1 Introductions I 595 Express Corridor Improvements Project Davie-Cooper City Chamber of Commerce Wednesday, June 23, 2010 Project Limits Project Components To West Palm Beach Sunrise Boulevard To Naples Broward Boulevard Davie Boulevard To Miami SW 136 Avenue Flamingo Road Griffin Road Hiatus Road Nob Hill Road Pin ne Island Road Univ versity Drive Project Limits Da avie Road Griffin Road I 595 from I 75/Sawgrass Expressway Interchange to East of the I 95 Interchange FLL Airport To Miami Port Everglades Reversible Express Lanes DirectConnect to Florida s Turnpike Open Road Tolling S.R. 84 Continuous Connection Turnpike Interchange Broward County Greenway Ramp Improvements Auxiliary Lanes Ramp Braids Bypass Bridges Sound Barrier Walls Transit Accommodations Express Bus Service 1

2 Project Video Please visit our website to view the Project Video. P3 Benefits Accelerates the schedule Provides capacity improvements 15 years sooner than originally planned Provides finance mechanism for funding shortfall No Payments until project is substantially complete Potential to deliver long term cost savings and higher levels of service Transfer of appropriate risk items to private partner Encourages Industry Innovation CONSTRUCTION YEARS PROJECTS 1 THRU 10A Original FDOT PLAN Projects 1 thru 6 & 8 UNFUNDED Projects 7, 9, 10, & 10A PROJECTS 1 THRU 10A PUBLIC PRIVATE PARTNERSHIP (P3) Projects 1 thru 10A I 595 Team Organization Five Construction Segments CONSTRUCTION SEGMENT A From Begin Project to Flamingo Road CONSTRUCTION SEGMENT B From Flamingo Road To Nob Hill Road CONSTRUCTION SEGMENT C From Nob Hill Road To East of Davie Road Concession Agreement Design Build Contractor DB Contract Concessionaire Financing Agreements Lenders CONSTRUCTION SEGMENT E Florida s Turnpike From Griffin Road To Peters Road Design Subcontractor CEI O&M Technical and Legal Advice Technical Advisor Counsel 8B DAVIE RD 8A CONSTRUCTION SEGMENT D From East of Davie Road To End Project 2

3 Construction Schedule Sound Barrier #3 Between Hiatus Road and Nob Hill Road Greenway West Between 136 th Avenue and University Drive Greenway West Between 136 th Avenue and University Drive Greenway West Construction began Summer

4 Greenway West Between 136 th Avenue and University Drive Greenway East Between Sewell Lock and Red Road Pedestrian Bridges Greenway East Construction began Spring 2010 Construction crews began major roadway construction near Pine Island Road. Test Piles 4

5 Temporary Drainage Temporary Asphalt and Maintenance Of Traffic (MOT) Opportunities Microtunneling Pit 5

6 Contractor & Supplier Breakfast Forum Work to be Bid Disadvantage Business Enterprise Overall DBE Goal 8.1% Committed to the DBE Program DBE Outreach Program Administrative CAP Engineering Peckar and Abramson Keith & Associates Aerotek Design AECOM Beiswenger, Hoch & Assoc., Inc. C3TS Curtis + Rogers Design Studio Eptisa F.R. Aleman & Associates, Inc. Greenhorne & O'Mara, Inc. Kimley-Horn and Associates MACTEC Engineering MPS3D R.J. Behar & Company, Inc. CEI HNTB Corporation Calvin Giordano O&M Jorgensen Contract Services Florida Bushog Procopio & Associates Southeast Guardrail Superior Towing Extended Project Team I 595 Express, LLC Subcontractors Construction Dragados USA Dragados-Baker Bergeron Land Development Alpha Corporation Anzac AZTEC Engineering Beyel Brothers Bob's Barricades Bolton Perez & Associates Botas Engineering Inc. Bradshaw Construction Brisk Construction Brothers Concrete C&R Painting CECOS Chin Diesel Complete Highway Duratek Ebsary ECM El Champion Paint Epperson Cranes, Inc. Gene's Striping Guaranteed Fence HBC Engineering Construction Continued JE Hill Johnson Davis Kailas Contractors Kisinger Campo & Associates Manaty Maytin Engineering Nodarse and Associates Nova Engineering and Environmental Performance Turf Pressure Cleaning Resources Tech Shoreline Foundation Signal Group Sorrel Development South Florida Pile Speedy Cutting T&R Painting Tate Transport Test Lab Transcore US Grounds Weekly Asphalt Wingerter Laboratory Currently over 100 Firms employing over 1170 staff 6

