1 Construction - One Week Look Ahead Public Works Capital Projects April 2, 2018 April 8, 2018 The following is a summary of Sarasota County construction, repair and maintenance projects that are expected to have an impact on local traffic or public areas during the one-week period beginning Monday, April 2, 2018 and continuing through Sunday, April 8, This summary includes all road or lane closures approved by the county engineer. Sarasota County Projects: Dory Lane Resurfacing: Gator Grading and Paving will be resurfacing a section of Dory Lane, south of Blackburn Point and west of US-41 next week. Work is expected to take 2 to 4 days. Art Powell, Project Manager, Ed Smith Stadium: Beginning October 9 and lasting for approximately 16 weeks, Prem. US began removing and replacing exterior floor coverings in the public walkway areas of the stadium. The work is being done in two phases, with the potential to complete all work in the first phase which concludes before Spring Training season. If necessary, the second phase will begin immediately after the Spring Training and last approximately 4-6 weeks. The new floor coating must be installed in relatively cool temperatures, so this work will be done at night. Flooring removal will be done in daytime hours, so this project with be around the clock, normally on weekdays only. Some limited stadium lighting will likely be used through the night time hours, but night operations will not generate any significant noise. Brad Gaubatz, Project Manager, Fruitville Initiative Stormwater Improvements: Gator Grading and Paving was tasked with the construction for this project. There 2 work sites as part of this project. Celery Fields: There were three (3) 60-inch reinforced concrete pipe (RCP) installed in the Celery Fields north of the observation mound. Excavation and installation of the pipes began on January 2, 2018 and was completed on January 18, Each pipe had a Tideflex Valve installed to prevent back flow to the by-pass canal. Work was competed on the valves at the beginning of March along with the trash grates. Some additional work is planned in the coming week to assure proper operation of the valves. East Road: A second site on East Rd. replaced two old metal culverts with (2) 42-inch concrete pipes under East Road between Fruitville Road and Rim Road. The installation of the pipes has been completed. The road is open at this time. Guard rail options are being discussed along with a possible barrier wall to help with the safety factor of the traveling public. Art Powell, Project Manager, Page 1 of 8

2 Landings & Riverview Lift Stations: This construction project contains five lift stations in need of rehabilitation and/or pipe work; Landings I, Landings III, Beneva/Webber, Golden Rod, and Riverview High School. Temporary traffic control measures will be in place where needed. Motorists are urged to use caution while traveling through these areas and be mindful of the work crews and equipment. Jason Brown, Project Manager, Mid-County Tax Collector Office: This project is located at 6100 Sawyer Loop Road in Sarasota (just south of Clark Road and on the west side of Sawyer Loop Road). The project is being managed by the County s Public Works (Capital Improvements) Department and will construct a new 10,770 square-foot office for the Sarasota County Tax Collector. When completed and operational, the project will feature a total of 24 customer service positions offering the full range of motorist services, tax services and other services provided by the Sarasota County Tax Collector. The nearly 6-acre site will also include a new practical course for driver s license testing, an after-hours payment drop-box, and a drive-thru window for expedited service. Construction site access is being handled from an access drive along the north side of the site, and minimal impact to traffic along Sawyer Loop Road is expected. Site construction and construction of the building pad are underway. Construction is scheduled for completion in very early 2018, and the operational opening is scheduled for early Spring of Daniel Lee Cruz, Project Manager, Phillippi Creek Septic System Replacement Program Area N, Phase 3: The Phillippi Creek Septic System Replacement Program (PCSSRP) was developed in 2000 to protect public health and to improve water quality in Phillippi Creek, by replacing individual septic systems and small private package waste water plants in many Sarasota County neighborhoods with central sewer service. Over 15,000 septic tanks will be replaced over the life of the project. Approximately, 200 residents will be connecting to central sewer in Area N3. Area N3 is being designed as a hybrid gravity sewer system with two smaller lift stations within the project area. Homeowners will connect to the central sewer system using a conventional gravity lateral rather than maintaining individual low-pressure units on each property, as originally planned. Award of the construction contract was April 25, 2017 to Spectrum Underground. The construction Notice to Proceed was given on May 23, Construction has begun and completion of the project was originally scheduled for March The contractor has fallen behind schedule and new estimates place completion to be approximately September Installation of sewer mains will take place on Webber Street this week beginning at Tanglewood and moving towards Lockwood Ridge Road. One eastbound lane will be permanently closed until the sewer installation is complete. This work is expected to take another 2 weeks. Work on the lift station on North Seclusion Drive and the station at Bermuda Brook on Tanglewood will continue. The contractor has asked that we reiterate the need for safety for the residents and all of those traveling in the areas under construction. There have been several instances of pedestrians and bicyclists entering the work zone to see the work being done. Please do not enter an active zone of construction. John Saputo, Project Manager, Page 2 of 8

