1 The M & V Guided Recommissioning Process MOO Energy & Water Conservation Program September 2015

2 EWC Agenda MOO EWC Overview Our approach Progress Fault Detection Zone & customer feedback Variance reporting Rogue zone diagnostics Existing Building Commissioning Selection Process GDC BME M&V Plan for New Construction EUI & 3PIM Benchmarking BAS Trend Review

3 EWC Our Approach Behavior Programs Campus-Wide Scheduling, Resets, & Economizing Campus-Wide Fault Diagnostics System Component Replacements Existing Building (EB) Commissioning Measurement & Verification

4 Campus Distributed E&G Building EUI

5 Fault Detection Tools Bi-Monthly Variance Report Most Recent Two Weeks Steam Usage Previous Two Weeks Steam Usage Campus Average Increase in Steam Usage

6 Townes Hall AHU-08 BAS Graphic Pre-Heat Set Point: 50 o F Actual Temp: 110 o F

7 Summary of our Investigation Improperly installed and leaking preheat steam valve Steam costs increased $400 per day due to leak-by steam If left unaddressed, problem would have resulted in annual utility cost increases of $140,000 Short term solution: Steam to AHU was valved off Long term solution: Correct faulty installation of valve stem

8 TNH Steam Consumption

9 Fault Detection Tools Rogue Zone Diagnostics

10 Rogue Zone Diagnostics Reheat valve is open above 80% Space temp is 2 o F less than heating set point Space temp is 2 o F greater than cooling set point Damper position is above 95%

11 Rogue Zone Diagnostics

12 Impact of Rogue Zone Program at GDC Chilled Water (Ton-Hours) 4/28/ /7/2014 4/28/2015 Date

13 EWC EB Commissioning Selection Process EUI Ranking EUI change over year before 4 PIM modeling baseload and controllability BAS control level and potential for success Service request frequency and maintenance personnel feedback Validated Utility Data

14 Top 30 EUI Buildings

15 Example 3 PIM Chilled Water Model 0.2 Ton-hrs/day/sq-ft Base load Slope (performance efficiency) Scatter (controllability) 0 Pivot Temp 65 degrees Average Daily Temp Three Parameter Inverse Modeling, Dr. Kissock, University of Dayton

16 3PIM Chilled Water Campus Average PIM Chilled Water Campus Averages Ton-hr / Day / Sq-ft Campus Average Campus Lab Average Campus Office/Academic Avg Average Daily Temperature Three Parameter Inverse Modeling, Dr. Kissock, University of Daton

17 BAS Control Level and Potential for Success AHU Resets Supply air temp reset based on zone loads Air is pretreated by a dedicated OAU with chilled water and hot water/ steam coils Supply air temperature feedback and set-point in BAS All zones have room temp feedback in BAS All zones have terminal box damper feedback in BAS Return air humidity feedback in BAS Sensitive areas are evaluated and monitored Water-Side Resets Hot water supply temperature set-point reset based on outdoor air temperature Building has a heating hot water loop in place Supply temperature of hot water loop is tied into the BAS Outdoor air temperature is available for use in the reset schedule Hot water pump serves only HVAC loads

18 GDC Re-Commissioning Process 1. Baseline Validation Verify Metering & Billing 2. Reviewing documents As-builts (Mechanical Schedule, MEP Drawings) Sequence of Operations (SOO) Test and Balance (T&B) Commissioning Report Building Automation Systems (BAS)

19 GDC Re-Commissioning Process 3. Verify and resolve operational discrepancies Repaired/ replaced minor equipment sensors & actuators Rewrote and reprogrammed vague static pressure reset SOO Rewrote and reprogrammed outside air flow control Programmed supply air temperature reset Corrected inconsistent minimum air flow values 4. Optimize for energy conservation Optimized supply air and space temperature set-points Improved supply air temperature reset Added economizer programming Added rogue zone programming