7 Opportunities Contact Information Contractor & Suppliers You must pre-register register to receive bid packages Download pre-registration form and submit Contact companies under contract for sub-contracting opportunities Individual Employment All jobs will be posted with WorkForce One Contact companies under contract for employment opportunities I 595 Express Project Office StateRoad 84 Davie, Florida com THANK YOU! 7

I-4 Ultimate Project Update and QA/QC Process on a P3. FTBA Annual Construction Conference February 18, 2015

I-4 Ultimate Project Update and QA/QC Process on a P3. FTBA Annual Construction Conference February 18, 2015 I-4 Ultimate Project Update and QA/QC Process on a P3 FTBA Annual Conference February 18, 2015 Project Overview 21 miles in Orange and Seminole counties From west of Kirkman Road to east of SR 434 Scope

More information

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road

SOLICITATION J P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road SOLICITATION J2112395P1 Construction Engineering Services for Wiles Road Riverside Drive to Rock Island Road Qualifications and Experience of Key Personnel Dan Tintner, P.E., Project Manager/Senior Project

More information

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals ABOUT US Creative Engineering Group Inc, (Creative) is a Construction Engineering and Inspection (CEI) firm established in 2006 by two Principals Rick Estripeaut & Sri Mavanur. In the last decade Creative

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018 I-4 Beyond the Ultimate Florida Transportation Builders Association February 9, 2018 FDOT: Improving Mobility & Safety in Central Florida FDOT is Designing and building a better I-4 through Central Florida

More information

Construction Engineering & Inspection

Construction Engineering & Inspection Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over

More information

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT) 1 Firm Overview 2 We are a well established multi disciplinary firm that has

More information

Broward County Complete Stre ts

Broward County Complete Stre ts Broward County Complete Strets Greenways Integration Study PO# SC 033 UP101713000000000001 Prepared by Kimley-Horn and Urban Health Solutions for Broward County Planning and Redevelopment Division Funded

More information

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA FINANCIAL PROJECT ID NUMBER 411189-2-22-01 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 4 Prepared

More information

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation. We will provide you information on the overall project and

More information

TxDOT Experience with Long-Term Private Maintenance Agreements

TxDOT Experience with Long-Term Private Maintenance Agreements TxDOT Experience with Long-Term Private Maintenance Agreements June 2, 2015 Beau B. Buchanan, P.E. Project Manager TxDOT South Central Strategic Projects Office San Antonio, Texas Maintenance Agreements

More information

Design Services for Wiles Road Broward County Project #104026

Design Services for Wiles Road Broward County Project #104026 Design Services for Wiles Road Broward County Project #104026 ORGANIZATIONAL CHART THE CGA TEAM Firm Services Key Staff CBE Calvin, Giordano & Associates, Inc. HBC Engineering Company Florida Engineering

More information

AGENDA ITEM 3A Red Hills Coastal Parkway

AGENDA ITEM 3A Red Hills Coastal Parkway March 26, 2007 AGENDA ITEM 3A Red Hills Coastal Parkway REQUESTED BY: CRTPA Members TYPE OF ITEM: Discussion STATEMENT OF ISSUE At the January 22, 2006 Capital Region Transportation Planning Agency (CRTPA)

More information

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Program Goals, Activities and Accomplishments I. Beach Front Multi-modal Transportation, Aesthetic and Parking Improvements III. Connector

More information

PROJECT SHOWING MINUTES

PROJECT SHOWING MINUTES PROJECT SHOWING MINUTES North Lynn Street Esplanade Improvements Project No. 0029-000-859, C501, B605 UPC No. 109813 November 1, 2017 10:00 a.m. 1911 North Ft. Myer Drive, LL-10, Arlington, VA Overview

More information

Poinciana Parkway Extension Project Development & Environment Study

Poinciana Parkway Extension Project Development & Environment Study Poinciana Parkway Extension Project Development & Environment Study Nicole Gough, Dewberry Mary Brooks, Quest Corporation of America Clif Tate, Kimley-Horn and Associates February 19, 2019 Title VI Compliance

More information

Capital Projects in and near Odenton Town Center

Capital Projects in and near Odenton Town Center Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately

More information

All inquiries or complaints will be handled according to CFX procedure and in a prompt and courteous manner.