3 Resurfacing Area O & P: Minor lane closures throughout areas O & P are expected over the next 2-3 weeks while crews remove and replace ADA ramps and associated curbing. Clean-up crews may also put up lanes closure for their work. Motorists are urged to use caution while traveling through the work areas and be mindful of the work crews and equipment. Robbin L. Levar, Project Manager Sanitary Manhole Rehabilitation: This construction project consists of cleaning, video inspections, and coating installations. The manhole rehabilitation will be in the Prestancia. Temporary traffic control measures will be in place where needed. Motorists are urged to use caution while traveling through these areas and be mindful of the work crews and equipment. Jason Brown, Project Manager, Sanitary Pipeline Rehabilitation: This construction project consists of cleaning, video inspections, and liner installations. The pipeline rehabilitation will be in the following Lift Station areas; Collins, Green Manor, Bob-O-Link, Post, and Antigua. Temporary traffic control measures will be in place where needed. Motorists are urged to use caution while traveling through these areas and be mindful of the work crews and equipment. Jason Brown, Project Manager, Siesta Key Master Pump Station and Forcemain Phase 3: The treatment plant is in the final stages of decommissioning. There may be some temporary odors and/or noises related to taking the plant permanently off-line. The master pump station is receiving partial flow from the treatment plant. During the month of March, the Contractor is scheduled to perform restoration work along Midnight Pass Road at the South View Drive intersection. The contractor will be working on Saturdays at the existing Siesta Key Waste Water Treatment plant during the month of March. Motorists and pedestrians in this area are asked to use caution as heavy equipment and workers could be active in the right of way periodically. Jack Gibson, Project Manager, Stormwater Pipeline Rehabilitation: This construction project consists of cleaning, video inspections, and liner installations. The pipeline rehabilitation will be in the following areas; Osprey Avenue, Downtown Sarasota, Englewood South, Whippoorwill area, Lockwood Meadows, S. Neponsit Drive, E. Rossetti Drive, Boulder Road. Temporary traffic control measures will be in place where needed. Motorists are urged to use caution while traveling through these areas and be mindful of the work crews and equipment. Jason Brown, Project Manager, Tuttle Avenue and 53 rd Street Road Closure: Stormwater operations is installing a 12 x18 pipe crossing under Tuttle Avenue and a catch basin on the west side, just north of the intersection with 53 rd Street. This work is scheduled to begin on Monday, April 2 nd and be completed by Friday, April 6 th Jordan Corby, Project Manager, Page 3 of 8

4 William H. Jervey, Jr. Venice Public Library: The new library building has been designed as a hybrid model, exemplifying a blend of the latest practices in service delivery with more traditional services that remain relevant to the community needs. The library will offer lending, reference and youth services, public access computers, wireless internet access, information and educational programs, while serving as a community gathering space. The library is consistent with design and functionality requirements for libraries within the Sarasota County Library System and employs strategies to reduce energy costs and provide opportunities for installation of automation equipment for increased efficiency. Site improvements include a drive-through book return, more direct access into the library site and the addition of pedestrian walkways from parking areas for enhanced patron safety. This project is poised to achieve Certified status through the United States Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) program. Construction of this project began on November 1, 2017, and will conclude Fall 2018, with move-in and opening following soon thereafter. The existing Venice Public Library Patron parking Lot at 305 Nokomis Avenue South will be partially closed from November 1, 2017, for the duration of construction. A portion of the parking area will be secured with construction fencing and screening and will be used for construction offices, storage, and worker parking. Kim Humphrey, Project Manager, Tree Maintenance: Mission Valley Boulevard: From Mission Valley Boulevard to Capistrano Road, there will be occasional lane closures in work zones Monday through Friday of next week. Sidewalks will be closed in the respective work zones for roadside tree maintenance. David Godson, Project Manager, Venice: City of Venice Bond Resurfacing Project PH1: Concrete replacement and asphalt resurfacing is progressing well on the island of Venice for the Road Bond Resurfacing Project, Phase 1. The contractor will be removing the old asphalt pavement and installing new asphalt pavement over the next two weeks on the following roadways: The Rialto Nokomis Avenue Alley between Tampa Avenue and Nokomis Avenue Alley between Fiesole Street and San Marco Drive Golf Drive Milan Avenue East Bahama Street Erskine Drive Country Club Way Cypress Avenue Camion Street Page 4 of 8