20 VAV Reheat Valve Position VAV HW Valve Position % Nov. 6 th, 2014 Returned Room Temp Set-point to 70-74F Nov. 7 th, 2014 Reduced Air Flow Min. Date (Day/Hour)

21 GDC OAU-1 Fan Speed Percentage Fan Speed Percentage Nov. 6 th, 2014 Demand control ventilation sequence utilized Date (Day/Hour)

22 GDC 4 PIM Model After start of EB Cx but before tuning CW (kbtu/day) 10/6/13 9/30/14 10/1/14 12/9/14 Temperature ( o F) Generated using Energy Explorer

23 GDC 4 PIM Model After tuning CW (kbtu/day) 10/6/13 9/30/14 12/10/14 5/6/15 Temperature ( o F) Generated using Energy Explorer

24 % Avoidance Cost Avoidance Chilled Water Electricity Steam Total Measured (10/6/14-5/6/15) Daily Avoidance Annual Estimate 46% 5% 51% 37% $ 173, $ $ 297,327.48

25 BME Re-Commissioning 3. Verify and resolve operational discrepancies Correct fume hood controller CFM calculation Add schedule for motion sensors Adjust motion sensor ultrasonic sensitivity Correct AHU-3 return air CFM set-point calculation Replace CO2 sensors and enable demand controlled ventilation

26 MOO Offset = General Exhaust + Hood Exhaust Supply Air

27 BME Motion sensors not fully operational Design requires that ventilation rates reduce and lights turn off during unoccupied periods Programming was partially complete and motion sensors were installed Ultrasonic sensitivity was not adjusted Occupancy schedule was not programmed Located in higher hazard labs and not teaching labs If utilized, potential energy cost avoidance >$30,000 (ROI < 1 year)

28 M&V Plan for RBRH EUI & 3PIM Comparisons Against itself at 1, 2, 3, and 5 years from SC Campus averages National benchmarks Energy model BAS Trend Comparisons Against expected operation at 6 to 8 months after SC Set-up trending in system groups Use in preparation for enhanced commissioning Record anomalies and discrepancies

29 Building Automation Trend Review Energy Conservation Measure AHU static pressure reset AHU supply air temperature reset AHU set-back schedule Terminal box set-back Demand Control Ventilation Economizer Trended Point to Review Static pressure set point, actual static pressure, fan speed feedback Supply air temp set-point, actual supply air temp, relative humidity Fan speed feedback, valve position Damper position, reheat valve position Return air, space, and outside air CO2 value, outside air flow Outside air flow, Outside air & return air damper position, CHW valve position, mixed air temperature

30 The M & V Guided Recommissioning Process MOO Energy & Water Conservation Program September 2015

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University

More information

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

Auburn University Basketball Arena:

Auburn University Basketball Arena: Auburn University Basketball Arena: How Building Data Analytics Achieved Energy and O&M Savings While Improving Comfort and Sustainability Eric Moore, PE, CEM, Auburn University Hadas Webb, CEM, Cimetrics

More information

Civil Engineering Building

Civil Engineering Building Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA Continuous Commissioning of a LEED-EB Gold Certified Office Building Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA KEYWORDS Continuous Commissioning, Retro-Commissioning,

More information

DIGI-VAV APPLICATIONS

DIGI-VAV APPLICATIONS DIGI-VAV DIGI-VAV APPLICATIONS Digi-VAV: An optimization kit for Variable Air Volume Air Handling Units (VAV AHU) that ensures individual zone indoor air quality (IAQ), and minimizes system energy consumption.

More information

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks Improving Performance with a Building Tune-Up Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks How much is too much? Most buildings can cut total energy use by 5-30% while

More information

Building Automation System (BAS) Design Criteria

Building Automation System (BAS) Design Criteria 25 0520 Building Automation System (BAS) Design Criteria 1. Design Statement a. During the various design phases of this project, the Engineer will develop options and strategies for selection of the appropriate

More information

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Continuous Commissioning: A Valuable Partner to Retrofit Projects Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner ESL-TR-99/12-09 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Commerce (TAMU-Commerce) Commerce, Texas Submitted to Texas

More information

An HVAC Audit of the Canberra Institute of Technology

An HVAC Audit of the Canberra Institute of Technology An HVAC Audit of the Canberra Institute of Technology 30 th November 2016 Amnon Holland amnon.holland@esbsconsult.com.au www.esbsconsult.com.au Agenda Overview CIT and various other sites The sites Type

More information

Selected Laboratory Energy Efficiency Measures

Selected Laboratory Energy Efficiency Measures Selected Laboratory Energy Efficiency Measures These are some of the most effective energy efficiency measures for laboratories 1. Reduce (optimize) air changes per hour in lab space 2. Design to the proper

More information

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012) Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Digital Precise Air Control - DPAC

Digital Precise Air Control - DPAC Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx Case Study: Furman University Charles H. Townes Center for Science Michael K. Mantai, PE, CCP President System WorCx AIA Quality Assurance Learning Objectives 1. Case study example of Chilled Beam technology

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

IAQ: Re-tuning Commercial Buildings

IAQ: Re-tuning Commercial Buildings IAQ: Re-tuning Commercial Buildings A low-cost path to improved air quality and energy efficiency. B y S c o t t G o r d o n, C M All images courtesy of Johnson Controls Service. 10 RSES Journal FEBRUARY

More information

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01915 - FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION PART 1 GENERAL 1.1 Section includes:

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

American University Design Standards

American University Design Standards 25 95 00 CONTROL SEQUENCES FOR HVAC PART 1. GENERAL 1.01 SECTION INCLUDES A. Description of Work B. Control Sequences General Requirements C. System Specific Control Sequences 1.02 RELATED DOCUMENTS A.

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Continuous Commissioning Report

Continuous Commissioning Report Continuous Commissioning Report for the Bush Academic Facility (Bldg. 1607) Submitted to: Office of Energy Management Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION BES-TECH TECHNOLOGY & SYSTEM INTEGRATION BES-TECH TECHNOLOGY & SYSTEM INTEGRATION DIGI-ACC Digi-ACC is a control kit for air cooled chiller systems, optimizing both chiller and pumps thereby reducing consumption

More information

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT SEQUENCE OF OPERATION GUIDELINE AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT Document: VAV-HTG rev1 Revision: 1.0 Rev. Date: July 22, 2011 NOTES: 1. THIS SEQUENCE

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

Christopher Kelly Technical Report Three

Christopher Kelly Technical Report Three Christopher Kelly Technical Report Three Mechanical Systems and Existing Conditions Evaluation SALK HALL ADDITION The University of Pittsburgh, Pittsburgh Christopher Kelly, Mechanical Option Professor

More information

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates Prescriptions for Critical Healthcare Cx John D. Villani, P.E. Associate Grumman/Butkus Associates AIA Quality Assurance Learning Objectives 1. Medical Industry Changes and how they impact Design, Construction,

More information

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 Carrier Software Systems Carrier Corporation Syracuse, New York rev October 10, 2013 Copyright 2013 Carrier Corporation, All Rights Reserved Page

More information

Technical Report Three

Technical Report Three Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET Design Standard Detailed specifications follow. PART 1 CHW AND HHW SUPPLY TEMPERATURE RESET 1.1 The Utilities & Energy Services Department (UES) at Texas A&M University is actively identifying and implementing

More information

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information

Analyzing Air Handling Unit Efficiency. Michael Rosenberg, PE, CEM

Analyzing Air Handling Unit Efficiency. Michael Rosenberg, PE, CEM Analyzing Air Handling Unit Efficiency Michael Rosenberg, PE, CEM Analyzing Air Handling Unit Efficiency Introduction...1 Air Handlers and Energy...2 Air Handler Case Study...7 Optimizing Economization

More information

Implementation of the Laboratory Air Handling Unit Systems (LAHU)

Implementation of the Laboratory Air Handling Unit Systems (LAHU) University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Architectural Engineering -- Faculty Publications Architectural Engineering 2003 Implementation of the Laboratory Air Handling

More information

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of

More information

Harrington Tower Building

Harrington Tower Building Continuous Commissioning Report For the Harrington Tower Building Building #435 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Virginia Tech Standards for Building Automation System

Virginia Tech Standards for Building Automation System March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia

More information

BAS Point Trend Data Guidance

BAS Point Trend Data Guidance BAS Point Trend Data Guidance Rev. 3, January 2018 Introduction The Building Automation System (BAS also, referred to as a DDC system, or a Direct Digital Control system) at your building has been set-up

More information

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. Overview Measurement & Verification (M&V) Plan for New

More information

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare

More information

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled

More information

SECTION INTEGRATED AUTOMATION COMMISSIONING

SECTION INTEGRATED AUTOMATION COMMISSIONING SECTION 25 08 00 INTEGRATED AUTOMATION COMMISSIONING PART 1. GENERAL 1.01 SECTION INCLUDES: A. BAS and equipment testing and start-up B. Validation of proper and thorough installation of BAS and equipment

More information

HVAC Trajectories toward Zero

HVAC Trajectories toward Zero HVAC Trajectories toward Zero Jon McHugh, McHugh Energy at WCEC Affiliate Forum Western Cooling Efficiency Center Davis, CA May 7, 2013 jon@mchughenergy.com McHugh Energy Consultants CPUC Big Bold EE Strategies

More information

Continuous Commissioning of Commercial Kitchen and Dining Facilities Case Study

Continuous Commissioning of Commercial Kitchen and Dining Facilities Case Study The 7 th International onference for Enhanced Building Operations (IEBO 2007) ontinuous ommissioning of ommercial Kitchen and Dining Facilities ase Study Hui Li, hen Xu, Qiang hen and Song Deng Energy

More information

To: Steve Ardolf, MSU Mankato From: Chris Plum, CEE. CC: Tim Ellingson, CEE. Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014.

To: Steve Ardolf, MSU Mankato From: Chris Plum, CEE. CC: Tim Ellingson, CEE. Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014. To: Steve Ardolf, MSU Mankato From: Chris Plum, CEE CC: Tim Ellingson, CEE Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014 Re: MSU Mankato Verification State PBEEEP Executive Summary

More information

ASHRAE Guideline 36 Advanced HVAC Control Sequences

ASHRAE Guideline 36 Advanced HVAC Control Sequences ASHRAE Guideline 36 Advanced HVAC Control Sequences Rick Stehmeyer - Senior Engineer Matt Napolitan, P.E., CCP, CPMP, LEED AP BD+C - Principal Image Source: http://worldatdistance.com/2013/10/07/the-complete-noobs-guide-to-making-a-website//

More information

Case Study: New York Marriott Marquis BAS & Commissioning. Bill Michell, RPA, FMA, CEOE Director of Engineering

Case Study: New York Marriott Marquis BAS & Commissioning. Bill Michell, RPA, FMA, CEOE Director of Engineering Case Study: New York Marriott Marquis BAS & Commissioning Bill Michell, RPA, FMA, CEOE Director of Engineering Retro-Commissioning ( 05-06) NYSERDA co-funded study Re-Commissioning of all major mechanical,

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

Manual Supplement. Model Number: 8680-N2. Communications Protocol. Contents of this manual supplement include:

Manual Supplement. Model Number: 8680-N2. Communications Protocol. Contents of this manual supplement include: Model Number: 8680-N2 Product/System Title: Room Pressure AOC Controller with N2 Communications Protocol Contents of this manual supplement include: 1) Sequence of Operation 2) Variable map 3) Description

More information

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3 Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

Welsh Commissioning Group, Inc.

Welsh Commissioning Group, Inc. Ongoing Commissioning with Building Automation System and Data Loggers Bryan W. Welsh, P.E. President Welsh Commissioning Group, Inc. AIA Quality Assurance Learning Objectives 1. General understanding

More information

Feature Summary. I. System

Feature Summary. I. System I. System A. Supports up to 60 VAV HVAC Units 1. Each HVAC Unit Can Support up to 59 VAV Boxes 2. Constant Volume Units Can Be Integrated With VAV Units 3. System Can Support Over 3000 Controllers B. Fill-in

More information

4-Pipe VAV vs. Active Chilled Beams for Labs

4-Pipe VAV vs. Active Chilled Beams for Labs Steven T. Taylor 4-Pipe VAV vs. Active Chilled Beams for Labs BY STEVEN T. TAYLOR, P.E., FELLOW ASHRAE Variable air volume (VAV) laboratory HVAC systems, including VAV fume hoods, are now standard practice

More information

Physical Plant Complex

Physical Plant Complex Continuous Commissioning Report For the Physical Plant Complex Building #1156 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.

More information

Technical Assignment 3

Technical Assignment 3 0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical

More information

2009 IECC Commercial Mechanical Requirements

2009 IECC Commercial Mechanical Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(

More information

Energy Consumption (MWH) 273. i i i i. Welcome to the Demo of Gladius Connected Buildings

Energy Consumption (MWH) 273. i i i i. Welcome to the Demo of Gladius Connected Buildings 15 Faulty 966 Working < Summary Welcome to the Demo of Gladius Connected Gladius Connected is an IoT platform, which acts as a smart layer to your existing infrastructure. It provides a responsive building

More information

Sequence of Operations (excerpt)

Sequence of Operations (excerpt) Sequence of Operations (excerpt) Chilled Water System Consists of one (1) 600 cooling ton Trane CVHE 3 stage centrifugal chiller, with associated chilled water pumps, condenser water pumps and one (1)

More information

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY Date: June 14, 2017 Invitation No: IB-096-17 Title: Student Activity Center Renovation and Addition, Bid Package V Addendum No. Three (3) The following shall

More information

Florida Department of Transportation

Florida Department of Transportation Page 1 of 7 RICK SCOTT GOVERNOR Florida Department of Transportation 1109 S. Marion Avenue Lake City, Florida 32025 ANANTH PRASAD SECRETARY September 27, 2011 To: Proposal Holders Addendum No: 1, E2Q23,

More information

Energy Recovery with Cooling and Heating Model ERCH

Energy Recovery with Cooling and Heating Model ERCH Energy Recovery with Cooling and Heating Model ERCH 100% Outdoor Air System Dedicated Outdoor Air System 1,000-10,000 cfm 1.75 in. wg External Static Pressure Indirect Gas, Hot Water, Electric Heating,

More information

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating

More information

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS PART 1 - GENERAL 1.01 General: A. Laboratory ventilation system will ensure the health and safety of laboratory occupants. B. Room pressurization control will utilize airflow tracking to vary the volume

More information

Building Automation System

Building Automation System University of New Hampshire University of New Hampshire Scholars' Repository Division 25 Integrated Automation Chapter 5 Technical Construction and Renovation Standards 8-1-2014 250000 - Building Automation

More information

Existing Mechanical System Operation

Existing Mechanical System Operation majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable

More information

CxA to Answer this Section

CxA to Answer this Section EXHIBIT 01 91 13-3, SAMPLE Construction checklist items are to be completed as part of initial checkout and subsequent startup, preparatory to Functional testing. This checklist does not take the place

More information

Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2

Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2 Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2 john.woollett@swegon.se, jonas.akesson@swegon.se SUMMARY The main focus of the paper will be on active beam technology regarding

More information

SEQUENCE OF OPERATIONS

SEQUENCE OF OPERATIONS SEQUENCE OF OPERATIONS DDC CONTROLLER: Controller with integral LCD readout for changing set points and monitoring unit operation. Provided with required sensors and programming. Factory programmed, mounted,

More information

Energy Management and Controls

Energy Management and Controls As with the Chapter Review Tests and the Final Exam, the tests your understanding of the materials underlying the learning objectives. After you ve reviewed your answers to the Chapter Review Tests, try

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

High Efficiency Dehumidification System (HEDS)

High Efficiency Dehumidification System (HEDS) Advanced HVAC Technologies High Efficiency Dehumidification System (HEDS) Scot Duncan, P.E., Jim Meacham, P.E. Conservant Systems, Inc. August 16, 2017 Tampa Convention Center Tampa, Florida Why Was HEDS

More information

Contact Information. Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone

Contact Information. Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone Contact Information Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone 509 335 9300 steve_potratz@wsu.edu WSU Utilities WSU primary systems are all based on district type

More information

VCM-X Controller Technical Guide

VCM-X Controller Technical Guide 2 2 www.orioncontrols.com VCM-X Controller Technical Guide VCM-X Controller Code: SS1026 & Y200920 Version 2.0 and up; VCM-X Modular Controller: Tulsa - SS1030; Coil - SS1034 VCM-X WSHP Controller: Tulsa

More information

Continuous Commissioning SM Report. For. Wing 86, Chemistry Complex (Building # 376) Hui Chen Song Deng Homer L. Bruner, Jr., CEM.

Continuous Commissioning SM Report. For. Wing 86, Chemistry Complex (Building # 376) Hui Chen Song Deng Homer L. Bruner, Jr., CEM. Continuous Commissioning SM Report For Wing 86, Chemistry Complex (Building # 376) By Hui Chen Song Deng Homer L. Bruner, Jr., CEM Contact: Song Deng (979-862-1234) Homer L. Bruner, Jr. (979-862-7185)

More information

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products Document 475595 Microprocessor Controller for Tempered Air Products Reference Guide for the Microprocessor Controller Please read and save these instructions. Read carefully before attempting to operate

More information

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon OSU Alumni Center Phase I Implementation Review Prepared for Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon 97331 October 31, 2011 Job No. 02.11.00113 Introduction: Glumac was engaged by

More information

Continuous Commissioning Report

Continuous Commissioning Report ontinuous ommissioning Report for the Price Hobgood Building (Bldg. 1507) Submitted to: Office of Energy Management Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Strategies for Building Energy Efficiency

Strategies for Building Energy Efficiency Strategies for Building Energy Efficiency Ben Sliwinski Technical Director SEDAC University of Illinois at Urbana-Champaign How Buildings Use Energy Building Envelope (Walls, Roof, Windows, Floors) Lighting

More information

Tech Report III. Technology and Engineering Development (TED) Building. Thomas Jefferson National Accelerator Facility.

Tech Report III. Technology and Engineering Development (TED) Building. Thomas Jefferson National Accelerator Facility. Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA Tech Report III Mechanical Systems Existing Conditions Report 11/29/2010 Architectural

More information

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department

More information

EarthWise System Seminar

EarthWise System Seminar EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States

More information

1 - This title will copy onto other forms Date

1 - This title will copy onto other forms Date 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM Project Title: 1 - This title will copy onto other forms Date 1/1/2015

More information

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed

More information

Table of Contents. W2W Open

Table of Contents. W2W Open W2W Open Points and Properties CARRIER CORPORATION 2013 A member of the United Technologies Corporation family Stock symbol UTX Catalog No. 11-808-457-01 3/27/2013 Table of Contents Introduction... 1

More information

DACC Health Sciences Building Air Handler Assessment/Study

DACC Health Sciences Building Air Handler Assessment/Study DACC Health Sciences Building Air Handler Assessment/Study NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 June 14, 2016 Final Submittal 1065 S. Main St., Bldg. D, Ste.

More information