All inquiries or complaints will be handled according to CFX procedure and in a prompt and courteous manner. We d like to thank you for attending tonight s community open house on Wekiva Parkway Section 2. The focus of tonight s meeting is the Central Florida Expressway Authority s second part of the parkway

More information

2017 Canadian Consulting Engineering Awards

2017 Canadian Consulting Engineering Awards 2017 Canadian Consulting Engineering Awards Northeast Anthony Henday Drive DBFO Edmonton, Alberta Four years of detours, traffic snarls, varying speed limits, and stop-and-start driving has come to an

More information

Creating Complete Roadway Corridors:

Creating Complete Roadway Corridors: Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee

More information

SR 916/NW/NE 135 Street Public Hearing

SR 916/NW/NE 135 Street Public Hearing Florida Department of TRANSPORTATION SR 916/NW/NE 135 Street Public Hearing Resurfacing, Restoration, and Rehabilitation (RRR) Project From NW 6 Avenue to west of SR 5/Biscayne Boulevard FM #429346-1-52-01

More information

Bringing the Community Together. TOWN SQUARE UPDATE November 1, 2017

Bringing the Community Together. TOWN SQUARE UPDATE November 1, 2017 Bringing the Community Together TOWN SQUARE UPDATE November 1, 2017 TOWN SQUARE COMMUNITY VISION The City currently owns 16.5 acres in downtown Boynton Beach which contains several historic structures

More information

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016

City of Fort Lauderdale UPTOWN URBAN VILLAGE. Public Workshop December 7, 2016 Public Workshop December 7, 2016 Workshop Agenda Introductions Project Presentation o o o History Project Scope/Timeline Character of Study Area o o o o Land Use Public Realm/Pedestrian Mobility Multimodal

More information

Three-Question Matrix and Reference Checks RFP Number: R P1 RFP Name: Design Services for Wiles Road from University Drive to Riverside Drive

Three-Question Matrix and Reference Checks RFP Number: R P1 RFP Name: Design Services for Wiles Road from University Drive to Riverside Drive Three-Question Matrix and Reference Checks RFP Number: RFP Name: Design Services for Wiles Road from University Drive to Riverside Drive Ranking (Not Alphabetical) 1 2 3 4 5 6 Firm Name Kimley-Horn and

More information

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION AASHTO SUBCOMMITTEE ON DESIGN June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION CENTRAL FLORIDA INTERSTATE 4 FACTS Trucks and Others 12% Tourist

More information

FDOT D4 Complete Streets

FDOT D4 Complete Streets FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,

More information

S.R.7/U.S.441 COLLABORATIVE THE COLLEGE OF CORRIDOR KNOWLEDGE

S.R.7/U.S.441 COLLABORATIVE THE COLLEGE OF CORRIDOR KNOWLEDGE S.R.7/U.S.441 COLLABORATIVE THE COLLEGE OF CORRIDOR KNOWLEDGE S.R.7 Corridor : A Sense of Place? ANYWHERE USA SR 7: Civilizing the Corridor Bad rules = Bad development! The SR 7 Collaborative A model for

More information

COLLIER BOULEVARD (CR 951) CORRIDOR

COLLIER BOULEVARD (CR 951) CORRIDOR Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts

More information

SR 836 Southwest Extension

SR 836 Southwest Extension SR 836 Southwest Extension Miami-Dade County, Florida August 8, 2018 MDX WORK PROGRAM NO.: 83618 Project Need Population growth and traffic in southwest Miami-Dade has significantly increased without the

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

Reconnecting New Haven: Downtown Crossing

Reconnecting New Haven: Downtown Crossing Reconnecting New Haven: Downtown Crossing Phase 2 Update Introduction to Phase 3 November 16, 2017 City of New Haven, Connecticut Toni N. Harp, Mayor Reconnecting New Haven Introduction Project Overview

More information

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement.