5 Seaboard Avenue Please be aware that any private improvement such as landscaping or sprinkler heads directly against the roadway could be impacted during the pavement removal process. The contractor will be restoring the area after the paving process is complete, and your patience is greatly appreciated. Please be prepared to move any parked vehicles from the roadway and we ask residents not to run irrigation while the contractors are in the area. For more information, please call James Clinch, Assistant City Engineer, at Service Club Park Boardwalk Replacement: Bayshore Construction has almost completed rebuilding the existing Service Club boardwalk and raised picnic areas. The new facility will provide a full ADA compliant access to the beach and the raised picnic areas. The park will remain closed during construction since there will not be a safe beach access available. We encourage beachgoers to use any of the other nearby beach accesses such as The Venice Fishing Pier, Maxine Barritt Park, the Paw Park or South Brohard Park. It is anticipated Service Club Park will be reopened the week of February 12 th. For more information, call James Clinch, PE, Assistant City Engineer, Sidewalk GAP Project: Installation of concrete sidewalks to fill gaps in existing sidewalk access and associated stormwater work will begin in multiple locations throughout the City. The Notice to Proceed for this project was issued on October 2, The contractor is currently working at Park Boulevard S from Gulf Street to Cornwell on the Gulf, and then will be installing sidewalks at the Airport Access Road from Airport Avenue to Business US-41, Fiesole Street from Nokomis Avenue to The Rialto, and Firenze Avenue from Nokomis Avenue to the Rialto. For more information, call James Clinch, PE, Assistant City Engineer, Edmondson Multi-Use Trail: Installation of a 10-ft. wide multi-use trail along the southern side of Edmondson Road from Pinebrook Road to Auburn Road. This new trail will provide ADA compliant trail along this corridor for use by pedestrians and bicycles. Please expect traffic delays and temporary lane closures in this area. For more information, call James Clinch, PE, Assistant City Engineer, Hatchett Creek Under-Bridge Parking Project: Beginning February 20 th and lasting for 2 months, a contractor will be installing a gravel parking area underneath the Hatchett Creek US-41 Business bridge adjacent to the Hamilton Building. This will provide additional public parking for use at the Temporary Library, Downtown and for Special Events. For more information, call James Clinch, PE, Assistant City Engineer, Water Main Replacement Phase 4: Andrew Sitework, LLC, will continue to address punch list items project wide. For more information, call the Venice City Utilities Department at FDOT Projects in Sarasota County: Laurel Road at the Legacy Trail Crossing: Construction project: Crews are constructing a pedestrian bridge along the Legacy Trail over Laurel Road. Please be aware of construction Page 5 of 8

