By Budget Unit 114,159,000 34,576, ,000 50,939,000. Page 1 of 21

Size: px
Start display at page:

Download "By Budget Unit 114,159,000 34,576, ,000 50,939,000. Page 1 of 21"

Transcription

1 Campus SYS Category UHM UHH UHWO HAW HON KAP KAU LEE MAU WIN Air Conditioning Improvements 30,685,000 7,040, , ,000 1,570,000 2,052,000 1,318,000 1,080,000 1,186, ,000 46,443,000 Building Interiors and Surrounding Grounds 29,010,000 16,806, ,000 2,876,000 2,245, ,923,000 2,409, ,000 59,227,000 Infrastructure 9,405,000 5,140, ,000 1,811, , , , , ,000 19,489,000 Reroofing 12,403,000 2,655, ,139, , , , ,000 17,473,000 Resurfacing 3,871, , ,000 1,222, ,000 1,108, ,000 1,197,000 10,659,000 Sports Facilities 4,570, , ,896,000 General Repairs and Repainting 24,215,000 1,950, , ,734,000 2,330, ,000 4,089,000 3,649,000 1,274,000 41,927,000 - University of Hawaii 114,159,000 34,576, ,000 2,478,000 10,921,000 9,330,000 2,888,000 11,776,000 9,150,000 4,396, ,114,000 Report Pages 2 through 7 8 through through through through through By Budget Unit 114,159,000 34,576, ,000 50,939,000 Page 1 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress SYS Summary

2 Campus: University of Hawaii at Manoa 1 Sinclair Library Reroofing Reroofing 1,050,000 2 Physical Education Complex General Repairs / Repainting / Reroofing General Repairs and Repainting 1,800,000 3 George Hall Replace Rooftop HVAC Equipment, Phs 1 & II Air Conditioning Improvements 1,500,000 4 Maile Way Resurface Roadway Resurfacing 1,200,000 5 Pope Lab Greenhouses General Repairs / Repainting / Reroofing General Repairs and Repainting 1,200,000 6 Music Building Complex Repair Walkways, Structural System & Reroofing General Repairs and Repainting 3,300,000 7 Art Building Reroofing Reroofing 980,000 8 Biomedical Science Complex General Repairs and Repainting General Repairs and Repainting 3,700,000 9 Physical Science Building General Mechanical Repairs Air Conditioning Improvements 500, IFA - Haleakala (Maui) Reroofing Reroofing 500, George Hall - Makai Wing Reroofing Reroofing 300, Webster Hall Reroofing Reroofing 275, PBRC Reroofing Reroofing 225, Keller Hall Reroofing Reroofing 310, Watanabe Hall General Mechanical Repairs Air Conditioning Improvements 1,075, Sakamaki Hall (Court A & B) Replace Air Conditioning System Phs 1 Air Conditioning Improvements 1,650, Sakamaki Hall (Court C & D) Replace Air Conditioning System Phs 2 Air Conditioning Improvements 1,500, Astronomy Replace Cooling Tower & Hot Water Reheat Systems Air Conditioning Improvements 975, Gilmore Hall Replace Air Conditioning System Phs 1 Air Conditioning Improvements 1,650, Gilmore Hall Replace Air Conditioning System Phs 2 Air Conditioning Improvements 1,500, Cooke Field Replace Turf Sports Facilities 1,125, Moore Hall Reroofing Reroofing 430, Physical Science Building Reroofing Reroofing 305, Orvis Auditorium Lighting System Replacement Infrastructure 190, Kuykendall Hall/Annex General Repairs and Repainting General Repairs and Repainting 350, PBRC General Repairs and Repainting General Repairs and Repainting 230, Art Building General Repairs and Repainting General Repairs and Repainting 1,300, ETV Building Remove Transformer Infrastructure 85, Gilmore Hall Reroofing Reroofing 345, Holmes Hall, Art Building Replace Secondary Switchboards and Panelboards Infrastructure 450, Various Bldgs Replace Emergency Lighting Infrastructure 350, Various Bldg (24 Buildings) Lighting Improvements/Retrofits Infrastructure 2,550, Various Bldgs (Physical Science 217, Watanabe Upgrade Auditoriums Building Interiors and Surrounding Grounds 1,218, & 420, St. John 11) (Seating/AC/Lighting/AV/Carpeting) Page 2 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress UHM

3 Campus: University of Hawaii at Manoa 34 Campus Sidewalk Repairs Repairs to Walkways/ADA Compliance Building Interiors and Surrounding Grounds 230, Electrical Substations General Electrical Repairs Infrastructure 460, Various Bldgs Elevator Modernization Infrastructure 965, Various Bldgs (George, HPER, Bilger, IFA, Interior Renovations Building Interiors and Surrounding Grounds 2,500,000 Physical Science, Spalding) 38 CTAHR-Off Campus Facilities Interior Renovations/General Repairs & Building Interiors and Surrounding Grounds 2,300,000 Repainting/Reroofing 39 School of Architecture General Repairs and Repainting General Repairs and Repainting 510, East-West Road Resurface Roadway Resurfacing 1,200, Lower Campus Road Resurface Roadway Resurfacing 220, Saunders Hall Replace Central Plant Equipment Air Conditioning Improvements 1,775, Business Administration Bldg Replace Chillers & Pumps Air Conditioning Improvements 915, Moore Hall Replace Central Chilled Water Plant Equipment & Air Conditioning Improvements 1,600,000 Associated Components 45 Physical Science Building General Mechanical Repairs Air Conditioning Improvements 575, Ag Engineering General Mechanical Repairs Air Conditioning Improvements 550, Agricultural Science Facility, Phs 3 Upgrade Building Reheat System Air Conditioning Improvements 675, Pope Lab General Repairs and Repainting General Repairs and Repainting 280, Kennedy Theater General Repairs and Repainting General Repairs and Repainting 445, Gilmore Hall General Repairs and Repainting General Repairs and Repainting 340, Moore Hall General Repairs and Repainting General Repairs and Repainting 460, Marine Science Building General Repairs and Repainting General Repairs and Repainting 330, Watanabe Hall General Repairs and Repainting General Repairs and Repainting 345, Queen Liliuokalani Center General Repairs and Repainting General Repairs and Repainting 335, St. John Plant Science Lab General Repairs and Repainting General Repairs and Repainting 560, HIG General Repairs and Repainting General Repairs and Repainting 370, Campus Electrical Distribution System Cable Replacement Infrastructure 230, Various Bldgs (Holmes, Edmondson, Keller) Renovation of Classroom Spaces Building Interiors and Surrounding Grounds 1,430, Various Bldgs (Cancer Center, Edmondson, HIG, Renovation of Lab Spaces Building Interiors and Surrounding Grounds 2,500,000 Snyder, MSB) (Lighting/Health & Safety/Other) 60 Watanabe Hall Reroofing Reroofing 335, Bilger Addition Reroofing Reroofing 310, Marine Science (Includes Mech Room) Reroofing Reroofing 335, Everly Hall Reroofing Reroofing 500,000 Page 3 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress UHM