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement. Welcome South Seminole Heights Civic Association, Inc. October 17, 2018 Tampa Interstate Study Supplemental Environmental Impact Statement 1 Stephen Benson Opening FDOT District Seven 2 3 Our solutions

More information

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October HARBOR BRIDGE Randall C. Grones, PE - SPD US 181 Harbor Bridge October October 13, 13, 2015 2015 Project Scope Develop, design, construct and maintain a total project length of 6.44 miles. Base scope New

More information

Transit / Housing Oriented Redevelopment

Transit / Housing Oriented Redevelopment Broward County Urban Planning and Redevelopment Department Kick-Off Meeting October 24, 2007 Transit / Housing Oriented Redevelopment 1 Future Land Use 2 Broward County Charter Voters approved in 1974.

More information

A Connected Region for Our Future. Tampa Bay Regional Planning Council

A Connected Region for Our Future. Tampa Bay Regional Planning Council A Connected Region for Our Future Tampa Bay Regional Planning Council TBARTA Vision A world class transportation network for the Tampa Bay region that will connect people and places, move goods and services,

More information

FDOT/FTBA Construction Conference Work Plan

FDOT/FTBA Construction Conference Work Plan FDOT/FTBA Construction Conference 19 2019 2023 Work Plan Ben Dreiling, P.E., Director of Construction Central Florida Expressway Authority January 18, 2019 Major Projects Map FY 2019-2023 Work Plan 2 FY

More information

TRANSPORTATION COMMITTEE

TRANSPORTATION COMMITTEE TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island

More information

DESIGN SCENE SUBJECT INDEX

DESIGN SCENE SUBJECT INDEX DESIGN SCENE SUBJECT INDEX CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: October 19, 2017 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction and Traffic Highlights

More information

NEIGHBORHOOD DESIGN ELEMENT

NEIGHBORHOOD DESIGN ELEMENT NEIGHBORHOOD DESIGN ELEMENT INTRODUCTION The following recommendations constitute an urban design oriented "neighborhood analysis" of Plantation. It is an optional Comprehensive Plan Element. The five

More information

MEMORANDUM AGENDA ITEM #IV.C

MEMORANDUM AGENDA ITEM #IV.C MEMORANDUM AGENDA ITEM #IV.C DATE: NOVEMBER 27, 2017 TO: FROM: COUNCIL MEMBERS STAFF SUBJECT: LOCAL GOVERNMENT COMPREHENSIVE PLAN PROPOSED AND ADOPTED AMENDMENT CONSENT AGENDA Pursuant to Section 163.3184,

More information

Old Brick Township DRI Recommendation Report

Old Brick Township DRI Recommendation Report Old Brick Township DRI Recommendation Report City of Palm Coast Presented to NEFRC Planning and Growth Management; Board of Directors July 8, 2010 Recommendation #1 Conversion table limited by transportation

More information

Capital Projects impacting Odenton Town Center

Capital Projects impacting Odenton Town Center Capital Projects impacting Odenton Town Center 1 2 E549700 W801600/ W801602 Anne Arundel County Department of Public Works Manor View Elementary School Transmission Main - MD 32 @ Meade Phase 2 $34,399,000

More information

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010 Action Items 1. Storm water* a. Retrofit drainage in remaining areas of Miami River starting with Pinehurst neighborhoods This project included drainage work that consist of French drains, solid piping,

More information

Highway & Bridge Capabilities

Highway & Bridge Capabilities Highway & Bridge Capabilities Part of a diversified family of solutions www.jmt.com An Employee Owned Company I-95/I-295/I-495 Interchange, Woodrow Wilson Memorial Bridge, Prince George s County, MD Our

More information

Awarded Small Works Projects

Awarded Small Works Projects Small Works Projects Kamins Construction TBD 4th Avenue West Sidewalk Project 12/6/2018 $47,056 Tube Art Group 1451 Wayfinding Signs 9/4/2018 $11,000 POP Electric Inc 1354 Repurposed Exterior Light for

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM Metropolitan Planning Organization [ X ] Transit [ ] Administration and Finance [ ] SUBJECT: PROJECT SELECTION PROCESS FOR TRANSPORTATION

More information

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222 PD&E STUDY SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # 435808-1-22-02 ETDM 14222 WELCOME TO THE KICK-OFF MEETING May 24, 2016 1 1 2 3 4 5 6 PLANNING PROJECT DEVELOPMENT AND ENVIRONMENT