6 vehicles entering and leaving the construction zone. Both northbound and southbound trail traffic are now being detoured to the west along the signed detour route. The Mission Valley Boulevard crosswalk to the east is no longer a trail detour route to cross Laurel Road. Both sidewalks on the north and south side of Laurel Road are now closed. Please follow detour signs provided. Denson Construction, Inc. is the contractor for the bridge. Expected completion is fall I-75 (SR 93) / University Parkway (Exit 213) Diverging Diamond Interchange (DDI) Sarasota/Manatee (Bradenton): Construction project: Temporary intermittent single and double lane closures are in place at night/overnight on northbound and southbound I-75 Monday, April 2 through Thursday, April 5 between 8 p.m. and 7 a.m. the following morning. Double lane closures begin at 11 p.m. Temporary intermittent single and double lane closures are in place at night/overnight on eastbound and westbound University Parkway from Cooper Creek Blvd. to Market Street Monday, April 2 through Thursday, April 5 from 9 p.m. to 7 a.m. the following morning. Double lane closures begin at 10 p.m. The contractor is installing final asphalt friction course and pavement markings, weather permitting. Improvements being made as part of this project consist of constructing a diverging diamond interchange, adding an auxiliary lane on northbound and southbound I-75, constructing new bridges on I-75 over University Parkway, widening of University Parkway, widening of I-75 bridges over Errie Creek and Foley Creek, realignment of on-ramps and off-ramps at I- 75/University Parkway, addition of ponds, drainage improvements, new lighting and signalization, construction of a noise wall on the west side of I-75, sidewalks, bike lanes, and pedestrian walkways. Expected completion is early The contractor is Prince Contracting, LLC. For additional information, please visit the project website at US 41 from SR 789 to Ritz Carlton Drive and sidewalk located along the north side of SR 789 from Sunset Drive to US 41: Maintenance permit project: The sidewalk will remain closed until construction of the development located at the corner of US 41 and SR 789 is complete. Pedestrians should follow the established detour. US 41 from Browning Street to 11th Street: Construction project: Crews are resurfacing the roadway; installing new drainage; installing highway lighting, curb and gutter; constructing new sidewalk, and installing new signing and pavement markings. Expect nighttime/overnight lane closures on US 41; US 301; Fruitville Road, and Orange Avenue while crews are working. Crews are constructing a new right turn-lane from northbound US 41 to Fruitville Road. Once constructed, the existing right turn-lane will be closed to traffic. Crews will then construct a pedestrian island and improve drainage. Nighttime/overnight northbound outside lane closures are also expected from 9 p.m. each night to 6 a.m. each morning while crews are working. Preferred Materials, Inc. is the contractor. Expected completion is Spring US 41 from Salford Boulevard to Sumter Boulevard: Construction project: Crews are widening US 41 from Salford Boulevard to Sumter Boulevard to a six-lane highway; resurfacing Page 6 of 8

7 the roadway; improving drainage; constructing sidewalk, and installing highway lighting. Expect nighttime/overnight lane closures from 9 p.m. to 6 a.m. when crews are resurfacing the roadway. Expect periodic driveway closures along the northbound lanes while crews are installing drainage systems. Russell Engineering, Inc. is the contractor. Expected completion is Spring US 41 Roundabouts at 10th Street and 14th Street, Sarasota: Construction project: Crews continue work within the right-of-way, medians and driveways. Construction activities will take place mostly during daytime. Night time activities may happen if there is an unforeseen activity involving lane closures. Temporary single lane closures may occur between 9th Street and 15th Street from 9 a.m. to 4 p.m. and between 7 p.m. and 6 a.m. if night time activities are scheduled. Centennial Park Boat Ramp driveway on 10th Street will be closed. Motorists can access the boat ramp via the US 41 entrance. Northbound left turn lane from US 41 into the boat ramp is available. Pedestrian paths have been reconfigured around the work zone, please use designated sidewalks and cross walks. No pedestrian access on the west side of US 41 beyond Centennial Park, pedestrians are advised to use the sidewalk on the east side of US 41. Dewatering piping systems will continue to be installed from 10th Street to 11th Street west of US 41. Dewatering pumps will be running 24/7. Stormwater pipe installation and box culvert extension activities will take place at Hog Creek/11th Street. Demolition of box culvert and removal of old signal poles and foundation on west side of project will occur during daytime hours. Expect noise during demolition and removal of the pole foundation. Trenching and installation of drainage pipe/water lines at Imperial Drive and 11th St during daytime hours. Expect equipment noise and backup alarms during the operation at these locations in addition to the contractor s storage yard while equipment and trucks load and offload material. Please be aware of heavy equipment and construction vehicles when travelling in the area. Excavation and grading for placement of temporary asphalt and sidewalk on Imperial Drive between US 41 and Sarasota Bay Club entrance on the south side. The traffic pattern access will be limited to right turn in/out for 11th, 12th and 13th Street. Traveling southbound and northbound direction left turns are not permitted at 11th, 12th, 13th and 14th Streets. Motorists are advised to follow the posted signs. Temporary detour route in effect. Use Cocoanut Avenue as alternate route to access 12th, 13th, 14th and 15th Street. Motorists are advised to follow the posted detour route and seek an alternate route while traveling in this area. Speed limit is reduced to 30 mph. Speeding fines are doubled in the construction area when workers are present. Page 7 of 8