4 Campus: University of Hawaii at Manoa 64 Environmental Protection Facility Reroofing Reroofing 225, Queen Liliuokalani Center Reroofing Reroofing 280, Kuykendall Hall Reroofing Reroofing 275, Saunders Hall Reroofing Reroofing 205, Agricultural Engineering Reroofing Reroofing 175, Speech Pathology/Audiology Reroofing Reroofing 225, Building 171 Reroofing Reroofing 175, Cooke Field Replace Bleachers Sports Facilities 165, Les Murakami Stadium Reroofing Sports Facilities 300, Sherman Lab General Mechanical Repairs Phs 1 Air Conditioning Improvements 825, Sherman Lab General Mechanical Repairs Phs 2 Air Conditioning Improvements 825, Music Complex - New Wing General Mechanical Repairs Phs 1 Air Conditioning Improvements 675, Astronomy Replace AHU's & Air Distribution System Air Conditioning Improvements 1,300, HPER General Mechanical Repairs Phs 1 Air Conditioning Improvements 1,625, HPER General Mechanical Repairs Phs 2 Air Conditioning Improvements 850, Kuykendall Hall Install Outside Air Handling Unit Air Conditioning Improvements 825, Various Bldgs (Snyder, Holmes, Bilger Addition) Renovation of Lab Spaces Building Interiors and Surrounding Grounds 1,813, Temporary Bldgs Refurbishing of Interior Spaces Building Interiors and Surrounding Grounds 900, Various Bldgs (Hemmenway Hall, Holmes, ADA Modifications/Improvements Building Interiors and Surrounding Grounds 2,400,000 Hamilton) 83 Various Bldgs Renovation of Classroom Spaces Building Interiors and Surrounding Grounds 784, Edmondson Hall Electrical System Replacement & Upgrade Infrastructure 675, Various Bldgs Install/Replace Capacitor Banks Infrastructure 340, Various Bldgs Exit Lighting Replacement Infrastructure 350, Various Bldgs Repair/Replace Autoclaves Infrastructure 300, Agricultural Engineering General Repairs and Repainting General Repairs and Repainting 225, Keller Hall/Physical Science Building General Repairs and Repainting General Repairs and Repainting 550, Auxiliary Services General Repairs and Repainting General Repairs and Repainting 280, Agricultural Science General Repairs and Repainting General Repairs and Repainting 285, Hamilton Library, Phs I & II General Repairs and Repainting General Repairs and Repainting 560, Wist Hall/Everly Hall General Repairs and Repainting General Repairs and Repainting 550, Dean Hall Reroofing Reroofing 175, Pope Lab Reroofing Reroofing 280, CTAHR-Off Campus Facilities Reroofing Reroofing 1,500,000 Page 4 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress UHM

5 Campus: University of Hawaii at Manoa 97 Krauss Hall Reroofing Reroofing 240, Various Bldgs Elevator Modernization Infrastructure 405, Various Bldgs (Biomed, St. John, MSB) Replace Refrigeration/Freezer Systems Infrastructure 440, University High School Site Upgrade Water Distribution Systems, Phs. I Infrastructure 565, Les Murakami Stadium General Mechanical Repairs Sports Facilities 385, Les Murakami Stadium General Repairs, Repainting, Seating & Exit Stairs Sports Facilities 1,590, Stan Sheriff Center General Repairs and Repainting Sports Facilities 610, Gym I & II General Repairs and Repainting Sports Facilities 395, Building 37 Reroofing Reroofing 38, Bachman Hall Reroofing Reroofing 335, Engineering Quad Reroofing Reroofing 200, Temporary Bldgs (18) Reroofing Reroofing 375, School of Architecture Reroofing Reroofing 385, University Lab-HS #3 Reroofing Reroofing 205, University Lab-Locker Room Reroofing Reroofing 80, Various Bldgs Elevator Modernization Infrastructure 1,050, Various Bldgs (Physical Science, Art, Gilmore) Renovation of Lab Spaces Building Interiors and Surrounding Grounds 1,565, Various Bldgs (Art, Biomed Court B, MSB 110&114, Upgrade Auditoriums Building Interiors and Surrounding Grounds 1,590,000 Gartley 103, Music #3) 115 Various Bldgs Repairs to Walkways/ADA Compliance Building Interiors and Surrounding Grounds 600, Bachman Hall General Mechanical Repairs Air Conditioning Improvements 700, Marine Science Building General Mechanical Repairs Phs 1 Air Conditioning Improvements 800, Marine Science Building General Mechanical Repairs Phs 2 Air Conditioning Improvements 750, Saunders Hall General Mechanical Repairs Phs 1 Air Conditioning Improvements 750, Biomedical Sciences Building General Mechanical Repairs Phs 3 Air Conditioning Improvements 800, Bilger Addition General Mechanical Repairs Phs 2 Air Conditioning Improvements 800, Astronomy General Mechanical Repairs Air Conditioning Improvements 825, Holmes Hall General Mechanical Repairs Phs 3 Air Conditioning Improvements 825, Magoon Lab Ag Complex Security Fencing Building Interiors and Surrounding Grounds 225, Campus Irrigation Improvement & Expansion of Existing System Building Interiors and Surrounding Grounds 250, Dean Hall Repairs to Exterior/Interior Building Interiors and Surrounding Grounds 335, Various Bldgs Replacement of Dance Floors Building Interiors and Surrounding Grounds 280, Small Animal Replace Incinerator Building Interiors and Surrounding Grounds 200, CTAHR-Various (Oahu/Maui/Kauai/Hawaii) Interior Renovations Building Interiors and Surrounding Grounds 1,000,000 Page 5 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress UHM