More information

CURRICULUM VITAE REZA MARSHAL, MECE, PE, PTOE

CURRICULUM VITAE REZA MARSHAL, MECE, PE, PTOE CURRICULUM VITAE REZA MARSHAL, MECE, PE, PTOE SPECIALIZATION Traffic Engineering & Highway Design Traffic Signal Analysis & Design MUTCD/Design Standards Traffic Signal Warrant Investigation AASHTO/Design

More information

DRAFT Subject to Modifications TREASURE COAST REGIONAL PLANNING COUNCIL

DRAFT Subject to Modifications TREASURE COAST REGIONAL PLANNING COUNCIL DRAFT Subject to Modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 7C From: Date: Subject: Staff June 22, 2007 Council Meeting Local Government

More information

BANYAN BOULEVARD (325-365) SITE DEVELOPMENT PLANS LEGAL DESCRIPTION SECTION 33 TOWNSHIP 49 SOUTH, RANGE 25 EAST COLLIER COUNTY, FLORIDA PREPARED FOR: REDEVELOPMENT 990 1ST AVENUE SOUTH SUITE 202, FL 34102

More information

Proposed Staging Plan For:

Proposed Staging Plan For: 701 Waterford Way, Suite 450, Miami, FL 33126 Suffolk Page 1 Proposed Staging Plan For: St aging Plan Includes: 1.0 Construction Site 2.0 MOT Traffic Circulation Plan 2.1.P1 MOT Road Closures (Alhambra)

More information

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects Gessner Widening: T-1701 What: Widen the road from a six-lane divided boulevard to an eight-lane divided boulevard street section, increase turn lanes, update traffic signal system, improve drainage by

More information

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) Preliminary Design Report February 2015 Prepared For: City of Inver Grove Heights Dakota County Prepared By: Kimley-Horn and Associates,

More information

Palm Beach County (University Drive Removal) and Broward County (Transportation Element) Remedial Amendments

Palm Beach County (University Drive Removal) and Broward County (Transportation Element) Remedial Amendments SR 7/US 441 Transit-Supportive Land Use Planning and Urban Design Assistance (SR 7 Study) Focus TCRPC: Develop detailed analysis of land uses, development regulations, and community visioning all relative

More information

2040 Long Range Transportation Plan

2040 Long Range Transportation Plan 2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)

More information

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date HILLSBOROUGH COUNTY Greenways and Trails Plan Update Executive Summary Date PURPOSE AND PROJECT OVERVIEW The Hillsborough County Greenways Master Plan (1995) and the City of Tampa s Greenways and Trails

More information

S T V. P E R F O R M A N C E M A T T E R S. highways + bridges

S T V. P E R F O R M A N C E M A T T E R S. highways + bridges S T V. P E R F O R M A N C E M A T T E R S. highways + bridges STV s bridge and highway assignments traverse major metropolitan areas, cities and towns as well as rural corridors. Reflecting the tenets

More information

Planning & Zoning Board Meeting. DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version

Planning & Zoning Board Meeting. DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version Planning & Zoning Board Meeting DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version May 10, 2018 Overview Overview of Agency Comments Overview of proposed modifications to the Draft

More information

DRAFT Subject to modifications

DRAFT Subject to modifications TREASURE COAST REGIONAL PLANNING COUNCIL DRAFT M E M O R A N D U M To: Council Members AGENDA ITEM 7C From: Date: Subject: Staff September 17, 2010 Council Meeting Commuter Rail Update Resolution of Support

More information

Lone Oak Road/ 70 th Street West. Efficient, Effective, Responsive. Preliminary Design Services (CP 26-54)

Lone Oak Road/ 70 th Street West. Efficient, Effective, Responsive. Preliminary Design Services (CP 26-54) (CP 26-54) Dakota County Board of Commissioners September 12, 2017 Purpose of Request Award Design Contract to Kimley-Horn and Associates Approve Joint Powers Agreements with the Cities of Eagan and Inver

More information

We provide exceptional solutions to help our clients achieve success.

