1 Long-Range School Facility and Technology Improvement Plan
2 Modernizing and replacing the significant number of school buildings and technology in Spokane Public Schools requires a well thought out, long-range bond plan Phase I 2003 to 2009 Phase II 2009 to 2015 Phase III 2015 to 2021 Phase IV 2021 to 2027
3 Bond Components Major Construction Projects Smaller Building Improvements at All Schools Technology Upgrades and Replacements Safety and Security Improvements Commitment to keep local tax rate for bonds around $1.96 per thousand of assessed property value
4 Phase I 2003 to 2009 Spokane voters passed a bond in March 2003 by 67+% YES vote Phase I was the first 6-year installment of the long-range bond plan to provide facility, technology and security upgrades or replacements for school district sites
5 Phase I Investment 2003 to 2009 In Millions $165.3 local bond 67.5 state match 13.3 interest income 6.8 residual capital fund monies 2.6 rebates, grants and gifts $255.5 total investment
6 Phase I Major Construction Projects John R. Rogers High School Renovation and Expansion
7 Phase I Major Construction Projects New Ferris High School Athletic Center
8 Phase I Major Construction Projects Shadle Park High School Modernization
9 Phase I Major Construction Projects New Lidgerwood Elementary New Lincoln Heights Elementary New Ridgeview Elementary North Central parking expansion, ball field improvements, roofing replacement and air system upgrades New air systems and flooring at Arlington, Bemiss, Grant, Regal, Sheridan and Willard
10 Phase I Building Improvements at All Sites Examples: New playground equipment Classroom remodels Intercom replacements Clock upgrades Flooring replacements Boiler replacements Irrigation upgrades Parking improvements Office remodels
11 Phase I Technology Upgrades Student and staff computer upgrades/replacements Classroom projectors Document cameras Multi-functional printers Network infrastructure District-wide wireless
12 Phase I Security/Safety Improvements Over 750 video cameras Smart-card door access points Increased lighting Upgraded fire alarm systems
13 Phase II 2009 to 2015 Spokane voters passed a bond in February 2009 by 62.65% YES vote Phase II is the second 6-year installment of the long-range bond plan to provide facility, technology and security upgrades or replacements for school district sites
14 Phase II Investment 2009 to 2015 In Millions $288 local bond 64 state match (est.) 3 interest income (est.) 2 residual capital fund (est.) $357 total investment Maintains commitment to keep local tax rate around $1.96 per thousand of assessed property value
15 Phase II Major Construction Projects Ferris Modernization Jefferson Renovation or Replacement Westview Replacement Hutton Renovation Finch Renovation Salk Gymnasium and Master Planning Garry Select Improvements Havermale Select Improvements
16 Phase II Major Construction Projects Ferris High School Modernization
17 Phase II Major Construction Projects Westview Elementary Replacement
18 Phase II Major Construction Projects Jefferson Elementary Replacement
19 Phase II Major Construction Projects Finch Elementary School Modernization
20 Phase II Major Construction Projects Hutton Elementary School Modernization
21 Phase II Major Construction Projects Salk Middle School Gymnasium
22 Phase II Major Construction Projects continued Air Systems / Roofing / Flooring Upgrades - Audubon - Holmes - Roosevelt - Cooper - Longfellow - Whitman - Garfield - Mullan Road - Woodridge LC/Hart Field Improvements and Reconfiguration Rogers Athletic Field Improvements and Parking Expansion Shadle Athletic Field Improvements
23 Phase II Building Improvements at All Sites Examples: Sidewalk and Curb Improvements Bus and Vehicle Turnouts Bleacher Replacement or Restoration Additional Boiler Replacements and Upgrades Additional Clock, Bell, Intercom Upgrades Fencing Replacement and New Installation Flooring Replacement Carpet, Vinyl and Wood Air System Upgrades Lighting Upgrades Office, Library and Classroom Remodels Playground Equipment and Surfacing Material Roofing Replacements
24 Phase II Technology Upgrades Upgrade Student Record System Upgrade Student and Staff Computers Classroom Smartboards Classroom Digital Projectors Digital and Video Cameras Network Performance Upgrades Multi-function Copier/Printer/Scanners Update Phone System
25 Phase II Security and Safety Upgrades Additional Security Cameras Increase Card Access Points Lighting Enhancements Fire Alarm Upgrades Indoor Air Quality Improvements
26 Phase III Bond Plan 2015 to 2021 Major Construction - Renovation/Replacement of 4 Elementary Schools - Renovation/Replacement of 3 Middle Schools - Renovation/Replacement of 1 High School Building Improvements at All Sites Technology Upgrades Regulatory and Safety Upgrades
27 Phase IV Bond Plan 2021 to 2027 Major Construction - Renovation/Replacement of 3 Elementary Schools - Renovation/Replacement of 2 Middle Schools - Renovation/Replacement of 1 High School - Renovation/Replacement of 2 Special Schools Building Improvements at All Sites Technology Upgrades Regulatory and Safety Upgrades
28 Long-Range Bond Plan: Keeps 50-year building replacement and modernization plan on course Protects and maintains current investment in school buildings and technology Keeps cost manageable for future Spokane generations Stimulates local economy
Cherry Hill Public Schools BUILDING A SOLID FUTURE
Cherry Hill Public Schools BUILDING A SOLID FUTURE Who We Are The Cherry Hill School District is the 12 th largest in the state, serving 11,500 students 19 Locations 2 High Schools, 3 Middle Schools, 12