8 Improvements being made as part of this project consist of reconstructing the signalized intersections and replacing them with roundabouts, enhancing connectivity, circulation and safety. US 41 will be widened between the two intersections and will include bike lanes as well as dedicated turn lanes, a 10-foot sidewalk along the west side, and a 6- foot sidewalk along the east side. Other improvements include raised islands for pedestrian refuge at the intersections of US 41 at 10th Street and 14th Street, pedestrian signals, LED street lights, landscaping, and City of Sarasota utility and underground drainage structure replacements. Expected completion is spring The contractor is IBT Construction LLC. US 41 from Hospital Road to River Road: Maintenance permit project: Crews are constructing new turn-lanes, driveway connections, and working in the medians. Expect intermittent north and southbound daytime lane closures from 9 a.m. to 4:30 p.m. through Friday, April 6. Use caution and expect possible delays. SR 758/Bee Ridge Road from Bond Place to Cattleman Road: Construction project: Crews are resurfacing the roadway, constructing sidewalk, improving drainage, and upgrading traffic signals and highway lighting. Expect nighttime/overnight single-lane closures from 7 p.m. to 6 a.m. while crews are working. Ajax Paving Industries of Florida is the contractor. Expected completion is late Fall JoAnn May, Florida Department of Transportation, Non-County Projects of Interest: Honore Avenue/Central Sarasota Parkway Roundabout Project: Watson Civil Construction, Inc. was given the project to construct this fast-paced community project. Crews have Maintenance of Traffic (MOT) signs in place. Construction activities will take place during daytime hours along with survey layout work. Single lanes through the work zone areas with construction on the outside of the roundabout is progressing. Temporary stop signs on Honore Avenue have been placed along with Variable Message Boards. Expected completion is August Art Powell, Project Manager, Page 8 of 8

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

Canal Road City Limits (East of Van Dyke Ave) to Saal Road Canal Road City Limits (East of Van Dyke Ave) to Saal Road Construction Update 9/14/2018 The ashalt paving on the southside of Canal Road is expected to start Saturday, September 15 (weather permitting)

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 18, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C Exposition Light Rail Transit Project Project Status Update Meeting West End Corridor Segment C Culver City Senior Center November 18, 2010 Phase 1 Project Description Phase 1 from Downtown Los Angeles

More information

Downtown Redevelopment Project Update

Downtown Redevelopment Project Update Downtown Redevelopment Project Update The redevelopment project will begin the week of September 4, 2017. It is anticipated that construction will be approximately 565 days, depending on weather. 7-6-18

More information

Moving The Metro. A special construction update for the metro Omaha area.

Moving The Metro. A special construction update for the metro Omaha area. Moving The Metro A special construction update for the metro Omaha area. ebraska Department of Roads Spring/Summer 2017 I-80 / I-480 / US-75 Interchange The improvements on this project consist of bridge

More information

SR 483 Clyde Morris Boulevard FDOT District 5

SR 483 Clyde Morris Boulevard FDOT District 5 This project occurs on a 3.0 mile section of SR 483 (Clyde Morris Blvd.) south of Beville Road (SR 400) to north of International Speedway Boulevard (SR 600). Ghyabi is providing project management and

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280 I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange THIRD

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018 I-4 Beyond the Ultimate Florida Transportation Builders Association February 9, 2018 FDOT: Improving Mobility & Safety in Central Florida FDOT is Designing and building a better I-4 through Central Florida

More information

Spring 2018 Construction Update

Spring 2018 Construction Update Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the

More information

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016 Rt. 29 Solutions Project Delivery Advisory Panel January 7, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Dec

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name Project # PROJECT NAME PAGE 2134 2119 PR-1109 Clayton Road (Market Street to Oakland Avenue) Sidewalk Repair 911 System Replacement and Dispatch Room Remodel ADA Barrier

More information

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B

More information

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project PennDOT Public Meeting S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project Mt Lebanon Township, Allegheny County Mt Lebanon Township Municipal Building November 6, 2014 1 Project

More information

NEWSLETTER #03 BEAUDESERT ROAD LOGAN MOTORWAY

NEWSLETTER #03 BEAUDESERT ROAD LOGAN MOTORWAY NEWSLETTER #03 MT. LINDESAY HIGHWAY Feedback shapes design changes Thank you to the more than 600 stakeholders and community members that provided feedback on the Logan Enhancement Project initial concept

More information

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases. I-95 Avenue Interchange Project Status Construction is underway for Phase 3. Overall Project Area and Schedule Phase 0: Completed 2010 Section GR0: Completed in Fallin 2010 Phase 2: Completed Section GR2:

More information

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals ABOUT US Creative Engineering Group Inc, (Creative) is a Construction Engineering and Inspection (CEI) firm established in 2006 by two Principals Rick Estripeaut & Sri Mavanur. In the last decade Creative

More information

5-Year Street Reconstruction Plan ( )

5-Year Street Reconstruction Plan ( ) 5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580

More information

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We will provide you information on the overall project and

More information

Prince William Street Project (Grant Avenue to Wellington Road)

Prince William Street Project (Grant Avenue to Wellington Road) Prince William Street Project (Grant Avenue to Wellington Road) 1 Goals Improve pedestrian and bike traffic safety Improve street drainage with curb & gutter Upsize water mains Enhance overall street appearance

More information

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES ROAD CONSTRUCTION 36 June 2014 ROADS&BRIDGES Young is full of life Recent expansion completes continuous, multilane arterial By Donald Hammack, P.E. Contributing Author The Florida Department of Transportation

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

COLLIER BOULEVARD (CR 951) CORRIDOR

COLLIER BOULEVARD (CR 951) CORRIDOR Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts

More information

JOB CREATION PROJECTS

JOB CREATION PROJECTS SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each

More information

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Project will Replace: Utilities Curb Pavement Lighting. City of Madison Project will Replace: Utilities Curb Pavement Lighting Replace sanitary sewer main & laterals Winnebago: Existing 8 main, 1905 Linden: Existing 6 main, 1915, upsize to 8 main Atwood: Existing 12 main,

More information

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in

More information

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road SOLICITATION J2112395P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road Qualifications and Experience of Key Personnel Dan Tintner, P.E., Project Manager/Senior Project

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking

More information

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010

I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project Informational Meeting Tuesday, July 27, 2010 I-75/I-475 Interchange Upgrade Project David R. Dysard, AICP District Two Deputy Director Theresa Pollick Public Information

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

Index to Projects by Project Name

Index to Projects by Project Name Index to Projects by Project Name 2062 1701 & 1711 Concord Avenue Purchase and Demolition of Structures 85 1279 1024 UF-802 UF-803 Affordable Housing 77 Annual CIP/TIP Management Program 105 Arnold Industrial

More information

PROJECTS UNDER CONSTRUCTION

PROJECTS UNDER CONSTRUCTION Project Name Project Status Project Funding Project Manager PJ 2144 Clayton Rd-Treat Blvd Intersection Improvements Widen the Clayton Road/Treat Blvd intersection and upgrade the traffic signal. Construction

More information

7.5 Impacts on the Section 4(f) Properties

7.5 Impacts on the Section 4(f) Properties constructive use, such as noise, air quality and visual impacts were also assessed. It was determined that this project would not introduce changes of an external nature that would affect the recreational

More information

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015 AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department

More information

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING I-66 EASTBOUND WIDENING INSIDE THE BELTWAY From the Dulles Connector Road (Route 267) to Fairfax Drive (Route 237) PARDON OUR DUST MEETING Bill Cuttler, PE (VDOT District Construction Engineer, Northern

More information

PROPOSED IMPROVEMENTS

PROPOSED IMPROVEMENTS IV. PROPOSED IMPROVEMENTS The proposed improvements for each alternative carried forward are discussed below. A. FUNCTIONAL CLASSIFICATION AND ROADWAY CROSS-SECTIONS The classifications of the roadways

More information

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Meeting Purpose: Date and Time: Location: Attendance: Handouts: Meeting Purpose: Date and Time: Location: Attendance: Handouts: PA Turnpike / I-95 Interchange Project Design Advisory Committee (DAC)/Public Officials Meeting #8 April 12, 2012 at 1:30 p.m. Project Office,