We provide exceptional solutions to help our clients achieve success. We provide exceptional solutions to help our clients achieve success. We began as a small, two-person surveying firm called M.E. Berry & Associates in Hollywood, Florida. Known today as Calvin, Giordano

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT TRANSPORTATION ELEMENT GOAL I: To create and maintain a safe, efficient and aesthetic transportation system that encourages multi-modal transportation and promotes the mobility strategies of the Ocala

More information

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples. Gordon River Project Location Naples Beach Golf Club East Naples Naples Naples Bay Evergreen Golf and Country Club and Gordon River Greenway Connector Bridge Gordon River Greenway CONNECTOR BRIDGE AND

More information

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006 Project Goal Town of Halifax Revitalization Project RRRC Living Towns Planning Workshp July 12, 2006 Town of Halifax Halifax County *** Revitalization Project Goal*** To create Economic Opportunity and

More information

Wiles Road from University Drive to Riverside Drive

Wiles Road from University Drive to Riverside Drive Wiles Road from University Drive to Riverside Drive Presented to: Broward County WSP Parsons Brinckerhoff is now Presented by: WSP USA Inc. Our Team.. Introduction / Project Team Cecilia Villoria, PE Project

More information

The Ambassador Bridge/ Gateway Project

The Ambassador Bridge/ Gateway Project The Ambassador Bridge/ Gateway Project Connecting Neighbors & Driving the Economy 2008 Ohio Conference on Freight Given by the Toledo Metropolitan Area Council of Governments, National Association of Regional

More information

New Stanton Project Update July 3, 2012

New Stanton Project Update July 3, 2012 New Stanton Project Update July 3, 2012 The Needs BACKGROUND INFO I-70 Geometric Concerns Substandard Horizontal & Vertical Clearance at Center Ave. Bridge (The Center Avenue Bridge is Replaced in all

More information

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item TO: THRU: FROM: RE: Mayor Leon Skip Beeler and Members of the City Commission Chuck Billias, City Manager Anthony

More information

Strategic Growth Area #1 Northampton Boulevard Corridor Area

Strategic Growth Area #1 Northampton Boulevard Corridor Area Strategic Growth Area #1 Northampton Boulevard Corridor Area Description Strategic Growth Area #1 has established itself as a major employment center in Southside Hampton Roads. Opportunities exist to

More information

2017 Asphalt Contractors Association of Florida Pavement Awards

2017 Asphalt Contractors Association of Florida Pavement Awards 2017 Asphalt Contractors Association of Florida Pavement Awards Special Projects Any project of a special or unique nature requiring specialized equipment, techniques, materials, time restrictions, or

More information

SUNSET CORRIDOR LAND. The property is now available and ready for corporate utilization, development or investment.

SUNSET CORRIDOR LAND. The property is now available and ready for corporate utilization, development or investment. SUNSET CORRIDOR LAND The property is now available and ready for corporate utilization, development or investment. This 275-acre site is now available and ready to develop. Just off US 26, this west Sunset

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College

Welcome. Tina Fischer. East Tampa Area Community Working Group September 25, Collaborative Labs, St. Petersburg College Welcome East Tampa Area Community Working Group September 25, 2018 Tina Fischer Collaborative Labs, St. Petersburg College Tonight s Agenda Open House Area (6:00 - ongoing) Information about related studies,

More information

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES CITY OF LARKSPUR PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES PRESENTED BY Julian Skinner Larkspur Public Works Director DATE July 13, 2016 Bon Air Bridge

More information

I-95 Interchange & Ellis Road PD&E Study

I-95 Interchange & Ellis Road PD&E Study I-95 Interchange & Ellis Road PD&E Study Brevard County, Florida Presentation to the Space Coast TPO October 14, 2010 The Project Provide a New Interchange with I-95 Using the Ellis Road Corridor, Extend

More information

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING I-66 EASTBOUND WIDENING INSIDE THE BELTWAY From the Dulles Connector Road (Route 267) to Fairfax Drive (Route 237) PARDON OUR DUST MEETING Bill Cuttler, PE (VDOT District Construction Engineer, Northern

More information

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the first Public Meeting for the proposed interchange improvement

More information

MEMORANDUM AGENDA ITEM #6c

MEMORANDUM AGENDA ITEM #6c South Florida Regional Planning Council MEMORANDUM AGENDA ITEM #6c DATE: FEBRUARY 1, 2010 TO: FROM: SUBJECT: COUNCIL MEMBERS STAFF CITY OF PARKLAND PROPOSED COMPREHENSIVE PLAN AMENDMENT (ALTERNATIVE REVIEW)

More information

APPENDIX F: DETAIL DRAWINGS

APPENDIX F: DETAIL DRAWINGS APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900