More informationMaster Facility Planning Update School Board Meeting May 26, 2016
Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility
More informationE-SPLOST V. Facts and Information. August 2018
E-SPLOST V Facts and Information August 2018 Education Special Purpose Local Option Sales Tax What is E-SPLOST? It is a one penny sales tax that allows for shared contribution to education, including visitors
More information2014 Bond Project Guide
2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center
More informationTillamook High School Bond Projects
Tillamook High School Bond Projects School Project Description All Buildings Upgrade fire alarm H&S All Buildings Add door lock capability from inside rooms Security All Buildings Install card lock entry
More information5 Year Capital Improvement Plan Update
5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John
More informationSchool District of New London. Community Listening Session & Referendum Consideration
School District of New London Community Listening Session & Referendum Consideration 1 Why? Significant facility, maintenance, safety, energy efficiency needs Independent Facility Study identified millions
More informationBriar Crest Elementary
Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary
More informationREPORT CARD TO THE COMMUNITY MAY 15, 2018
REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000
More informationProposed Bond Construction Projects
Proposed Bond Construction Projects The Facility Planning Process * September, 2006: - Board of Education established the Facilities and Asset Review Committee with the responsibility to evaluate all district
More informationCAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14
2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher
More informationNYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS
NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the
More informationChariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)
Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers
More informationSchool District of Milton 5- Year Capital Maintenance and Improvement Plan
Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom
More informationOxford Hills School District Capital Renewal Plan Updated March 2017
Color Coding Guide Recently Completed In Progress FY 2017 Budget in FY 2018 Future Budgets/Projects 3/20/17 Capital Renewal Plan Updated March 2017 Capital Renewal Plan - Harrison Elementary Harrison add
More informationSagebrush Elementary School East Temple Place Aurora, Colorado 80015
Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical
More informationDesign Presentation. Chief Operations Officer Willie Burroughs
Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community
More information2014 Bond District-wide Facility Repairs
Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls
More information2014 Bond District-wide Facility Repairs
Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls
More informationMaster Project List Report
Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.
More informationESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization
James Lick Track & Field Improvements Bleacher Replacement Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization Design Mt Pleasant Bleacher Replacement New Performing
More informationLong Beach Unified School District Measure K Citizens' Bond Oversight Committee 2013 Annual Report
Long Beach Unified School District Measure K Citizens' Bond Oversight Committee 2013 Annual Report May 6, 2014 (DRAFT) To the Board of Education and residents of the Long Beach Unified School District:
More informationKerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018
Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 WHAT IS A BOND ELECTION? Provide communities an opportunity to vote to give the Board of Trustees authority
More informationHOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District
HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the
More informationRenovation Project Presentation Public Meetings
Renovation Project Presentation Public Meetings SWBR Architects and Tappé Associates made a formal presentation to both the Board and Public in early February of a conceptual design of a proposed renovation
More informationWarren County Schools Plant and Operations
Warren County Schools Plant and Operations Buildings/Facilities/Energy Strategic Plan September 28, 2017 (Updated January 18, 2018) Donnie Caldwell; Facilities Director One Team, One Goal, High Levels
More informationDEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students
DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for
More informationCity Commission Agenda Cover Memorandum
City Commission Agenda Cover Memorandum Originating Department: Engineering Services (ENG) Meeting Type: Regular Agenda Date: 02/27/2017 Advertised: Required?: Yes No ACM#: 21260 Subject: Presentation
More informationForest Hills Facilities Plan
Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation
More informationGreenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111
Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical
More informationLAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537
LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 Buildings and Grounds Committee Minutes March 20, 2017 The meeting was called to order at 6:30 p.m. PRESENT: Board Members, Mr. Jeffrey A.
More informationWest Hartford Public School District
West Hartford Public School District Agenda Item: Adoption of Capital Improvement Plan for 2018-19 Meeting Date: February 6, 2018 From: Through: Andy Morrow, Assistant Superintendent for Administration
More informationH107 Video Conference Room
Capacity: 20 persons White Board (1) Document Camera (1) Door (1) Network connections possible Layout: Seminar style with chairs and tables (moveable) Podium (1) Media Cart (1) Windows (4) Meets all ADA
More information3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert
More informationA 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect
West Sunset Park A 2012 Clean and Safe Neighborhood Parks Bond Project Community Meeting #2 November 20, 2013 Katy Tang, District Supervisor Dan Mauer, Project Manager Jasmine Kaw, Landscape Architect
More informationNew High School Concept
Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide
More informationTIFT COUNTY SCHOOLS E-SPLOST HISTORY
TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,
More informationMeadow Point Elementary School East Grand Avenue Aurora, Colorado 80015
Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,
More informationSpokane River Forum: City of Spokane Permeable Pavements
Spokane River Forum: City of Spokane Permeable Pavements Spokane River Forum March 23, 2016 Mark Papich, PE Senior Engineer City of Spokane Integrated Capital Management It s all about the Spokane River
More informationAllisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767
Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be
More information2016 Bond Steering Committee Meeting
2016 Bond Steering Committee Meeting Meeting 4: July 14, 2016 Safety & Security Needs Bond Steering Committee Schedule Thursday, June 23 6:00-8:00 p.m. Spring ISD Boardroom Thursday, June 30 6:00-8 :00
More informationENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS MASTER PLAN
ENVIRONMENTAL INITIAL STUDY FOR THE BERKELEY CITYWIDE POOLS MASTER PLAN CITY OF BERKELEY PARKS RECREATION AND WATERFRONT DEPARTMENT SEPTEMBER 1, 2009 ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS
More informationAttachment F. Campus Capital Needs Sales Surtax Funded Detail Report
Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Williams Elementary 1.40
More informationPLATTEVILLE MIDDLE SCHOOL
Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle
More informationCity of Gainesville Parks, Recreation and Cultural Affairs Infrastructure Sales Tax City Commission Approved Project List
City of Gainesville Parks, Recreation and Cultural Affairs Infrastructure Sales Tax City Commission Approved Project List Alfred A. Ring Park Description: Boardwalk replacement, signage and general park
More informationPreserving Our Community s School Buildings & Equipment
Preserving Our Community s School Buildings & Equipment Permanent Improvement Renewal Levy November 3, 2015 Perrysburg Board of Educa1on is asking voters to renew a 1.9 mill, five- year permanent improvement
More informationNYC Department of Education
Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural
More informationLINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm
LINCOLN COUNTY COMMONS - REVISED MASTER PLAN Lincoln County Public Meetings June 26-27, 2018, 6pm PROJECT OVERVIEW Lincoln County is preparing a Refined Master Plan for facilities at the Lincoln County
More informationJanuary 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.
Project Updates January 11, 2018 CENTERVILLE CHESAPEAKE ARBORETUM BELLS MILL CITY CREEKWOOD SOUTH DEEP CREEK LOCK WORK TO BE PERFORMED/UPDATES Improvements to the parking lot include installation of a
More informationCITY OF TULSA PUBLIC FACILITIES & INFRASTRUCTURE
PUBLIC FACILITIES & INFRASTRUCTURE TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING FEBRUARY 7, 2013 PUBLIC FACILITIES - CITYWIDE ADA TRANSITION PLAN BUILDING REPORTS PUBLIC FACILITIES
More informationGroup Presenta-ons. Mee#ng #6 December 14, 2017
Group Presenta-ons Mee#ng #6 December 14, 2017 Team Report Out The Lavender Team Chip Concklin December 14, 2017 2 New Schools Consensus of the group was to support Op#on 1 Renova#ons and Upgrades Consensus
More informationMASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW
DISTRICT CAMPUS OVERVIEW Classrooms, CR Special Education Computer Lab INTERSTATE 5 FW - Faculty Work, FL - Faculty Physical Education / Athletics Support Spaces S - Storage, T - Toilets, U - Utility,
More informationExhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS
Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS DATE: July 10, 2007 TO: FROM: SUBJECT: ORIGINATOR: RESOURCE PERSON(S): BOARD OF EDUCATION Dr. Joe A. Hairston, Superintendent ABBREVIATED FACILITY STATUS REPORT
More informationAbout IntraLogic. In Business since 2004 Over 55 Full time employees
Security Services In Business since 2004 Over 55 Full time employees About IntraLogic National & State Contracts including OGS / GSA Our sales & system design team all have security backgrounds Clients
More informationMEASURE A. Completed Bond Projects
MEASURE A Completed Bond Projects October 26, 2010 Background On March 2, 2004, the voters of Riverside County passed ballot Measure A, authorizing the issuance and sale of $49,000,946 of General Obligation
More informationFY Capital Improvement Program Parks and Landscaping. 8 - Summary
PARK PROJECTS FY 211-215 Capital Improvement Program Description FY 21 FY 211 FY 212 FY 213 FY 214 FY 215 1 Restroom Bldgs (Replace or Construct)-Jefferson, McDonald, 5,774,623 4,669,623 1,15, Allendale,
More informationImagine RBC 2010 The Plan
Imagine RBC 2010 The Plan Creation of New Space The creation of a new Student Center will greatly relieve the demands on existing space. Currently 1,700 students, including both RBC and St. James Grammar
More informationMt. Diablo Unified School District 2010 Measure C Facilities Improvement Program
Mt. Diablo Unified School District 2010 Measure C Facilities Improvement Program Report to the Board of Education Remaining Funds and Proposed Project List February 26, 2018 The picture can't be displayed.
More informationEmergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools
Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky
More informationLMS A NORTH BEACH BRANCH LIBRARY SCHEMATIC DESIGN IMAGES SAN FRANCISCO PUBLIC LIBRARY
LMS A SAN FRANCISCO PUBLIC LIBRARY NORTH BEACH BRANCH LIBRARY IMAGES APRIL 2009 NORTH BEACH BRANCH LIBRARY SAN FRANCISCO, CA LEDDY MAYTUM STACY Architects NORTH BEACH BRANCH LIBRARY PROJECT BACKGROUND
More informationIchabod Crane Central School District 2018 Capital Project Preliminary Estimate
Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -
More informationTable of Contents Board of Education of Queen Anne's County Comprehensive Maintenance Plan Page
Table of Contents Board of Education of Queen Anne's County Comprehensive Maintenance Plan 2015 2020 Page Purpose of Plan... 1 Objectives of Maintenance... 1 Personnel Organization... 1 Supporting Services...
More informationSchool Property REVIEWING YOUR BUILDINGS & GROUNDS
School Property REVIEWING YOUR BUILDINGS & GROUNDS Risk Management CHECKLIST Instructions: Use this checklist to record issues that may affect your school s security and safety. Check needs attention and
More information2005 Proposition II. Bond Construction & Projects Report
2005 Proposition II Bond Construction & Projects Report as of September 30, 2008 INDEX Financial Report Narrative Budget Report by Project Bills Paid for Current Month 2005 Proposition II Bond Construction
More informationCommunity Unit School District 200 Facilities
Community Unit School District 200 Facilities Committee of the Whole Presentation February 27, 2013 Community Unit School District 200 Facilities Update The purpose of this CUSD 200 Facilities update is
More informationSolutions to maintain, protect, and connect your campus. WESCO, Your One Source for Education Solutions
WESCO, Your One Source for Education Solutions Downtime costs data centers thousands each minute. Can you afford that? Solutions to maintain, protect, and connect your campus A Powerful Solution for Educational
More informationa program supported by the transforming neighborhoods initiative
a program supported by the transforming neighborhoods initiative Mission To improve and beautify the neighborhood through comprehensive façade and landscape improvements. Program The Kentland/Palmer Park
More informationMADISON ELEMENTARY SCHOOL
TWIN RIVERS UNIFIED SCHOOL DISTRICT MADISON ELEMENTARY SCHOOL 54 HARRISON STREET NORTH HIGHLANDS, CALIFORNIA 95660 ORIGINAL BUILDING COMPLETED: 96, 67 BUILDING AREA: 45,69 SITE ACREAGE: 0 BUILDING CAPACITY:
More informationNAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX
NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA 18064 610-759-1367 FAX 610-759-7028 TO: FROM: Dr. Riker, Superintendent of Schools Board of School Directors Lewis F.
More informationOhlone College Measure G Project Scope Revisions
Scope Revisions Current Title Revised Title Current Scope Revised Scope 6101 Relocated Baseball Field Athletic Fields Create new sustainable baseball field with synthetic turf, bleacher seating and batting
More informationChabot College: Plan Kickoff and Visioning Session with Student Senate
Facilities Master Plan 2017 Chabot College: Plan Kickoff and Visioning Session with Student Senate February 05, 2018 Key issues, challenges and opportunities: Need more information on the projects that
More informationWashington State s Growth Management Act
Washington State s Growth Management Act A Framework for Smart Growth Anne Aurelia Fritzel, AICP Growth Management Services Department of Community, Trade and Economic Development The GMA A Framework for
More informationHVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms
$4,013,500.00 $4,013,500.00 $ 1,155,000.00 $ 1,000,000.00 $ 205,000.00 $ 275,000.00 $ 300,000.00 $ 360,000.00 $ 438,500.00 $ 280,000.00 School Status Item HS Boilers boiler controls replaced 2017 2002
More informationNYC Department of Education
Asset: COLUMBUS AF - BRONX, 925 ASTOR AVENUE, New York, 10469 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 9:21 AM 2017-11-29 8:45 AM AA : Architectural - Associate
More informationTown of Cornelius Bond Update August, 2017
Town of Cornelius Bond Update August, 2017 Referendum Results Roads, Intersections, & Sidewalks ($11.15 mil) Pass rate 81.38% in favor Parks and Recreation ($5.25 mil) Pass rate 72.09% in favor Town Center
More informationAdopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes
Adopted DEFP FY16 - Amendment Broward County Public Schools Adopted District Educational Facilities Plan Fiscal 015-16 to 2019-20 Amended to Incorporate Board Approved Changes Robert W. Runcie, Superintendent
More informationNECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence
NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence Meeting Minutes April 9, 2014 Lawrence Campus Backfill Subcommittee Updates Martha Leavitt/Dick Goulet Revised goal
More information2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16
1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated
More informationDraft. Security Study. Germantown School District Germantown, WI. PRA Project # February 2014
Draft Security Study Germantown School District Germantown, WI PRA Project # 114440 February 2014 February 2014 Germantown School District Facilities Security Study Page 1 Facilities Security Study Page
More informationComputerized Facility Management
Computerized Facility Management Nicholas Thornton Eaton Corporation 1 A bit about me Energy & Manager for WWCS for 7 years Energy Engineer for Siemens for 3 years Energy Engineer for U of M (consultant)
More informationFUMC Research Task Force Site Visit Report Arlington Unitarian Universalist, Arlington April 29, 2015
FUMC Research Task Force Site Visit Report Arlington Unitarian Universalist, Arlington April 29, 2015 General Arlington Unitarian Universalist Church was built in 1962. They did a significant renovation
More informationGarden Grove Unified School District Board of Education. April 16, 2013
Garden Grove Unified School District Board of Education April 16, 2013 Presenters: Rick Nakano, Asst. Sup. Business Services Sal Sanchez, Director, M.O.T. and Facilities Margie Brown, Consultant, Bond
More informationCITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020
CITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020 A BLUE PRINT FOR THE NEXT 20 YEARS The PRCA Vision 2020 Master Plan, adopted in November 2012, addresses the current state
More informationVendor Application Form
Vendor Application Form DIRECTIONS: Fill out this form as completely as possible. Forms that are incomplete will be discarded without notification. If you encounter an error, use the "Back" function in
More informationThe Auburn Plan Designing the Future of Auburn February 28, 2005
The Auburn Plan Designing the Future of Auburn February 28, 2005 Block-by-Block Bicycle Tour Aerial survey Focus Group Meetings September 7 and 8 Design Workshops October 11, 14, and 21 Revitalization
More informationFinal Report from the Measure N Bond Oversight Committee February 5, 2014
Final Report from the Measure N Bond Oversight Committee February 5, 2014 On November 5, 2002, voters approved the issue of up to $38,000,000 aggregate principal amount of the Lompoc Unified School District
More informationElectrical Inspection Special Electrical
0941 Fire Alarm System Devices, panels, wiring, conduit, etc. Description of the building system The school is equipped with a hard wired fire alarm control panel, and automatic dialer. The fire alarm
More informationFacility Condition Report. District Community Meetings February 2019
Facility Condition Report District Community Meetings February 2019 2 Florida School District Facility Conditions Average Building Age 7 Largest Districts in Florida * Orange, 20 Palm Beach, 21 Broward,
More informationPHA Plan Table Library
PHA Plan Component 7 Capital Fund Program Annual Statement Parts I, II, and III Annual Statement Capital Fund Program (CFP) Part I: Summary Capital Fund Grant FFY of Grant Approval: (09/2010) X Original
More informationPreliminary Capital Fund Appeal Renovation Priorities
New York Avenue Presbyterian Church Vision 2020 Preliminary Capital Fund Appeal Renovation Priorities Dialogue Sessions Sunday, June 21 & Sunday, June 28 Following the Worship Service Please return the
More informationPROPOSED SCOPE OF WORK
WATERTOWN CITY SCHOOL DISTRICT SCHOOL AND COMMUNITY WORKING TOGETHER SMART SCHOOLS PROJECT PROPOSED SCOPE OF WORK BCA PROJECT NO. 2017-100 NOVEMBER 2, 2017 Prepared By: & 327 Mullin Street 2136 Five Mile
More informationMEDIA CENTER September 30, 2010
MEDIA CENTER September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype
More informationAUDUBON ELEMENTARY SCHOOL
AUDUBON ELEMENTARY SCHOOL Security System 1,125.99 Security System 1,721.25 Carpet Replacement 2,526.53 Control Panel 6,630.00 Door Frames 3,790.00 Fencing 6,300.00 Frame Heat Exchanger 11,025.88 GE Front
More informationSCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL
SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm
More informationCity of Hartford Capital Improvement Plan 2009/ /2019. Part II: Project Descriptions. Eddie A. Perez, Mayor
City of Hartford Capital Improvement Plan 2009/2010 2018/2019 Part II: Project Descriptions Eddie A. Perez, Mayor March 23, 2009 RECOMMENDED PROJECTS FOR CAPITAL IMPROVEMENT PROGRAM 2009/2010 2018/2019
More informationColumns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD
PREPARING FOR THE DESIGN OF YOUR SCHOOL CAPITAL PROJECT A Checklist of Issues March 2014, v.1 This document can be used in preparing the stakeholder team for decision-making and for documenting the input
More informationDecember 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation
December 1, 2014 (revised) TO: FROM: RE Arlington County Board Thomas Jefferson Site Evaluation Working Group by Carrie Johnson, Chair Preliminary Report -- Thomas Jefferson Site Evaluation The Thomas
More informationGO Bond March 2019 Regular City Commission Meeting December 5, 2018
GO Bond March 2019 Regular City Commission Meeting December 5, 2018 Agenda Overview of GO Bond Planning GO Bond Revised Project Recommendations Impact on tax (millage) rate GO Bond Ballot Questions GO
More informationKenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2
Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2 Adams Field Kenmore East High School Kenmore West High School Crosby Field Charles Lindbergh Elementary Thomas
More information