIC SOLUTIONS A FULL LINE OF GEOSYNTHETIC SOLUTIONS As one of the largest manufacturer of geosynthetics in the world, we are focused on providing superior performance every
More informationI. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...
PROJECT COMMITMENTS SUMMARY... S-1 1. Type of Action... S-1 2. Description of Action... S-1 3. Summary of Purpose and Need... S-1 4. Alternatives Considered... S-2 5. NCDOT Alternatives Carried Forward...
More informationGLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017
GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017 Glen Road Pedestrian Bridge Class Environmental Assessment 1 WELCOME! Welcome to the second Public
More informationfoi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7
FLOOD PLAIN SERVICES County Road Needs Report County udges' Association of Arkansas 20L7 Annual Winter Meeting Thomas F. Black, P.E., CFM shsl201-7 i*"-i"s;a,i=?;;,#'1 tta le0isrtnet foi"#'.w Flood Plain
More informationTOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06
TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More information