6 Campus: University of Hawaii at Manoa 130 Waikiki Aquarium Refurbishment of Interior Spaces/Grounds Building Interiors and Surrounding Grounds 790, Sakamaki Hall General Repairs and Repainting General Repairs and Repainting 400, Building 37 General Repairs and Repainting General Repairs and Repainting 40, Multipurpose Building General Repairs and Repainting General Repairs and Repainting 105, Bachman Hall General Repairs and Repainting General Repairs and Repainting 345, Krauss Hall General Repairs and Repainting General Repairs and Repainting 225, Klum Gym General Repairs and Repainting General Repairs and Repainting 325, Speech Pathology/Audiology General Repairs and Repainting General Repairs and Repainting 95, Environmental Protection Facility General Repairs and Repainting General Repairs and Repainting 135, Dance Building General Repairs and Repainting General Repairs and Repainting 170, Temporary Buildings (20) General Repairs and Repainting General Repairs and Repainting 430, Cancer Center General Repairs and Repainting General Repairs and Repainting 455, CTAHR-Off Campus Facilities General Repairs and Repainting General Repairs and Repainting 510, Leahi Hospital Renovation to Interior Spaces Building Interiors and Surrounding Grounds 600, Coconut Island Renovation to Interior Spaces Building Interiors and Surrounding Grounds 2,800, Holmes Hall Renovation of Carpenter Shop Building Interiors and Surrounding Grounds 285, University Lab-HS #3 Repairs to Exterior/Interior Building Interiors and Surrounding Grounds 445, Waikiki Aquarium General Mechanical Repairs Air Conditioning Improvements 340, Mauna Kea General Mechanical Repairs Air Conditioning Improvements 180, POST Upgrade AHU's with VFD's Air Conditioning Improvements 550, Mauna Kea 2.2m Telescope Dome General Repairs and Repainting General Repairs and Repainting 350, University Lab-HS #3 General Repairs and Repainting General Repairs and Repainting 290, Cottages (4) General Repairs and Repainting General Repairs and Repainting 250, Physical Plant General Repairs and Repainting General Repairs and Repainting 220, UH Press Resurface Roadway Resurfacing 48, CBA/MSB/CC Resurface Roadway Resurfacing 290, College of Ed/Lab School Resurface Roadway Resurfacing 175, Magoon Lab Resurface Roadway Resurfacing 48, Motor Pool Resurface Roadway Resurfacing 60, Waikiki Aquarium Resurface Roadway Resurfacing 60, Mauna Kea Resurface Roadway Resurfacing 570, University Lab-HS #1, #2 Reroofing Reroofing 320, Castle Memorial Reroofing Reroofing 510, Castle Memorial General Repairs and Repainting, Exterior/Interior General Repairs and Repainting 815,000 Page 6 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress UHM

7 Campus: University of Hawaii at Manoa 164 Various Bldgs Signage Replacement General Repairs and Repainting 290, University Lab-HS #1 Repairs to Exterior/Interior Building Interiors and Surrounding Grounds 445, University Lab-HS #2 Repairs to Exterior/Interior Building Interiors and Surrounding Grounds 445, University Avenue Gateway Renovations and Landscaping Building Interiors and Surrounding Grounds 700, Saunders Hall, Ground Floor Landscaping, Kiosk Building Interiors and Surrounding Grounds 380, University Lab-HS #1, #2 General Repairs and Repainting General Repairs and Repainting 460,000 Deferred and Unfunded Repairs and Maintenance - University of Hawaii at Manoa 114,159,000 Air Conditioning Improvements 30,685,000 Building Interiors and Surrounding Grounds 29,010,000 Infrastructure 9,405,000 Reroofing 12,403,000 Resurfacing 3,871,000 Sports Facilities 4,570,000 General Repairs and Repainting 24,215,000 Deferred and Unfunded Maintenance 114,159,000 Page 7 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress UHM

8 Campus: University of Hawaii at Hilo 1 EKH Sidewalk Improvements Building Interiors and Surrounding Grounds 150,000 2 Campus wide Repair uneven walkways to reduce tripping General Repairs and Repainting 200,000 hazards behind Library, College Hall B, College Hall C, by old flagpole 3 Business Office Reroof with PV Reroofing 300,000 4 New Gym Reroof with PV Reroofing 600,000 5 Auxiliary Services Reroof with PV Reroofing 300,000 6 Corner Kapiolani & Kawili St. Remove large trees to mitigate limb hazard and Building Interiors and Surrounding Grounds 220,000 landscape 7 Campus wide ADA Improvements Building Interiors and Surrounding Grounds 3,250,000 8 Provide ADA and directional signs - phase 1 ADA Improvements Building Interiors and Surrounding Grounds 1,700,000 9 Campus wide Replace locksets - phase 1 Building Interiors and Surrounding Grounds 825, Maintenance Shed Renovate old shed with new including toilet, General Repairs and Repainting 600,000 shower and storage 11 NHERC Reroof with PV Reroofing 500, Covered Walkways Reroof with PV Reroofing 480, Keaukaha Aquaculture Major renovation for two buildings Building Interiors and Surrounding Grounds 870, Renovate/replace elevators Renovate/replace elevators Infrastructure 4,100, College Hall C Replacement of distribution system to eliminate Air Conditioning Improvements 450,000 interior duct insulation 16 Computing Center Renovation and A/C improvements Air Conditioning Improvements 1,000, Athletics Complex Cool Training Room for MS effected employee Air Conditioning Improvements 250,000 and upgrade electrical service 18 College of Agriculture Elevator controller replacement Building Interiors and Surrounding Grounds 115, Campus wide Improve emergency call stations and provide General Repairs and Repainting 300,000 security cameras 20 College Hall A&B Renovate teaching labs, including elect Building Interiors and Surrounding Grounds 1,200, College of Agriculture Replace end-of-life-cycle A/C system. Air Conditioning Improvements 350, Campus Center Repair and reconfigure A/C & Misc repairs Air Conditioning Improvements 3,300, Campus Center Landscape to screen loading dock from main Building Interiors and Surrounding Grounds 91,000 entrance 24 Campus Center Renovation of kitchen area. Building Interiors and Surrounding Grounds 1,150, Library Up-grade HITS rooms A/c Air Conditioning Improvements 900, Theater Replace and reconfigure A/C Air Conditioning Improvements 300,000 Page 8 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress UHH

9 Campus: University of Hawaii at Hilo 27 Wentworth Lecture Hall Renovate interior Building Interiors and Surrounding Grounds 1,150, Theater and Old Gym Entrance Improvements Provide adequate turning radius and entrance Infrastructure 540,000 widths 29 College of Agriculture Replace end-of-life-cycle A/C system. Air Conditioning Improvements 240, Edith Kanakaole Hall Renovation for multimedia education classrooms Building Interiors and Surrounding Grounds 1,200, PB 1, 2, 3, 4 Refurbish toilets and update labs Building Interiors and Surrounding Grounds 460, Campus wide Replacement of carpet with vinyl Building Interiors and Surrounding Grounds 950, UHH Administration Replace end-of-life-cycle A/C system. Air Conditioning Improvements 250, Campus wide Lead paint survey General Repairs and Repainting 250, Provide ADA and directional signs - phase 2 ADA Improvements Building Interiors and Surrounding Grounds 1,700, Campus wide Replace locksets - phase 2 Building Interiors and Surrounding Grounds 825, Edith Kanakaole Hall Upgrade 1st floor small toilets Building Interiors and Surrounding Grounds 140, Campus Center ADA renovations to entrances Building Interiors and Surrounding Grounds 60, Campus Center Reroof Reroofing 450, Campus Center Provide cover to lanai Building Interiors and Surrounding Grounds 750, Campus wide Install additional outlets as needed to eliminate General Repairs and Repainting 600,000 permanent extension cord use. 42 Utility Grid Electrical system at capacity in College Hall area Infrastructure 500, Old Gym Parking Repave Resurfacing 220, College Hall Parking and Access Repave Resurfacing 220, Hale Kanilehua Parking Repave Resurfacing 220, Life Sciences/Marine Option Program Reroof Reroofing 25, PB 9 Parking Repave Resurfacing 325,000 Deferred and Unfunded Repairs and Maintenance - University of Hawaii at Hilo 34,576,000 Air Conditioning Improvements 7,040,000 Building Interiors and Surrounding Grounds 16,806,000 Infrastructure 5,140,000 Reroofing 2,655,000 Resurfacing 985,000 Sports Facilities 0 General Repairs and Repainting 1,950,000 Deferred and Unfunded Maintenance 34,576,000 Page 9 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress UHH

10 Campus: University of Hawaii West Oahu 1 Campuswide Repair/Replace Lanai and Walkways General Repairs and Repainting 160,000 2 Buildings A, B, C Repair/Replace Air Conditioning System Air Conditioning Improvements 280,000 Deferred and Unfunded Repairs and Maintenance - University of Hawaii West Oahu 440,000 Air Conditioning Improvements 280,000 Building Interiors and Surrounding Grounds 0 Infrastructure 0 Reroofing 0 Resurfacing 0 Sports Facilities 0 General Repairs and Repainting 160,000 Deferred and Unfunded Maintenance 440,000 Page 10 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress UHWO

11 Campus: Hawaii Community College & 381 Drafting/Skills Upgrade Electrical Service, Upgrade AC Infrastructure 161, Provost Bldg Reroof Reroofing 44, Provost Bldg Refurbish Toilets Building Interiors and Surrounding Grounds 53, B Ceramics, 385C Art, 392B ATE Correct Sewer Line connections for three buildings Infrastructure 28, B - Ceramics Reroof Reroofing 74, C Art Remove and Replace Existing AC Units Air Conditioning Improvements 91, Business Office Reroof Reroofing 35, A - OCET/Financial Aid Reroof Reroofing 210, Carpentry Renovate Carpentry Building Building Interiors and Surrounding Grounds 242, Electricity Renovate Electricity/Electronics Building Building Interiors and Surrounding Grounds 302, Welding Reroof Reroofing 340, Welding Refurbish Classrooms 24 & 25 Building Interiors and Surrounding Grounds 182, Provost Building AC improvements to eliminate duct insulation Air Conditioning Improvements 115, Provost Building Replace end-of-life cycle AC system Air Conditioning Improvements 55, Electricity Replace end-of-life cycle AC system Air Conditioning Improvements 110, C, 391 Art, Electricity Reroof Reroofing 106, Electricity Reroof Reroofing 330,000 Deferred and Unfunded Repairs and Maintenance - Hawaii Community College 2,478,000 Air Conditioning Improvements 371,000 Building Interiors and Surrounding Grounds 779,000 Infrastructure 189,000 Reroofing 1,139,000 Resurfacing 0 Sports Facilities 0 General Repairs and Repainting 0 Deferred and Unfunded Maintenance 2,478,000 Page 11 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress HAW

12 Campus: Honolulu Community College 1 Bldg 8814 Trades Replace A/C Chiller Lines Air Conditioning Improvements 63, Library Recarpet the Floors 1, 2, and 3 of Building General Repairs and Repainting 500, Trades Replace Air Compressor General Repairs and Repainting 74,000 4 Campuswide Termite Damage Campuswide General Repairs and Repainting 111, , 8807, & 8814 Refurbish Building Exhaust Fans Air Conditioning Improvements 69, Trades Replace Feeder Water Line General Repairs and Repainting 43, AC Chiller Plant Replace Exhaust Fan Air Conditioning Improvements 43,000 8 Incinerator Site Upgrade Lighting and repave area Infrastructure 1,520, Airport Training Center Replace Roll-Up Doors General Repairs and Repainting 212, /METC Repair Finger Piers (2) General Repairs and Repainting 132, Cosmetology Replace Interlocking Ceiling Tile General Repairs and Repainting 216, , 8820, 8824 Renovate Bathrooms Building Interiors and Surrounding Grounds 79, Cosmetology Repair Walkways Around Building Building Interiors and Surrounding Grounds 127, Cafeteria Regrade floor to ensure proper drainage Building Interiors and Surrounding Grounds 82, Trades Provide Air Conditioning Control by Area Air Conditioning Improvements 48, Cosmetology Provide Air Conditioning Control by Area Air Conditioning Improvements 76, Campuswide Replace Campuswide Signage General Repairs and Repainting 322, Bldg 8807 Library Eliminate Mold Problem Air Conditioning Improvements 636, Welding Replacement of asbestos partitions. Building Interiors and Surrounding Grounds 25, Auto, 8844 Heavy Equip Reinforce Chain Link Fence Building Interiors and Surrounding Grounds 187, Library Replace Fire Doors & Door Frames General Repairs and Repainting 36, Bakery & Foods Improve Water Drainage in Parking Lot 2 Resurfacing 565, Campus Mall Repair Concrete Walkway Building Interiors and Surrounding Grounds 806, , 8813, 8814 Drainage for Rainwater Infrastructure 291, Pipe Fitters Renovate Bathrooms including ADA Compliance Building Interiors and Surrounding Grounds 114, Hangar 111 Repaint Exterior General Repairs and Repainting 644, METC Upgrade Ventilation General Repairs and Repainting 262, Science Retrofit/Replace Air Conditioning System Air Conditioning Improvements 399, METC Replace Louvers General Repairs and Repainting 79, Campuswide Upgrade Campus Irrigation system Building Interiors and Surrounding Grounds 100, , 8818, 8812 Reroof - Asbestos Reroofing 365, METC Refurbish Flooring General Repairs and Repainting 233, Bakery & Foods Install Central AC System in Dining Area Air Conditioning Improvements 236, Cosmetology Repaint Interior of Building General Repairs and Repainting 291,000 Page 12 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress HON

13 Campus: Honolulu Community College Trades Renovate Building Building Interiors and Surrounding Grounds 259, Admin Refurbish Administration Building Interiors and Surrounding Grounds 350, , 8812, 8817, 8818, Repaint Exterior of Buildings-3,12,17,18,20,24 General Repairs and Repainting 430, Science Renovate Elevator to be ADA Compliant General Repairs and Repainting 34, Science Refurbish Interior of Building 8805 Building Interiors and Surrounding Grounds 747, Bakery & Foods Repair/Repaint Building Exterior General Repairs and Repainting 115,000 Deferred and Unfunded Repairs and Maintenance - Honolulu Community College 10,921,000 Air Conditioning Improvements 1,570,000 Building Interiors and Surrounding Grounds 2,876,000 Infrastructure 1,811,000 Reroofing 365,000 Resurfacing 565,000 Sports Facilities 0 General Repairs and Repainting 3,734,000 Deferred and Unfunded Maintenance 10,921,000 Page 13 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress HON