More information

I-70/71 Innerbelt Project

I-70/71 Innerbelt Project I-70/71 Innerbelt Project Project Progress Meeting and Design Enhancement Update November 9, 2009 Ohio Department of Transportation MS Consultants MSI Design Overview of Presentation 1. Recap Recent Project

More information

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280 I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange THIRD

More information

Pine Island Road Corridor Master Plan

Pine Island Road Corridor Master Plan RECOMMENDED DEVELOPMENT PLAN Figure 9: Del Prado Village District Conceptual Framework The Conceptual Framework (Figure 8) for development of the Pine Island Corridor is to encourage mixed-use development

More information

Adopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes

Adopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes Adopted DEFP FY16 - Amendment Broward County Public Schools Adopted District Educational Facilities Plan Fiscal 015-16 to 2019-20 Amended to Incorporate Board Approved Changes Robert W. Runcie, Superintendent

More information

Community Meeting US 101/Peninsula Avenue Interchange Project JUNE 25, 2015

Community Meeting US 101/Peninsula Avenue Interchange Project JUNE 25, 2015 Community Meeting US 101/Peninsula Avenue Interchange Project JUNE 25, 2015 Project Team Gary Heap, Engineering Division Manager Tracy Scramaglia, Senior Engineer Ramesh Sathiamurthy, AECOM Peter DeStefano,

More information

PLANNING COMMISSION Work Session Meeting Agenda

PLANNING COMMISSION Work Session Meeting Agenda PLANNING COMMISSION Work Session Meeting Agenda 5200 85TH AVENUE NORTH BROOKLYN PARK MN 55443 PHONE (763) 424-8000 FAX (763) 493-8391 Wednesday, September 27, 2017-7:00 P.M. Brooklyn Township Room If due

More information

CHAPTER 2 TRANSPORTATION ELEMENT

CHAPTER 2 TRANSPORTATION ELEMENT SUMMARY CHAPTER 2 TRANSPORTATION ELEMENT A City cannot continue to grow and develop if its citizens cannot reasonably access community facilities and commercial areas. A system of adequate and functional

More information

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE 3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations

More information

Isabel Neighborhood Plan: Alternatives

Isabel Neighborhood Plan: Alternatives Isabel Neighborhood Plan: Alternatives Presented by: Lori Parks, Associate Planner February 2, 2015 Agenda 1. Background on BART to Livermore 2. Isabel Neighborhood Plan 3. Alternative Scenarios 4. General

More information

Regarding actual construction when development occurs, the following applicable guidelines are provided to address public safety issues:

Regarding actual construction when development occurs, the following applicable guidelines are provided to address public safety issues: MIAMI-DADE COUNTY DEPARTMENT OF PLANNING AND ZONING General Comments 1. COMMENT: A careful review of the application provided shows that there is likely to be an impact on the Miami-Dade Police Department

More information

List of Priority Projects

List of Priority Projects List of Priority Projects Fiscal Years 2017-18 to 2021-22 June 27, 2016 Draft Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area List of Priority Projects Fiscal Years

More information

5-E ====================================================== -==-= ====================================================

5-E ====================================================== -==-= ==================================================== PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS 5-E AGENDA ITEM SUMMARY ------------====================================================== Meeting Date: September 11, 2007 Department: [] [] Consent [ ]

More information

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background Summary of SMBC Asks 23/09/13 Background The Council has a developed a significant number of asks and propositions for consideration by HS2 Ltd and Government throughout further development of the HS2

More information

AASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance.

AASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance. AASHTO Board of Directors Executive Committee Standing Committees (Modal): Aviation Standing Committees (Functional Areas): Environment Special Committees: Intermodal and Economic Expansion Highways Finance

More information

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007 Sponsored by: The Ohio Department of Transportation and The City of Defiance Project

More information

The next meeting of the City Council is Tuesday, June 19 th, beginning with a Closed Session at 5:00 PM and with the regular agenda starting at 6:30

The next meeting of the City Council is Tuesday, June 19 th, beginning with a Closed Session at 5:00 PM and with the regular agenda starting at 6:30 Mayor and Councilmembers: This is the weekly report for the week ending June 15 th, 2012. 1. Meeting Notes The next meeting of the City Council is Tuesday, June 19 th, beginning with a Closed Session at

More information

Issues Requiring Future Study

Issues Requiring Future Study Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem