Iowa 100 Extension Project Visualizations for Design and Public Involvement ASCE Transportation Conference November 6, 2013 Ames, Iowa

Size: px
Start display at page:

Download "Iowa 100 Extension Project Visualizations for Design and Public Involvement ASCE Transportation Conference November 6, 2013 Ames, Iowa"

Transcription

1 Iowa 100 Extension Project Visualizations for Design and Public Involvement 2013 ASCE Transportation Conference November 6, 2013 Ames, Iowa

2 Agenda Project Corridor Constraints Key Features Project History Project Status and Timeline Visualizations Used In Design Visualizations Used In Public Involvement 2

3 Project Corridor IA 100 Project Corridor Limits and Features Extension of IA 100 From Edgewood Road to US 30 Crossing of the Cedar River System Interchange at US 30 Three Local Service Interchanges Two Rural Standard Diamond Interchanges Single Point Urban Diamond Interchange 8 Miles of New Four Lane Freeway Rural and Urban Sections Constraints Morgan Creek and Morgan Creek County Park Iowa Northern Railroad Rock Island Preserve Wetlands and Historic Constraints 3

4 Project History Linn County Regional Planning Commission identified the route as an integral part of their metro plan in 1969 LCRPC added IA 100 extension from I-380 to Edgewood Road in 1977 Iowa DOT began Location Studies to extend IA 100 to US 30 and circulated a DEIS in 1978 Final EIS approved and circulated in late 1980 Spring 1983 IA 100 Construction from I-380 to Edgewood Road began Funding constraints delay the rest of the corridor Reevaluation of 1980 FEIS determined in 1998 and the project corridor added back into the DOT s transportation plan FHWA determined a Supplemental EIS should be prepared in 2000 Supplemental DEIS with Preferred Alternative released for circulation in mid

5 Project History cont. Subsequent Corridor Alternative Evaluations Late 2001 to Avoid Rock Island Preserve Late 2002 to Avoid Byssus Skipper Habitat Fall 2004 to Avoid/Minimize Impacts to Blandings and Ornate Box Turtle Habitat Late 2005 Linn County Conservation Board Alternatives to Avoid Rock Island Preserve FHWA recognizes the Rock Island Preserve as a 4(f) Resource Alternatives Evaluation continues through mid 2007 SEIS Finalized and Signed in 2007 Preliminary Design started but stopped at 30% plans in 2009 Preliminary and Final Design restarted in

6 Project Status Two Phases Phase I Covington Road to Edgewood Road Phase II US 30 to Covington Road Phase I Final Design Three Grading Packages One Paving Package Tree Felling Contract Wildlife Crossing Contract Bridge Contracts First Letting Scheduled September 2013 Phase II Preliminary Design First Letting Scheduled Spring

7 Project Visualizations for Design Used for: Evaluation of ROW and Existing Access Evaluation of current features Coordination between disciplines Aesthetic Features Coordination with Key Stakeholders Tools Geopak Site, Corridor Modeler and 3D Features in Microstation Google Earth Google Sketch Up 7

8 Project Visualizations for Design cont. Google Earth Fly Through Street View 8

9 Project Visualizations for Design cont. Google Sketch Up Iowa DOT Renderings Project Team Meetings Key Stakeholder Outreach Edgewood Road Interchange Interchange Lighting Aesthetics Pedestrian Accommodations Design Details 9

10 Project Visualizations for Design cont. 10

11 Project Visualizations for Design cont. 11

12 Project Visualizations for Design cont. 12

13 Project Visualizations for Design cont. 13

14 Project Visualizations for Public Involvement Used for: Tools Public Involvement and Coordination One-on-One Communications with Property Owners Google Earth Fly Through Microstation 3D Views and Still Renderings Property Owner Meetings Drive Thru Renderings Real Time Visualizations 14