14 Campus: Kapiolani Community College 1 Campuswide Refurbish/Replace Exterior Light Fixtures Building Interiors and Surrounding Grounds 504, Classrooms Repair/Replace AC Systems--Air Handlers, Iliahi Air Conditioning Improvements 136, Ilima, 6921 Iliahi, 6919 Kauila Replace Cooling Towers (10) Air Conditioning Improvements 1,000,000 4 Campuswide Upgrade Centralized Fire Alarm System Infrastructure 600, Culinary Reroof Ohelo Reroofing 207, Ohia, 6930 Ohelo Refloor Building Interiors and Surrounding Grounds 90,000 7 Building 6932 Arts & Sciences Reroof Kalia Reroofing 106,000 8 Campuswide Install Energy Management System Air Conditioning Improvements 916, Performing Arts Renovations - Add Showers, Maile Building Interiors and Surrounding Grounds 131, Chapel Refurbish Chapel Building Building Interiors and Surrounding Grounds 511, Building 6934 Arts & Sciences Reroof Olona Reroofing 94, Building 6921 A,B,C,D Reroof Iliahi Reroofing 275, Campuswide Upgrade Electrical Systems Infrastructure 199, Kopiko Lab, Rm 101 Renovate lab, classroom, offices General Repairs and Repainting 126, Kopiko 202 Lab Renovate lab into 2 labs General Repairs and Repainting 56, Ohia, 6930 Ohelo Repair/Replace Refrigeration Units General Repairs and Repainting 870, Library, Bus Ed Recarpeting General Repairs and Repainting 240, New road to connect buildings (6931 & 6935) New interior service road to connect Alani Child Resurfacing 242,000 Care Center to Olopua 19 Service Roads at 6937 Classrooms, 6938 Offices Resurface Road Fronting Manele/Manono Resurfacing 133, Parking Lots A,B,C,D Resurface Resurfacing 617, Campuswide Resurface Asphalt Walkways/Bike paths, including Resurfacing 230,000 Alani Culinary, 6928 Cafeteria Renovate/Refurbish Food Service Public Areas, Building Interiors and Surrounding Grounds 230,000 Ohelo, Ohia Culinary, 6928 Cafeteria Replace Fixed Equipment and Repair Rooms, Building Interiors and Surrounding Grounds 280,000 Ohelo, Ohia 24 Building 6946, Chapel Repaint Exterior Chapel General Repairs and Repainting 32, Campuswide Rekey w/ Electronic Keying System General Repairs and Repainting 440, Campuswide Upgrade/Replace Landscaping/Irrigation System Building Interiors and Surrounding Grounds 499, Campuswide Repaint/Recarpet General Repairs and Repainting 325, Campuswide Refurbish Termite Damaged Bldgs Phase II General Repairs and Repainting 241,000 Page 14 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress KAP

15 Campus: Kapiolani Community College Deferred and Unfunded Repairs and Maintenance - Kapiolani Community College 9,330,000 Air Conditioning Improvements 2,052,000 Building Interiors and Surrounding Grounds 2,245,000 Infrastructure 799,000 Reroofing 682,000 Resurfacing 1,222,000 Sports Facilities 0 General Repairs and Repainting 2,330,000 Deferred and Unfunded Maintenance 9,330,000 Page 15 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress KAP

16 Campus: Kauai Community College 1 Portables Repair/Replace Portable Building and Decking General Repairs and Repainting 102,000 2 Carpentry Repair/Replace Saw Dust Vacuum System General Repairs and Repainting 75,000 3 Campuswide Repair Root-Damaged Curbing Resurfacing 85,000 4 Campuswide Repair/Replace Damaged light poles and Infrastructure 100,000 Electrical Circuits Learning Resource Center Retrofit A/C Air Handlers and Fan Coil Units in the Air Conditioning Improvements 751,000 Learning Resource Center 6 Campuswide Resurface Roads and Parking Lots Resurfacing 785,000 7 Bldg 4454 Business/Nursing Retrofit A/C Air Handlers and Fan Coil Units in Air Conditioning Improvements 189,000 the Business/Nursing Building 8 Library & Business/Nursing Replace Carpet General Repairs and Repainting 40, Natural Science Complete Fume Hood Project General Repairs and Repainting 95, Fine Arts Replace Ceramics Kiln General Repairs and Repainting 42, (PAC), 4469 Electronics Exterior Lighting Infrastructure 74, Bldg 4456 Faculty, 4464 Carpentry, 4463 Welding Retrofit/Replace Air Conditioning System Air Conditioning Improvements 189, Bldg 4458 Social Science, 4466 Auto Body, 4467 Retrofit/Replace Air Conditioning System Air Conditioning Improvements 189,000 Automotive Tech 14 Campuswide Caulk/seal/repair Roof Flashing and Exhaust Hoods General Repairs and Repainting 100, Campuswide Replace Signage General Repairs and Repainting 72,000 Deferred and Unfunded Repairs and Maintenance - Kauai Community College 2,888,000 Air Conditioning Improvements 1,318,000 Building Interiors and Surrounding Grounds 0 Infrastructure 174,000 Reroofing 0 Resurfacing 870,000 Sports Facilities 0 General Repairs and Repainting 526,000 Deferred and Unfunded Maintenance 2,888,000 Page 16 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress KAU

17 Campus: Leeward Community College Drafting Tech Renovate DA Basement - Instructional/ Building Interiors and Surrounding Grounds 1,300,000 Programmatic/Office/Storage 2 Campuswide, 880-GenTech, 884-FineArts, Instructional/Programmatic Classroom and Building Interiors and Surrounding Grounds 700, Arts & Music, 886-BusEd, 875-Library, Faculty Office Renovations, Re-carpeting, Fixed 878-BioSci 3 Campuswide Desk/Swivel Chair Seats Building Interiors and Surrounding Grounds 901, Admin Renovate First Floor of Admin Bldg Building Interiors and Surrounding Grounds 150,000 5 Campuswide Repair/replace Directional Signage From Street, General Repairs and Repainting 100,000 Parking Areas, Campus Campus Center Repair/Replace Campus Center Doors and General Repairs and Repainting 381,000 Library Doors 7 Campuswide Upgrade Lighting & Resurface Service Road & Resurfacing 505,000 Expand Parking (Ewa) Auto Tech Replace Rolling Doors - Phase II General Repairs and Repainting 231,000 9 Campuswide Replace Exterior Metal Doors General Repairs and Repainting 550, Campuswide Upgrade Irrigation System Building Interiors and Surrounding Grounds 159, Campuswide Landscaping/Tree Management Building Interiors and Surrounding Grounds 50, Campuswide Resurface Lower Campus Service Road (Makai) Resurfacing 175, Campuswide Refurbish Restrooms-Phase II Building Interiors and Surrounding Grounds 900, N/A Remove Dive Tank General Repairs and Repainting 30, Auto Tech Repair/Replace Firewalls for Offices in Building Interiors and Surrounding Grounds 81,000 Automotive Building 16 Campuswide Waterproof Fascias General Repairs and Repainting 386, Campuswide Repair/Waterproof Exterior of Buildings General Repairs and Repainting 366, OCET Bldgs 896, 897, 898 Renovate OCET Portables Building Interiors and Surrounding Grounds 411, Theater Replace Flooring - Dance General Repairs and Repainting 99, Theater Refurbish Theater (Replace Stage, Replace Carpets, General Repairs and Repainting 447,000 Replace Rolling Doors, Refurbish/Modify Counter Weight System, and Modify Speaker System) 21 Campuswide Retrofit/Replace Chill Water Pipe Insulation Air Conditioning Improvements 1,080, Library Install Elevator for Interior of Library Infrastructure 250, Campuswide Rekey Campus Door Locks--Add Electronic System General Repairs and Repainting 461, Biological Science Remove Salt-Water Tank General Repairs and Repainting 69,000 Page 17 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress LEE