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

WELCOME NEIGHBORS! April 11, 2019

WELCOME NEIGHBORS! April 11, 2019 District of Columbia Water and Sewer Authority David L. Gadis, CEO and General Manager Clean Rivers Project Northeast Boundary Tunnel Tunnel Forum Meeting WELCOME NEIGHBORS! April 11, 2019 0 Welcome! 1

More information

Welcome to the Sellwood Bridge Project Pre-Construction Open House

Welcome to the Sellwood Bridge Project Pre-Construction Open House Welcome to the Sellwood Bridge Project Pre-Construction Open House 5:30 7:30 p.m. Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting

More information

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the

More information

County of El Dorado Standard Plans

County of El Dorado Standard Plans County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013 Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN

More information

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION

More information

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS 56TH STREET AND 17TH AVENUE IMPROVEMENTS FUNDING: Bonded ESTIMATED COST: $3,885,000 COMPLETION DATE: Fall 2018 SCOPE OF PROJECT: Widening of 56th Street from 6th Avenue to 19th Avenue, and widening 17th

More information

Design Services for Wiles Road Broward County Project #104026

Design Services for Wiles Road Broward County Project #104026 Design Services for Wiles Road Broward County Project #104026 ORGANIZATIONAL CHART THE CGA TEAM Firm Services Key Staff CBE Calvin, Giordano & Associates, Inc. HBC Engineering Company Florida Engineering

More information

Bexar County Public Works Department Flood Control Program

Bexar County Public Works Department Flood Control Program Bexar County Public Works Department Flood Control Program Bulverde Rd. at Mud Creek Trib. A (SC-27) February 23 rd, 2016 Agenda Introductions Bexar County Flood Control (Engineering and PR) Office of

More information

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details CITY OF LATHROP Department of Public Works DESIGN & CONSTRUCTION Standard Details January 2014 General G-1A Signature Blocks G-1B Signature Blocks G-2 Drafting Standards G-3 Drafting Standards G-4 Drafting

More information

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement (blank page) WestConnex New M5 5-42 (blank page) WestConnex New M5 5-44 5.5 Tunnels 5.5.1 Main alignment tunnels The main alignment tunnels would be about nine kilometres long, with the western tunnel

More information

Shell Beach Road Streetscape Frequently asked Questions

Shell Beach Road Streetscape Frequently asked Questions Shell Beach Road Streetscape Frequently asked Questions General What is the Shell Beach Road Streetscape Improvements Project? The overall goal of the Shell Beach Road Streetscape Improvement project is

More information

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,

More information

STANDARD DETAILS QUICK REFERENCE

STANDARD DETAILS QUICK REFERENCE STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 TABLE OF CONTENTS Sheet Number Title Revision Date I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 STREETS ST-1 LOCAL STREETS 03/17/08 ST-1A LOCAL STREETS, 2015 GENERAL PLAN 11/15/04 ST-2 COLLECTOR AND ARTERIAL

More information

City of Richmond. Engineering Design Specifications

City of Richmond. Engineering Design Specifications City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

Highway 417 Expansion East

Highway 417 Expansion East Highway 417 Expansion East Nicholas Street to Ottawa Road 174 GWP 4091-07-00 & GWP 4320-06-00 Outline Project Overview Highway 417 Widening Bridge Rapid Replacements Traffic & Incident Management Project

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier Mission We connect our communities Vision Getting you there better, faster and easier Values Play as a team Think forward Serve with passion 1 Metrolinx overview go transit, up express, presto Serve a

More information

Fairfax County Parkway (Route 286) Widening Project

Fairfax County Parkway (Route 286) Widening Project Fairfax County Parkway (Route 286) Widening Project Route 29 (Lee Highway) to Route 123 (Ox Road) State Project No. 0286-029-259, P101; UPC 107937 Fairfax Station HOA Meeting January 30, 2018 7:00 to 9:00

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

startup. Construction of contractor entrance off University City Blvd connecting to Lot 8 has started.

startup. Construction of contractor entrance off University City Blvd connecting to Lot 8 has started. Campus Construction Situation Report #6 March 15, 2012 Hechenbleikner Lake Dam No change from previous notice Dewatering maintenance continues. Major construction activity will begin mid April and with

More information

Wiles Road from University Drive to Riverside Drive

Wiles Road from University Drive to Riverside Drive Wiles Road from University Drive to Riverside Drive Presented to: Broward County WSP Parsons Brinckerhoff is now Presented by: WSP USA Inc. Our Team.. Introduction / Project Team Cecilia Villoria, PE Project

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on

More information

Date: Thursday, August 21, 2014

Date: Thursday, August 21, 2014 RESOLUTION 2014-02 A RESOLUTION OF THE BOARD OF SUPERVISORS OF LAKEWOOD RANCH COMMUNITY DEVELOPMENT DISTRICT 4 APPROVING PROPOSED BUDGETS FOR FISCAL YEAR 2015 AND SETTING A PUBLIC HEARING TO ADOPT THE

More information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

Engineering Department

Engineering Department Engineering Department Department Mission It is the mission of the Engineering Department to protect and enhance the public health, safety and welfare by reviewing, inspecting and maintaining documentation

More information

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017 Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background

More information

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge MEPA Meeting, EEA#14702 Wednesday, March 2, 2011 6:30 PM Dr. Martin Luther King, Jr. School 100 Putnam Avenue, Cambridge, MA Rendering by:

More information

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015 CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012 MARINA BAY NEIGHBORHOOD PRESENTATION City of Richmond Officer Bradley A. Moody Memorial Underpass April 11, 2012 TEAM INTRODUCTIONS Project Oversight and Approval City of Richmond Formally Richmond Community

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island

More information

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015 Rt. 29 Solutions Project Delivery Advisory Panel December 3, 2015 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Nov

More information

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES CITY OF LARKSPUR PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES PRESENTED BY Julian Skinner Larkspur Public Works Director DATE July 13, 2016 Bon Air Bridge

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

Highway 15 Project - Hutchinson

Highway 15 Project - Hutchinson Highway 15 Project - Hutchinson Agenda What are we going to talk about today? Goals and benefits of the project Details about the proposed work Project schedule and costs Any questions you may have about

More information

Welcome to the. Open House

Welcome to the. Open House Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect

More information

Public Information Centre. Welcome

Public Information Centre. Welcome Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff

More information

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018 Monroe Street Reconstruction Public Preconstruction Meeting February 21, 2018 Thank you to Edgewood College! Tonight s Agenda 1. Project Overview 2. Initial project schedule and phasing 3. Expectations

More information

APPENDIX F: DETAIL DRAWINGS

APPENDIX F: DETAIL DRAWINGS APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

Route 29 Project Delivery Advisory Panel September 11, 2014 Meeting Minutes

Route 29 Project Delivery Advisory Panel September 11, 2014 Meeting Minutes Route 29 Project Delivery Advisory Panel Meeting Minutes Meeting 5 of the Route 29 Project Delivery Advisory Panel (PDAP) was held at the Virginia Center for Transportation Innovation and Research in Charlottesville,

More information

The Ambassador Bridge/ Gateway Project

The Ambassador Bridge/ Gateway Project The Ambassador Bridge/ Gateway Project Connecting Neighbors & Driving the Economy 2008 Ohio Conference on Freight Given by the Toledo Metropolitan Area Council of Governments, National Association of Regional

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Schooleys Mountain Bridge Rehabilitation Project ID Numbers: N1707 / 173470 Schooleys Mountain Road Bridge was built in 1920 and widened in 1937. The project is a replacement of the bridge structure and

More information

ROAD PAVING VARIOUS LOCATIONS LANE KM

ROAD PAVING VARIOUS LOCATIONS LANE KM ROAD PAVING VARIOUS LOCATIONS 9.317 LANE KM $1,465,200 General: $1,465,200 BASED ON CONDITION ASSESSMENTS OF THE ENTIRE ROAD NETWORK; USING ASSET MANAGEMENT PRINCIPLES, ROADS THAT ARE SUITABLE FOR REPAVING

More information

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change* 12/6/2017 3012115-03 Northwood Dr NE, Glass to s/o Brookland $980,000.00 J. 4/16/2018 12/13/2017 3012121-02 O Ave NW, 16th to Ellis $4,065,000.00 Tippe; Lee J. 3/19/2018 Collins Rd NE from E of Northland

More information