15 Project Visualizations for Public Involvement cont. 15

16 Project Visualizations for Public Involvement cont. 16

17 Project Visualizations for Public Involvement cont. 17

18 Project Visualizations for Public Involvement cont. 18

19 Project Visualizations for Public Involvement cont. 19

20 Project Visualizations for Public Involvement cont. 20

21 Project Visualizations for Public Involvement cont. 21

22 Project Visualizations for Public Involvement cont. 22

23 Project Visualizations for Public Involvement cont. 23

24 Project Visualizations for Public Involvement cont. 24

25 Project Visualizations for Public Involvement cont. 25

26 Project Visualizations for Public Involvement cont. 26

27 Project Visualizations for Public Involvement cont. 27

28 Project Visualizations for Public Involvement cont. 28

29 29

30 Summary and Conclusions Not for Every Project Beneficial for Projects With: Complex Features and Design Details Significant Public Involvement Aesthetics Target Audiences Design Teams Managers and Decision Makers (Local Jurisdictions, City Councils) Key Stakeholders (Aesthetics Committees, Public Interest Groups, Neighborhood Groups) General Public 30

31 Dan Smith CH2M HILL 4200 University Ave. Ste 309 West Des Moines, IA x

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION County: Linn County, IA GREEN SHEET Location: IA 100, from its terminus at Edgewood Rd. to US 30 southwest of Cedar Rapids Route: IA 100 Extension Project No.: NHS-100-1(36) 19-57 OLE Project Managers:

More information

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting Rosecrans/Marquardt Grade Separation Project Community Open House Meeting October 17, 2017 Rosecrans/Marquardt Presentation Agenda 1. Welcome Remarks & Introductions 2. Community Outreach 3. Project Goals

More information

Corridor Management Committee. September 29, 2017

Corridor Management Committee. September 29, 2017 Corridor Management Committee September 29, 2017 1 Today s Topics Chair s Update Proposed Corridor Protection Wall Aesthetic Design Overview Public Outreach Environmental Review Civil Construction Update

More information

Illiana Corridor CPG/TTF Meeting #1

Illiana Corridor CPG/TTF Meeting #1 Illiana Corridor CPG/TTF #1 March 14, 2013 #10 1 Agenda Tier One Recap What happens in Tier Two? Tier Two Purpose and Need Identify Range of Alternatives Landowner Outreach Initial Context Sensitive Solution

More information

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina 1.0 INTRODUCTION Section 4(f) of the Department of Transportation Act of 1966, 49 U.S.C. 303, requires that prior to

More information

Planning Sustainable Places Program

Planning Sustainable Places Program Planning Sustainable Places Program A D VA N C I N G A S U S TA I N A B L E R E G I O N P L A C E BY P L A C E Kansas STP Committee February 11, 2016 Planning Sustainable Places Recognition Both the Missouri

More information

Transportation Committee

Transportation Committee Transportation Committee Business Item No. 2013-286SW Meeting date: October 14, 2013 For the Metropolitan Council meeting of October 16, 2013 Subject: Southwest Light Rail Transit (Green Line Extension):

More information

Isabel Neighborhood Plan: Alternatives

Isabel Neighborhood Plan: Alternatives Isabel Neighborhood Plan: Alternatives Presented by: Lori Parks, Associate Planner February 2, 2015 Agenda 1. Background on BART to Livermore 2. Isabel Neighborhood Plan 3. Alternative Scenarios 4. General

More information

South Dakota 100 Corridor Preservation

South Dakota 100 Corridor Preservation South Dakota 100 Corridor Preservation Purpose of this Public Hearing Inform Receive Input SD100 Project Progress East Side Corridor 1993 East Side Corridor EA March 20, 2003 SD100 Corridor Preservation

More information

Fort Ord Regional Trails Planning

Fort Ord Regional Trails Planning Fort Ord Regional Trails Planning FORA Board July 11, 2014 Josh Metz, Associate Planner Overview Base Reuse Plan (BRP) trails planning context Trails planning in FORA jurisdictions and related entities

More information

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. November 30, 2017

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. November 30, 2017 SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY November 30, 2017 Agenda Introductions and Overview Study Purpose Study Approach Key Analysis Components Study Context Existing Conditions Corridor Constraints

More information

I-70 Corridor Enhancement Plan

I-70 Corridor Enhancement Plan i - Table of Contents Table of Contents Chapter I Overview Chapter II Bridge and Roadway Improvements Chapter III Landscape Enhancements Chapter IV Riparian Corridors Chapter V Showcase Missouri Plan Chapter

More information

7.0 SECTION 4(F) EVALUATION

7.0 SECTION 4(F) EVALUATION Chapter 7 Section 4(f) Evaluation 7.0 SECTION 4(F) EVALUATION 7.1 Background Information and Regulatory Requirements This chapter presents the existing conditions and potential effects to parklands and

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017 Congestion Management Safety Plan Michael Corbett State Program Administrator September 2017 Agenda Topic 1 What is the Congestion Management Safety Plan (CMSP)? 2 Relevance to Congestion Investments 3

More information

Rapid Transit Implementation Working Group

Rapid Transit Implementation Working Group Rapid Transit Implementation Working Group October 12, 2017 1 Agenda 1. Consultation Update 2. Technical Work Update 3. LTC Rapid Transit Integration 4. Next Steps 2 Consultation Update 3 Consultation

More information

MARINA BAY. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 14, 2010

MARINA BAY. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 14, 2010 MARINA BAY NEIGHBORHOOD G O OO PRESENTATION S O City of Richmond Officer Bradley A. Moody Memorial Underpass April 14, 2010 TEAM INTRODUCTIONS Project Oversight and Approval City of Richmond Richmond Community

More information

Carrboro Greenways Commission January 9 th, 2007

Carrboro Greenways Commission January 9 th, 2007 Carrboro Greenways Commission January 9 th, 2007 Statewide The flooding of Crabtree Valley in the early 1970 s (right before Crabtree Valley Mall was set to open) caused city, state, and federal officials

More information

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF. Overall Map Summit Chicago Bloomington-Normal Lincoln New Station Planned New Station Planned Dwight Pontiac Joliet Pedestrian overpass and second platform planned Higher speed service began in this section

More information

WARM SPRINGS PARK MASTER PLAN

WARM SPRINGS PARK MASTER PLAN TABLE OF CONTENTS page 1.0 Introduction and Overview 1 2.0 Information Gathering 2 3.0 Conceptual Alternative Development 8 4.0 Master Plan Development 14 5.0 Construction Cost Estimates 19 LIST OF FIGURES

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016 Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment May 5, 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service

More information

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project 1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA 1.1.1 Project Description The Trunk Highway (TH) 14 West Corridor is a two-lane roadway approximately 22 miles in length. Located in Nicollet County, the corridor

More information

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, 2010 6:00 pm - 8:00 pm 1 Project Area 2 Sheridan Parking Structure RTD Ownership 3 Project Elements Structure and amenities include: 1.

More information

Iowa s Statewide Urban Design Standards Promote Improved Access Management

Iowa s Statewide Urban Design Standards Promote Improved Access Management Iowa s Statewide Urban Design Standards Promote Improved Access Management David J. Plazak and Dale S. Harrington Center for Transportation Research and Education Iowa State University 2901 South Loop

More information

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates... PROJECT COMMITMENTS SUMMARY... S-1 1. Type of Action... S-1 2. Description of Action... S-1 3. Summary of Purpose and Need... S-1 4. Alternatives Considered... S-2 5. NCDOT Alternatives Carried Forward...

More information

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011 Expo Line Community Meeting Phase 2 Design Update November 2011 Meeting Agenda Phase 2 Design Update Meeting Meeting Purpose and Format Project Status Update Overview of Design Progress Next Steps Open

More information

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222 PD&E STUDY SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # 435808-1-22-02 ETDM 14222 WELCOME TO THE KICK-OFF MEETING May 24, 2016 1 1 2 3 4 5 6 PLANNING PROJECT DEVELOPMENT AND ENVIRONMENT

More information

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the first Public Meeting for the proposed interchange improvement

More information

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015 Longmeadow Parkway Fox River Bridge Corridor August 6, 2015 Longmeadow Parkway Bridge Corridor 5.6 miles from Huntley Road to IL 62 Unique municipal/county/state/federal partnership Links Randall Road

More information

Creating Complete Roadway Corridors:

Creating Complete Roadway Corridors: Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee

More information

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY Board of County Commissioners Public Hearing March 20, 2018 Presentation Overview Study Overview Existing Conditions Project Development Plan Public Involvement

More information

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Meeting Purpose: Date and Time: Location: Attendance: Handouts: Meeting Purpose: Date and Time: Location: Attendance: Handouts: PA Turnpike / I-95 Interchange Project Design Advisory Committee (DAC)/Public Officials Meeting #8 April 12, 2012 at 1:30 p.m. Project Office,

More information

Asheville Design Center March 2010

Asheville Design Center March 2010 Community-Based Design Update Asheville Design Center March 2010 www.ashevilledesigncenter.org 1 introduction contents 1. Introduction 2. Background 3. ovember Design Charrette 4. January Work Session

More information

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018

More information

Chesterfield County Project Update

Chesterfield County Project Update Chesterfield County Project Update SOUTHEAST HIGH SPEED RAIL TIER II ENVIRONMENTAL IMPACT STATEMENT RICHMOND, VA, TO RALEIGH, NC CHESTERFIELD COUNTY, VA OFFICIALS BRIEFING February 2013 Federal Railroad

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Background and Process Monroe Expressway will be open by the end of 2018 Union County and Indian Trail identified a need to revisit

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA 1 1 Purpose of Public Information Centre #2 To provide interested and/or potentially affected stakeholders with an opportunity to participate in the planning and decision-making process for this Municipal

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

Kenilworth Landscape Design Community Workshop. June 13, 2015

Kenilworth Landscape Design Community Workshop. June 13, 2015 Kenilworth Landscape Design Community Workshop June 13, 2015 1 Meeting Agenda 8:30 9:00 am: Project presentation 9:00 11:00 am: Small group / table activities 11:00 11:30 am: Reporting and next steps 11:30

More information

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

WHAT IS THE PURPOSE OF THE OPEN HOUSE? WHAT IS THE PURPOSE OF THE OPEN HOUSE? OPEN HOUSE PURPOSE The purpose of the open house is to provide an update on the study process and introduce the preliminary concept alternatives. The open house provides

More information

BeltLine Corridor Environmental Study

BeltLine Corridor Environmental Study BeltLine Corridor Environmental Study Joint TAC and SAC Meeting December 8, 2008 What We Will Discuss Today Outreach and Agency Coordination Scoping Results Existing Conditions Historical and Archeological

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

Alaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016.

Alaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016. B-001-001 The use of Columbia Street for two-way transit was a decision made by King County Metro as part of its Southwest Transit Pathway evaluation. This project is separate from AWPOW. B-001-002 Modeling

More information

Alternative Routes. St. Vital to La Verendrye Station - Southern Loop Transmission Corridor. 20 different segments 4 segments common to all routes

Alternative Routes. St. Vital to La Verendrye Station - Southern Loop Transmission Corridor. 20 different segments 4 segments common to all routes Alternative Routes St. Vital to La Verendrye Station - Southern Loop Transmission Corridor In a fixed right-of-way St. Vital to Letellier Station 20 different segments 4 segments common to all routes Goal

More information

A Vision for Walnut Creek

A Vision for Walnut Creek A Vision for Walnut Creek Photo: City of Clive Walnut Creek Booklet 8 of 8 Greater Des Moines Water Trails and Greenways 1 Table of Contents Booklet 1: Water Trails Strategies and Policies Booklet 2: Beaver

More information

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1 1.0 Introduction The Town of Castle Rock is situated between the metropolitan areas of Denver and Colorado Springs, amidst a unique terrain of rolling hills, mesas, ravines, and waterways. Like many Front

More information

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM Metropolitan Planning Organization [ X ] Transit [ ] Administration and Finance [ ] SUBJECT: PROJECT SELECTION PROCESS FOR TRANSPORTATION

More information

Table of Contents. Appendices Appendix A.2. Public Hearing Summary. Appendix A.3. Public Correspondence

Table of Contents. Appendices Appendix A.2. Public Hearing Summary. Appendix A.3. Public Correspondence Condensed Final EIS Table of Contents Executive Summary...ES-1 1.0 Purpose and Need...1-1 1.1 Project Overview... 1-1 1.2 Proposed Action... 1-3 1.3 Purpose and Need of Proposed Action... 1-3 2.0 Alternatives

More information

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY SEPTEMBER 2016 Introduction The Platteview Road Corridor Study was led by the Metropolitan Area Planning Agency (MAPA) with assistance from

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018 I-4 Beyond the Ultimate Florida Transportation Builders Association February 9, 2018 FDOT: Improving Mobility & Safety in Central Florida FDOT is Designing and building a better I-4 through Central Florida

More information

Northern Branch Corridor SDEIS March 2017

Northern Branch Corridor SDEIS March 2017 Northern Branch Corridor SDEIS March 2017 15. 15.1. Chapter Overview 15.1.1. Introduction This chapter discusses changes to the Preferred Alternative resulting in the potential for project improvements

More information

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008 Atlanta BeltLine Corridor Environmental Study Scoping Meeting August 2008 What Will We Be Discussing Today? Study Overview - How Did We Get Here? - What Is the Study About? - Who Is Involved? - Where Is

More information

Trail Feasibility and Planning Project for Northern Dutchess County, New York

Trail Feasibility and Planning Project for Northern Dutchess County, New York for Northern Dutchess County, New York Funded in Part by Grants from the Hudson River Valley Greenway, Land Trust Alliance Conservation Partnership Program and the Thomas Thompson Trust 1 STEERING COMMITTEE

More information

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College Welcome East Tampa Area Community Working Group September 25, 2018 Tina Fischer Collaborative Labs, St. Petersburg College Tonight s Agenda Open House Area (6:00 - ongoing) Information about related studies,

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

Constructing PCCP Under High Traffic Volume

Constructing PCCP Under High Traffic Volume Constructing PCCP Under High Traffic Volume THE LANE CONSTRUCTION CORPORATION Jim Seybert Casey Hurley PE, PLS November 18, 2016 Agenda Lane Experience Challenges Access Design Elements Staging of Construction

More information

Poinciana Parkway Extension Project Development & Environment Study

Poinciana Parkway Extension Project Development & Environment Study Poinciana Parkway Extension Project Development & Environment Study Nicole Gough, Dewberry Mary Brooks, Quest Corporation of America Clif Tate, Kimley-Horn and Associates February 19, 2019 Title VI Compliance

More information

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016 2035 General Plan Update and Belmont Village Specific Plan Joint Study with the City Council and Planning Commission April 12, 2016 Agenda 1. Welcome and Introductions 2. General Plan Update Status of

More information

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation State Highway 121 Southwest Parkway Fort Worth s Transportation Success Story in Design and Cooperation Greater Fort Worth Association of Realtors October 24, 2007 Presented by: Dan Lamers, P.E. North

More information

SAWYER RANCH ROAD Pedestrian and Bicycle Improvements

SAWYER RANCH ROAD Pedestrian and Bicycle Improvements SAWYER RANCH ROAD Pedestrian and Bicycle Improvements RM 150: From West of Kyle to I-35 Oct. 25, 2018 Thank you for your interest in the RM 150 project. The purpose of this meeting is to share project

More information

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative

More information

Lake Oswego to Portland Transit Project. Lessons Learned. John Cullerton Senior Project Manager, URS 2012 APTA/TRB Light Rail Conference

Lake Oswego to Portland Transit Project. Lessons Learned. John Cullerton Senior Project Manager, URS 2012 APTA/TRB Light Rail Conference Lake Oswego to Portland Transit Project Lessons Learned John Cullerton Senior Project Manager, URS 2012 APTA/TRB Light Rail Conference Overview Project Location and Context Corridor History and Project

More information

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 SOUTHWEST CORRIDOR EXTENSION Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009 AGENDA I. Welcome/Introductions II. Project Review and Status III. Environmental

More information

Puget Sound Gateway Program Team. Phase 1, SR 509 Completion Project NEPA Re-evaluation

Puget Sound Gateway Program Team. Phase 1, SR 509 Completion Project NEPA Re-evaluation Land Use COPY TO: PREPARED BY: Project File DATE: November, 2017 SUBJECT 1. Introduction Puget Sound Gateway Program Team Phase 1, SR 509 Completion Project NEPA Re-evaluation This memorandum was prepared

More information

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project... Mississippi Drive Corridor Revitalization A DestinationTransportation Project... Mississippi Drive Corridor Revitalization Welcome! Tonight s Agenda: Further define the Scope of the Project Discuss the

More information

Bassett Creek Valley Working Group. October 4, 2017

Bassett Creek Valley Working Group. October 4, 2017 Bassett Creek Valley Working Group October 4, 2017 1 Today s Topics Introductions Overview of Design Teams (P+W and WSP) Expertise Working Group Roles and Responsibilities Schedule & Community Engagement

More information

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204 DISTRICT TWO PUBLIC HEARING I 10 (SR 8) from I 295 to I 95 Project Development & Environment Study Duval County, Florida Financial Project Number 213326 2 22 01 Efficient Transportation Decision Making

More information

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s RFP Pre-submittal meeting December 18, 2015 City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s Office Background

More information

Community Meeting US 101/Peninsula Avenue Interchange Project JUNE 25, 2015

Community Meeting US 101/Peninsula Avenue Interchange Project JUNE 25, 2015 Community Meeting US 101/Peninsula Avenue Interchange Project JUNE 25, 2015 Project Team Gary Heap, Engineering Division Manager Tracy Scramaglia, Senior Engineer Ramesh Sathiamurthy, AECOM Peter DeStefano,

More information

US 95 Phase 2B/5 Open House

US 95 Phase 2B/5 Open House US 95 Phase 2B/5 Open House www.us95nw.com Wednesday, Mountain Crest Community Center 4701 N Durango Drive Las Vegas, NV 89129 Brian Sandoval Governor Rudy Malfabon Director Nevada Department of Transportation

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

Creating a Supportive Organizational and Policy Framework Luisa Paiewonsky. John D. Pagini, AICP USDOT CCAPA PDO

Creating a Supportive Organizational and Policy Framework Luisa Paiewonsky. John D. Pagini, AICP USDOT CCAPA PDO Creating a Supportive Organizational and Policy Framework Luisa Paiewonsky USDOT John D. Pagini, AICP CCAPA PDO Provides guidelines for the planning, design, and construction of: State Highways Local roads

More information

A larger version of this map is located on the last page of this PDF.

A larger version of this map is located on the last page of this PDF. MAP Committee Input McLoughlin Area Draft Vision Map A larger version of this map is located on the last page of this PDF. 1. The map above is intended to portray a vision for the McLoughlin area. It highlights

More information

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County Exhibit A SH 161 RTC Work Program of New Projects Collin County 0918-24-969 N/A 0918-24-970 N/A 0918-24-973 N/A 2351-01-020 N/A 2679-03-010 N/A On Exchange Parkway from US 75 to Allen Heights On Country

More information

UNIVERSITY OF NORTHERN IOWA

UNIVERSITY OF NORTHERN IOWA UNIVERSITY OF NORTHERN IOWA Municipal Separate Storm Sewer System 2015/2016 Report Permit Number 07-09-0-04 August 2016 Prepared by: Environmental Health and Safety Office University of Northern Iowa 8628

More information

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial Project ID: 433693-2-22-01 ETDM No.: 13957 - Poinciana Parkway

More information

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

Atlanta BeltLine, Inc. Pathways to Urban Sustainability Atlanta BeltLine, Inc. Pathways to Urban Sustainability September 30, 2010 WHAT IS THE ATLANTA BELTLINE? Transit 22-mile loop Parks 1300 + new acres Trails 33 miles Jobs & Economic Development 20 areas,

More information

WESTERN ILLINOIS UNIVERSITY

WESTERN ILLINOIS UNIVERSITY WESTERN ILLINOIS UNIVERSITY Quad Cities Riverfront Campus Preliminary Master Plan Presentation 2 February 1, 2006 Achieving Future Flexibility 1. Monitor space needs as the new buildings come on line and

More information

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011) Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011) Description The Corps of Engineers, Rock Island District (District) and the Illinois