18 Campus: Leeward Community College 25 Campuswide Repair and Seal Ground Level Campus Sidewalks General Repairs and Repainting 273, Upper Campus Parking Lot Reseal Upper Campus Parking Lot General Repairs and Repainting 470, OCET Parking Lot Resurface Resurfacing 428, N/A Renovate Light Timers General Repairs and Repainting 226, Theatre Relocate Theater Box Office, Add Concession Building Interiors and Surrounding Grounds 271,000 Stand 30 N/A Resurface Basketball/Volleyball Court Sports Facilities 326,000 Deferred and Unfunded Repairs and Maintenance - Leeward Community College 11,776,000 Air Conditioning Improvements 1,080,000 Building Interiors and Surrounding Grounds 4,923,000 Infrastructure 250,000 Reroofing 0 Resurfacing 1,108,000 Sports Facilities 326,000 General Repairs and Repainting 4,089,000 Deferred and Unfunded Maintenance 11,776,000 Page 18 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress LEE

19 Campus: Maui Community College 1 Bldg 2224 Library Repair/Repaint Exterior General Repairs and Repainting 359,000 2 Bldgs 2224, 2249, 2250, 2251, 2236, 2237,2238 Mold/Mildew abatement from AC hood system, Air Conditioning Improvements 300,000 coils, fan units, etc 3 Bldg 2224 Library Skylight Dome on Rooftop General Repairs and Repainting 60,000 4 Bldg 2237, 2249, 2224 TLC Bldg, Library (2nd/3rd floors) Remove carpet Building Interiors and Surrounding Grounds 355,000 and replace w/ sound resistant tile and specific 5 Bldg 2249 and 2251 classrooms in Kalama General Repairs and Repainting 100, Carpentry Shop Repair/Replace Dust Collector General Repairs and Repainting 136,000 7 Moloka i Ag Strengthen Molokai AG Greenhouse Structure General Repairs and Repainting 285,000 and Deteriorated Panels 8 Bldg 2220 Faculty Hale/Lanai Ed Ctr Refurbish restrooms, fixtures, stalls, walls, etc General Repairs and Repainting 285,000 9 Bldg 2239A Ag Classrooms, 2249 Kalama Bldg Refurbish/Replace Windows, Ag Building and General Repairs and Repainting 285,000 Kalama Bldg 10 Campuswide Ground Termite Treatment campus wide (phase I) General Repairs and Repainting 640, Library, 2232 Stdnt Ctr Connect to Chiller Plan Air Conditioning Improvements 158, Campuswide--Upper Campus Upgrade Potable Water Lines Infrastructure 426, Business, 2250 Annex Repair/Repaint Exterior General Repairs and Repainting 347, Bldgs 2201, 2202, 2203, 2204, 2235, 2223 Refurbish Roll-up Doors Building Interiors and Surrounding Grounds 509, Campuswide Refurbish Sidewalks Building Interiors and Surrounding Grounds 281, Campuswide Resurface Roads and Parking Lots - Lower Campus Resurfacing 467, Campuswide Termite Damage Repair campus wide (phase II) General Repairs and Repainting 550, Campuswide Rekey Door Locks and replace with proximity General Repairs and Repainting 528,000 card readers 19 Campuswide Upgrade Energy Management System Air Conditioning Improvements 278, Campuswide Building, Parking, Traffic signage replacement, General Repairs and Repainting 74,000 campus-wide 21 Automotive Upgrade Electrical (new equipment items were Infrastructure 560,000 purchased) 22 Campuswide Upgrade Irrigation System Building Interiors and Surrounding Grounds 310, Bldgs 2205 Community Service Reroof Reroofing 79, Dormitory Parking Lot Resurface Resurfacing 206, Overflow parking areas Install grass blocks to prevent deterioration Building Interiors and Surrounding Grounds 580, Bldg 2253 Paina Humidity Control in Building, and reduce size of Air Conditioning Improvements 450,000 entry way fan Page 19 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress MAU

20 Campus: Maui Community College 27 Tennis Courts Resurface Resurfacing 168, Bldg Science Refurbish-Chemistry and Biology Labs (Upgrade Building Interiors and Surrounding Grounds 374,000 Fixed Lab Furniture, Gas Lines, etc.) Deferred and Unfunded Repairs and Maintenance - Maui Community College 9,150,000 Air Conditioning Improvements 1,186,000 Building Interiors and Surrounding Grounds 2,409,000 Infrastructure 986,000 Reroofing 79,000 Resurfacing 841,000 Sports Facilities 0 General Repairs and Repainting 3,649,000 Deferred and Unfunded Maintenance 9,150,000 Page 20 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress MAU

21 Campus: Windward Community College 1 Bldg 5977 Replace AC, Laakea Air Conditioning Improvements 420,000 2 Bldg 5989 Reseal/Reroof Hale Hokulani building Reroofing 150,000 3 Bldg 5977, 5979, 5980, 5981, 5982, 5983 Electrical Rewiring - Various Buildings Infrastructure 735,000 4 Campuswide Resurface Roadways & widen 2 ends. Resurfacing 1,197,000 5 Bldg 5977, 5979, 5980, 5982, 5983 Replace Ceiling Tiles - Laakea, Manaopono, General Repairs and Repainting 242,000 Noeau, Alakai, Naauao 6 Bldg 5979, 5980 Replace Window AC Units - Manaopono, Noeau Air Conditioning Improvements 163,000 7 Bldg 5977, 5979, 5980 Awning/Ramp Replacement- Laakea, Building Interiors and Surrounding Grounds 179,000 Manaopono, Noeau 8 Campuswide Security System General Repairs and Repainting 121,000 9 Campuswide Rekey Door Locks General Repairs and Repainting 43, Campuswide ADA automatic door openers. General Repairs and Repainting 96, NA Removal of Transite Pipes General Repairs and Repainting 151, Bldg 5977, 5981, 5982, 5983, 5979 Repaint Interior- Laakea, Iolani, Alakai, Naauao, General Repairs and Repainting 379,000 Manaopono 13 Admin (5982), Stdnt Svcs (5983), & Classrooms Replace Interior Water Lines, 3 buildings General Repairs and Repainting 242,000 (5979) 14 Campuswide Upgrade Energy Management System Air Conditioning Improvements 278,000 Deferred and Unfunded Repairs and Maintenance - Windward Community College 4,396,000 Air Conditioning Improvements 861,000 Building Interiors and Surrounding Grounds 179,000 Infrastructure 735,000 Reroofing 150,000 Resurfacing 1,197,000 Sports Facilities 0 General Repairs and Repainting 1,274,000 Deferred and Unfunded Maintenance 4,396,000 Page 21 of 21 C:\RTK-CIP\R&M Documents\Deferred R&M Reports\FY 2007\FY Work in Progress WIN

By Budget Unit 100,588,000 23,236, ,830,671. Page 1 of 20

By Budget Unit 100,588,000 23,236, ,830,671. Page 1 of 20 Campus SYS Category UHM UHH UHWO HAW HON KAP KAU LEE MAU WIN Air Conditioning Improvements 32,335,000 4,645,000 0 86,250 1,624,810 3,053,820 540,000 1,024,480 414,300 419,300 44,142,960 Building Interiors

More information

Lou Chan & Assoc. St. John Plant Science Lab, Reroof Building 198B,

Lou Chan & Assoc. St. John Plant Science Lab, Reroof Building 198B, 52921 Lou Chan & Assoc. St. John Plant Science Lab, Reroof Building 198B, UHM UHM 04-541-501B Lou Chan & Associates, Inc. Kimra/Ybl & Assoc., Ltd. $21,600.00 52924 Kennedy Theater Reroof, UHM UHM 04-541-500

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

Ohlone College Measure G Project Scope Revisions

Ohlone College Measure G Project Scope Revisions Scope Revisions Current Title Revised Title Current Scope Revised Scope 6101 Relocated Baseball Field Athletic Fields Create new sustainable baseball field with synthetic turf, bleacher seating and batting

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

Oxford Hills School District Capital Renewal Plan Updated March 2017

Oxford Hills School District Capital Renewal Plan Updated March 2017 Color Coding Guide Recently Completed In Progress FY 2017 Budget in FY 2018 Future Budgets/Projects 3/20/17 Capital Renewal Plan Updated March 2017 Capital Renewal Plan - Harrison Elementary Harrison add

More information

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0. Branham High School Budget Remaining 1 906030 Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765,473.00 $635,342.00 $635,342.00 $130,131.00 $0.00 2 970205 Branham Interim Housing - 12 Portable

More information

Tillamook High School Bond Projects

Tillamook High School Bond Projects Tillamook High School Bond Projects School Project Description All Buildings Upgrade fire alarm H&S All Buildings Add door lock capability from inside rooms Security All Buildings Install card lock entry

More information

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School

More information

Design Presentation. Chief Operations Officer Willie Burroughs

Design Presentation. Chief Operations Officer Willie Burroughs Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community

More information

School District of Milton 5- Year Capital Maintenance and Improvement Plan

School District of Milton 5- Year Capital Maintenance and Improvement Plan Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom

More information

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,

More information

Facilities Management Services

Facilities Management Services Facilities Management Services Operating Budget Facilities Management (FM) receives an Operating Budget each year predicated on funding the routine, predictable costs of cleaning, maintaining,, and repairing,

More information

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Year Opened 1971 Current Square Footage 175,743 Site Acreage (included in CCHS) 87.22 campus.cherrycreekschools.org $2,441,170

More information

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

Forest Hills Facilities Plan

Forest Hills Facilities Plan Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation

More information

5 Year Capital Improvement Plan Update

5 Year Capital Improvement Plan Update 5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John

More information

New High School Concept

New High School Concept Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA 18064 610-759-1367 FAX 610-759-7028 TO: FROM: Dr. Riker, Superintendent of Schools Board of School Directors Lewis F.

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls

More information

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017 Projects Completed FY14, FY15 and FY16 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Akers Hall Renovations

More information

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction CITY HALL ADA ENHANCEMENT/REMODEL 2016 ACTION PLAN 1978 Construction 1 HISTORY At the February 2, 2016 Council Workshop Council Motions included: The direction to staff to move forward with the City Hall

More information

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction Summer 2012 Large and small construction projects were completed during the summer 2012 construction season.

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls

More information

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015 Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining. Project Updates January 11, 2018 CENTERVILLE CHESAPEAKE ARBORETUM BELLS MILL CITY CREEKWOOD SOUTH DEEP CREEK LOCK WORK TO BE PERFORMED/UPDATES Improvements to the parking lot include installation of a

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015 Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

SCHOOLS + COMMUNITY rehabs, renovations, new construction

SCHOOLS + COMMUNITY rehabs, renovations, new construction OCV HAS A WEALTH OF EXPERIENCE HELPING S AND COMMU- NITY CENTERS BUILD, MODERNIZE + EXPAND THEIR FACILITIES, PROVIDING THE RIGHT ENVIRONMENT FOR GROWTH 2015 SMILOW CLUBHOUSE, MADISON SQUARE BOYS & GIRLS

More information

Sidney Sawyer Elementary School

Sidney Sawyer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Maintenance Road Show

Maintenance Road Show Maintenance Road Show What does it take to maintain a campus? What are the costs? Buildings: 267 Campus Sq. Feet: 3,470,408 GSF Roads: 8.28 miles Walkways: 8.81 miles Exterior lights: 1,000 Exterior stairways:

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

ESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization

ESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization James Lick Track & Field Improvements Bleacher Replacement Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization Design Mt Pleasant Bleacher Replacement New Performing

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

West Hartford Public School District

West Hartford Public School District West Hartford Public School District Agenda Item: Adoption of Capital Improvement Plan for 2018-19 Meeting Date: February 6, 2018 From: Through: Andy Morrow, Assistant Superintendent for Administration

More information

George B Swift Elementary Specialty School

George B Swift Elementary Specialty School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW DISTRICT CAMPUS OVERVIEW Classrooms, CR Special Education Computer Lab INTERSTATE 5 FW - Faculty Work, FL - Faculty Physical Education / Athletics Support Spaces S - Storage, T - Toilets, U - Utility,

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

EXISTING CONDITIONS SUMMARY

EXISTING CONDITIONS SUMMARY SITE Fire alarm system does meet current requirements Accessible path of travel lacking throughout campus Announcer s booth at Football Field booth not ADA compliant Covered and non covered outdoor eating

More information

Measure R Measure R Interest Measure R Refunding

Measure R Measure R Interest Measure R Refunding Measure R Measure R Measure R Interest Measure R Refunding Expenditures thru 6/30/15 15/16 Expenditures thru 6/30/15 15/16 Expenditures thru 6/30/15 15/16 Measure R Project 1 ScienceLocal Portion 770010

More information

Laney College 2012 Facilities Master Plan

Laney College 2012 Facilities Master Plan laney college 2012 Facilities Master Plan Purpose of the master plan The purpose of the 2012 Long Range Facilities Master Plan is to create a roadmap for facilities development that addresses the educational

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan PBA Project No. 2014.0137.00 Prepared By: Wayne Kerbelis Terry Cleis September

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment

CENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment CENTRAL GEORGIA TECHNICAL COLLEGE Maintenance, Custodial & Operation Plan Facilities & Equipment Central Georgia Technical College Maintenance, Custodial and Operation Plan In order that Central Georgia

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Mt. Diablo Unified School District 2010 Measure C Facilities Improvement Program

Mt. Diablo Unified School District 2010 Measure C Facilities Improvement Program Mt. Diablo Unified School District 2010 Measure C Facilities Improvement Program Report to the Board of Education Remaining Funds and Proposed Project List February 26, 2018 The picture can't be displayed.

More information

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013 AREAS OF IMPROVEMENT E A POOL HOUSE POOL DECK B B MAIN BUILDING UPPER PLAZAS A D F G C MAJOR BLEACHERS DUGOUTS FIELD MAIN COURTYARD D REGGIE PARK C E SPORT COURT ADA RAMP H F G H TENNIS COURTS KITCHENETTE

More information

Service Description Service Shop Customer Charge Comments. Electronic Shop. Electric Shop Yes additional circuits for equipment

Service Description Service Shop Customer Charge Comments. Electronic Shop. Electric Shop Yes additional circuits for equipment Fire alarm repairs Electronic Shop Fire alarm sound level testing Electronic Shop Fire system inspections Electronic Shop Installation of additional fire detection/alarm/supression devices Electronic Shop

More information

SPLOST I, II, III,IV

SPLOST I, II, III,IV ACWORTH ES (OLD) ACWORTH INTERMEDIATE Construction projects not done due to school replacement Land Acquisition, 61 IU Replacement Elementary School Access Controls, Temperature monitors for walk in coolers

More information

Appendix E: Photo Documentation

Appendix E: Photo Documentation Appendix E: Photo Documentation Brown County Library Central Branch Building Assessment Appendix E: Photo Documentation Architectural and Structural Brown County Library Central Branch Building Assessment

More information

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 Buildings and Grounds Committee Minutes March 20, 2017 The meeting was called to order at 6:30 p.m. PRESENT: Board Members, Mr. Jeffrey A.

More information

DeWitt Clinton Elementary School

DeWitt Clinton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Cherry Hill Public Schools BUILDING A SOLID FUTURE Cherry Hill Public Schools BUILDING A SOLID FUTURE Who We Are The Cherry Hill School District is the 12 th largest in the state, serving 11,500 students 19 Locations 2 High Schools, 3 Middle Schools, 12

More information

Adopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes

Adopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes Adopted DEFP FY16 - Amendment Broward County Public Schools Adopted District Educational Facilities Plan Fiscal 015-16 to 2019-20 Amended to Incorporate Board Approved Changes Robert W. Runcie, Superintendent

More information

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 WHAT IS A BOND ELECTION? Provide communities an opportunity to vote to give the Board of Trustees authority

More information

Beaufort County Community College. Maintenance and House Keeping Plan

Beaufort County Community College. Maintenance and House Keeping Plan Beaufort County Community College Maintenance and House Keeping Plan Summary: The College s facility management is handled by the Maintenance Department. The Director of Plant and Maintenance Operations

More information

Facilities Management State-Funded and Billable Services

Facilities Management State-Funded and Billable Services Facilities Management State-Funded and Billable Services Facilities Management receives funding to provide maintenance in eligible state-supported areas only, per UCOP guidelines. State-supported areas,

More information

Warren County Schools Plant and Operations

Warren County Schools Plant and Operations Warren County Schools Plant and Operations Buildings/Facilities/Energy Strategic Plan September 28, 2017 (Updated January 18, 2018) Donnie Caldwell; Facilities Director One Team, One Goal, High Levels

More information

WPUMC Capital Report Existing Facilities February 19, Maintenance Coordinator George Smit

WPUMC Capital Report Existing Facilities February 19, Maintenance Coordinator George Smit WPUMC Capital Report Existing Facilities February 19, 2017 Maintenance Coordinator George Smit Facility Overview Buildings Sanctuary Building (SB) Sanctuary, Narthex, Lobby Choir Room. Dr. Lee s Office,

More information

bold/italic items are revisions to the previous program notes

bold/italic items are revisions to the previous program notes bold/italic items are revisions to the previous program notes Future Meetings: - Dr. Caldwell - Students - Industry Partners (Mike Betts? Sam Geil? Kevin Harmon? TBD by SCCCD) A. Specific Room Requirements

More information

Design Review of Facility Improvement Projects

Design Review of Facility Improvement Projects Design Review of Facility Improvement Projects Agenda Board Meeting Schedule Scope of Work Summary Overall Building Plans and Scope Summary Update on Areas of Design Development Programming and Space planning

More information

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 Year Built 1960 // Age 58 years Building Area 31,688 Square Feet Student Capacity 389 Current Enrollment (2017-2018) 466 Priority

More information

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM NASSAU COMMUNITY COLLEGE Garden City, New York 11530 Capital Committee Meeting January 12, 2016 5:00 PM 1. Review and Approval of December 8, 2015 minutes: Chair: Do I have a motion to approve the minutes

More information

Proposed Bond Construction Projects

Proposed Bond Construction Projects Proposed Bond Construction Projects The Facility Planning Process * September, 2006: - Board of Education established the Facilities and Asset Review Committee with the responsibility to evaluate all district

More information

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY 2018 57 MECHANICAL ASSESSMENT MECHANICAL ASSESSMENT This report section includes an overview of the existing

More information

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University

More information

Custom Report // Priorities 1+2

Custom Report // Priorities 1+2 Custom Report // Priorities + All costs are shown in 08 dollars. The cost of all work items after this date should be adjusted accordingly. Print Date: 4/3/08 Foothill High School DESCRIPTION Building

More information

University of Delaware

University of Delaware KEY STATION Campus must have a key station minimum 20 x 16 1 Computer hook up for time and attendance Furniture Seating for 20 Employee mailbox 3 Key Boxes (2 boxes should hold 30 keys; 1 box should hold

More information

Campus Facilities Planning Board (CFPB)

Campus Facilities Planning Board (CFPB) Campus Facilities Planning Board (CFPB) Summary Points of Meeting May 6, 2010 Hawai i Hall 309 2:00 pm 3:30 pm Attendees: David Hafner, Eric Crispin, Kathy Cutshaw, Reed Dasenbrock, Peter Crouch, Vassilis

More information

Final Report from the Measure N Bond Oversight Committee February 5, 2014

Final Report from the Measure N Bond Oversight Committee February 5, 2014 Final Report from the Measure N Bond Oversight Committee February 5, 2014 On November 5, 2002, voters approved the issue of up to $38,000,000 aggregate principal amount of the Lompoc Unified School District

More information

NYC Department of Education

NYC Department of Education Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural

More information