More information

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014 INTRODUCTION The City of Cedar Falls and the Iowa Department of Transportation are conducting a Public Informational

More information

Presenting a Vision for Thread Lake

Presenting a Vision for Thread Lake Presenting a Vision for Thread Lake FEBRUARY 20, 2014 SPECIAL THANKS TO: International Academy of Flint Flint River Watershed Coalition South Saginaw Business and Resident Association South Side Neighborhood

More information

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) Preliminary Design Report February 2015 Prepared For: City of Inver Grove Heights Dakota County Prepared By: Kimley-Horn and Associates,

More information

Welcome to the. Citizen Information Meeting for the Martinsville Southern Connector Study. The purpose of this meeting is to:

Welcome to the. Citizen Information Meeting for the Martinsville Southern Connector Study. The purpose of this meeting is to: Route Environmental Impact Statement Welcome to the Citizen Information Meeting for the Martinsville Southern Connector Study The purpose of this meeting is to: Introduce the Martinsville Southern Connector

More information

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session Chain Bridge Road Sidewalk Improvements Citizen Council Work Session May 10, 2016 Project Location 2 Project Objectives Provide a continuous pedestrian facility (sidewalk) connection from Downtown City

More information

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session Oconee Rivers Greenway Project Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11 Mayor & Commission Work Session February 13, 2018 North Oconee River Greenway 1 Project # 05 - Oconee Rivers Greenway

More information

I-70/71 Innerbelt Project

I-70/71 Innerbelt Project I-70/71 Innerbelt Project Project Progress Meeting and Design Enhancement Update November 9, 2009 Ohio Department of Transportation MS Consultants MSI Design Overview of Presentation 1. Recap Recent Project

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: DECEMBER 16, 2015 TO: THRU: FROM: SUBJECT: Chair McCormick and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Kelly Christensen

More information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement.

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement. Welcome South Seminole Heights Civic Association, Inc. October 17, 2018 Tampa Interstate Study Supplemental Environmental Impact Statement 1 Stephen Benson Opening FDOT District Seven 2 3 Our solutions

More information

Planned Manufacturing District Review

Planned Manufacturing District Review Mayor Emanuel s Industrial Corridor Modernization Planned Manufacturing District Review North Branch Framework Implementation Chicago Plan Commission July 20, 2017 Rahm Emanuel, Mayor David Reifman, Commissioner

More information

Final Environmental Impact Statement / Record of Decision

Final Environmental Impact Statement / Record of Decision Final Environmental Impact Statement / Record of Decision APRIL 2014 (this page intentionally left blank) (this page intentionally left blank) the CLEVELAND OPPORTUNITY CORRIDOR Project RECORD OF DECISION

More information

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING I-66 EASTBOUND WIDENING INSIDE THE BELTWAY From the Dulles Connector Road (Route 267) to Fairfax Drive (Route 237) PARDON OUR DUST MEETING Bill Cuttler, PE (VDOT District Construction Engineer, Northern

More information

State Project No Heroes Tunnel

State Project No Heroes Tunnel Public Scoping Meeting State Project No. 167-108 Bridge No. 00773 Heroes Tunnel Route 15 Wilbur Cross Parkway Through West Rock Ridge Towns of Hamden, Woodbridge City of New Haven Agenda Show Project Location

More information

Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009

Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009 Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009 Process for Aesthetics Subcommittee June 25, 2009 Kick off Meeting June 26, 2009 Gateway and Tremont Focus Groups

More information

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY KICK-OFF PRESENTATION SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PROJECT IDENTIFICATION NUMBER (PID): #001036A May 13, 2015 1 2 PROJECT LOCATION PROJECT HISTORY

More information

Lowe Park Master Plan Update Marion, IA August 25 th, 2011

Lowe Park Master Plan Update Marion, IA August 25 th, 2011 Lowe Park Master Plan Update Marion, IA August 25 th, 2011 Lowe Park Master Plan Update Concept Plan - June 1 st, 2011 Agenda 1 - INTRODUCTION Vision Statement Aerial of Existing Condition 2 MASTER PLAN

More information